Loading...
HomeMy WebLinkAboutNCG021003_Scanned Site Plans_20220830VICINITY MAP N.T.S. ;Im•rw' ACREAGE PARCEL PORTION OF 16300015 TOTAL SITE AREA 20.00 EXISTING WETLANDS 0 DISTURBED WETLANDS 0 UNDISTURBED WETLANDS 0 CATEGORY ACREAGE MINE EXCAVATION 14.84 PROCESSING AREA/HAUL ROADS 0.27 TAILINGS/SEDIMENT PONDS 0 STOCKPILES 0 WASTE PILES 0 BUFFER AREA 4.8 TOTAL AREA TO BE PERMITTED 20.00 TOP BANK ELEV. VARIES FROM 38' TO 30' MINE RECLAMATION iI,______ y BACKSLOPE 3 FINAL NORMAL WATER ELEVATION MAXIMUM DEPTH - 35' 1L_ z BOTTOM ELEV. VARIES MINE SLOPE & RECLAMATION CROSS SECTION NTS NOTES: 1. DEPTH OF MINE WILL BE DICTATED BY SUITABLE MATERIAL. 2. AT RECLAMATION ALL BANKS ABOVE NORMAL WATER WILL BE SLOPED & GRADED AT 4:1 & STABILIZED WITH GRASSING. HAUL ROAD SECTION NTS NOTES: 1. MINING TO COMMENCE ON AN AS NEEDED BASIS. 2. RECLAMATION IS REQUIRED PRIOR TO MINE CLOSE OUT. 3. NO PERMANENT STRUCTURES OR PERMANENT EMPLOYEES ARE PROPOSED ON SITE. 4. THE HOURS OF OPERATION WILL BE MONDAY THRU FRIDAY FROM 7:30 AM TO 5:00 PM. 5. BUFFERS SHALL BE NATURAL VEGETATION SUPPLEMENTED WITH PLANTINGS AS NECESSARY TO MEET UDO REQUIREMENTS, MINE AREA LOCATED ADJACENT TO DEVELOPED RR ZONE REQUIRES 0.4 VISUAL OPACITY AND VACANT RR REQUIRES 0.2 VISUAL OPACITY. 6. ALL REQUIREMENTS OF SECTION 5.3.7.G. OF THE UDO SHALL BE MET AS FOLLOWS; A. THE MINE AREA IS LIMITED TO NO MORE THAN 20 ACRES INCLUDING BUFFER AREAS. B. NO ONSITE PROCESSING IS PERMITTED SUCH AS, CONVEYER SYSTEMS, SCREENING MACHINES, CRUSHING, OR OTHER MECHANICAL EQUIPMENT. C. THE USE OF EXPLOSIVES IS NOT PERMITTED, D. THE PUMPING OF SURFACE WATERS FROM ONE EXCAVATION PIT TO ANOTHER EXCAVATION PIT LOCATED ON THE SAME PARCEL OF LAND AS THE MINING OPERATIONS IS PROPOSED. E. THE DEPTH OF EACH EXCAVATION PIT SHALL NOT EXCEED 35 FEET. 7. MINE OPERATOR SHALL USE A WATER TRUCK TO CONTROL DUST ALONG THE HAUL ROAD AS NECESSARY. 8. THE MINE WILL BE LEGALLY SUBDIVIDED WITH ITS OWN UNIQUE TAX PARCEL NUMBER. 9. NO PORTION OF THE MINE AREA IS LOCATED WITHIN A FLOOD HAZARD AREA 10. THERE IS NO PHASING PLAN FOR THE MINE. LEGEND PROPERTY LINE MPB MPB MINE PERMIT BOUNDARY LOE -LOE LIMITS OF EXCAVATION TSF TEMPORARY SILT FENCE ® PUMPING LOCATION :.:.:.:.:.:.:.:.:.:.:.:.:.:..:.::::::::^::::::... WETLANDS AREA -EXISTING DRIVEWAY-, TRIPP pAvPAR ONJO g6MA00, 5 2NlNG RR ' ASHTON F PARMS LLC PARCEL: - - ZONING: RR004 MAoz r G` RR --� t e pARC TRIPP DAVE _ ' ZONING.