Loading...
HomeMy WebLinkAboutGW1-2022-07891_Well Construction - GW1_20220825 WELL CONSTRUCTION RECORD For Internal use ONLY: This form can be used for single or multiple wells 1.Well Contractor Information: Gary Justice 14.WATER ZONES FROM TO DESCRIPTION Well Contractor Name 300 fL 320 fL 2 G P M NCWC 2150-A fL ft. NC Well Contractor Certification Number 15.OUTER CASING(for multi-cased wells)OR LINER(if applicable) g FROM TO fL DR THICKNESS MATERIAL Justice well Drilling, INC 0 fL 110 61/8 in. DR 21 Company Name 16.INNER CASING OR TUBING(geothermal closed-loop) SW21 -0504 FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: ft. ft. in• List all applicable well permits(i.e.County,State, Variance,Injection,etc) ft. ft. in. 3.Well Use(check well use): 17.SCREEN Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ElAgricultural ❑Municipal/Public ft ft. in. ❑Geothermal(Heating/Cooling/Coolin Supply) XResidential Water Supply tt' ft. in. ( g g PPY) PPY ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT ❑Irri ation 0 ft. 1 fL Hole Plug 1 Poured Non-Water Supply Well: ❑Monitoring El Recovery 0 fL 21 ft- Easy seal 1 Bag pumped Injection Well: 108 fL 110 fL Hole Plug 1 Poured ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stormwater Drainage fL fL ❑Experimental Technology ❑Subsidence Control 20.DRILLING LOG attach additional sheets if necessary) ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION color,hardness,soilfrock a rain size,etc. El Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) 0 u' 104 u' Dirt ,Rock 8/24/22 104ft- 605 ft- Granite Quarts 4.Date Well(s)Completed: Well ID# ft ft 5a.Well Location: ft ft Charlie Owens C/O LJCH ft ft Facility/Owner Name Facility ID#(if applicable) ft. ft. 2685 IVY RAYS NEBO N.Q Lot 47 ft. ft Physical Address,City,and Zip 21.REMARKS Mcdowell 173400147674 County Parcel Identification No.(PIN) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22 rtification: (if well field,one lat/long is sufficient) 35.76127 N - 81 .92692 W 8/24/22 Signature of Certif Well Co ctor Date 6.Is(are)the well(s): XPermanent or ❑Temporary By signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or XNo copy of this record has been provided to the well owner. If this is a repair,fill out known well construction information and explain the nature of the repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8.Number of wells constructed: 1 construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONLY with the same construction,you can submit one.form. SUBMITTAL INSTUCTIONS 9.Total well depth below land surface: 605 (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths if different(example-3@200'and 2@100') construction to the following: 10.Static water level below top of casing: 60 (ft) Division of Water Resources,Information Processing Unit, Ifwater level is above casing,use"+" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6 1/4 (in) 24b. For Iniection Wells ONLY: In addition to sending the form to the address in Rotar 24aabove, also submit a copy of this form within 30 days of completion of well 12.Well construction method: y construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield m 2 Method of test: Air 24c.For Water Supply&Injection Wells: �p ) Also submit one copy of this form within 30 days of completion of 13b.Disinfection type: C I o r i n e Amount: 73% well construction to the county health department of the county where constructed. Form GW-1 North Carolina Department of Environment and Natural Resources-Division of Water Resources Revised August 2013