Loading...
HomeMy WebLinkAboutNC0024970_Permit Modification_20020221NPDES DOCUMENT SCANNING COVER SHEET NPDES Permit: NC0024970 McAlpine Creek WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Correspondence Owner Name Change Meeting Notes Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: February 21, 2002 Thins document is printed on reuuae paper - ignore a.ay content on the rest -ex -me aside State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Gregory J. Thorpe, Ph.D., Acting Director February 21, 2002 Mr. Douglas Bean CMUD Administrative Division 5100 Brookshire Boulevard Charlotte, North Carolina 28216 A7A NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: NPDES Permit Modification Permit NC0024970 CMUD McAlpine Creek WWTP Mecklenburg County Dear Mr. Gullet: On March 1, 2001, a final permit for the subject facility became effective. As per the settlement agreement signed by CMUD, South Carolina Department of Health and Environmental Control and the North Carolina Division of Water Quality on January 15, 2002, this permit must be modified to include a phosphorus limit. This major modification request was submitted to the Division on January 15, 2002 and acknowledged on February 1, 2002 and contains the terms of the agreement applicable to the phosphorus limit at McAlpine Creek (as well as the conditions relating to the three CMUD plants as a whole). The permit has been modified in accordance with the settlement agreement. Please find enclosed the revised permit pages. The revised pages should be inserted into your permit. The old pages may then be discarded. All other terms and conditions contained in the original permit remain unchanged and in full effect. This permit modification is issued under the requirements of North Carolina General Statutes 143- 215.1 and the Memorandum of Agreement between North Carolina and the U. S. Environmental Protection Agency. If any parts, measurement frequencies or sampling requirements contained in this permit modification are unacceptable to you, you have the right to an adjudicatory hearing upon written request within thirty (30) days following receipt of this letter. This request must be a written petition conforming to Chapter 150B of the North Carolina General Statutes, filed with the Office of Administrative Hearings (6714 Mail Service Center, Raleigh, North Carolina 27699-6714). Unless such demand is made, this decision shall be final and binding. If you have any questions concerning this permit modification, please contact Natalie Sierra at (919) 733- 5083, extension 551. cc; Mooresville Regional Office, Water Quality Section --NPDES Unit Point Source Compliance and Enforcement US EPA Region 4 Central Files 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Sincerely, r dory J. Thorpe, Ph.D. Telephone (919) 733-5083 FAX (919) 733-0719 An Equal Opportunity Affirmative Action Employer VISIT US ON THE INTERNET C© http://h2o.enr.state.nc.usINPDES 1 Permit NC0024970 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY PERMIT TO DISCHARGE WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Charlotte -Mecklenburg Utility Department is hereby authorized to discharge wastewater from a facility located at the McAlpine Creek Wastewater Treatment Plant On US Highway 521 South of Charlotte Mecklenburg County to receiving waters designated as McAlpine Creek in the Catawba River Basin in accordance with effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV hereof. This permit shall become effective May I, 2002. This permit and authorization to discharge shall expire at midnight on February 8, 2006. Signed this day February 21, 2002. Gregory J. Thorpe, Ph.D., Acting Director Division of Water Quality By Authority of the Environmental Management Commission Permit NC0024970 A. (1.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS — FINAL During the period beginning on May 1, 2002 and lasting until February 27, 2006. the Permittee is authorized to discharge from outfall 001. Such discharges shall be limited and monitored by the Permittee as specified below: EFFLUENT CHARACTERISTICS LIMITS MONITORING REQUIREMENTS Monthly Average Weekly Average Daily Maximum Measurement Frequency Sample Type Sample Location1 Flow 64.0 MGD Continuous Recording I or E CBOD, 5-day (20°C)2 April 1- October 31 4.0 mg/L 6.0 mg/L Daily Composite E, I CBOD, 5-day (20°C)2 November 1 - March 31 8.0 mg/L 12.0 mg/L Daily Composite E, I Total Suspended Residue2 15.0 mg/L 22.5 mg/L Daily Composite E, I NH3 as N (April 1- October 31) 1.0 mg/L Daily Composite E NH3 as N (November 1-March 31) 1.9 mg/L Daily Composite E Dissolved Oxygen3 Daily Grab E, U, D Fecal Coliform (geometric mean) 200 / 100 ml 400 / 100 ml Daily Grab E Total Residual Chlorine' 17 µg/L Daily Grab E Temperature (°C) Daily Grab E, U, D Total Nitrogen (NO2 + NO3 + TKN) Monthly Composite E _ Total Phosphorus5 Monthly Composite E Chronic Toxicity6 Quarterly Composite E Conductivity Daily Grab E, U, D Chromium 51 µg/L 204 µg/L Weekly Composite E ,i,, Lindane 0.01 jig/ Weekly Grab E' Copper 2/Month Composite E, U, D Cyanide? 5 µg/L 15 µg/L Weekly Grab E Lead 26 µg/L 34 µg/L Weekly Composite E Silver 2/Month Composite E Zinc 2/Month Composite E, U, D Mercury5 0.012 lug/ Weekly Composite E Molybdenum 2/Month Composite E Footnotes: 1 Sample Locations: E - Effluent, I - Influent, U - Upstream, D- Downstream. For instream monitoring requirements, see Part A. (3.). 2The monthly average effluent CBOD5 and total suspended residue concentrations shall not exceed 15% of the respective influent value. 3 The daily average dissolved oxygen effluent concentrations shall not be less than 6.0 mg/L. 4 The daily average limit for total residual chlorine shall be 28 µg/L. 5 See Part A. (5.). for additional nutrient monitoring information. 6 Whole effluent toxicity shall be measured by Chronic Toxicity (Ceriodaphnia) P/F at 90 %. Samples shall be taken quarterly during the months of March, June, September and December. See Part A. (4.). 7 The Division of Water Quality shall consider all cyanide concentrations reported below 10 ug/L to be "zero" for permit -compliance purposes only. 8 The quantitation limit for mercury shall be 0.2 ug/1 (0.2 ppb). Levels reported at less than 0.2 ug/1 shall be considered zero for compliance purposes. The pH shall not be less than 6.0 standard units nor greater than 9.0 standard units. There shall be no discharge of floating solids or visible foam in other than trace amounts. Permit NC0024970 A. (2.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS — FINAL During the period beginning on February 28, 2006 and lasting until expiration, the Permittee is authorized to discharge from outfall 001. Such discharges shall be limited and monitored by the Permittee as specified below: EFFLUENT CHARACTERISTICS LIMITS MONITORING REQUIREMENTS Monthly Average Weekly Average Daily Maximum Measurement Frequency Sample Type Sample Location1 Flow 64.0 MGD Continuous Recording I or E CBOD, 5-day (20°C)2 April 1- October 31 4.0 mg/L 6.0 mg/L Daily Composite - E, I CBOD, 5-day (202C)2 November 1— March 31 8.0 mg/L 12.0 mg/L Daily Composite E, I Total Suspended Residue2 15.0 mg/L 22.5 mg/L Daily Composite E, I NH3 as N (April 1— October 31) 1.0 mg/L Daily Composite E NH3 as N (November 1—March 31) 1.9 mg/L Daily Composite E Dissolved 0xygen3 Daily Grab E, U, D Fecal Coliform (geometric mean) 200 / 100 ml 400 / 100 ml Daily Grab E Total Residual Chlorine4 17 µg/L Daily Grab E Temperature (°C) Daily Grab E, U, D Total Nitrogen (NO2 + NO3 + TKN) Monthly Composite E Total Phosphorus5 Monthly Average: 1,067.0 lbs./day 12-month Average: 534 lbs./day Monthly Composite E _ Chronic Toxicity6 Quarterly Composite E Conductivity Daily Grab E, U, D Chromium 51 µg/L 204 µg/L Weekly Composite El 0 ,0 , Lindane 0.01 µg/L Weekly Grab E Copper 2/Month Composite E, U, D Cyanides 5 µg/L 15 µg/L Weekly Grab _ E Lead 26 µg/L 34 µg/L Weekly Composite E Silver 2/Month Composite E Zinc 2/Month Composite E, U, D Mercury5 0.012 µg/L Weekly Composite E Molybdenum 2/Month _ Composite E Footnotes: 1 Sample Locations: E - Effluent, I - Influent, U - Upstream, D- Downstream. For instream monitoring requirements, see Part A.(3.). 2 The monthly average effluent CBODs and total suspended residue concentrations shall not exceed 15% of the respective influent value. 3 The daily average dissolved oxygen effluent concentrations shall not be less than 6.0 mg/L. 4 The daily average limit for total residual chlorine shall be 28 µg/L. 5 The 12-month average limit will remain in effect until such time as the total combined discharge limit stipulated in Part A. (5.) comes into effect. Once the total combined discharge limit is effective, the 12-month average limit is 826 lbs./day for all three CMUD plants (McAlpine, Irwin and Sugar Creek WWTPs) combined. See Part A. (5.). for additional information on this limit. Part A. (6.) describes the methodology for calculation of the monthly average and 12-month limits. 6 Whole effluent toxicity shall be measured by Chronic Toxicity (Ceriodaphnia) P/F at 90 %. Samples shall be taken quarterly during the months of March, June, September and December. See Part A. (4.). 7 The Division of Water Quality shall consider all cyanide concentrations reported below 10 ug/L to be "zero" for permit -compliance purposes only. 8 The quantitation limit for mercury shall be 0.2 ug/1 (0.2 ppb). Levels reported at less than 0.2 ug/1 shall be considered zero for compliance purposes. The pH shall not be less than 6.0 standard units nor greater than 9.0 standard units. There shall be no discharge of floating solids or visible foam in other than trace amounts. Permit NC0024970 A.(5.) TOTAL PHOSPHORUS LIMIT As stipulated by the 2002 Settlement Agreement between Charlotte -Mecklenburg Utilities Department (CMUD), the South Carolina Department of Health and Environmental Control (SC DHEC) and the North Carolina Division of Water Quality (NC-DWQ), CMUD's McAlpine Creek WWTP, Sugar Creek WWTP and Irwin Creek WWTP must comply with a limit of 826.0 lbs/day. This limit is defined as an effluent limit for total phosphorus from the total combined discharge from the three referenced CMUD wastewater treatment plants (based on a 12-month rolling average). The methodology for calculating the annual average is described in Part A. (6.). The compliance dates for the limit are as follows. If CMUD conducts construction activities associated with phosphorus removal at either the Sugar Creek WWTP or the Irwin Creek WWTP, , the annual average limit of 826.0 lbs/day (based on the collective discharge from all three plants) shall become effective February 28, 2007. Said construction activities will also trigger an effluent limit for total phosphorus for the McAlpine Creek WWTP of 534.0 lbs/day (based on a 12-month rolling average) as of February 28, 2006 (as stipulated in Part. A. (2.) of NPDES Permit NC0024970). If however, CMUD decides not to pursue construction activities, associated with phosphorus removal, at either the Sugar Creek WWTP or the Irwin Creek WWTP, the total phosphorus annual average limit applicable to the loading from all three WWTPs, shall become effective on February 28, 2006. A. (6.) TOTAL PHOSPHORUS MONITORING The Permittee shall calculate a 12-month rolling average mass loading as the sum of monthly loadings, according to the following equations: (1) Monthly Loading (lb) = Days x TP x Qw x 8.34 where: Days = the number of discharge days in that month TP = the arithmetic average of total phosphorus concentrations (mg/L) obtained via composite samples collected during the month Qw = the average daily waste flow (MGD) for the month 8.34= conversion factor, from (mg/L x MGD) to pounds The 12-month rolling average mass loading is defined as the sum of the monthly loadings for the previous 12 months inclusive of the reporting month: 12 (2) 12-Month Mass Loading (lb/yr)= Tema (inclusive of reporting month) Where: TPma is defined as the total phosphorus monthly average mass loading. The monthly average and 12-month average mass loadings shall be reported on the attached worksheet and submitted with the discharge monitoring report for McAlpine Creek WWTP. The first worksheet is due with the discharge monitoring report, 12 months from the effective date of the total phosphorus limit (referenced in Special Condition A. (5)). In the interim period between the effective date and the requirement to -submit the attached worksheet, the total phosphorus monthly average mass loadings should be reported on the discharge monitoring report for the respective facility. The Permittee shall report the total phosphorus concentration for each sample on the appropriate discharge monitoring report for each facility. Reporting of and compliance with the phosphorus limit shall be done on a monthly basis. • 4- Reporting Month: Beginning Month: Ending Month: Total Phosphorus Worksheet for Irwin, Sugar and McAlpine Creek Wastewater Treatment Plants Month used for calculating mass loadings for month 1 Month used for calculating mass loadings for month 12 Irwin Creek WWTP's Monthly Average Total Phosphorus Mass Loading NC0024937 Sugar Creek WWTP's Monthly Average Total Phosphorus Mass Loading NC0024945 McAlpine Creek WWTP's Monthly Average Total Phosphorus Mass Loading NC0024970 Monthly Average Total Phosphorus Mass Loading from all three facilities Month 1 {lb./day} Month 2 {lb./day} Month 3 (lb./day} Month 4 {lb./day} Month 5 {lb./day} Month 6 {Ib./day} Month 7 {lb./day} Month 8 {lb./day} Month 9 {Ib./day} Month 10 {Ib./day} Month 11 {lb./day} Month 12 {Ib./day} Sum {Ib./day} I I I I Annual Average {lb./day} Note: The total phosphorus mass loadings for the current reporting month should be entered for Month 1. • (07) CHARLOTTE. January15, 2002 Mr. William G. Ross, Jr., Secretary N.C. Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, North Carolina 27699-1601 Subject: Request for Permit Modification McAlpine Creek Wastewater Treatment Plant NPDES Permit No. NC0024970 Dear Secretary Ross, By this letter, Charlotte Mecklenburg Utilities ("Utilities") requests modifications to the subject NPDES permit. This request is made pursuant to the January 15, 2002 Settlement Agreement between NC DENR, SC DHEC, and the City of Charlotte. Specifically, Utilities requests the following modifications: 1. Extend the term of the permit from June 30, 2005, to February 28, 2006. The resultant NPDES Permit will then have an effective term from March 1, 2001 through February 28, 2006. 2. Include limits for phosphorus discharges in the effluent as described below: a. The effluent limit for total phosphorous from the total combined discharge from McAlpine Creek WWTP, Sugar Creek WWTP, and Irwin Creek WWTP shall not exceed 826 lbs/day based on a 12-month rolling average. b. If the City conducts construction activities at either Sugar Creek WWTP or Irwin Creek WWTP as part of its efforts to achieve compliance with the Total Phosphorous Limit, the Total Phosphorous Limit shall apply collectively to the Sugar, Irwin, and McAlpine Creek Plants on February 28, 2007. c. If the City does not conduct construction activities at either the Sugar Creek Plant or the Irwin Creek Plant as part of its efforts to achieve compliance with the Total Phosphorous Limit, the Total Phosphorous Limit shall apply collectively to Sugar, Irwin, and McAlpine Creek Plants on February 28, 2006. d. If the City conducts construction activities at either the Sugar Creek Plant or the Irwin Creek Plant as part of its efforts to achieve compliance with the Total Phosphorous Limit, an effluent limit for total phosphorous not to exceed 534 lbs/day based on a 12-month rolling average shall apply to the McAlpine Creek Plant on February 28, 2006 and shall stay in effect until the Total Phosphorous Limit becomes effective. Administrative Division 5100 Brookshire Blvd. Charlotte, NC 28216 Phone: 704/399-2221 Fax: 704/393-2219 Charlotte -Mecklenburg Utilities e. Whether or not the City conducts construction activities at either the Sugar Creek Plant or the Irwin Creek Plant as part of its efforts to achieve compliance with the Total Phosphorous Limit, an effluent limitation for total phosphorous of 1,067 lbs/day averaged on a monthly basis shall apply to the McAlpine Creek Plant commencing February 28, 2006. 3. Any deadline or date of applicability established by the modifications to this permit shall be extended for the duration of any event of force ;najeure, which shall mean any event arising from causes beyond the control of the party subject to the deadline or date of applicability that causes a delay in or prevents the performance of any of the conditions under this Settlement Agreement, including, but not limited to: a. acts of God, fire, war, insurrection, civil disturbance, explosion or natural catastrophes; b. restraint by court order or order of public authority; c. inability to obtain, after the exercise of reasonable diligence and timely submittal of all applicable applications, any necessary authorizations, approval, permits, or licenses due to action or inaction of any governmental agency or authority; and d. delays caused by compliance with applicable statutes or regulations governing contracting, procurement or acquisition procedures, despite the exercise of reasonable diligence by the party subject to the deadline. We are enclosing a check in the amount of eight hundred sixty ($860) for the required permit modification fee. Please let me know immediately if you have any questions or need additional information. Sincerely, CHARLOTTE MECKLENBURG UTILITIES Douglas O. an Director Cc: David Goodrich, NC DWQ Rex Gleason, Mooresville Regional Office NC DWQ Barry Gullet File SETTLEMENT AGREEMENT This SETTLEMENT AGREEMENT made and entered into this MIX day of January, 2002 by and between, the South Carolina Department of Health and Environmental Control ("SCDHEC"), an agency of the State of South Carolina, the North Carolina Division of Water Quality ("NCDWQ"), an agency of the State of North Carolina, and the City of Charlotte (the "City"), a North Carolina municipal corporation. RECITALS 1. SCDHEC has filed a Petition for Contested Case Hearing (the "Contested Case Petition"), Case No. 01-EHR-0856, in the North Carolina Office of Administrative Hearings, regarding the decision of NCDWQ to grant National Pollutant Discharge Elimination System Permit NC0024970 (the "McAlpine Creek NPDES Permit") to the Charlotte -Mecklenburg Utility Department ("CMUD"). 2. CMUD currently has pending with NCDENR applications to renew National Pollutant Discharge Elimination System Permit NC0024937 (the "Sugar Creek NPDES Permit") and National Pollutant Discharge Elimination System Permit NC0024945 (the "Irwin Creek NPDES Permit"). 3. The parties desire to settle this matter and have agreed to enter into this Settlement Agreement. STATEMENT OF AGREEMENT 1. Recitals. The recitals are incorporated by reference. 2. Effluent Limitations for Total Phosphorous. With regard to effluent limitations for total phosphorous from the City's McAlpine Creek wastewater treatment plant, Sugar Creek wastewater treatment plant and Irwin Creek wastewater treatment plant (individually the "McAlpine Creek Plant", the "Sugar Creek Plant", and the "Irwin Creek Plant", and collectively, the "Plants") the parties agree as follows: a. The effluent limit for total phosphorous from the total combined discharge from the Plants shall not exceed 826 lbs/day based on a 12-month rolling average (the "Total Phosphorous Limit"). b. If the City conducts construction activities at either the Sugar Creek Plant or the Irwin Creek Plant as part of its efforts to achieve compliance with the Total Phosphorous Limit, the Total Phosphorous Limit shall apply to the Plants on February 28, 2007. c. If the City does not conduct construction activities at either the Sugar Creek Plant or the Irwin Creek Plant as part of its efforts to achieve compliance with the Total Phosphorous Limit, the Total Phosphorous Limit shall apply to the Plants on February 28, 2006. d. If the City conducts construction activities at either the Sugar Creek Plant or the Irwin Creek Plant as part of its efforts to achieve compliance with the Total Phosphorous Limit, an effluent limit for total phosphorous not to exceed 534 lbs/day based on 12-month rolling average shall apply to the McAlpine Creek Plant on February 28, 2006 and shall stay in effect until the Total Phosphorus Limit becomes effective. e. Whether or not the City conducts construction activities at either the Sugar Creek Plant or the Irwin Creek Plant as part of its efforts to achieve compliance with the Total Phosphorous Limit, an effluent limitation for total phosphorous of 1,067 lbs/day averaged on a monthly basis shall also apply to the McAlpine Creek Plant commencing on February 28, 2006. f. If the City conducts construction activities at the Sugar Creek Plant as part of its efforts to achieve compliance with the Total Phosphorous Limit, an effluent limitation for total phosphorous of 334 lbs/day averaged on a monthly basis shall also apply to the Sugar Creek Plant commencing on February 28, 2007. g. If the City conducts construction activities at the Irwin Creek Plant as part of its efforts to achieve compliance with the Total Phosphorous Limit, an effluent limitation for total phosphorous of 250 lbs/day averaged on a monthly basis shall also apply to the Irwin Creek Plant commencing on February 28, 2007. 