Loading...
HomeMy WebLinkAboutSW6220501_Plansheet C-3.0 - Grading_Drainage Plan_20220825THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED EROSION CONTROL NOTES 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE -CONSTRUCTION CONFERENCE. 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT FENCE, SKIMMER BASIN, SEDIMENT TRAPS AND DISSIPATERS WHERE SPECIFIED. 3. CLEAR AND GRUB THE SITE AS NEEDED. 4. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO AREAS REMAIN GRASSED. PERMANENT WET POND 6. INSTALL UTILITIES. WATER SURFACE: 202.50' 7. INSTALL ALL RIP RAP DISSIPATERS AND INLET PROTECTION ON ALL NEW STORM WATER INLETS. HIGH WATER (1 YR): 203.20' TEMPORARY SEDIMENT BASIN #1 8. PERFORM FINE GRADING. TOP OF POND: 206.00' L=123', W=61', D=9' 9. INSTALL AND PREPARE BASE COURSE. EMERGENCY SPILLWAY: 206.00' SIDE SLOPES= 2:1 10. PAVE ROADWAYS AND PARKING LOTS. INVERT OF POND: 197.00' TOP OF BASIN: 207.00' ' 11. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. I BOTTOM OF BASIN: 197.00' 12. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE ALL TEMPORARY MEASURES. PERMANENT POND IS TO BE 6' EMERGENCY SPILLWAY: 206.00' ' 13. AFTER THE SITE HAS BEEN STABILIZED, REMOVE TEMPORARY CHECK DAMS AND FINAL GRADE THE PERMANENT SWALES FOR THE SITE. USED AS A TEMPORARY SEDIMENT INVERT OF SKIMMER: 202.50' 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING TO THE BASIN THROUGH CONSTRUCTION SIDE SLOPES OF BASIN ARE TO RIP RAP WATER BAR TO NCDEQ EROSION CONTROL MANUAL. THEN CONVERTED TO A WET POND BE SEEDED WITHIN SEVEN DAYS. DIVERT RUNOFF INTO WETLAND 15. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL STORM WATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST BE REQUESTED BY UPON STABILIZATION OF THE SITE. **ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) =14' _ H=1.5' L W 2 THE PERMITTEE VIA A NOTICE OF TERMINATION (NOT). THE NOT IS AVAILABLE AT: HTTPS://EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION. PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT MUST BE UPLOADED 15'X15' DRAINAGE EASEMENT REMOVE THE SKIMMER AFTER CONSTRUCTION IS COMPLETE WITH 1.4" ORIFICE FOR DEWATERING THE SEDIMENT BASIN DURING CONSTRUCTION. Dso-8" Dm� 12„ CLASS B I AS PART OF COMPLETING THE NOTICE OF TERMINATION PROCESS. AND THE SITE IS STABLE. VICINITY MAP NOT TO SCALE LEGEND: EPK0 EPK-EXISTING PK NAIL o COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY SETBACK LINE ss SANITARY SEWER LINE w WATER LINE WETLANDS PERMANENT EASEMENT 210 MAJOR CONTOUR 207 MINOR CONTOUR BENCHMARK PP UTILITY POLE C• GUY WIRE WV D4 WATER VALVE FIRE HYDRANT 0 WATER METER SS SANITARY SEWER MANHOLE oco CLEANOUT CONCRETE 0 WETLANDS UTILITY EASEMENT DASHED LINES ARE GRADE LINES INDICATE TO SKIMMER STRAIGHT GRADE FROM GIVEN ELEVATIONS. LOC LIMITS OF CONSTRUCTION SF SILT FENCE LINE JN JUTE NETTING DIV DIVERSION BERM 0INLET PROTECTION GRADING NOTES 1. COMMON AREA 1 IS ALSO THE STORM WATER ACCESS AND MAINTENANCE EASEMENT 2. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR.ALL SPOT ELEVATIONS ARE TO THE FINISHED GRADE OF THE CURB, UNLESS OTHERWISE NOTED. 3. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES SHALL HAVE A CROSS SLOPE NO STEEPER THAN 2% AND LONGITUDINAL SLOPE NO STEEPER THAN 5%. 4. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. 5. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS BEEN COMPLETED 6. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN 7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS OPERATION. 8. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A SLOPE STABILITY PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 9. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED BY SILT FENCE. 10. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. 11. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN A CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO HANDLE THE STORM WATER ARE CONSTRUCTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. 12. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF THE CHANGE. 13. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR EQUAL SUBSTITUTE. 