- RRj TRIPp ' I ZONING RRI P DA �P DA AR EL 146M 04201 6 6MAVr 02 PA C TRIPP PAVE ZONING: RR NG RR EL7O ,. A003 L I DA RR _ _ ASHTON F GARB 41RCEL. 1, A04 - - 1 AR ZONING. - _ ( PARCEL: 146 S L LC DAVE+I F_ ' - _ 'RRI ZONING: N Q05 ' ARRg PAF�CEL:TRIMpP PAR TRIPP PAVE ' 4 AS l AVE ;�_ONING: RRI Z NING6RR3204' HTON _ PARC ARMS LLC RR' PA CEL:TR148MA00R - 2 NIR ZONING46NA007 L ZONING: R I PARCTRIPP p VE 7 J �- 74 0003201RIPP ZONING: RRR PA CEL146MA AID q ' — o El ZONING: R ASHTON FARMS LLC MC T-343 PARCEL: 16300015 ZONING: R75 1 PA CELTRIPP DAVE/ PARCTRIPP pA S it SHTON A �."� �..,�►, 4 �% LI 146 1460 03202 PARCEL: RM ZONINGA RRI ZONING: RR ; ; \ ZONING: RR OOS \ ZONING.- 00 3203 ASHTON J PARCEL: AARMS LLC ` � ; . J. ZONING: 6NA00g l( ! - = 112" EIP RR 1 TRIPP DA PARCEL W------ ZONING: RRAOo9l TRIPP pA VE PARCEL. ZONING RR�MAp p _ TRIPP DA VE PARCEL. 1MAO11' ZONING; RR TRIPP DA VE PARCEL: 146 ZONING: RR MAO12 TRIPP pA PARCEL V146MA017 ZONING: RR -TRIPP DAB I ZONING RPARCER46MAD16 op DAVE 'NGE RR 6MA015 ' 2 RUSSELL WAYNE/ ZCEL: 16200023 ZONING: RR ?IPP DAVE L: 1620002410' DNING: RR ' _7 SSELL WAYNE 1620002408 NG: RR EXISTING DRIVEWAY11 TO BE PAVED � PER NCDOT REQUIREMENTS O W 00 N UNDISTURBED L0 BUFFER CO AREA RESERVED O FOR FUTURE Z DEVELOPMENT j `TY2" N I R \ :412 BENTON RTHA WARD 4 r r f'- O >L to0: zm '—PROPOSED MARL HR ROAD PROPOSED GATE TO BE LOCATED 100 FT MINIMUM FROM RIGHT OF WAY MINE AREA #1 14.84 ACRES (PARCEL NUMBER TO BE DETERMINED) ZONING: RR PARCEL: 1 Od02}d4 ' ZONING: RR I 2 !/ XONG SR (CUN lY WATER) ) \ \ BENTON MARTHA WARD \ \ ao PARCEL: 1620002404 \ -ExlsnNc ZONING: RR \\\ (COUNTY HOUSE /"7 wATFRI / ASHTON FARMS LLC MC T--- 343 :1 PARCEL: 16300015 ZONING: R75 tvO J�p\0J - �oz, �x ,—LOE LOC 17 NGE CAL 1 11 �, 100' SEE DES BASIN SHEET C2 L 0 100 200 300 NIR C7 '' .7 lec, /1� 111 ASHTON FARMS LLC MC T-343 PARCEL: 16300015 ZONING: R75 1 /2" NGGo2iDo3 j6LS6,�j �� PUMPING OPERATIONS AND MONITORING PLAN 1. BEGIN EXCAVATION IN THE SOUTHEAST CORNER OF THE SITE AND WHEN THE EXCAVATION IS LARGE ENOUGH TO REQUIRE THE WITHDRAW OF GROUND WATER INSTALL A PUMP IN THE GENERAL LOCATION SHOWN THAT CAN DISCHARGE UP TO 500,000 GALLONS PER DAY. 2. INSTALL THE STILLING BASIN PER THE DETAIL ON SHEET C2 PRIOR TO BEGINNING DEWATERING OPERATION TO ENSURE A NON -.EROSIVE DISCHARGE INTO THE EXISTING DRAINAGE DITCH SHOWN. 3. AT THE BEGINNING AND END OF EACH DEWATERING ACTIVITY INSPECT -17HE STILLING BASIN TO ENSURE IT IS FUNCTIONING PROPERLY AND THAT NO EROSION IS OCCURING. REPAIR ANY AREA THAT NEEDS REINFORCEMENT WITH RIP RAP. z 0 d a Q cz n W Z H 0 0 Ln � Lu 0 z a 0 0 m _. cy CD cm !' r • CC .. • 4 .. owotq IS QA N U N W � �zs W a Z C7 Z W a n N m �U ZOO ® U� 00^ �zw C) gl Licence #C-3641 0