Loading...
HomeMy WebLinkAboutNCC222998_Site Plan or Location Map_20220906FINAL APPROVAL 6/27/2022 CHARLOTTE. PR03ECT NUMBER: ESDRMF-2022-00001 ENGINEERING Robert M Zink PCSO / DETENTION /DRAINAGE PLAN EROSION CONTROL Peter Rodriguez URBAN FORESTRY Jonathan Wils n TREE ORDINANCE 6 37 24 RCP C O Kevin Parker fs Cg 51, / NOTE: SCHE ULE PRE -CONSTRUCTION MEETING AT L AST 48 HRS. PRIOR TO ANY LAND DIST RBING ACTIVITY USING THE ONLINE FOR FOUN AT http://charlottenc.gov/ld TC/BC 5 8" V 684. 3 l"V U 6662 ' .40 Cp CP V / 0 MATCH LINE 143-041-25 LAKEPOINTE HOTEL INVESTMENT LLC, C/O CHANDRESH B PATEL 1719 FUNNY CIDE DR WAXHAW NC 28173 INSET A 1 "=100' PR OSED PUBLIC STREET TO DB. 31601, PG. 948 aCONSTRUCTED AS PART EX. LAND USE: OFFICE OF THE ADJOINING PARCEL ZONING: 1-1 (CD) DEVELOPMENT (143-031-33) PER THE PREVIOUSLY APPROVED SUBDIVISION PLANS FOR THF4%0�%D (APN: SDR,q°??5j9,W090). TOTAL LIMITS OF DISTURBANCE: 21.3 AC 143-031-33 AGS HOTELS NC LLC 7505 VILLAGE CLUB DR WAKE FOREST NC 27587 DB. 33051, PG. 160 EX. LAND USE: COMMERCIAL ZONING: 1-1 (CD) \ I fno 17 o MATCH LINE SEE INSET A Z�~� a� HEALTH CARE CENTER 143-041-06 )RESS KLEIN-CAMBRIDGE THCARE SOLUTIONS LLC, D COURTHOUSE RD STE 210 VIENNA VA 22182 i DB. 28904, PG. 1 -AND USE: COMMERCIAL\ ZONING: 1-1 (CD) / \ I N/ 1430, SS KLEI CARE tS DB Ra9 EROSION CONTROL NOTES - EROSION CONTROL PLANS DEFINE MEASURES REQUIRED FOR EROSION AND SEDIMENTATION CONTROL, AND DO NOT REFLECT FOOTING, FOUNDATION, SHORING, OR BASEMENT EXCAVATION REQUIREMENTS OR QUANTITIES. EROSION CONTROL PLANS SHOW LIMITED PHASES DURING THE COURSE OF CONSTRUCTION. DURATION OF A PARTICULAR PHASE DEPENDS ON THE GENERAL CONTRACTOR'S MEANS AND METHODS. LANDDESIGN IS NOT RESPONSIBLE FOR FIELD MEANS AND METHODS DURING CONSTRUCTION. 1. THE CONTRACTOR SHALL INSTALL AND MAINTAIN THROUGHOUT THE PROJECT CONSTRUCTION ALL EROSION CONTROL MEASURES SHOWN WITHIN THESE PLANS IN ACCORDANCE WITH APPLICABLE NCDEQ EROSION AND SEDIMENT CONTROL REGULATIONS. 2. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS, U.S. DEPARTMENT OF AGRICULTURE, AND U.S. SOIL CONSERVATION SERVICE REGULATIONS. 3. ALL CONSTRUCTION WORK SHALL BE IN COMPLIANCE WITH REGULATIONS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORM WATER GENERAL PERMIT. 4. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE NCDEQ EROSION CONTROL INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 5. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. CONTRACT PROJECT ENGINEER AND PROJECT EROSION CONTROL INSPECTOR TO ENSURE ADDITIONAL EROSION CONTROL MEASURES ARE INSTALLED PRIOR TO OFF -SITE GRADING. 6. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RELOCATED WHEN AND AS NECESSARY, AND SHALL BE CHECKED AFTER EVERY RAINFALL. SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED, AND MULCHED AS NECESSARY TO OBTAIN A DENSE STAND OF GRASS. 7. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. ALL DISTURBED AREAS WHICH ARE NOT OTHERWISE STABILIZED SHALL BE TOP SOILED AND SEEDED, TEMPORARILY OR PERMANENTLY IN ACCORDANCE WITH THE NORTH CAROLINA SEDIMENT CONTROL REGULATIONS. PERMANENT SEEDING AND GRASS ESTABLISHMENT IS REQUIRED PRIOR TO PROJECT COMPLETION AND ACCEPTANCE. 8. CONTRACTOR SHALL PROVIDE GROUND COVER ON EXPOSED SLOPES WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING, PERMANENT GROUND COVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION. 9. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 14 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 10. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 1 11. WHEN A CRUSHED STONE CONSTRUCTION ENTRANCE HAS BEEN COVERED WITH SOIL OR X / ✓ ~ I� HAS BEEN PUSHED INTO THE SOIL BY CONSTRUCTION TRAFFIC, IT SHALL BE REPLACED - ♦ I WITH A DEPTH OF STONE EQUAL TO THAT OF ORIGINAL APPLICATION. 12. ALL DRAINAGE INLETS SHALL BE PROTECTED FROM SILTATION. INEFFECTIVE PROTECTION DITCH 2 DEVICES SHALL BE IMMEDIATELY REPLACED AND THE INLET CLEANED. FLUSHING IS NOT AN 3.37 AC I ACCEPTABLE METHOD OF CLEANING. `644 / / I. 13. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL BE STABILIZED OR CB 2091 PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR RIM:643.75 THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES NV CL:636.52 ROCK CHECK DAM / 1 II ON SITE AS WELL AS SOIL INTENTIONALLY FROM THE PROJECT SITE. CLDSM #30.10A (TYP.) / 14. ALL "STD." NUMBERS REFER TO THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL. I I 15. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. / 16. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE I�ROP. SILT FENCE / ( II CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. LDSM #30.06A (TYP.) I / I 17. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A 0�3 ROCK CHECK DAM Z 1 I I / I VIOLATION OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A CLDSM #30.10A (TYP.) -A II I FINE. / \ % 18. EFFORT SHOULD BE MADE NOT TO UNCOVER MORE THAN 20 ACRES AT ONE TIME. IF MORE THAN 20 ACRESARE TO BE UNCOVERED AT ANY ONE TIME, THE PLAN SHALL CONTAIN THE LLC �/ / I I FOLLOWING: 18.1. THE METHOD OF LIMITING THE TIME OF EXPOSURE AND AMOUNT OF EXPOSED AREA TO ACHF THIS CHAPTER. L I I I 11 18.2. A CUIT FILL ANALYSIS EVE THE T HATIVES OSHOWS WHERE SOIL WILL BE MOVED FROM ONE AREA OF ROCK CHECK DAM / -� III I / J I THE TRACT TO ANOTHER AS GROUND ELEVATION IS CHANGED. CLDSM #30.10A (TYP.) I I 18.3. CONSTRUCTION SEQEUNCE AND CONSTRUCTION PHASING TO JUSTIFY THE TIME AND J J I 4TR AMOUNT OF EXPOSURE. // Y \ PORTION C�F � v II III I 18.4. DISTURBED AREAS. ADDITIONALTECHNIQUES TO BE USED TO REVENT SEDIMENTATION EROS ON CONTROL MEASURES, STRUCTURES, ATED WITH AND PROP. LIMITS OF DISTURBANCE (TYP.) � GER CK LAKEPOINTE COfj.�ORLCE CEl'VTER / � I \ ASSOCIA / I I DEVICES TO PREVENT SEDIMENTATION. AS � I D8 13908R 86 E) I 19. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER �- (TYP.) \ J III I II �� I THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 00 4CEDAR# \ \ / , ROCK CHECK DAM 20. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT 7 "#� \ _ 642 / / CLDSM #30.10A (TYP.) \ \\ \ STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 6 3CED \ 1 I / f 11\\\ PROP. SILT FENCE I 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 7 CLDSM #30.06A (TYP.) MH 12A9 / / / / I\\ \ 11 21 REDDITIONAL MEASURES PRESENTATIVE OF THEOCITYNTROL ENGINEERINION AND G DEPARTMENT. MAY BE REQUIRED BY A RIM: 636. 6 / \E A( RI INV IN: 6 9.43 I / / 11\ l 22 SLOPES SHALL BE GRADED NO STEEPER THAN 21 FILL SLOPES GREATER THAN 10' REQUIRE SSM 2090 642.19 N N: 630 �9,^ U T: 6 • �V STMH 83 RIM:6478 4 INV IN: INV OUT: \ \\\ II I \ �\ / \ 646 / J I L \� EROSION CONTROL LEGEND INV OUT 629.43 ADEQUATE TERRACING [CLDSM / v II II II 23. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. ROCK CHECK DAM I I 1 24. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE CLDSM #30.10A (TYP.) / \�I I PRESENTED AT PRE -CONSTRUCTION MEETING. o f II I I� �• I I TEMPORARY DIVERSION DITCH 2 / CONSTRUCTION SEQUENCE: IIIIII I CONSTRUCTION ENTRANCE / / CLDSM #30.05 (TYP.) I I I I PHASE 1: � CLDSM #30.11A / / TEMPORARY 18" SLOPE DRAIN II,III II I \'ti09 u� nu�L� roe SEE CALCS FOR SIZING �l I 1 dwC I 1. OBTAIN PLAN APPROVAL FROM CITY OF CHARLOTTE. ` / O 2. THE CONTRACTOR SHALL SET UP AN ON -SITE PRE -CONSTRUCTION CONFERENCE WITH THE CITY OF CHARLOTTE EROSION PROP. 6" PVC PIPE FROM TIRE WASH / / �[ CLDSM #30.04 (TYP.) I I CONTROL INSPECTOR TO DISCUSS EROSION CONTROL MEASURES. FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS ono / SEDIMENT BASIN / / \ I PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION AND IS SUBJECT TO FINE. CONSTRUCTION ENTRANCE TIRE WASH / / 1 3. CONTRACTOR TO INSTALL CONSTRUCTION ENTRANCES, SILT FENCE, INLET PROTECTION, AND OTHER MEASURES AS SHOWN CLDSM #30.11 B / DRAINAGE AREA: 20.54 ACRES /• BOTTOM EL.: 617.00 SKIMMER EL.: 618.00 /� I WEIR EL.: 623.00 / II OP TOF BERM: 624.00 I \ / o � IIIIII TEMPORARY 18" SLOPE DRAIN / •" 482 I III SEE CALCS FOR SIZING / "cPP INV IN:625. I I 143-031-0�! 6�0 CLDSM #30.04 (TYP.) V INV:1426 ,IIIIII 111���J / C LAKEPOINTE CORP ATE CENTS 18"CPP T.O.P.:624 I \ \ ASSOCIATES, LLC \ _ ±14.637ACREBs / FG:624.19 ,III I v: Q. ON PROP. TREE ss 1144 \ \ \ \ / o�ti �� 6ti° 6tir / PROTECTION FENCE I CL11 .619.07 \ °o� CLDSM #40.02 (TYP.) \ \ FG: 625.24 PROP. BAFFLE N / CLDSM #30.19 (TY .) \ \ ROCK CHECK DAM ° �� FG: 630.42 \ ROCK CHECK DAM CLDSM #30.10A (TYP.) PROP. 6' SKIMMER / CLDSM #30.10A (TYP.) / CLDSM #30.02B (TYP.) - \ 6z V PROP. TEMPORARY STORM RIS R STRUCTURE CLDSM #30.05 (TYP.)) \ TEMPORARY DIVERSION DITCH630 / / SEE SHEET C4-11 FOR DETAILS / � - 47. 