Loading...
HomeMy WebLinkAboutU-2579B_Sites_3A_3B_DWR_CloseoutROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Mr. Randy Griffin Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina, 27699-1598 NORTH CAROLINA Environmental Quality September 1, 2022 Subject: Monitoring of temporary stream impacts at Sites 3A and 3B for U-2579B; Forsyth County; DWR Project No. 20140090v2 Dear Mr. Griffin, This correspondence is in reference to your letter dated August 29, 2022 regarding the above referenced temporary impact sites, located in Forsyth County, North Carolina. The sites were being monitored by the North Carolina Department of Transportation to ensure that stream channel improvements were stable and functioning per the plans. By copy of this letter, we are notifying you that no further monitoring of the sites will be required since the construction and success criteria have been met. If you have any questions or require additional information, please contact Dave Wanucha at (336) 403-5655 or Dave.Wanucha@ncdenr.gov. Electronic copy only distribution: Eric Alsmeyer, US Army Corps of Engineers, Raleigh Field Office Amy Euliss Division 9 Environmental Officer David McHenry, NCWRC Rebekah Reid, USFWS Amanetta Sommerville, USEPA David D. Johnson, NCDOT e:!eo.of y7 RE irr�l r � Sincerely, DoSigned by: for: werRinrlo6gs, Jr., Director Division of Water Resources North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707.9000