HomeMy WebLinkAbout20140998 Ver 1_Application_20140922
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
PAT L. MCCRORY ANTHONY J. TATA
GOVERNOR SECRETARY
September 19, 2014
Washington Regulatory Field Office
US Army Corps of Engineers
2407 West 5th St.
Washington, North Carolina 27889
ATTN: Mr. Tom Steffens
NCDOT Coordinator
Dear Sir:
Subject: Application for Section 404 Individual Permit, Tar-Pamlico Riparian Buffer
Authorization and Section 401 Water Quality Certification for the proposed
replacement of Bridge Nos. 85, 141, 151 and Culvert No. C70 on US 301 over
Swift Creek and Culvert No. C161 on US 301 over Lane Swamp in Nash County.
Federal Aid Project No. BRSTP-0301(25), TIP No. B-5124.
Debit $570.00 from WBS 42270.1.1.
The North Carolina Department of Transportation (NCDOT), Division of Highways, in
consultation with the Federal Highway Administration (FHWA), proposes to replace Bridge
Nos. 141, 151, 85, and Culverts C70 and C161 on US 301 in Nash County.
The purpose of this letter is to request approval for a Section 404 Individual Permit, Tar-Pamlico
Buffer Authorization and Section 401 Water Quality Certification. In addition to the cover letter,
this application package includes the following for B-5124: ENG Form 4345, stormwater
management plan, permit drawings, roadway plans, EEP acceptance letter, and USFWS
Concurrence Letter.
1.0 Purpose and Need
The purpose for this project, as identified in the Categorical Exclusion (CE), is replace the either
functionally obsolete or structurally deficient bridges and bring US 301 shoulder width up to
current design standards, thus necessitating the culvert extensions.
2.0 Project Description
The project involves replacing Bridge Nos. 85, 141, and 151 and Culvert Nos. C70 and C161
along US 301.
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1598 MAIL SERVICE CENTER
RALEIGH NC 27699-1598
TELEPHONE: 919-707-6100
FAX: 919-212-5785
WEBSITE: WWW.NCDOT.ORG
LOCATION:
CENTURY CENTER, BUILDING B
1020 BIRCH RIDGE DRIVE
RALEIGH NC 27610
3.0 Summary of Impacts
Waters of the U.S.: Proposed permanent impacts to jurisdictional areas total 4.17 acres of
permanent wetland impacts and 108 feet of permanent stream impacts.
4.0 Summary of Mitigation
The proposed construction of B-5124 will impact 4.17 acres of riparian wetlands that will require
mitigation. See attached EEP acceptance letter for additional information.
5.0 Project Schedule
Currently, B-5124 has a review date of March 3, 2015 and is scheduled to let April 21, 2015; it
will be available for construction shortly thereafter. The let date, however, may advance as
additional funds become available.
6.0 NEPA Document Status
The FHWA and NCDOT completed the CE in December 2013 in compliance with the NEPA
guidelines. The CE explains the purpose and need for the project, provides a description of the
alternatives considered, and characterizes the social, economic, and environmental effects. The
CE was approved and circulated to federal, state, and local agencies. This document is posted on
the NCDOT website at https://connect.ncdot.gov/resources/Environmental/Pages/default.aspx,
under Quick Links > Environmental Documents.
6.1 Independent Utility
B-5124 is in compliance with 23 CFR Part 771.111(f) which lists the FHWA characteristics of
the independent utility of a project. The project meets the criteria for independent utility as
discussed below:
• The project has logical termini and independent utility and is of sufficient length to
address environmental matters on a broad scope;
• The project is usable and a reasonable expenditure of funds, even if no additional
transportation improvements are made in the area; and
• The project does not restrict consideration of alternatives for other reasonably
foreseeable transportation improvements.
7.0 Resource Status
The project is located in the Tar-Pamlico River basin and lies within Hydrologic Unit 03020101
(Subbasin 28-78-(0.5). This is within the Middle Atlantic Coastal Plain eco-region. The project
crosses Swift Creek, as well as several tributaries to waters of the U.S., and multiple wetlands.
Wetland and stream delineations were completed April 23, 2009. Jurisdictional areas within the
project study area were field reviewed by the USACE (William Westcott) May 28, 2009.
2
7.1 Wetland Delineations
A wetland identification and preliminary assessment analysis for the study area was performed
and summarized in the 2009 Natural Resources Technical Report (NRTR) and 2012 NRTR
Addendum. The wetlands within the study area were delineated based on the 1987 U.S. Army
Corps of Engineers (USACE) Wetland Delineation Manual and a preliminary design was
prepared to avoid and minimize wetlands to the maximum extent possible.
7.2 Stream Delineations
The stream channels within the project study area were identified, evaluated, and classified using
the NCDWQ stream identification form and the Cowardin classification system. Water quality
information for the streams within the project study area was derived from available sources
provided through the NCDENR.