3 4 2 LF OF RCP 0.9 %� / FG: 627.85 @ EXISTING 100YR FEMA I \\ \\\ FG: 628.73 FLOOD FRINGE LINE I 612 /// 24" INV. IN: 615.50 (OCS-121) lJ / / SSMH 15 I FUTURE COMMUNITY RIM:607. 36" INV. OUT: 615.50 EX FES / LOODFRIINGE LINE ( ) 0 630 11 1 SS _ - PROP. DOUBLE ROW HIGH C SSMH 1586 i HAZARD SILT FENCE \�� �i�j �� SS RIM: 605.96 _ - CLDSM #30.06B (TYP.) \ `\ / �- sM 645 I RM: 610.17 UPLA N - ZOtiqN qc� 5oS6335' MAN, SSMR59 / SiaFReEQ\ \ �/ 30' UNDISTURBED STREAM SIDE ZE ONE A \ �� S / / P EL I INA PLANN-EDr - - _ � �143-031-07 \2�NF MU TI-FA ILY SUBMVISION / M E C KL E N B- �hLT_Y------ �- _ -------------------- \ \ -� RIM TINGIFEMA F ODWAY SSMH 1 \ PP AL/ 600 E 4TH ST \ \ ENCROACHMENTS FIRM CROSS SECTION 014 \ 03.81 FEMA FLOOD FRINGE EL: 609.64 / CHAR OTTE-W� L BURG PLANAI-ING DEPARTMENT CHARLOTTE NC 28202 -� \ �- ENTURE CO E�ITYLIN/ \ \/ � DB: 25324, PG: 475 \ \ � APPROXIMATE LOCATION CV I Akin I ICC• Ir)r) VC:AD CI nnn DI AIAI OF IRWIN CREEK CL ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 4. CONTRACTOR SHALL INSTALL SEDIMENT BASIN AND DIVERSION DITCHES AND GRADE AS NECESSARY TO INSTALL THESE MEASURES. 5. CONTRACTOR SHALL SCHEDULE AN ON -SITE INSPECTION BY CITY OF CHARLOTTE INSPECTOR. WHEN APPROVED, CLEARING, GRUBBING, AND MASS GRADING MAY BEGIN. 6. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 7. CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. 8. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, US DEPT. OF AGRICULTURE, CITY OF CHARLOTTE EROSION CONTROL ORDINANCE, AND THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL. PHASE 2: 1. BEGIN EARTHWORK/GRADING ACTIVITIES. BEGIN GRADING OF FILL SLOPES. MAINTAIN AND VERTICALLY ADJUST ALL ROCK CHECK DAMS, INLET PROTECTION DEVICES, DITCHES, AND SILT FENCE THROUGHOUT GRADING ACTIVITIES TO MAINTAIN DRAINAGE PATTERNS. 2. CONTRACTOR SHALL BEGIN TO BUILD RETAINING WALLS FROM BOTTOM UP. AS WALLS ARE BEING BUILT, BRING SURROUNDING SITE TO GRADE. 3. AS SITE IS BROUGHT TO GRADE, BEGIN INSTALLING STORM DRAINAGE STRUCTURES AND PIPES. AS STORM DRAINAGE IS INSTALLED, CONTRACTOR SHALL PLACE INLET PROTECTION ON ALL STORM INLETS. NO PIPES SHALL BE LEFT EXPOSED AT THE CLOSE OF BUSINESS EACH DAY. ALL REASONABLE MEASURES SHALL BE TAKEN TO PREVENT SILT FROM ENTERING THE STORM SYSTEM. 4. REMOVE DIVERSION DITCHES WHEN FLOW IS DIVERTED TO STORM INLETS AND PIPES. 5. DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURE TO MINIMIZE EROSION. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE CITY INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 6. AS CONSTRUCTION PROGRESSES, INSTALL PERMANENT EROSION CONTROL MEASURES SUCH A RIP RAP APRONS, VELOCITY DISSIPATERS, CHANNEL LINERS, GRAVEL BASE COURSE, ETC. 7. GRADED SLOPES AND FILLS ARE TO BE PLANTED OR PROVIDED WITH PROTECTIVE COVER SUFFICIENT TO RESTRAIN EROSION WITHIN 14 CALENDAR DAYS AFTER THE COMPLETION OF ANY PHASE OF GRADING. 8. AS AREAS ARE BROUGHT TO FINISHED GRADE, CONTRACTOR TO INSTALL TEMPORARY OR PERMANENT SEEDING AND STABILIZE ALL SLOPES PER THE EROSION CONTROL NOTES AND DETAILS. 9. CONTRACTOR SHALL COORDINATE WITH THE EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. PHASE 3: 1. CONTRACTOR SHALL STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE 2. CONTRACTOR TO CONVERT SEDIMENT BASIN TO FULLY FUNCTIONING WET POND BMP. 3. COMPLETE SITE GRADING, INSTALLING ALL STORM DRAIN UTILITIES AND INLET PROTECTIONS. CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE TO EACH INLET AS EACH INLET IS INSTALLED AND INSURE PROPER FUNCTIONING OF BMP THROUGHOUT THE COURSE OF CONSTRUCTION. 4. PER CHARLOTTE FIRE DEPARTMENT ALL NEW FIRE ACCESS ROADS AND FIRE HYDRANTS WILL NEED TO BE INSTALLED AND CERTIFIED BY CLT WATER PRIOR TO COMBUSTIBLE MATERIALS BEING BROUGHT ON SITE AND START OF VERTICAL CONSTRUCTION. 5. ALL FIRE ACCESS ROADS WILL NEED TO MAINTAIN 20' CLEAR DURING VERTICAL CONSTRUCTION Know what's below. Call before you dig. LandDesign. 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 WWW.LANDDESIGN.COM NC ENG. FIRM LICENSE # C-0658 KEY MAP SEAL DOMINION REALTY PARTNERS 101 N. 5TH ST, SUITE B RICHMOND, VA 23219 804.780.3030 RULE JOY TRAMMELL + RUBIO 300 GALLERIA PKWY, #700 ATLANTA, GA 30339 770.661.1492 CArt 0 ®®0®� ��� *°a Leo-016 oe*= €AL a 048124 05.09.22 PROJECT LAKEPOINTE MULTIFAMILY DOMINION REALTY PARTNERS 2200 CASCADE POINTE BLVD. CHARLOTTE, NC 28208 LANDDESIGN PROJ.# 1021015 REVISION / ISSUANCE NO. DESCRIPTION DATE 1 1ST LAND DEVELOPMENT SUBMITTAL 01.17.2022 2 CLT WATER 1 ST SUBMITTAL 02.03.2022 3 2ND LAND DEVELOPMENT SUBMITTAL 03.30.2022 4 PERMIT REVISION 1 04.07.2022 5 CLT WATER REVISIONS O4.14.2022 6 3RD LAND DEVELOPMENT SUBMITTAL 05.09.2022 DESIGNED BY: CJL DRAWN BY: CJL CHECKED BY: MKW SCALE NORTH VERT: N/A HORZ: 1 "=80' 0 40' 80' 160' ORIGINAL SHEET SIZE: 24" X 36" SHEET TITLE EROSION CONTROL PHASE 1 SHEET NUMBER c1_00 5/9/2022 4:38 PM CHRIS LAWLEY N:\ 2021\1021015\CAD\DOCUMENTATION\1021015 PLN ECP - PH 1.DWG FINAL APPROVAL 6/27/2022 CHARLOTTE. ROJECT NUMBER: ESDRMF-2022-00001 ENGINEERING PCSO / DETENTION /¢DMMI GE PLAN EROSION C L CONTROL O O URBAN FORESTRY TREE ORDIN NCE CDO10 NOTE: SCHE ULE PRE -CONSTRUCTION MEETING AT L AST 48 IRS. PRIOR TO ANY LAND DIST RBING ACTIVITY USING THE ONLINE FOR FOUND AT http://charlottenc.gov/ld EROSION CONTROL NOTES - EROSION CONTROL PLANS DEFINE MEASURES REQUIRED FOR EROSION AND SEDIMENTATION CONTROL, AND DO NOT REFLECT FOOTING, FOUNDATION, SHORING, OR BASEMENT EXCAVATION REQUIREMENTS OR QUANTITIES. EROSION CONTROL PLANS SHOW LIMITED PHASES DURING THE COURSE OF CONSTRUCTION. DURATION OF A PARTICULAR PHASE DEPENDS ON THE GENERAL CONTRACTOR'S MEANS AND METHODS. LANDDESIGN IS NOT RESPONSIBLE FOR FIELD MEANS AND METHODS DURING CONSTRUCTION. 1. THE CONTRACTOR SHALL INSTALL AND MAINTAIN THROUGHOUT THE PROJECT CONSTRUCTION ALL EROSION CONTROL MEASURES SHOWN WITHIN THESE PLANS IN ACCORDANCE WITH APPLICABLE NCDEQ EROSION AND SEDIMENT CONTROL REGULATIONS. 2. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS, U.S. DEPARTMENT OF AGRICULTURE, AND U.S. SOIL CONSERVATION SERVICE REGULATIONS. 3. ALL CONSTRUCTION WORK SHALL BE IN COMPLIANCE WITH REGULATIONS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORM WATER GENERAL PERMIT. 4. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE NCDEQ EROSION CONTROL INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 5. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. CONTRACT PROJECT ENGINEER AND PROJECT EROSION CONTROL INSPECTOR TO ENSURE ADDITIONAL EROSION CONTROL MEASURES ARE INSTALLED PRIOR TO OFF -SITE GRADING. 6. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RELOCATED WHEN AND AS NECESSARY, AND SHALL BE CHECKED AFTER EVERY RAINFALL. SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED, AND MULCHED AS NECESSARY TO OBTAIN A DENSE STAND OF GRASS. 7. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. ALL DISTURBED AREAS WHICH ARE NOT OTHERWISE STABILIZED SHALL BE TOP SOILED AND SEEDED, TEMPORARILY OR PERMANENTLY IN ACCORDANCE WITH THE NORTH CAROLINA SEDIMENT CONTROL REGULATIONS. PERMANENT SEEDING AND GRASS ESTABLISHMENT IS REQUIRED PRIOR TO PROJECT COMPLETION AND ACCEPTANCE. 8. CONTRACTOR SHALL PROVIDE GROUND COVER ON EXPOSED SLOPES WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING, PERMANENT GROUND COVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION. 9. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 14 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 10. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER / SEDIMENT IS REMOVED IN THIS MANNER. 11. WHEN A CRUSHED STONE CONSTRUCTION ENTRANCE HAS BEEN COVERED WITH SOIL OR HAS BEEN PUSHED INTO THE SOIL BY CONSTRUCTION TRAFFIC, IT SHALL BE REPLACED I ( I WITH A DEPTH OF STONE EQUAL TO THAT OF ORIGINAL APPLICATION. \ 1 12. ALL DRAINAGE INLETS SHALL BE PROTECTED FROM SILTATION. INEFFECTIVE PROTECTION DEVICES SHALL BE IMMEDIATELY REPLACED AND THE INLET CLEANED. FLUSHING IS NOT AN / % I ACCEPTABLE METHOD OF CLEANING. / 644 I I 13. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL BE STABILIZED OR 91 PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR RIB . 43. 5 ( I THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES I I CL: 36.52 / I I ON SITE AS WELL AS SOIL INTENTIONALLY FROM THE PROJECT SITE. II I 14. ALL "STD." NUMBERS REFER TO THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL. 2090 PROP. SILT FENCE 15. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE 642.19 CLDSM #30.06A (TYP.) / ) ZONING ADMINISTRATOR. N N:630 9 - `_/ / J 16. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE U T: 6 / / CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 17. