Loading...
HomeMy WebLinkAboutNC0023876_Burlington_PCI_CoverLetter_20220830ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Robert C. Patterson, Jr. Water Resources Director PO Box 1358 Burlington, NC 27216-1358 NORTH CAROLINA Environmental Quality September 7, 2022 SUBJECT: Pretreatment Compliance Inspection (PCI) City of Burlington Main Program Permit (NPDES) #NC0023876 / South Burlington WWTP Secondary (NPDES) #NC0023868 / East Burlington WWTP Alamance County Dear Mr. Patterson: On 8/18/2022 a Pretreatment Compliance Inspection (PCI) was performed by Tricia Lowery of the Winston-Salem Regional Office. Kristi King was present for the inspection. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program, which includes reviewing the files, POTW plant performance, industry monitoring data, and adherence to the enforcement response plan (ERP). Background South Burlington WWTP (NC0023876) and East Burlington WWTP (NC0023868) are both a 12.0 MGD permitted facilities. The City of Burlington has 12 Significant Industrial Users (SIUs), 2 of which are categorical. Of the 12 SIUs, South Burlington has 7 SIUs discharging to their facility and East Burlington has 5 SIUs (2 categorical) discharging to their facility. POTW Interview There are no plant problems related to pretreatment issues. One SIU was SNC for zinc in the first 6- month period of 2021: Indulor. Notices of Violations were issued, in addition to a civil penalty for zinc. The facility was back in compliance for 2nd 6-month period. Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted 3/17/2020 and is still awaiting approval. The next HWA due will be determined once current submittal is approved. The IWS renewal was submitted 7/1/2021 was approved on 8/10/2022. The next IWS is due 8/9/2027. The Sewer Use Ordinance (SUO) was submitted on 12/5/2013. The last SUO approval date was 3/1/2013. Currently awaiting approval for updated SUO submitted on 12/5/2013. The Enforcement Response Plan (ERP) was submitted on 11/12/2019 and approved on 2/5/2020. GDE NORTH C OLI JA ' omm mr� ep..of o�.i North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105 336.776.9800 The Long -Term Monitoring Plan (LTMP) was submitted 11/18/2005 and approved on 1/27/2006. LTMP File Review The Long -Term Monitoring Plan (LTMP) is being conducted at the proper locations and frequencies (2/year). Industrial User Permit (IUP) File Review A review of the file for Engineered Controls (#0019) revealed that the monitoring data was well organized and compliant. A review of the file for Carolina Hosiery Mill (#0055) revealed that the monitoring data was well organized and compliant. A review of the file for LabCorp (#0066) revealed that the monitoring data was well organized and compliant. The slug/spill control plan for Engineered Controls (#0019) was in good order. The slug/spill control plan for Carolina Hosiery Mill (#0055) was in good order. The slug/spill control plan for LabCorp (#0066) was in good order. Action Items No other action items were noted. The pretreatment program is considered satisfactory. Kristi King runs an adequate and comprehensive pretreatment program. If you have any questions, please contact Tricia Lowery at (336) 776-9691 or me at (336) 776-9800. Sincerely, DocuSigned by: 0D2D3CE3F 167456 Jennifer F. Graznak Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO Attachment: 1. NC DWR Pretreatment Compliance Inspection (PCI) Report D_E NORTH CAROLINA gaparMeM of Environment,/quay North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Raleigh, North Carolina 27105 336.776.9800