7.3 B-5124: Characterization of Jurisdictional Sites
7.3.1 Wetlands
There is one wetland type found within the project study area based on the NC Wetland
Assessment Method (NC WAM): Riverine Swamp Forest. More detailed information about
these wetlands can be found in the CE and the NRTR which includes figures showing the
wetlands within the project area.
7.3.2 Streams
The Best Usage Classification for the Swift Creek, UT’s to Swift Creek and Lane Swamp, on the
project is “C; NSW”. Details for the jurisdictional streams within the project area are provided
in the CE and NRTR.
There are no waters within the project vicinity classified as High Quality Waters (HQW).
Neither Water Supplies (WS-I: undeveloped watersheds or WS-II: predominately undeveloped
watersheds), nor Outstanding Resource Waters (ORW) occur within 1.0 mile of the project area.
Streams within the B-5124 project area are not designated as North Carolina Natural or Scenic
Rivers, or as National Wild and Scenic Rivers. Additionally, these waters are not listed on the
2014 303(d) list of impaired waters due to sedimentation or turbidity.
7.4 Impacts to Jurisdictional Resources
Impacts to jurisdictional wetlands and surface waters for B-5124 are summarized below in
Tables 1 and 2 respectively.
3
Table 1. B-5124 Wetlands Impacts
Permit
Drawing
Site
Number
(2014)
Map Label in
CE (2013) Type Permanent
Impacts (ac.)
Temporary
Impacts (ac.)
Mitigation
Required*
(2:1)
1 WA & WB Riverine Swamp Forest 0.39 Yes
2 WA & WB Riverine Swamp Forest 1.10 0.02 Yes
3 WA & WB Riverine Swamp Forest 1.22 Yes
4 WA & WB Riverine Swamp Forest 0.75 0.01 Yes
5 WA & WB Riverine Swamp Forest 0.69 Yes
Total Riparian: 4.17** 0.03
Total Non-riparian: 0.00 0.00
Grand Total: 4.17** 0.03
* For permanent jurisdictional wetland impacts
**Rounded totals are sum of actual impacts
Table 2. B-5124 Surface Water Impacts
Permit
Drawing
Site
Number
Waterbody
Labeled in
CE
Permanent
(ft)
Permanent
(ac.)
Temporary
(ft)
Temporary
(ac.)
USACE
Mitigation
Required (2:1)
1 UT to Swift
Creek 18 0.03 32 0.02 No
1* UT to Swift
Creek 20 No
2 UT to Swift
Creek <0.01 56 0.05 No
3 UT to Swift
Creek 5 <0.01 12 0.10 No
4 Swift Creek <0.01 73 <0.01 No
5 Lane
Swamp 19 0.02 54 0.03 No
5* Lane
Swamp 46 0.03 No
Total: 108 0.09 227 0.21
*Denotes bank stabilization; when necessary, mitigation required by the USACE exceeds the amount required by
NCDWR
Permanent Impacts: Proposed permanent impacts for B-5124 include fill, excavation, and
mechanized clearing in 4.17 acres of riparian wetlands. Proposed permanent impacts to
jurisdictional streams are 108 linear feet. Bank stabilization totals 66 linear feet.
Temporary Impacts: There will be 227 linear feet of temporary impacts to jurisdictional streams
due to culvert installations.
4
Riparian Buffer Impacts: This project is located in the Tar-Pamlico River Basin; therefore, the
regulations pertaining to the Tar-Pamlico River Buffer Rules apply. There will be 13,596 ft2 of
impacts to riparian buffers. This includes 8,384 ft2 in Zone 1 and 5,215 ft2 due to the bridge and
culvert crossings.
Utility Impacts: There are no jurisdictional impacts resulting from utility relocations on this
project.
8.0 Protected Species
The United States Fish and Wildlife Service (USFWS) list 3 federally protected species for Nash
County as of the December 27, 2012 listing (Table 3).
Table 3. Federally Protected Species in Nash County
Common Name Scientific Name Federal
Status Habitat Biological
Conclusion
Red-cockaded
woodpecker
Picoides borealis E No No Effect
Dwarf wedgemussel Alasmidonta heterodon E No MA-NLAA
Tar River spinymussel Elliptio steinstansana E No MA-NLAA
E - Endangered ; MA-NLAA – May Affect-Not Likely to Adversely Affect
Dwarf wedgemussel and Tar River spinymussel
Mussel surveys were conducted on May 6, 2009 and August 24, 2011 by NCDOT biologists.
During the survey, no mussels or mollusks of any kind were encountered. The dwarf
wedgemussel and Tar River spinymussel appear to be limited to creeks and rivers having
moving, well-oxygenated water with gravel or sandy, silt-free substrate. Due to little water
movement and the presence of large amounts of decaying organic material, this reach of Swift
Creek is likely to have low dissolved oxygen and low pH, making it unstable for these species.
Subsequent surveys were performed for Lane Swamp and Ut crossings. No suitable habitat for
either species was found in these surveys. Because dwarf wedgemussel and Tar River
spinym ussel have been found in the Swift Creek watershed, their presence in the project area
cannot be entirely ruled out. Therefore, the biological conclusion for the dwarf wedgemussel and
Tar River spinymussel is “May Affect- Not Likely to Adversely Affect”. Concurrence was
issued September 3, 2010 by the USFWS for Swift Creek (see attached).
