Loading...
HomeMy WebLinkAboutNCC213518_NOT Closeout Documents (3)_20220902MINIMUM BUILDING SETBACKS: City of Roxboro Zoning: 1-2 - heavy Industrial District Per City of Roxboro Zoning Ordinance, Section G.5.9: Front setback - 50 feet Side setback - 20 feet Rear setback - 30 feet PARCEL DATA Person County Tax Information (Per Person County GIS) Parcels Included in this Project: 3 Parcel I : Tax Map t Parcel No: A50 39 PIN: 0904- 1 5-54-4575 Property Address: Old Durham Road, Roxboro, NC 27573 Township: Roxboro Property Area: 2.48 Acres ± (not Including right-of-way) Deed Reference: D.B. 187, Pg. G41 Parcel 2: Tax Map � Parcel No: A50 31 PIN: 0904- 1 5-54-G5G5 Property Address: Old Durham Road, Roxboro, NC 27573 Township: Roxboro Property Area: 0.50 Acres ± (not including right-of-way) Deed Reference: D.B. G44, Pg. 455 Parcel 3: Tax Map * Parcel No: A50 30 PIN: 0904- 1 5-54-7G 19 Property Address: Old Durham Road, Roxboro, NC 27573 Township: Roxboro Property Area: 0.45 Acres ± (not including right-of-way) Deed Reference: D.B. 249, Pg, 18 City of Roxboro Zoning: 1-2 - Heavy Industrial District (Per Person County GIS Zoning Map) NOTE: Project proposes recombination of the above parcels and further subdivision as shown on plan. Resulting subject parcel area = 1 12,037 sf ± = 2.59 Acres ± (Including Right -of -Way) 10 1 ,52G sf ± = 2.33 Acres ± (Not Including Right -of -Way) CONTRACTORS NOTES: I . The contractor shall verify the location of all exi5tmg utilities prior to beginning construction. Locations of existing utllltle5 shown on the plan are based on the best available Information, but can only be con5ldered approximate. 2. The City of Roxboro shall review and approve construction drawings prior to construction. Any confllct5 Should be reported to the project engineer Immediately for review prior to begin irg construction. It shall be the owner's responsibility to obtain all required approvals and permlt5 from agencies governing this work prior to any construction. 3. It shall be the responsibility of the owner to obtain all applicable permlt5, complete te5ting and 111512ectlOn5, and obtain proper certification that the proposed construction was Installed In accordance with the approved plans and SpeclflcatlOns. 4. All underground utilities are to be mstalled and tested prior to the placement of any base course stone, concrete (51dewalk5, curbs, slabs, etc.), or pavement. 5. Any fill material Imported Into or exported from the site shall originate from or be disposed Of at a properly permitted location. All structural fill material and bearing 50115 shall be tested and certified by the project geotechnical engineer. G. Cle3nout5 In traffic areas shall be placed m5lde traffic rated mini manholes (typ.) PAVING SCHEDULE: Contractor shall coordinate with owner to determine the desired pavement section and finalize design sections prior to construction. Minimum stone, asphalt and concrete section thickness' shown hereon over approved subgrade soils are provided for reference only. No pavement design was performed to establish these sections. Final pavement sections should be constructed per owner's geotechnical engineering recommendations based on the evaluation of exposed subgrade soils. Site 50115 Classification: Unclasslfled. Classification of near surface 50115 shall be made per owner's geotechnical engineering recommendations based on the evaluation of exposed subgrade 50115. Sidewalk Note: Min. sidewalk thickness = G" Max. sidewalk longitudinal slope = 5% Max. sidewalk cross slope = 2% Sidewalk widths as shown on plan GENERAL NOTES: I . All utility installation, construction methods, and materials shall conform to the City of Roxboro Standard Specifications and Details, North Carolina Erosion and Sediment Control Practice Standard Speclflcatlons, NCDOT Standard Specifications, and the NC Plumbing Code. 2. Boundary, topographic, and existing feature information obtained from a survey prepared by Boswell Surveyors, Inc., Burlington, North Carolina (Job No. 20-346-300). 