Loading...
HomeMy WebLinkAbout20221168 Ver 1_ePCN Application_20220829DWR Division of Water Resources Initial Review Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. Pre -Filing Meeting Date Request was submitted on: 6/14/2022 BIMS # Assigned* Version#* 20221168 1 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Reviewing Office* Winston-Salem Regional Office - (336) 776- 9800 Information for Initial Review What amout is owed?* $240.00 $570.00 Select Project Reviewer* Sue Homewood:eads\slhomewood la. Name of project: Chandler NRCS-EQIP Stream Restoration Project la. Who is the Primary Contact?* Jeff Belflower 1 b. Primary Contact Email:* lc. Primary Contact Phone:* jeff@belflowerfarm.com (828)980-5715 Date Submitted 8/29/2022 Nearest Body of Water MIDDLE PRONG ROARING RIVER Basin Yadkin-PeeDee Water Classification C;Tr Site Coordinates Latitude: 36.363360 A. Processing Information Longitude: -81.124104 County (or Counties) where the project is located: Wilkes Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No la. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) lc. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 27 - Restoration NWP Numbers (for multiple NWPS): ld. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?* Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information ld. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project?* Yes No 2. Owner Information 2a. Name(s) on recorded deed: CHANDLER, WINBORNE S 2b. Deed book and page no.: 0976/0047 2c. Contact Person: NA 2d. Address Street Address 1244 ARBOR RD # 172 Address Line 2 City WINSTON SALEM Postal /Zip Code 27104 401 Water Quality Certification - Express Riparian Buffer Authorization State / Province / Region NC Country USA Yes No Yes No 2e. Telephone Number: 2f. Fax Number: (336)403-7679 2g. Email Address:* chanborne@msn.com 4. Agent/Consultant (if applicable) 4a. Name: Jeff Belflower 4b. Business Name: Jefferson Belflower, PE 4c. Address Street Address 452 Luckadoo Rd Address Line 2 City State / Province / Region Bostic NC Postal / Zip Code Country 28018 USA 4d. Telephone Number: 4e. Fax Number: (828)980-5715 4f. Email Address: * jeff@belflowerfarm.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) lc. Nearest municipality / town: Traphill 2. Project Identification 2a. Property Identification Number: 2101985 2c. Project Address Street Address 2242 MOXLEY RD Address Line 2 City Hays Postal / Zip Code 28635 3. Surface Waters 3a. Name of the nearest body of water to proposed project: * MIDDLE PRONG ROARING RIVER 3b. Water Resources Classification of nearest receiving water: * C;Tr 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401010404 4. Project Description and History 2b. Property size: 57.4 State / Province / Region NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The current condition of these two small streams and adjacent riparian area is very poor. Bank erosion is evident throughout the proposed project reach and active erosion continues to erode multiple mass wasting banks at the site. The health of the riparian corridor is poor; little riparian buffer or bedform diversity is currently present. The land use surrounding the proposed project consists mostly of pasture, hayland, and forests. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? * Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 1200 4h. Explain the purpose of the proposed project:* The landowner has been approved for an Environmental Quality Incentives Program (EQIP) contract with the US Department of Agriculture's Natural Resources Conservation Service (NRCS) to stabilize and restore this stream and to plant native riparian vegetation. Currently, the streambanks are eroding causing impairment to water quality and instream aquatic habitat. The proposed stream restoration project will restore about 672 feet of this stream by improving channel and bank stability, as well as installation of trees and shrubs to create a riparian buffer consisting of native species. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The proposed stream restoration project will restore approximately 672 feet of two small tributaries with the goal of improving natural ecological conditions and streambank stability. The stream will be restored by grading the channel and streambanks to a naturally stable morphology and adding native vegetation adapted to site conditions for bank protection and soil strength. Natural channel design in -stream structures will be used to maintain grade control, enhance bedform diversity, and protect streambanks from erosive hydraulic forces. Erosion control matting, live stakes, bare root seedlings, vegetation plugs, and temporary and permanent seeding will be established to support long term stream health. The project will have a positive impact on the downstream watershed by reducing sediment loading and creating a shaded woody stream buffer to help maintain water temperature. Equipment used to construct the project will include a tracked hydraulic excavator with a hydraulic thumb, loaders, and dump trucks/trailers. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes Comments: No • Unknown 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? NA D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Open Waters 3. Stream Impacts Streams -tributaries Pond Construction Buffers 3a. Reason for impact (2) 3b.Impact type* 3c. Type of impact* 3d. S. name* 3e. Stream Type * (2) 3f. Type of Jurisdiction* 3g. S. width 3h. Impact length* Si Stream Restoration and Enhancement Permanent Stabilization UT MIDDLE PRONG ROARING RIVER Perennial Both 2 Average (feet) 672 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 672 3i. Total stream and ditch impacts: 672 3i. Total temporary stream impacts: 0 3j. Comments: Impacts to the 672 feet of stream channel include the installation of j-hooks, log steps, and constructed riffles. These structures are needed to maintain grade, reduce shear stress along the streambanks, and to enhance bedform diversity. This will result in a long-term positive impact to instream aquatic habitat. E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Stream restoration is needed to achieve ecological objectives and to enhance water quality within the project reach and downstream receiving waters. Impacts will be minimized by maintaining the existing channel and minimal existing buffer as much as possible. lb. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Construction impacts will be minimized by limiting in -channel work to low -flow conditions and working in the dry as much as possible. Streambanks and other disturbed areas will be stabilized as soon as possible using seed, straw, and biodegradable erosion control matting. Appropriately sized equipment will be used to minimize soil compaction. Experienced stream restoration contractors will work efficiently to minimize the time of disturbance. