HomeMy WebLinkAbout20141132 All Versions_EEP Mitigation Letter_20140924 111111 ,��1V A
rerkYrv`Imu�m!N4 mod{�r rtN lAn'r;GNYINAY�.�'Cd9tlIA9tFk
Sd � °^,� �17�(1
tudd / 1'i7m�ri
N oliI1 C' ro ina Departn'lronl of E" iviros it a d Uafir I Res tturc,.����,i
D'Hcct,( cfl'-1 l E
S e c re,i'.i4(�p�
September 23, 2014
Mr-. Richard W. Hancock, P.Fv,
Project Development and Environmental Analysis Unit
North.Carolina Department cif"'I'rarnsportation
1545 Mail Service Center
Raleigh,North Carolina 27699-1548
Dear Mr. Hancock:
Subject: I EP Mitigation Acceptance. Letter:
R-2501(;,US I from 1.2 Miles North of`SR 1606 (F=ox Road) to South of SIZ 1001 (Marston
Road`),Richmond County.
The purpose Of'tlji4 letter is to notify you that the Ecosystem l"nhancement Program (EFP) will provide the
compensatory riparian wetland mitigation fear the subject project. (lased oil the infarrtitstic]rt supplied by you can
September 22, 2014, the impacts are located in CU 03040201 of the Yadkin River basin in the Southern Piedmont(Sl')
l'co-Re€ ion, and are as f«llows:
_.. ... _ _...__ �........ ........ _.....-------- _._ _... .__._ _...._..- ..........._...
Yadkin Stream Wetlands Buffer(Sep. Ft)
03040201 �._...._-_... ___.._ .. .__..... _. ... _ __---- - _........ _.. .
SFr Cold C'caol Warm Riparian Non- C oastaI Itrrac 1 Ccanc 2
Riparian_. ._...Macrsla.._.
Impacts(i�eet/acres) 0 0 0 0,25 0 0 0 0
ornc of the stream impacts Inlay lac:proposed to be mitigated at ar 1 1 mitigation ratio. Sec,permit application for details.
This impact and associated mitigation need were under projected by the NCDOT in tlae 2014 impact data. EEP
will commit to implement sufficient compensatory riparian wetland mitigation credits to offset the impacts associated
with this project as determined by the regulatory agencies using the delivery timeline listed in Section 1=.3.c.1ii of the
N.C. Department of Environment and Natural Resources' 1✓cosystem Enhancement Prrrgraan In-I_ietr Fee lrrstrnnrent
dated July 28,2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no
longer be valid and a new tacit gation acceptance letter will be required from UP,
If you have any questions or need additional information, please contact Beth l larmon at 919-707-8420.
Sincerely,
Jarnes 3 Stanfill
FIT ,asset Management Supervisor
cc: Ms. Liz Bair, US ACE— Wilmington Regulatory Field Office
Mr. David Wainwright,NC,DWQ .Raleigh Office.
Ms. Linda f"itrpartrick,NCI:7OT PDEA
File:R-25010