3. McAlpine Creek NPDES Permit Modification. Within five (5) business days of the date of this Settlement Agreement, the City will submit to NCDENR a written request that the McAlpine Creek NPDES Permit be modified as follows: a. To include the effluent limits for total phosphorous described in Section 2 of this Settlement A reement to the extent such limits apply to the McAlpine Creek Plant; and b. To extend the expiration date from June 30, 2005 to February 28, 2006. NCDENR shall take all required actions with regard to the request for permit modification as expeditiously as is reasonably possible and without any unreasonable delay. 4. McAlpine Creek Plant Authorization to Construct. The Parties acknowledge that the City will be conducting construction activities at the McAlpine Creek Plant as part of its efforts to comply with the Total Phosphorous Limit and those effluent limits on total phosphorous in Section 2 of this Settlement Agreement that specifically apply to the McAlpine Creek Plant. The Parties further acknowledge that the City will have to obtain from NCDENR an authorization to construct before those construction activities can begin. Within 20 days after receiving the City's application for an authorization to construct, NCDENR will determine and notify the City as to whether or not the application is complete. Within 60 days after receiving a complete application, NCDENR will determine and notify the City as to whether or not the authorization to construct has been granted. 5. Sugar Creek Plant and Irwin Creek Plant Construction. By February 28, 2004, the City will notify SCDHEC and NCDENR as to whether or not it intends to perform construction activities at either the Sugar Creek Plant or the Irwin Creek Plant as part of its efforts to achieve compliance with the Total Phosphorous Limit. 6. Sugar Creek and Irwin Creek NPDES Permits. NCDENR shall issue NPDES Permits for the Sugar Creek Plant and Irwin Creek Plant with effluent limits for total phosphorous and with construction notification requirements consistent with the provisions of Sections 2 and 5 of this Settlement Agreement, respectively. 7. Dismissal of Contested Case Proceeding. Within five (5) business days of the date of this Settlement Agreement, SCDHEC shall take all necessary actions to dismiss with prejudice the Contested Case Petition. 8. Duty of Good Faith. The Parties agree that this Settlement Agreement embodies their mutual agreement and agree to act in good faith consistently herewith in all matters related hereto, including without limitation any public hearing or comment ' period on the modification of the McAlpine Creek NPDES Permit and the renewal of the Sugar Creek and Irwin Creek NPDES Permits. 9. Force Majeure. Any deadline or date of applicability in this Settlement Agreement shall be extended for the duration of any event of force niajeure, which shall mean any event arising from causes beyond the control of the party subject to the deadline or date of applicability that causes a delay in or prevents the performance of any of the conditions under this Settlement Agreement, including, but not limited to: a. acts of God, fire, war, insurrection, civil disturbance, explosion or natural catastrophes; b. restraint by court order or order of public authority; c. inability to obtain, after the exercise of reasonable diligence and timely submittal of all applicable applications, any necessary authorizations, approval, permits, or licenses due to action or inaction of any governmental agency or authority; and d. delays caused by compliance with applicable statutes or regulations governing contracting, procurement or acquisition procedures, despite the exercise of reasonable diligence by the party subject to the deadline. 10. Notices. Any notice, communication, or statement required or permitted to be given pursuant to this Settlement Agreement shall be in writing and deemed to have been sufficiently given when delivered in person or sent by certified mail, return receipt requested, postage prepaid, or by any other delivery service providing a signed receipt of delivery, to the addresses for the other parties set forth as follows, or to such other address that a party may by written notice designate: a. To SCDHEC: Director, Water Facilities Permitting Division Bureau of Water SC DHEC 2600 Bull Street Columbia, SC 29201 With a copy to: General Counsel SCDHEC 2600 Bull Street Columbia, SC 29201 b. To NCDENR: Mr. David A. Goodrich Supervisor NPDES Group Permits and Engineering Unit Division of Water Quality North Carolina Department of Environment and Natural Resources Post Office Box 29535 Raleigh, North Carolina 27626-0535 c. To the City: Director Charlotte Mecklenburg Utilities 5100 Brookshire Boulevard Charlotte, North Carolina 28216-3354 With a copy to: H. Michael Boyd Deputy City Attorney City of Charlotte 600 East Fourth Street Charlotte, North Carolina 28202-2841 and Benne C. Hutson Smith Helms Mulliss & Moore, L.L.P. P.O. Box 31247 Charlotte, North Carolina 28231 11. Total Maximum Daily Load Participation. In the development of the total maximum daily load for phosphorous in the Catawba River Basin ("TMDL"), SCDHEC will use a process that is open to the public and will continue to provide NCDWQ, the opportunity to participate prior to public notice of the proposed TMDL. SCDHEC will provide the City and other North Carolina entities that may be affected by the TMDL the same opportunity to participate in its development prior to public notice. SCDHEC will provide notice of the opportunity to participate in the development of the TMDL to NCDWQ, the City, and all entities specified on a list to be provided by NCDWQ. 12. Default. In the event of a default by a party, any non -defaulting party may bring suit against the defaulting party to enforce the terms of this Settlement Agreement. 13. No Admission of Liability. By entering into this Settlement Agreement , none of the Parties makes any admissions of law or fact with regard to any of the matters relevant to any claims that were or could have been asserted in the Contested Case Petition. 14. Modification. This Settlement Agreement may not be modified except in writing signed by all the Parties. 15. Entire Agreement. The Parties agree and acknowledge that this Settlement Agreement constitutes the agreement between the Parties and that all prior or contemporaneous written or oral agreements with respect to these matters are merged into this Settlement Agreement. 16. Successors and Assigns. This Settlement Agreement shall be binding upon and shall inure to the benefit of the Parties and their respective successors and assigns. 17. Choice of Law. This Settlement Agreement shall be governed by, construed in accordance with, and enforced pursuant to the laws of the State of North Carolina without resort to choice of law principles. 18. Counterparts. This Settlement Agreement may be executed in counterparts, each of which shall be considered an original but all of which together shall constitute but one and the same instrument. [SIGNATURE PAGES FOLLOW] • .. SOUTH CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL By: kae-PLY Printed Name: Alton C. Boozer. Title: Chief, Bureau of Water NORTH CAROLINA DIVISION OF WATER QUALITY By: Printed Name: /7/00 ,4 . 60047e/c7ii Title: 4� WAi lT SPev/so CITY OF CH By: sc-,1 Printed Name: Title: J \y Q OTT g • Clee4AA" ooauqs O. -ZEt9lV February 11, 2002 CHARLOTTE_ Mr. Charles H. Weaver, Jr. NPDES Unit, N.C. Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Subject: Modification of NPDES Permit NC0024970 McAlpine Creek WWTP Mecklenburg County Dear Mr. Weaver: We recently received a letter from you dated February 1, 2002, acknowledging receipt of our subject permit modification request and check. Your letter states that the Division received this request on January 25, 2002. That date is incorrect. The request was hand delivered by Doug Bean to Mr. Bill Ross, Mr. Dave Goodrich, and Ms. Natalie Sierra at a news conference in Charlotte on January 15, 2002. Utilities was required by the settlement agreement with NC DENR and SC DHEC to submit this permit modification request within 5 business days of the execution of the settlement agreement. Since that agreement was executed on January 15, it is important that you correct the receipt date of the request. The settlement agreement also requires Utilities to comply with a rather aggressive schedule for completion of the phosphorus reduction project. Although we agreed to begin design prior to receiving the permit modification, we would appreciate a prompt turn -around of our modification request for this highly visible and very important project. Please let me know if you have any questions. Sincerely, CHARLOTTE MECKLENBURG UTILITIES Barry M. Gullet, PE Deputy Director Cc: Dave Goodrich Mooresville Regional Office/Water Quality Section NC DENR Central Files Mike Boyd Jackie Jarrell Administrative Division 5100 Brookshire Blvd. Charlotte, NC 28216 Phone: 704/399-2221 Fax: 704/393-2219 Charlotte -Mecklenburg Utilities SUMMARY OF CMUD/DWQ/SCDHEC SETTLEMENT AGREEMENT INTRODUCTION In the summer of 2001, the South Carolina Department of Health and Environmental Control (SCDHEC) filed a Petition for a Contested Case in the North Carolina Office of Administrative Hearings regarding the renewal of NPDES Permit No. NC0024970, the Charlotte Mecklenburg Utilities Department (CMUD) McAlpine Creek Wastewater Treatment Plant. The primary complaint on the part of SCDHEC has been that the permit was renewed without a phosphorus limit. Nearly all of South Carolina's municipal dischargers to the mainstem Catawba (upstream of Lake Wateree) have been given phosphorus limits, generally equivalent to 1 mg/L. The McAlpine Creek WWTP permit had a phosphorus optimization study special condition that stipulated preparatory requirements for the facility to ready itself for the upcoming phosphorus Total Maximum Daily Load (TMD). Since the summer, SCDHEC, the North Carolina Division of Water Quality (NCDWQ) and CMUD have been working towards achieving consensus on an appropriate phosphorus limit for the McAlpine Creek WWTP. The understanding has been that this decision will also affect DWQ's permitting strategy for three additional municipal permits: CMUD - Irwin Creek WWTP, CMUD - Sugar Creek WWTP, and Union County - 12-Mile Creek WWTP. The final settlement agreement includes the terms of the limits for all three CMUD plants. A similar strategy will be used by DWQ to limit phosphorus in the Union County permit. SUMMARY OF SETTLEMENT AGREEMENT Limits at McAlpine Creek WWTP Based upon a construction schedule provided by CMUD during the settlement proceedings, the compliance date for the total phosphorus limit at the McAlpine Creek WWTP is set for February 28, 2006. At this time, the McAlpine Creek WWTP must meet a 534 lbs./day total phosphorus limit. This limit is to be calculated as a 12-month rolling average. It corresponds to a 1 mg/L limit at McAlpine Creek's permitted flow of 64 MGD. This limit, as well as the monthly mass cap described below, shall be incorporated into a major modification to NPDES Permit NC0024970 with special condition language to be included with reference to the Irwin and Sugar Creek WWTPs. Since SCDHEC's stipulation was that any limit come into effect prior to the expiration date of the permit, the permit expiration date will also be modified to February 28th, 2006 (instead of June 30, 2005). This puts the permit out of sync with the Basinwide schedule, but is within the five years allowable for a permit term under federal regulations. Bubble Limit A major point of the settlement agreement is the idea of a bubble limit. This refers to a mass limit for total phosphorus that applies to discharge at the three CMUD plants combined. This type of a limit would give CMUD more operational flexibility with regard to phosphorus removal. The bubble limit, to be calculated as a 12-month rolling average, is 826 lbs./day of total phosphorus from all three CMUD plants. This corresponds to a 1 mg/L phosphorus limit at permitted discharge for the three plants. If CMUD conducts construction activities at either the Sugar or Irwin Creek plants, the compliance date for this bubble limit will be February 28, 2007. If CMUD decides not to conduct construction activities at either plant in order to achieve compliance, the bubble limit will come into effect on February 28, 2006. This is identical to the compliance date at the McAlpine Creek plant. Special condition language will be included in the Irwin and Sugar Creek WWTP permits regarding the compliance date. Mass cap In order to be protective of the water quality at the downstream lakes in South Carolina, SCHEC requested that monthly mass caps also be included as part of the total phosphorus limits at the three CMUD plants. This would also ensure optimized operation of the plants at all times. The mass caps at the three plants take the form of a monthly average mass limit and correspond to a concentration limit of 2 mg/L at maximum permitted flow. At McAlpine Creek, this limit is 1,0671bs. /day of total phosphorus beginning February 29, 2006. At the Sugar and • Irwin Creek plants, the mass caps only come into effect if construction activities are pursued at each plant. At Sugar Creek WWTP, the limit is 334 lbs./day with compliance commencing on February 28, 2007. At Irwin Creek WWTP, the limit is 250 lbs./day with compliance commencing on February 28, 2007. TMDL As part of the settlement agreement DWQ requested a provision for full inclusion in the TMDL process for both DWQ and all affected NC entities (to be provided in a list by DWQ). APPLICABILITY TO PERMITTING PROCESS The three CMUD permits will have the bubble limit included as a special condition. Monitoring for phosphorus will be included in the regular effluent limit pages. Mass caps will also be included in the effluent limit pages, with a footnote specifying applicability (for Sugar and Irwin Creek plants) and compliance dates. The Union County - 12 Mile Creek WWTP shall have a mass limit equivalent to 1 mg/L at the permitted flow. As with the three CMUD plants, compliance for this limit is to be judged as a rolling annual average. Special monitoring language is being developed for this situation. It is also recommended that the phosphorus optimization study special condition from the original McAlpine Creek WWTP permit be included in this permit to allow DWQ time to review the County's preparations for the impending phosphorus TMDL. (CfX CHARLOTTK CHARLOTTE•MECKLENBURG UTILITIES June ,2001 REQUEST FOR QUALIFICATIONS Phosphorus Reduction Feasibility Study Charlotte -Mecklenburg Utilities Charlotte -Mecklenburg Utilities seeks the services of a qualified consulting engineering firm to prepare a feasibility study of phosphorus reduction at McAlpine Creek, Sugar Creek, and Irwin Creek Wastewater Treatment Plants. This study is required by the recently renewed NPDES Permit for the McAlpine Creek WWTP. Plant and Watershed Characteristics: All three of the plants involved in this study are advanced treatment facilities using conventional activated sludge processes followed by effluent filtration and disinfection/dechlorination. McAlpine Creek WWTP is permitted to treat 64 mgd and is currently treating average daily flows of about 45 mgd. Sugar Creek is permitted for 20 mgd and is treating about 17 mgd and Irwin is permitted for 15 mgd and is treating about 10 mgd. Typical phosphorus concentrations in the effluent are as follows: Plant Effluent concentration of P McAlpine 3.2 mg/1 Sugar 5.7 mg/1 Irwin 2.2 mg/1 Lower influent loading at Sugar Creek and a corresponding reduction in effluent concentrations are expected due to imminent changes in industrial loading upstream of the Sugar Creek Plant. A slight reduction is also expected at McAlpine Creek. The streams receiving the discharges of each of the three plants eventually converge into Sugar Creek and later into the Catawba River. The Catawba River flows into Lake Wateree which South Carolina has determined to be eutrophic and which is the reason NC DENR has required this study. Sugar Creek and Irwin Creek WWTP's have the ability to divert portions of their influent flow to Page 1 -- RFQ, Phosphorus Reduction Feasibility Study McAlpine Creek WWTP for treatment. Sugar Creek WWTP routinely transfers all primary and waste activated sludge to McAlpine Creek WWTP for treatment and dewatering. Scope of Services: The selected consulting firm will be required to review and further develop the information presented in a study titled "Identification of Nutrient Discharge Control Opportunities at the McAlpine Creek, Sugar Creek, and Irwin Creek Wastewater Treatment Facilities." This study was prepared by Aware Environmental. The executive summary of this report is attached. Also attached is an excerpt of the current NPDES permit for McAlpine Creek Wastewater Treatment Plant. This attachment outlines NCDENR's specific requirements of the study to be performed. Charlotte Mecklenburg Utilities has expanded the study scope to include Sugar and Irwin because these plants all discharge into streams that are tributaries to Sugar Creek. In order to meet the deadline set forth in the permit, the complete report must be delivered to Charlotte Mecklenburg Utilities on December 3, 2001. Charlotte Mecklenburg Utilities expects that the study will be conceptual in nature, and will be based on limited data. The study report should present of a series of options to reduce effluent phosphorus concentrations to 2.0 mg/1, 1.5 mg/1, 1.0 mg/1, and 0.5 mg/1 at each of the plants. Each option would include a cost estimate, list of assumptions, and potential issues involved. The study would also include an evaluation of the potential for providing more extensive treatment at one or more of the three plants that would result in the same mass loading to the receiving stream as reducing each individual effluent concentration to a lesser extent. Meeting(s) with NC DENR staff may also be required. Note: The above scope represents the Owner's requirements at this time. Charlotte Mecklenburg Utilities reserves the right to change this scope (either reductions or additions). Submittal Requirements: Interested firms must submit six copies of their qualifications no later than , 2001 at noon. Submittals must be no more than 10 one-sided, single spaced pages (exclusive of cover) with a font size of at least 12. (This includes all attachments). Submittals must include: Firm Qualification: Provide a brief description of the services your firm provides, list any sub -consultants you propose to use and describe their respective roles and qualifications. Indicate whether any of these are M/WBE firms. Also discuss manpower resources available to your firm that you will commit to the project, and out of what office these resources are available. Due to the deadline imposed by the State, workload of the project team will be an important factor for the selection committee. Related Project Experience: Key in the selection of this consultant is whether the project team has an established positive working relationship with NC DENR Also Page 2 -- RFQ, Phosphorus Reduction Feasibility Study important is the team's current experience and knowledge of a) advanced wastewater treatment processes; b) biological and chemical phosphorus treatment methods; c) operation optimization at existing plants; and d) creative ideas to maximize efficiency. For each similar study that your firm has completed, include a project summary, identify the owner and list the name and phone number of a contact person who was directly involved in the study. In addition, indicate which member(s) of your proposed project team had key roles in the projects, and what those roles were. Include in this section the name of at least one ORC (operator in responsible charge) at a wastewater treatment plant who is familiar with your project team's capabilities. Resumes of Key Personnel: List the key members of your project team and include a brief description of their related project experience, education, and pertinent registrations. Particular emphasis should be placed on the project manager. Local Office: Indicate what percentage of your work will be based in the Charlotte area. Also indicate which members of the project team will be local. Preference will be given to firms with significant local representation. Project Approach: Describe the general tasks required to fulfill project requirements and your firm's approach to completing those tasks in the most timely and effective manner possible. Schedule: Depending on number and thoroughness of submittals received, the Selection Committee plans to have either a short list or a final selection within two weeks of receipt of qualifications. Oral interviews may or may not be required of some or all of the firms that are considered. Selection Committee: The selection committee