HomeMy WebLinkAbout20181034 Ver 1_Staff Report Davis, Erin B (AsBuilt)_20220906Mitigation Project Information Upload
Initial Review and Submittal
ID#* 20181034
Mitigation Project Submittal - 8/23/2022
................................................................................................................................................................
Type of Mitigation Project:*
si Stream Wetlands Buffer Nutrient Offset
(Select all that apply)
Version* 1
Is this a Prospectus,Technical Proposal or New Site?* Yes • No
Project Contact Information
......................................................................................................................
Contact Name: *
Paul Wiesner
Project Information
Existing 20181034
(DWR)
ID#:
Project Name:
Project Type: *
County:
Email Address: *
paul.wiesner@ncdenr.gov
Existing 1
Version: (numbers only)
UT to Rush Fork Stream Mitigation Project
• DMS Mitigation Bank
Haywood
Document Information
Mitigation Document Type: *
Mitigation As -Built Plans
All attachments have been uploaded into Laserfiche for your review.
Signature
Print Name: *
Signature: *
Paul Wiesner
Staff Review
Staff Review by Davis, Erin B
Project Location: WaterResources\DWR - Wetlands Program\Non DOT\20181034\Ver 1
Staff Comments
File Upload Jpg or pdf only
Staff Review
Completed Date:
09/06/2022