Loading...
HomeMy WebLinkAbout20211721 Ver 1_ePCN Application_20220829 DW R mrlsloa of ware.Besourcrs Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13,2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. Pre-Filing Meeting Date Request was submitted on: 4/29/2022 BIMS#Assigned" Version#* 20211721 1 Is a payment required for this project?* No payment required Fee received Reviewing Office* Fee needed-send electronic notification Central Office-(919)707-9000 Select Project Reviewer* Ryan Conchilla:eads\rjconchilla Information for Initial Review 1a.Name of project: U-4015A Proposed improvements to Gallimore Dairy Road(SR 1556)from NC 68 to Airpark Drive in Guilford County 1a.Who is the Primary Contact?* Jerry Parker 1 b.Primary Contact Email:* 1c.Primary Contact Phone:* japarker3@ncdot.gov (336)256-2063 Date Submitted 8/29/2022 Nearest Body of Water East Fork Deep River Basin Cape Fear Water Classification WS-IV:* Site Coordinates Latitude: Longitude: 36.066186 -79.954417 A. Processing Information County(or Counties)where the project is located: Guilford Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No Is this a NCDOT Project?* Yes No (NCDOT only)T.I.P.or state project number: U-4015A WBS#r) 35013.1.1 1a.Type(s)of approval sought from the Corps: Section 404 Permit(wetlands,streams and waters,Clean Water Act) Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?" Yes No 1 b.What type(s)of permit(s)do you wish to seek authorization? Nationwide Permit(N W P) Regional General Permit(RGP) Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? Yes No Regional General Permit(RGP)Number: 201902350-Work associated with bridge construction,widening,replacement,and interchanges RGP Numbers(for multiple RGPS): 1d.Type(s)of approval sought from the DWR: 401 Water Quality Certification-Regular 401 Water Quality Certification-Express Non-404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f.Is this an after-the-fact permit application?* Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1 h.Is the project located in any of NC's twenty coastal counties? Yes No 1j.Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d.Who is applying for the permit? Owner Applicant(other than owner) le.Is there an Agent/Consultant for this project?" Yes No 2.Owner Information 2a.Name(s)on recorded deed: NCDOT Division 7 2b.Deed book and page no.: 2c.Contact Person: Jerry Parker 2d.Address Street Address 1584 Yanceyville Street Address Line 2 PO Box14996 City State/Province/Region Greensboro NC Postal/Zip Code Country 27415 USA 2e.Telephone Number: 2f.Fax Number: (336)256-2063 2g.Email Address:* japarker3@ncdot.gov 4.Agent/Consultant(if applicable) 4a.Name: Matt Martin 4b.Business Name: RK&K 4c.Address Street Address 8601 Six Forks Road Address Line 2 Forum 1,Suite 700 City State I Province/Region Raleigh NC Postal/Zip Code Country 27615 USA 4d.Telephone Number: 4e.Fax Number: (919)878-9560 4f.Email Address:* mmartin@rkk.com C. Project Information and Prior Project History 1.Project Information 1 b.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Greensboro 2.Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Gallimore Dairy Road(SR 1556)from NC 68 to Airpark Drive Address Line 2 City State/Province/Region Postal/Zip Code Country 3. Surface Waters 3a.Name of the nearest body of water to proposed project: East Fork Deep River 3b.Water Resources Classification of nearest receiving water:* WS-IV:* 3c. What river basin(s)is your project located in?* Cape Fear 3d.Please provide the 12-digit HUC in which the project is located. 030300030102 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:' The general land use in the vicinity of the project is industrial with development on all sides of the project. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* Yes No Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 0.09 4g.List the total estimated linear feet of all existing streams on the property: 1,354 4h.Explain the purpose of the proposed project:" The purpose of the project is to increase capacity and reduce congestion on Gallimore Dairy Road(SR 1556). 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used: Widen and improve Gallimore Dairy Road(SR 1556)from NC 68 to Airpark Drive(approximately 1.1 miles long).This section of road is currently two to three lanes and will be widened to five lanes.The typical section includes five 12'lanes with a center turn lane along the corridor. 5. Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2019-00840 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Matt Martin/Gordon Marsh Agency/Consultant Company: RK&K Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR April 25th,2019.David Bailey USACE and April Norton NCDWR 6.Future Project Plans 6a.Is this a phased project?* Yes No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): Wetlands Streams-tributaries Buffers Open Waters Pond Construction 2.Wetland Impacts 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W. 2d.W.name 2e.Forested* �12f.Type of Jurisdicition*2g•Impact area Fill P Headwater Forest WC Yes Both 0.010 (acm (acres) Mechanized Clearing T Headwater Forest WB ��A Both 0.010 �777� acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.010 0.010 2g.Total Wetland Impact 0.020 2i.Comments: 3. Stream Impacts 3a.Reason for impact(') 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* [3f.Type of 3g.S.width 3h.Impact (?) urisdiction* length* S1 Site 1:Stream Relocation Permanent Relocation SA Perennial Both 153 Average(feet) (linear feet) S2 Site 1:Culvert Permanent Culvert SA Perennial Both 49 Average(feet) (linear feet) S3 Site 1:Bank Stabilization Permanent Bank Stabilization East Fork Deep River Perennial Both 25 98 Average(feet) pinear feet) S4 Site 1:Bank Stabilization Temporary Bank Stabilization J East Fork Deep River Perennial Both 25 11 Average(feet) (linear feet) S5 Site 2:Culvert Permanent Culvert SD Intermittent Both 2 10 Average(feet) (linear feet) S6 Site 2:Culvert Temporary Culvert SD Intermittent Both 2 6 Average(feet) (linear feet) S7 Site 3:Culvert Permanent Culvert SC Intermittent Both 3 36 Average(feet) (linear feet) gg Site 3:Culvert Temporary Culvert SC 7Intermittent Both �i Average(feet) (linear feet) --] 31.