August 4, 2022
LETTER OF APPROVAL WITH MODIFICNTIONS
Carolina Lots and Land Inc.
Attention: E Autry Dawsey Jr., President
1520 Candlewyck Court
Kannapolis, North Carolina 28081
RE: Project Name: Trinity Church Road Mass Grading
Project ID: CABAR-2023-001
Acres Approved: 4.1
County: Cabarrus
City: Kannapolis Location: Stonewood View
River Basin: Yadkin -Pee -Dee
Stream Classification: Other
Submitted By: ACRO Development Services
Date Received by LQS: July 06, 2022
Plan Type: New
Dear Mr. Dawsey:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire
three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15.A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted
for this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.goviNCG01. Please direct questions about
the eNOI form to the Stormwater Proarain stag in the Raleigh central office. If the owner/operator of
this project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
North Carolina Department of Environmental Quality Division of Energy, Mineral and Resources
Mooresville Reginal Office 1610 East Center Avenue, Suite 301 Aooresville, North Carolina 28115
�cun� P A"'^ "� �./ 704.663.1699 -
DocuSign Envelope ID: 0052488A-8F83-4E31-8201-FE781AD8B89E
Letter of Approval with Modifications
Carolina Lots and Land Inc.
August 4, 2022
Page 2 of 3
2. The NCGO1 permit and the COC, once it is received.
Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with -the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it
is determined that the erosion and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973 worth Carolina General Statute 113A-51 through
66), this office may require revisions to the plan and implementation of the revisions to ensure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also
apply to this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if there
is any change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
DocuSigned�b'y,: n'A
42CFABFC568C459...
Zahid S. Khan, CPM, CPESC, CPSWQ
Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: ACRO Development Services
Attention: Marcus Magers
601 South Cedar Street, Suite 101
Charlotte, North Carolina 28202
North Carolina Department of Environmental Quality DiAsion of Energy, Mineral and Resources
Mooresville Reginal Office 1610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115
704.663.1699
DocuSign Envelope ID: 0052488A-8F83-4E31-8201-FE781AD8889E
Letter of Approval with Modifications
Carolina Lots and Land Inc.
August 4, 2022
Page 3 of 3
i1 ;i i 1 � ••'•
Project Name: Trinity Church Road Mass Grading
Project ID: CABAR-2023-001
County: Cabarrus
Reviewed by: Kenny S. Llywelyn
1. Check calculations for skinner dewatering time. Skimmers should be at least 3 days for
optimal function of the basin.
2. Remove +/- with the acreage references in the plan. The approval is for 4.1 acres make
references to 4.1 acres.
3. Ensure diversion channels are directing flows into the basin and not bypass the basin. Also,
Silt fence should not be used as a diversion channel. The silt fence will scour in these areas
and may have failures.