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A JI r 1 I FINE. N/F / 18. EFFORT SHOULD BE MADE NOT TO UNCOVER MORE THAN 20 ACRES AT ONE TIME. IF MORE I I �1430410 Y I 1 I THAN 20 ACRESARE TO BE UNCOVERED AT ANY ONE TIME, THE PLAN SHALL CONTAIN THE 3S KLE - R G \ FOLLOWING: I jBRE 9 LLC 18.1. THE METHOD OF LIMITING THE TIME OF EXPOSURE AND AMOUNT OF EXPOSED AREA TO ACHIEVE THE OBJECTIVES OF THIS CHAPTER. 18.2. A CUT/FILL ANALYSIS THAT SHOWS WHERE SOIL WILL BE MOVED FROM ONE AREA OF THE TRACT TO ANOTHER AS GROUND ELEVATION IS CHANGED. 18.3. CONSTRUCTION SEQEUNCE AND CONSTRUCTION PHASING TO JUSTIFY THE TIME AND I 4TR AMOUNT OF EXPOSURE. PROP. LIMITS OF DISTURBANCE (TYP.) TION 184 F / III I I .. TECHNIQUES TO BE USED TO PREVENT SEDIMENTATION ASSOCIATED WITH LARGER CK LAKEPON ITE TER 1 DISTURBED AREAS. ADDITIONAL EROSION CONTROL MEASURES, STRUCTURES, AND \ ASSOCIACO s, LLC DEVICES TO PREVENT SEDIMENTATION. 1 DB 13 08-286 PS tE/ �I \ J 19. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER 9.767 ACR THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 4CEDA( \ _ 642 / / \\ 20. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT / \ / \ ; 11 STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN ' 3CED 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. / STM 2 9 / / / \ 21. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A �11� cE A( RIM- R:6 9.43 / / \ REPRESENTATIVE OF THE CITY ENGINEERING DEPARTMENT. / I OUT 629.43 / r 1 22. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE PROP. SILT FENCE (( 1 ADEQUATE TERRACING [CLDSM #30.161 CLDSM #30.06A (TYP.) I II 23. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. 24. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PROP. INLET PROTECTION PRESENTED AT PRE -CONSTRUCTION MEETING. \ I i I I I _ 6Q� / CLDSM #30.15 (TYP.) I I I �� I � CONSTRUCTION SEQUENCE. - � � / IIIIII CONSTRUCTION ENTRANCE / / / / IIII I ul �t II_ I 1- PHASE 1: p CLDSM #30.11A nulLV III II I �Og dW0 0� 1. OBTAIN PLAN APPROVAL FROM CITY OF CHARLOTTE. I 2. THE CONTRACTOR SHALL SET UP AN ON -SITE PRE -CONSTRUCTION CONFERENCE WITH THE CITY OF CHARLOTTE EROSION 6� PROP. 6" PVC PIPE FROM TIRE WASH / / �\\I I I CONTROL INSPECTOR TO DISCUSS EROSION CONTROL MEASURES. FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS \ C, // \ ` I PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION AND IS SUBJECT TO FINE. ' CONSTRUCTION ENTRANCE TIRE WASH �� -/ SEDIMENT BASIN / 1�1\ \ 1 I 3. CONTRACTOR TO INSTALL CONSTRUCTION ENTRANCES, SILT FENCE, INLET PROTECTION, AND OTHER MEASURES AS SHOWN rn CLDSM #30.11 B DRAINAGE AREA: 20.54 ACRES 1 w � ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. \ BOTTOM EL.: 617.00 4. CONTRACTOR SHALL INSTALL SEDIMENT BASIN AND DIVERSION DITCHES AND GRADE AS NECESSARY TO INSTALL THESE I SKIMMER EL.:618.00 - �j III 1 I MEASURES. p WEIR EL.: 623.00 I \ 1 5. CONTRACTOR SHALL SCHEDULE AN ON -SITE INSPECTION BY CITY OF CHARLOTTE INSPECTOR. WHEN APPROVED, CLEARING, II I TOP OF BERM' 624.00 I 1 GRUBBING, AND MASS GRADING MAY BEGIN. DILIGENTLY6 THE CONTRACTOR SHALL S AND U 77, CONT ACTOR SHHALL MEETWITH EROSIONN CONTROL TINS ECTOR PRIOR TO COMMENCCING WITH PHASE OF EROSION CONTROL MEASURES. 182 I III roc 8. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NC EROSION AND SEDIMENT INV IN:625. I I mor. 1 CONTROL PLANNING AND DESIGN MANUAL, US DEPT. OF AGRICULTURE, CITY OF CHARLOTTE EROSION CONTROL ORDINANCE, 0 - / 1426 IIIIII o� c I AND THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL. CLAKEPOINTE CORP TE CENTE CPP T.O.P.:624. ASSOCIATES, � p�p� 21.3 AC 143-031-33 / \ Y / 6g3 \ 632 t14.63 AC2 6 ��� p9V: IIII �Z 1 l PHASE 2: "IAGS HOTELS NC LLC / 635 / CT E� �� 42g 11 1. BEGIN EARTHWORK/GRADING ACTIVITIES. BEGIN GRADING OF FILL SLOPES. MAINTAIN AND VERTICALLY ADJUST ALL ROCK 7505 VILLAGE CLUB DR 632 / / �� /SCO9.2 CHECK DAMS, INLET PROTECTION DEVICES, DITCHES, AND SILT FENCE THROUGHOUT GRADING ACTIVITIES TO MAINTAIN �°' Ilk N PROP. TREE DRAINAGE PATTERNS. 631 1144 \ \ \ / / / 6ti° 6ti� PROTECTION FENCE 1 2. CONTRACTOR SHALL BEGIN TO BUILD RETAINING WALLS FROM BOTTOM UP. AS WALLS ARE BEING BUILT, BRING WAKE FOR�ST NC 27587 631 630 RI 1 .619.07 �\ / 6� 6 CLDSM #40.02 (TYP.) ; SURROUNDING SITE TO GRADE, DBA3051, PG. 160 3. AS SITE IS BROUGHT TO GRADE, BEGIN INSTALLING STORM DRAINAGE STRUCTURES AND PIPES. AS STORM DRAINAGE IS \ \ / / / o / INSTALLED, CONTRACTOR SHALL PLACE INLET PROTECTION ON ALL STORM INLETS. NO PIPES SHALL BE LEFT EXPOSED AT EX. SAND USE: COMMERCIAL 9 \' / / 6� // ° 1 THE CLOSE OF BUSINESS EACH DAY. ALL REASONABLE MEASURES SHALL BE TAKEN TO PREVENT SILT FROM ENTERING THE STORM SYSTEM. ZONING: 1-1 (CD) qB 630 PROP. 6" SKIMMER y� ^_ ` 4. REMOVE DIVERSION DITCHES WHEN FLOW IS DIVERTED TO STORM INLETS AND PIPES. �, CLDSM #30.02B (TYP.) 5. DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURE TO MINIMIZE EROSION. THE 7 CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE CITY INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE U�.2 PROP. TEMPORARY STORM RISER STRUCTURE ` PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. � - , SEE SHEET C4-11 FOR DETAILS 6. AS CONSTRUCTION PROGRESSES, INSTALL PERMANENT EROSION CONTROL MEASURES SUCH A RIP RAP APRONS, VELOCITY 100 OBbI \ - - / \ \ \ \ 630 \ / / / / 1 I / DISSIPATERS, CHANNEL LINERS, GRAVEL BASE COURSE, ETC. / \ �` 7. GRADED SLOPES AND FILLS ARE TO BE PLANTED OR PROVIDED WITH PROTECTIVE COVER SUFFICIENT TO RESTRAIN EROSION \ 1 \ / \ \� \ e �✓ %� �/� FEMA \ WITHIN 14 CALENDAR DAYS AFTER THE COMPLETION OF ANY PHASE OF GRADING. \ LF OF 24" RCP @ 0.9 % FLOOD FRINGE LINE 8. AS AREAS ARE BROUGHT TO FINISHED GRADE, CONTRACTOR TO INSTALL TEMPORARY OR PERMANENT SEEDING AND F STABILIZE ALL SLOPES PER THE EROSION CONTROL NOTES AND DETAILS. , SSMH 15 ELOODEFRONGE LINE MUNITY 1 9. CONTRACTOR SHALL COORDINATE WITH THE EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL \ \ 1/�//j�j 24" INV. IN: 615.50 (OCS-1 1) RIM: 507.0$$ 1 MEASURES. //// /��� 36" INV. OUT: 615.50 (EX F 1� \ Nv:> \ � ///s 11 ��� SS �� \ PHASE 3: \ I 1. CONTRACTOR SHALL STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE PROP. DOUBLE ROW HIGH ` _ ijj/ SSMH 1596 i 2. CONTRACTOR TO CONVERT SEDIMENT BASIN TO FULLY FUNCTIONING WET POND BMP. HAZARD SILT FENCE ��\ �� =�i�j SS RIM:605.96 \ 1\ CLDSM #30.06B (TYP.) J/ / ssM 545 \ �� 3. COMPLETE SITE GRADING, INSTALLING ALL STORM DRAIN UTILITIES AND INLET PROTECTIONS. CONTRACTOR SHALL MAINTAIN RIM:610.17 _ _ 1 POSITIVE DRAINAGE TO EACH INLET AS EACH INLET IS INSTALLED AND INSURE PROPER FUNCTIONING OF BMP THROUGHOUT 85S _ \ \ \ j�A �� \ THE COURSE OF CONSTRUCTION. s �, / NF Gq 4. PER CHARLOTTE FIRE DEPARTMENT ALL NEW FIRE ACCESS ROADS AND FIRE HYDRANTS WILL NEED TO BE INSTALLED AND / CERTIFIED BY CLT WATER PRIOR TO COMBUSTIBLE MATERIALS BEING BROUGHT ON SITE AND START OF VERTICAL 1 / �5' MANAGED �Z _ \ SS\ SS633 / j� �- NSF �qN ssN6.59 1650 \ l CONSTRUCTION. / j611.29 5 / 3o ZoN qRIM: 6 .59 \ 5. ALL FIRE ACCESS ROADS WILL NEED TO MAINTAIN 20' CLEAR DURING VERTICAL CONSTRUCTION A 30' UNDISTURBED STREAM SIDE ZONE A \ / A Side P EL INA PLANNER' _ - s % z / 143-031-07 \�"F MU TI-FA ILY SUBMVISIO MECKLENBURG COU Y �- 1 2/ \ \ �- P*V-AL/ 600 E 4TH ST \ \ RIM:TINGIFEMA F ODWAY \ SSMH 1 \ ENCROACHMENT FIRM CROSS SECTION 014 5W-603.81 U����/M�� FEMA FLOOD FRINGE EL: 609.64 CHAR OTTE- CKL BURG PLANKING DEPARTMENT CHARLOTTE NC 28202 -� \ �- FUTURECHM Q'U ITY �° / Know what's below. DB: 25324, PG: 475 \ APPROXIMATE LOCATION _/ Call before you din CV I Akin I ICC• I!)!1 VC/�D CI nnn DI /�IAI OF IRWIN CREEK C. l digOF Robert WZink Peter R tg ez Jonathan ilt n /NV 656 3� 4 RCP Kevin e.r ES V ca w /35 143-041-25 LAKEPO E HOTEL INVESTMENT LLC, C/O C NDRESH B PATEL 1719 FUNNY CIDE DR a WAXHAW NC 28173 DB. 31601, PG. 948 EX. LAND USE: OFFICE ZONING: 1-1 (CD) TOTAL LIMITS OF � DISTURBANCE: INSET B 1 "=100' x PR OSED PUBLIC STREET TO E CONSTRUCTED AS PART OF THE ADJOINING PARCEL DEVELOPMENT (143-031-33) PER THE PREVIOUSLY APPROVED SUBDIVISION PLANS FOR THE4%�%D (APN SDR1q5j91Qqp090) �c c� O ENTER MATCH LINE SEE INSET B / - 646 - v I I I I J X EROSION CONTROL LEGEND DRAINAGE DIVIDE - - - - PROPERTY LINE - - TEMPORARY SILT FENCE (CLDSM 30.06 HIGH HAZARD SILT FENCE (CLDSM 30.06B) LIMITS OF DISTURBANCE LD ROCK OUTLET (CLDSM #30.06C) TREE PROTECTION (CLDSM #30.08) INLET PROTECTION ❑ (CLDSM #30.09) EXIST. 5' CONTOURS 735 EXIST. 1' CONTOURS - PROP.5'CONTOURS PROP. 1' CONTOURS TEMP. CONSTRUCTION pOoc)oc)o oho ENTRANCE/EXIT (CLDSM #30.11A&B) ROCK CHECK DAM (CLDSM #30.10) TEMPORARY SILT DITCH TD-> (CLDSM #30.05) LandDesign. 