will be composed of Utilities' plant staff, engineering staff, and may include representatives from NC DENR. Contacts from consultants for marketing purposes is discouraged. The Project Manager should be contacted regarding questions concerning clarifications on the submittal or the selection process. Proposals must be received by noon eastern standard time on , 2001 and should be addressed to: Ms. Julie McLelland, P.E. Project Manager Charlotte -Mecklenburg Utilities 5100 Brookshire Boulevard Charlotte, North Carolina 28216 Page 3 -- RFQ, Phosphorus Reduction Feasibility Study Any questions regarding the above project or this request can be directed to Julie McLelland at (704)391- 5126, email jmclelland@ci.charlotte.nc.us. This selection process is open to all professional engineering consulting firms licensed to perform work in North Carolina. Sincerely, CHARLOTTE-MECKLENBURG UTILITIES Julie L. McLelland, P.E. Project Manager Page 4 -- RFQ, Phosphorus Reduction Feasibility Study WATF Michael F. Easley, Governor \O`�O 9pG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources G) I r Gregory J. Thorpe, Ph.D, Acting Director Division of Water Quality t DELEGATION OF AUTHORITY I hereby delegate to David A. Goodrich, Supervisor of the NPDES Unit, the authority to settle contested case 01 EHR 0856, brought by the South Carolina Department of Health and Environmental Control to challenge NPDES permit No. NC0024970 issued for the Charlotte Mecklenburg Utility Department's (C.M.U.D.) McAlpine Creek wastewater treatment plant, and to execute the Settlement Agreement, which resolves the permit limits for total phosphorus in the NPDES permits for C.M.U.D.'s McAlpine, Sugar, and Irwin Creek wastewater treatment plants. This the day of January, 2002. Greg J. Tpe, Ph.D Acting Dire or Division of Water Quality C2) 0 N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 wicrA AL3 NCDENR Customer Service 1 800 623-6748 1 201 North Tryon Street Charlotte, NC 28202 PO Box 31247 (28231) (704) 343-2000 direct: 704-343-2060 fax: 704-444-8739 benne.hutson@smithhelms.com December 19, 2001 VIA E-MAIL AND FACSIMILE Jill B. Hickey Assistant Attorney General Office of Attorney General Environmental Division Post Office Box 629 Raleigh, North Carolina 27602-629 Samuel J. Finklea, III South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201 Re: SCDHEC v. NCDENR and CMUD/Settlement Issues Dear Jill and Sam: I am writing in response to Sam's letter to me dated December 17, 2001. Although from Sam, I understand the letter is the response of both DHEC and DENR to my letter dated December 7, 2001. Hence, this response is addressed to both of you. For ease of reference, we will address the issues raised in the order they appear in Sam's letter. Proposed Schedule We appreciate your recognition that you "have not been privy to the detailed analysis" the City did to prepare the schedule included with our December 7 letter. However, it may be helpful for you to better understand what that detailed analysis included. What the City has proposed to do at the McAlpine plant is not a typical construction project. The phosphorous upgrades that the City has offered to make as part of its settlement offer are additions to an already crowded construction schedule at that plant over the next five years. As of the -date of our November 9 meeting, the City had already begun or had scheduled eight to ten capital projects at the McAlpine plant with a total cost of over $100 million. Less than two weeks after the November 9 meeting, during the week of Thanksgiving, the City Jill B. Hickey Samuel J. Finklea, III December 19, 2001 Page 2 Ain? &et? I d scheduled and held a meeting with all of the firms responsible for these projects to determine how the phosphorous work could be done in a timely fashion while being coordinated with the performance of all the other work either ongoing or already planned. Following that meeting there were numerous telephone calls and other contacts to resolve issues and questions and refine and finalize the schedule. As a result of all of that work, we were able to present the detailed schedule included with our December 7 letter. This is an aggressive schedule for work at the largest POTW in the two Carolinas where a number of other necessary, scheduled and funded projects were already underway or planned. Furthermore, we are offering to begin work on this project now and not at some time in the future. If either DHEC or DENR has specific suggestions as to how the schedule may be shortened, we would be happy to consider them. Absent such suggestions, we have not identified any ways to compress the schedule. With regard to DENR's request to have 90 days to approve authorizations to construct provided the City submits a complete application, we have two concerns. First, as proposed, the 90-day clock does not start to run until the application is deemed complete and there is no deadline for DENR to make a completen interim deadline after the City makes is complete. We would propose application. ermination. We believe there needs to be a short on for DENR to determine that an application adline be 15 days after submission of the Second, our proposed schedule • s based on 60-day approvals by the State and other permitting agencies. We are willing to agree to DENR's 90-day proposal. However, everyone must recognize that with a 90-day time limit for the DENR, the City's proposed schedule will be automatically extended 30 days until May 3, 2006. Furthermore, current regulations require DENR to act on authorizations to construct within 90 days. 15A N.C.A.C. 2H.0112(a). The City has been working from the premise that time is of the essence in completing the work at McAlpine and thus has gone to great lengths to establish an aggressive design, construction and start up schedule, in short doing things faster than it normally would. In light of this principle, we would hope that DENR might reconsider its position on this issue. Finally, there is one clarification we need to make to the schedule included with our December 7 letter. The City is willing to begin selection of and negotiation of a contract with a consultant prior to the effective date of the permit modification contemplated by the proposed settlement. However, the City will not authorize work to begin under the contract until the permit modification is effective. The City will commit to submitting its permit modification request on January 15, 2002, assuming the City Council approves the settlement the night before. North Carolina regulations then require a 45-day public notice period on DENR's intent to issue the modification. 15A N.C.A.C. 2H.0109 and .0114. Thus the March 1, 2002 date for beginning Jill B. Hickey Samuel J. Finklea, III December 19, 2001 Page 3 design work will be delayed. The length of that delay will depend on when DENR can begin the public notice period. o summarize, based on the . •' osals in Sam's letter, the end date of the City's proposed sedule will be extended 30 day (to account for DENR's 90-day processing of the uthorization to construct.) Th ity will begin the selection of and negotiation of a contract h a contractor im ui - = ' . e y following City Council approval. However, work on the design and pre u .i . ion of plans and specifications will not begin until the permit modification becomes effective. Performance of that and all subsequent phases of this project will run from that date. DENR will need to provide guidance as to what that date will be. Force Majeur With the exception of the first of our seven enumerated assumptions (Charlotte City Council approvals following the settlement), we believe all of the other items are contingencies that are outside the City's control and thus truly constitute force majeur events. We believe DHEC's proposed settlement language, with some modifications, can be used to incorporate these concepts into a final agreement. Enclosed is a blacklined version of that proposed language that highlights our suggested changes. We will await your response to these proposed changes. Monthly Phosphorous Limits We have reviewed and believe we understand your rationale for a short-term permit limit in addition to the rolling annual limit. However, it is our understanding that the impacts of phosphorous on the environment are related not to concentrations of phosphorous but rather to the mass load of phosphorous into the lakes and the resulting in -lake concentration. In light of this and the fact that the volume of the lake remains relatively constant more so that the flow rates from treatment plants and feeder streams, it would seem that a monthly mass limit would be more appropriate. Recognizing this, we would propose a combined monthly mass limit equivalent to 2 mg/1 at the permitted flow rates of the three plants. This would be a monthly average of 1,651 lbs/day from the three plants. This limit would become effective five years after the effective date of the renewed permit for Sugar Creek, five years after the effective date of the renewed permit for Irwin Creek, or the completion of the McAlpine phosphorous upgrades, whichever occurred last. If the McAlpine project is completed before then (which is likely going to happen), that that plant would be subject to an interim monthly mass limit equivalent to 2 mg/1 at 64 mgd, or 1,067 lbs/day averaged on a monthly basis. Jill B. Hickey Samuel J. Finklea, III December 19, 2001 Page 4 The combined limit for all three plants will allow for the flexibility, operational and otherwise, that the City needs, a need that both DHEC and DENR have recognized throughout our settlement negotiations. At the same time, the focus will remain on the loading of phosphorous coming into South Carolina, which has been the primary focus of all the settlement discussions. Sugar and Irwin Creek Phosphorous Controls and Schedules Sam's letter raises two issues with regard to phosphorous management at the Sugar and Irwin Creek plants. First, it asks for an explanation of the City's phosphorous strategy for these two plants. Although our primary focus, as all the parties concurred was appropriate, has been on the McAlpine plant, as part of the phosphorous reduction feasibility study required by the current permit, the City has considered approaches for the Sugar and Irwin plants. This has included an identification of future flow scenarios, analysis of influent characteristics, design and construction limitations at the plants, and development of treatment scenarios based on different phosphorous effluent limits and application of chemical treatment, biological treatment or some combination of the two. Through this work, 18 different alternative scenarios were identified for the Irwin Creek plant and 12 were identified for the Sugar Creek plant. Based on this preliminary analysis, the most likely approach for Irwin Creek will be a chemical phosphorous removal process that will include, among other things, the conversion of at least one secondary digester to a primary digester, the construction of chemical feed facilities, and solid handlings improvements. At Sugar Creek, the most likely approach will be a biological removal process that will include, among other things, a new final clarifier, new anaerobic and anoxic basins, and various new digesters. Second, Sam's letter requests that dates be established by which the phosphorous limits will become effective for Sugar and Irwin. We are very concerned about this request and the discussion of it in the letter. Since the initial meeting of the parties in August, the City believes there has been a consensus that there should be an overall mass limit for the three plants and that the focus of the initial efforts should be on McAlpine as it is the largest of the plants and the plant where the greatest amount of phosphorous reduction can be obtained. Furthermore, there is already a permit in place for McAlpine so the City has no uncertainty regarding its legal requirements as it develops and implements its phosphorous reduction project there. The same is not the case with regard to Sugar and Irwin. Although what follows repeats what I already said in my December 7 letter and what a number of City representatives have said at our meetings and in other contacts, it appears we need to say it yet again. First, any schedules for projects at Sugar and Irwin will be dependent on other terms and conditions of the renewed permits. If those permits require the City to undertake other projects at those plants, the nature Jill B. Hickey Samuel J. Finklea, III December 19, 2001 Page 5 of those projects may impact the type and/or nature of any phosphorous reduction projects at those plants. At McAlpine we knew what the other projects were when we developed plans for the phosphorous project. We do not know that at Sugar or Irwin. To commit to schedules now without such knowledge would be, to say the least, foolish on the City's part. Second, the waste load allocation for phosphorous is to apply to all three plants so that the City has flexibility to determine how that limit is allocated among the three plants. Problems encountered at and the effectiveness of the efforts at McAlpine will need to be evaluated to determine what actions need to be taken at Sugar and Irwin. Third, all parties have recognized for some time that the greatest reductions in phosphorous loading can be achieved at the McAlpine plant. If we are to develop schedules now for Sugar and Irwin, the work at McAlpine will be delayed and a settlement cannot be reached by January 7. For all of these reasons, the City will agree to achieve compliance with the mass -based limit for phosphorous within five years of the effective dates of the renewed permits for the Sugar and Irwin Creek plants. Without the permits, the City cannot agree to anything else at this time. Please keep in mind that the City timely filed for renewal of both of those permits so the timing of when the five years begins to run is solely within the control of DENR. Finally Sam's letter proposes that the City "does not need to explain its strategies or share its timetables if it will agree that the limits for Sugar and Irwin shall take effect at the same time as the limit for McAlpine." Since the City has explained its strategies and shared its timetables, no response to this proposal is necessary. Interim Limits We agree with your position on this issue. Stakeholder Process with TMDL Like DENR, the City wishes to be involved in a meaningful stakeholder process for South Carolina's TMDL development and allocation process and concurs with DENR that this should be reflected in the settlement agreement. Next Steps We hope that this letter resolves all of the remaining issues regarding settlement of this matter. If not, with the holidays next week and the impending January 7 deadline, further exchanges of letters may not be the most efficient way to proceed. We should consider a Jill B. Hickey Samuel J. Finklea, III December 19, 2001 Page 6 conference call or, if absolutely necessary, a meeting as the final attempt to reach definitive settlement terms. No City representatives will be available next week due to the Christmas holidays. Please get back to me as to if, how and when we should proceed from here. Sincerely, Smith Helms Mulliss & Moore, L.L.P. Benne C. Hutson BCH cc: Douglas O. Bean (via electronic mail) Barry Gullet (via electronic mail) H. Michael Boyd (via electronic mail) The Division of Water Quality shall provide written notice as soon as practicable that a specified extension of time has been granted or that no extension has been granted. An extension shall be granted for any scheduled activity delayed by an event of force majeure, which shall mean any event arising from causes beyond the control of CMUD that causes a delay in or prevents the performance of any of the conditions under this settlement agreement including, but not limited to: a) acts of God, fire, war, insurrection, civil disturbance, explosion or natural catastrophes; b) adverse weather conditions, c) restraint by court order or order of public authority; d) inability to obtain, after exercise or reasonable diligence and timely submittal of all applicable applications, any necessary authorizations, approval, permits, or licenses due to action or inaction of any governmental agency or authority; e) delays caused by compliance with applicable statutes or regulations governing contracting, procurement or acquisition procedures, despite the exercise of reasonable diligence by CMUD; f) failure of suppliers to provide equipment or components that meets specifications and is not defective; g) failure of CMUD's consultants or contractors to fully and satisfactorily complete their work provided CMUD exercises due diligence in attempting to obtain full and satisfactory completion; and h) failure of the plant and equipment to perform as designed and intended to meet the effluent limit for phosphorous. Events which are not force majeure include by example, but are not limited to, unanticipated or increased costs of performance or changed economic circumstances. Total Phosphorus (pounds per year) 1000000 900000 800000 700000 600000 500000 400000 300000 200000 100000 0 TP limit = 1 mg/I Total Phosphorus Load for CMUD WWTPs Combined TP limit = 2 mg/I TP limit = 3 mg/I IJTotal Projected TP Load (All CMUD Plants) ■Actual TP Load (2000- 2001, all CMUD Plants) a ll!PTER g LPN SECT -MN Fax :919-716-6766 Dec 12 '01 9:26 P.01 r • , • bc/INA • TTY— tilitfc' or .N )1-1k1 c:nr-t)li�t�t ttr,} ( c,rr1 ;.It r, ! )t ;l-(till r)t 11( „I l;rti(r< \I Irtlf.\I \ ,d \11,\I. ( � 1 • + r I ;,,C ,_r, It.\:JO(:I! rE/.Tn, f rv,_IV ITT. P S'xrr• rT ro: c-�•tc�f 6ao�ur.v I'rLinV ir') .!il•nrwii l:.rx , 11 �r •I,r.r, ',,. PROM: G 7� NUMBER OF P;\CIS (rlNc[.uurti'C TRANsNrrr-r L SHEET): CON Frnm RECEIPr cl' DocL';NrE;v`r•(s) IF yr;1RKLD HERE: COMjE;NTS. (2),� s a.-yt p7t.2e A L r_•P) 43596%= o,L. /(J2/.%--~_ , WATER & LAND SECTION Fax Dec 12 '01 9:26 P.02 al Hickey - 2TIER Rationale for a concentration limit. We have agreed to a monthly mass limit equivalent to 1 rng/1 at Rill flow, measw ed using a rolling annual average, for all three plants. A. second litnit (e.g., concentration) is necessary for several reasons. The downstream impoundments can absorb some variability in phosphorus loading hut arc not completely indifferent to the rate of loading; a short -tern limit is necessary to protect the lakes during low -flow conditions and to prevent concentration spikes which could cause localized eutrophication. A monthly concentration limit would ensure that nuisance algal blooms would not develop downstream, blooms which can develop in 14 days or leis. The water quality standard of 0.06 mg/1 for phosphorus in the downstream reservoirs is t? be met at all times, not just as an annual average. EPA's NPDES Permit Writer's Manual (EPA-S33-B-96-003), page 112 (section 6.5.1) states that "The objective is to establish permit limits that result in the effluent meeting the WLA under normal operating condition virtually all the time." Further it states, "In effect, the limits crust force treatment plant performance levels that, after considering acceptable effluent variability, will only have low statistical p 'obability of exceeding the WLA and will achieve the desired loadings." From this, it is clear that you set limits to insure a certain measure of treatment plant performance. Setting a monthly limit that assesses only annual data would not accomplish this goal. Concentration limits are the best way to insure plant performance. In addition, EPA regulations, NC regulations, and SC regulations require a shortl-term limit in addition to the long-term limit; see, e.g., 40 CFR I22.45(d): "Continuous discharge. For continuous discharges all permit effluent limitations, standards, and prohibitions, in9luding those necessary to achieve water quality standards, shall unless impracticable be stated as ... (2) Average weekly and average monthly discharge limitations for POTWs." Finally, 40 CFR122.41(e) requires operation of all installed controls at all time and a concentration limit in the permit will verify such operation. We think a concentration limit of 2 mg/1, reported as a monthly average, satisfies all these considerations. R:190471SETTLE\:ier a. f North Carolina } ss Mecklenburg County} The Knight Publishing Co., Inc. Charlotte, NC Affidavit of Publication THE CHARLOTTE OBSERVER WATER QUALITY BUDGET OFC PO BOX 27687 RALEIGH NC 27611-7687 REFERENCE: 20076845 4282774 modify npdes Before the undersigned, a Notary Public of said County and State, duly authorized to administer oaths affirmations, etc., personally appeared, being duly sworn or affirmed according to law, doth depose and say that he/she is a representative of the Knight Publishing Company a corporation organized and doing business under the laws of the State of Delaware, and publishing a newspaper known as The Charlotte Observer in the city of Charlotte, County of Mecklenburg and State of North Carolina and that as such he/she is familiar with the books, records, files and business of said Corporation and by reference to the files of said publication the attached advertisement was inserted. The following is correctly copied from the books and files of the aforesaid Corporation and Publication. PUBLISHED ON: 10/16 AD SPACE: 44 LINE FILED ON: 10/18/01 NAME: T'W. lrt ',it Y 9 ul 1 ll'l (1 k TITLE: DATE: In Testimony Whereof I have hereunto set my hand and affixed my seal, day and year aforesaid. Notice of Intent To Modify NPDES Discharge Permit NC0024970 SUBJECT The Division of Water Duality plans to estabksh a scted- u!e off compliance on a new lin- i dane limit in the existent NPDES Permit for the Charlotte Meriden - burg utilities Department (CMUD) - McAlpine Creek Wastewater Treatment plant (NC0024970) PURPOSE The facility fisted above discharges into McAlpineCreek In the Catawba River basin. A com- pliance schedule lasting until Feb- ruary 28. 