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Compensatory mitigation is not required for activities authorized by NWP 27 since this activity will result in net increases in aquatic functions and services. F. Stormwater Management and Diffuse Flow Plan (required by DWR) u 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Other SCM that removes minimum 30% nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? x Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * Yes No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* Yes No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?* Yes No Comments:* Awaiting NRCS cultural resources review to finalize in-house NEPA review initiated by the local NRCS field office. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* Yes No 3b. If you answered "no," provide a short narrative description. This site will be maintained as a farm. No additional development will occur resulting from the completion of this project. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5d. Is another Federal agency involved?* Yes What Federal Agency is involved? USDA-NRCS 5e. Is this a DOT project located within Division's 1-8? Yes No No Unknown 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The proposed restoration is not expected to impact any federally listed species nor designated critical habitat due to the existing state of the project area (frequently hayed pasture/cropland with minimal riparian buffer and poor channel conditions). The US Fish and Wildlife Critical Habitat Mapper, IPaC, and Asheville Field office websites were consulted. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * NOAA EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NRCS and SWCD cultural resources reviews for past projects near this site have not found any cultural resources. A cultural resources review for this site will be completed before construction begins. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b. If yes, explain how project meets FEMA requirements: The site is designated as a 100 year floodplain due to it's proximity to the Middle Prong Roaring River. The proposed project will not reach the confluence with the Middle Prong Roaring River and will not affect flood elevations. A floodplain permit will be obtained from the Wilkes County planning office before construction begins. 8c. What source(s) did you use to make the floodplain determination?* NC Flood Maps Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document PRELIMINARY PLANS - Chandler Stream Restoration.pdf 6.58MB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: Jefferson Belflower Signature Date 8/29/2022 UNNAMED TRIBUTARY (UT) TO MIDDLE PRONG ROARING RIVER STREAM RESTORATION WILKES COUNTY, NORTH CAROLINA PROJECT DIRECTORY LANDOWNER DUDLEY CHANDLER 336-403-7679 FUNDING AGENCY USDA-NRCS ROGER TOLEDO SUPERVISORY SOIL CONSERVATIONIST 336-838-3622, ext. 3 LOCAL PARTNER WILKES SWCD BJ COOK NWQI WATERSHED ADMINISTRATOR 336-838-3622, ext. 3 ENGINEER JEFF BELFLOWER, PE 828-980-5715 jeff@belflowerfarm.com SHEET INDEX COVER SHEET 1.0 NOTES, SPECIFICATIONS, AND MATERIALS 2.0 EROSION & SEDIMENT CONTROL 3.0 STREAM RESTORATION 4.0 RE -VEGETATION 5.0 touritain Serenity 2 h Y =•y 11 36° 21' 49.2" N 81°07'26.0"W STONE MOUNTAIN STATE PARK Abshers PROJECT LOCATION ='Iney Grove Chun:119 I1:rie Mountain Golf Club PRELIMINARY PLAN FOR PERMITTING 08/29/2022 828-980-5715 Prepared Sy: co co Prepared For: File Name: Chond/erStreom.dwg Last Revision: 8/29/22 10.3.3 AM Sheet 1.1 EXISTING CONDITIONS: NOTES: • EASTERN STREAM DRAINAGE AREA: 0.09 SQUARE MILES • WESTERN STREAM DRAINAGE AREA: 0.3 SQUARE MILES • SITE LOCATION:: 36' 21' 49.2" N; 81' 07' 26.0" W SUMMARY OF PROPOSED PROJECT: This stream restoration project will address instabilities along approximately 672 feet of two small tributaries to the Middle Prong Roaring River. The channel is migrating laterally in multiple meander bends. This process is actively eroding vertical mass wasting banks throughout the proposed project reach. Instabilities exist throughout the reach. Additionally, the stream does not hove adequate access to a floodplain. The objective of the proposed project will be to use natural channel design methodology to address the stream's dimension, pattern, and profile to improve sediment transport and stop bank erosion. Pattern or alignment will be corrected to a tolerable range and he/d in p/ace with multiple structures including bou/der steps, /og steps, and j-hooks. These structures will also maintain a stable channel dimension and profile created through construction activities. Native herbaceous and woody vegetation will be installed to create a high quality riparian corridor GENERAL PROJECT SPECIFICATION AND NOTES 1. EXTREME CARE AND DILIGENCE SHALL BE EXERCISED BY THE CONTRACTOR TO ASSURE THE SAFETY OF PERSONS, ANIMALS, AND PROPERTY. THE CONTRACTOR SHALL MAINTAIN ALL LIGHTS, GUARDS, SIGNS, TEMPORARY PASSAGES, OR OTHER PRECAUTIONS NECESSARY FOR THE SAFETY OF ALL PERSONS. THE CONTRACTOR SHALL ABIDE BY ALL SAFETY RULES AND CONSTRUCTION CONDITIONS REQUIRED BY GOVERNMENTAL AUTHORITIES AND OTHER ENTITIES, INCLUDING RAILROADS, SO THE PUBLIC IS SAFEGUARDED FROM ACCIDENTS AND DELAYS. GUARDS AND FLAGS REQUIRED BY GOVERNMENTAL OR RAILROAD AUTHORITIES SHALL BE PROVIDED AT THE CONTRACTOR'S EXPENSE, UNLESS DIRECTED OTHERWISE BY THE DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL AT NO TIME COMPROMISE EITHER SAFETY OR ENVIRONMENTAL REQUIREMENTS. 2. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY THE LANDOWNER PRIOR TO USE. 3. NO FILL IN WETLANDS MAY OCCUR. ALL EXCESS SOILS FROM STREAM STABILIZATION AND CHANNEL WORK SHALL BE DISPOSED OF IN OLD STREAM CHANNEL OR TO OTHER AREAS. 4. SITE SHOULD BE "STORM READY" AT THE END OF EACH WORK WEEK. TOPOGRAPHIC SPECIFICATIONS AND NOTES 5. ELECTRONIC SURVEY DATA, BASE DRAWINGS, AND SITE DATA WERE DEVELOPED BY TURNER LAND SURVEYING PLLC. 6. HORIZONTAL DATUM IS NAD83(2011) & VERTICAL DATUM IS NAVD88. ALL COORDINATES ARE BASED ON NAD83(2011) AND ALL ELEVATIONS ARE BASED ON NAVD88. 7. EXISTING GROUND SURFACES WERE DEVELOPED BASED ON COMBINING AND MERGING LiDAR DATA AND A SITE SURVEY. SOME CHANGES MAY HAVE OCCURRED SINCE THE SURVEY WAS COMPLETED. VERTICAL ACCURACY OF EXISTING GROUND IS ± 1 FOOT. 8. THE PROPOSED ELEVATIONS AND GRADES SHOWN HEREIN ARE BASED ON THE DATA DESCRIBED ABOVE THAT ENCOMPASSES THE EXISTING GROUND SURFACE FROM WHICH ALL COMPUTATIONS OF CUT AND FILL ARE BASED. SLIGHT DISCREPANCIES BETWEEN THE EXISTING GROUND AND DIGITAL SURFACE AND FIELD CONDITIONS CAN RESULT IN VARIATIONS OF TOTAL EXCAVATED QUANTITIES. 9. THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION STAKEOUT. THE ENGINEER WILL BE AVAILABLE FOR VERIFICATION AND ASSISTANCE DURING STAKEOUT OF THE PLANS. STREAM RESTORATION SPECIFICATIONS AND NOTES 10. FIELD CONDITIONS AND PROJECT VARIABILITY MAY REQUIRE ADAPTATION OF THE PLANSHEETS AND/OR DETAILS PROVIDED IN THE CONSTRUCTION DOCUMENTS DEPENDING ON SITE CONDITIONS OR PROJECT NEEDS. MINOR VARIATION(S) OR ADAPTATION(S) OF THE PROPOSED WORK SHOWN ON THE PLANSHEETS AND/OR DETAILS ARE CONSIDERED INCIDENTAL TO THE WORK. 11. WHERE PRACTICABLE, EXISTING TREES AND VEGETATION SHOULD BE LEFT IN PLACE TO FACILITATE NATURAL REGENERATION AND SOIL STABILIZATION. 12. THE CONTRACTOR SHALL STAKE OUT THE PROPOSED STREAM CENTERLINE IN APPROXIMATELY 500 FT SECTIONS USING SURVEYING EQUIPMENT FOR REVIEW BY THE ENGINEER BEFORE BEGINNING EXCAVATION AND GRADING. DEPENDING ON ENCOUNTERED CONDITIONS SOME SHIFTING OF THE STREAM ALIGNMENT MAY BE NECESSARY. PRIOR TO CLEARING AND GRUBBING, THE CONTRACTOR SHALL MARK THE LIMITS OF CLEARING NEAR TREES FOR VERIFICATION OF INTENT BY THE ENGINEER. SOME MINOR ADJUSTMENT OF CHANNEL ALIGNMENT MAY BE REQUIRED TO PRESERVE TREES OR MINIMIZE IMPACT TO TREES. 13. ANY HARVESTING OF TREES FROM ONSITE MUST BE APPROVED BY THE ENGINEER. CONTRACTOR SHALL MINIMIZE, TO THE MAXIMUM EXTENT POSSIBLE, IMPACTS TO THE ADJACENT TREES. 14. CONTRACTOR SHALL USE AN EXCAVATOR WITH A HYDRAULIC THUMB TO INSTALL IN -STREAM STRUCTURES. 15. ELEVATIONS OF TRIBUTARIES AT CONFLUENCES MAY NEED TO BE ADJUSTED TO MEET CONSTRUCTED CONDITIONS. ADJUSTMENTS SHALL BE MADE IN CONJUNCTION WITH THE ENGINEER. PROFILES MAY NEED TO BE ADJUSTED TO AVOID ABRUPT CHANGES IN ELEVATION. ADJUSTMENTS SHALL BE MADE IN CONJUNCTION WITH THE ENGINEER. 16. STREAM RESTORATION WORK SHALL BE IMPLEMENTED BY FIRST GRADING THE FLOODPLAIN ADJACENT TO THE CHANNEL TO THE ELEVATIONS AND GRADES SPECIFIED IN THE PLANSHEETS. THE PROPOSED STREAM CHANNEL SHALL THEN BE EXCAVATED TO THE CHANNEL CROSS-SECTION GEOMETRY AND LONGITUDINAL PROFILE IN THE CONSTRUCTION DOCUMENTS. THIS CHANNEL WORK SHALL BE DONE WITH LOW GROUND PRESSURE TRACK EQUIPMENT. PLANSHEETS PROVIDE DIMENSIONS, ELEVATIONS AND SLOPES TO AID IN CONSTRUCTION OF THE CHANNEL. THE THALWEG CAN FIRST BE EXCAVATED TO THE ELEVATION SPECIFIED IN THE LONGITUDINAL PROFILE AND EXCAVATION AND FINE GRADING OF THE CROSS -SECTIONS SHALL THEN BE PERFORMED. 17. BANKFULL CHANNEL DIMENSIONS WILL BE HELD TO THE DIMENSIONS SHOWN ON THE TYPICAL CROSS-SECTION PLANSHEETS. ELEVATIONS SHALL BE CONSTRUCTED WITHIN 0.1' (VERTICAL). WIDTHS AND DEPTHS MUST FALL WITHIN RANGES SHOWN IN THE PLANSHEETS. CHANNEL CROSS-SECTION DIMENSIONS SHALL BE WITHIN 0.2' (HORIZONTAL). IF THE EXISTING GROUND IS LESS THAN 0.2' HIGHER THAN THE PROPOSED BANKFULL ELEVATION, IT IS NOT NECESSARY TO EXCAVATE TO THE PROPOSED ELEVATIONS AND GRADES IN THE CONSTRUCTION DOCUMENTS. 18. THE CONTRACTOR SHALL UTILIZE NATIVE ONSITE ROCK, WOOD, AND VEGETATION MATERIALS WHERE AVAILABLE AND APPROVED BY THE ENGINEER. 19. WOOD AND ROCK STRUCTURES MAY BE SUBSTITUTED TO FIT FIELD CONDITIONS AND AVAILABLE MATERIALS. 20. ALL FILTER FABRIC SHALL BE 80Z. NONWOVEN GEOTEXTILE UNLESS OTHERWISE SPECIFIED IN STRUCTURE DETAILS OR SPECIFICATIONS. FILTER FABRIC SHALL BE TRIMMED TIGHT TO THE SURFACE OF THE STRUCTURE AND SHOULD NOT BE OBSERVED BY VISUAL INSPECTION. 828-980-5715 Prepared Sy: co co DUDLEY CHANDLER STREAM RESTORATION PROJECT NOTES File Name: Chond/erStreom. d 'g Last Revision: 8/29/22 10.3.3 AM Sheet 2.1 STANDARD LINES AND SYMBOLS EXISTING GIS PARCEL BOUNDARY 315 - EXISTING MAJOR CONTOUR STREAM RESTORATION SPECIFICATIONS AND NOTES CONTINUED 21. AFTER THE STRUCTURE IS COMPLETE AND UNDIVERTED FLOW IS RESTORED TO THE CHANNEL, SOME ADJUSTMENT TO THE STRUCTURE OR ADDITIONAL STABILIZATION MEASURE MAY BE NECESSARY TO ACHIEVE THE DESIRED FUNCTION. 22. THIS STREAM IS A STEEP MOUNTAIN HEADWATER STREAM. CHANNEL ALIGNMENT MAY NOT EXACTLY MATCH TYPICAL PT AND PC PLAN VIEW ALIGNMENT SEEN IN LARGER STREAM SYSTEMS, BUT IN GENERAL RIFFLES WILL BE STRAIGHT AND POOLS FORMED BY IN -STREAM STRUCTURES W1LL BE CURVED. IN -STREAM STRUCTURE DETAILS ARE GENERALLY ACCURATE BUT FIELD CONDITIONS MIGHT NECESSITATE MODIFICATION TO ACCOMMODATE THE NARROW AND STEEP NATURE OF THIS STREAM. 23. THE CONSTRUCTED CHANNEL SHALL BE STABILIZED AS SOON AS POSSIBLE BY TEMPORARY AND PERMANENT SEEDING, ADDING STRAW MULCH TO BARE SOIL AND INSTALLING EROSION CONTROL MATTING FROM THE TOE OF THE BANKFULL CHANNEL TO 4' BEYOND THE BANKFULL STAGE. SEED SHALL BE BROADCAST EVENLY OF THE AREA USING A BROADCAST SPREADER PRIOR TO COVERING WITH THE EROSION CONTROL MATTING. THE MATTING SHALL BE ROLLED OUT IN THE DIRECTION OF ANTICIPATED RUNOFF FLOW. INSTALL MATTING IN ACCORDANCE WITH THE DETAIL INCLUDED IN THE CONSTRUCTION DOCUMENTS. REWORKING OF AREAS THAT DO NOT ESTABLISH VEGETATION OR BECOME UNSTABLE SHALL BE NECESSARY IF THE MATTING SEPARATES FROM THE SOIL. 24. THE HARVESTING AND INSTALLATION OF LIVE STAKES SHALL BE PERFORMED ONLY DURING THE DORMANT SEASON, TYPICALLY BETWEEN 314 EXISTING MINOR CONTOUR DECEMBER 1 AND MARCH 1. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 7 DAYS PRIOR TO HARVESTING TO REVIEWAND APPROVE ALL HARVESTING SITES AND SPECIES. -"--/ EXISTING TREE LINE PROPOSED CONSTRUCTED RIFFLE WITH OFFSET BOULDER STEPS PROPOSED BOULDER J-HOOK VANE/STEP PROPOSED LOG STEP PROPOSED BOULDER CROSS VANE/STEP PROPOSED CONSTRUCTION ENTRANCE / CROSSING PROPOSED SILT FENCE — °— Lo— LIMITS OF DISTURBANCE EXISTING CHANNEL CENTERLINE PROPOSED CHANNEL BANKFULL PROPOSED CHANNEL CENTERLINE RIFFLE PROPOSED CHANNEL CENTERLINE POOL 25. LIVE STAKES SHALL BE INSTALLED ALONG THE TOE OF SLOPE ON OUTSIDE MEANDER BENDS OF POOLS AND IN RIFFLES WHERE SHOWN ON THE RE -VEGETATION PLAN. LIVE STAKES SHALL BE INSTALLED THROUGH THE EROSION CONTROL MATTING TO A DEPTH THAT REACHES THE WATER TABLE OR AT LEAST 12" DEEP. 26. EXCESS EARTH MAY BE USED TO BACKFILL THE OLD CHANNEL OR SPREAD IN OTHER LOCATIONS WITHIN THE PROJECT AREA THAT ARE APPROVED BY THE ENGINEER. 27. FILL AREAS SHALL BE SEEDED W1TH TEMPORARY VEGETATION WITHIN 14 DAYS OF GRADING. THE PLACEMENT OF STRAW MULCH SHALL OCCUR WITHIN 48 HOURS OF SEEDING. MULCH SHALL BE SPREAD TO COVER DISTURBED CHANNEL AND FLOODPLAIN AREAS. MULCH SHALL BE KEPT OUT OF THE CROWNS OF SHRUBS AND GROUND COVER. QUANTITIES AND MATERIALS SPECIFICATIONS 28. THE EROSION CONTROL MEASURES DEPICTED ON THE PLANS ARE TO BE INSTALLED AS NEEDED TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. ADDITIONAL EROSION CONTROL MEASURES (ABOVE THOSE SHOVVN ON THE PLANS AND ON THE QUANTITIES AND MATERIALS LIST) MAY BE REQUIRED IN ORDER TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER PRIOR TO INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES. 29. ANY ADDITIONAL GRADING OTHER THAN WHAT IS SHOVVN ON THE PLANS SHALL REQUIRE PRIOR APPROVAL FROM THE ENGINEER. ANY ADDITIONAL AREAS OF DISTURBANCE (CHANGES IN ACCESS, GRADING, CLEARING, ETC.) W1LL REQUIRE APPROVAL FROM THE ENGINEER. 