14. STORM PIPE DISTANCES SHOWN ARE TO THE CENTER OF THE BOX FOR ALL STRUCTURES UNLESS OTHERWISE NOTED. Know what's below. Call before you dig. GRAPHIC SCALE 30 0 15 30 60 ( IN FEET ) 1 inch = 30 ft. ROOF DRAINS TO BE 'TED TO THE FRONT OF THIS LOT 120 ml7 viva I INV OUT:205.94 T I1 1 I I I I N 3 I I I I N�ln 3 U I J J J _p - _ p Z a I � 3 � ` MH 3011 1 INV IN(N):200.55 INV IN(W):200.72 INV IN(E):200.71 I g INV OUT: (S): 200.47 RIP RAP DISSIPATER D50=8" D►A=12„ CLASS B 18" THICK 71RIP RAP TO BOTTOM OF SLOPE m � too ALL DIVERSION BERMS TO BE MATTED WITH NAG S150 IMMEDIATELY UPON COMPLETION DIVERSION BERM TO BE SEEDED WITHIN 7 DAYS (TYP) EROSION CONTROL NOTES 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP AND INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO MAINTAIN A PROPER BARRIER. 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE OR AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION. 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ OLD WAR OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY 40' R/W (PUI LAND DISTURBING ACTIVITIES. 910-433-3300 i LSF _ �:)r 00� ANE I 1 , 1 TI-S EP COLLAR00• t � 206 0 to ♦ 71 � ^ I SIF I-= Q.0 ►� ♦ ����-` DIV DIV zoo � Zo$ - 704.34 � W )3�SF 19 GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) RIP RAP DISSIPATER y L=12' W=6/14' D-8" Dw,x=12" CLASS B 18" THICK 1 i IV I LIMITS OF CONSTRUCTION 5.3 AC ♦ LOB '♦j5F SF �► BOG/ SF ♦/ �� / 00 C.� ( I lr O U 0 J I I � r a I n I o J n ♦ / OS 0 13 03 LF ® i ;IIII/1 30:15 LF ® 0 //,! 3' WALL 200.80) PAD 207.70 i lW R I 0 \ c' WALL DITCH 1 I /`® ?SEED WITHIM S 001 ---RIP RAP DISSIPATEF L=8' W=4/9' D-8„ D-12" CLASS B 18" (THICK DIVERT PAVEMENT RUNOFF TO TSB#2 UNTIL CONTRIBUTING DRAINAGE AREA IS STABLE ' 'T DIVERSION BERM T BE / / SEEDED WITHIN 7 DAYS (TYP) ^ I m 000000, ry CA '00; N � O / J ^ DASHED LINES ARE GRADE LINES INDICATE TO STRAIGHT GRADE FROM GIVEN ELEVATIONS. .i, - 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING OCCURS. 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS, OR OTHER MEANS. CONTROL EROSION FROM ALL STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE NO LESS THAN FIVE FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT MORE THAN 24 HOURS. 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL DEVICES IMMEDIATELY. 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS WHICH HAVE BEEN FINISH GRADED, AND ALL DENUDED AREAS IN WHICH GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION CONTROL MATTING, AND/OR SODDING AND STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED. 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE FINAL STABILIZATION AND PERMANENT VEGETATION HAS BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ APPROVE THE ACTION PRIOR TO REMOVAL. 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION ACTIVITY. 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION ACTIVITIES. 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK ON THIS PROJECT. 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR SOLUr7 02 RIP RAP DISSIPATER CID L=2' W=1 /3' D,1.10=4" D­­6" CLASS B 9" THICK TEMPORARY S........ ER BASIN #2 L=65', W=30', D=4' o SIDE SLOPES= 2:1 TOP OF BASIN: 203.50' cc BOTTOM OF BASIN: 199.50' Q 6' EMERGENCY SPILLWAY. 202.50' Z INVERT OF SKIMMER: 200.00' SIDE SLOPES OF BASIN ARE TO BE SEEDED WITHIN SEVEN DAYS. Z **ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) WITH 1.3" ORIFICE FOR DEWATERING THE SEDIMENT BASIN DURING CONSTRUCTION. 20' DRAINAGE EASEMENT NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) 433-3300. STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONTROL MEASURES SHOWN AND ANY ADDITIONAL MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING THE COURSE OF CONSTRUCTION. 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE DETAILS HEREIN. 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT ARISE ON SITE IS SANJAY KHAZANCHI. CONTACT 917-371-7175. 0site solutions civil engineering I Land surveying 409 Chicago Drive, Suite.U2, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com `````\ y\ CARD �% 2 : OF SS ..�L SEA • 02 .G � NE .•: ja��� z/ O�I I111\� U 81-7 - 2 2 REVISIONS PROJECT NAME SOUTHVIEW PARK SUBDIVISION ( ZERO LOT LINE) GRADING AND EROSION CONTROL PLAN CLIENT FAITHWILL HOMES 3840 Legion Road Hope Mills, North Carolina 28348 Phone: (917) 371-7175 PROJECT INFORMATION DESIGNED BY: SEAN DRAWN BY: BRETT CHECKED BY: SCOTT PROJECT NUMBER: 1722 DRAWING SCALE HORIZONTAL: 1 "=30' DATE RELEASED J U LY 26, 2022 SHEET NUMBER C-3nO