Loading...
HomeMy WebLinkAbout20221173 Ver 1_Shoreline Stabilization_20220831Shoreline Stabilization Application Form NORTH CAROLINA Environmental Quality 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 DRAFT -NOT FOR USE AT THIS TIME Submission Form I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * hager@lakepermit.com Please provide an email address for payment and requests for more information here. Pre -Filing Meeting Date Request was 8/29/2022 submitted on: * Owner Information: Name: * STEVEN BARTNISKI Email: * SBARTNISKI@ATT.NET Phone Number: (317)697-0456 (xxx)xxx-xxxx Mailing Address:* Street Address 5769 MEADOWLARK PL Address Line 2 City CARMEL Postal / Zip Code 46033 State / Province / Region IN Country US Is there an agent working on the project?* Yes No Agent/Consultant Information Name: * TAMARA HAGER Company Affiliation: * LAKE PERMIT LLC/ RENEGAR Email: * hager@lakepermit.com Phone Number:* Mailing Address:* (704)575-2227 (xxx)xxx-xxxx Street Address PO BOX 5335 Address Line 2 City State / Province / Region MOORESVILLE NC Postal / Zip Code Country 28117 US A signed and dated copy of the Agent Authorization letter:* BARTNISKI AUTH.pdf I.38MB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name: * BARTNISKI If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* Upload File Look up address Upload Map: BARTNISKI SURVEY.pdf 1.5MB Latitude:* 35.604886 Longitude: *-80.937729 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* BARTNISKI SKETCH.pdf 815.76KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) BARTNISKI PIC.pdf 763.84KB 4. Location of the property (where work is to be conducted) Nearest Town: * MOORESVILLE County: * Iredell Lake/ river/ ocean adjacent to NORMAN/CATAWBA property: Subdivisions name or site address: * PINNACLE SHORES LOT 21 Include phase/lot number Directions to site: * FROM MARSHALL STEAM STATION TRAVEL HWY 150 E 2.5 MILES, TURN RIGHT ONTO MARINER POINTE LN .20 MILES, PROPERTY ON LEFT. Please include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application: * RESIDENTIAL Residential, undeveloped, etc. 6. Property Size .969 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): RIP RAP SHORELINE FOR STABILIZATION 8. How will the work be done? * From Land From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 0 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land- ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 0 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) NONE BY BARGE Sketch: BARTNISKI SKETCH.pdf 815.76KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): a $240.00 for impacts to lake (below normal water level) of less than 1 acre a $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: a I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief a I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. a I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); a I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND 0 I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* STEVEN BARTNISKI Signature: gAMSe Submittal Date: 8/29/2022 Initial Review Is this accepted into the review process?* Yes No Project Number:* 20221173 Version:* 1 Select Reviewer: * Doug Perez:eads\djperez Select Reviewing Office: Mooresville Regional Office - (704) 663-1699 Has payment been received?* ( No Payment Needed C Fee Received C• Need Fee - send electronic notification What amount is owed?* C• $240.00 C $570.00 PrOlect rilemi 1131 addLtraggt �►LT Lrff Print SionatOr _ Print sisna- The approval is for the purpose and design described in your application. lmpads not irldicated in the application is a violation oftha Buffer Rule.Site specific work should be provided in the application. 