30. THE USE OF ANY BRAND NAMES/MANUFACTURERS OR MODELS IS INTENDED SOLELY TO DENOTE THE QUALITY STANDARD OF THE DESIRED PRODUCT. ANY USE OF BRAND NAMES IS NOT INTENDED TO RESTRICT BIDDERS TO A SPECIFIC BRAND, MAKE, MANUFACTURER, OR NAME. THE BRAND NAMES / MANUFACTURERS OF MODELS ARE INTENDED TO CONVEY THE GENERAL STYLE, TYPE, CHARACTER, AND QUALITY OF PRODUCT. EQUIVALENT PRODUCTS WILL BE ACCEPTABLE IF THE PROJECT OWNER OR ENGINEER HAS GIVEN APPROVAL OF THE SPECIFIC PRODUCT IN WRITING. 31. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROVIDING STORAGE AREAS FOR CONSTRUCTION MATERIALS AND EQUIPMENT. THE MATERIAL AND EQUIPMENT STORAGE SHALL COMPLY W1TH THE CONSTRUCTION DOCUMENTS AND ALL LOCAL, STATE AND FEDERAL REGULATIONS THROUGHOUT THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL RESTORE THE STORAGE AREA TO ITS ORIGINAL (OR BETTER) CONDITION UPON COMPLETION OF THE PROJECT OR UPON SUCH TIME AS DIRECTED BY JE OR RI. SUCH RESTORATION SHALL BE AT NO ADDITIONAL COST. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEGUARDING OF MATERIALS AND EQUIPMENT AGAINST FIRE, THEFT AND VANDALISM AND SHALL NOT HOLD RI, JE, OR LANDOWNER RESPONSIBLE IN ANY WAY FOR THE OCCURRENCES OF SAME. IF NECESSARY, THE CONTRACTOR SHALL FURNISH AND ERECT, AT NO ADDITIONAL COST, WHATEVER WORKS MAY BE NECESSARY FOR THE PROTECTION OF THE PUBLIC AND SAFEGUARDING OF EQUIPMENT, INCLUDING BUT NOT LIMITED TO BARRICADES, FENCES, ETC. 32. THE CONTRACTOR SHALL ESTABLISH, PROVIDE AND MAINTAIN AN EFFECTIVE QUALITY CONTROL PROGRAM THAT DETAILS THE METHODS AND PROCEDURES TO BE TAKEN TO ASSURE THAT ALL MATERIALS AND COMPLETED WORK REQUIRED FOR THE PROJECT, CONFORM TO THE CONSTRUCTION DOCUMENTS. ALTHOUGH GUIDELINES ARE ESTABLISHED AND CERTAIN MINIMUM REQUIREMENTS ARE SPECIFIED HEREIN AND ELSEWHERE IN THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR IS FULLY RESPONSIBLE FOR DEVELOPING AND EXECUTING THEIR OWN QUALITY CONTROL PROGRAM. THE CONTRACTOR SHALL PERFORM INSPECTION, TESTING, AND MEASUREMENT OF ALL ITEMS OF WORK REQUIRED BY THE CONSTRUCTION DOCUMENTS AND TECHNICAL SPECIFICATIONS, INCLUDING THOSE PERFORMED BY SUBCONTRACTORS. REVIEW OF THE MATERIALS AND COMPLETED WORK BY RI AND JE DOES NOT RELIEVE THE CONTRACTOR OF PERFORMING QUALITY CONTROL INSPECTIONS/REVIEW OF THE CONTRACTOR'S AND/OR SUBCONTRACTOR'S WORK. 828-980-5715 Prepared Sy. DUDLEY CHANDLER STREAM RESTORATION LEGEND, QUANTITIES, AND NOTES File Name: ChondlerStreom. dwg Last Revision: 8/29/22 10.33 AM Sheet 2.2 _UTILIZE PRIVATE DRIVE AS CONSTRUCTION ENTRANCE TEMPORARY STOCKPILE AND STAGING AREA CAUTION! Before Starting Excavation Check for Underground Utilities CALL 811 828-980-5715 Prepared Sy: co o Nc CO o0i in L DUDLEY CHANDLER STREAM RESTORATION EROSION AND SEDIMENT CONTROL PLAN File Name: Chond/erStreom.dwg Last Revision: 8/29/22 10.3.3 AM Sheet 3.1 EXISTING ROADWAY 50' MIN. BUT SUFFICIENT TO KEEP SEDIMENT ON SITE 00 googs:SY.soo oog000g 004� 2'- 3' STONE TO BE USED ( SURGE STONE OR RAILROAD BALAST) 0000 DDSs o0 000 3,363o PLAN EXISTING ROADWAY 6" MIN 25' OR FULL WIDTH OF PROPOSED STREET OR ENTRANCE, WHICHEVER IS GREATER. 35' MIN. NOTES: 1 PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2 IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE STONE, THEN THE TIRES OF THE VEHICLE MUST BE WASHED BEFORE ENTERING THE PUBLIC ROAD. 3 IF A PROJECT CONTINUES TO PULL MUD AND DEBRIS ON TO THE PUBLIC ROAD, THE GOVERNING AUTHORITY WILL CLEAN THE AREA AND INVOICE THE FINANCIALLY RESPONSIBLE PERSON AS INDICATED ON THE FINANCIAL RESPONSIBILITY FORM. 15'MIN. NEW CONSTRUCTION �o oS o08 00 t12"MIN_ � o r o s o§go oo�goso�o ��32�� 1Slllll-ll�"� —IIII I I-IIIII '11F=IIIII=IIII IIII— 0 000 FABRIC UNDER STONE IIIII— CONSTRUCTION ENTRANCE CROSS SECTION EROSION AND SEDIMENTATION CONTROL MEASURES DURING PROJECT IMPLEMENTATION, BMPS/CONSERVATION MEASURES WLL BE IMPLEMENTED TO REDUCE SEDIMENTATION INTO THE STREAM. EFFORTS WLL BE MADE TO LIMIT AND EXPEDITE EQUIPMENT TIME IN THE STREAM CHANNEL. WHEN POSSIBLE, WORK WLL OCCUR FROM THE STREAMBANKS. THE DESIGN ATTEMPTS TO MINIMIZE SEDIMENTATION AND OTHER POTENTIALLY NEGATIVE IMPACTS THROUGH THE FOLLOWING PRACTICES: 1. EXCAVATION AND GRADING ON THE SITE IS BALANCED. NO EARTH SHOULD BE REMOVED FROM THE LOD. 2. THE CONTRACTOR WILL BE REQUIRED TO STAGE AND STORE EQUIPMENT AND MATERIALS AT LEAST 25 FEET FROM TOP OF BANKS. 3. EQUIPMENT WILL BE WELL -MAINTAINED, CLEANED PRIOR TO MOBILIZATION, AND CHECKED DAILY FOR LEAKS OF PETROLEUM PRODUCTS. 4. FUELING WLL BE PERFORMED IN A CONTAINED AREA AWAY FROM SURFACE WATER. 5. THE CONTRACTOR WLL BE REQUIRED TO STAGE WORK SUCH THAT DISTURBED AREAS WLL BE STABILIZED IN PHASES WITH SEEDING, MULCH AND BIODEGRADABLE (COIR) EROSION CONTROL MATTING (WHERE APPROPRIATE). 6. ALL TREES, UTILITIES AND OTHER SITE FEATURES WILL BE PROTECTED UNLESS MARKED FOR REMOVAL OR RELOCATION. 7. WORK IN THE STREAM CHANNEL SHALL BE CONDUCTED "IN THE DRY" TO THE EXTENT POSSIBLE. 8. ALL WORK ADJACENT TO STREAM WATERS WILL BE CONDUCTED IN A DRY WORK AREA TO THE EXTENT POSSIBLE. 9. TO THE EXTENT POSSIBLE, CONSTRUCTION WILL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW. 10.CONSTRUCTION ACTIVITIES SHALL NOT OCCUR IN THE CHANNEL DURING WET WEATHER OR STORM FLOWS. 11.CONSTRUCTION SCHEDULING AND STAGING WILL BE TIMED TO MINIMIZE THE AMOUNT OF TIME SPENT WORKING IN THE STREAM CHANNEL. 12.THE PROPOSED WESTERN STREAM CHANNEL CAN BE CONSTRUCTED AND STABILIZED COMPLETELY IN THE DRY BEFORE WATER IS RELEASED INTO THE CHANNEL AND THE OLD CHANNEL IS PLUGGED. 13.APPROPRIATELY SIZED EQUIPMENT WILL BE UTILIZED TO PREVENT EXCESSIVE COMPACTING AND MINIMIZE CLEARING. STEEL POST WOVEN WIRE FABRIC FILL SLOPE GRADE °N \sLT,NCE CEarIXnLE FABRIC IIIII-IIIII II 111 VARIABLE AS DIRECTED BY THE ENGINEER SIDE VIEW APPROVED SEDIMENT FILTERING DEVICE (SEDIMENT FILTER BAG). PROVIDE POSITIVE DRAINAGE FROM SEDIMENT FILTER BAG TO STREAM. DISCHARGE ONTO STABLE RIPRAP PAD TO PREVENT SCOUR HOLE SILT FENCE FABRIC INSTALLED TO SECOND WIRE FROM TOP PLASTIC OR WIRETES III III III III III III III III III III III III 11111 III III 1111111 111111111=1r FRONT VIEW NOTES 1 FLOW SHALL NOT RUN PARALLEL WITH THE FENCE 2 END OF SILT FENCE NEEDS TO BE TURNED UPHILL SEDIMENT NRNO CONSIDERATIONS SET FO CONDITIONS TIONCRTERA_ PRACTICE APPLIES, PLA MIN 10. LINEWIRES SILT FENCE DISCHARGE HOSES WORK AREA LENGTH NOT TO EXCEED THAT WHICH CAN BE COMPLETED IN ONE DAY INTERMEDIATE WIRES GRADE STREAM DIVERSION PUMP INTAKE HOSE ANIBANI SUMP -HOLE FOR POOL (17 TO 18" DEEP, 2-FT DIAMETER) NOTES 1 SANDBAG DIKES SHALL BE SITUATED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA, AND STREAM FLOW SHALL BE PUMPED AROUND THE WORK AREA. THE PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER CONSTRUCTED OF RIPRAP OR SANDBAGS. 