2002 has been granted in order to meet a newly imposed undone limit. INFORMATION:A copy of the ex- isting NPDES permit and a map showing the location of the dis- charge is available by writing qr calling: Ms. Natalie Sierra NC DENR-DWO•NPDES Unit 1617 Mai $ervice Center Raleigh,North Carolina27699-1617 Telephone number: (919)733-5083. extension 551 The tan of permit e Divisionot er Duality. Archdale Building, 512 North Salisbury Street (Room 925), Raleigh, North Carolina, It maybe Inspected dur- ing normal office hours. Copies of the information on 1leare available 'Von Payment otthe 6P4282774 Notary: 0.44) My Commission Expires: //_ the N1y ".i 47j; 200(3 onto ST44., UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4 ATLANTA FEDERAL CENTER 61 FORSYTH STREET ATLANTA, GEORGIA 30303 �een Sullins, Chief W er Quality Section orth Carolina Department of Environment and Natural Resources 1617 Mail Service Center Raleigh, North' Carolina 27699-1617 NOV 1 9 ZOvi SUBJ: Charlotte Mecklenburg Utilities Department (CMUD) - McAlpine Creek Wast tV.atw_ ml.at.e,k Plant - 17TPWLQ Permit 11/4:uber NC002 98 Dear Ms. Sullins: In accordance with the EPA/NC Memorandum of Agreement (MOA), we have completed the review of the modification for the above referenced North Carolina Department of Environment and Natural Resources (NC DENR) National Pollutant Discharge Elimination System (NPDES) permit and have no objections to this proposed permit modification. However EPA does recommend that the NPDES permit contain interim reporting dates for the submission of reports of progress towards meeting the lindane limit. If you have any questions, please do not hesitate to contact me or Ms. Caroline Ejimofor of my staff, at 404-562-9309. Sincerely, oosevelt Childress, Chief NPDES and Biosolids Permits Section Permits, Grants, and Technical Assistance Branch Water Management Division >/VfC4/p5114411 lPre. e corlse M'Itri? pv,.(444-- kepik ho,c me Thei,1.- Cern ki W me.,6471 a Aar calce-r. 'age- /mvin/7 4ffiroac4 #10000C. tidy (50nut... 4,-VG a 'tidy dancr h 4 reet figr,464-- deo& . L 042mlions Iclali : A Ifni; 1 pi la conrifetc-c, hti-G -kkat ale.netc keyemk-7W,i4firairan otrAfte• *Feun delife4 ge,e("AhA(e.. 54thentwm4- tivudwitvif A-mly 5 ill8c'/C/Mt49 -7 V14€C- I 19 tft I IL I z ter a 7 eel ":111triiitIA. viitt 4,1;e1u4 MhuteilOtTfrS Pg-oPnatkl--- WI- I 5 5C `, gei2 CajTS 111-_©1 ociA .F0/0/e,thil91/ eariti6titttf Poo 444.4cf/ "774,9170/. g...1E_Le 7 ifeY Aykif-d t;56ele-tmirty Ave j #0./71/ er(c1 VOI 06/ 1/01 s'/er (e�(evi 7 y/s ;11 pcfre 5-CP/1. 07404170\i 714Q ' 1/4Atet le a / a %71- if17' fed inf 1/,(1:14. W‘177,#) ‘e--1/ e(' ,,,f7446E1/:,st azed . Oice t/241/ "'Rio reedinti974- deihtfii9 tir 9 _ -— - _4rcheead-s �- f .. / /Intl _>Jr15-44 ANA1114-4-- cyr74X • ce,75 _ z. -3 _6tz.,1 col/ova) > &-f-boe, Nim1/41 '7'' eiN5T ? — v s epir- /07.--,ry /e19/Z > e a /z,-4" I :7 7474 ..r tip role Rc4tilaita� Afj:7 Air gilt425 LA/ CL—IP // — .1775/141 ,Cjee Redi"Tr MICIAWs5E 7790 fid iti6rr YA-)L .) r�- r ,4 4.44-41( hfift Sigt91,4-) 9wo, fib? Adiv e6l-nia/-06"( Cs0 I ilowf? `#(2 44 clef b/relf.cf,e-/ ete- /11 /60 . kve finc vfty lee inannod g:s. c1714 • rievuern it/111171.1- eift* 41:74,4r 1. ri-nr6560( ghal f` A._0142y *mod a4/4=Tc. • Tirn ivt:7 t%'Srio# • P C .• 1174/4L. ave._ ivy kfee( _1040( . • mica tie„_ty et arc)/ -bd, It 4 yyl. _ - halt..kOt . 145- rrsoPp fit coo" sada • reakild_ ,c44144/e.. (14,17,04 knotatiw eAryni Di- 114Afilat fich eta+L. WA- wade( !My ikfiv j+) frmitet 41r4_, 4 3c kap, te > yzotr, . 011••••••••• HCAJIuIQ hi 4. --r? Procadiey utileptifiWzotHon t Pretf41- eTeN b") 1. /2./31101 Mod GI' ectic.ern - MAA awile.fitstiFcal)."-) 12) st.ct,o/k.. " 17.wied iwpm,441 ot/ 1-1/91 '11-44ciell- • Dva Wu" scte;c. ivr,C1 6rvist% in elf p(yrvi rt$1Y1c1-7?31.5; ci-f6C e tiefr Ili • 4_4112i-a Aced -re bnolf-4 11.4 • ! , • /lfvij t ,t4,07, 01, A a 4-tad/ a- 77 n /.1 i7e4r les o5-wer61 kietee4.1aKe97 C0712lifirl td/ 4 S-727.5 et /rue( 4,7 WATER & LAND SECTION Fax:919-716-6766 Nov 16 '01 11:26 P.03 1'1/rIs/20o1 11;24 FAX 704 334 846Y W11111 71nLma SMITH HELMS MULLISS & MOORE, L.L.P. Attorneys at Law 201 North Tryon Street Charlotte, NC 26202 PO Box 31247 (28231) (704) 343-2000 direct: 704-343-2060 fax: 704-444-6739 beanahutson@uaitkhe leas.com VIA E-MAIL VIA FACSINLILE Ji11 B. Hickey Assistant Attorney General Office of Attorney General Environmental Division Post Office Box 629 Raleigh, North Carolina 27602-629 November 8, 2001 Samuel J. Finl;lea, III South Carolina Department of Health and Environmental Control 2600 Bull Strcet Columbia, South Carolina 29201 Re: SCDHEC v. NCDENR and CMUD/Settlement Proposal Dear Jill and :tam: The C.ty of Charlotte would propose to resolve the pending Petition for Contested Case regarding the McAlpine Creek POTW on the following terms: 1, The City will agree to a phosphorous limit for the McAlpine POTW of 534 pounds per day measured as a rolling annual average. The City will have designed and awarded a contract to construct any improvements or modifications to the McAlpine POTW to meet this limit by the I'.xpiration of the current permit (June 30, 2005). A more detailed schedule is enclosed. Thc: City will voluntarily apply to NCDENR for a permit modification to include these items in its existing NPDES permit. 2. The City will agree to a phosphorous limit for the Sugar Creelc POTW of 167 pounds per day measured as a rolling annual average with compliance to be achieved within five years of the effective date of the renewed NPDES permit for Sugar Creek. 3. The City will agree to a phosphorous limit for the Irwin Creelc POTW of 125 pounds per day measured as a rolling annual average with compliance to be achieved within five years of the cll:ective date of the renewed NPDES permit for Irwin Creek. ARLA ITA C#AkL TTE 6REEM411010 AILEIRH WW1 NGWOW WATER & LAND SECTION ;Fax:919-716-6766 31 /0S/2001 11: Z7 FAX 704 334 8487 SMITH HUMS Nov 16 '01 11V P. 04 W 003/004 Jill B. Hickey Samuel J. Finklea, III November 8, 001 Page 2 4. By the last date when all POTWs are to have achieved comp; fiance with their respective phosphorous limits, the combined limit for the plants will be 826 pounds per day measured as a rolling annual average with the allocation of this limit to the individual POTWs to be determined by the City at its discretion. 5. The parties will enter into a Settlement Agreement or other documentation evidencing the; terms of this resolution. The documentation will provide, among other things, that this settlement resolves all of' SCDHEC's issues regarding the current kilcAlpine Creek NPDES permit, that SCDHEC will dismiss its pending Petition for Cont9sted Case with prejudice, and that SCDHEC will not make any comments, raise any objections O otherwise take any adverse actions with regard to inclusion of these phosphorous limits in the renewed Sugar Crock and Irwin Creek NPDES permits at any time. Sincerely, SMI - ' LMS MULLISS & MOORE, L.L.P. e C. Hutson Enclosure cc: Douglas D. Bean Barry Gullet H. Michael Boyd Jill Hickey zom- Fa.x:919 716-6766 WATER & LAND SECTION McAlpine rake Penni llodfic tion kct Engineer lepat: Mud Esotneedno Wntra-A Oast in prupresss Design Conglete Apply tor Auarorietioriho Construct (ATC) Receive ATC disc forCenstnrcton edS Receive Bids Award contract.? dor Wbtkhes Cms6u�ion (end dale unknown) urent NPDES Permit Eagles 6f3O 5 SugaiRrwin HP issues Draft Permits ennui, Pr for Pinta Ccarne is conSl edee D€HNR Issues Foal Permit PerrnitBeeones tffecne Select Engineer Negotiaie&Award Engineering Ccrelract Design n progress Design Apply for ATC Receive ATC Advcrfsso ror Core ucsoo Bids R.:o..In. Bids ward Cunlea(e) entrance Mobilizes t ConsWClion in Progress Compls.%Carsbuclion Plant Sart Up Pont Cowes into CtrnabricesritnPermi li�rils Deadline forCorrpliance ‘4,a/`''1'r`r 1'F:I OC:11 TOOZ/RO/TT t9 0 Screening level model results 10/22/01 SCENARIO TP = 1 mg/L for all NC and SC discharges No non -point source reductions TOTAL PHOSPHORUS ASSOCIATED PERMIT CONCENTRATION RANGE LIMITS FOR SC AND NC IN FISHING CREEK PLANTS RESERVOIR 0.11 NC = 1 mg/L SC = 1 mg/L TP =0 mg/L for all NC discharges TP =1 mg/L for all SC discharges No non -point source reductions 0.08 NC = 0 mg/L SC = 1 mg/L . TP =0 mg/L for all NC and SC discharges No non -point source reductions 0.06 NC = 0 mg/L SC = 0 mg/L TP = 1 mg/L for all NC and SC discharges Non -point sources eliminated 0.10 NC = 1 mg/L SC = 1 mg/L TP = 1 mg/L for all NC and SC discharges 'Non -point sources eliminated Background phosphorus levels set to zero 0.06 NC = 1 mg/L SC = 1 mg/L TP=0.5mg/LforallNCandSC discharges (BAT) BMPs implemented for 25% reduction in non -point source contribution 0.08 NC = 0.5 mg/L SC = 0.5 mg/L TP= 0.5 mg/L for all NC and SC discharges (BAT) No non -point source reductions 0.09 NC = 0.5 mg/L SC = 0.5 mg/L TP= 0.18 mg/L for all NC and SC discharges No non -point source reductions 0.07 NC = 0.18 mg/L SC = 0.18 mg/L TP= 0.18 mg/L for all NC and SC discharges BMPs implemented for 25% reduction in non -point source contribution 0.06 NC = 0.18 mg/L SC = 0.18 mg/L TP= 0.31 mg/L for all NC and SC discharges No non -point source reductions 0.08 NC = 0.31 mg/L SC = 0.31 mg/L g TP= 0.31mg/L for all NC and SC discharges BMPs implemented for 50% reduction in non -point source contribution 0.06 NC = 0.31 mg/L SC = 0.31 mg/L Table 1. Possible scenarios for phosphorus contributions to Fishing Creek Reservoir. Phosphorus concentrations in Fishing Creek are based on Jim Bowen's screening model (10/9/01 version) ®Watershed Analysis Risk Management Framework - [DAwarmt51CatawbalCatawba.wsm] SO© Fle Edit Yew Mode Scenario Dgcu Module Window �4'Ckl P1+01%1 :k62,i 41J Lake Wylie Fishing Creek Lake Great Falls Reservoir Cedar Creek Reservoir Aston' q;Quick Lake Wateree IMicrosofl Word - Document 12 MicrosoftWord-Doc... ISk TE litte $44,•0 Jri ram„ Watershed Analy... TER Help _J8J xf Arial :5 NUM NG:OGAM .. NCOO85359 - Union County - 12 Mile Creek WWTP Assessment of Effluent Nutrient Loadings 9/21/01 Date Flow (MGD) Jan-98 Feb-98 Mar-98 Apr-98 May-98 Jun-98 JuI-98 Aug-98 Sep-98 Oct-98 Nov-98 Dec-98 Jan-99 Feb-99 Mar-99 Apr-99 May-99 Jun-99 Jul-99 Aug-99 Sep-99 Oct-99 Nov-99 Dec-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 JuI-00 Aug-00 Sep-00 Oct-00 Nov-00 Dec-00 Average 0.8448 0.8353 0.8033 0.7931 0.6608 0.5999 0.7145 0.7676 0.8358 0.7467 0.7724 0.7894 1.0081 0.9383 0.904 0.8245 0.8503 0.7573 0.7342 0.7607 0.8235 0.9214 0.8426 0.8344 1.0316 1.3041 1.0548 1.0242 0.9532 0.919 0.8919 0.9867 1.0753 0.9887 1.0316 1.0735 0.939 Total Phosphoru: (mg/L) Total Phosphoru; (lb/day) 1.0 7.0 2.0 13.9 3.0 20.1 0.0 2.9 16.0 4.0 20.0 3.4 20.3 3.0 19.2 3.9 27.2 4.1 25.5 2.4 15.5 3.4 22.4 0.48 4.0 2.6 20.3 2.9 21.9 2.6 17.9 2.3 16.3 3 18.9 3.2 19.6 1.7 10.8 1.7 11.7 1.8 13.8 1 7.0 1.3 9.0 0.34 2.9 1 10.9 1.2 10.6 0.14 1.2 1.5 11.9 4.2 32.2 6 44.6 2.5 20.6 3.9 35.0 2.1 17.3 0.51 4.4 0.4 3.6 2.015 15.270 Temperature (deg C) 12.23 12.2 13.5 16.57 20.0 23.4 25.27 24.42 23.87 20.22 17.52 16.66 14.25 14.17 14.13 17.33 19.1 21.59 23.95 23.97 22 20.09 18.19 15.67 13.86 13.53 16.47 17.05 19.15 21.77 23.09 23.77 22.84 20.64 18.5 15.06 *data contained herein was culled from the monthly averages posted on gkpr NC0024970 - CMUD McAlpine Creek WWTP Assessment of Effluent Nutrient Loadings 9/20/01 Date RAW DATA MASS LOADING Flow (MGD) Total Phosphorus (mg/L) Total Phosphorus (lb/day) Temperature (deg. C) Jan-99 Feb-99 Mar-99 Apr-99 May-99 Jun-99 JuI-99 Aug-99 Sep-99 Oct-99 Nov-99 Dec-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 JuI-00 Aug-00 Sep-00 Oct-00 Nov-00 Dec-00 42.4032 42.2928 39.1741 38.7666 38.929 38.624 35.7412 37.2332 35.039 38.9319 35.69 37.239 41.8558 47.0368 43.8177 44.216 43.4461 41.361 41.2893 47.4754 50.5473 40.4916 41.6933 40.247 2.1 3.9 3.4 4 3.9 2.1 2.6 2.5 3.4 1.5 1.3 1.3 4.4578 2.862 6.2083 5.84 6.1681 6.5136 6.19 6.0521 6.4 6.2043 6.954 5.8263 742.6 1375.6 1110.8 1293.3 1266.2 676.5 775.0 776.3 993.6 487.0 387.0 403.7 1556.1 1122.7 2268.8 2153.6 2235.0 2246.9 2131.5 2396.3 2698.0 2095.2 2418.1 1955.7 16.05 16.4 16.65 19.42 21.55 24.18 25.9 27.09 25.25 22.28 20.98 17.81 16.28 15.44 18.28 19.58 22.77 26.2 27.15 27.6 25.97 23.58 20.53 16.58 *data contained herein has been culled from the facility's 2000-2001 Discharge Monitoring Reports NC0024937 - CMUD Sugar Creek WWTP Assessment of Effluent Nutrient Loadings 9/20/01 RAW DATA MASS LOADING Date Flow Total Phosphorus Total Phosphorus Temperature (MGD) (mg/L) (lb/day) (deg. C) Jan-99 Feb-99 Mar-99 Apr-99 May-99 Jun-99 Jul-99 Aug-99 Sep-99 Oct-99 Nov-99 Dec-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 Oct-00 Nov-00 Dec-00 Average 15.5745 13.7764 13.2032 13.9243 14.3787 14.2366 16.7 14.7161 16.2 16.0548 14.9366 14.2419 15.9096 15.2586 14.6451 15.1366 13.8935 13.771 14.0806 13.9548 14.32 12.5774 13.39 13.5354 14.52 4.585 5.4238 6.3954 6.7571 6.92 5.3909 4.0545 4.7583 4.5904 4.5285 5.7047 5.6904 4.4578 2.862 6.2083 5.84 6.1681 6.5136 6.19 6.0521 6.4 6.2043 6.954 5.8263 5.60 595.6 623.2 704.2 784.7 829.8 640.1 564.7 584.0 620.2 606.4 710.6 675.9 591.5 364.2 758.3 737.2 714.7 748.1 726.9 704.4 764.3 650.8 776.6 657.7 672.25 *data contained herein was culled from the monthly averages posted on gkpr 16.73 17.25 17.41 20.9 22.8 25.5 27.09 28.54 26.76 23.85 21.66 18.89 16.28 15.44 18.28 19.58 22.77 26.2 27.15 27.6 25.97 23.58 20.53 16.58 NCOO24945 - CMUD Irwin Creek WWTP Assessment of Effluent Nutrient Loadings 9/20/01 Date Flow (MGD) Jan-99 Feb-99 Mar-99 Apr-99 May-99 Jun-99 J u I-99 Aug-99 Sep-99 Oct-99 Nov-99 Dec-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 JuI-00 Aug-00 Sep-00 Oct-00 Nov-00 Dec-00 Average 10.6 10.33921 10.6933 10.8166 10.3645 10.1533 10.1354 10.5451 10.7133 10.5322 9.52 9.7225 10.4903 10.6689 10.3645 10.9933 8.787 9.7533 9.1967 9.8064 10.5666 6.558 9.06 8.0322 9.934 Total Phosphorus (mg/L) 2.6 2 2.45 2.3 1.5 2.2 1.8 2 2.9 3.4 1.8 2.1 2 2 1.8 1.2 1.4 2.3 2.8 1.6 3.8 1.9 3.4 1.8 2.210 Total Phosphorus (lb/day) 229.9 172.5 218.5 207.5 129.7 186.3 152.2 175.9 259.1 298.7 142.9 170.3 175.0 178.0 155.6 110.0 102.6 187.1 214.8 130.9 334.9 103.9 256.9 120.6 183.891 Temperature (deg C) 15.05 15.6 15.76 19.96 21.95 24.77 26.57 27.86 25.42 22.38 20 16.58 14.21 13.64 16.8 18.24 22 25.85 26.7 26.95 25.08 21.53 17.86 13.91 *data contained herein was culled from the monthly averages posted on gkpr USGS Station 2176750 Station Description McAlpine Cr below McMullen Cr nr F Agencies monitoring at these locations • USGS gage DWQ CMUD MCDEP (subset) DHEC 214676115 C968 (McAlpine Cr at SC SR 2964 at Camp Cox, SC MC2 (Downstream of McMullen and McAlpine Cr confluence at SC 9aaeI USGS WQ MC45A (McAlpine Cr CW226 (McAlpine Cr at US Hwv 521) atRte521) CW064 (McAlpine Cr at S 29-64) 0 O Q Agencies monitoring at these locations USGS Station Station Description USGS gage DWQ CMUD MCDEP (subset) DHEC USGS WO Sugar Creek Proper 2146211 Irwin Creek at Statesville Ave/US Hv X MC19 (Irwin Cr 42) Statesville Ave) 2146300 Irwin Cr nr Charlotte X C88965 (Irwin Cr at Irwin Cr WWTP) 2146315 Taggart Cr at West Blvd X MC52 (Taggart Cr at Billy Graham Pkwv) 2146348 Coffey Cr at NC Hwy 49 nr Charlotte X MC25 (Coffey Cr NC Hwv 49) SC2 (Downstream of Irwin and Sugar Cr confluence at Arrnwnnri Rrfl MC23A (Sugar Cr Arrowood Rd) SC3 (Downstream of Irwin and Sugar Cr confluence at Nations Ford Rril MC26 (Sugar Cr 0 Nations Ford Rd) 2146381 Sugar Cr at NC Hwy 51 nr Pineville X C905 (Sugar Cr at NC 51 at Pineville) SC4 (Downstream of Irwin and Sugar Cr confluence at Rte 51) MC27 (Sugar Cr CO NC Hwy 51) 2146800 C979 (Sugar Cr at SC Hwy 160 nr Fort Mill) SC5 (Downstream of McAlpine and Sugar Cr confluence at Rte IAn) CW013 (Sugar Cr at SC 160 E of Fort Mill) CW036 (Sugar Cr on Sec Rd 36) Little Sugar Creek 2146409 L Sugar Cr at Med Ctr Dr X 214672825 Briar Cr above Shamrock Rd X 214645022 Briar Cr ab Colony Rd X 2146470 Little Hope Cr at Seneca PI X 2146507 Little Sugar C at Archdale Dr X LSC2 (Downstream of Sugar Cr WWTP at Archdale Rd) MC32A (L Sugar Cr, Archdale Dr) 2146530 Little Sugar Cr at NC Hwy 51 at Pine X C921 (L Sugar Cr at NC Hwy 51 at Pineville) MC49A (L Sugar Cr, NC Hwy 51) LSC3 (Downstream of Sugar Creek WWTP at Rte 5211 McAlpine Creek 2146600 McAlpine Cr at Sardis Rd near Char! X C937(McAlpine Cr at Sardis Rd. Charlotte) MC38 (McAlpine Cr, Sardis Rd) 2146670 Four Mile Cr below Elm Lane W nea X MC40A (Four Mile Cr, Elm Ln) 2146700 McMullen Cr at Sharon View Rd nr C X MC42 (McMullen Cr 0 Sharon View) eoweto.'s *de/ e e #ia no cewc rieef ;r1/461( /cflai;.if 71" e e/l4q,e4., iler7Wito17'07-7 )4474.5 47,5 sia4-41.21:9 - 144- wni, ev,145.110-4( (6'409 it) J% S•r4l 2� A yJ q 02 19. 4C PRojE�'•l UNITED STATES ENVIRONMENTAL•PROTECTION AGENCY REGION 4 ATLANTA FEDERAL CENTER 61 FORSYTH STREET ATLANTA, GEORGIA 30303-8960 Mr. Samuel L. Finklea, III Chief Counsel for EQC Office of General Counsel South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 Dear Mr. Finklea: AUG 1 7 2001 AUG 2 3 2001 DIV, OF WATER DUALITY DIRECTOR'S OFFICE DoP(- Thank you for your April 27, 2001, letter and your May 9, 2001, petition outlining your concerns with the re -issuance of the National Pollutant Discharge Elimination System (NPDES) permit for the McAlpine Creek Wastewater Treatment Plant (WWTP), NC0024970. This facility is located in the Catawba River Basin, which spans both the States of North Carolina and South Carolina. This permit was issued by the North Carolina Department of Environment and Natural Resources on January 31, 2001, and was effective on March 1, 2001. It covers the discharge from a major municipality into McAlpine Creek, approximately one mile upstream from the point where McAlpine Creek flows into South Carolina. EPA understands your primary concerns to be the lack of an appropriate total phosphorus limit and North Carolina's failure to provide South Carolina with copies of the fact sheet, the permit application, and the proposed permit, as required by 40 CFR §124.10(e), prior to permit issuance for the McAlpine Creek NPDES permit. Clearly, under the Clean Water Act (CWA), NPDES pc-mits cannot be issued that do not ensure compliance with applicable water quality standards in all affected states (40 CFR §122.4(d)), as expressed in your petition. This fact applies regardless of whether the affected state has been provided notice as required by the CWA and regulations. Additionally, you note in your petition that North Carolina did not provide South Carolina with copies of the fact sheet, the permit application, and the proposed permit prior to issuance as required by 40 CFR §124.10(e). If North Carolina did not provide you with appropriate notice and opportunity for comment, this would be considered a flaw in the permit. South Carolina is within its rights to raise these issues in a permit challenge to North Carolina. The federal regulations at 40 CFR § 124.10(e) lay out the responsibility of a state issuing NPDES permits to send a copy of all proposed permits, fact sheets, and permit applications for dischargers which affect another state to that state prior to permit issuance. Additionally, the Internet Address (URL) • http://www.epa.gov Recycled/Recyclable • Printed with Vegetable Oil Based Inks on Recycled Paper (Minimum 30% Postconsumer) 2 failure to notify an affected state is justification for the Director to modify or revoke and reissue an NPDES permit, in accordance with 40 CFR §122.62(a)(10). EPA considers these regulations an important foundation for meeting water quality standards in all states and complying with them a critical component of NPDES Program Authorization per 40 CFR § 123.25. Under 40 CFR § 122.2, since North Carolina has an approved state program, "Director" refers to the State Director, not the EPA Regional Administrator. Therefore, North Carolina has the discretionary responsibility to take this action. South Carolina sent a request for draft and final permits for the McAlpine Creek WWTP to North Carolina in a letter dated December 20, 2000, and has documented that it did not receive this information. Additionally, South Carolina has documented violations of water quality standards due to excessive phosphorus. For these reasons, it would appear that cause exists under 40 CFR §122.62(a)(10) for South Carolina to request a permit modification. EPA Region 4 recognizes the critical oversight role it plays in ensuring that NPDES permits are issued incorporating the appropriate state and federal requirements. South Carolina's concerns with nutrient enrichment in the Catawba River Basin are valid and EPA does have a responsibility to ensure that State Regulation 61-68.E.9.a.