Loading...
HomeMy WebLinkAboutSW6220804_O&M Agreement/Plan_20220831Operation & Maintenance Agreement Project Name: Rebekah Evans 230kV POD Project Location: Upton Tyson Rd, Fayetteville, NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & co Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity: Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present: User Defined SCM Present: Low Density Present: O&M sheets will Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Type: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Chris Spears Title & Organization: Executive Vice President & CEO Street address: 17494 US 421 S City, state, zip: Dunn, NC 28335 Phone number(s): 910.892.8071 Email: cspears@sremc.com Signature: County of personally appeared before me this a Notary Public for the State of , do hereby certify that day of acknowledge the due execution of the Operations and Maintenance Agreement . Witness my hand and official seal, Seal My commission expires Date: and