2 WATER FROM THE WORK AREA SHALL BE PUMPED TO A SEDIMENT FILTERING MEASURE SUCH AS A SEDIMENT BAG OR OTHER APPROVED DEVICE. THE MEASURE SHALL BE LOCATED SUCH THAT THE WATER DRAINS BACK INTO THE CHANNEL BELOW THE DOWNSTREAM SANDBAG DIKE WITHOUT CAUSING FURTHER EROSION BETWEEN THE SEDIMENT FILTER BAG AND THE STREAMBANK. THIS MEASURE MAY BE OMITTED IF TURBID WATER IS NOT ESCAR NG THE WORK AREA 3 STREAMBANKS MUST BE STABILIZED AT THE END OF EACH DAY. TEMPORARY PUMP AROUND SYSTEM ISOMETRIC VIEW STEEL POST POLY BARRICADE FABRIC (-11P1cAL) WARNING SIGN oFF SIDE VIEW ICI 40. SIDE VIEW STRAW WATTLES WIRE TIES ■■■■r--TON -■■■■1 ■■■■� �N ■■■■1 II■■■■L_=_=J■■■■111 ■■■■■■■■■■■■■■111 IIIII-1��11 11�11 CONSTRUCTON AREA DO NOT ENTER WARNING SIGN DETAIL III III III 11111=IIII I=11111=I1III -IIII I-IIII I-IIIII -III 11-II IIIII-III II-IIII I-IIIII -IIII=IIIIF NOTES OFUNGE UV RESISTANT TENSILE O POLY BARRICADE FABcmPiGLI FRONT VIEW GRADE a.n�iac�+sicus s.cuwriv�or i.er vasuan,�raxric. reonorvo Lens Fwvi onrnrc.ii rre vem�cnoii Areen. CONSTRUCTION SAFETY FENCE au rY MAXIMUM BANK HFIf`11T ICI k' /6. / II mi ICI 11i�S°� 8�g�e �, Ali / /��I, ...— I / rill L4, SURFACE FLOW DIVERSION o a °D• I Q `O STONE OVER h FILTER FABRIC STONE YI STONE APPROACH SECTION &1 MAXIMUM SLOPE ON ROAD ORIGINAL STREAMBANK STREAM CHANNEL FILTER FABRIC TEMPORARY STREAM FORD CROSSING SURFACE FLOW DIVERSION lI SURFACE FLOW DIVERSION 828-980-5715 Prepared Sy: co co DUDLEY CHANDLER STREAM RESTORATION EROSION AND SEDIMENT CONTROL NOTES File Name: Chond/erStreom.dwg Last Revision: 8/29/22 10.3.3 AM Sheet 3.2 BANK PROTECTION MEETING REQUIREMENTS DETAILED IN NRCS PRACTICE STANDARD 580 (BIOENGINEERED) WILL BE INSTALLED ON ALL DISTURBED BANKS. THIS WILL CONSIST OF PLANTING AS WELL AS BENCHING AND BANK SLOPING. EROSION CONTROL MATTING WILL BE INSTALLED AS SHOWN ON THIS SHEET EXCEPT WHERE BRUSH TOE, SOD OR WOODY TRANSPLANTS, OR OTHER METHODS OF BANK STABILIZATION ARE IMPLEMENTED. / FLOODPLAIN: 5' MIN ////%/! /// i // // PROPOSED 700 GRAM COIR EROSION CONTROL MATTING SEE DETAIL FLOODPLAIN WIDTH VARIES PER PLAN BKF WSE PROPOSED GRADE MAX DEPTH AT CENTER OF RIFFLE CROSS—SECTION PROPOSED CENTERLINE ALIGNMENT UT MIDDLE PRONG ROARING RIVER WBKF DMAX r EXISTING CROSS—SECTION DIMENSIONS AND SLOPES OF THE TWO TRIBUTARIES ARE VIRTUALLY IDENTICAL. CONSTRUCTED CHANNEL DIMENSIONS SHOWN ARE FOR THE WESTERN TRIBUTARY DIMENSIONS OF THE EASTERN TRIBUTARY WILL BE VERY SIMILAR BUT WILL BLENDED TO EXISTING CONDITIONS SINCE THE CHANNEL WILL BE STABILIZED IN PLACE. FLOODPLAIN: 5' MIN RIFFLE CROSS—SECTION SUMMARY PARAMETER VALUE A. (FT2) 7.2 WBKF (FT) 9 DBKF (FT) 0.8 D. (FT) 1.2 W/D (FT) 11.25 DMAx/D. 1.5 So (FT/FT) .02 TIE TO EXISTING PER GRADING PLAN r / / NOT TO SCALE RIFFLE CROSS -SECTIONS FLOODPLAIN: 5' MIN / PROPOSED 700 GRAM COIR EROSION CONTROL MATTING SEE DETAIL POINT BAR WIDTH VARIES PER PLAN WPOOL BKF 1 WSE 1 1 DMPOOL 1 PROPOSED CENTER LINE ALIGNMENT UT MIDDLE PRONG ROARING RIVER / DRAINAGE AREA = 0.10.3 SQUARE MILES TIE TO EXISTING PER GRADING PLAN FLOODPLAIN: 5' MIN ///! /// i // / // / POOL CROSS—SECTION SUMMARY PARAMETER VALUE Amyx 14 WPOOL 10 Dna. 1,4 DMPODL 2 AFL/ABKF 1.9 WPOOL/WBKF 1.1 DMPDOL/DBKF 1.7 / / / NOT TO SCALE POOL CROSS -SECTIONS DRAINAGE AREA = 0.10.3 SQUARE MILES 828-980-5715 Prepared Sy: co co DUDLEY CHANDLER STREAM RESTORATION PROPOSED CHANNEL CROSS —SECTIONS File Name: Chond/erStreom. d 'g Last Revision: 8/29/22 10.3.3 AM Sheet 4.1 60 1340 1330 A CONSTRUCTED RIFFLE IS UPSTREAM OF EACH IN —STREAM STRUCTURE APPROXIMATE EXISTING GROUND PROPOSED WATER SURFACE 1320 0+00 0 60 1 +00 2+00 3+00 4+00 120 180 HORIZONTAL SCALE IN FEET VERTICAL EXAGGERATION = 10: 1 Western Stream Proposed Elevations STA ELEVATION FEATURE 0 1336.0 TOP RIFFLE 24 1335.6 J-HOOK 39 1335.4 TOP RIFFLE 58 1335.0 J-HOOK 81 1334.8 TOP RIFFLE 110 1334.3 LOG STEP 128 1334.1 TOP RIFFLE 161 1333.5 J-HOOK 190 1333.3 TOP RIFFLE 216 1332.7 J-HOOK 246 1332.5 TOP RIFFLE 281 1331.9 LOG STEP 299 1331.7 TOP RIFFLE 364 1329.0 EXISTING CULVERT 828-980-5715 Prepared Sy: DUDLEY CHANDLER STREAM RESTORATION PROPOSED PLAN AND PROFILE - WESTERN STREAM File Name: Chond/erStreom.dwg Last Revision: 8/29/22 10.3.3 AM Sheet 4.2 s REPLACE EXISTING FAILING CULVERT SEE SHEET 4.9 FOR DETAILS 0+00 • • • .M A CONSTRUCTED RIFFLE IS UPSTREAM OF EACH IN —STREAM STRUCTURE 1 +00 • 4: 3/1 /d0 31 V/1 /dd CAUTION! Before Starting Excavation Check for Underground Utilities CALL 811 30 0 30 60 90 Scale in Feet EXISTING AND PROPOSED ELEVATIONS AND PROFILE ARE ALMOST IDENTICAL Eastern Stream Proposed Elevations STA ELEVATION FEATURE 0 1334.3 CULVERT INLET 20 1333.8 CULVERT OUTLET 25 1333.8 J-HOOK 38 1333.6 TOP RIFFLE 57 1333.3 J-HOOK 69 1333.1 TOP RIFFLE 101 1332.6 J-HOOK 130 1332.4 TOP RIFFLE 165 1331.8 LOG S IEP 181 1331.6 TOP RIFFLE 192 1331.4 LOGS 1EP 204 1331.2 TOP RIFFLE 221 1330.9 LOG S I'EP 236 1330.7 TOP RIFFLE 255 1330.4 J-HOOK 277 1330.2 TOP RIFFLE 308 1329.8 CONFLUENCE 828-980-5715 Prepared Sy: o co co o aii Qb j CO oin Prepared For: File Name: Chond/erStreom. d 'g Last Revision: 8/29/22 10..3.3 AM Sheet 4.3 1350 1340 1330 EXISTING AND PROPOSED CROSS -SECTIONS LOOKING DOWNSTREAM EXISTING GROUND ELEV. EXISTING DRIVEWAYS — PROPOSED GROUND ELEV. 1350 1340 1330 -0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1350 EASTE\ TR BUTAY @ 1+50 10 0 10 20 30 HOR/ZONTAL AND INERT/CAL SCALE /N FEET JIIIIIIII 1340 _ 1330 IIIIIIII IIIIIIIIII1 EXISTING GROUND ELEV. IIIIIIII (IIIIIIII IIIIIII 1350 PROPOSED GROUND ELEV. 1340 1330 -0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 WESTE\ -R3UTAY @ 2+50 828-980-5715 Prepared Sy: co 0 co DUDLEY CHANDLER STREAM RESTORATION CROSS -SECTIONS File Name: Chond/erStreom.dwg Last Revision: 8/29/22 10..3.3 AM Sheet 4,4 EXTEND RIFFLE SUBSTRATE INTO RUN MIN. 3 FT P.T. STATION PER PLAN CO\C D A RUC D P.T. ELEVATION PER PROFILE CO\C A GLIDE R _A\ RUC ED R RD CROCC C r BANKFULL WSE RC STR`BANKFULL STAGE EAMBANK TOE OF SLOPE RIFFLE SUBSTRATE MATERIAL DEPTH AND GRADATION PER NOTES 0\ A A EXTEND RIFFLE SUBSTRATE INTO RUN MIN. 3 FT P.C. STATION PER PLAN STREAMBED NOT TO SCALE P.C. ELEVATION PER PROFILE RUN NOT TO SCALE CO\C RUC R \0 C 1. ALL RIFFLE MATERIAL SHALL BE QUARRIED STONE UNLESS NATIVE MATERIAL OF SIMILAR SIZE IS AVAILABLE ONSITE AND MEETS THE CONSTRUCTED RIFFLE SUBSTRATE SIZE SPECIFICATIONS. THE ENGINEER MUST APPROVE THE USE OF ALL ONSITE NATIVE MATERIAL. 2. RIFFLE MATERIAL SHALL HAVE A GRADATION AS DEFINED IN THE TABLE WITHIN THIS DETAIL OR AS APPROVED BY THE ENGINEER. RIFFLE MATERIAL SHALL BE WELL —GRADED AND MIXED WITH EARTH WHEN IT IS PLACED IN THE CHANNEL. 