-e., effective June 22, 2001, requiring a 0.06 mg/1 Total Phosphorus in -lake numeric standard is met. In light of this responsibility, we will be reviewing each and every municipal permit in the Catawba River Basin issued in North Carolina, as described in a letter dated July 1, 2001, and sent to Ms. Coleen Sullins, Water Quality Section Chief, NC Department of Environment and Natural Resources (Enclosure). Additionally, we appreciate South Carolina's submittal of every municipal permit issued in the Catawba River as requested by EPA R4 in a letter dated July 1, 2001. These permits will be reviewed with respect to the appropriate federal regulations, i.e., reasonable potential procedures outlined in 40 CFR §122.44(d), state water quality standards, and in the time frame outlined in the North Carolina and South Carolina Memorandum of Agreements. In the future, EPA will provide written comments, as appropriate, to the permitting authority, affected state, and facility, for each of these facilities within the appropriate time frame. Furthermore, EPA Region 4 is in the process of reviewing South Carolina water quality modeling reports and information listed in your April 9, 2001, letter as well and the September 1997, "Water Quality Model and Monitoring Needs Assessment for Lake Wateree, SC" prepared by the Department of Environmental Health Sciences and Department of Civil and Environmental Engineering of the University of South Carolina. EPA Region 4 is evaluating this information with respect to appropriate nutrient loadings from point and non -point sources. We are also analyzing State Regulation 61-68.E.9.a.-e. publishing a 0.06 mg/1 total phosphorus in -lake numeric standard for the Piedmont and Southeastern Plains ecoregions of the State and how this standard would apply to upstream dischargers, such as the McAlpine Creek WWTP. 3 EPA Region 4 appreciates the efforts South Carolina is taking to protect its water resources from excessive nutrient pollution, as evidenced bythe many municipal NPDES permits issued in the State with enforceable total phosphorus limits. It is our hope that prompt discussions among the States of North and South Carolina and the Charlotte Mecklenburg Utility District can produce a satisfactory resolution to this issue that will provide strong environmental protection for the Catawba River Basin. Sincerely, A. Stanley Meiburg Acting Regional Administrator Enclosure cc: William G. Ross, Jr., Secretary, NCDENR R. Lewis Shaw, Deputy Commissioner, SCDHEC Greg Thorpe, Division of Water Quality, NCDENR' Alton Boozer, Chief, Water Pollution Control, SCDHEC Douglas O. Bean, Director, Charlotte Mecklenburg Utility District Table 1. Results of scenario run with decay equation Pt=Po*exp(-kt) where k=0.00011 s-1. Phosphorus uptake in the downstream lakes was assumed as follows: 25% uptake in Fishing Creek Lake, 20% in Great Falls Reservoir, and 15% in Cedar Creek Reservoir CMUD-McAlpine Creek WWTP (2001) CMUD- Sugar Creek WWTP (2001) CMUD - Irwin Creek WWTP (2001) Town of Rock Hill WWTP City of Lancaster WWTP 2001 Flow 2001 Effluent Phosphorus Est. Distance from Fishing (MGD) Concentration (mg/L) Creek Lake (m) 44 3.25 32733 14.5 5.57 46722 10 1.67 51583 9.5 1 33503 (assumed) 2.6 1 8253 (assumed) Phosphorus Load at Lake Wateree (kg/day) (kg/year) (lb/year) 4.3 1568.1 3457.6 0.1 19.7 43.4 0.0 6.3 13.9 0.8 299.1 659.5 2.8 1030.9 2273.0 Table 2. Results of a second scenario run with decay equation Pt=Po*exp(-kt) where k=0.00011 s-1. Phosphorus uptake in the downstream lakes was assumed as follows: 25% uptake in Fishing Creek Lake, 20% in Great Falls Reservoir, and 15% in Cedar Creek Reservoir. A 50% reduction to the phosphorus load reaching Wateree was fixed in this scenario. Effluent concentrations corresponding to the 50% reduction goal were determined accordingly. CMUD-McAlpine Creek WWTP CMUD- Sugar Creek WWTP CMUD - Irwin Creek WWTP 44 14.5 10 1.63 2.78 0.91 785 1730.374 10 21.67515 3 6.9678 mow- e0&-14;6,15 OINDIPHeclaK pro/. j vo ✓G m,1-5 `r'yrj4 cer/Lekva4-4, 7fd',ei1ckl1.t'' Alof orpsd P/mit- Aloe( &css ogpFr* i `cce, - /Q ,-Svt6s f 6'dye 7 tm) .i1vp a t/ai�r�' fn7c.47s 1,(41 oft r,1. ter -ism s �h�f5 (-7-1740-.5 per -,al 7 e 7 rz,ph ! • Ci pr112.07 4 /of, pn b/i c a#doh. • Ur/e IC 4friffti Q/( P11 . ("{""end., fork. a/nt' rii4ky- keg, ft.-itc(0-0k7. 7 • /014,4 171? ✓ en j/jhr2�tr cU . • 9/1 ' 1/20 (pi,coec.7 4/ dk , l* s C. • b j/.,J: Ocl 4•Axe- as , �' /21 4 -- Ca/delW. - 6V--E-1°T% 5 - Tt$ oi- C/rriml ZA , o,J�r 4J o ate-,t(ce, pitwfs - ctwv- c•7nd s r T"y. Oog2ca o) WorkA, vi P • r tgf__ rx,(7.,it -fr i2/1 /dr/ • r five-t J a' k' • �le•f+w►o � h4 Tr re rr . 4714, y ►�f� C • l ,7#t�4() `• • 4 � •L, (�of 2,1.5/4.o.5 fr, ILc,Irfa.43-. ✓a -(p(4S Su yc e % • .c J * Cis . „actu ip k- ; €, UU , . ` Iritom- er(y 6 `44 fri(te( p knito:rza. -- 6/ kiov. I,eock r, )�'YI > ;r f vaoLS • 0 D'5 34ye•t& ? f" finem1 . • J miri3 - cic opt+mi¢a17.00 s-k cty. • r ..5yferill 15 i nvo fve4. - —rr 7v. tss. . `FP 5.M- .'S ^,P • 5 ( E7. ? 90% o(4 /c5 7 F M = 1- f (.- . C4f-a = nWC, a IL. Wt`vx.�efi4r')-t rein!'(-f: ove 4 Th Er c-1 - firms trprave„ . i,4 la 140 acmes poP Tr(- 4itu' j� ecceAfs .eve.,I) out5f-Aw 41evt_sevc caLot am k/Q N —517, • tivvv_Laj__Am-111•1--.f-Alcc_. -lp ettev4-1-"treort-c_ `s ,-duos o o-h tfxb: n%/s 02- PR.t9P AZ VtiGtaf_ _ trciAm4 c_ �fi l tv144A111 vne, de IA* we/0( 4 V 12 -f weer • CA,�. a cokAftu/ a c 00 - && f erK fG� Seoul > VeiL%p llw4 l4l �O �G - ha( TWA v/ Cron fop ro,k, 104'5 ca,r • via.,v� is G ra4Wok• r. ��) ;�'u4) kat (s Ater' NIG�r rG "(Z-; S. I II , f 4' fit . FACILITY PHASED FLOW LIMIT (MGD) COMPLIANCE SCHEDULE PHOSPHORUS LIMITS: (mg/L) PHOSPHORUS LIMITS: MASS LOADING - BASED TP LIMIT AT Qw (mg/L) NAME/ PERMIT PERMIT? NUMBER Monthly Average (PPd) The Chester Sewer District - Manetta Lando) WWTP SC0001741 Yes - Compliance schedule given 0.50 10/ 1 /00 - 2/28/03 Weekly 24 hour composite mon. Weekly 24 hour composite mon. 3/1/01 - 9/30/05 2 (monthly ave.) 3 (weekly ave.) 4.2 (monthly ave.) 6.3 (weekly ave.) 1.01 (monthly ave.) 1.51 (weekly ave.) Town of Fort Mill- Fort Mill WWTP SC0020371 Yes Scheduled Expansion 1.5 12/1/99 - 2/28/01 OR exp. to 2.0 MGD (whichever is first) Weekly 24 hour composite mon. Weekly 24 hour composite mon. 2.0 2 (monthly ave.) No weekly limit - 12.5 (monthly ave.) No weekly limit 0.75 (monthly ave.) Town of Great Falls - NC Childers Plant SC0021211 No 1.40 None given 2 (monthly ave.) 3 (weekly ave.) 12 (monthly ave.) 18 (weekly ave.) 1.02 (monthly ave.) 1.54 (weekly ave.) City of Lancaster Catawba River Yes - Compliance schedule given 5.75 12/1/99 - 2/28/02 Wcckday 24 hour composite mon. Weekday 24 hour composite mon. WWTP SC0046892 5.75 3/1/02 - exp. to 7.5 MGD 2 (monthly ave.) No weekly limit 48 (monthly ave.) No weekly limit 1.0 (monthly ave.) 7.5 Upon exp. to 7.5- MGD -11 /30/04 2 (monthly ave.) No weekly limit. 48 (monthly ave.) No weekly limit 0.77 (monthly ave) Lancaster County Water & Sewer - Indian Land WWTP SC0047864 Yes Scheduled Expansion 1.2 3/1/98 - exp. to 2.0 MGD 2 (monthly ave) No weekly limit 16.7 (monthly and weekly average) 1.67 (monthly and weekly average) 2.0 Exp to 2 MGD- 4.0 MGD 2 (monthly ave) No weekly limit 16.7 (monthly and weekly average) 1.00 (monthly and weekly average) 4.0 Exp to 4 MGD- 2/28/03 2 (monthly ave) No weekly limit 16.7 (monthly and weekly average) 0.5 (monthly and weekly average) City of Rock Hill Manchester Creek Plant SC0020443 Yes - Compliance schedule given P limits are only on 001B - no flow limit 4/1/00 - 2/28/03 11.000 (monthly limit) 28200 (quarterly limit) 73200 (yearly limit) 3/1/03 - 4/30/03 2 (monthly ave) 5100 (monthly ave.) 45500 (yearly limit) City of York - Fishing Creek No 1.40 None given 1 (monthly ave.) 17 (monthly ave) 1.02 (monthly ave) WWTP SC0038156 u\90171--HAI (04 dap( 01);VC i s -CCOTA Cyr e�►S �:� Ivan C IMF -A vv._ )� lam; � �n ��(�i� 2�+ ( ° 3-) (aki) nc_st(vcD /tDc-t-c 4-) ektc.OuSt., vult v_( INGL> I , , 0 o 4?)\ oo ,) 6(.,0 b,0 -' H'. 65,1)\ § 122.44 all applicable requirements of CWA and regula- tions. These shall include conditions under §§ 122.46 (duration of permits), 122.47(a) (sched- ules of compliance), 122.48 (monitoring), and for EPA permits only 122.47(b) (alternates schedule of compliance) and 122.49 (considerations undcr Federal law). (b)(1) For a State issucd permit, an applicable requirement is a State statutory or regulatory re- quirement which takcs effect prior to final admin- istrative disposition of a permit. For a permit is- sued by EPA, an applicable requirement is a statu- tory or regulatory requirement (including any in- tcrim final regulation) which takes effect prior to thc issuance of the permit (except as provided in § 124.86(c) for NPDES permits being processed under subpart E or F of part 124). Section 124.14 (rcopcning of comment period) provides a means for rcopcning EPA permit procccdings at thc dis- crction of the Director whcrc ncw requirements become effective during the permitting process and arc of sufficient magnitude to make additonal proceedings desirable. For Statc and EPA adminis- tered programs, an applicable requirement is also any requirement which takes effect prior to the modification or revocation and rcissuance of a per- mit, to the cxtcnt allowed in § 122.62. (2) New or rcissucd permits, and to thc extent allowed under § 122.62 modified or revoked and rcissucd permits, shall incorporate each of thc ap- plicable requirements referenced in §§ 122.44 and 122.45. (c) Incorporation. All permit conditions shall be incorporated cithcr expressly or by reference. If in- corporated by reference, a specific citation to thc applicable regulations or requirements must be given in thc permit. § 122.44 Establishing limitations, standards, and other permit condi- tions (applicable to State NPDES programs, see § 123.25). In addition to the conditions established under § 122.43(a), cach NPDES permit shall include con- ditions meeting the following requirements whcn applicable. (a) Technology -based effluent limitations and standards bascd on effluent limitations and stand- ards promulgated undcr section 301 of CWA or ncw source performance standards promulgated undcr section 306 of CWA, on case -by -case efflu- ent limitations determined undcr scction 402(a)(I) of CWA, or on a combination of the two, in ac- cordance with § I25.3. For new sources or new dischargcrs, thcsc technology bascd limitations and standards arc subjcct to the provisions of § 122.29(d) (protection period). (b)(1) Other effluent limitations and standards under sections 301, 302, 303, 307, 318 and 405 of 44 CWA. If any applicable toxic effluent standard or prohibition (including any schedule of compliance specified in such effluent standard or prohibition) is promulgated under section 307(a) of CWA for a toxic pollutant and that standard or prohibition is more stringent than any limitation on the pollut- ant in the permit, the Director shall institute pro- ceedings under these regulations to modify or re- voke and reissue the permit to conform to the toxic effluent standard or prohibition. See also § 122.41(a). (2) Standards for sewage sludge use or disposal under section 405(d) of the CWA unless those standards have been included in a permit issucd under the appropriate provisions of subtitle C of the Solid Waste Disposal Act, Part C of Safe Drinking Water Act, the Marine Protection, Re- search, and Sanctuaries Act of 1972, or the Clean Air Act, or undcr State permit programs approved by the Administrator. When there are no applica- ble standards for sewage sludge use or disposal, the permit may include requirements developed on a case -by -case basis to protect public health and the environment from any adverse effects which may occur from toxic pollutants in sewage sludge. If any applicable standard for sewage sludge use or disposal is promulgated under section 405(d) of the CWA and that standard is more stringent than any limitation on the pollutant or practice in the permit, the Director may initiate proceedings undcr these regulations to modify or revoke and reissue the permit to conform to the standard for sewage sludge use or disposal. (c) Reopener clause: for any dischargcr within a primary industry category (sec appendix A), re- quirements under scction 307(a)(2) of CWA as fol lows: (1) On or before June 30, 1981: (i) If applicable standards or limitations have not yet been promul- gated, the permit shall include a condition stating that, if an applicable standard or limitation is pro- mulgated under sections 301(b)(2) (C) and (D), 304(b)(2), and 307(a)(2) and that effluent standard or limitation is morc stringent than any effluent limitation in the permit or controls a pollutant not limited in the permit, the permit shall be promptly modified or revoked and reissued to conform to that effluent standard or limitation. (ii) If applicable standards or limitations have been promulgated or approved, the permit shall in- clude those standards or limitations. (If EPA ap- proves existing effluent limitations or decides not to develop new effluent limitations, it will publish a notice in the FEDERAL REGISTER that the limita- tions arc "approved" for the purpose of this regu- lation.) (2) On or after the statutory deadline set forth in section 301(b)(2) (A), (C), and (E) of CWA, any permit issued shall include effluent limitations to meet the requirements of section 301(b)(2) (A), (C), (D), (E), (F), whether or not applicable efflu- ent limitations guidelines have been promulgated or approved. These permits need not incorporate the clause required by paragraph (c)(I) of this sec- tion. (3) The Director shall promptly modify or re- voke and reissue any permit containing the clause required under paragraph (c)(1) of this section to incorporate an applicable cfflucnt standard or limi- tation under scctions 301(b)(2) (C) and (D), 304(b)(2) and 307(a)(2) which is promulgated or approved after the permit is issued if that effluent standard or limitation is more stringent than any cfflucnt limitation in the permit, or controls a pol- lutant not limited in the permit. (4) For any permit issued to a treatment works treating domcstic sewage (including "sludge -only facilities"), the Director shall include a reopcncr clause to incorporate any applicable standard for sewage sludge use or disposal promulgated undcr scction 405(d) of the CWA. The Director may promptly modify or revoke and reissue any permit containing the reopener clause required by this paragraph if the standard for sewage sludge use or disposal is more stringent than any requirements for sludge use or disposal in thc permit, or con- trols a pollutant or practice not limited in the per- mit. (d) Water quality standards and State require- ments: any requirements in addition to or more stringent than promulgated cfflucnt limitations guidelines or standards under sections 301, 304, 306, 307, 318 and 405 of CWA necessary to: (1) Achieve water quality standards established undcr section 303 of the CWA, including State narrative critcria for water quality. (i) Limitations must control all pollutants or pollutant parameters (either conventional, nonconventional, or toxic pollutants) which the Di- rcctor determines arc or may be discharged at a level which will cause, have the reasonable poten- tial to cause, or contribute to an excursion above any State water quality standard, including State narrative critcria for water quality. (ii) When determining whether a discharge causes, has the rcasonablc potential to cause, or contributes to an in -stream excursion above a nar- rative or numeric critcria within a State water quality standard, thc permitting authority shall use procedures which account for existing controls on point and nonpoint sources of pollution, the varia- bility of thc pollutant or pollutant parameter in the effluent, the sensitivity of the species to toxicity testing (when evaluating whole effluent toxicity), and where appropriate, the dilution of thc effluent in the receiving water. (iii) When the permitting authority determines, using the procedures in paragraph (d)(I)(ii) of this 45 § 122.44 section, that a discharge causes, has the reasonable potential to cause, or contributcs to an in -stream excursion above the allowable ambient concentra- tion of a State numeric criteria within a State watcr quality standard for an individual pollutant, the permit must contain cfflucnt limits for that pollutant. (iv) When the permitting authority determines, using the proccdurcs in paragraph (d)(I)(ii) of this section, that a discharge causes, has thc reasonable potential to cause, or contributcs to an in -stream excursion above the numeric criterion for whole effluent toxicity, the permit must contain cfflucnt limits for whole cfflucnt toxicity. (v) Except as provided in this subparagraph, whcn the permitting authority determines, using thc procedures in paragraph (d)(I)(ii) of this sec- tion, toxicity testing data, or othcr information, that a discharge causcs, has the reasonable poten- tial to cause, or contributes to an in -stream excur- sion above a narrative critcrion within an applica- ble Statc water quality standard, the permit must contain effluent limits for whole cfflucnt toxicity. Limits on whole cfflucnt toxicity arc not necessary whcrc the permitting authority demonstrates in the fact sheet or statement of basis of thc NPDES per- mit, using thc proccdurcs in paragraph (d)(I)(ii) of this section, that chemical -specific limits for the cfflucnt are sufficient to attain and maintain appli- cable numcric and narrative Statc water quality standards. (vi) Where a Statc has not established a water quality critcrion for a specific chemical pollutant that is present in an effluent at a concentration that causes, has the reasonable potential to cause, or contributes to an excursion above a narrative cri- terion within an applicable State water quality standard, the permitting authority must establish effluent limits using one or morc of the following options: (A) Establish effluent limits using a calculated numcric water quality critcrion for the pollutant which the permitting authority demonstrates will attain and maintain applicable narrative watcr quality critcria and will fully protect the des- ignated use. Such a critcrion may be derived using a proposed State critcrion, or an explicit State pol- icy or regulation intcrprcting its narrative water quality critcrion, supplemented with other relevant information which may include: EPA's Water Quality Standards Handbook, October 1983, risk assessment data, exposure data, information about the pollutant from the Food and Drug Administra- tion, and current EPA critcria documents; or (B) Establish cfflucnt limits on a casc-by-casc basis, using EPA's water quality critcria, published under section 304(a) of the CWA, supplemented where necessary by othcr relevant information; or § 122.44 (C) Establish effluent limitations on an indicator parameter for the pollutant of concern, provided: (/) The permit identifies which pollutants are intended to be controlled by the use of the effluent limitation; (2) The fact sheet required by § 124.56 sets forth the basis for the limit, including a finding that compliance with the effluent limit on the indi- cator parameter will result in controls on the pol- lutant of concem which are sufficient to attain and maintain applicable water quality standards; (3) The permit requires all effluent and ambient monitoring necessary to show that during the term of the permit the limit on thc indicator parameter continues to attain and maintain applicable watcr quality standards; and (4) The permit contains a rcopencr clause allow- ing the permitting authority to modify or revoke and reissue the permit if the limits on the indicator parameter no longer attain and maintain applicable water quality standards. (vii) When developing water quality -based ef- fluent limits under this paragraph the permitting authority shall ensure that: (A) The level of water quality to be achieved by limits on point sources established under this para- graph is derived from, and complies with all appli- cable water quality standards; and (B) Effluent limits developed to protect a nar- rative watcr quality criterion, a numeric water quality criterion, or both, are consistent with the assumptions and requirements of any available wastcload allocation for the discharge prepared by the State and approved by EPA pursuant to 40 CFR 130.7. (2) Attain or maintain a specified water quality through water quality related effluent limits estab- lished under section 302 of CWA; (3) Conform to the conditions to a State certifi- cation undcr section 401 of the CWA that meets the requirements of § 124.53 when EPA is the per- mitting authority. If a State certification is stayed by a court of competent jurisdiction or an appro- priate State board or agency, EPA shall notify the State that the Agency will deem certification waived unless a finally effective State certification is received within