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 346 26 3i.Total stream and ditch impacts: 372 3j.Comments: 6. Buffer Impacts (for DWR) 6a.Project is in which protect basin(s)? Check all that apply. Neuse Tar-Pamlico Catawba Randleman Goose Creek Jordan Lake Other 6b.Impact Type 6c.Per or Temp 6d.Stream name 6e.Buffer mitigation required? 6f.Zone 1 impact 6g.Zone 2 impact Parallel Impact P East Fork Deep River Yes 0 563 Road Crossing P East Fork Deep River No 10,384 4,758 Parallel Impact P I SA No 3,919 11 1,668 Parallel Impact P SA Yes 0 522 Road Crossing P SC No 2,322 705 Road Crossing P SD No 2,226 1,533 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 18,851.00 9,749.00 Zone 1 Zone 2 Total combined buffer impacts: 18,851.00 9,749.00 6i.Comments: E. Impact Justification and Mitigation 1.Avoidance and Minimization la.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: 1.Steepening of roadway fill slopes within jurisdictional areas. 2.Stormwater was designed to avoid direct discharge into jurisdictional features to maximum extent practicable. 3.Stormwater design velocities entering jurisdictional features have beem mitigated to be non-erosive(less than 2 fps). 4.Open shoulder sections were maximized to promote sheet flow from the roadway. 5.Diffuse flow provided at outlets that do not have a well defined outfall. 6.Dissipater pads are provided in buffers at pipe outlets where channel change occurs. 1 b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Best construction practices will be adhered to. 2.Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? Yes No 2c.If yes,mitigation is required by(check all that apply): DWR Corps 2d.If yes,which mitigation option(s)will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a.Approval letter from in-lieu fee program is attached. Yes No 4b.Stream mitigation requested: (iinearfeet) 4c.If using stream mitigation,what is the stream temperature: 248 warm 4d.Buffer mitigation requested(DWR only): 4e.Riparian wetland mitigation requested: (square feet) (acres) 1086 0 4f.Non-riparian wetland mitigation requested: 4g.Coastal(tidal)wetland mitigation requested: (acres) (acres) 0 0 4h.Comments Mitigation will be secured from NCDMS 6. Buffer mitigation (State Regulated Riparian Buffer Rules)- required by DWR 6a.Will the project result in an impact within a protected riparian buffer that requires buffer mitigation?If yes,you must fill out this entire form-please contact DWR for more information. Yes No 6b.If yes,then identify the square feet of impact. 6c.Reason for impact 6d.Total impact(square Multiplier 6e.Required mitigation feet) (square feet) IF Zone 1 0 0 Zone 2 1,085 1,085 6f.Total buffer mitigation required 1085 6g.If buffer mitigation is required,is payment to a mitigation bank or NC Division of Mitigation Services proposed? Yes No 6j.Comments: Mitigation will be secured from NCDMS F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance(lower SHWT) Wetland Swale(higher SHWT) Other SCM that removes minimum 30%nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* Yes No Comments: A stormwater management plan is attached. G. Supplementary Information 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* Yes No 1 b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* Yes No 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* Yes No Comments:* This project included a Minimum Criteria Determination Checklist(MCDC).Review by the state clearing house is no longer a requirement. 2.Violations (DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality? Yes No 3b.If you answered"no,"provide a short narrative description. Due to the minimal transportation impact resulting from this project,this project will neither influence nearby land uses nor stimulate growth.Therefore,a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5d.Is another Federal agency involved?* Yes No Unknown 5e.Is this a DOT project located within Division's 1-8? Yes No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NRTR,FAC,Field Surveys.Habitat is present for Schweinitz's sunflower and small-whorled pogonia. Schweinitz's sunflower habitat is present on site in the form of disturbed roadside rights-of-way.Habitat was surveyed on September 11,2019 by RK&K biologists,one species of Helianthus was observed onsite and determinded to be Helianthus maximiliani.A review of the NCNHP database,updated April 2019,revealed no occurrences within 1.0 mile of the study area.This project will have no effect on the species. Small whorled pogonia habitat in the form of dry deciduous woods and moist slopes are present on the site A review of NHP records on or updated January 22,2019 indicates no known occurrences within 1.0 mile of the study area.A survey was conducted,and no specimens were observed.This project will have no effect on small whorled pogonia. 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?" Yes No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?" https://www.habitat.noaa.gov/apps/efhmapper/ 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* Minimum Criteria Determination Checklist(MCDC) 8. Flood Zone Designation (Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b.If yes,explain how project meets FEMA requirements: Hydrologic model.MCA program. 8c.What source(s)did you use to make the floodplain determination?* Hydrologic modeling HEC-RAS hftps://msc.fema.gov/portal/search FEMA Maps Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document U-4015A_Permit_Application_v3.pdf 15.96MB PRE_app_request.pdf 124.57KB U-4015A_MCDC_FINAL.pdf 8.91 MB U-4015A-Permit_Drawings.pdf 6.37MB File must be PDF or KMZ Comments Signature By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief';and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: W.R.Archer III,PE Signature Date 8/29/2022