Loading...
HomeMy WebLinkAbout20181034 Ver 1_Staff Report Davis, Erin B (Year 0 MR)_20220906Mitigation Project Information Upload Initial Review and Submittal ID#* 20181034 Mitigation Project Submittal - 8/23/2022 ................................................................................................................................................................ Type of Mitigation Project:* si Stream Wetlands Buffer Nutrient Offset (Select all that apply) Version* 1 Is this a Prospectus,Technical Proposal or New Site?* Yes • No Project Contact Information ...................................................................................................................... Contact Name: * Paul Wiesner Project Information Existing 20181034 (DWR) ID#: Project Name: Project Type: * County: Email Address: * paul.wiesner@ncdenr.gov Existing 1 Version: (numbers only) UT to Rush Fork Stream Mitigation Project • DMS Mitigation Bank Haywood Document Information Mitigation Document Type: * Mitigation Monitoring Plans All attachments have been uploaded into Laserfiche for your review. Signature Print Name: * Signature: * Paul Wiesner Staff Review Staff Review by Davis, Erin B Project Location: WaterResources\DWR - Wetlands Program\Non DOT\20181034\Ver 1 Staff Comments File Upload Jpg or pdf only Staff Review Completed Date: 09/06/2022