11 5A WC AC 02H.0505 end 15A NCAC 07B.07 3(8)1 Trees ere not elloww ed to be removed from 7o n r 1 of the Buffer(within 30 r u'of the full pond elevation), unless approved.EltCCption:chose trees ehatare severely undermined along the immediate shoreline can be removed. Minimal Shaping and sloping clomp the immediate shoreline is allowed.1:15A.NCAC 02 .0243(6)1 Benching, grading in the buffer is not allowe .aacessitive disturbance of ground cover.ElM NCAC OZB.0243(6)] Beaches,impervious patios,le It ,►.]eraliov trial eways,etc.are not allowed in the buffer unless specifically approved by the Division. There are.limitation on size for decks.i35A 1`CdCO2B.0743(4)and(5)] Work to be conducted from land must indicate an access and indicate any trees that ere to be removed. The work corridor should be described.The cpprov_d eCCe_s corridor shell be restored.t zing,spoil, constructior: material must be outside the buffer. (15A NCAC a _0502 and 15A NCAC 07B.074° .-P-L (5), (8.)) Storrftweter cannot be piped or channeled for direct disther®e to the Jeke. AD constructed etor:av✓eter discher es must be et the natural =levetion and diseh-reed prior to entering the buffer directeed es diffuse or sheet flow et non-erosive velocities to the lake. CiSA NCAC 02B.0743(5);(ai1 Acknowledgement of�PVoottReci±iiogj, • �8 p� 6A t7?,J.S -J hereby stele that I have been ir1Fo m ed of the Catawba Riparian Buffer Rule. Anywork conducted in the 6.19 ,riot eoeeii`Iceiiy ste cd in the application end approvni by the Division of Water.Resources(D%4'P), la a violation and subject to enforcement. Due diligence will o'e taken such that the constructian will be built within substantial a e o !! i iia e7illplterlOid and �� ilea Quality Ccrtificetloil end Buffer Rules,the approved plants)and_pecificattlon(s),and other supportlne materials. ( 1111 1m VNiY $r - ^ : 000"6� - ; o m N'f N 9' my Err +0�yitl] m��7X .- c•:�'........A yyyy X01'10'p6'E '�1 4°, 1; XOY 33�� yt 90.52' ' NO1.14 06•E i ` 4C`i 71.A7' z m R 00.25' N2 ;' ;�I4T - - .v i 9. 1- is NORTH f`� ri m1 I y0 1 m.e e W• 74; /�'a O °'s- 0X10 NORTH(NW 83) rz 17 P - _ 6 m aO A` rl 00 D a 4 e \ m � \ y lw 4�, - '� D • e ,� wN° aO r n 0,4 �6�,�C SO Cy '' a ww w !N `S,r g2 `'9. C f 9 eB ? ors AV So n 67 rui - , �2p 0, 'tl!3 1 ,\ ins =_ y 35 -./P ooc�oa 77�9E 1BAc �2i S3i2B3 e, o`' �' m �D mmxrj- /T�K :: �'4. a w o� cnao H 2/ '0 eo. 6A' $ EOvo aw \I'm _ ^c3z Z -. n/ '3j..,✓6+F ` 00 ,7l. i i. orar r gr' '^ r s"s' C B y 1\o v3Y VCT fir- a r='N ti 47 as ',' \\, !111- Z ��r wwk' iSO 'Ee c Ss. .iy� ip Z.a� A,��2 ii(V Ce S mr, J. z r.\ E. my .<.i e aO / \ y .Zg7. .'Za,O/i^'M/E,b*,� nr a m n \ �" q�y= H r nN6 \n �A\Ayq�e a�o m m $i m ly- aAi En GZj 3\ / y0q'L0 m tU \ n.,,n s NO `tlxlw n $m - as.� y,. Z m.N mO `c r , Ea Zl m a 1 N W•u•uM F. € \ a : 1W a 3m`i t5Y02�,5 yg /m~ _ - - " L50 4,y m 'El+ q$S:' w A Ei ess iQ0 y� �I�� 1 • \ \ ,Tri� 2\p '�v' O I' Ye o o'er=ov EN \\ `eo w i\\� "aw; e7. m� s \ - O07 \\ i gd ' \`o,\mzx 11111' a oN�» gl Ed: v n e \\ Las \ \ C,, y""I,of - -'sr- _ o.w \ a a `1 s !,, -- co N I _ — 62 Z -� \\ a 110 N r ..e'$- ^y N. T as \ _ , w Q En ao \ -z C� :"1 ..'•=.: cn Elf' -O m roa gr �m g o \ Z �11 �Y _tE' j _ _ - - ' o�oo :=RL al o Rlrc \ a - _ - �oy k. gER I — a El p9. ? N m - - . ���. . a. � rL�" \\\ u d g._ o:cmm3n.n�3 \ • Re 9&-0U^--Poo_ .. ,. ... '. ... .r. ... .: n . :`.E:;A.AF'3�_.•5.asssti -.a9'M�"-"�I Lake (At Full Pond/Normal Water Level) 70 Full Ponds 12) LO�'I��{ Normal We �� tee-Leve itir Shoreline �� Q; u `*)—`11.14teie.. 44pso tv 'awl,-," •a' 1 t��-ri0�l" fOt7 1i- E S 1 nnc��� 1 .N L b is if ty-ir a r3ic,te12 c1 T Please approximately sketch the following information on this plan (provide dimensions for each item,such as 10 ft x 10o ft) 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM:SSGP 10-2013 Page 3 of 3 , i yin +�- a T r. e` .C` itp++,f f «. V .#, *:'Ai S..:4:4", ; ,.' a .,... yfk• 1 j • • am T . ' Fm R4 , 4e. . P , i ! 4. *, - 4 / W � r . ♦ a.� n __al-. M1, t' e Tamara Hager Lake (At Full Pond/Normal Water Level) 70 Full Ponds 12) LO�'I��{ Normal We �� tee-Leve itir Shoreline �� Q; u `*)—`11.14teie.. 44pso tv 'awl,-," •a' 1 t��-ri0�l" fOt7 1i- E S 1 nnc��� 1 .N L b is if ty-ir a r3ic,te12 c1 T Please approximately sketch the following information on this plan (provide dimensions for each item,such as 10 ft x 10o ft) 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM:SSGP 10-2013 Page 3 of 3