Loading...
HomeMy WebLinkAboutNCG021003_Site Plans 3_2022083014 GA. o MESH FOR w )ARD FABRIC i cv STEEL POST WIRE MESH FOR STANDARD FABRIC STANDARD OR EXTRA STRENGTH FILTER FABRIC ---DIRECTION OF WATER FLOW ANCHOR FABRIC SKIRT MIN. 8" DEEP & 4" WIDE. NOTES: 1. SYN. FENCE FABRIC SHALL BE MIN. OF 30" IN WIDTH WITH 30 LB/IN TENSILE STRENGTH FOR STANDARD FABRIC AND 50 LB/IN FOR EXTRA STRENGTH. 2. FABRIC SHALL BE CONTINUOUS LENGTH. IF JOINTS ARE NECESSARY, LAP FABRIC POST TO POST. 3. STEEL POST SHALL BE MIN 4' IN HEIGHT AND BE OF THE SELF -FASTENER STEEL ANGLE TYPE. TEMPORARY SILT FENCE NTS TOP BANK ELEV. VARIES FROM 38' TO 30' MINE RECLAMATION' 1 L BACKSLOPE 3 NTS \ I -\FINAL NORMAL WATER ELEVATION AVERAGE DEPTH = 35' 1 L__2- j BOTTOM ELEV. VARIES FROM 8' TO 0' NOTES: 1. DEPTH OF MINE WILL BE DICTATED BY SUITABLE MATERIAL. 2. AT RECLAMATION ALL BANKS ABOVE NORMAL WATER WILL BE SLOPED & GRADED AT 4:1 & STABILIZED WITH GRASSING. HAUL ROAD SECTION NTS TEMPORARY/PERMANENT GRASS SPECIFICATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS. 2. RIP THE ENTIRE AREA TO A 6 INCH DEPTH. 3. REMOVE ALL ROCKS, ROOTS AND OTHER OBSTRUCTIONS LEAVING SURFACES SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME AND FERTILIZER UNIFORMLY AND MIX WITH SOIL. LIME: 45 LBS. PER 1000 S.F. PHOSPHOROUS: 20 LBS PER 1000 S.F. FERTILIZER: 17 LBS. PER 1000 S.F. 5. CONTINUE TILLAGE UNTIL A WELL PULVERIZED, FIRM, UNIFORM SEED BED IS PREPARED 4-6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEED BED AND COVER SEED LIGHTLY. 2 - 3 LBS PER 1000 S.F. (SEE MIXTURE BELOW) 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH, GRAIN STRAW & HAY AT 75 TO 100 LBS PER 1000 S.F. WOOD CHIPS AT 500 LBS. PER 1000 S.F. JUTE & MESH AS PER MANUFACTURER 8. ASPHALT FOR ANCHORING MULCH SHALL BE TYPE SS-1 EMULSION AND APPLIED AT A RATE OF 1000 GAL. PER ACRE FOR SLOPE STABILIZATION, AND 150 GAL. PER TON OF STRAW FOR ANCHORING STRAW. 9. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEED WITHIN THE PLANTING SEASON, IF POSSIBLE. IF GRASS STAND SHOULD BE OVER 60% DAMAGED, REESTABUSH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES, 10. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE, TREATMENT, AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. 11. SEED FOR TEMPORARY AND PERMANENT APPLICATIONS SHALL BE: 20% CARPET GRASS 247 BERMUDA GRASS 20% TURF FESCUE 10% CREEPING RED FESCUE 247 ANNUAL RYE GRAIN *BERMUDA SEED SHALL BE HULLED FOR WARM WEATHER PLANTING. PURITY OF SEED SHALL BE A MIN. OF 98% AND GERMINATION SHALL BE A MIN. OF 85%. ALL DISTURBED AREA SHALL BE SEEDED WITHIN 15 DAYS OF THE COMPLETION OF GRADING. CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS, OTHER SEEDING SCHEDULES MAY BE POSSIBLE. NPDES STABILIZATION TIMEFRAMES SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HOW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10 OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HOW ZONES PUMPING SPECIFICATIONS: MAKE GODWIN SIZE 4" HOURS OF OPERATION M-F 8AM-5PM NEAREST WELL N/A NOTE: USE CLASS A RIP RAP INSIDE STILLING BASIN 6� WI 0 z V) Iw SITE WORK NOTES: > 1. THE CONTRACTOR SHALL VISIT THE SITE TO BECOME FAMILIAR WITH FIELD CONSTRUCTION CONDITIONS. 