HomeMy WebLinkAboutNCG070057_Inspection Report_20220902DocuSign EAvelope ID: BFAA1D73-7688-4C56-9C99-5F3814852A38
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
NORTH C.AR?C UNA;
September 2, 2022
Hitachi Metals North Carolina
Attention: Patrick Barton, Permit Owner
1 Hitachi Metals Drive
China Grove, North Carolina 28023
Subject: Compliance Evaluation Inspection
Hitachi Metals North Carolina
NPDES Certificate of Coverage — NCG070057
Rowan County, North Carolina
Dear Mr. Barton:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection we conducted at the Hitachi Metals Facility on August 16, 2022. Please note that in
the stormwater inspection report summary we ask that you continue to operate and maintain the
stormwater pollution prevention plan per the current permit cycle.
The report should be self-explanatory; however, should you have any questions, please do
not hesitate to contact me at (704) 663-1699 or by E-mail at jesse.mcdonnell@ncdenr.gov.
Sincerely,
DmuSigned by:
1=�4
42CFABFC08C459...
Zahid S. Khan, CPM, CPESC, CPSWQ
Regional Engineer
Land Quality Section
Enclosure
c: Laserfiche
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115
4A P 704-663-1699
Compliance Inspection Report
Permit: NCG070057 Effective: 06/01/18 Expiration: 05/31/23 Owner: Hitachi Metals North Carolina
SOC: Effective: Expiration: Facility: Hitachi Metals North Carolina
County: Rowan One Hitachi Metals Dr
Region: Mooresville
China Grove NC 28023
Contact Person: Jeff Goodman Title: Phone: 704-855-2800
Directions to Facility:
System Classifications: SWNC,
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 08/16/2022 Entry Time 11:20AM
Primary Inspector: Jesse M McDonnell
Secondary Inspector(s):
Certification:
Phone:
Exit Time: 12:15PM
Phone: 704-235-2139
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG070057 Owner - Facility: Hitachi Metals North Carolina
Inspection Date: 08/16/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The stormwater pollution prevention plan and associated documents are current and complete. Based on discussions with
the plant manager, the facility will be closing starting at the end of September. A recission request needs to be submitted to
the Raleigh Central office to rescind the permit after operations have ceased.
Page 2 of 3
a
O
Permit: NCG070057 Owner - Facility: Hitachi Metals North Carolina
Inspection Date: 08/16/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
0
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
0
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
■
❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
N
❑ ❑ ❑
# Does the Plan include a BMP summary?
0
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
N
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0
❑ ❑ ❑
# Does the facility provide and document Employee Training?
0
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
■
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
N
❑ ❑ ❑
Comment: The stormwater pollution prevention plan (SWPPP) is current and complete. All associated
documents are current.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑
Comment: Qualitative monitoring is current and complete. Future monitoring needs to be conducted on
the current monitoring form on the NCDEQ website.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ E ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment: Analytical monitoring is not required due to the facility not having vehicle maintenance.
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
# Were all outfalls observed during the inspection? N ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? N ❑ 1111
Comment: All outfalls were observed during the inspection. Two outfalls near Highway 152 are eroded and
need to be repaired.
Page 3 of 3