HomeMy WebLinkAboutNCG021003_Scanned Site Plans_20220830VICINITY MAP
N.T.S.
;Im•rw'
ACREAGE
PARCEL
PORTION OF 16300015
TOTAL SITE AREA
20.00
EXISTING WETLANDS
0
DISTURBED WETLANDS
0
UNDISTURBED WETLANDS
0
CATEGORY
ACREAGE
MINE EXCAVATION
14.84
PROCESSING AREA/HAUL ROADS
0.27
TAILINGS/SEDIMENT PONDS
0
STOCKPILES
0
WASTE PILES
0
BUFFER AREA
4.8
TOTAL AREA TO BE PERMITTED
20.00
TOP BANK ELEV.
VARIES FROM 38' TO 30'
MINE RECLAMATION iI,______ y
BACKSLOPE 3 FINAL NORMAL WATER ELEVATION
MAXIMUM
DEPTH - 35'
1L_
z
BOTTOM ELEV. VARIES
MINE SLOPE & RECLAMATION CROSS SECTION
NTS
NOTES:
1. DEPTH OF MINE WILL BE DICTATED BY SUITABLE MATERIAL.
2. AT RECLAMATION ALL BANKS ABOVE NORMAL WATER WILL BE
SLOPED & GRADED AT 4:1 & STABILIZED WITH GRASSING.
HAUL ROAD SECTION
NTS
NOTES:
1. MINING TO COMMENCE ON AN AS NEEDED BASIS.
2. RECLAMATION IS REQUIRED PRIOR TO MINE CLOSE OUT.
3. NO PERMANENT STRUCTURES OR PERMANENT EMPLOYEES ARE PROPOSED ON SITE.
4. THE HOURS OF OPERATION WILL BE MONDAY THRU FRIDAY FROM 7:30 AM TO 5:00 PM.
5. BUFFERS SHALL BE NATURAL VEGETATION SUPPLEMENTED WITH PLANTINGS AS
NECESSARY TO MEET UDO REQUIREMENTS, MINE AREA LOCATED ADJACENT TO DEVELOPED RR
ZONE REQUIRES 0.4 VISUAL OPACITY AND VACANT RR REQUIRES 0.2 VISUAL OPACITY.
6. ALL REQUIREMENTS OF SECTION 5.3.7.G. OF THE UDO SHALL BE MET AS FOLLOWS;
A. THE MINE AREA IS LIMITED TO NO MORE THAN 20 ACRES INCLUDING BUFFER AREAS.
B. NO ONSITE PROCESSING IS PERMITTED SUCH AS, CONVEYER SYSTEMS, SCREENING
MACHINES, CRUSHING, OR OTHER MECHANICAL EQUIPMENT.
C. THE USE OF EXPLOSIVES IS NOT PERMITTED,
D. THE PUMPING OF SURFACE WATERS FROM ONE EXCAVATION PIT TO ANOTHER
EXCAVATION PIT LOCATED ON THE SAME PARCEL OF LAND AS THE MINING OPERATIONS
IS PROPOSED.
E. THE DEPTH OF EACH EXCAVATION PIT SHALL NOT EXCEED 35 FEET.
7. MINE OPERATOR SHALL USE A WATER TRUCK TO CONTROL DUST ALONG THE HAUL
ROAD AS NECESSARY.
8. THE MINE WILL BE LEGALLY SUBDIVIDED WITH ITS OWN UNIQUE TAX PARCEL NUMBER.
9. NO PORTION OF THE MINE AREA IS LOCATED WITHIN A FLOOD HAZARD AREA
10. THERE IS NO PHASING PLAN FOR THE MINE.
LEGEND
PROPERTY LINE
MPB MPB MINE PERMIT BOUNDARY
LOE -LOE LIMITS OF EXCAVATION
TSF TEMPORARY SILT FENCE
® PUMPING LOCATION
:.:.:.:.:.:.:.:.:.:.:.:.:.:..:.::::::::^::::::... WETLANDS AREA
-EXISTING DRIVEWAY-,
TRIPP pAvPAR
ONJO g6MA00, 5
2NlNG RR ' ASHTON F
PARMS LLC
PARCEL:
- - ZONING: RR004
MAoz r
G` RR --� t e
pARC TRIPP DAVE
_ ' ZONING.- RRj TRIPp ' I
ZONING RRI P DA
�P DA AR EL 146M 04201 6
6MAVr
02 PA C TRIPP PAVE ZONING: RR
NG RR EL7O ,. A003 L I
DA RR _ _ ASHTON F
GARB 41RCEL. 1, A04 - - 1 AR
ZONING. - _ ( PARCEL: 146 S L
LC
DAVE+I F_ ' - _ 'RRI ZONING:
N Q05 '
ARRg PAF�CEL:TRIMpP PAR TRIPP PAVE ' 4 AS l
AVE ;�_ONING: RRI Z NING6RR3204' HTON
_ PARC ARMS LLC
RR' PA CEL:TR148MA00R - 2 NIR ZONING46NA007
L ZONING: R I PARCTRIPP p VE 7 J
�- 74 0003201RIPP ZONING: RRR PA CEL146MA
AID q
' — o
El ZONING: R
ASHTON FARMS LLC
MC T-343
PARCEL: 16300015
ZONING: R75
1 PA CELTRIPP DAVE/ PARCTRIPP pA S it
SHTON A �."� �..,�►, 4 �% LI
146 1460 03202 PARCEL: RM
ZONINGA RRI ZONING: RR ; ;
\ ZONING: RR OOS
\ ZONING.- 00 3203 ASHTON
J PARCEL: AARMS LLC ` � ; .
