Loading...
HomeMy WebLinkAboutSite Inspection 8.29.22 Chinquapin BridgeWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20211560 TPB NCDOT - Replace Bridge 3 on SR 1887 Haywood TPB NCDOT - Replace Bridge 3 on SR 1887 NC DOT Division 14 - Sylva 8/29/2022 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-82° 48' 41''+35° 25' 04'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Site inspection was conducted on August 29, 2022 by Kevin Mitchell with the Asheville Regional Office. Chris Barker was present during the inspection. The following are items that need attention: Contractor is excavating the area on the right bank descending. Measures are needed at the end of the day. This was discussed with Chris. Silt fence is to be added and spoils that have been discarded down the bank will be stabilized at the end of the day. NPDES records were up to date. page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20211560 8/29/2022 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? H piles have been driven on the left bank descending. Area is being excavated on the right bank.Comment: page:2