Loading...
HomeMy WebLinkAboutSW6220804_Supplement-EZ Form_20220831SUPPLEMENT-EZ COVER PAGE LOAD SUPPLEMENT FORM PROJECT INFORMATION 1 1 Project Name Rebekah Evans 2301kV POD 2 Project Area (ac) 2.73 3 Coastal Wetland Area (ac) 0 4 Surface Water Area (ac) 0 5 Is this project High or Low Density? Low 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H. 1 003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 1 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 0 0 0 0 0 0 17 Rainwater Harvesting (RWH) 0 18 JGreen Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 LOAD SUPPLEMENT FORMS DESIGNER CERTIFICATION 27 Name and Title: Organization: 28 29 Street address: 30 City, State, Zip: 31 Phone number(s): 32 Email: Joe Ervin, P.E. Pike Engineering, LLC 123 N White St. Fort Mill, SC, 29715 803-835-7929 jervin@pike.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer r' yy t L i OJIF EF J�r�111L1 Seal Signature of Designer Date DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so, number of low density drainage areas 2 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LID 1 LD 2 4 Type of SCM Sheet Flow Sheet Flow 5 Total drainage area (sq ft 132858 77537 6 Onsite drainage area (sq ft 78491 7 Offsite drainage area (sq ft 54367 8 Total BUA in project (sq ft 14997 sf 9 New BUA on subdivided lots (subject to permitting) 1 (sq ft sf 10permitting) New BUA not on subdivided lots (subject to s 14997 sf sf 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: - Parkina (sq fit) -Sidewalk (sft sf sf - Roof (sq ft sf - Roadway s ft sf - Future (sq ft sf - Other, please specify in the comment box below (sq ft 14997 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft sf 14 New infiltrating permeable pavement not on subdivided lots (sq ft Existing BUA that will remain (not subject to s ft sf 15permitting) sf 16 Existing BUA that is already permitted (sq ft sf 17 Existing BUA that will be removed (sq ft sf 18 Percent BUA 11 % 19 Design storm inches 5.6 in 20 Design volume of SCM cu ft 21 Calculation method for design volume DDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per .1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) n1a 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (% ) n1a 8 Bottom width of curb outlet swale(s) (feet) n1a 9 Maximum side slope of curb outlet swale(s) (H:V) n1a 10 Minimum length of curb outlet swale(s) (feet) n1a 11 Are treatment swales used instead of curb outlet swales? 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? 14 JAre variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 1 Please use this space to provide any additional information about this low density project: Proposed site has a total built upon area (BUA) of 21.97%. Stormwater runoff for the site utilizes unchannelized surface flow (<1.5 % slope) which passes though an existing vegetated area (<0.6 % slope) before flowing into existing surface conveyances.