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 WWW.LANDDESIGN.COM NC ENG. FIRM LICENSE # C-0658 KEY MAP SEAL DOMINION REALTY PARTNERS 101 N. 5TH ST, SUITE B RICHMOND, VA 23219 804.780.3030 RULE JOY TRAMMELL + RUBIO 300 GALLERIA PKWY, #700 ATLANTA, GA 30339 770.661.1492 ®N o �. ARCH%pF�l�®� s *°a C-015 oe*e l ode V'mlc ®'°®� s ® �e - a� L - ° 048124 05.09.22 PROJECT LAKEPOINTE MULTIFAMILY DOMINION REALTY PARTNERS 2200 CASCADE POINTE BLVD. CHARLOTTE, NC 28208 LANDDESIGN PROJ.# 1021015 REVISION / ISSUANCE NO. DESCRIPTION DATE 1 1ST LAND DEVELOPMENT SUBMITTAL 01.17.2022 2 CLT WATER 1 ST SUBMITTAL 02.03.2022 3 2ND LAND DEVELOPMENT SUBMITTAL 03.30.2022 4 PERMIT REVISION 1 04.07.2022 5 CLT WATER REVISIONS O4.14.2022 6 3RD LAND DEVELOPMENT SUBMITTAL 05.09.2022 DESIGNED BY: CJL DRAWN BY: CJL CHECKED BY: MKW SCALE NORTH VERT: N/A HORZ: 1 "=80' 0 40' 80' 160' ORIGINAL SHEET SIZE: 24" X 36" SHEET TITLE EROSION CONTROL PHASE 2 SHEET NUMBER c 1 -0 1 5/9/2022 4:39 PM CHRIS LAWLEY N:\ 2021\1021015\CAD\DOCUMENTATION\1021015 PLN ECP - PH 2.DWG FINAL APPROVAL 6/27/2022 �ROJECT NUMBER: ESDRMF-2022-00001 CHARLOTTE. ENGINEERING Robert M Zink PCSO / DETENTION __lDRA gAGE PLAN 4 -.. - EROSION CONTROL Peter Rodriguez URBAN FORESTRY Jonathan Wilson TREE ORDINANCE .s B 37 24 RC C O Kevin ParkerF£S T B 5335 NOTE: SCHE ULE PRE -CONSTRUCTION MEETING �, N,�N�664.s6 AT LEAST 48 RS. PRIOR TO ANY LAND ` 0� p a�665640 24Rc DISTURBING ACTIVITY USING THE ONLINE FORM FOUNE AT http://charlottenc.gov/ld EROSION CONTROL NOTES - EROSION CONTROL PLANS DEFINE MEASURES REQUIRED FOR EROSION AND SEDIMENTATION CONTROL, AND DO NOT REFLECT FOOTING, FOUNDATION, SHORING, OR BASEMENT EXCAVATION REQUIREMENTS OR QUANTITIES. EROSION CONTROL PLANS SHOW LIMITED PHASES DURING THE COURSE OF CONSTRUCTION. DURATION OF A PARTICULAR PHASE DEPENDS ON THE GENERAL CONTRACTOR'S MEANS AND METHODS. LANDDESIGN IS NOT RESPONSIBLE FOR FIELD MEANS AND METHODS DURING CONSTRUCTION. 1. THE CONTRACTOR SHALL INSTALL AND MAINTAIN THROUGHOUT THE PROJECT CONSTRUCTION ALL EROSION CONTROL MEASURES SHOWN WITHIN THESE PLANS IN ACCORDANCE WITH APPLICABLE NCDEQ EROSION AND SEDIMENT CONTROL REGULATIONS. 2. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS, U.S. DEPARTMENT OF AGRICULTURE, AND U.S. SOIL CONSERVATION SERVICE REGULATIONS. 3. ALL CONSTRUCTION WORK SHALL BE IN COMPLIANCE WITH REGULATIONS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORM WATER GENERAL PERMIT. 4. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE NCDEQ EROSION CONTROL INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 5. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. CONTRACT PROJECT ENGINEER AND PROJECT EROSION CONTROL INSPECTOR TO ENSURE ADDITIONAL EROSION CONTROL MEASURES ARE INSTALLED PRIOR TO OFF -SITE GRADING. 6. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RELOCATED WHEN AND AS NECESSARY, AND SHALL BE CHECKED AFTER EVERY RAINFALL. SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED, AND MULCHED AS NECESSARY TO OBTAIN A DENSE STAND OF GRASS. 7. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. ALL DISTURBED AREAS WHICH ARE NOT OTHERWISE STABILIZED SHALL BE TOP SOILED AND SEEDED, TEMPORARILY OR PERMANENTLY IN ACCORDANCE WITH THE NORTH CAROLINA SEDIMENT CONTROL REGULATIONS. PERMANENT SEEDING AND GRASS ESTABLISHMENT IS REQUIRED PRIOR TO PROJECT COMPLETION AND ACCEPTANCE. 8. CONTRACTOR SHALL PROVIDE GROUND COVER ON EXPOSED SLOPES WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING, PERMANENT GROUND COVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION. 9. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 14 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 10. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 11. WHEN A CRUSHED STONE CONSTRUCTION ENTRANCE HAS BEEN COVERED WITH SOIL OR HAS BEEN PUSHED INTO THE SOIL BY CONSTRUCTION TRAFFIC, IT SHALL BE REPLACED WITH A DEPTH OF STONE EQUAL TO THAT OF ORIGINAL APPLICATION. 12. ALL DRAINAGE INLETS SHALL BE PROTECTED FROM SILTATION. INEFFECTIVE PROTECTION DEVICES SHALL BE IMMEDIATELY REPLACED AND THE INLET CLEANED. FLUSHING IS NOT AN ACCEPTABLE METHOD OF CLEANING. 13. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL BE STABILIZED OR li PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR �1 ( THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES I ON SITE AS WELL AS SOIL INTENTIONALLY FROM THE PROJECT SITE. 14. ALL "STD." NUMBERS REFER TO THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL. 15. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE 0 0 ) ZONING ADMINISTRATOR. 16. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. I 2 17. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 18. EFFORT SHOULD BE MADE NOT TO UNCOVER MORE THAN 20 ACRES AT ONE TIME. IF MORE THAN 20 ACRESARE TO BE UNCOVERED AT ANY ONE TIME, THE PLAN SHALL CONTAIN THE FOLLOWING: 18.1. THE METHOD OF LIMITING THE TIME OF EXPOSURE AND AMOUNT OF EXPOSED AREA TO ACHIEVE THE OBJECTIVES OF THIS CHAPTER. f 18.2. A CUT/FILL ANALYSIS THAT SHOWS WHERE SOIL WILL BE MOVED FROM ONE AREA OF ILD NG THE TRACT TO ANOTHER AS GROUND ELEVATION IS CHANGED. J18.3. CONSTRUCTION SEQEUNCE AND CONSTRUCTION PHASING TO JUSTIFY THE TIME AND III AMOUNT OEXPOSURE. 18.4. TECHNIQUES TO BEUSED TO PREVENT SEDIMENTATION ASSOCIATED WITH LARGER I DISTURBED AREAS. ADDITIONAL EROSION CONTROL MEASURES, STRUCTURES, AND I DEVICES TO PREVENT SEDIMENTATION. EJ 19. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT `\I STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN \\ 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 20. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT \ STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN \ 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 7-1 21. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE CITY ENGINEERING DEPARTMENT. r 22. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING [CLDSM #30.161 23. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. 24. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE 0 I PRESENTED AT PRE -CONSTRUCTION MEETING. � II cc II CONSTRUCTION SEQUENCE: J J II I PR OSED PUBLIC STREET TO J � DB. 31601, PG. 948 E CONSTRUCTED AS PART PHASE 1: II II 1. OBTAIN PLAN APPROVAL FROM CITY OF CHARLOTTE. EX. LAND USE: OFFICE OF THE ADJOINING PARCEL 2. THE CONTRACTOR SHALL SET UP AN ON -SITE PRE -CONSTRUCTION CONFERENCE WITH THE CITY OF CHARLOTTE EROSION ZONING: 1-1 (CD) DEVELOPMENT (143-031-33) `/ 6 / \\III I I CONTROL INSPECTOR TO DISCUSS EROSION CONTROL MEASURES. FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS s j PER THE PREVIOUSLY M,,,� �� I � _. / \ � PRIOR TO ANY LAND DISTURBING ACTIVITY IS AVIOLATION AND IS SUBJECT TO FINE. APPROVED SUBDIVISION - / l\ 3. CONTRACTOR TO INSTALL CONSTRUCTION ENTRANCES, SILT FENCE, INLET PROTECTION, AND OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. PLANS FOR THE4D (APN: \ I °�� II 4. CONTRACTOR SHALL INSTALL SEDIMENT BASIN AND DIVERSION DITCHES AND GRADE AS NECESSARY TO INSTALL THESE SDR�pI � ��190 . � BUIL 3 � MEASURES. 5y-� � M - \ 5. CONTRACTOR SHALL SCHEDULE AN ON -SITE INSPECTION BY CITY OF CHARLOTTE INSPECTOR. WHEN APPROVED, CLEARING, I I - / IIIII GRUBBING, AND MASS GRADING MAY BEGIN. c 6. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 7. CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION 1 A I IIIIII o CONTROL MEASURES. 5 A \ 633 N "gg 8. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NC EROSION AND SEDIMENT BU 6 IN �9 111 ' Aoyc CONTROL PLANNING AND DESIGN MANUAL, US DEPT. OF AGRICULTURE, CITY OF CHARLOTTE EROSION CONTROL ORDINANCE, \ / 6 III o➢ AND THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL. \ CIry/L KEPOINTE C P E EN t P T.O.P.: �P Ipm TOTAL LIMITS OF 143-031-33 o B32 ±14.63 G PHASE 2: 33 _ 6� � ._ /NV. / � III �� Jz� DISTURBANCE. S HOTELS NC LLC \ g32 \ E/V Fo 4 o 1. BEGIN EARTHWORK/GRADING ACTIVITIES. BEGIN GRADING OF FILL SLOPES. MAINTAIN AND VERTICALLY ADJUST ALL ROCK 5 VILLAGE CLUB DR / PROP. TREE CHECK DAMS, INLET PROTECTION DEVICES, DITCHES, AND SILT FENCE THROUGHOUT GRADING ACTIVITIES TO MAINTAIN 21.3 AC PROTECTION FENCE DRAINAGE PATTERNS. KE FOREST NC 27587 631 1144 / / �// CLDSM #40.02 (TYP.) 2. CONTRACTOR SHALL BEGIN TO BUILD RETAINING WALLS FROM BOTTOM UP. AS WALLS ARE BEING BUILT, BRING DB. 33051, PG. 160 630 1 .619.07 SURROUNDING SITE TO GRADE. 