Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0064726_Compliance Evaluation Inspection_20220831
ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Archie B. Hicks, Jr, Mayor Town of East Bend 108 W. Main Street East Bend, NC 27018 NORTH CAROLINA Environmental Quality August 29, 2022 SUBJECT: Notice of Violation NOV-2022-PC-0470 Compliance Evaluation Inspection Town of East Bend WWTP NPDES Permit No. NC0064726 Yadkin County Dear Mr. Hicks, On August 12, 2022, Gary Hudson of this office met with Mark Matthews to perform a Compliance Evaluation Inspection at the above referenced wastewater treatment plant. This type of inspection consists of two basic parts: an in -office file review and an on -site inspection of the treatment facility. The attached EPA inspection form details the areas that were evaluated during this inspection. If you have any questions regarding the inspection or this report, please contact Gary Hudson or me at (336) 776-9800 or by email at gary.hudson©ncdenr.gov or lon.snider©ncdenr.gov. Sincerely, DocuSigned by: < L-on. l . JM,l&ts- 145B49E225C94EA.. Lon Snider Regional Supervisor Water Quality Regional Operations Division of Water Resources Attachments: EPA Water Compliance Inspection Report cc: WSRO GDE NORTH C CUNA ' omm mr� ep..of o�.i North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105 336.776.9800 United States Environmental Protection Agency E PA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction 1 IN Code I 2 IL NPDES yr/mo/day Inspection Type Inspector Fac I 3 I NC0064726 111 121 22/08/12 117 18 1 19 I S I 201 Type 21IIIIII IIIIIIIIIII IIIIIII I IIIIII IIIIIIIIIII P6 Inspection 671 Work Days Facility Self -Monitoring I 70I Evaluation Rating I 711 B1 1 72 QA I N I 73I I I I Reserved 74 71 I I I I I I 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES Dermit Number) East Bend Industrial Park WWTP NC Hwy 67 E East Bend NC 27018 Entry Time/Date 10:OOAM 22/08/12 Permit Effective Date 19/07/01 Exit Time/Date 11:30AM 22/08/12 Permit Expiration Date 23/12/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Mark C Matthews/ORC/336-403-2171/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Mark Matthews,108 W Main St East Bend NC 27018//336-699-4481/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran Facility Site Review Effluent/Receiving Wate Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Gary Hudson DWR/Division of Water Quality/336-776-9694/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date r;iDocuSigned by: -e. T. StiAcr 8/29/2022 145B49E225C94EA... EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# 1 3I NPDES yr/mo/day N C 0064726 111 121 22/08/12 117 Inspection Type 18 [j 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) *The permit became effective July 1, 2019 and will expire on December 31, 2023. *The UV control panel was inoperable at the time of the inspection. However, the UV bulbs were on. *eDMR's are cosistently late. *The aeration basin appeared to be operating properly. *The secondary clarifier appeared to be working properly. The effluent leaving the clarifier was very clear on the day of the inspection. *The flow meter was last caliberated in May 2020. Page# 2 Permit: NC0064726 Inspection Date: 08/12/2022 Owner - Facility: East Bend Industrial Park WWTP Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new DOME application? Is the facility as described in the permit? • ❑ ❑ ❑ # Are there any special conditions for the permit? • ❑ ❑ ❑ Is access to the plant site restricted to the general public? • ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑ Comment: *The permit became effective July 1, 2019 and will expire on December 31, 2023. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable DOOM Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: The UV control panel was inoperable at the time of the inspection. However, the UV bulbs were on. Record Keeping Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • • • ❑ • ❑ ❑ Page# 3 Permit: NC0064726 Inspection Date: 08/12/2022 Owner - Facility: East Bend Industrial Park WWTP Inspection Type: Compliance Evaluation Record Keeping Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Comment: eDMR's are cosistently late. Yes No NA NE Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system Diffused Is the basin free of dead spots? • ❑ ❑ ❑ Are surface aerators and mixers operational? ❑ ❑ • ❑ Are the diffusers operational? • ❑ ❑ ❑ Is the foam the proper color for the treatment process? • ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? • ❑ ❑ ❑ Is the DO level acceptable? ❑ ❑ ❑ • Is the DO level acceptable?(1.0 to 3.0 mg/I) ❑ ❑ ❑ • Comment: *The aeration basin appeared to be operating properly. Secondary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) Yes No NA NE ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: *The secondary clarifier appeared to be working properly. The effluent leaving the clarifier was very clear on the day of the inspection. Flow Measurement - Effluent # Is flow meter used for reporting? Yes No NA NE Page# 4 Permit: NC0064726 Inspection Date: 08/12/2022 Owner - Facility: East Bend Industrial Park WWTP Inspection Type: Compliance Evaluation Flow Measurement - Effluent Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Comment: *The flow meter was last caliberated in May 2020. Yes No NA NE ❑ • ❑ ❑ Page# 5