3. FOR INSTALLATION, THE CONTRACTOR SHALL OVER EXCAVATE THE LENGTH OF THE RIFFLE, INSTALL 700 GRAM COIR FIBER EROSION CONTROL MATTING, KEY MATTING INTO THE RIFFLE TRENCH AND BACKFILL WITH THE SPECIFIED SELECT RIFFLE MATERIAL TO THE ELEVATIONS SHOWN ON THE PROPOSED PROFILE 4 CONSTRUCTED RIFFLE MATERIAL SHALL EXTEND A MINIMUM OF 3 FT U7S OF THE P.T. INTO THE GLIDE AND A MINIMUM OF 3 FT D/S OF THE P.C. INTO THE RUN. 5. THE SELECT RIFFLE MATERIAL SHALL BE PLACED AT A UNIFORM THICKNESS SUCH THAT, IN CROSS—SECTION, ITS LOWEST ELEVATION OCCURS IN THE CENTER OF THE CHANNEL.. 6 FINE WOODY MATERIAL MAY BE PLACED LONGITUDINALLY BETWEEN THE LOG ROLLERS AND INCORPORATED INTO THE RIFFLE MATERIAL. 7. RIFFLE MATERIAL SHALL BE COMPACTED USING AN EXCAVATOR BUCKET SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 8. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS —SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. 9 RE —DRESSING OF CHANNEL AND BANKFULL BENCH7FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN —STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 10. SEE TYPICAL RIFFLE CROSS SECTION FOR DIMENSIONS. 11. STRUCTURE DETAILS ARE DRAWN FOR A MEDIUM SIZE STREAM. APPEARANCE OF STRUCTURES CAN DEVIATE SIGNIFICANTLY IN LARGER OR SMALLER STREAMS. DETAILS PROVIDE A SCHEMATIC VIEW ONLY. CONTRACTOR EXPERIENCE AND CONSULTATION WITH THE ENGINEER SHALL DETERMINE THE MOST EFFECTIVE STRUCTURE INSTALLATION FOR EACH INDIVIDUAL STREAM AND LOCATION WITHIN THE STREAM. 12.IF APPROVED BY THE ENGINEER, NATIVE STREAMBED COBBLE CAN SUPPLEMENT AND7OR REPLACE SPECIFIED QUARRY STONE. TYPICAL RIFFLE SUBSTRATE SHALL BE NC DOT CLASS B RIPRAP MIXED WITH NATIVE COBBLE. BANKFULL EROSION CONTROL MATTING COIR 700 GRAM BANKFULL WSE KEY MATTING INTO RIFFLE TRENCH SELECT RIFFLE SUBSTRATE MATERIAL GRADATION PER NOTES CO\C D A RUC ED R RD CROSS S C RIFFLE SUBSTRATE DEPTH = 1.5' 0\ B NOT TO SCALE 828-980-5715 Prepared Sy: Prepared For: File Name: Chond/erStreom. d 'g Last Revision: 8/29/22 10.3.3 AM Sheet 4,5 CO\C D A CO\C D=A RUC D BOU A\ BOULDER STEP _D r EXTEND BOULDER SILL INTO— STREAMBANK MIN 3.0' OR TWO FULL BOULDER LENGTHS BOULDER STEP—\ 416 30-40' W BANKFULL L TOE OF CHANNEL SLOPE R MOST DOWN STREAM STRUCTURE AT PC MAY BE SUBSTITUTED FOR BOULDER J—HOOK VANE OR BOULDER ARCH PER PLAN AND DETAILS RIFFLE WITH BOULDERS SLOPE VARIES PER PROFILE ELV = 0.3' — 0.5' MICROPOOL BELOW STEP TYPICAL RIFFLE SUBSTRATE 10% NCDOT CLASS A 20% NCDOT CLASS B 70% NCDOT CLASS 1 RUC ID BOU ID CROSS S _D C RIFFLE SUBSTRATE DEPTH MIN. = 2.5' R 0\ A NOT TO SCALE OFFSET HEADER STREAMBED / BOULDERS 1.0' U/S NON —WOVEN GEOTEXTILE ��RUN NOT TO SCALE OFFSET BOULDER RIFFLE \0 IS 1. ALL BOULDERS USED FOR THE PROPOSED STRUCTURE SHALL BE STRUCTURAL STONE, CUBICAL OR RECTANGULAR IN SHAPE. THE ENGINEER MUST APPROVE THE USE OF BOULDERS THAT MAY BE AVAILABLE ONSITE. BOULDERS DIMENSIONS SHALL BE 2.0 FT X 3.0 FT X 1.0 FT +/— 0.5 FT. 2. DIMENSIONS AND SLOPES OF STRUCTURES DESCRIBED IN THE DETAIL MAY BE ADJUSTED BY DESIGN ENGINEER TO FIT CONDITIONS ONSITE. 3. CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TOGETHER TIGHTLY. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH NC DOT CLASS A ROCK OR CHINKING STONE APPROVED BY ENGINEER, 4. HEADER BOULDERS SHALL BE UNDERLAIN BY FOOTER BOULDERS TO PROVIDE A FOUNDATION UNLESS OTHERWISE DIRECTED BY THE ENGINEER. HEADER BOULDERS SHALL BE OFFSET 1 FT UPSTREAM OF THE FOOTER BOULDERS WHERE MICROPOOLS ARE ANTICIPATED TO FORM AS SHOWN IN THE DETAIL. 5. SET BOULDER INVERTS AT ELEVATION SHOWN ON THE PLAN AND PROFILE SHEETS. NO ELEVATIONS OF THE BOULDERS MAY VARY FROM THE PLAN SHEETS WITHOUT DIRECTION FROM THE ENGINEER. 6 THE BOULDER ARM SHALL EXTEND UP TO THE STREAMBANK AT A 1% SLOPE AND INTO THE STREAMBANK A MINIMUM OF 3.0' OR TWO FULL BOULDER LENGTHS. 7. MAXIMUM ELEVATION DROP OVER EACH BOULDER IS STEP IS 0.3' — 0.5'. 8 ON THE UPSTREAM SIDE OF THE BOULDERS, NON —WOVEN GEOTEXTILE FABRIC SHALL BE PLACED ON THE ENTIRE LENGTH OF THE STRUCTURE. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. RIFFLE MATERIAL SHALL BE USED AS BACKFILL MATERIAL AROUND THE OFFSET BOULDER STEPS AND MICROPOOLS SHALL BE ESTABLISHED BELOW EACH STEP. 9. IF STREAMBED COMPOSITION AND SOIL TYPE IS APPROPRIATE, AND APPROVED BY THE ENGINEER, NON —WOVEN GEOTEXTILE MAY BE OMITTED IF SUFFICIENT COBBLE IS AVAILABLE TO ENSURE THAT THE STREAMBED DOES NOT SCOUR BELOW THE STRUCTURE INVERT. 10 CONSTRUCTED RIFFLE MATERIAL SHALL EXTEND A MINIMUM OF 3.0 FT UWS OF THE P.T. INTO THE GLIDE AND A MINIMUM OF 3,0 FT D/S OF THE P.C. INTO THE RUN. 11. RIFFLE MATERIAL SHALL BE PLACED AT A UNIFORM THICKNESS SUCH THAT, IN CROSS—SECTION, ITS LOWEST ELEVATION OCCURS IN THE CENTER OF THE CHANNEL. RIFFLE MATERIAL SHALL BE COMPACTED USING AN EXCAVATOR BUCKET SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 12. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS —SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. 13. RE —DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN —STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 14. SEE TYPICAL RIFFLE CROSS SECTION FOR DIMENSIONS 15. STRUCTURE DETAILS ARE DRAWN FOR A MEDIUM SIZE STREAM. APPEARANCE OF STRUCTURES CAN DEVIATE SIGNIFICANTLY IN LARGER OR SMALLER STREAMS. DETAILS PROVIDE A SCHEMATIC VIEW ONLY. CONTRACTOR EXPERIENCE AND CONSULTATION WITH THE ENGINEER SHALL DETERMINE THE MOST EFFECTIVE STRUCTURE INSTALLATION FOR EACH INDIVIDUAL STREAM AND LOCATION WITHIN THE STREAM. 16.IF APPROVED BY THE ENGINEER, NATIVE STREAMBED COBBLE CAN SUPPLEMENT AND/OR REPLACE SPECIFIED QUARRY STONE. TYPICAL RIFFLE SUBSTRATE 10% NCDOT CLASS A 20% NCDOT CLASS B 70% NCDOT CLASS 1 COOS D = A RUC ID BOU ID CROSS C BANKFULL BOULDER STEP RIFFLE SUBSTRATE DEPTH PER 2.5' _D EC R 0\ B EROSION CONTROL MATTING BOULDER SILL EXTEND INTO STREAMBANK MIN 3.0' OR TWO FULL BOULDER LENGTHS NOT TO SCALE 828-980-5715 Prepared Sy: Prepared For: File Name: Chond/erStreom. d 'g Last Revision: 8/29/22 10.3.3 AM Sheet 4.6 OC C TOE OF SLOP 0 0 B' 0 0 0 HIGH DENSIT LIVE STAKING 0 0 D 0 BANKFULL- 0 0 0 O 0 0 P.C. STATION PER PLAN _OC \0 D SELECT BACKFILL ALL LOGS SHALL BE RELATIVELY STRAIGHT AND LIMBS AND BRANCHES SHALL BE TRIMMED MATERIAL FLUSH. LOGS SHALL HAVE MINIMUM DIAMETER OF 1.3'. LOGS SHALL HAVE A MINIMUM LENGTH BEHIND STRUCTURE OF 20 FEET. NON —WOVEN GEOTEXTILE 2. HEADER LOGS SHALL BE UNDERLAIN BY FOOTER LOGS TO PROVIDE A SILL UNLESS OTHERWISE DIRECTED BY THE ENGINEER. HEADER LOGS SHALL BE OFFSET SLIGHTLY DOWNSTREAM OF THE 0 FOOTER LOG. 0 DEPARTURE ANGLE VARIES PER PLAN OR AS DIRECTED BY ENGINEER ONSITE 0 0 B 0 EXTEND LOGS INTO STREAMBANK MIN. 6.0'. NOT TO SCALE D _A\ PROPOSED BANKFULL WSE STREAMBED SELECT BACKFILL MATERIAL NON —WOVEN GEOTEXTILE OG C P.C. ELEVATION PER PROFILE BASEFLOW WSE SCOUR POOL BELOW STRUCTURE NOT TO SCALE A BD C 0\ A A 3. SET SILL INVERTS AT ELEVATION SHOWN ON THE PLAN AND PROFILE SHEETS. NO ELEVATIONS OF THE LOG SILL MAY VARY FROM THE PLAN SHEETS WITHOUT DIRECTION FROM THE ENGINEER. 