Loading...
HomeMy WebLinkAboutSite Inspection 8.29.22 Walnut St Round-AboutWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20190586 NCDOT - US 23 Business and Walnut Street Round-About (U-5888)Haywood NCDOT - US 23 Business and Walnut Street Round-About (U-5888) NC DOT Division 14 - Sylva 8/29/2022 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Other Region:Asheville Longitude:-82° 58' 48''+35° 29' 51'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted on August 29, 2022 by Kevin Mitchell with the Asheville Regional Office. Levi McFalls and Hayden Stockton were present during the inspection. The following are items that need attention: - Station L1 15+70 LT (Site 1 above culvert) - Measures are needed along right bank descending to prevent sediment loss. - Station L1 15+15 LT (W Marshall St) - Measures are needed to prevent sediment from entering stormwater inlet on road. Recommend routine sweeping and adding a wattle around inlet if this doesn't interfere with traffic. - Station Y5 15+80 RT - Need cover on exposed soil slopes. Remove 57 stone from left bank descending. Remove fabric from JS. - NPDES records were not up to date for last week. Record of weekly inspection was not on sheet. Please ensure that these records are up to date and that a weekly inspection is being conducted. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190586 8/29/2022 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Culvert is under construction at Site 1.Comment: page:2