Loading...
HomeMy WebLinkAboutNCC222883_ESC Approval Submitted_20220831ROY COOPER Governor ELIZABETH S. BISER Secretary �' n BRIAN WRENN Director NORTH CAROLINA Environmental Quality August 1, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Arden Group, LLC Attention: Stuart Parks, Manager PO Box 5323 Winston-Salem, NC 27113 RE: Project Name: Saddle Ridge Acres Approved: 25 Project ID: STOKE-2022-009 County: Stokes City: King Address: Mountain View Ridge River Basin: Yadkin — Pee Dee Stream Classification: WS-IV Submitted By: Green Mountain Engineering, PLLC Date Received by LQS: July 26, 2022 Plan Type: Revised Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO 1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. North Carolina Department of Environmental Quality I Division Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 3001 � Winston-Salem, North Carolina 27105 '"'! 336-776-9800 Letter of Approval with Modifications Arden Group, LLC August 1, 2022c Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Saddle Ridge Project ID: STOKE-2022-009 County: Stokes Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. Any disturbance of driveways or sidewalks must have the area replaced with like material. [G.S. 113A-57(2)] 2. Please maintain access for the public and residents when working across driveways and roads. Coordination for access will be necessary. [General Comment] 3. All landowners must be properly notified and easements obtained prior to construction. 4. This review is only for the additional proposed area. All prior comments apply. 5. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities Letter of Approval with Modifications Arden Group, LLC August 1, 2022c Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (No`rth Carolina General Statute-143-A=51-throughi 6-6); this --- - - office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Tamera Eph , PE - - - - - -Regional-Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval Green Mountain Engineering, PLLC Attention: Jeremy McCall, PE 7A Wendy Court Greensboro, NC 27409