4 THE VERTICAL SLOPE OF EACH LOG SHALL NOT EXCEED 1% UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 9 ALL GAPS/VOIDS LARGER THAN 1 INCHES BETWEEN THE HEADER AND FOOTER LOGS SHALL BE CHINKED WITH LIMBS AND/OR BRUSH ON THE UPSTREAM SIDE PRIOR TO PLACEMENT OF THE GEOTEXTILE. 10. ON THE UPSTREAM SIDE OF THE LOGS A LAYER OF NON —WOVEN GEOTEXTILE FABRIC SHALL BE PLACED AS SHOWN IN THE DETAIL THE ENTIRE LENGTH OF THE LOG. SECURE ALL GEOTEXTILE FABRIC ON TOP OF FOOTER LOG USING 3 INCH 10D GALVANIZED COMMON NAIL ON 12 IN SPACING ALONG LOG. NAIL NON —WOVEN GEOTEXTILE TO EDGE OF HEADER LOG AND BACKFILL. 11. SELECT BACKFILL MATERIAL SHALL BE FILL MATERIAL GENERATED ON —SITE WITH A MINIMUM D50 OF 60 MM OR A GRADATION SUBMITTED IN WRITING AND APPROVED BY THE ENGINEER. A WELL —GRADED BLEND OF NCDOT CLASS A RIP —RAP AND ASTM #57 ROCK MIXED WITH EARTH WILL BE AN ACCEPTABLE SUBSTITUTE. SELECT BACKFILL AND SOIL BACKFILL MATERIAL SHALL BE COMPACTED SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 12. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS —SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. 13. RE —DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN —STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. BANKFULL EROSION CONTROL MATTING COIR 700 GRAM P.C. ELEVATION PER PROFILE BANKFULL WSE BASEFLOW WSE EXTEND LOGS BEYOND BANKFULL STAGE MIN. 4.0 FT OC C A FOOTER LOG FIT LOGS TIGHTLY TOGETHER NOT TO SCALE DD CROCC C 0\ B B 828-980-5715 Prepared Sy: Q3 sz vQCv O co o 6 a DUDLEY CHANDLER STREAM RESTORATION LOG' STEP DETAIL File Name: Chond/erStreom.dwg Last Revision: 8/29/22 10.3.3 AM Sheet 4,7 SELECT BACKFILL BEHIND STRUCTURE NON —WOVEN GEOTEXTILE HIGH DENSITY LIVE STAKING, CONTAINERIZED PLANTS OR TRANSPLANTS EXTEND VANE ARM AND SILL INTO STREAMBANK MIN. 3 FT BOU 0 0 0 0 0 BANKFULL 00 0 0 0 0 0 S VA\ A •*-14 u o .ir4 _ EXTEND BOULDER SILL INTO STREAMBANK MIN 3 FT 0 0 0 0 O -1111111 0 0 O 0 HIGH DENSITY LIVE STAKING NOT TO SCALE A _D P _A\ PROPOSED BANKFULL WSE HEADER BOULDER NON —WOVEN FILTER FABRIC COARSE BACKFILL MATERIAL BOU SC FOOTER BOULDER DR 0\ A // 00\ VA\ A 5 FLOW 1 FT OFFSET SCOUR POOL / NOT TO SCALE BOU _D R 00\ VA\ /C \0 1, ALL BOULDERS USED FOR THE PROPOSED STRUCTURE SHALL BE STRUCTURAL STONE, CUBICAL OR RECTANGULAR IN SHAPE. THE ENGINEER MUST APPROVE THE USE OF BOULDERS THAT MAY BE AVAILABLE ONSITE. BOULDERS DIMENSIONS SHALL BE 2.5 FT X 4.0 FT X 1.5 FT +/— 0.5 FT. 2. DIMENSIONS AND SLOPES OF STRUCTURES DESCRIBED IN THE DETAIL MAY BE ADJUSTED BY DESIGN ENGINEER TO FIT CONDITIONS ONSITE. 3. CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TOGETHER TIGHTLY. 4 GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH NC DOT CLASS A ROCK OR CHINKING STONE APPROVED BY ENGINEER. 2. HEADER BOULDERS SHALL BE UNDERLAIN BY FOOTER BOULDERS TO PROVIDE A FOUNDATION UNLESS OTHERWISE DIRECTED BY THE ENGINEER. HEADER BOULDERS SHALL BE OFFSET 1.0 FT UPSTREAM OF THE FOOTER. 3. SET BOULDER INVERTS AT ELEVATION SHOWN ON THE PLAN AND PROFILE SHEETS. NO ELEVATIONS OF THE BOULDERS MAY VARY FROM THE PLAN SHEETS WITHOUT DIRECTION FROM THE ENGINEER. 4 NON —WOVEN GEOTEXTILE SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. SELECT BACK FILL MATERIAL SHALL BE PLACED UPSTREAM OF THE GEOTEXTILE MATERIAL. 5. SELECT BACKFILL MATERIAL SHALL BE FILL MATERIAL GENERATED ON —SITE WITH A MINIMUM DSU OF 60 MM OR A GRADATION SUBMITTED IN WRITING AND APPROVED BY THE ENGINEER. A WELL —GRADED BLEND OF NCDOT CLASS A RIP —RAP AND ASTM #/57 ROCK MIXED WITH EARTH WILL BE AN ACCEPTABLE SUBSTITUTE. SELECT BACKFILL AND SOIL BACKFILL MATERIAL SHALL BE COMPACTED SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 6. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS —SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. 7. 8 RE —DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN —STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. STRUCTURE DETAILS ARE DRAWN FOR A MEDIUM SIZE STREAM. APPEARANCE OF STRUCTURES CAN DEVIATE SIGNIFICANTLY IN LARGER OR SMALLER STREAMS. DETAILS PROVIDE A SCHEMATIC VIEW ONLY. CONTRACTOR EXPERIENCE AND CONSULTATION WITH THE ENGINEER SHALL DETERMINE THE MOST EFFECTIVE STRUCTURE INSTALLATION FOR EACH INDIVIDUAL STREAM AND LOCATION WITHIN THE STREAM. 9 IF STREAMBED COMPOSITION AND SOIL TYPE IS APPROPRIATE, AND APPROVED BY THE ENGINEER, NON —WOVEN GEOTEXTILE MAY BE OMITTED IF SUFFICIENT COBBLE IS AVAILABLE TO ENSURE THAT THE STREAMBED DOES NOT SCOUR BELOW THE STRUCTURE INVERT. 10. IF APPROVED BY THE ENGINEER, NATIVE STREAMBED COBBLE CAN SUPPLEMENT AND/OR REPLACE SPECIFIED QUARRY STONE, KEY BOULDERS INTO STREAMBANK MIN. 3 FT OR TWO FULL BOULDER LENGTHS BOU_DD R CROCC C c, KEY BOULDERS INTO STREAMBANK 4 TO BKF STAGE BANKFULL WSE 00\ VA\ 0\ P.C. ELEVATION PER PROFILE FIT BOULDERS TIGHTLY TOGETHER LACE BOULDERS INTO STREAMBED A MINIMUM OF THE BOULDER DIAMETER NOT TO SCALE 828-980-5715 Prepared Sy: co co DUDLEY CHANDLER STREAM RESTORATION J—HOOK DETAIL File Name: Chond/erStreom.dwg Last Revision: 8/29/22 10.3.3 AM Sheet 4.8 18" DIAMETER DOUBLE WALL HDPE CULVERT PIPE TO BE INSTALLED IN THE SAME LOCATION AS THE REMOVED FAILING 15" CMP CULVERT CROSS-SECTION VIEW EARTHEN SLOPES SHALL BE 2:1 OR FLATTER - 12' WIDE ROAD ROAD SURFACE CROWNED 2" 20' LONG CULVERT PIPE 6" THICK LAYER OF COMPACTED CRUSHER RUN OVER GEOTEXT/LE COMPACTED EARTH FILL FILL ADJACENT TO PIPE SHALL BE PLACED /N 6" LIFTS AND COMPACTED CULVERT BURIED 0.3' DEEP IN STREAM BED COMPACTED EARTH FILL 0.5' DEEP EMERGENCY OVERFLOW ROAD SURFACE ELEVATION = 1338.0 INV ELEV = 1334.0 STREAM BED ELEV = 1334.3— FRONT VIEW 6" THICK LAYER OF COMPACTED CRUSHER RUN OVER GEOTEXTILE UNDISTURBED GROUND INLET AND OUTLET OF PIPE SHALL BE PROTECTED WITH CLASS B R/PRAP 5 0 NOTES: • CONTRACTOR SHALL BACKFILL THE EXCAVATION AFTER PLACEMENT OF PERMANENT STRUCTURE • BACKFILL WILL BE COMPOSED OF CLEAN CLAY FILL APPROVED BY THE ENGINEER • CONTRACTOR WILL USE A NEW HDPE DOUBLE -WALL CULVERT PIPE • CONTRACTOR SHALL PLACE 6" - 8" DEEP LAYERS OF COMPACTED FILL • CONTRACTOR SHALL USE NON -WOVEN 6OZ GEOTEXTILE FABRIC 5 10 15 Sco% in Feet 828-980-5715 Prepared Sy: DUDLEY CHANDLER STREAM RESTORATION EASTERN STREAM CULVERT File Name: Chond/erStreom. d 'g Last Revision: 8/29/22 10.3.3 AM Sheet 4,9 OD A C CO\ D DO _A\ I 6" MIN. HORIZONTAL — OVERLAP 6" MIN. HORIZONTAL OVERLAP OD A \ CO C VA \� 6" MIN. VERTICAL OVERLAP ■ ■ ■ BANKFULL CHANNEL TOE OF SLO 700 GRAM COIR FIBER MATTING FROM TOE OF CHANNEL TO BANKFULL ELEVATION 2' HH (TYP) ■ ■ ■ ■ N N } 1- --■ En Q_ O N ■ 0 • 0 2.5' (TYP) ■ O O ■ ■ ■ ■ ■ ■ J DO A\ VA \C D _A\ \ G NOT TO SCALE SUPPLEMENT WOODEN STAKES WITH 12" ECO—STAKES 700 GRAM COIR MATTING 2' LONG 2" x 2" WOOD STAKES w/ 3" GALVANIZED ROOFING NAIL AT THE TOP TO SECURE MATTING NOT TO SCALE -OAS 0\ CO\ DO VA \� CO 1. EROSION CONTROL MATTING IS USED TO PROTECT RECENTLY CONSTRUCTED STREAMBANKS FROM EROSION. THE MATTING WILL REMAIN INTACT WHILE THE BANK AND RIPARIAN VEGETATION MATURES, PROVIDING CRITICAL BANK PROTECTION. 