3. AS SITE IS BROUGHT TO GRADE, BEGIN INSTALLING STORM DRAINAGE STRUCTURES AND PIPES. AS STORM DRAINAGE IS EX. AND USE: COMMERCIAL 629 - 3° �� INSTALLED, CONTRACTOR SHALL PLACE INLET PROTECTION ON ALL STORM INLETS. NO PIPES SHALL BE LEFT EXPOSED AT /° THE CLOSE OF BUSINESS EACH DAY. ALL REASONABLE MEASURES SHALL BE TAKEN TO PREVENT SILT FROM ENTERING THE \\ / ZONING: 1-1 (CD) / Z$j p 0 STORM SYSTEM. � 4. REMOVE DIVERSION DITCHES WHEN FLOW IS DIVERTED TO STORM INLETS AND PIPES. 27j BUILDI / < i 5. DILIGENTLY TRACTOR SD CONTINUOUSLY CLOSE CONTACTROSION WITH CONTROLE CITY IDEVICES NSPECTOR STRUCTURE AT ODIC INSPECTIONS MINIMIZE IONS OAS OBN. THE u.2�/ \ \ PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 6. AS CONSTRUCTION PROGRESSES, INSTALL PERMANENT EROSION CONTROL MEASURES SUCH A RIP RAP APRONS, VELOCITY DISSIPATERS, CHANNEL LINERS, GRAVEL BASE COURSE, ETC. OF 24" RCP @ 6 /o�/ �� / 7. GRADED SLOPES AND FILLS ARE TO BE PLANTED OR PROVIDED WITH PROTECTIVE COVER SUFFICIENT TO RESTRAIN EROSION / /� FLOOD FRINGE EXISTING RLINE MA PS I1\ 8. AS AREAS ARE BROUGHT TO FINISHED GRADETHIN 14 CALENDAR DAYS AFTER THE , CONTRACTORETION OF ANY T O INSTHASE ALL TEMPORARY OR PERMANENT SEEDING AND \\� `� ���� / 24" INV. IN: 615.50 (OCS-12) / / _ \ \ �_ ��\_� / %// 36" INV. OUT: 615.50 EX FE i UTURE 100YR COMMUNITY STABILIZE ALL SLOPES PER THE EROSION CONTROL NOTES AND DETAILS. ( ) SSMH 15 I LOOD FRINGE LINE 1 9. CONTRACTOR SHALL COORDINATE WITH THE EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL RIM:607.0 1 1 MEASURES. �\` 7V_ / / Rf- SS PHASE 3: SSMH 1586 1. CONTRACTOR SHALL STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE RIM:605.96 \ 1\ 2. CONTRACTOR TO CONVERT SEDIMENT BASIN TO FULLY FUNCTIONING WET POND BMP. EIP �=S �� / �- SSMH- .17 3. COMPLETE SITE GRADING, INSTALLING ALL STORM DRAIN UTILITIES AND INLET PROTECTIONS. CONTRACTOR SHALL MAINTAIN � � �` 1 POSITIVE DRAINAGE TO EACH INLET AS EACH INLET IS INSTALLED AND INSURE PROPER FUNCTIONING OF BMP THROUGHOUT 85 S \� \� \ �� c / -��� // / / _ - / pN� p� \ THE COURSE OF CONSTRUCTION. 4. PER CHARLOTTE FIRE DEPARTMENT ALL NEW FIRE ACCESS ROADS AND FIRE HYDRANTS WILL NEED TO BE INSTALLED AND - CERTIFIED BY CLT WATER PRIOR TO COMBUSTIBLE MATERIALS BEING BROUGHT ON SITE AND START OF VERTICAL MANAGED _ S \ s 1s / _ �- �S 2i ss 1650 / CONSTRUCTION. �>=Z �� S \ s11.29 5�� / Flo tigc\ RIM:6 .59 - \ eD 5. ALL FIRE ACCESS ROADS WILL NEED TO MAINTAIN 20' CLEAR DURING VERTICAL CONSTRUCTION 30' UNDISTURBED STREAM SIDE ZONE RELIINA PLANI�EH'--- - 143-031-07 F LTI-FA ILY SUBDIVIS ON MECKLENBURG COU Y - � �- pp L/ 600 E 4TH ST \ RIM:TINGIFEMA 5J,60DWAY \ S� 1 \ ENCROACHMENT'FIRM CROSS SECTION 014 \ R 03.81 OTTE-MECKL BURG PLAING DEPARTMENT CHARLOTTE NC 28202 -� FUTURE COMMUNITY FEMA FLOOD FRINGE EL: 609.64 \ ENCR9ACHMENT LINE Know what's bBiOW. DB: 25324, PG: 475 \ \ / \ APPROXIMATE LOCATION \/ FX_ I ANn USF- 100 YFAR FI non PI AIN OF IRWIN CREEK CL Call befoheyoudig. OAF i /"V C(/T,.s6Co C CIl 4,.653856 Zq RCP INSET C 1 "=100' MATCH LINE SEE INSET C - HEALTH CARE CENTER ` 143-041-06 / )RESS KLEIN-CAMBRIDGE THCARE SOLUTIONS LLC, ou D COURTHOUSE RD STE 210 / VIENNA VA 22182 646 DB. 28904, PG. 1 o -AND USE: COMMERCIAL ZONING: I-1 (CD) SSMH 2O90 RIM: 642.19 INV IN:630.96 INV OUT:630.90 MATCH LINE v c CB 3020 l"V CUT 645 2624 1Rcp \S S \ 60 N /F 14304106 ESS KLEIN-CAMBRIDGE iCARE SOLUTIONS LLC DB 28904-01 SSMH 1 50 4CEDARO RIM:633 20 / IN: 624 97 / IN: 624 46 3CED 1 : 624 37 L 143-041-25 \ SS LAKEPOINTE HOTEL INVESTMENT LLC, C/O CHANDRESH B PATEL 1719 FUNNY CIDE DR WAXHAW NC 28173 / W0 I +RIN PIN IPA, L•�� III■Yd■ _ '1� �� : 11 11 11 11 11 � � �■�■ � ' �' - - • -INLET PROTECTION NJ '' � 11 11 S 1�,® • � NFAOn,millM0 W. . III ■I��JI� _ _ _ _ _.� LandDesign. 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 WWW.LANDDESIGN.COM NC ENG. FIRM LICENSE # C-0658 DOMINION REALTY PARTNERS 101 N. 5TH ST, SUITE B RICHMOND, VA 23219 804.780.3030 RULE JOY TRAMMELL + RUBIO 300 GALLERIA PKWY, #700 ATLANTA, GA 30339 770.661.1492 KEY MAP SEAL ®®® -ISM s *°a C-015 o•*e a e r Q. SEAL = ° 048124 ;0ei9®��W�N®���VaY®���`�® 05.09.22 PROJECT LAKEPOINTE MULTIFAMILY DOMINION REALTY PARTNERS 2200 CASCADE POINTE BLVD. CHARLOTTE, NC 28208 LANDDESIGN PROJ.# 1021015 REVISION / ISSUANCE NO. DESCRIPTION DATE 1 1ST LAND DEVELOPMENT SUBMITTAL 01.17.2022 2 CLT WATER 1 ST SUBMITTAL 02.03.2022 3 2ND LAND DEVELOPMENT SUBMITTAL 03.30.2022 4 PERMIT REVISION 1 04.07.2022 5 CLT WATER REVISIONS O4.14.2022 6 3RD LAND DEVELOPMENT SUBMITTAL 05.09.2022 DESIGNED BY: CJL DRAWN BY: CJL CHECKED BY: MKW SCALE NORTH VERT: N/A HORZ: 1 "=80' 0 40' 80' 160' ORIGINAL SHEET SIZE: 24" X 36" SHEET TITLE EROSION CONTROL PHASE 3 SHEET NUMBER Cl-02 5/9/2022 4:39 PM CHRIS LAWLEY N:\ 2021\1021015\CAD\DOCUMENTATION\1021015 PLN ECP - PH 3.DWG • CHAR I.ATTE. FINAL APPROVAL 6/27/2022 PROJECT NUMBER: ESDRMF-2n77_nnnn4. ENGINEERING PCSO / DETENTION / DRAINAGE PLAN EROSION CONTROL URBAN FORESTRY TREE ORDINANCE CDOT NOTE: SCHEDULE PRE -CONSTRUCTION MEETING AT LEAST 48 HRS. PRIOR TO ANY LAND DISTURBING ACTIVITY USING THE ONLINE FORM FOUND AT http://charlottenc.gov/ld Robert M Zink Peter Rodri uez REQUIREMENTS & NOTES Jonathnn■ CT WEIR TOP WIDTH 10' MIN., BOTTOM 7' MIN. Kevin FLASH BOARD RISER NOT PERMITTED 1ST BAFFLE: RIP RAP & WASHED STONE BERM 2ND BAFFLE: STANDARD BAFFLE 3RD BAFFLE: STANDARD BAFFLE CE - THE STANDARDS & SPECIFICATIONS SHOWN ARE FROM THE "NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" (NCESCPDM) PREPARED BY NC DEPT. OF ENVIRONMENT AND NATURAL RESOURCES (NCDENR); ALSO REFERENCE NCDOT "ROADWAY STANDARD DRAWINGS," LATEST EDITION. THE CITY OF CHARLOTTE HAS ADOPTED THE SPECIFIC STANDARDS & SPECIFICATIONS SHOWN ON THIS DETAIL AS MANDATORY MINIMUM DESIGN STANDARDS & SPECIFICATIONS. "SPECIAL REQUIREMENTS & NOTES" ARE INCLUDED WHEN THE CITY OF CHARLOTTE'S CRITERIA ARE MORE STRINGENT THAN THE NCESCPDM OR NCDOT STANDARDS. • CITY OF CHARLOTTE SPECIAL LAND DEVELOPMENT STANDARDS EROSION CONTROL CMPJffrfE INCLUDES CHARLOTTE ETJ REQUIREMENTS & NOTES CHARLOTTE LAND DEVELOPMENT STANDARDS 30.00 CLDSM 30.00 N.T.S. GENERAL NOTES: 1. AREA UNDER EMBANKMENT SHALL BE CLEARED, GRUBBED, AND STRIPPED OF ANY VEGETATION AND ROOT MATERIAL. THE BASIN AREA SHALL BE CLEARED. 2. THE FILL MATERIAL FOR THE EMBANKMENT SHALL BE FREE OF ROOTS OR OTHER WOODY VEGETATION AS WELL AS OVERSIZED STONES, ROCKS, ORGANIC MATERIAL OR OTHER OBJECTIONABLE MATERIAL. THE EMBANKMENT SHALL BE COMPACTED BY TRAVERSING WITH EQUIPMENT WHILE BEING CONSTRUCTED. SPILLWAYS SHOULD NOT BE CONSTRUCTED THROUGH FILL SECTIONS. ALL SPILLWAYS SHOULD BE LINED AND/OR RIPRAPPED. 3. SEDIMENT SHALL BE REMOVED AND TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO DEPTH SHOWN ON STANDARD. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA IN SUCH A MANNER THAT IT WILL NOT ERODE. 4. THE TRAP SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NECESSARY. 5. CONSTRUCTION OPERATION SHALL BE CARRIED OUT IN SUCH A MANNER THAT EROSION AND WATER POLLUTION IS MINIMIZED. 6. ALL CUT AND FILL SLOPES SHALL BE 2:1 OR FLATTER, UNLESS CERTIFIED BY REGISTERED GEOTECHICAL ENGINEER. 7. SEDIMENT BASIN EMBANKMENTS SHOULD BE PROVIDED WITH EROSION CONTROL AND STABILIZATION. 8. STORAGE AREA MAY BE CONSTRUCTED IN ANY SHAPE PROVIDED THE MINIMUM STORAGE VOLUME REQUIREMENT IS MET. THE BASIN SHOULD ALSO BE ORIENTED SUCH THAT THE FILTER AND THE MAIN FLOW OF WATER AND SEDIMENT ARE ON OPPOSITE ENDS ON THE LONGER BASIN DIMENSIONS. 9. THE LENGTH OF THE STONE OUTLET (SPILLWAY) IS TO BE BASED ON A 10 YEAR STORM. 10. WHENEVER TOPOGRAPHY ALLOWS, THE BASIN LENGTH SHOULD BE TWICE (2X) THE BASIN WIDTH, TO ALLOW FOR SETTLING. BAFFLES SHALL BE INSTALLED IN ALL BASINS. 11. CLEANOUT STAKES SHALL BE PLACED IN ALL SEDIMENT BASINS AT THE LOW POINT IN THE BASIN. THE STAKES SHALL BE MARKED SHOWING THE HALF FULL, CLEANOUT POINT, OF THE BASIN. 12. SAFETY FENCING 3' HIGH SHOULD BE PLACED AROUND ALL SEDIMENT BASINS. 13. FOR DESIGN OF SEDIMENT BASINS, REFER TO THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 14. FOR SLOPES GREATER THAN 10' IN LENGTH AND PROTECTED BY SILT FENCE AT THE TOE OF THE SLOPE, SLOPE TERRACING WILL BE REQUIRED. 15. THE BERM ON SEDIMENT BASINS SHALL BE SEEDED ONCE FINAL GRADE HAS BEEN REACHED. THE SILT FENCE MAY BE REMOVED IF PERMISSION HAS BEEN GRANTED BY THE CITY LAND DEVELOPMENT INSPECTOR AFTER THE GRASS HAS GERMINATED AND STABLE GROUND HAS BEEN ESTABLISHED. 16. WASHED STONE AND WIRE BACKING SHALL BE USED WITH SILT FENCE WHENEVER SILT FENCE IS PLACED AT THE TOE OF A SLOPE >10' VERTICAL OR ALONG ANY CHANNEL OR WATER COURSE • CITY OF CHARLOTTE LAND DEVELOPMENT STANDARDS GENERAL NOTES -SEDIMENT BASINS CHARLOTTE. INCLUDES CHARLOTTE ETJ CHARLOTTE LAND DEVELOPMENT STANDARDS CLDSM 30.03B 6' MAX. WOVEN FILTER FABRIC 0 STEEL POST z FILTER FABRIC � JU FLOW ANCHOR SKIRT; EXCAVATE TRENCH AND COMPACT BACKFILL 30.03B 115 N.T.S. GENERAL NOTES: 1. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 2. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. MAINTENANCE NOTES: 3. TURN SILT FENCE UP SLOPE AT ENDS. 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING 4. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. ADJACENT TO SWIM BUFFERS, STREAMS OR WETLANDS (REFER TO SWIM BUFFER GUIDELINES). THE COLOR ORANGE IS RESERVED FOR VISUAL IDENTIFICATION OF 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END ENVIRONMENTALLY SENSITIVE AREAS. OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 5. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX. HALF 6. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. 7. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. NOT TO SCALE • CITY OF CHARLOTTE �,xlmm DARDS TEMPORARY SILT FENCE STD. N0. REV. P EL INCLUDES CHARLOTTE ETJ 30.06A 15 MU TI-F -APPROVAL CHAR OTT ME�KL GH-�AR-OTTE' LAN-D'DEVELOPMENT STANDARDS -� CLDSM 30.06A N.T.S. PVC END CAP PVC TEE "C" ENCLOSURE ,TFR ENTRY IINIT PERSPECTIVE VIEW PVC VENT PVC ELBOW PIPE WATER SURFACE PVC END CAP PVC PIPE 1 1/2" HOLES IN UNDERSIDE GIN % 51 PVC TEE FLEXIBLE HOSE SCHEDULE 40 0 PVC PIPE END VIEW FRONT VIEW SCHEMATIC OF SKIMMER TAKEN FROM PENNSYLVANIA EROSION AND SEDIMENT POLLUTION CONTROL MANUAL, MARCH 2O00. "H" REFERS TO THE HEIGHT FROM INVERT OF FLEXIBLE HOSE ON SKIMMER TO THE INVERT OF THE PRIMARY SPILLWAY. NOT TO SCALE • CITY OF CHARLOTTE CM LAND DEVELOPMENT STANDARDS SKIMMER STD. N0. REV. CUTARIATTE_ INCLUDES CHARLOTTE ETJ 30.02B 12 CHARLOTTE LAND DEVELOPMENT STANDARDS SCHEDULE 40 PVC PIPE CLDSM 30.02B LENGTH AS NECESSARY TO GO THRU DIKE 4' MIN. PIPE 1.5' MIN. 1r FLEXIBLE PIPE TIE DOWN 10' MAX. SPACING TIE DOWN AT END 4(MIN)* _. RIP RAP & WASHED STONE FILTER BERM (CLDS 30.12) -SEDIMENT PITpool ORIFICE PLATE SEDIMENT PIT NOT REQUIRED IF BASIN IS LOCATED DOWNSTREAM OF PIPE OUTLET. (VOLUME PER CLDS 30.1, I DIAMETER (D) II PROFILE STAKES' ** *° EARTH DIKE * AT LESS THAN 1% SLOPE RIP -RAP APRON EXTEND TO EDGE OF DISTURBANCE CONSTRUCTION SPECIFICATIONS: 1. THE TOP OF THE EARTH DIKE OVER THE INLET PIPE AND THOSE DIKES CARRYING WATER TO THE PIPE SHALL BE AT LEAST 1.5 FEET HIGHER AT ALL POINTS THAN THE TOP OF THE INLET PIPE. 2. THE PIPE SHALL BE FLEXIBLE WITH WATER TIGHT CONNECTING BANDS. FLEXIBLE PIPE UNLESS THEY ARE INDIVIDUALLY DESIGNED, SHOULD BE STAKED ON EITHER SIDE. SIZE THE DRAINS AS FOLLOWS: 3. A RIP RAP APRON SHALL BE PROVIDED AT THE OUTLET, IF EMPTYING INTO A DISTURBED AREA. MAXIMUM DRAINAGE AREA PIPE DIAMETER 4. THE SOIL AROUND AND UNDER THE INLET PIPE AND ENTRANCE SECTION SHALL BE PER PIPE (ACRES) INCHES 0.5 12 HAND TAMPED IN 4" LIFTS TO THE TOP OF THE EARTH DIKE. 0.75 15 0 18 5. FOLLOW-UP INSPECTION AND ANY NEEDED MAINTENANCE SHALL BE PERFORMED AFTER >1.000 AS DESIGNED EACH STORM BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT. 6. OUTLET PIPE SHOULD BE TAKEN OVER OR THROUGH ANY SILT FENCE, TAKING CARE NOT TO VOID THE EFFECTIVENESS OF THE SILT FENCE. NOT TO SCALE • CITY OF CHARLOTTE �! LAND DEVELOPMENT STANDARDS FLEXIBLE PIPE SLOPE DRAIN STD. NQ. REV. CHARLOTTE. INCLUDES CHARLOTTE ETJ 30.04 20 CHARLOTTE LAND DEVELOPMENT STANDARDS CLDSM 30.04 SiE­ on WIRE FENCING WOVEN FILTER FABRIC a iV GENERAL NOTES: 1. WIRE FENCING SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 2. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 3. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. 4. WIRE FENCING SHALL BE AT LEAST #10 GAGE WITH A MINIMUM OF 6 LINE WIRES WITH 6" STAY SPACING. 5. TURN SILT FENCE UP SLOPE AT ENDS. 6. WIRE AND WASHED STONE IS REQUIRED TO BE SHOWN ON PLANS AT THE TOE OF SLOPES GREATER THAN 10 FEET VERTICAL (2:1 SLOPE) 7. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS ADJACENT TO SWIM BUFFERS, STREAMS OR WETLANDS (REFER TO SWIM BUFFER GUIDELINES). THE COLOR ORANGE IS RESERVED FOR VISUAL IDENTIFICATION OF ENVIRONMENTALLY SENSITIVE AREAS. 8. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 9. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 10. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. • CITY OF CHARLOTTE �! LAND DEVELOPMENT STANDARDS CLARIAYF 'E. INCLUDES CHARLOTTE ETJ 8' MAX. SEDIMENT BASIN DESIGN CRITERIA DRAINAGE AREA >10 AC. (ACRES) <100 AC. MIN. LENGTH TO WIDTH RATIO 2:1 MAX. LENGTH TO 6:1 WIDTH RATIO MIN. 1800 VOLUME (CU. FT. REQUIRED PER AC. DISTURBED) 435 SURFACE (SQ. FT. AREA PER CFS REQUIRED Q10) BAFFLES PER PLAN VIEW CLDS NOTES: 1. REFER TO NCESCPDM SECTION #6.61 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING LENGTH SEDIMENT BASINS. 2. REFER TO STD. #30.19 10' FOR BAFFLE SPACING AND MIN. INSTALLATION. INFLOW 3. FIRST BAFFLE IS TO BE CONSTRUCTED OF RIP -RAP. -- -- WITH A MIN. HEIGHT OF 3' - - AND MIN. TOPWIDTH OF 2'. --------- 4. TURBIDITY CURTAIN (CLDS RISER #30.23) MAY BE USED IN LIEU OF POROUS BAFFLES SKIMMER (CLDS #30.19). AVERAGE AREA* DEWATERING 5. FLASHBOARD RISER NOT WIDTH =LENGTH DEVICE PERMITTED FOR USE IN THE CITY OF CHARLOTTE * AREA OF BASIN WATER L=20' 6. SKIMMER INVERT ELEVATION SURFACE AT TOP OF PRIMARY MIN. = BASIN BOTTOM + 1' SPILLWAY MIN. 7. H = SPILLWAY ELEVATION - SKIMMER INVERT CROSS-SECTION VIEW IP RAP BERM; SEE NOTE #3 ELEVATION 1' FREEBOARD W 6" MAX. DEPTH OF FLOW OVER EMERGENCY SPILLWAY EMBANKMENT INFLOW MIN. 1' �T PRIMARY SPILLWAY (RISER) ----- MIN. - ---�- DEWATERING ZONE - ----- ---- --- -- --- H - ------ EMERGENCY -�- FILTER FABRIC SPILLWAY CLEANOUT SPECIFY SEEPAGE DEPTH 1' SEDIMENT BAFFLE H X 1.5 CONTROL MEASURES DATA BLOCK (H/2) STORAGE (5' MIN.) NOT TO SCALE BASIN DRAINAGE AREA (ACRES) DENUDED AREA (ACRES) Q10 BASIN VOLUME BASIN SURFACE AREA CLEANOUT DEPTH (FT.) H/2 H (FEET) Z (FEET) L (FEET) T (FEET) W (FEET) SKIMMER PIPE DIAMETER SKIMMER ORIFICE DIAMETER REQUIRED (CUBIC FT.) PROVIDED (CUBIC FT.) REQUIRED (SQ FT.) PROVIDED (SQ FT.) SB-F 14.89 14.89 62.81 26,802 83,180 27,321 27,412 1.25 2.5 5 20 1.5 5 4.0 4.0 • CITY OF CHARLOTTE LAND DEVELOPMENT STANDARDS SEDIMENT BASIN CHARLOTTE. INCLUDES CHARLOTTE ETJ 3 CHARLOTTE LAND DEVELOPMENT STANDARDS 30.03AI 1 CLDSM 30.03A N.T.S. NOTES: 1. DITCH SHOULD HAVE LONGITUDINAL SLOPE OF 1 %. 2. SILT FENCE MAY BE REQUIRED BEHIND BERM 3. DITCHES SHOULD BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION REQUIREMENTS OF THE NCGO10000 PERMIT. 4. WHERE DESIGN VELOCITIES EXCEED 2 FT/SEC, A CHANNEL LINER IS NECESSARY TO PREVENT DITCH EROSION. SLOPES DITCH NO. AREA(AC.) DEPTH* W(FT) B(FT) VELOCITY10 ROLLED EROSION CONTROL PRODUCT / LINING TYPE * = DEPTH INCLUDES 6" FREEBOARD NOT TO SCALE • CITY OF CHARLOTTE LAND DEVELOPMENT STANDARDS TEMPORARY SILT DITCH STD. N0. REV. CIIARLOI'TE. INCLUDES CHARLOTTE ETJ 30.05 20 CHARLOTTE LAND DEVELOPMENT STANDARDS N.T.S. "_0 CLDSM 30.05 GENERAL NOTES: 1. RIPRAP SIZE TO BE DESIGNED BY ENGINEER. STEEL POST 2. CHECK DAMS MAY BE USED IN SLOPING DITCHES WIRE FENCING OR CHANNELS TO SLOW VELOCITY OR TO CREATE FILTER FABRIC SEDIMENT TRAPS. M w #5 OR #57 WASHED STONE 3. ENSURE THAT MAXIMUM SPACING BETWEEN DAMS PLACES THE FLOW 5�°ems TOE OF THE UPSTREAM DAM AT THE SAME ELEVATION AS THE Fy DOWNSTREAM DAM (SEE DIAGRAM BELOW). 8 CLASS B RIP F1\_ANCHOR SKIRT; _ _ MAXIMUM S PAC I N G EXCAVATE TRENCHrAND III_11=111_lll�ll_IIIA - B BACKFILL - _=III_lll_III_III_III_III_ =III_III_111=111_III- III=111_ A AND B ARE AT EQUAL ELEVATIONS MAINTENANCE NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. HIGH HAZARD TEMPORARY SILT FENCE CHARLOTTE LAND DEVELOPMENT STANDARDS CLDSM 30.06B NOT TO SCALE • CITY OF CHARLOTTE STD. N0. REV. LAND DEVELOPMENT STANDARDS 30.06B 1 5j CHARLOTTE. INCLUDES CHARLOTTE ETJ N.T.S. V-6" MIN. N.T.S. ` n ,.,...�.. "ONE IAX NTER CROSS SECTION H NOT TO SCALE TEMPORARY ROCK CHECK DAM STD. NO. I REV. 30.10A 115, CHARLOTTE LAND DEVELOPMENT STANDARDS CLDSM 30.1 CIA N.T.S. Know what's below. Call before you dig. LandDesign. 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 WWW.LANDDESIGN.COM NC ENG. FIRM LICENSE # C-0658 DOMINION REALTY PARTNERS 101 N. 5TH ST, SUITE B RICHMOND, VA 23219 804.780.3030 RULE JOY TRAMMELL + RUBIO 300 GALLERIA PKWY, #700 ATLANTA, GA 30339 770.661.1492 KEY MAP SEAL 4�. ARCdBlTFC��®� �® * ° a Leo-016 co, *13 111110 SEAL 05.09.22 PROJECT LAKEPOINTE MULTIFAMILY DOMINION REALTY PARTNERS 2200 CASCADE POINTE BLVD. CHARLOTTE, NC 28208 LANDDESIGN PROJ.