HomeMy WebLinkAboutSW6220501_Plansheet C-3.0 - Grading_Drainage Plan_20220825THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED
EROSION CONTROL NOTES
1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE -CONSTRUCTION CONFERENCE.
2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT FENCE, SKIMMER BASIN, SEDIMENT TRAPS AND DISSIPATERS WHERE
SPECIFIED.
3. CLEAR AND GRUB THE SITE AS NEEDED.
4. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO AREAS REMAIN GRASSED.
PERMANENT WET POND
6. INSTALL UTILITIES.
WATER SURFACE: 202.50'
7. INSTALL ALL RIP RAP DISSIPATERS AND INLET PROTECTION ON ALL NEW STORM WATER INLETS.
HIGH WATER (1 YR): 203.20'
TEMPORARY SEDIMENT
BASIN #1
8. PERFORM FINE GRADING.
TOP OF POND: 206.00'
L=123', W=61', D=9'
9. INSTALL AND PREPARE BASE COURSE.
EMERGENCY SPILLWAY: 206.00'
SIDE SLOPES= 2:1
10. PAVE ROADWAYS AND PARKING LOTS.
INVERT OF POND: 197.00'
TOP OF BASIN: 207.00'
'
11. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS.
I
BOTTOM OF BASIN: 197.00'
12. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE ALL TEMPORARY MEASURES.
PERMANENT POND IS TO BE
6' EMERGENCY SPILLWAY: 206.00'
'
13. AFTER THE SITE HAS BEEN STABILIZED, REMOVE TEMPORARY CHECK DAMS AND FINAL GRADE THE PERMANENT SWALES FOR THE SITE.
USED AS A TEMPORARY SEDIMENT
INVERT OF SKIMMER: 202.50'
14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING TO THE
BASIN THROUGH CONSTRUCTION
SIDE SLOPES OF BASIN ARE TO
RIP RAP WATER BAR TO
NCDEQ EROSION CONTROL MANUAL.
THEN CONVERTED TO A WET POND
BE SEEDED WITHIN SEVEN DAYS.
DIVERT RUNOFF INTO WETLAND
15. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL STORM WATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST BE REQUESTED BY
UPON STABILIZATION OF THE SITE.
**ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL)
=14' _ H=1.5'
L W 2
THE PERMITTEE VIA A NOTICE OF TERMINATION (NOT). THE NOT IS AVAILABLE AT:
HTTPS://EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION. PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT MUST BE UPLOADED
15'X15' DRAINAGE
EASEMENT
REMOVE THE SKIMMER AFTER
CONSTRUCTION IS COMPLETE
WITH 1.4" ORIFICE FOR DEWATERING THE
SEDIMENT BASIN DURING CONSTRUCTION.
Dso-8" Dm� 12„
CLASS B
I
AS PART OF COMPLETING THE NOTICE OF TERMINATION PROCESS.
AND THE SITE IS STABLE.
VICINITY MAP NOT TO SCALE
LEGEND:
EPK0 EPK-EXISTING PK NAIL
o COMPUTED POINT
N/F - NOW OR FORMERLY
R/W - RIGHT OF WAY
PROPERTY LINE
ADJACENT PROPERTY LINE
RIGHT-OF-WAY
SETBACK LINE
ss SANITARY SEWER LINE
w WATER LINE
WETLANDS
PERMANENT EASEMENT
210 MAJOR CONTOUR
207 MINOR CONTOUR
BENCHMARK
PP UTILITY POLE
C• GUY WIRE
WV
D4 WATER VALVE
FIRE HYDRANT
0 WATER METER
SS SANITARY SEWER MANHOLE
oco CLEANOUT
CONCRETE
0 WETLANDS
UTILITY EASEMENT DASHED LINES ARE GRADE LINES INDICATE TO
SKIMMER STRAIGHT GRADE FROM GIVEN ELEVATIONS.
LOC LIMITS OF CONSTRUCTION
SF SILT FENCE LINE
JN JUTE NETTING
DIV DIVERSION BERM
0INLET PROTECTION
GRADING NOTES
1. COMMON AREA 1 IS ALSO THE STORM WATER ACCESS AND
MAINTENANCE EASEMENT
2. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE
BENCHMARK AND MUST BE VERIFIED BY THE GENERAL
CONTRACTOR.ALL SPOT ELEVATIONS ARE TO THE FINISHED
GRADE OF THE CURB, UNLESS OTHERWISE NOTED.
3. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES
SHALL HAVE A CROSS SLOPE NO STEEPER THAN 2% AND
LONGITUDINAL SLOPE NO STEEPER THAN 5%.
4. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL
LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE
WITH THE APPROVED EROSION AND SEDIMENTATION
CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND
MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY
DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS.
5. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE
PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL,
AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL
BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND
HAS BEEN COMPLETED
6. PROTECTIVE MEASURES SHALL BE TAKEN BY THE
CONTRACTOR AND THE OWNER TO PROTECT ADJACENT
PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING
OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR
THE UNDERGROUND UTILITY PIPES, CONDUITS, OR
STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN
7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY
THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE
AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE
PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE
TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS
OPERATION.
8. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH
DURING AND AFTER GRADING BY THE CONTRACTOR TO
DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT
IS DETERMINED THAT THERE IS A SLOPE STABILITY
PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED.
9. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT
SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED
BY SILT FENCE.
10. APPROVED COPIES OF THE GRADING AND EROSION CONTROL
PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS
IN PROGRESS.
11. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE
SHALL REMAIN IN A CONDITION SUCH THAT THEY CAN
TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO
HANDLE THE STORM WATER ARE CONSTRUCTED. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE
DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS.
12. ANY DEVIATION FROM THE APPROVED GRADING PLAN
SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR
TO IMPLEMENTATION OF THE CHANGE.
13. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR
MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75
TEMPORARY EROSION CONTROL BLANKET OR EQUAL
SUBSTITUTE.
14. STORM PIPE DISTANCES SHOWN ARE TO THE CENTER OF
THE BOX FOR ALL STRUCTURES UNLESS OTHERWISE NOTED.
Know what's below.
Call before you dig.
GRAPHIC SCALE
30 0 15 30 60
( IN FEET )
1 inch = 30 ft.
ROOF DRAINS TO BE
'TED TO THE FRONT
OF THIS LOT
120
ml7 viva
I
INV OUT:205.94
T
I1
1
I
I
I
I
N
3
I
I
I
I
N�ln 3
U I
J J
J _p
-
_ p
Z a I
� 3 �
`
MH 3011 1
INV IN(N):200.55
INV IN(W):200.72
INV IN(E):200.71 I
g
INV OUT: (S): 200.47
RIP RAP DISSIPATER
D50=8" D►A=12„
CLASS B 18" THICK
71RIP RAP TO BOTTOM
OF SLOPE
m �
too
ALL DIVERSION BERMS
TO BE MATTED WITH NAG S150
IMMEDIATELY UPON COMPLETION
DIVERSION BERM TO BE
SEEDED WITHIN 7 DAYS
(TYP)
EROSION CONTROL NOTES
1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR
MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE.
SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP
AND INLET PROTECTION DEVICES WHEN THE STORAGE
CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL
WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL
NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE
REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT
BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT
FENCE WILL BE REPAIRED AS NEEDED TO MAINTAIN A
PROPER BARRIER.
2. TEMPORARY EROSION CONTROL FACILITIES AND/OR
PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF
AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED
BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE
OR AT THE EARLIEST POSSIBLE POINT DURING
CONSTRUCTION.
3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES
SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR
SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH
CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND
DESIGN MANUAL.
4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ
OLD WAR OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY
40' R/W (PUI LAND DISTURBING ACTIVITIES. 910-433-3300
i LSF _ �:)r 00�
ANE I 1 ,
1
TI-S EP COLLAR00•
t �
206 0
to ♦
71 �
^ I
SIF
I-= Q.0 ►�
♦ ����-`
DIV DIV
zoo �
Zo$ -
704.34 � W
)3�SF 19
GROUND STABILIZATION CHART
SITE AREA
STABILIZATION
STABILIZATION TIME
DESCRIPTION
TIME FRAME
FRAME EXCEPTIONS
PERIMETER DIKES,
SWALES, DITHCES
7 DAYS
NONE
AND SLOPES
HIGH QUALITY
WATER (HQW)
7 DAYS
NONE
ZONES
IF SLOPES ARE 10' OR
SLOPES STEEPER
7 DAYS
LESS IN LENGTH AND ARE
THAN 3:1
NOT STEEPER THAN 2:1,
14 DAYS ARE ALLOWED
SLOPES 3:1 OR
7-DAYS FOR SLOPES
FLATTER
14 DAYS
GREATER THAN 50 FEET
IN LENGTH
NONE
ALL OTHER AREAS
(EXCEPT FOR
WITH SLOPES FLATTER
14 DAYS
PERIMETERS AND
THAN 4:1
HQW ZONES)
RIP RAP DISSIPATER y
L=12' W=6/14'
D-8" Dw,x=12"
CLASS B 18" THICK
1 i
IV
I
LIMITS OF CONSTRUCTION
5.3 AC
♦ LOB
'♦j5F SF �►
BOG/ SF
♦/ ��
/ 00
C.�
( I lr
O
U
0
J
I
I �
r
a
I n
I o
J
n
♦ / OS 0
13 03 LF ® i
;IIII/1
30:15 LF ® 0
//,!
3' WALL 200.80)
PAD 207.70 i lW
R I 0
\ c'
WALL DITCH 1
I /`® ?SEED WITHIM
S
001
---RIP RAP DISSIPATEF
L=8' W=4/9'
D-8„ D-12"
CLASS B 18" (THICK
DIVERT PAVEMENT RUNOFF
TO TSB#2 UNTIL CONTRIBUTING
DRAINAGE AREA IS STABLE
' 'T DIVERSION BERM T BE
/ / SEEDED WITHIN 7 DAYS
(TYP)
^ I
m 000000,
ry CA
'00;
N �
O /
J ^
DASHED LINES ARE GRADE LINES INDICATE TO
STRAIGHT GRADE FROM GIVEN ELEVATIONS.
