HomeMy WebLinkAboutNCC223141_MODIFICATION Supporting Doc LOT 4 (Ph 10)_20220906Engineering and
I+ • Environmental Services
LETTER OF APPROVAL
PROJECT NAME: Colvard Farms Ph. 10 Lot 4
SUBMITTED BY: Loyd Builders, LLC.
NEW SUBMITTAL (X) REVISED ()
8/24/2022
Tripp Loyd Builders, LLC.
Attn: Erin Hartmann
2501 Reliance Ave.
Apex, NC 27539
Dear Sir or Madam:
JOB NUMBER: 6521-14
8/03/2022
ACRES: 0.82
This office has reviewed the subject Sedimentation and Erosion Control Permit
Application. We find the application to be acceptable and hereby issue this letter of
approval. If any stipulations or recommendations are applicable, a list is attached and is
incorporated as a part of this letter of approval. Pursuant to Section 3.8.5 of the Durham
City -County Unified Development Ordinance, plans for which no permit has been issued
shall expire one year from the approval date.
Please be advised that a copy of the approved plan must be on file at the job site, and a land
disturbing permit must be obtained and prominently displayed. Pursuant to G.S. 113A-61
(d) and Section 15.5.1 of the Durham City -County Unified Development Ordinance, you
are hereby notified that the Sedimentation and Erosion Control Office has the right to
inspect the site over the life of the project to insure compliance with the approved plan and
ordinance.
The Sedimentation and Erosion Control Program is performance oriented, requiring
protection of the natural resources and adjoining properties. If following the
commencement of this project it is determined that the sedimentation and erosion control
plan is inadequate to meet the requirements of the Durham City -County Unified
Development Ordinance, this office may require revisions in the plan and its
implementation to insure compliance with the Ordinance.
Pursuant to Section 12.10.6 of the Durham City -County Unified Development Ordinance,
prior to initiating land -disturbing activity, the person conducting such activity must notify
the sedimentation and erosion control office of the date that such activity will begin.
It should also be noted that approval of an erosion control plan does not in any way
indicate approval of, or authorization to begin installation of Stormwater
infrastructure without City/County approved Construction Drawings.
We look forward to working with you on this project.
Sincerely,
fi" tw�
Lauren Neaves
Stormwater Technician
CC: arkeith@bellsouth.net
mg/jm
Rev.08/10
APPLICATION REVIEW COMMENTS
Project Name: Colvard Farms Ph. 10 Lot 4 Job Number: 6521-14
Reviewed By: Lauren Neaves Approved (X)
1. Submit a Land Disturbing Plan review fee in the amount of $100.00.
2. Submit a Land Disturbing Permit fee in the amount of $275.00.
3. Contact the Durham City/County Planning Department and have them provide
a Zoning Compliance Check off and an approved site plan to this office.