Loading...
HomeMy WebLinkAboutNC0024872_Authorization to Construct_20020301NPDES DOCYNENT SCANNING COVER SHEET NPDES Permit: NC0024872 Cooleemee WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Correspondence Owner Name Change 201 Facilities Plan Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: March 1, 2002 This document is printed on reuse paper - ignore any content on the reYerse side State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Gregory J. Thorpe, Ph.D., Acting Director Mr. Bruce Pratt, Director, Public Works Davie County Water System 261 Chaffin Street Mocksville, North Carolina 27028 Dear Mr. Pratt: A7A NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES March 1, 2002 Subject: Authorization to Construct Permit Issuance ATC Number 024872A01 Cooleemee WWTP/ Davie County NPDES Permit NC0024872 Davie County The Division of Water Quality received the County's letter of request for an Authorization to Construct (ATC) and final plans and specifications for this project have been reviewed and found to be satisfactory. Authorization is hereby granted for additional components at the Cooleemee WWTP. Specifically, this ATC allows the installation of: • A mechanical bar screen, 3/8" width, to the influent pump station, • Wash press (washing and dewatering of screenings), • all additional piping, valves, control equipment and appurtenances as indicated on plans. NOTE: In order to comply with the Division of Water Quality's requirement for duality, an indicator (be it alarm or telemetry) system must be present to alert the operator of failure of the bar screen (to prevent any overflow at the pump station). Once construction under this ATC has been completed and an Engineer's Certificate has been submitted, the permittee is authorized to operate the above components and discharge. Davie Co. / Cooleemee's WWTP permitted flow of 1.5 MGD shall remain unchanged with this ATC. This Authorization to Construct is issued in accordance with NPDES Permit No. NC0024872 and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in the permit. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. 1 61 7 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1617 - TELEPHONE 919-733-5083/FAX 919-733-0719 AN EQUAL OPPORTUNITY AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/ 1 0% POST -CONSUMER PAPER VISIT US ON THE WEB AT http://h2o.enr.state.nc.us/NPDES r Mr. Pratt Page 2 of 3 NC0024872 The Winston-Salem Regional Office, telephone number (336) 771 - 4600, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified water pollution control treatment system operator to be in responsible charge (ORC) of the water pollution control treatment system. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the water pollution control treatment system by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions outlined in Title 15A, Chapter 8G, .0204. Once the facility is classified, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge within: (A) Sixty calendar days prior to wastewater being introduced into a new system or (B) within 120 calendar days of the following, (i) after receiving notification of a change in the classification of the system requiring the designation of a new ORC and back-up ORC or (ii) a vacancy in the position of ORC or back-up ORC. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the NPDES Unit, Division of Water Quality, 1617 Mail Service Center, Raleigh, NC 27699-1617. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Ms. Susan A, Wilson, telephone number (919) 733-5083, extension 510. Sinc ely, egory J. Thorpe, Ph.D. PE. cc: Central Files NPDES Unit - Permit File Winston-Salem Regional Office, Water Quality Technical Assistance and Certification, Hope Walters Steve Cavanaugh, P.E. 8064 North Point Boulevard, Suite 102, Winston-Salem, NC 27106 August 22, 2001 Mr. Dave Goodrich, NPDES Unit Supervisor NPDES Group, Water Quality Section NC DENR - DWQ - NPDES Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 CAVANAU G H Solutions through integer ota Re.: Cooleemee Wastewater Treatment Plant Improvements (Replacement Of Existing Equipment). C&A No.: 1.00.008 Dear Mr. Goodrich: On behalf of Davie County, Cavanaugh & Associates, P.A. now submits the formal request for an Authorization to Construct modifications to the existing pump station at the wastewater treatment facility for the County. The County has coordinated their efforts with Mr. Larry Coble in the regional office. This wastewater treatment facility is currently permitted under NPDES Permit No. NC0024872. This permit was dated September 1, 1994 with a provision to allow the upgrade of the facility. In the early part of 1999, our firm was hired to conduct an investigation of the operation