sixty days from the date of thc notice. If the State does not forward a finally ef- fective certification within the sixty day period, EPA shall include conditions in the permit that may be necessary to meet EPA's obligation under section 301(b)(I)(C) of the CWA; (4) Conform to applicable water quality require- ments under section 401(a)(2) of CWA when the discharge affects a State other than the certifying State; (5) Incorporate any more stringent limitations, treatment standards, or schedule of compliance re- quirements established under Federal or State law 46 or regulations in accordance with section 301(b)(1)(C) of CWA; (6) Ensure consistency with the requirements of a Water Quality Management plan approved by EPA under section 208(b) of CWA; (7) Incorporate section 403(c) criteria under part 125, subpart M, for ocean discharges; (8) Incorporate alternative effluent limitations or standards where warranted by "fundamentally dif- ferent factors," under 40 CFR part 125, subpart D; (9) Incorporate any othcr appropriate require- ments, conditions, or limitations (other than efflu- ent limitations) into a new source permit to the ex- tent allowed by the National Environmental Policy Act, 42 U.S.C. 4321 el seq. and section 511 of the CWA, when EPA is the permit issuing authority. (See § 122.29(c)). (e) Technology -based controls for toxic pollut- ants. Limitations established under paragraphs (a), (b), or (d) of this section, to control pollutants meeting the criteria listed in paragraph (c)(1) of this section. Limitations will be established in ac- cordance with paragraph (e)(2) of this section. An explanation of the development of these limita- tions shall be included in the fact sheet under § 124.56(b)(1)(i). (1) Limitations must control all toxic pollutants which the Director determines (based on informa- tion reported in a permit application undcr § 122.21(g)(7) or (10) or in a notification under § 122.42(a)(1) or on other information) are or may be discharged at a level greater than the level which can be achieved by thc technology -based treatment requirements appropriate to the permittee under § 125.3(c); or (2) The requirement that the limitations control the pollutants meeting the criteria of paragraph (c)(1) of this section will be satisfied by: (i) Limitations on those pollutants; or (ii) Limitations on other pollutants which, in the judgment of the Director, will provide treatment of the pollutants under paragraph (e)(1) of this sec- tion to the levels required by § 125.3(c). (f) Notification level. A "notification level" which exceeds the notification level of § 122.42(a)(1)(i), (ii) or (iii), upon a petition from the permitter or on the Director's initiative. This new notification level may not exceed the level which can be achieved by the technology -based treatment requirements appropriate to the permittee under § 125.3(c) (g) Twenty-four hour reporting. Pollutants for which the permittee must report violations of max- imum daily discharge limitations under § 122.41(1)(6)(ii)(C) (24-hour reporting) shall be listed in the permit. This list shall include any toxic pollutant or hazardous substance, or any pol- lutant specifically identified as thc method to con- trol a toxic pollutant or hazardous substancc. (h) Durations for permits, as sct forth in § 122.46. (i) Monitoring requirements. In addition to § 122.48, thc following monitoring rcquircmcnts: (1) To assurc compliancc with permit limita- tions, requirements to monitor. (i) Thc mass (or othcr measurement spccificd in the permit) for cach pollutant limited in thc per- mit; (ii) Thc volumc of effluent dischargcd from cach outfall; (iii) Othcr measurements as appropriatc includ- ing pollutants in internal wastc streams under § 122.45(i); pollutants in intakc water for nct limi- tations undcr § 122.45(f); frequency, rate of dis- chargc, etc., for noncontinuous dischargcs undcr § 122.45(c); pollutants subject to notification rc- quircmcnts under § I22.42(a); and pollutants in scwagc sludgc or othcr monitoring as specified in 40 CFR part 503; or as determined to be ncccssary on a casc-by-case basis pursuant to section 405(d)(4) of thc CWA. (iv) According to tcst procedures approved under 40 CFR part 136 for thc analyses of pollut- ants having approvcd mcthods undcr that part, and according to a tcst proccdurc specified in thc per- mit for pollutants with no approvcd methods. (2) Exccpt as providcd in paragraphs (i)(4) and (i)(5) of this scction, rcquircmcnts to report mon- itoring rcsults shall bc cstablishcd on a casc-by- casc basis with a frcqucncy dcpcndcnt on the na- ture and cffcct of the dischargc, but in no casc Icss than oncc a ycar. For scwagc sludgc use or dis- posal practices, requirements to monitor and rcport results shall be cstablishcd on a casc-by-casc basis with a frcqucncy dcpcndcnt on the nature and ef- fect of thc scwagc sludgc use or disposal practice; minimally this shall bc as spccificd in 40 CFR part 503 (where applicable), but in no casc less than once a year. (3) Rcquircmcnts to report monitoring rcsults for storm watcr dischargcs associatcd with indus- trial activity which arc subjcct to an cfflucnt limi- tation guidclinc shall bc cstablishcd on a casc-by- casc basis with a frcqucncy dcpcndcnt on the na- ture and effect of thc dischargc, but in no cast less than oncc a year. (4) Rcquircmcnts to rcport monitoring rcsults for storm water dischargcs associatcd with indus- trial activity (othcr than thosc addrcsscd in para- graph (i)(3) of this scction) shall bc established on a casc-by-casc basis with a frequency dependent on thc nature and cffcct of thc dischargc. At a minimum, a permit for such a dischargc must rc- quirc: (i) Thc dischargcr to conduct an annual inspcc- tion of thc facility site to identify arcas contribut- 47 § 122.44 ing to a storm water discharge associatcd with in- dustrial activity and evaluate whether measures to reduce pollutant loadings identified in a storm watcr pollution prevention plan are adequate and properly implemented in accordance with the terms of thc permit or whether additional control measures arc needed; (ii) Thc discharger to maintain for a period of three years a record summarizing the results of the inspection and a certification that the facility is in compliance with the plan and the permit, and idcn- tifying any incidents of non-compliance; (iii) Such report and certification be signed in accordance with § 122.22; and (iv) Pcrmits for storm water discharges associ- ated with industrial activity from inactive mining operations may, where annual inspections arc im- practicable, require certification once every three years by a Rcgistcrcd Professional Engineer that thc facility is in compliance with the permit, or al- ternative requirements. (5) Permits which do not require thc submittal of monitoring result reports at lcast annually shall rcquirc that thc permittcc rcport all instances of noncompliance not reported undcr § 122.41(1) (I), (4), (5), and (6) at least annually. (j) Pretreatment program for POTWs. Require- ments for POTWs to: (1) Identify, in terms of character and volumc of pollutants, any significant indircct dischargcrs into thc POTW subject to pretreatment standards undcr scction 307(b) of CWA and 40 CFR part 403. (2) Submit a local program whcn rcquircd by and in accordance with 40 CFR part 403 to assurc compliancc with pretreatment standards to the ex- tent applicable undcr section 307(b). Thc local program shall be incorporated into the permit as described in 40 CFR part 403. The program shall rcquirc all indircct dischargers to the POTW to comply with thc reporting requirements of 40 CFR part 403. (3) For POTWs which arc "sludge -only facili- ties," a requirement to develop a pretreatment pro- gram undcr 40 CFR part 403 when thc Director determines that a pretreatment program is nec- essary to assure compliance with Section 405(d) of thc CWA. (k) Best management practices to control or abatc the dischargc of pollutants when: (1) Authorized under section 304(c) of CWA for the control of toxic pollutants and hazardous substances from ancillary industrial activities; (2) Numeric effluent limitations arc infcasiblc, or (3) The practices are reasonably necessary to achieve effluent limitations and standards or to carry out the purposes and intent of CWA. (1) Reissued permits. (1) Except as provided in paragraph (1)(2) of this section whcn a permit is § 122.44 rcncwcd or rcissucd, interim cfflucnt limitations, standards or conditions must bc at !cast as strin- gent as the final cfflucnt limitations, standards, or conditions in thc previous permit (unlcss thc cir- cumstances on which thc prcvious permit was bascd havc materially and substantially changcd sincc thc timc thc permit was issucd and would constitute causc for permit modification or revoca- tion and rcissuance under § I22.62.) (2) In thc casc of cfflucnt limitations established on the basis of Section 402(a)(1)(B) of the CWA, a permit may not be renewed, reissued, or modi- ficd on thc basis of cfflucnt guidclincs promul- gatcd undcr scction 304(b) subscqucnt to thc origi- nal issuancc of such permit, to contain effluent limitations which arc less stringcnt than thc com- parable effluent limitations in the prcvious permit. (i) Exceptions —A permit with rcspcct to which paragraph (I)(2) of this section applies may be re- newed, reissued, or modificd to contain a less stringcnt effluent limitation applicablc to a pollut- ant, if — (A) Material and substantial altcrations or addi- tions to the pctmincd facility occurred after permit issuance which justify thc application of a less stringcnt effluent limitation; (B)(1) Information is availablc which was not availablc at thc time of permit issuance (other than revised rcgulations, guidance, or test methods) and which would havc justified thc application of a less stringent effluent limitation at thc timc of per- mit issuancc; or (2) The Administrator determines that tcchnical mistakes or mistakcn interpretations of law were made in issuing the permit under section 402(a)(I)(b); (C) A less stringent effluent limitation is ncc- cssary because of events over which the permittcc has no control and for which thcrc is no reason- ably available remedy; (D) The permince has received a permit modi- fication undcr scction 301(c), 301(g), 301(h), 30I (i), 301(k), 301(n), or 3 16(a); or (E) Thc pet -mince has installed thc treatment fa- cilities required to mcct thc effluent limitations in the previous permit and has properly operated and maintaincd thc facilities but has nevertheless been unablc to achicvc thc prcvious effluent limitations, in which casc the limitations in the reviewed, re- issued, or modified permit may reflect thc Icvcl of pollutant control actually achicvcd (but shall not bc less stringcnt than required by effluent guide- lines in cffcct at thc timc of permit rcncwal, rcissuancc, or modification). (ii) Limitations. In no event may a permit with respect to which paragraph (1)(2) of this section applics be renewed, reissued, or modificd to con- tain an cfflucnt limitation which is Tess stringent than rcquircd by effluent guidelines in cffcct at the 48 timc thc permit is renewed, reissued, or modified. In no event may such a permit to discharge into waters be renewed, issued, or modified to contain a less stringent effluent limitation if the implcmcn- tation of such limitation would result in a violation of a watcr quality standard undcr section 303 ap- plicablc to such waters. (m) Privately owned treatment works. For a pri- vatcly owned treatment works, any conditions ex- pressly applicablc to any user, as a limited co -per - mince, that may be necessary in the permit issued to the trcatmcnt works to ensure compliancc with applicablc requirements under this part. Alter- natively, the Director may issuc scparate permits to the treatment works and to its users, or may re- quire a separate permit application from any uscr. Thc Director's dccision to issue a permit with no conditions applicable to any user, to impose condi- tions on one or more users, to issuc separate per- mits, or to require separate applications, and thc basis for that dccision, shall be stated in thc fact sheet for the draft permit for thc treatment works. (n) Grants. Any conditions imposed in grants madc by the Administrator to POTWs under scc- tions 201 and 204 of CWA which are reasonably necessary for thc achievement of effluent limita- tions undcr scction 301 of CWA. (o) Sewage sludge. Requirements under section 405 of CWA governing the disposal of sewage sludgc from publicly owned treatment works or any other treatment works treating domestic sew- age for any use for which regulations have been established, in accordance with any applicable rcg- ulations. (p) Coast Guard. Whcn a permit is issued to a facility that may operate at certain times as a mcans of transportation over water, a condition that the discharge shall comply with any applica- blc regulations promulgated by thc Secretary of the department in which the Coast Guard is oper- ating, that establish specifications for safe trans- portation, handling, carriage, and storage of pollut- ants. (q) Navigation. Any conditions that thc Sec- retary of thc Army considers necessary to ensure that navigation and anchorage will not be substan- tially impaired, in accordance with § 124.58. (r) Great Lakes. When a permit is issued to a facility that discharges into the Great Lakes Sys- tem (as defined in 40 CFR 132.2), conditions pro- mulgated by the Statc, Tribe, or EPA pursuant to 40 CFR part 132. [48 FR 14153, Apr. 1, 1983, as amended at 49 FR 31842, Aug. 8, 1984; 49 FR 38049, Sept. 26, 1984; 50 FR 6940, Feb. 19, 1985; 50 FR 7912, Feb. 27, 1985; 54 FR 256, Jan. 4, 1989; 54 FR 18783, May 2, 1989; 54 FR 23895, June 2, 1989; 57 FR 11413, Apr. 2, 1992; 57 FR 33049, July 24, 1992; 60 FR 15386, Mar. 23, 1995] UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4 ATLANTA FEDERAL CENTER 61 FORSYTH STREET ATLANTA, GEORGIA 30303-8960 Ms. Coleen Sullins Water Quality Section Chief NC Dept. of Environment and Natural Resources P.O. Box 29535 Raleigh, NC 27626-0535 Dear Ms. Sullins: The Environmental Protection Agency (EPA) Region 4 is initiating a review of all municipal permits in the Catawba River Basin. We will be reviewing these permits with a focus on the inclusion of appropriate nutrient limits that would be protective of all receiving waters. In light of this effort, EPA Region 4 requests, in accordance with the Memorandum of Agreement between EPA Region 4 and the State of North Carolina, that all proposed National Pollutant Discharge Elimination System (NPDES) municipal permits for the Catawba River Basin be sent to EPA for review when drafted. The proposed permits should be transmitted with the appropriate fact sheet, application, and supporting materials used to develop permit conditions. Since the Catawba River Basin spans more than one state, please ensure that all proposed permits, fact sheets, and permit applications for dischargers which affect another downstream state are sent to that state for review and comment. Thank you for your cooperation in this matter. EPA looks forward to working with North Carolina to ensure the issuance of NPDES permits that are protective of the environment. If you have any questions, please call me at (404) 562-9334 or Mr. Roosevelt Childress, Chief, NPDES & Biosolids Section at 404/562-9279. Sincerely, 6Jud-E Carol L. Kemker, Acting Chief Permits, Grants, & Technical Assistance Branch Water Management Division cc: Alton Boozer, SCDHEC Internet Address (URL) • http://www,epa,gov Recycled/Recyclable • Printed with Vegetable Oil Based Inks on Recycled Paper (Minimum 30% Postconsumer) IN THE OFFICE OF ADMINISTRAT V'E HEARINGS MECHLENBURG CouNTX, NORTH CAROLINA South Carolina Department of Health and ) Environmental Control, ) .) Petitioner, ) ) -v- ) ) North Carolina Department of Environment ) and Natural Resources, Charlotte ' ) Mecklenburg Utility Department, North ) Carolina Environmental Management ) Commission, ) )' Respondent. ) -� — ) PETITION FOR CONTESTED CASE HEARING • INTRODUCTION • 1. In accordance with N.C. Gen. Stat. § 150B-23, petitioner, the South Carolina Department of Health and Environmental Control ("SC DHEC") hereby petitions for a contested case hearing regarding the decision df the North Carolina Department of Environment and . Natural Resources ("NC DENR") to grant a National Pollutant Discharge Elimination System ("NPDES") permit to the Charlotte -Mecklenburg Utility Department ("CMUD"). 2. SC DHEC is an agency ofthe State of South Carolina responsible for administering the NPDES permit program pursuant to the South Carolina Pollution Control Act, S.C. Code Ann. §§ 48-1-10 to -350 (1987), and the Federal Water Pollution Control Act (commonly rcfcrrcd to as the Clean Water Act), 33 U.S.C. § 1251 et. seq. 1 60 'd 6V: L TO, SI un f 992.9-9TL-6T6: xuJ NOI133S QNdl 13 d3ldl'l JU USDYCTION AND VENUE 3 - Under N.C. Gen. Stat. § ..150D-23, the Office of Administrative Hearings has juri diction of this proceeding. In accordance with N.C. Gen. Stat. § 15013-24(a)(2). venue of this proceeding is proper in Mecklenburg County. PARTIES 4. SC DHEC is authorized to bring and maintain actions to any out the purposes of the. South Carolina Pollution Control Act. S.C. Code Ann. § 48-1-50. Specifically, SC DHEC has the authority to "abate, control and prevent pollution." S.C. Code Ann. § 48-1-20. South Carolina is an "affected State" within the meaning of section 402(b) of the Clean Water Act, 33 U.S.C. § 1342 and 40 C.F.R. parts 122.4, 122.44, 122.62 and 123.44, as well as N.C. Admin. Code tit. 15A, r.2D.1112. 5. The North Carolina Environmental Management Commission ("Commission"), is an agency of the State of North Carolina. The Commission is authorized by N.C. Gen. Stat. § 143- • 215.1 and by the U.S. Environmental Protection Agency ("EPA") to issue NPDES permits. 6. The NC DENR is an agency of the State of North Carolina. The Commission has delegated the authority to issue NPDES permits to NC DEM. under N.C. Admin. Code tit. 15A, r. 211.0112 (1993). 7. The CMUD is a statutory :body established to construct, own and operate sewage collection lines and waste water treatment and disposal facilities' serving the City.of Charlotte, North Carolina. FACTUAL ALLEGATIONS 8. North Carolina i4sues NPDES permits under N.C. Gen. Stat. § 143-215.1. Any 2 OT 'd 6V:1 T0, SZ unf 99L.9-9TL-616: XEd NOI103S QNd5 '8 31df NPDES permit granted by North Carolina must conform to the requirements of the Clean Water. Act and the water quality regulations promulgated by the U.S. EPA. 9. Under EPA's regulations;.011 Statc-issued NPDES permits must provide for "compliance with the applicable water quality requirements of all affected States." 40 C.P.A. § 122.4(d)(1996). Similarly, North Carolina's water quality rules provide that "[njo permit maybe' issued when the imposition of conditions cannot reasonably ensure compliance with applicable water quality standards and regulations 'of all affected states." • N.C. Admin. Code tit. 15A, r.2H.0112(c)(1993). 10. NPDES Permit No. NC0024970 allows CMUD to discharge wastewater from a wastewater treatment plant owned by CMUD, which discharges into McAlpine Creek. 11. The discharge point for the McAlpine Creek waste water treatment plant is approximately one stream mile upstream from the point where McAlpine Creek flows into South Carolina. McAlpine Creek flows into Sugar Creek which flows into the Catawba River. 12. McAlpine Creek, Sugar.Creek, and the Catawba River are waters of the State of South Carolina for which water quality standards have been established by •25 S.C. Ann. Reg. 61- 68 and 61-69. 13. Water quality in the lower Catawba is demonstrably affected by phosphorus loading. The NPDES Permit at issue authorizes the discharge of up to 64 million gallons per day without ' limits on phosphorus. South Carolina is actively imposing phosphorus limits on all South • • • Carolina dischargers to address the documented nutrient problems in the lower Catawba and Waterec Rivers. DHEC has documented violations of water quality standards due to excessive phosphorus loading in Sugar Creek and in the Catawba River. 3 TT •d 6b:2. TO, ST unf 992.9-9TL-6T6: X J NOI LMS QNITI niUM 14. Median total phosphorus concentrations from Sugar Creek, McAlpine Creek and Little Sugar Creek as they flow into South Carolina exceed the Mecklenburg County surface water quality action level for streams. Total phosphorus concentrations in the Catawba River remain elevated from the confluence with Sugar Creek into the headwaters of Lake Wateree. Preliminary loading calculations indicate that over 50% of the phosphorus load g to the Catawba River is coming from the Sugar Creek, Irwin Creek and McAlpine Creels CMUD waste water treatment facilities. 15. Prior to the issuance of the permit,.DHEC staff contacted staff of NC DENR to discuss the phosphorus problem in the Catawba River Basin. Over a two-year period staff from • both agencies met and exchanged information relating to the issue. 