# 1021015 REVISION / ISSUANCE NO. DESCRIPTION DATE 1 1ST LAND DEVELOPMENT SUBMITTAL 01.17.2022 2 CLT WATER 1 ST SUBMITTAL 02.03.2022 3 2ND LAND DEVELOPMENT SUBMITTAL 03.30.2022 4 PERMIT REVISION 1 04.07.2022 5 CLT WATER REVISIONS O4.14.2022 6 3RD LAND DEVELOPMENT SUBMITTAL 05.09.2022 DESIGNED BY: CJL DRAWN BY: CJL CHECKED BY: MKW SCALE NORTH VERT: N/A HORZ: N/A ORIGINAL SHEET SIZE: 24" X 36" SHEET TITLE EROSION CONTROL DETAILS SHEEP NUMBER Cl-03 5/9/2022 439 PM DAPHNE BRICE Z:\TEMPLATES\SHEETS\CD SHEETS\CIVIL\SHEET-24X36.DW-F • CHARLOTTE. FINAL APPROVAL 6/27/2022 PROJECT NUMBER: ESDRMF-2022-00001 ENGINEERING PAD OF 2-3" OF WAS PCSO / DETENTION / DRA1INAC*I,pb&�b CRUSHER RUN r� 3. TV TRANCE SHALL BE MAINTAINED IN A CO E � OS I ONEDC C P �GDITOR SWEPT BACK ONSITE ON A NIGHTLY BASIS. WHEN APPROPRIATE, WHEELS MUST BE CLEANE U RBAN S - j -q D �i DRAIN 6. C T E A D MERCIAL TREE ORDINANCESTREET WITH AN EXISTING SIDEWALK TO REMAIN I C DOT NOTE: SCHEDULE PRE-CONSTRUCTI N MEETING AT LEAST 48 HRS. PRIOR TO ANY LAND DISTURBING ACTIVITY USLNGII`TFfE-,ONLI-NE FORM FOUND AT http://charlottenc.gov/ld ED RObF �) NsZhi kATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO ONE SHALL BE USE BASE FOR THE CONSTRUCTION ENTRANCE. DITION WHICH WILL PREV� TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY A AAL NQ�T� MEASURES USED TO TRAP (ROADWAY TR KFDdTtOI�QIT I NYYAGGREGATE TRACKED INTO THE MUST BE IWH�ENN r ..._..._�L_R TO ENTERING A PUBLIC STREET. WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA INTT�N�il'r-.SS11v"V'■ qT N SEE TN O n atl 1. '� THE DRIVEWAY IS ON A THOROUGHFARE, OR ON ANY K (WATCH) FOR SIDEwt LOSURE OR DETOUR/DIVERSION. Kevin Parker 100' PUBLIC STREET SOIL STABILIZATION FABRIC -III- UNDER 2-3" OF WASHED STONE EX CONC w W N U m a DRIVEWAY APRON WITH SIDEWALK AT BACK OF CURB (IF RETAINED DURING CONSTRUCTION.) NOT TO SCALE • CITY OF CHARLOTTE LAND DEVELOPMENT STANDARDS STABILIZED CONSTRUCTION ENTRANCE STD. NQ. REV CIWRLO 'M INCLUDES CHARLOTTE ETJ 30.1 1 A 1 5 CHARLOTTE LAND DEVELOPMENT STANDARDS CLDSM 30.11A SECTION NOTES: 1. INLET MAINTENANCE SHALL BE DOCUMENTED IN PROJECT LOG BOOK. 2. FILTER TYPES SHALL BE APPROVED BY THE CITY INSPECTOR PRIOR TO INSTALLATION. 3. FILTER BAGS MAY BE REMOVED WHEN SITE IS STABILIZED AT THE DIRECTION OF THE ENGINEER. 4, FILTER BAGS SHALL BE REMOVED PRIOR TO STREET ACCEPTANCE AND/OR CLOSE OUT OF GRADING PERMIT. 5. FILTER BAGS SHALL BE CLEANED OR REPLACED ON A REGULAR BASIS (NOT BE MORE THAN HALF FULL AT ANY TIME). 6. FILTER BAGS MAY BE INSTALLED IN EXISTING CITY OR NCDOT ROADS AS LONG AS STORM DRAINAGE IS NOT IMPEDED. GRATE 1" REBAR FOR BA REMOVAL FROM INLET FILTER BAG DEFLECTOR REQUIRED WHEN USED ON EXISTING MAINTAINED STREETS. DUMP LOOPS DEFLECTOR SHALL BE PLACED SUCH THAT IT WILL NOT COMPLETELY OBSTRUCT STORM WATER FLOW FROM ENTERING VIA THE CURB OPENING. ENSURE NO MORE THAN 25% OF CURB OPENING IS OBSTRUCTED. CATCH BASIN �( OUTLET \�1 4 INSTALLATION 0 ANGLE IRON °O H °o°o°o 0 0 o a o 0 0 0 0 0 000000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0< 0 0 00000000000 O 000 0000000000000000000000000000000 0 0 0 - °Jc~i 3" TUBE STEELY-- IIIIII I O III -I ,-III-III; _ � _I I-III-III=1 I --III- I I 1=1 I I -III III -I � 1= -I 11=III-III-III=1 I I=1 I I -1 11-1 I I, I I I I I�, I I I I � I I I I I I I 11- -III I NOTE: MAY BE USED WHERE EXTENSIVE HAULING WILL BE DONE. wz aW a� 0 '0cn _RAIN R' P\/r' PIPP T(1 CFfIIAAPNT TPAP 2-3" OF WASHED ST6NJ` STD. 30.11A q f q 2-3" STD. 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0O 0O 0O 0O 0 0 0 0 0 0 0 0 0O 0O 0 0 0O 0 0 0 0 O O O O O O O O O O O O O O 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O 3000000 O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 QUO 0 0 0 0 0 0 0 0 °O°O°O°O°O°0 O °O°O°O°O°O°O°0°0°� O O O O O O O O O O O O O O O O Z O 0 0 0 0 0 0 0 0 O O O O O O O 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O 0 000000000000 00000 ¢ 0000000000000000000 000000000000000000 0°0°00000°0°0°0°0°0 000000000000000000 O O O O O O O O O O O 0000 O O O O O 000000000000000000 30000 O O O O O 000 00 0 0 0 0 000000000000000000 0000000000000000000 000000000000000000 WATER SUPPLY • CITY OF CHARLOTTE CONSTRUCTION ENTRANCE LAND DEVELOPMENT STANDARDS TIRE WASH CHARLOTTE" INCLUDES CHARLOTTE ETJ L 1 CHARLOTTE LAND DEVELOPMENT STANDARDS CLDSM 30.11 B ALTERNATIVE 1: 10' CONSTRUCTION HIGH ACCESS HAZARD SILT FENCE SEE CLDSM #30.06B IN WIRE MES __ NOTES: 1. IF DIVERSION DITCH USED, IT SHOULD FLOW INTO SEDIMENT BASIN ROCK CHECK DAM, OR SLOPE DRAIN 2. BENCH SHOULD BE GRADED AT 0% LONGITUDINAL SLOPE (ON -CONTOUR) TEMPORARY DIVERSION DITCH SEE CLDSM #30.05 SEE NOTE 1 OR FLATTER 2 J 1 OR FLATTER 2 10' MAX. 10' CONSTRUCTION HIGH ACCESS HAZARD SILT FENCE SEE CLDSM #30.06B IN WIRE MES _ 10' MAX. )F WASHED STONE ).11A SILT FENCE AS NEEDED FLOW VEGETATIVE BUFFER MEDIA (SEE NOTE 2) NOTE: 1. PRIOR TO INSTALLATION, MANUFACTURER SPECIFICATIONS OF FILTER MEDIA SHALL BE PROVIDED TO THE EROSION CONTROL INSPECTOR FOR APPROVAL AND USE. DISCHARGE FROM FILTER MEDIA SHALL MEET OR EXCEED THE PROVISIONS OF THE CLEAN WATER ACT. 2. ENSURE THAT PUMP PRESSURE DOES NOT EXCEED FILTER MEDIA PRESSURE RATING. 3, FILTER MEDIA MAY BE, BUT NOT LIMITED TO, SAND MEDIA FILTRATION DEVICES, RATED FILTER FABRIC BAGS OR POLYMER BASED DEWATERING PRACTICES. 4. PUMP STRAINER SHALL NOT BE IN CONTACT WITH BOTTOM OF POND. POINT LEVEL NOT TO SCALE NOT TO SCALE • CITY OF CHARLOTTE �! LAND DEVELOPMENT STANDARDS EROSION CONTROL D E WAT E R I N G STD. NO. REV. STD. N0. REV. 30.11 B 15 C LIRIATTF._ INCLUDES CHARLOTTE ETJ 3 0.13 (J 1 CHARLOTTE LAND DEVELOPMENT STANDARDS ALTERNATIVE 2: 10' MAX. 3' WIDE BENCH J 1 OR FLATTER SEE N� 2 0.5% -� J 1 OR FLATTER 2 10' MAX. NOT TO SCALE CITY OF OTTE CITY OF CHARLOTTE LAND DEVELOPMENT LSTANDARDS CATCH BASIN INLET PROTECTION LAND DEVELOPMENT STANDARDS STD. N0. REV. SLOPE STABILITY CHARLOTTE- INCLUDES CHARLOTTE ETJ 130.15 1 I,,CHARtDTTE- INCLUDES CHARLOTTE ETJ o 4 CHARLOTTE LAND DEVELOPMENT STANDARDS 5 CHARLOTTE LAND DEVELOPMENT STANDARDS CLDSM 30.15 4'-0" MAX. SPACING (TYPICAL) N.T.S. `C 1 -04 CLDSM 30.16 INLET ZONE 25% OF SURFACE AREA INLET ZONE 25% OF SURFACE AREA INLET ZONE 25% GENERAL NOTES: OF SURFACE AREA 1. DRIVE 5' STEEL POST AT LEAST OUTLET 24" INTO SOLID GROUND. OF SURFACEACE AREA 2. USE STAPLES 1' APART HORIZONTALLY AND VERTICALLY TO ATTACH THE FILTER FABRIC TO THE WIRE FENCE. / X 3. MINIMUM BAFFLE SPACING IS 10'. FLU X 4. THE FLOOR OF THE BASIN IN THE OUTLET ZONE AND BERMS I SHOULD BE SEEDED ° + IMMEDIATELY AFTER THE BASIN IS CONSTRUCTED. EgRTN ° 5. REFER TO NCESCPDM SECTION X l / BERM SPECIFIAOTONSDITIONAL O� l �Er of T cy X �X X� 700 COIR g/m25'5' STEEL OR EQUIVALENT FL 6" X 6" TRENCH BACKFILL AND COMPAC FENCE AND FABRIC BURIED IN TRENCH 0 M 0 fV P ELM rF �EMINEDSTA ARDS BAFFLE INSTALLATION MU TI- T ,-APPROVAL CHAR OTT ME�KL & LOTGTiEPLAN@TDEVELOPMENT STANDARDS -� CLDSM 30.19 *11 i 5/9/2022 439 PM DAPHNE BRICE Z:\TEMPLATES\SHEETS\CD SHEETS\CIVIL\SHEET-24X36.DVVT NOT TO SCALE STD. NO. I REV. 30.1 6 12, N.T.S. KEY/ANCHOR MATERIAL AT TOP OF SLOPE. 12" MIN. SPACING TYP.* < < GENERAL NOTES: 36" MIN. SPACING TYP.* 1. LAY BLANKETS LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH THE SOIL. DO NOT STRETCH. 2. * DIMENSIONS SHOWN ARE MINIMUM, MANUFACTURED PRODUCTS MAY HAVE ADDITIONAL REQUIREMENTS THAT MUST BE / MET. 6" OVERLAP 3. SLOPE SURFACE SHALL BE FREE IN SLICE OF ROCKS, SOIL CLODS,KS, GRASS. MAT/BLANKETSSHALL HAVE GOOD SOIL CONTACT. 4. THE DETAIL SHOWN IS FOR SLOPE MATTING. FOR CHANNEL OR PIPE t OUTFALL MATTING SPECIFICATIONS, PLEASE REFER TO NCESCPDM / WATER TABLE STANDARD #6.17 AND MANUFACTURER'S GUIDELINES. AWE 1 NON -WOVEN GEOTEXTILE FILTER CLOTH ! FABRIC 4' ABOVE SOURCE WATER. KEY/ANCHOR MATERIAL TO TOE OF SLOPE. NOT TO SCALE NOT TO SCALE • CITY OF CHARLOTTE STD. N0. REV. LAND DEVELOPMENT STANDARDS EMBANKMENT MATTING DETAIL ST N0. R . 