3. Existing Conditions are shown based on field surveys and best available record at the time of this plan. Any discrepancies shall be reported to the engineer immediately. 4. Sanitary sewer service is proposed as shown. 5. Water service 15 proposed as shown. G. Exact size and location of utilities are to be field verified prior to construction. 7. Contact the project engineer immediately with any conflicts regarding the design or construction of the project. All field adjustments shall be verified by the project engineer prior to construction. 8. Construction and location of 50ew311<5, slopes, landings, approaches, ramps, and accessible routes shall be in accordance with the ANSI 2009 Handicap code or latest Acce556111ty Code revision. 9. Contractor shall contact project engineer to observe formwork for site curb, concrete 516Iew3lk5, and other items as well as string lines or other controls prior to the placement of concrete, setting base course stone, or the placement of asphalt. 10. Compaction of fill materials, approval of residual subgrade, 5011 proof rolls, stone placement, and/or other materials testing functions shall be in accordance with the project geotechnical engineer's guidance, specifications, recommendations, and te5ting standards. Plan Prepared for: Chadco Builders, LLC 2004-A Anthony Road Burlington, NC 272 15 Contact: Chad Porterfield - 33G.227.G585 ;N Z 0 W w C 41 N cA -i m 3,14 EIP 5CM ACCESS MAINTENANCE EASEMENT - WET DETENTION BASIN PROP- 3'W x 21L x 22' Th. KIPRAP ARMOR D50= 13", CLASS 'B' RIP -RAP w/ G oz. GEOTEXTILE FABRIC UNDER AS -BUILT: Concrete Riser, Trash Rack, Anti -Vortex Plates Installed CONCRETE POND RISER STRUCTURF AND ALUMINUM TRASH RACK/ ANTI -VORTEX PLATES WITH G" GATE VALVE, STEPS, It CONCRETE ANCHOR BLOCK), SEE POND DETAIL SHEET. 78 LF, 18" RCP O-RING - FIFE @ .O% THROUGH DAM WITH G' RADIUS ANTISEEP COLLAR (SEA POND DETAIL) AS -BUILT: Inv. 653,53' 18" RCP 75.4 LF FES INV. OUT: RROP- I G53.5 3'W x 12'L x 22' Th. RIPRAP ARMOR D50= 13', CLA55 'B' PIP -RAP w/ G oz. GEOTEXTILE FABRIC UNDER AS -BUILT: Rip Rap Dissipater /I 0 I LpC) CID LLJ Z I - o Ln Cri rn t �I N w a CA LLJ DIN c1� CA O N NI 0 a 3/4' �� O n EIP 66� / OL I Curve Table Curve Chord Bearing Chord Radius Length C 1 N 46`30'00" E 318.41 ' 492.41 ' 324.24' CURVE TABLE CURVE CHORD BEARING CHORD LENGTH RADIUS ARC LENGTH C2 N 83022' 1 1 " W 83.55' 275. 1 9' 63.67' C3 N G2033'39" W 73.0 1' 1 2482.G5' 73.0 P C4 N OG'40'09" W 59.93' 85.82' G 1 .22' Parcel C Property of Business Development Corporation / P.B. 18, Pg. 176 o C), hart ^ P5� S 74'55'51 " E 4.48' Owner: PARRISI1 � KONE, INC 6691' / Tax Map * Parcel No: A50 17 E / City of Roxboro Zoning: 1-2 �2226 ,,o / 6 0 ) J (=O)hv o� a Fg 5 � Wm: SSSB9' Invert: C5e.30 PN Existing � � O k G NIP �`: Q Gravel w �' 0 36 PN / 30' WIDE �� � 40 �m GPLe��� / EMERGENCY AS -BUILT: ^ C'' ���� / SPILLWAY: G58.0 35' Emergency Spillway / /O1 �� / TKM ARMOR with liner +� / OLO Proposed (SEE DETAIL) �� O Property Line C2 MAIN POOL � / / FLOOR: G48.0 dge of EXst ^ry II,�� �Sf'halt N EMERGENCY Vv /_ AS -BUILT: 6? SPILLWAY �O �T�n' >10' Top of Dam 660.0 / O �� r VV - - _ M. S MIN. G FT WIDE AS -BUILT: / O O N VEGETATED SHELF Min. 6' Wide Shelf Present / o (MAX SLOPE GH: I V) �, (� AS -BUILT: / / •HQ) FLOOP = Rip Rap Dissipater V A 5 I .o RP�3'W x O / 3'1N x 12'L x 22" Th. a� \� KIPRAP ARMOR D50= 1 3', CLASS 'S' 3 O RIP -RAP w/ 6 oz. Kim: SQa.zs' • o� n GEOTEXTILE FABRIC UNDER Invin: ��2.1°' <D \ Inv Out: SS2.05' Q �\ r V 0) O o 0 / F-H / O / TOP OF SHELF: O G55.5, TYP. / 30 1 . 