16. DIEC staff has submitted written requests to NC DENR staff asking to be notified of draft and proposed final permit decisions for discharges in the North Carolina portions of the • Catawba River watershed, which includes those portions of McAlpine Creek located in North • Carolina. The last such request was: sent on December 20, 2000. 17. On January 30, 2001, NC DENR staff notified CMUD of its issuance of NPDES • Permit No. NC0024970 for the Mo ipine Creek plant. NC DENR did not notify SC DREC of this decision. 18. On April 9, 2001, NC,DENR staff transmitted a copy of the reissued permit to SC • DEC staff Because South Carolina is an "affected State" it should have been notified by CMUD or NC DENR of the pending permit decision in order to have an opportunity to comment and, if necessary, voice any objections to the permit. 4 Zl 'd OS: L 10, SI ant 99Z9-912.-616.x2J NOI103S QNd5131bm VIOLATIONS OF LAW 19. Under N.C. Gen. Stat. § 1 5013_23 (a), an agency decision cannot be sustained if the agency: 1) exceeded its authority or jurisdiction; 2) acted erroneously; 3) failed to use proper procedure; 4) acted arbitrarily or capriciously; or 5) failed to act as required by law or rule. 20. The NPDES permit at issue allows CMUD to discharge waste water in a manner that does not adequately provide for compliance with the South Carolina water quality standards. As a result, the NC DENR's decision to grant the permit was in excess of its authority, and was erroneous, arbitrary and capricious. PRAYER FOR RELIEF • WH REPORE, petitioner respectfully requests: 1. That this petition by filed in accordance with N.C. Gen. Stat. § 150B-23, and that a contested case proceeding be commenced. 2. That the decision to issue the permit dated March 1, 2001 be overturned. 3. That petitioners be granted•any other relief as may be appropriate. CHARLES M. CONDON • • Attorney General TREVA ASHWORTH- Deputy Attorney General KENNETH P. WOODINGTON Senior Assistant Attorney General P. O. Box 11549 (803) 734-3680 PACii. R. DICHINSON, .TR. NC Bar #20510 5 it). t D�sr7Zon-Sr; .A,.- LT 'd OS:/ TO, ST unr 99L9-9TL-616: xPJ NOI13 S UNI.$1 '8 9. WP1 2001 Colu bia, SC R:199471DRFTPETz.WPD 6 Lcwis & Roberts, P.L.L.C. 301 South McDowell St., Suite 400 Charlotte, NC 28204 SAMUEL L. FIN'KLEA, I SC Bar #2015 ELIZABETH G. HOWARD SC Bar #1 0261 South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 (803)898-3350 t 'd OS: Z TO, SI un f 99Z9-9IZ-6I6:xe3 NOI13 S 081'8 d31111 0 CHARLOTTE June 14, 2001 Mr. R. Lewis Shaw, PE Deputy Commissioner, S.C. DHEC 2600 Bull Street Columbia, SC 29201-1708 1 0 Subject: June 13 Meeting follow-up Dear Lewis: Thank you for meeting with us yesterday. I believe that we now have a better understanding of the issues and your position. I also wanted to confirm the next steps in the process that we all agreed to at the conclusion of the meeting. DHEC, DENR, and CMUD are to each consult individually with our respective legal counsel as to how we can maintain our legal rights and privileges while we work on resolving technical issues. The attorneys may need to confer with each other to discuss appropriate legal options. These internal discussions would be followed up by a meeting of all three parties. The purpose of that meeting would be to see if a strategy can be developed whereby the technical issues can be addressed while not compromising anyone's legal position. I suggest that we try to schedule this meeting within the next few weeks if possible. Please let us know if there are any other issues that need to be addressed. We look forward to working with you on these important water quality issues. Sincerely, CHARLOTTE MECKLENBURG UTILITIES Doi Douglas O. Bean Director Cc: Alton Boozer Jeff deBessonet Coleen Sullins Dave Goodrich File Administration Division 5100 Brookshire Blvd. Charlotte, NC 28216 Phone: 704/399-2221 Fax: 704/393-2219 Charlotte -Mecklenburg Utilities 01-01e. A-67 IA) Kr° TA M CIA :lc • 1-ficorq Nv5 C EKKILVILA-C qfJo.I oeltvak ____ ff,' ertite(tor/.. An. • fiq cenric At fi a ildVe 5 r s� ' 4�4, 2411 prerzett.wes &VI - roeLls 176 fceigexcl ey 111,1,„t. , pt,c,44 Mt: Kayak( r effilf: I i pritfoit_174.144 4.;.',14 //y h'cce e(g.Y7 And ,ik cil/ccia. • Nif-,) Pit TA/ J/S5fo' > cii(9-,1114 M Y ''f WDf,7 � yob ✓codr. caw 3e.rr• --- 5.6z-zel7S" 1\107741 t4C7 4eiN1 • cif, •-f — ( L 1 / In? 1 cis at rcSfrt 17 -or f"-..----5-- e/reptk;i hili IC54' ( 1-17'lekt i 00 . - Wt tri- 1 4.14.- c.<4 5 VI tAj (-1 e41 cerv4iro . Afiail‘te-ei, (15c( rti 'h'zi .e---P *12. P-t--)7-) P444 it firec _ I title!" dtt( 4,1/4. ;;,,.r. "44re rIt yee:,p pv, k... Ktsciel • i fidr ity_c za ft./74 imie/w(: > No skefer 1 ((g cc (1-4-c t > ovu- v•A•rvo•sema I > &el/broiro-iel inAl4e9et itti.;1752- 14 • /1/114 I eihr/sa pwri- WAV,P.F k //,( ,91477 /r, 47/1/3‘ 4,4,9frye. .5: ilia...4 44,-4 . 4,1/ //tre?.,t) a'4.1e_rie-t4 (02-0/17 44- / 2 c')(7 L 4-- 1V-iy75/2"71 Mellivi°7 4,0 4-4,..e_ ty,A;41-i--e411. 4-4- pucce--€› -r-o (9c 11c-11441,d • 17j lq, Cyv,e-4 fiC '174.clk-/ • • Mc..K.L ev de-(.01 pkr;'fti,154x_jd.-i . A offec-444-1LIrAt iwo1 h1 i, rit !Ake . . • • < Sugar Creek Watershed ® N.C. Wastewater Treatment Plants 0 S.C. Cities - Lakes Ai Interstate rCity Jurisdictional Limits A/ Highways n 8-Digit Hydrologic Units NMajor Streams 1 North Carolina Tributaries • NC Wastewater Treatment Plants - Reservoirs Impaired by Phosphoms North Carolina South Carklina Lake waterer 03050104 DHEC PROMOTE PROTECT PROSPER South Carolina Department of Health and Environmental Control CMUD-Sugar Creek Phosphorus Loading Assesment Qw Qave (2000) Qave (2001) Phosphorus Loading Array Actual data Using Q = 14.5 MGD 2000 2001 TP limit = 1 TP limit = 2 TP limit = 3 TP limit = 1 Using Qw = TP limit = 2 20 MGD aitainTP limit = 3 1800.00 1600.00 1400.00 1200.00 1000.00 800.00 600.00 400.00 200.00 0.00 20 MGD 14.21 MGD 14.36 MGD mg/1 mg/1 mg/1 mg/1 mg/1 mg/1 [P]ave (2000-2001) [P]ave (2000) [P]ave (2001) Phosphorus load Average Phosphorus (lb/day) Concentration (mg/1) 687.93 667.31 5.57 120.93 1 241.86 2 362.79 3 168.6 1 337.2 2 3 505.8 5.81 Potential Phosphorus Loadings for CMUD- Sugar Creek WWTP TP limit = 1 mg/I TP limit = 2 mg/I TP limit = 3 mg/I 5.76 mg/1 5.81 mg/1 5.57 mg/1 0 (2000 P load) 111(2001 P load) ❑ Q=44MGD - Theoretical TP load ❑ 0=64 MGD - Theoretical TP load CMUD-McAlpine Creek Phosphorus Loading Assesment Qw gave (2000) Qave (2001) 64 MGD 43.31 MGD 43.54 MGD Phosphorus Loading Array 2000 Actual data 2001 TP limit = 1 mg/1 Using Q = TP limit = 2 mg/1 44 MGD TP limit = 3 mg/1 TP limit = 1 mg/1 Using Qw = TP limit = 2 mg/1 64 MGD TP limit = 3 mg/1 1800.00 1600.00 1400.00 1200.00 1000.00 800.00 600.00 400.00 200.00 0.00 [Piave (2000-2001) [Piave (2000) [Piave (2001) Phosphorus load Average Phosphorus (lb/day) Concentration (mg/1) 1155.76 3.20 1178.76 3.25 366.96 1 733.92 2 1100.88 3 539.52- 1 1079.04 1618.56 3 2 Potential Phosphorus Loadings for CMUD- McAlpine Creek WWTP TP limit = 1 mg/I TP limit = 2 mg/I CMUD-Irwin Creek Phosphorus Loading Assesment TP limit = 3 mg/I 3.22 mg/1 3.20 mg/1 3.25 mg/1 O (2000 P load) IN (2001 P load) ❑ Q=44MGD - Theoretical TP load ❑ Q=64 MGD - Theoretical TP load QW Qave (2000) Qave (2001) 15 MGD 9.62 MGD 10.00 MGD Phosphorus Loading Array Actual data Using Q = 44 MGD Using Qw = 64 MGD 1800.00 1600.00 1400.00 1200.00 1000.00 800.00 600.00 400.00 200.00 0.00 2000 2001 TP limit= 1 mg/1 TP limit = 2 mg/1 TP limit = 3 mg/1 TP limit = 1 mg/1 TP limit = 2 mg/1 TP limit = 3 mg/1 [P]ave (2000-2001) [Piave (2000) nave (2001) Phosphorus load Average Phosphorus (lb/day) Concentration (mg/1) 173.79 2.17 139.22 83.40 166.80 250.20 126.45 252.9 379.35 1.67 1 2 3 1 2 3 Potential Phosphorus Loadings for CMUD- Irwin Creek WWTP TP limit = 1 mg/I TP limit = 2 mg/I TP limit = 3 mg/I 2.07 mg/1 2.17 mg/1 1.67 mg/1 M (2000 P load) ■ (2001 P load) ❑ Q=44MGD - Theoretical TP load ❑ Q=64 MGD - Theoretical TP load CMUD TOTAL LOADING TO SUGAR CREEK BASIN McAlpine Creek WWTP Actual data Using Q = 44 MGD Using Qw = 64 MGD 2000 2001 TP limit = 1 mg/1 TP limit = 2 mg/1 TP limit = 3 mg/1 TP limit = 1 mg/1 TP limit = 2 mg/1 TP limit = 3 mg/1 Sugar Creek WWTP Actual data Using Q = 14.5 MGD Using Qw = 20 MGD 2000 2001 TP limit = 1 mg/1 TP limit = 2 mg/1 TP limit = 3 mg/1 TP limit = 1 mg/1 TP limit = 2 mg/1 TP limit = 3 mg/1 Irwin Creek WWTP Actual data Using Q = 10 MGD Using Qw =15 MGD 2000 2001 TP limit = 1 mg/1 TP limit = 2 mg/1 TP limit = 3 mg/1 TP limit = 1 mg/1 TP limit = 2 mg/1 TP limit = 3 mg/1 Phosphorus load (lb/day) 1155.76 1178.76 366.96 733.92 1100.88 539.52 1079.04 1618.56 Phosphorus load (1b/day) 687.93 667.31 120.93 • 241.86 362.79 168.6 337.2 505.8 Average Phosphorus Concentration (mg/1) 3.20 3.25 1 2 3 1 2 3 Average Phosphorus Concentration (mg/1) 5.81 5.57 1 2 3 1 2 3 Phosphorus load Average Phosphorus (lb/day) Concentration (mg/1) 173.79 2.17 139.22 83.40 166.80 250.20 126.45 252.9 379.35 1.67 1 2 3 1 2 3 ANNUAL MASS LOADING Actual data Using Q = 64 MGD Using Qw = 20 MGD Using Qw = 15 MGD 2000 2001 TP limit = 1 mg/1 TP limit = 2 mg/1 TP limit = 3 mg/1 TP limit = 1 mg/1 TP limit = 2 mg/1 TP limit = 3 mg/1 TP limit = 1 mg/1 TP limit = 2 mg/1 TP limit = 3 mg/1 Irwin Creek 173.79 139.22 McAlpine Creek 1155.76 1178.76 539.52 1079.04 1618.56 Phosphorus load (lb/day) WWTP Sugar Creek 687.93 667.31 168.6 337.2 505.8 126.45 252.9 379.35 Assuming all plants are operating at maximum permitted flow, this translates to the following *annual* mass loadings: TP limit = 1 mg/1 TP limit = 2 mg/1 TP limit = 3 mg/1 2000 2001 McAlpine Creek 196924.8 393849.6 590774.4 421854 430246 Phosphorus load (lb/year) WWTP Sugar Creek Irwin Creek 61539 46154.3 304618 123078 92308.5 609236 184617 138462.8 913854 251095 — 63434 736382 243568 50817 724630 Total Total P (Ibs/year) 1000000 900000 800000 700000 600000 500000 400000 300000 200000 100000 0 TP limit = 1 mg/l Annual Mass Loadings for Phosphorus in Sugar Creek TP limit = 2 mg/I TP limit = 3 mg/I ❑ McAlpine Creek (Q=64MGD) ® Sugar Creek (Q = 20 MGD) ❑ Sugar Creek (Q= 15 MGD) McAlpine Creek (Actual Flow 2000-2001) ® Sugar Creek (Actual Flow 2000-2001) 0 Irwin Creek (Actual Flow 2000-2001) III Total Loading (maximum permitted flow) ®Total Loading (Actual Flow 2000-2001) LEI • 1 Ja\le0 srq". T le% YJ W c<3/4,rq< PRO-C " UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4 ATLANTA FEDERAL CENTER 61 FORSYTH STREET ATLANTA, GEORGIA 30303-8960 JUN 11 2001 Ms. C een Sullins Wat Quality Section Chief NC ept. of Environment and Natural Resources P.O. Box 29535 Raleigh, NC 27626-0535 Dear Ms. Sullins: The Environmental Protection Agency (EPA) Region 4 is in receipt of a March 9, 2001, letter to Mr. Barry M. Gullet of the Charlotte -Mecklenburg Utility Department (CMUD), Administrative Division, from Mr. Kerr T. Stevens, Director, Division of Water Quality, NC Department of Environment and Natural Resources (NCDENR), which transmit revised pages to the CMUD McAlpine Creek WWTP 2001 Permit. It appears that the revised pages would allow for the deletion of the Lindane limit and the inclusion of a compliance schedule for one year, with a subsequent limit for Lindane for the CMUD McAlpine Creek WWTP, National Pollutant Discharge Elimination System (NPDES) permit, NC0024970. The letter further states that the CMUD permit for this facility can be revised by inserting the new pages in the permit and discarding the "old" pages. The CMUD permit for the McAlpine Creek WWTP was issued on January 30, 2001, and was effective on March 1, 2001. All limits, including the Lindane limit, were fully effective and enforceable on March 1, 2001. It appears that the March 9, 2001, letter attempts to modify this permit. EPA considers any removal of an effective limit and the substitution of a one year compliance schedule to be a major modification as defined in 40 CFR§ 122.62. All major modifications of NPDES permits are subject to the public notice requirements of 40 CFR§ 124.10. In addition, all major modifications of major POTW's greater than 1.0 MGD, of which this facility qualifies, must be sent to EPA for review at the time of public notice in accordance with the Memorandum of Agreement between the State of North Carolina and EPA Region 4 in accordance with 40 CFR§ 123.24. EPA's initial review of the McAlpine Creek WWTP NPDES permit file indicates that the Lindane limit was appropriate in the permit effective March 1, 2001. 40 CFR§ 122.44(d) requires that if a discharge causes or has reasonable potential to cause a water quality standards excursion than that permit must contain a limit. The fact sheet for NC0024970 states that a reasonable potential analysis was performed for Lindane concluding that reasonable potential for pollution from this pollutant existed and that a limit was necessary. It appears that sufficient information to support this decision was available since Lindane was monitored in the previous permit issued on November 13, 1995, twice per month and the permit issued on September 16, 1991, required monitoring monthly. Internet Address (URL) • http://www.epa.gov Recycled/Recyclable • Printed with Vegetable Oil Based Inks on Recycled Paper (Minimum 30% Poslconsumer) r ' 2 Additionally, in accordance with 40 CFR§ 122.44(1), all reissued permits must be at least as stringent as the previous permit, unless certain exceptions are met. None of the reasons listed in this regulation are addressed in the March 9, 2001, letter and therefore based on EPA's review, it appears that antibacksliding was not addressed. In summary, based on EPA's review, the major modification of the McAlpine Creek WWTP NPDES permit, effective on March 1, 2001, appears to be procedurally inconsistent with the NPDES regulatory requirements. EPA finds it is missing the appropriate public notice requirements, was not sent to EPA Region 4 for review prior to issuance, changes a limit which was based on reasonable potential, and does not address antibacksliding requirements. EPA requests that the State evaluate our concerns and present a strategy for remedy of this issue by July 9, 2001. Thank you for your attention to this matter. If you have any further questions, please feel free to call me directly at (404) 562-8975 or call Ms. Dee Stewart of my staff at (404) 562-9334. Sincerely, se. Carol L. Kemker, Acting Chief Permits, Grants, & Technical Assistance Branch Water Management Division cc: Mr. Barry M. Gullet, CMUD Administrative Division Alton C. Boozer, SCDHEC Dempsey Benton, NCDENR Linda Rimer, EPA • North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor William G. Ross Jr., Secretary TO: Bill Ross FROM: Dempsey Benton DATE: June 6, 2001 MEMORANDUM if SUBJECT: Phosphorous Nutrient Removal from Wastewater AVA NCDENR Pursuant to your inquiry, the City of Raleigh did implement a chemical feed process which allowed for a significant reduction in phosphorous concentrations in wastewater effluent. The City used ferrous sulfate to achieve odor reductions in the pump stations, and to achieve lower phosphorous levels. A summary report is attached. As noted, it was possible to get the phosphorous concentration down to about 1.0 PPM which was well under the State's NPDES limit of 2 PPM for the treatment plant. (dbphos) 1601 Mail Service Center, Raleigh, North 1..._ Phone: 919 — 733-4984 \ FAX: 919 — 715-3060 \ Internet: www.enr.state.nc.us/ENR/ _. AN EQUAL OPPORTUNITY \ AFFIRMATIVE ACTION EMPLOYER — 50% RECYCLED / I O% POST CONSUMER JUN 1 2 2001 DENR - WATER QUALITY POi !R E :("NCH /2001 12:39 919-890-3600 PUBLIC UTILITIES PAGE 01 Dale Cris From: Date Crisp [crispd @ raleigh-nc.orgi Sent: t Tuesday, June 05, 2001 12:31 PM To: Dempsey Benton . Subject: Subj . TP info you requested Y'm faxing you now the report I sent to you back in 995, when N dieclast e�didi. Oa comprehensive review of your TP performance � NRTrIWTP as part of thI do not have a current summary to TP performance results since then have been similiar, but date I can send you. I'm also faxing you the reportand ipress nfo hrelease we did in 1988 to City Council on the initial TP success story. P t ais We are currently feeding approximately 900,000 gals. per year of ferrous sulfate @ $0.23 per gallon for an estimated total cost of $207,000 per year Theee, threete (3)anchemical storage and feed facilities we built located along C Interceptors cost the City approximately $600.000 each. Thep ower t erecost tafor operatingothese facilities is minimal ($100 per month each) and personnel y low to ($500 per month) , since the sewer pump station mechanics check and off-load chemicals at stored these faCs.].a.CieS while they are out checking howthe mu hpump morestations. sluclg2Facilities (biosolids) rwe produce by SC,ADA, system• Anunknown cost however because we remove TP by chemical precipitation rather thanbiologically. iolo icad lly. I'm sure0this is a significant cost but we have never tried to pin this d r year for; this additional 0&M cost (i.e. 10% of sludge disposal program cost). Let me know if you have questions. Dale H. Dale Crisp, P.E. Raleigh Public Utilities Director (919)-890-3400 fax (919)-890-3600 1 00 05 / 2001 12 : 39 919-890-3600 PUBLIC UTILITIES PAGE 02 October 27, 1995 TO: City Manager FROM: Asst. Public Utilities Director RE: Update on Total Phosphorus Concentration in Neuse River WWTP Effluent Listed on the attached table is the monthly average total phosphorus concentrations for the Neuse Plant since January, 1987. The statewide phosphate detergent ban took effect January, 1988. Permanent phosphorus removal capability was implemented by the City January, 1989, but temporary / pilot facilities in October, 1988. I've attached a copy of the initial report we provided to City Council in November of 1988 regarding this Matter. We have continued to track the plant's performance in regard to phosphorus effluent concentration. The permit compliance limit of 2.0 PPM (a quarterly average of weekly samples) became effective in May, 1993. The City begun compliance with this limit in the first quarter of 1990. I have also attached a copy of the letter of appreciation the city received from NCDEM for voluntary compliance and reduction of phosphorus, well in advance of the compliance limit becoming effective. H. Dale Crisp 06/14/2001 12:39 919-890-3600 PUBLIC UTILITIES PAGE 03 NEUSE RIVER WWTP EFFLUENT TOTAL PHOSPHORUS DATA monthly averacre tots xihosp orr.?s (PPM 1987 1988 1989 1990 1991 1992 1993 1994 1995 Jan 6.2 3.7 2.6' 2.2 0.70 0.31 0.67 0.88 1.06 Feb 5.9 3.3 2.3 1.8 0.84 0.40 1.02 1.40 0.63 Mar 5.0 3.3 1.8 2.0 0.76 0.39 0.62 1.15 0.62 Apr 5.4 3.4 2.6 1.2 0.96 0.87 0.9 1.50 0.98 May 6.9 3.3 2.8 1.4 0.88 2.43 0.97 1.58 0.76 Jun 7.5 4.4 2.7 0.9 0.89 1.73 1.49 1.61 0.64 Jul 6,8 3 , 8 2.2 1,7 1.09 1,37 1.62 1,28 1,17 Aug 7.7 3.4 2.2 1.4 0.53 1.29 1.57 1.57 1.50 Sep 6.2 3.4 2.9 1.4 0.62 1.38 1.64 2.10 1.25 Oct 5.5 2.8 2.9 0.9 0.73 1.27 1.27 1.44 1.33 Nov 5.4 1.7 2.6 0.7 0.48 1.17 1.28 2.19 1.29 pec 4.7 2.9 2.4 0.7 0.48 0.93 1.16 2.02 1.48 avg 6.1 2.4 2.5 1.3 1,13 1,10 1.18 1.56 1.06 0010 ,gyp C/41UL /t ,4 flee (3(K (qt-f) /101...P pi/474W 1/1/75-6 -/7 47Crfroi:Ic. ct dylerla lyy5-(1414eav k Ya7+44 /moo c1 ce • Fer n1 f ��- bk- • �D%"4 !✓/`- /. J Q b(fi fl Gia I /1 /Ga 7 i)n_s D . 5 bjs // of"- ,e V,rli/c.F/G C kit(O✓✓,h sues, s , A/ r /7H {1-,..6e7- cif -7 /. (,7 4te P' /41 6 K,ffwwtl ClAzd - /tze. G wfs,s1 lb6 Goa ` 4,6( �/ Pkti4 FrM it irretcri-s4 /v1 y . • 1G j4•7% in MY. • -4vel ud/b'(Tot./f��J 01.5.<-US51011,5 . f 1.4417Lg7 7-/v FA- , ,Ai 'ram 9 4?iP G.IM' / ,tom/t, G1. • Zenf_`f€,vwr C4pot r 7 1951 45 . 'a cA,.> 6° -7070 Tr ey/iyibt/(-1-c6( t'frtctk.5 A4,15:1,6,- A tvutd.-/-7 diC 4 4. hi:y4 otlAs- t f✓ca,v4 4nvl rep itlr 11 be Git I 4 R r^ • (Cf)) €HARLOTTK CHARLOTTE-MECKLENBURG UTILITIES REGIONAL SOLUTIONS TO WASTEWATER TREATMENT IN THE CAROLINAS: POSITIONS OF CHARLOTTE-MECKLENBURG UTILITIES In the ongoing debate over a proposed regional treatment facility in South Carolina (SC), the position of Charlotte -Mecklenburg Utilities has frequently been misinterpreted and misrepresented. To clarify our position: 1) Charlotte -Mecklenburg Utilities is not involved in the South Carolina regional wastewater treatment plant currently being discussed. 2) If asked to participate in the proposed plant, Charlotte -Mecklenburg Utilities would decline due to financial and environmental concerns. 3) Charlotte -Mecklenburg Utilities shares the goal of protecting our natural resources and is actively taking steps to improve water quality. 4) Charlotte -Mecklenburg Utilities supports regional cooperation and is eager to work with North Carolina (NC) and SC neighbors on regional solutions to water quality issues. 