30.19 15 CHARLOTTE- INCLUDES CHARLOTTE ETJ 30.20 1 8) CHARLOTTE LAND DEVELOPMENT STANDARDS N.T.S. CLDSM 30.20 N.T.S. CLDSM 30.13 N.T.S. FOR LATE WINTER AND SOIL AMENDMENTS: EARLY SPRING: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: MULCH: RYE (GRAIN) - 120 LB/ACRE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANNUAL LESPEDEZA (KOBE) - 50 LB/ACRE ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING (OMIT ANNUAL LESPEDEZA WHEN DURATION TOOL OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE) MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING SEEDING DATES: EROSION OR OTHER DAMAGE JAN. 1 - MAY 1 FOR SUMMER: SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: GERMAN MILLET - 40 LB/ACRE MULCH: (A SMALL -STEMMED SUDANGRASS MAY BE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH SUBSTITUTED AT A RATE OF 50 LB/ACRE) ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL SEEDING DATES: MAY 1 - AUG. 15 MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE FOR FALL: SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: RYE (GRAIN) - 120 LB/ACRE MULCH: APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH SEEDING DATES: ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING AUG. 15 - DEC 30 TOOL MAINTENANCE: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. FOR ADDITIONAL INFORMATION, REFER TO NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (ESCPDM), SECTION 6.10. FOR PERMANENT SEEDING SPECIFICATIONS, INCLUDING SEED BED PREP, SEASONAL LIMITATIONS FOR SEEDING OPERATIONS, THE KINDS OF GRADES OF FERTILIZERS, THE KINDS OF SEED, AND THE RATES OF APPLICATION OF LIMESTONE, FERTILIZER, AND SEED, REFER TO NCDENR ESCPDM SECTION 6.11 AND THE CHARLOTTE LANDSCAPE CONSTRUCTION STANDARDS SECTION 04200 SEEDING AND SODDING OF TURFGRASS. • CITY OF CHARLOTTE LAND DEVELOPMENT STANDARDS TEMPORARY SEEDING SCHEDULE STD. NO. REV. CC[LLAR.LOTTE- INCLUDES CHARLOTTE ETJ 130.17 9 6 CHARLOTTE LAND DEVELOPMENT STANDARDS "_0 CLDSM 30.17 N.T.S. ASPHALT BERM ASPHALT BERM (TYP.) (TYP.) �� CURBLINE CURBLINE�i"DIRECTION ."-'DIRECTION OF FLOW OF FLOW EDGE OF PAVEMENT 1/2 OF LANE WIDTH CATCH BASIN INLET CATCH BASIN INLET PROTECTION (TYP.) PROTECTION (TYP.) SEE NOTE 5 SEE NOTE 5 OPTION 1 OPTION 2 CATCH BASINS ALIGNED CATCH BASINS OFFSET OR ACROSS STREET INDIVIDUAL CATCH BASIN NOTES: 1. TEMPORARY BERMS ARE INSTALLED TO ACHIEVE DESIGNED DRAINAGE ROLLED AREAS PRIOR TO FINAL ASPHALT LIFT BEING INSTALLED ON ROAD ASPHALT SURFACE. 2. CONTRACTOR TO INSTALL TEMPORARY BERMS ON INTERMEDIATE 3" (MIN.) COURSE, ON HIGH SIDE OF CURB INLETS FOR STRUCTURES ALONG THE STREET SLOPE. � 24" 3. REMOVE BERM PRIOR INSTALLING FINAL ASPHALT LIFT, FINISHING ROAD SURFACE. 4. REMOVE ACCUMULATED SEDIMENT FROM ABOVE BERM WEEKLY AND BERM CROSS SECTION AFTER RAINFALL, AS NEEDED TO MAINTAIN FUNCTION. 5. CATCH BASIN INLET PROTECTION MAY BE OMITTED IF APPROVED BY EROSION CONTROL COORDINATOR NOT TO SCALE • CITY OF CHARLOTTE �� LAND DEVELOPMENT STANDARDS TEMPORARY ASPHALT DIVERSION BERM STD. N0. RE\ C]LtRtk TE. INCLUDES CHARLOTTE ETJ 130.18 21 9 l CHARLOTTE LAND DEVELOPMENT STANDARDS CLDSM 30.20 N.T.S. Knowwhat's below. Call before you dig. LandDesign. 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 WWW.LANDDESIGN.COM NC ENG. FIRM LICENSE # C-0658 DOMINION REALTY PARTNERS 101 N. 5TH ST, SUITE B RICHMOND, VA 23219 804.780.3030 RULE JOY TRAMMELL + RUBIO 300 GALLERIA PKWY, #700 ATLANTA, GA 30339 770.661.1492 KEY MAP SEAL ®®0®� 4�� ARCdBlTFC��®� �® Leo-016 Cc,' dI ®10'/' 1s 9gn ®`®`®®� SEAL - 048124 - �0411/I�V �9V�� �® 05.09.22 PROJECT LAKEPOINTE MULTIFAMILY DOMINION REALTY PARTNERS 2200 CASCADE POINTE BLVD. CHARLOTTE, NC 28208 LANDDESIGN PROJ.# 1021015 REVISION / ISSUANCE NO. DESCRIPTION DATE 1 1ST LAND DEVELOPMENT SUBMITTAL 01.17.2022 2 CLT WATER 1 ST SUBMITTAL 02.03.2022 3 2ND LAND DEVELOPMENT SUBMITTAL 03.30.2022 4 PERMIT REVISION 1 04.07.2022 5 CLT WATER REVISIONS O4.14.2022 6 3RD LAND DEVELOPMENT SUBMITTAL 05.09.2022 DESIGNED BY: CJL DRAWN BY: CJL CHECKED BY: MKW SCALE NORTH VERT: N/A HORZ: N/A ORIGINAL SHEET SIZE: 24" X 36" SHEET TITLE EROSION CONTROL DETAILS SHEET NUMBER Cl-04 FINAL APPROVAL 6/27/2022 • CHARLOTTE. PROJECT NU$U8E- ESDRMF-2n2222_nnnn1. _ _. _,ALIZATION A. ING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details y being reENGINEE I tntnftheNCG01 l PCSO / DETENTION / DRAINAGE PLAN -all comply wi sa«u EROSION CONTROL URBAN F TREE ORDINANCE Site Area Description (a) er swaPerles swales, ditches, CDOT ditches, NOTE: SCHEDULE PRE -CONSTRUCTION MEETING AT LEAST 48 HRS. PRIOR TO ANY LAND DISTURBING ACTIVITY USING THE ONLINE FORM FOUND AT http://charlottenc.gov/ld P ELIMINA. MU TI-FAMIL`. APPR CHAR OTTE-MECKLENBUR, nd specifications on plan sheet will result in the construction i Ili17�. aterials Handling Robert t ioli�� pectively). The h the Erosion and Se ent Control plan approved by the jurisdiction. All det� and specifications shown on this sheet r!ge auti+horit havi��sdiction. v ■ w■yi ■ Pete r quired Ground 4t1h ition Timeframes eJ:io°l at h a nme ill o r days after ceasing Lind ditaarh^�^^ Kevin P a rkelrne None slopes are 10' or less in length and are ottenc.gov/Id at steeper than 2:1, 14 days are lowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Perm anert Stabilization • Temporary grass seed covered with straw or * Permanent grass seed covered with straw or Dther mulches and tack ifiers other mulches and tackifers ■ Hydroseeding * Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed * Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch ■ Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • polled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. F\ NORTH CAROLI NA Environmental Quality ❑NSITE CONCRETE WASHOUT STRUCTURE WITH LINER in __QC 0 0 = fiYN o 0 0 L,C 0 o o t 00 0 B n e.r Y VMUFD S1fiMff iINI A -A 2T■lIHErtTYN L A`TUIL ILGTIDI Or1010m p IUrrfi DEVIfI Or'%e1. 10U MA. r� L KTML lSwT01 ➢E1EY0ED DI iEL➢ f1FMLY MW® SViYLi A»wr �mvc orwa arxev imu e�u�wvLi rEIMDIMrED e nc mrxrrc vAvart srecYurs awL v�rx YIE Lqp wow m.m � WIrIrA➢EO n[x TIE u•m �l*I■ 1FAG1Es Ts � YIE smunuas ��uoc: Ys v TIE nae�■o riwmr m rNwLE AOF■MYE PWl �nooc wecx vmi � ,mm.w B.LOL7SlE VMIOJI r1RICINE IRIr M E @ NOE2 6 il®Nm o.rAar xxeas vmi aoucr nm¢ amurrz VA rr.enre BELnw GRADE WASHnUT STRUCTURE ABOVE GRA % 46MUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero.' The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At Ieast once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspectlon, outfalls (SDos) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil events 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (S) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands on site 7 calendar days stream has visible increased turbidity from the construction oroffshe and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Descrlption, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2l(a) of this permit of this permit. f G.I Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. INA Quality PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&5C Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. Initial and date a copy of the approved E&SC (c) Ground cover is located and installed in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E9L5C Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] EFFECTIVE: 04/01 / 19 SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, * They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or * They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and other Requirements • Within 24 hours, an oral or electronic notification. (a) Visible sediment deposition in a • Within 7 calendardays, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • if the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. * Within 24 hours, an oral or electronic notification. The notification (b) oil spills and release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated * A report at least fen days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR ■ Within 7 calendardam a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance * Within 24 hours, an oral or electronic notification. with the conditions ■ Within 7 calendordays, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to envronment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41j1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. PLANNING DEPARTMENT NCGO 1 SELF -INSPECTION, RECORDKEEPING AND REPORTING I EFFECTIVE: 04/01/191 i� Know what's beioW. Call before you dig. LandDesign. 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 WWW.LANDDESIGN.COM NC ENG. FIRM LICENSE # C-0658 DOMINION REALTY PARTNERS 101 N. 5TH ST, SUITE B RICHMOND, 23219 804.780.3030 RULE JOY TRAMMELL + RUBIO 300 GALLERIA PKWY, #700 ATLANTA, GA 30339 770.661.1492 KEY MAP SEAL ®®0®� 4�� ARCdflTFC��®00 �® * ° a C-016 Cc" off' Wsa� ®®®Qe•���5®0° ®�®� 4- - �EAL - GIN 05.09.22 PROJECT LAKEPOINTE MULTIFAMILY DOMINION REALTY PARTNERS 2200 CASCADE POINTE BLVD. CHARLOTTE, NC 28208 LANDDESIGN PROJ.# 1021015 REVISION / ISSUANCE NO. DESCRIPTION DATE 1 1ST LAND DEVELOPMENT SUBMITTAL 01.17.2022 2 CLT WATER 1 ST SUBMITTAL 02.03.2022 3 2ND LAND DEVELOPMENT SUBMITTAL 03.30.2022 4 PERMIT REVISION 1 04.07.2022 5 CLT WATER REVISIONS O4.14.2022 6 3RD LAND DEVELOPMENT SUBMITTAL 05.09.2022 DESIGNED BY: CJL DRAWN BY: CJL CHECKED BY: MKW SCALE NORTH VERT: N/A HORZ: N/A ORIGINAL SHEET SIZE: 24" X 36" SHEET TITLE EROSION CONTROL DETAILS SHEET NUMBER 5/9/2022 439 PM DAPHNE BRICE Z:\TEMPLATES\SHEETS\CD SHEETS\CIVIL\SHEET-24X36.DVVr Cl-05