of the existing treatment process with the intent to make recommendations for improvements. A series of technical suggestions were made to "enhance the effectiveness of the treatment effort," including the addition of provisions to the influent pump station. The report determined that the existing pump station was structurally sound but needed some mechanical upgrades. In consultation with the facility operators, upgrades for the bar screen and wash press have been made with regards to treatment efficiency and ease of operation. It should be noted that the bar screen is a replacement. The wash press is for the washing and dewatering of screenings. We have been contracted to provide construction drawings for preparation of the site for the rehab of the existing facilities as previously noted. I'. 'Thai (Mc�,u - , �1 �� � Iv re t on) rod- At tS�N� pea-5 i G CA tr . — AL 41, ' (IA- I - w e 11 OD eft) 1 & * (- Pam P SCATtoN Cooleemee Pump Station Page 1 Cavanaugh & Associates, P.A. 8064 North Point Boulevard, Suite 102 Winston-Salem NC 27106 336 759-9001 fax 336 759-1005 www.cavanaughsolutions.com CAVANAU G H Solutions through integrity and partnership Mr. Dave Goodrich, NPDES Unit Supervisor Cooleemee Waste Water Treatment Plant Improvements C&A No. 1.00.008 August 22, 2001 Page 2 of 2 The following items are included in this packet for your review: 1. Three sets of detailed plans with specifications for the site work. 2. The processing fee for the Authorization to Construct ($150.00). 3. Two copies of a Flow Schematic and major component information. 4. Two sets of design calculations (Replacement of deteriorating screen -no calculations required). 5. Construction Sequence Plan A review of the effluent data for 1999 shows that the plant is not running at optimal performance. The proposed upgrades and components are anticipated to provide a more reliable and higher quality effluent. We believe that you will find everything in order for your review of this request. Upon receiving your approval, we anticipate 30 days will be needed for securing the County's construction contract; the construction period is estimated to last 30 to 45 days, depending upon the shipping phases of construction. Upon receipt of this submission package, if you have any questions or require additional information, please do not hesitate to contact our office. Sincerely, CAVANAUGH & ASSOCIATES, P.A. Robby Stone, E.I. RDS Enclosures Cc: Mr. Ken Windley, County Manager, Davie County Mr. Steve Cavanaugh, P.E., Cavanaugh & Associates, P.A. Cooleemee Pump Station Page 2 Cavanaugh & Associates, P.A. 8064 North Point Boulevard, Suite 1.02 Winston-Salem NC 27106 336 759-9001 fax 336 759-1005 www.cavanaughsolutions.com Cooleemee Waste Water Treatment Plant Improvements C&A No. 1.00.008 August 22, 2001 Re: Construction Sequence Plan Contractor shall bypass influent by means of pumping from collection box to wet well. The influent to the collection box can be partially blocked from the screening area by means of a slide gate. The contractor shall account for an average daily flow of 1 MGD. Contractor shall monitor influent level so that it remains three feet or more below the crest of the weir in the collection box. g21-872 4-91( Icone U (zslo Ac /v. � 0/�0( (tOsT / %?(ON - 2- 5 #/ /,07)-�6(z 5 YA-,),r(,J 2► J ee , C 116 o 3 o7o6 PF = i, 9 /vy SCcoN i 1.1M ITS /WC- = Z.(`7o yA-Ort,l - >�- DC--C Co%15 v ��/�N T %v LXIsn^�G de.;) � J1i/ T /55ur✓,J 7/Z9/`� �l(/2/, () -7/3 r/99) /i�o YAI- • CA(ANAuN do6g- N. ? t. l vc> Su, rc /oZ W —S Nc 27/06 (�0175 . Ta (ST(^-1S Pee 44-P S7Xi i iON • 1� $1 uC i �t CI-`1 50 C? Al r >vu T N Z) So M ,)'$ j / 1 �A!/c L MPS') 4(42£-9D/ M'L O, 3S Ai c7(1/S !.d/D 4/ fzm7bs ee J/GvAsN Plc- $ r,J C" ^ 32' ��q R977-04/ f;, 3 6). , fig, e12 S/HE (4, 600- TV. 0,4 720, 000 9,6_ • _l2— , pay ?4Y 7- ye ;AL- Zytr./ Fri 14 icord Z,",I -3.7s5 .370/0oo yP0 !9.3z(7- n/N�L ToP Pr/z 4 Ai feu tivf5 A. �%Nr^loj .c ro'' x 4/ q,'0 x 4- 5/3 = (9. Z c- -2 - D. Z - 0 , Tru�rz s / s O.3 S rl o - 30 ° ?no A, , Q(C 77.IF..471-S /5 o v/ ff (hi( &7M,,J bof o,3-�tis M.32 del'-7 0, 06 (rt4,7„, cti 1) 'WU T TPr 5 ^a -A/ OE Gm1,4-i¢.0 LLai) 8'( (.7 rJtc� Fitz ckr II I II I rI I L I L f• Air • • • I�• ll 1 O tII I STATION warp rj LXSJWO AERATION CELL (HACmq OR --�.r---ems- —v--- —� — PROP SED A IMPRO MERA ONENTS EOSIN° ABLATION I® 1 maw � A y= au. SOUTH YADKIN OVER PROPOSED INFLUENT SCREENING STATION r gOSE SPLITTER- I =ONO t, CUIRIFIER i :MOM CONTACT BASIN RETURN =oar POW. TATION EFFLUENT INTO RIM SIVALLr .NO akZ CI E incam as ID WI►= IENmueoI PROPOSED RETURN SLUDGE PUMP STATION, FLOW ®MONITORING, LAB EQUIPMENT do INSTRUMENTATION IMPROVEMENTS ® PROPOSED CHLORINE CONTACT CHAMBER & EFFLUENT MONITORING IMPROVEMENTS