2. CONTRACTOR SHALL COORDINATE WORK WITHIN NCDOT AND LOCAL RIGHT OF WAYS WITH PROPER AUTHORITIES AND SHALL MEET ANY REQUIREMENTS AS TO TRAFFIC CONTROL AND CONNECTION TO EXISTING STREETS. 3. CLEARING AND GRUBBING: REMOVE ALL TREES AS REQUIRED UNLESS OTHERWISE NOTED TO REMAIN, STUMPS, ROOTS, SHRUBBERY, ASPHALT, CONCRETE, STRUCTURES, BURIED UTILITIES, STORAGE TANKS, ETC. WITHIN z LIMITS OF CONSTRUCTION. O 4. STRIPPING: BEFORE EXCAVATING OR FILLING, REMOVE ALL TOPSOIL, WOOD, LEAVES, AND ANY OTHER UNSUITABLE MATERIAL. 5. MUCKING: REMOVE ANY SOFT, ORGANIC SILT MATERIALS AND EXISTING BURIED CONSTRUCTION DEBRIS AS REQUIRED AND FILL TO SUBGRADE 0Z ELEVATIONS WITH A CLEAN SELECT -FILL COMPACTED AS SPECIFIED. w Z O 6. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR EXCAVATED SPOIL SHALL !n BE REMOVED FROM SITE AND DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE �j LOCAL AND STATE CODES. 0 cvCif 7. BORROW MATERIAL: THE CONTRACTOR SHALL FURNISH BORROW Rr MATERIAL REQUIRED FROM OFF SITE AND 013TAIN ALL REQUIRED PERMITS elf co ASSOCIATED WITH BORROW OPERATIONS. O z cm 8. FILL AND COMPACTION: AFTER STRIPPIN 3 THOSE AREAS DESIGNATED TO RECEIVE FILL SHOULD BE PROOFROLLED. TI• E TOP 8" OF SUBGRADE SHALL w N BE COMPACTED TO AT LEAST 98% OF MAXIMUM DENSITY AT OPTIMUM Q N MOISTURE CONTENT. ANY AREA WHICH PUMPS OR RUTS EXCESSIVELY SHOULD O Ncc BE UNDERCUT AND REPLACED WITF A CLEAN, SILTY OR CLAYEY Q SAND HAVING A UNIFIED SOIL CLASSIFICATION OF SP, SM, OR SC. FILL co MATERIAL 5" OUTSIDE OF BUILDING AREAS SHALL THEN BE PLACED IN LAYERS NOT TO EXCEED 8" AND COMPACTED TO AT LEAST 95% OF THE m STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698) WITH THE UPPER 12 INCHES OF SUBGRADE BEING COMPACTED TO 98% OF THE N STANDARD PROCTOR MAXIMUM DRY DENSITY. FILL MATERIALS WITHIN Q CC Z BUILDING AREAS TO A LINE OUTSIDE THE BUILDING AREAS SHALL BE PLACED IN LAYERS NOT TO EXCEED 8" AND COMPACTED TO AT LEAST 98% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698) WITH THE UPPER 12 INCHES OF SUBGRADE BEING COMPACTED IN 6 INCH LAYERS TO 100% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. IN AREAS WHERE NO STRUCTURAL FILL IS TO 13E PLACED THE UPPER 12 INCHES OF IN -PLACE SUBGRADE SHOULD BE COMPACTED TO AT LEAST 98% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. IF THE MATERIAL IS U. TOO DRY TO COMPACT TO THE REQUIRED D-NSITY EACH LAYER SHALL BE WETTED IN ACCORDANCE WITH COMPACTION REQUIREMENTS. IF THE MATERIAL IS TOO WET TO SECURE PROPER COMPACTION, IT SHALL BE HARROWED REPEATEDLY OR OTHERWISE AERATED WITH SUITABLE EQUIPMENT UNTIL OPTIMUM MOISTURE CONTENT IS OBTAINED. I"ILL SHALL BE PLACED IN SUCH A MANNER THAT THE SURFACE WILL DRAIN READILY AT ALL TIMES. SEE STRUCTURAL NOTES AND SOILS REPORT FOR ADDITIONAL REQUIREMENTS. W 9. LAYOUT: THE CONTRACTOR SHALL PROVIDE ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK. 10, THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF EXISTING UTILITIES DURING CONSTRUCTION. 