5" R - DOT. OF SHELF: Rim: CC N Inv In: 66 .9 I' a� .6%%a2 G54.5 / nv out: GG TYP. ss 1 .7S' °G 'Y"Y 0) 12' ACCESS GATE, TYP. - I Fes# I I o � I NV. OUT: \ O� / G55.0 PERMANENT DITCH PD- , a 2 PT. WIDE, I FT. DEEP, • �� " WITH NAG - 575 (OR / OC4 EQUIVALENT) DITCH LNER •0��� / .ham 6s5 a \ s w s66 0 5t� CIO 1 \ G67 0��\G� \ S67 2 �o°mac 071 Existing Building ol 5' RCS AS -BUILT: Concrete Riser Rim Elev.= 657,53' Wier Ele r - CP Inv. = 654.04' Orfice Elev.= 655.00' Inv of Riser = 647.53' CI#2 11< TOC: GG I .8 INV. IN: G55.7 INV. OUT: G55.5 �3 G°�G GG GG GG Gt. 1 INV. OUT C, GG4.9 LD / °� � o� OX G 55IJH RunI 676.21' /1 vv J Inv In: SSB.° 1' \('_ Ins Oit: 667.9�QN1' G� o0 V A\ G'O°o�•1CIA sT. cB Grate: 072. l 2' Inv. SS8.97' Lucy Garrett Road SR 1703 60Public Right of Way AS -BUILT: ITEMS LABELED AS -BUILT ARE AS CONSTRUCTED 12-29-2021 r� a � LUCY CAKREIT ROAD SCALE: NTS Vicinity Map SURVEYOR'S LEGEND O Existing Iron Pipe (EIP) • New Iron Pipe (NIP) Property Line - - - - Adjoiner's Property Line - Right of Way line Calculated Point (CP) PK Nail (Found) PK Nail (Set) ® Right of Way Monument A Rock Comer A Tree Corner Benchmark Pc Point of Curvature PT Point of Tangency e Centerline R/W Right of Way E,t Easement Sign MG Curb and Gutter 0/P Carport c­ Concrete D/w Driveway P Porch sM' Sidewalk 0/11Overhead U/c Underground © Sanitary Sewer Manhole (SSMH) - SS -Sanitary Sewer Line O Clean Out Plug 0 Storm Drainage Manhole (SDMH) Wo Curb Inlet (CI) Catch Basin (CB), Yard Inlet (YI) Rca Reinforced Concrete Pipe a"P Corrugated Metal Pipe Water Meter D° Water Valve Fire Hydrant - W -Water Line 0 Water Manhole D° Gas Valve 8 Gas Meter - G -Gas Line ~Overhead Utility Lines Utility Pole (with Guy Wire) Light Pole 4 Flood Light Telephone Manhole 0 Telephone Box 0 Cable Box W Tree iti v'�wY1 Woodline I Charles D. Huffine, PE certify that to the best of my knowledge and belief: That the design of all stormwater management facilities (also referred to as BMP) shown hereon will control and treat the runoff from the first one inch of rain over the total contributing drainage area, that the designs and plans are sufficient to comply with applicable standards and policies found in the applicable "stormwater BMP Design Manual" (C-3 DEQ.NC.gov wet pond 1 112012020), and that the designs and plans ensure compliance with the City of Roxboro's Falls Lake Watershed and NPDES Phase II stormwater Ordinance, this the 2Gth Day of February, 202 1 . Roxboro Approval Process Notes: No construction will be permitted until the following: I ) Site permitting and required surety approval. No Certificate of Occupancy will be issued until the following: 1 ) Operations and Maintenance Agreement signed for the stormwater Control Measure (Wet Detention Basin) 2) stormwater Control Measure access and maintenance easement plat recorded. 3) stormwater Control Measure (Wet Detention Basin) 35-bu11t and final construction certification are completed. Additional Borrow / Waste Note: If the same person conducts the land -disturbing activity and any related borrow or waste activity, the related borrow or waste actlVlty shall constitute part of the land -disturbing activity unless the borrow or waste activity is regulated by the Division of Solid Waste Management. If the land -disturbing activity and any related borrow or waste activity are not conducted by the same person, they shall be considered separate land disturbing activities and must be permitted either through the Sedimentation and Pollution Control Act as a one -use -borrow site or through the Mining Act. CALL BEFORE YOU DIG! ITS THE LAW ULOCO North Carolina One Call Center 1-800-632-4949 O' 60' 1 G 0 i Graphic Scale 40' HttT X2 AS -BUILT 2-29-2 1 DA 1"=40' SCAI_.'_ BSB/CDH cPA.nm, ri -nF USA av z 0 z J � W � � z ►-u 0 00 Q � � w a _ -20, <, �.,, . •••....•• �OFn rns/n�� �29 L4`iL4 (V �•i Al .�;N:.N.F;�� FS D J WAG 0) Ln V V J a Q Q 75 r, w � FJ � w a