J.
ZONING: 6NA00g l(
! - = 112" EIP RR 1
TRIPP DA
PARCEL W------
ZONING: RRAOo9l
TRIPP pA
VE
PARCEL.
ZONING RR�MAp p
_ TRIPP DA
VE
PARCEL. 1MAO11'
ZONING; RR
TRIPP DA
VE
PARCEL: 146
ZONING: RR MAO12
TRIPP pA
PARCEL V146MA017
ZONING: RR
-TRIPP DAB I
ZONING RPARCER46MAD16
op DAVE
'NGE RR 6MA015 '
2 RUSSELL WAYNE/
ZCEL: 16200023
ZONING: RR
?IPP DAVE
L: 1620002410'
DNING: RR '
_7
SSELL WAYNE
1620002408
NG: RR
EXISTING DRIVEWAY11
TO BE PAVED �
PER NCDOT
REQUIREMENTS
O
W
00
N UNDISTURBED
L0 BUFFER
CO AREA RESERVED
O FOR FUTURE
Z DEVELOPMENT
j `TY2" N I R
\
:412 BENTON RTHA WARD
4
r
r
f'-
O
>L
to0:
zm
'—PROPOSED MARL HR
ROAD
PROPOSED GATE TO BE
LOCATED 100 FT MINIMUM
FROM RIGHT OF WAY
MINE AREA #1
14.84 ACRES
(PARCEL NUMBER TO BE
DETERMINED)
ZONING: RR
PARCEL: 1 Od02}d4
' ZONING: RR I
2
!/ XONG SR
(CUN
lY WATER)
) \ \
BENTON MARTHA WARD \
\ ao
PARCEL: 1620002404 \
-ExlsnNc ZONING: RR \\\
(COUNTY HOUSE /"7
wATFRI /
ASHTON FARMS LLC
MC T--- 343 :1
PARCEL: 16300015
ZONING: R75
tvO
J�p\0J -
�oz,
�x
,—LOE
LOC 17 NGE CAL 1 11 �, 100'
SEE DES BASIN
SHEET C2 L 0 100 200 300
NIR
C7
'' .7
lec, /1�
111
ASHTON FARMS LLC
MC T-343
PARCEL: 16300015
ZONING: R75
1 /2"
NGGo2iDo3
j6LS6,�j ��
PUMPING OPERATIONS AND MONITORING PLAN
1. BEGIN EXCAVATION IN THE SOUTHEAST CORNER OF THE SITE AND WHEN THE
EXCAVATION IS LARGE ENOUGH TO REQUIRE THE WITHDRAW OF GROUND WATER INSTALL
A PUMP IN THE GENERAL LOCATION SHOWN THAT CAN DISCHARGE UP TO 500,000
GALLONS PER DAY.
2. INSTALL THE STILLING BASIN PER THE DETAIL ON SHEET C2 PRIOR TO BEGINNING
DEWATERING OPERATION TO ENSURE A NON -.EROSIVE DISCHARGE INTO THE EXISTING
DRAINAGE DITCH SHOWN.
3. AT THE BEGINNING AND END OF EACH DEWATERING ACTIVITY INSPECT -17HE STILLING
BASIN TO ENSURE IT IS FUNCTIONING PROPERLY AND THAT NO EROSION IS OCCURING.
REPAIR ANY AREA THAT NEEDS REINFORCEMENT WITH RIP RAP.
z
0 d
a Q
cz
n
W Z H
0 0
Ln �
Lu
0
z
a 0
0
m
_.
cy
CD
cm
!'
r
•
CC
..
•
4
..
owotq
IS
QA N
U N W �
�zs
W
a
Z
C7
Z
W
a
n N m
�U
ZOO
®
U�
00^
�zw
C)
gl
Licence #C-3641
0