11. EXISTING BOUNDARY INFORMATION BY GIS & AERIAL PHOTOGRAPHY AND PROVIDED BY OWNER. 12. THE CONTRACTOR SHALL VERIFY DIMENSIDNS AT JOBSITE. 13. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF RELOCATION OR DISCONNECTION OF ALL EXISTING UTILITIES WITH APPLICABLE AGENCIES AND AUTHORITIES. 14. ALL PAVEMENT AND BASE MATERIALS AND WORKMANSHIP SHALL CONFORM TO NCDOT STANDARDS. 15. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. 0 16. CONTRACTOR SHALL NOTE THAT EARTHWORK QUANTITIES ARE HIS RESPONSIBILITY. PLANS DO NOT REPRESENT A BALANCED EARTHWORK CONDITION. LU r O EROSION CONTROL NOTES AND N o Z m MAINTENANCE PLAN 1. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, vx� BUT IN NO CASE, LESS THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF �+ EVERY HALF -INCH RAINFALL. 2. z O ALL POINTS OF EGRESS WILL HAVE CONSTRUCTION ENTRANCES THAT WILL x BE PERIODICALLY TOP -DRESSED WITH AN ADDITIONAL 2 INCHES OF #4 STONE W 9 TO MAINTAIN PROPER DEPTH. THEY WILL BE MAINTAINED IN A CONDITION TO W a PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE. IMMEDIATELY REMOVE OBJECTIONABLE MATERIAL x SPILLED WASHED OR TRACKED ONTO THE Z C CONSTRUCTION ENTRANCE OR ROADWAYS. 3. DIVERSION DITCHES WILL BE CLEANED CUT IMMEDIATELY TO REMOVE rh a SEDIMENT OR OBSTRUCTIONS FROM THE FLOW AREA. THE DIVERSION RIDGES Z r WILL ALSO BE REPAIRED. SWALES MUST BE TEMPORARILY STABILIZED WITHIN W 21 CALENDAR DAYS OF CEASE OF ANY PHASI. OF ACTIVITY ASSOCIATED WITH A SWALE. rrr hhh 4. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF �k FILLED. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. STAKES MUST BE STEEL. STAKE SPACING WILL BE 6 FEET MAX. WITH THE USE: OF EXTRA STRENGTH FABRIC, M WITHOUT WIRE BACKING. STAKE SPACING WIL_ BE 8 FEET n MAX. WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED. IF ROCK FILTERS N p1 V o ARE DESIGNED AT LOW POINTS IN THE SEDIMENT FENCE, THE ROCK WILL BE Z a REPAIRED OR REPLACED IF IT BECOMES HALF -FULL OF SEDIMENT, NO LONGER Z O m DRAINS AS DESIGNED OR IS DAMAGED. 5. ^ O OF o ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND •J MULCHED, ACCORDING TO SPECIFICATIONS IN -THE VEGETATIVE PLAN, TO V (� a MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. ALL SLOPES WILL BE z w STABILIZED WITHIN 21 CALENDAR DAYS. ALL OTHER AREAS WILL BE STABILIZED WITHIN 15 WORKING DAYS. : WATER QUALITY REQUIRES ALL SEEDED AREAS Z O WILL BE FERTILIZED, RESEEDED AS NECESSARY AND MULCHED ACCORDING TO S oy W SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. ALL PERIMETER DIKES, SWALES, HORIZONTAL TO 'DITCHES, PERIMETER SLOPES, ALL SLOPES STEEPER THAN 3 VERTICAL (3:1) AND ALL HIGH QUALITY WATER (HOW) ZONES SHALL BE '1 PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN SEVEN (7) CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN FOURTEEN (14) CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 6. FLOCCULANTS WILL BE USED TO ADDRESS TURBIDITY ISSUES, THE PUMPS, TANKS, HOSES AND INJECT SYSTEMS WILL BE CHECKED FOR Licence #C-3641 PROBLEMS OR TURBID DISCHARGES DAILY. 127 I m Ar