.i, -
5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR
OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE
PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS
WHEN TRACKING OCCURS.
6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET
FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE
CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS,
STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS,
OR OTHER MEANS. CONTROL EROSION FROM ALL
STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES
TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES
MUST BE NO LESS THAN FIVE FEET FROM THE
DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT
MORE THAN 24 HOURS.
7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT
CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING
DRAINAGE AREA HAS BEEN STABILIZED. INSPECT
TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON
A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR
ROTTED EROSION CONTROL DEVICES IMMEDIATELY.
8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED
AREAS WHICH HAVE BEEN FINISH GRADED, AND ALL
DENUDED AREAS IN WHICH GRADING OR SITE BUILDING
CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY
AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER
WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION
CONTROL MATTING, AND/OR SODDING AND STAKING IN
GREEN SPACE AREAS AND OTHERWISE APPROPRIATE
MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON
AREAS TO BE PAVED.
9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL
DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE
FINAL STABILIZATION AND PERMANENT VEGETATION HAS
BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ
APPROVE THE ACTION PRIOR TO REMOVAL.
10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED
CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION
ACTIVITY.
11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL
TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION
ACTIVITIES.
12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE
ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES
PERFORMING WORK ON THIS PROJECT.
13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE
CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY
RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN
ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE
IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED.
14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED
SLOPES AND FILLS SHALL BE NO GREATER THAN THE
ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR
OTHER ADEQUATE EROSION CONTROL DEVICES OR
SOLUr7
02
RIP RAP DISSIPATER CID
L=2' W=1 /3'
D,1.10=4" D6"
CLASS B 9" THICK
TEMPORARY S........ ER BASIN #2
L=65', W=30', D=4' o
SIDE SLOPES= 2:1
TOP OF BASIN: 203.50' cc
BOTTOM OF BASIN: 199.50' Q
6' EMERGENCY SPILLWAY. 202.50' Z
INVERT OF SKIMMER: 200.00'
SIDE SLOPES OF BASIN ARE TO
BE SEEDED WITHIN SEVEN DAYS. Z
**ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL)
WITH 1.3" ORIFICE FOR DEWATERING THE
SEDIMENT BASIN DURING CONSTRUCTION.
20' DRAINAGE
EASEMENT
NOTIFICATION OF COMBINED SELF -MONITORING AND
SELF -INSPECTION FORM:
THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN
2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR
LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH
PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED
EROSION AND SEDIMENTATION CONTROL PLAN IS BEING
FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE
INSPECTIONS TOOK EFFECT OCTOBER 1, 2010.
TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS
AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR
DEVELOPED A COMBINED FORM. THE SELF -INSPECTION
PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING
PROGRAM OF THE NPDES STORMWATER PERMIT FOR
CONSTRUCTION ACTIVITIES. THE FOCUS OF THE
SELF -INSPECTION REPORT IS THE INSTALLATION AND
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL
MEASURES ACCORDING TO THE APPROVED PLAN. THE
INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF
THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND
COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT:
HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION
IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM,
PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910)
433-3300.
STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL,
WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY
PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED
WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES
OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION.
PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR
PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION
MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN
90 CALENDAR DAYS FOLLOWING COMPLETION OF
CONSTRUCTION OR DEVELOPMENT.
15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION
CONTROL MEASURES SHOWN AND ANY ADDITIONAL
MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING
THE COURSE OF CONSTRUCTION.
16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS
NECESSARY, AND MULCHED ACCORDING TO THE DETAILS
HEREIN.
17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT
ARISE ON SITE IS SANJAY KHAZANCHI. CONTACT
917-371-7175.
0site
solutions
civil engineering I Land surveying
409 Chicago Drive, Suite.U2, Fayetteville, NC 28306
office 1 910-426-6777 fax 1910-426-5777 license number I C-2354
www.4Dsitesotutions.com
`````\ y\ CARD �%
2 : OF SS ..�L
SEA
• 02
.G � NE .•: ja���
z/ O�I I111\�
U 81-7 - 2 2
REVISIONS
PROJECT NAME
SOUTHVIEW
PARK
SUBDIVISION
( ZERO LOT LINE)
GRADING AND
EROSION
CONTROL PLAN
CLIENT
FAITHWILL HOMES
3840 Legion Road
Hope Mills, North Carolina 28348
Phone: (917) 371-7175
PROJECT INFORMATION
DESIGNED BY:
SEAN
DRAWN BY:
BRETT
CHECKED BY:
SCOTT
PROJECT NUMBER:
1722
DRAWING SCALE
HORIZONTAL: 1 "=30'
DATE RELEASED
J U LY 26, 2022
SHEET NUMBER
C-3nO