2. BEFORE INSTALLING COIR FIBER MATTING, RAKE SOIL LEVEL, ADD TEMPORARY AND PERMANENT SEED, FERTILIZER, LIME AND MULCH. 3. 700 GRAM COIR FIBER EROSION CONTROL MATTING SHALL BE PLACED ALONG THE LENGTH OF THE NEW CHANNEL FROM THE TOE OF SLOPE OUT TO THE BANKFULL ELEVATION. 4 SECURE COIR MATTING IN PLACE BY STAKING AND OVERLAPPING AT THE SEAMS WITH A SHINGLE —TYPE METHOD SUCH THAT THE OVERLAPPING PIECE IS IN THE SAME DIRECTION AND AS THE STREAM FLOW. ADDITIONAL STAKING SHALL BE APPLIED BY THE CONTRACTOR AT NO ADDITIONAL COST IF THE MATTING SEPARATES FROM THE SOIL MORE THAN ONE INCH UNDER A REASONABLE PULL. 5. THE ROOFING NAILS SPECIFIED IN THE DETAILS CAN BE SUBSTITUTED FOR HOOKED STAKES OR ANY OTHER METHOD OF SECURING THE MATTING TO THE GROUND APPROVED BY THE ENGINEER. 6 EROSION CONTROL MATTING CAN BE OMITTED ON GRADED BANKS AT THE DISCRETION OF THE ENGINEER IF PERMANENT VEGETATION IS ESTABLISHED THROUGH SOD MATTING OR OTHER METHODS. 700 GRAM COIR MATTING _DOD A \ CO\ DO DD CDOSS C VA C 3' BANKFULL 2' LONG 2" x 2" WOOD STAKES w/ 3" GALVANIZED ROOFING NAIL AT THE TOP TO SECURE MATTING \ G 0\ A NOT TO SCALE 828-980-5715 Prepared Sy: DUDLEY CHANDLER STREAM RESTORATION EROSION CONTROL MATTING DETAIL File Name: Chond/erStreom. d 'g Last Revision: 8/29/22 10.3.3 AM Sheet 4.10 GENERAL RE —VEGETATION PLAN NOTES 1. SOIL PREPARATION ELEMENTS, TEMPORARY AND PERMANENT SEED AND GROUND COVER SHALL BE SPREAD OVER ALL AREAS WITHIN THE LOD THAT ARE DISTURBED DURING CONSTRUCTION. 2. THE LANDOWNER PREFERS THAT ANY REVEGETATION OUTSIDE OF THE RIPARIAN PLANTING AREA CONSIST OF TALL FESCUE, LIME, AND FERTILIZER. 3. LIVE STAKES, BARE ROOT STOCK AND CONTAINERIZED PLANTS SHALL BE EVENLY DISTRIBUTED THROUGHOUT THE RIPARIAN PLANTING AREA AS DIRECTED BY THE ENGINEER. 4. ADJUSTMENTS TO THE VEGETATION PLAN SHALL BE MADE ONLY IF APPROVED BY THE ENGINEER. 5. LONG-TERM SUCCESS OF THE PROJECT WILL BE DEPENDENT ON THE LANDOWNER'S ABILITY TO MONITOR AND REMOVE BEAVERS FROM THE SITE, PROTECTION AND PROMOTION OF TREE AND SHRUB ESTABLISHMENT, AND ELIMINATION OF INVASIVE PLANTS. BARE ROOTS 6. ALLOW BARE ROOTS TO SOAK IN WATER AN HOUR OR TWO BEFORE PLANTING. DO NOT SOAK THE ROOTS FOR MORE THAN 24 HOURS. 7. DIG A PLANTING PIT THAT IS THREE (3) TIMES WIDER THAN THE TREE'S CURRENT ROOT SYSTEM. SPREAD OUT ROOTS TO ENCOURAGE OUTWARD GROWTH. 8. KEEP THE TREE VERTICAL IN THE PLANTING PIT (PERPENDICULAR TO THE GROUND) SO THAT IT GROWS STRAIGHT. 9. REFILL THE PIT WITH NATIVE SOIL (WHAT WAS REMOVED AT DIGGING TIME), AND ANY OTHER SOIL AMENDMENTS. 10. GENTLY TAMP OUT ANY AIR POCKETS FROM THE SOIL ONCE THE PLANTING HOLE IS FILLED. LIVE STAKES 11. LIVE STAKES MUST BE DORMANT WHEN CUT. KEEP LIVE STAKES MOIST UNTIL PLANTING. THE STAKE SHOULD BE PREPARED WITH THE BUDS POINTED UP, AND THE BOTTOM SHOULD BE CUT AT AN ANGLE FOR EASY INSERTION INTO THE GROUND. 12. LIVE STAKES SHOULD BE PLACED WITH 3 TO a OF THE LENGTH OF THE STAKE BELOW GROUND AND ANGLED DOWNSTREAM. ENSURE THE BASE OF THE LIVE STAKE WILL REACH THE WATER TABLE. 13. INSERT LIVE STAKES POINTED BOTTOM END FIRST INTO THE STREAMBANK. CONTAINER STOCK 14. STOCK SHALL HAVE BEEN GROWN IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL TOGETHER ONCE REMOVED FROM THE CONTAINER. 15. CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY AND PLACED IN SHADY CONDITIONS UNTIL PLANTING OCCURS. CREATE PLANTING AREA FOR EACH PLANT AND EXCAVATE PIT. 16. THE DIAMETER OF THE PLANTING PITS FOR EACH PLANT SHOULD BE AT LEAST TWO TIMES THE DIAMETER OF THE ROOT MASS. SCARIFY THE PLANTING PIT PRIOR TO EACH PLANT INSTALLATION. 17. SET PLANTS UPRIGHT IN THE CENTER OF THE PIT. THE BOTTOM OF THE ROOT MASS SHOULD BE RESTING ON UNDISTURBED SOIL. 18. PLACE BACKFILL AROUND BASE AND SIDES OF ROOT MASS, AND WORK EACH LAYER TO SETTLE BACKFILL AND TO ELIMINATE VOIDS AND AIR POCKETS. WHEN PIT IS APPROXIMATELY 3 FULL, WATER THOROUGHLY BEFORE PLACING REMAINDER OF THE BACKFILL. WATER AGAIN AFTER PLACING FINAL LAYER OF BACKFILL. VEGETATION PLANTING SPECIFICATIONS DISTURBED STREAMBANK AND RIPARIAN AREA - 14,500 FT2 / (0.3 AC) SCIENTIFIC NAME COMMON NAME TYPE RATE / SPACING QTY NC Mountain Riparian Mix EARNMX - 304 (OR EQUIV.) SEED 20 LBS/ACRE 10 Comus amomum SILKY DOGWOOD LS 5' O.C. 100 Salix sericea SILKY WILLOW LS 5' O.C. 200 Salix nigra BLACK WILLOW LS 5' O.C. 50 Physocarpus opulifolius NINE BARK LS 5' O.C. 50 Sambucus nigra ELDERBERRY LS 5' O.C. 100 Alnus serrulata TAG ALDER 1 GAL POT AS DIRECTED BY ENGINEER 10 Platanus occidentalis SYCAMORE 1 GAL POT AS DIRECTED BY ENGINEER 10 Cephalanthus occidentalis BUTTON BUSH 1 GAL POT AS DIRECTED BY ENGINEER 10 Betula nigra RIVER BIRCH 1 GAL POT AS DIRECTED BY ENGINEER 10 Comus amomum SILKY DOGWOOD 1 GAL POT AS DIRECTED BY ENGINEER 10 Juncus effusus SOFT RUSH PLUG 7' O.C. 80 Carex vulpinoidea FOX SEDGE PLUG 25' O.C. 15 TEMPORARY SEEDING, MULCHING, AND SOIL PREP - 19,560 FT2 / (0.45 AC) SCIENTIFIC NAME COMMON NAME TYPE RATE / SPACING QTY Secale Cereale RYE OR WHEAT GRAIN SEED 50 LBS / AC 30 LBS Trifolium incarnatum CRIMSON CLOVER SEED 20 LBS / AC 10 LBS GROUND AG. LIMESTONE PELLET 1000 LBS / AC 450 LBS 10-10-10 FERTILIZER PELLET 500 LBS / AC 200 LBS WHEAT STRAW MULCH STRAW 4000 LBS / AC 1800 LBS 828-980-5715 Prepared Sy: a co vav O I co a DUDLEY CHANDLER STREAM RESTORATION VEGETATION PLAN File Name: Chond/erStreom. d 'g Last Revision: 8/29/22 10.3.3 AM Sheet 5.1 PLANTING LOCATION NOTES AND SPECIFICATIONS: 1. NATIVE TREE AND/OR SHRUB SPECIES SUITABLE FOR RIPARIAN CONDITIONS SHALL BE PLANTED AT LEAST FROM EDGE OF WATER TO TOP OF SLOPED BANK THROUGHOUT THE PROJECT. MINIMUM BUFFER WIDTH SHALL BE 10'. 2. A WIDER BUFFER IS PREFERRED AND SHALL BE PLANTED EVERYWHERE THAT PLANNED AGRICULTURAL ACTIVITIES WILL ALLOW. 3. LIVE STAKES SHALL BE PLANTED WITHIN 6' FROM THE EDGE OF WATER IN TWO ROWS APPROXIMATELY PARALLEL TO THE STREAM. 4. JUNCUS AND CAREX PLUGS SHALL BE PLANTED WITHIN 1' FROM THE EDGE OF WATER. 5. 1 GAL POTS AND BARE ROOT SPECIES WILL BE PLANTED ABOVE THE LIVE STAKE SPECIES UP TO TOP OF BANK AND BEYOND. 1 GAL POTS WILL BE MIXED INTO THE LIVE STAKE PLANTING ZONE IN THE OUTSIDE OF MEANDER BENDS AS SPECIFIED BY THE ENGINEER ON SITE. 6. ALL SPECIES SHOULD MIXED EVENLY THROUGHOUT THE PROJECT. 7. PLANT SPACING GRID OF LIVE STAKES SHALL BE 5' X 5' OR TIGHTER. 8. PLANT SPACING GRID OF ALL SPECIES ABOVE LIVE STAKES SHALL BE 10' X 10' OR TIGHTER. 0 0 '/. '/. 0 '/. '/. '/. '/. '/. / / /.'.'/.'/.'/. .'/.'/.'/.'/.'/. '/.'/.'/.'/.'/.'/.'/.'/.'/. CAUTION! Before Starting Excavation Check for Underground Utilities CALL 811 40 0 40 80 120 3+64 '/.'/.'/. APPROXIMATE EDGE OF PLANTED NATIVE RIPARIAN BUFFER Scale in Feet 3f08 f 00 828-980-5715 Prepared Sy: co co DUDLEY CHANDLER STREAM RESTORATION PLANTING PLAN VIEW File Name: Chond/erStreom.dwg Last Revision: 8/29/22 10.3.3 AM Sheet 5,2