1. Charlotte -Mecklenburg Utilities is not involved in the SC regional plant currently being proposed. Charlotte -Mecklenburg Utilities has firmly and consistently maintained since 1995 that any regional wastewater treatment plant in SC had to be developed by, and be right for, SC. Furthermore, if such a proposal were developed, Charlotte - Mecklenburg Utilities would like the chance to consider being a customer and not an owner. We established this position after a group of local governments in SC and Charlotte -Mecklenburg Utilities conducted a study of regional wastewater treatment alternatives in 1994. At that point it was evident that a number of issues needed to be addressed by SC partners before any consideration should be given to NC entities. In 1995, York, Lancaster and Chester counties formed the Tri-County Wastewater Management Planning Committee to study regional solutions with SC goals in mind. The latest proposal — by a group working with the Catawba May 17, 2001 Contact: Doug Bean, 704-399-2221 dbean@ci.charlotte.nc.us 4 1- 2 . ' Indian Nation to build a private SC wastewater treatment plant near Bowater — is a result of Tri-County discussions. Charlotte -Mecklenburg Utilities is not a member of the Tri-County committee, and is not involved in any of their proposals. We applaud the group's efforts to seek regional solutions, and — as we have consistently maintained — would welcome the opportunity to respond to any formal proposals that may come forward. As of this date, Charlotte -Mecklenburg Utilities has not received any formal proposal to participate in or be a customer of the SC regional plant near Bowater as brought forth by the Catawba Indian Nation and its partners. We have not worked with, encouraged, or given support to this proposal. Any characterization of Charlotte -Mecklenburg Utilities as the developer, organizer or leader of the plan to build a large regional wastewater treatment plant near Bowater and the construction of a large sewer interceptor line to it along the Catawba River is false. This is an issue best addressed by SC entities. 2. If asked to take part in the proposed plant, Charlotte -Mecklenburg Utilities would decline. The fact is, even if Charlotte -Mecklenburg Utilities received a formal proposal from the Catawba Indian Nation and its partners, we have concerns about the current proposal and have already concluded the plant is not the best solution for us economically or environmentally. While a large plant near Bowater would serve a considerable portion of SC, it would be very expensive for NC. Mecklenburg County's proximity to the plant location would require more than 18 miles of sewer line to be installed — some of it measuring up to seven feet in diameter. This pipe installation would be very expensive and since Charlotte -Mecklenburg Utilities would be the primary customer, the majority of the capital and ongoing costs would fall on us. We have also heard the concerns of many people in both states about the potential environmental impacts of building a large pipeline along a segment of the Catawba River. We share these concerns and do not believe this is an alternative that best protects the environment. 3. Charlotte -Mecklenburg Utilities shares the goal of protecting our natural resources and is actively taking measures to improve water quality. The five municipal wastewater treatment plants in Mecklenburg county have been characterized as large producers of pollution that are not being maintained and operate under less stringent standards then those in SC. Nothing could be further from the truth. Plants operated by Charlotte -Mecklenburg Utilities are modern, well -maintained plants and millions of dollars per year are invested in maintaining these facilities. 3 Since most of our plants discharge into small streams, they are subject to some of the most stringent quality limits in the state, which are comparable to any in SC. Our plants consistently meet their quality standards, and in many cases the treated wastewater effluent discharged from the plants is cleaner than what is present in the receiving stream. Perhaps drawing the most attention is the issue over the presence of phosphorous in SC bodies of water, the source of this phosphorous and what can be done to reduce it. In Mecklenburg County, Lake Wylie and some coves of Mountain Island Lake are nutrient -sensitive bodies of water and any discharge into these waters requires nutrient removal. Charlotte -Mecklenburg Utilities meets this requirement for its single plant that discharges into Mountain Island Lake; none of the Charlotte -Mecklenburg Utilities plants discharge into Lake Wylie. Additional studies need to be undertaken by the State of North Carolina to determine the sources of phosphorous in NC waters, how it moves downstream, and subsequently what limits would be appropriate for NC treatment plants. In the meantime, Charlotte -Mecklenburg Utilities has heard the concerns in SC and voluntarily begun looking at ways of reducing phosphorous levels coming from Charlotte -Mecklenburg Utilities treatment plants. By working with one industry to keep a major source of phosphorous out of our plants, we expect to see a 50 percent reduction coming from the Sugar Creek treatment plant, and another significant reduction coming from the McAlpine treatment plant. A study evaluating further phosphorous reduction at several plants has also been completed. Working on treatment plants is not our only effort to ensure good water quality. Millions of dollars have been added to our capital budget to expand our maintenance of the collection system. We support efforts by other agencies in Mecklenburg County to protect water sources, such as the Surface Water Improvement and Management program, stream buffers and limits on total maximum daily loading from point- and non -point pollution sources. In addition, we facilitate and promote strong environmental stewardship through participation with a number of organizations, including the Bi-State Catawba River Task Force, Voices & Choices, numerous stakeholder groups, marine commissions and others. We realize that much still remains to be done to protect the Catawba and we are committed to doing our part. 4. Charlotte -Mecklenburg Utilities supports regional solutions. Although the proposed regional plant and line is not financially or environmentally feasible for Charlotte -Mecklenburg Utilities, we continue to believe in regional 4 cooperation for water and wastewater planning. We currently have regional agreements with three governmental units in NC and two in SC. These agreements have been very effective. In some cases, Charlotte -Mecklenburg Utilities provides a service for other entities and in some cases we purchase services. We take the position that it does not matter who provides the service. What does matter is that local governments form partnerships to plan for water and wastewater services on a regional basis in order to lower costs for our customers and improve water quality in our rivers and streams. Charlotte -Mecklenburg Utilities is a regional agency that provides for public health through the delivery of clean drinking water and protects the environment through the collection and treatment of wastewater. As we plan for our future in Mecklenburg County, we stand ready to work with all our nearby neighbors — including SC — on regional water and wastewater planning efforts. '.H E C PROMOTE PROTECT 2600 Bull Street Columbia, SC 29201-1708 COMMISSIONER: Douglas E. Bryant BOARD: Bradford W. Wyche Chairman William M. Hull, Jr., MD Vice Chairman Mark B. Kent Secretary Howard L. Brilliant, MD Brian K. Smith Louisiana W. Wright Larry R. Chewning, Jr., DMD PROSPER P(A/v June 26, 2001 Mr. Douglas O. Bean Director Charlotte Mecklenburg Utilities 5100 Brookshire Blvd. Charlotte, NC 28216 RE: McAlpine WWTP Our meeting of June 13, 2001 Dear Mr. Bean: Thank you for your letter of June 14, 2001. I agree generally with your summary of the meeting with this clarification. As we make plans to meet again and as I stated, we are not planning at this point to postpone the schedule regarding the permit appeal and the hearing process. Certainly we are open to any settlement discussion but don't want to delay this hearing process while we discuss technical options for addressing the concerns we have raised. We believe that a permit limit for phosphorus is required and that a productive meeting will start with agreement by all parties on this point. 1 look forward to meeting with you again soon. Sincerely, R. Lewis Shaw, P.E. Deputy Commissioner Environmental Quality Control cc: Coleen Sullins Alton Boozer SOUTH CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL NC0024970 - CMUD McAlpine Creek WWTP Assessment of Effluent Nutrient Loadings 5/10/01 by: Natalie Sierra RAW DATA Date Flow Total Nitrogen Total Phosphorus (MGD) (mg/L) (mg/L) 1/12/00 39.03 1.5 1/27/00 48.78 10 2/4/00 48.56 1.2 2/28/00 47.24 11 3/6/00 43.29 2.1 3/13/00 40.54 8.6 4/5/00 46.07 10.7 3.4 5/11/00 47.38 10.7 5/16/00 43.56 3.2 6/8/00 41.75 13 3.8 7/6/00 39.45 11.3 4.9 8/3/00 44.49 3.2 8/31 /00 52.3 20.3 4.1 9/14/00 45.6 23 3.4 10/5/00 34.45 9.6 3.8 11/1/00 33.39 10.7 3.7 12/7/00 40.33 13.9 3.3 1/2/01 41.17 7.9 3.1 1/7/01 39.91 3.1 2/1/01 40.32 3.3 2/6/01 40.64 3.8 2/13/01 42.97 484.9 2.9 2/19/01 43.29 2.8 2/21/01 41.87 13.7 3.9 2/27/01 42.47 3.3 3/5/01 51.22 8.5 2.9 3/8/01 42.99 3.4 3/13/01 44.99 3.8 3/20/01 47.95 2.9 3/26/01 46.23 3 MASS LOADING Date Total Nitrogen (lb/day) Total Phosphorus (lb/day) 1/12/00 1/27/00 2/4/00 2/28/00 3/6/00 3/13/00 4/5/00 5/11/00 5/16/00 6/8/00 7/6/00 8/3/00 8/31/00 9/14/00 10/5/00 11/1/00 12/7/00 1/2/01 1/7/01 2/1/01 2/6/01 2/13/01 2/19/01 2/21/01 2/27/01 3/5/01 3/8/01 3/13/01 3/20/01 3/26/01 4068.3 4333.8 2907.7 4111.2 4228.1 488.3 486.0 758.2 1306.4 1162.5 4526.5 1323.1 3717.8 1612.2 1187.3 8854.5 1788.3 8747.0 1293.0 2758.2 1091.8 2979.7 1030.3 4675.3 1110.0 2712.5 1064.4 1031.8 1109.7 1288.0 173773.5 1039.3 1010.9 4784.0 1361.9 1168.9 3631.0 1238.8 1219.0 1425.8 1159.7 1156.7 SUMMARY TABLE Total N Total P (lb/day) (lb/day) Average 15050.6 1150.5 Maximum 173774 1788.3 Minimum 2712.5 486.0 LI(rrf 1" " Irt/7, vri ,... ' // ' 10 / ji(!G".. /'I/f i/v/rvvIW/ it01,t)1(17 6 / ta5r, 4t e , , . mon_ick 2:5v,,,,e, 4 (o% ,le. . ThccGja-5-- .71--ay 1ty;rc.G k(✓ �- �' Ale USe,/1-1,/g4- % 11 tom. lid l ( . _5A,m_61_ti MOM SI ' Witki -- iijdzig 4 A efiV;1_6±7_4i,-771i-141 t iti 4 • - tk-,e4.7 f re ' a ..�5( - t/ t" ill�� . y IFS' b yf -jU/i/ /( we (90t 75 e-e50 a 7//m/'/i /ftL- ,ciffrbec eyaik &1 . . 371/10t, , . . . , r _i _.,1_ r v., • 6 . o' 17k.. e t(5 . - 4/ men ktfth/ w2g-1- • A rC[w d. Gt IC/L-/t dir);//41 eGca. de cls� Th4PL Apilv 7P4 alon/ct" tnek1e. . > tilake.:, cut lore oirect — 01441 rnai PFR.27 222 = cr= r-•{ —_C =L—EPL OF :�PTER N0.411 F.1/2 -w -• P'0. 2600 Bull Street Columbia, SC 29201-1708 COMNUSSIONER: Doug!& E, Bryant BOARD: Bradford W. Wye::: Chairman Vl illia^.t' M. Hail.: r., MD Vrcc Chalet;.'-'3 Mark B. Kcnt Secretary Howard L. Brtlivn4 MD Brian K. Smith Louiaiana W. Wright Lary R. Chewing, Jr., DMD OFFICE OF GENERAL COUNSEL Telephone (803)898-3350 Fax 89S-3367 April 27, 2001 Mr. A. Stanley Meibt1rg Acting Regional Administrator U. S. Environmental Protection Agency, Region 4 Atlanta Federal Center 61 Forsyth Street Atlanta; C-eorgia 30303.8960 Mr. Barry M. Gullet C_LD Administrative Division. 5100 Brookshire Boulevard . Charlot'e; NC 28216 20 a 2 MAY 2 9 2001 DENR - WATER QUALITY POINT SOURCE BRANCH William. G. Ross, Yr., Secretary NC Department of Environment and Natural Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Re: Reissuance ofNPDES Permit NO. NC0024970 McAlpine Creek WWTP Decision issued January 31, 2001; effective March 1, 2001 Gentlemen: This is to notify you that the South Carolina Department of Health and Environmental Control, as the agency responsible for administering the Clean Water Actin South Carolina, objects to the above -referenced permit for the following reasons. The McAlpine Creek WWTP is located on McAlpine Creek approximately one mile from the South Carolina border. Attch 1, Catawba River Basin Watershed Report, map of Sugar Creek Watershed. McAlpine • • • SOUTH CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL FFF.27.2CC1 Li -EC ELF,EFL CF kFTER NO.411 F.2/2 Creek flows into South Carolina and its water ultimately flows into the Catawba River and then. the Wateree River. South Carolina is therefore an affected state within the meaning of Section 402(b) of the Clean Water Act, 33 U.S.C. § 1342(b), and 40 C.F.R. Parts 122,4,122.44(d)(4),122.62(d)(10), and 124.10(c)(1)(iii). Water quality in McAlpine creek in South Carolina and in the lower Catawba is demonstrably affected by *phosphorus loading. Attch 2, "A. Special Water Quality Assessment of Sugars Creek ..,," Technical Report No. 004-94; Attch 3, No ipoint-Source Assessment ... in the lower Catawba River Watershed; Attch 4, State of South Carolina Section 303(d) List for 2000, May 2, 2000, Staff of the North Carolina Department of Environment End Natural Resources recognizes this fact; DENR disputes DHEC's figures, but concedes that "CMUD point sources [i.e., the three waste water treatment plants, including the McAlpine Creek plant] account for 38% of the Total] P[hospl:orus] point source load...." Attch 5, memorandum from Woolfolk to Swanek, September 24, 1998. On December 20, 2000, Alton Boozer, chief of the Bureau of Water, wrote Coleen Sull;rs, chief of the DENR Water Quality Section, and explicitly requested to be notified of draft permits and pending permit decisions for discharges to the Catawba River watershed. Attch 6, Boozer to Sullins, December 20, 2000. Despite this request, and despite the obligation imposed by the Clean Water Act and EPA regulations, DHEC did not receive any notice of the reissuance of NPDES Permit No. NC0024970 until April 9, , 2001. Attch 7, copy of leter from Stevens to Gullet, dated March 9, 2001, • and date -stamped April 9, 2001. No notice of this permit decision was published in the Federal Register. No notice that the permit had been transmitted to EPA Region 'V was provided to DHEC, DEC considers that it received legally sufficient notice only on April 9. Permit No.. NC0024970 authorizes discharge of up to 64 million gallons per day witho s. any limits on phosphorus. As an affected state, South Carolina objects; such a discharge has a substantial likelihood of adversely affecting water quality in South Carolina and contributing to violations of South Carolina water quality standards set forth in 25 S.C. Code Ann, Regulation 61-68. Southi.Carolinais actively imposing phosphorus limits on all South Carolina dischargers to address the documented nutrient problems in the lower Catawba and Wateree Rivers. If DHEC had been provided timely notice, as requested by Mr. Boozer and required by Federal regulations, we would have provided this information and additional information to DENR and to EPA in support of Our objection. In order to protect our appeal rights, we will have to commence legal action no later than close of business on May 9,2001. NC General Statutes § 150B.23 and NC Administrative Code Title 15A.0308(b). If meaningful measures are instituted to address our objection:we may be able to withdraw FPF . a7.2e " • c - ti=F! C= kFTE. NC.411 any such action; however, at this time we intend to proceed. If 1 can answer any questions or provide: additional information, please let me know. Sincerely, ta-Vb1-, Carlisle Roberts, General Counsel Samuel L. Finklea,111 Chief Counsel for EQC Attachments: Attch 1, Catawba River Basin Watershed Report, map of Sugar Creek Watershed Attch 2, "A Special Water Quality Assessment of Sugar Creek .,.," Technical Report No. 004-94 Attch 3, "Nonpoint-Source Assessment ... in the lower Catawba River Watershed" Attch 4, portion of State of South Carolina Section 303(d) List for 2000, May 2, 2000 Attch 5, memorandum from Woolfolk to Swanek, September 24, 1998 Attch 6, Boozer to Sullins. December 20, 2000 Attch 7, copy of letter from Stevens to Gullet, dated March 9, 2001, and date - stamped April 9, 2001 cc: Hon. Charles M. Condon Attorney General of South Carolina Cr.1WATER1303(D)1010425.wpd 2.QO 'PPP . 27. rEe1;ev = . �Cc� �es...s''�cL =,U =EFL C= kFTF L?ITR •• r�rwwaavGtrib.labl NC.412 P.1/2 htrp:/Avww.scstatehouse.net/bil]s/82.htni 1 of 2 Product of the State House Network-L?ITR Scroll to History Page Scroll to Previous Versions Links List Scroll to Full Text Download This in Microsoft Word97 format Bill 82 wa....vu44r Indicates New Matter Current status Bill Number: : Type of Lec_slati o =: Inn oth. cjrc Body: Introduced rate: Primary Sponsor: All Sponsors: Drafted oBill Number: : � � Companion ill NL`',tot'__ : Res :dins Body: current Committee: Sub_ ect : Post-1t° Fax Not 7671 Senia,-al Bill GB Le ventis Leventis, Ford, Reese. 1: \council\bills\nbd\11112ac01. doc 3:.03 Senate Judiciary Committee 11 SITSewage services, county council, contracts ;or; sewage treated by facilities; Water and Sewer, Solid Waste Fis Cory Sody Date Acton Description Com Leg Involved 2O0=oi:7 Senate 20010:.=0 ComoaT No. 3103 Introduced, read first time, referred to Committee Versions of This Bill 11 SJ Product of the State House Network LPITR `i, n o7. ..:N�. N�l�!l .G�i. it,' • .G. l.. i•G! .1:'j. ,..: is �..,: �v,•h;lM..,� ('Text matches Drrited bills. Document has been reformatted to meet World Wide Web specifications.) i A BILL TO AMEND SECTION 6-1 5-20 CODE OF r M -�, LAWS OF SOUTH CAROLINA,1976, RELATING TO AUTHORIZING GOVERNMENTAL ENTITLES TO ENTER INTO CONTRACTS WITH OTHER GOVERNMENTAL ENTITLES FOR COLL.ECTr T F SEWAGE, AND TO A MND SECTION 1410, RELATfl G. TO DISPOSAL, AUTHORIZING TR ZING COT T TO OPERATEWATERr T AUTI30RYz?�TG COUNTIES CONTRACT T SHALL AND SEWEFACILITIES, IN BOTH, SO AS TO PROVIDE THAT A CONTAIN A PROVISION PROVIDING THAT MORE THAN TEN 4/2 7/012:23 PM -L ITR t• � � �� .� vevi..b... •..• • •vzS...St.. - ., .� Y `jVJL4L41lViiiS:.11CL .� a- NO.412 F.2/2 http:/Iwww.scstntehouse.net/b111s/82..bnn 2 of2 PERCENT OP THE SEWAGE TREATED BY THE SEWER. FACILITIES MAY BE GENERATED PROM 07.7TSIDE THE BOUNDARIES OF THE STATE. Be it enacted by the General Assembly of the State of South Carolina: SECTION 1, Section 5-1 of the 1976 Code is amended to read: "Section 6-15-20; Every governmental entity shall bo is empowered to enter into contracts with other governmental entities for the collection of sewage, for the disposal of sewage, and for the treatment of sewage, and to that end shall bc is jointly and severally empowered to construct, operate, maintain, enlarge;, and. improve sewer facilities designed for use by the parties to the contract. k The contract may provide for the joint ownership of .he sewerfacilities or for the ownership of i the facilities by any or Tie con*racting parties; provided, in &bleb that event, the remaining parties shall bo are empowered to utilize such the sewer facilities to the extent provided for in the contract, However, under no circurnstancesshall a contract contain a Drovision providing that more than ten percent of the Sewage treated" by the sewer facilities may be venerated from outside the boundaries of this State." SECTION 2, Section 4.-55-1410(D) of the 1976 Code is amended to read: "(D) Every county governing body is authorized to enter into contracts in connection with the providing of water or sewer services, or both, and facilities with persons, private corporations, municipal corporations; nub'_ic bodies, public agencies, special purpose districts, the State of South Carolina or any agencies thereof; and with the United. States Government or any agencies thereof. However. under no ctrcuxns:arces sha . a contract contain a. *provision proyidine_tbat more than ten percent of the sewaa e treated by :he sewer facLities may be venerated from outside ide the boundaries of this State." SECTION 3. This. act takes effect upon approval by the Governor. State HouseNetwork-LPITR@http://vvww,scstatehouse.net This web page was last Updated on April 4, 2001 at 2:29 PM 4/27101 2:23 PM ee-ifen.or44;_. ‘ . , sa. a Gt‘/-1..-.,4 le /rit e7-1441-: 7 (7); OP" •• PA2ev:/Z-COO 9,7 02 64.440C AfC O‘T- u? 7at 4 e k J,-aN 21 '99 11:19 FROM WS—RCKHILL UMWMMINIPINNIMIwa, TO f 2600 Bull art': Calizruubi2, SC 2fl0l .l704 Wes K Sen;th liszvizei cocady PI QS ' R Mr. Niec Stegall, Utilities Director City cif Redo Hill IP. 0, Box 11706 Rack Hill, SC 24731 PAGE.001 Post --it" Fax Note 7671 +rom Date ► Pesee ToLIf1 iegi 4Q 1 T Co/Dept. Co. Phone A Plono 0 Fax FaxA Rock Hill. Wastewater Tit Facility NPDE,S Penult SC0020443 Yaz1c County :Dear Mr. Stegall: 'This letter is in scfareaca to our correspondence and meetfiig related to the plupa ed effluent lauitz fbr Rock 'till facility at the expanded flow c pacify Of 20 MGA. To suaunatize the discIIstioAs: (1) The NPDES pcauit will be revoked said retssned to plado the 20 MGD petit limits page to etitcz. C2) A cam schedule will be ridded to toteti the proposed phospboros limits of 1251bslday to be completed by 1I112003. (3) An internal placed mass limit of 11,000 '73,00Q Ibs/ysu would placed in effect immediately (4) An interim ,phospliortts concertration limit 0! fa afk t with the pezmit chauge. If this dots sat epee with your recollection of the ova► please let me kilow, Whcn you your a� of tbesc co i out ire iyili proceed with the pe o ini g groom. You would of cora-se, have tlm sty to provide con=e4 cai tha dry N_FDFS, pen it, whoa we prepare it. � dense do not hesitate to cal meat 898-4228, if youhaysff ArtfEtionnl quesa s- i Sincerely, mouth, Z3,200 Ibs/7art r sad the NEWS paean 1044 u.u'x. & Report would be placed ktalusci L Maaxbelln Manager Oomestio Wastewater Permitting section IF: left delitsso net, Director, Water Facilities fitting Division Al Win, EQC Catawba District SOUTH CAROLI.NA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL O1/21 '99 11:09 TOTAI. PAGE 'A01 **