HomeMy WebLinkAboutNCC213518_NOT Closeout Documents (6)_20220902Frito Foxboro
Wet Detention Pond As -Built Report and
As -Built Photo Essay
Prepared By: The L.E.A.D.S. Group, PA
Date: 1-03-22
Photo 1: As -Built Emergency Spillway and Top of Dam with Fence
Photo 2: As -built Main Pool Area and Vegetative Shelf
Photo 3: As -built Riser Structure with Trash Rack, Weirs, and Trash Deflector centered over Orifice
Photo 4: As -built RCP FES into Forebay with Rip Rap Dissipator
. .�
Photo » As -built Main Pod with Concrete Rise Structure and RCP O- Ma Outlet Pipe
Photo E As -built RCP Outlet Pipe FES with Rip Rap ms&amr
- R
r
K r i /-1.,
MKM
-'�'� .,�? ......
—e u. asn.ii
Photo 9: As -built O-Ring RCP Outlet Pipe
Photo 10: As -built Anti -seep Collar
Photo 11: Planting Shelf Complete
Photo 12: Inlet structure
Photo 13: Planting Shelf Complete