Loading...
HomeMy WebLinkAbout20220897 Ver 1_More Info Received_20220830      Update for Permit Application: Pilot Beaver Dam Analog Restoration of an Unnamed Tributary of Canoe Creek August 29, 2022 Maintenance Plan for Pilot BDA Project:  Upkeep and repairs to the Beaver Dam Analogs (BDAs) will occur as needed for the first year of the project.  After first year further maintenance will cease unless significant signs of beaver take place around the BDAs without colonization by beaver. Then BDAs will be maintained if needed for an additional six months  Primary BDAs will be the first priority and secondaries as deemed necessary. The work will be done in exactly the same way as construction and if repaired will be repaired to its original demotions.  Only natural materials will be used from on site, but not within the riparian buffers.  After a year if colonization by beavers is unsuccessful structures will be left in place to degrade naturally or removed if needed.  If colonization by beavers occurs during the first year of the project, maintenance would be extremely rare. Grant Buckner Watershed Manager- Northern Basin Catawba Riverkeeper Foundation Phone: 704.679.9494. ext. 110 Email: grant@catawbariverkeeper.org