8.1 Bald and Golden Eagle Protection Act (BGPA)
In the July 9, 2007 Federal Register (72:37346-37372), the bald eagle was declared recovered,
and removed (de-listed) from the Federal List of Threatened and Endangered wildlife. This
delisting took effect August 8, 2007. After delisting, the Bald and Golden Eagle Protection Act
(Eagle Act) (16 U.S.C. 668-668d) became the primary law protecting bald eagles. While a few
large trees are present in the study area, the canopy is too closed to provide foraging habitat for
bald eagle. In addition, the NCNHP database (updated July 2014) does not indicate any
occurrences of bald eagle within 1.0 mile of the study area.
5
8.2 Moratoria
Anadromous fish moratorium February 15 – June 15 for Bridge Nos. 141 and 151. The moratorium
does not apply to Bridge No. 85 nor Culverts 70 and 161.
9.0 Cultural Resources
NCDOT – Human Environment Section, under the provisions of a Programmatic Agreement
with FHWA, NCDOT, HPO, OSA and the Advisory Council on Historic Preservation (effective
July 1, 2009), reviewed the proposed project and determined that no surveys are required.
10.0 FEMA Compliance
The project has been coordinated with appropriate state and local officials and the Federal
Emergency Management Agency (FEMA) to assure compliance with FEMA, state, and local
floodway regulations.
11.0 Mitigation Options
The NCDOT is committed to incorporating all reasonable and practicable design features to
avoid and minimize jurisdictional impacts, and to provide full compensatory mitigation of all
remaining, unavoidable jurisdictional impacts. Avoidance measures were taken during the
planning and NEPA compliance stages; minimization measures were incorporated as part of the
project design.
11.1 Avoidance and Minimization
All jurisdictional features were delineated, field verified and surveyed within the corridor for B-
5124. Using these surveyed features, preliminary designs were adjusted to avoid and/or
minimize impacts to jurisdictional areas. NCDOT employs many strategies to avoid and
minimize impacts to jurisdictional areas in all of its designs. Many of these strategies have been
incorporated into BMP documents that have been reviewed and approved by the resource
agencies and which will be followed throughout construction. All wetland areas not affected by
the project will be protected from unnecessary encroachment. Individual avoidance and
minimization items are as follows:
• No staging of construction equipment or storage of construction supplies will be allowed in
wetlands or near surface waters.
• The project was designed to avoid or minimize disturbance to aquatic life movements.
• NCDOT and its contractors will not excavate, fill, or perform land clearing activities within
Waters of the U.S. or any areas under the jurisdiction of the USACE, except as authorized by
the USACE. To ensure that all borrow and waste activities occur on high ground, except as
authorized by permit, the NCDOT shall require its contractors to identify all areas to be used
to borrow material, or to dispose of dredged, fill or waste material. Documentation of the
location and characteristics of all borrow and disposal sites associated with the project will be
6
available to the USACE on request.
• Grass Swale treatments have been incorporated in areas where flat slopes can be maintained.
• Proposed culverts will be buried 1 ft. to provide for fish passage.
• All wetlands will receive diffused flow.
• Special Sediment Control Fence will be used were applicable.
• The existing causeway will be utilized to minimize jurisdictional impacts.
• Maintenance of traffic via offsite detour.
• Anadromous fish moratorium February 15 – June 15 for Bridge Nos. 141 and 151. The
moratorium does not apply to Bridge No. 85 nor Culverts 70 and 161.
• Bank stabilization at outlets of culverts will not impact the stream bed.
• Considering environmental, hydraulic, and roadway perspectives, 3:1 slopes are proposed
within the wetlands.
11.2 Compensation
The NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent
possible as described above. The unavoidable impacts to Waters of the U.S. will be offset by
compensatory mitigation provided by EEP.
12.0 Indirect and Cumulative Effects
The project is not in conflict with any plans, existing land use, or zoning regulation. No change
in land use is expected to result from the construction of the project.
13.0 Essential Fish Habitat
The project will not impact any essential fish habitat afforded protection under the
Magnuson-Stevens Act of 1996 (16 U.S.C 1801 et seq.).
14.0 Regulatory Approvals
Section 404: Application is hereby made for a USACE Individual 404 Permit as required for the
above-described activities.
Section 401: We are requesting a Section 401 Water Quality Certification from NCDWR. We
are providing this application to the NCDWR, for their approval. Authorization to debit the
$570 Permit Application Fee from WBS Element 42270.1.1 is hereby given.
Tar-Pamlico River Buffer Authorization: NCDOT requests that the NC Division of Water
Resources review this application and issue a written approval for a Tar-Pamlico River Riparian
Buffer Authorization.
7
A copy of this permit application will be posted on the NCDOT Website at
https://connect.ncdot.gov/resources/Environmental/Pages/default.aspx, under Quick Links>
Permit Applications. A copy of the CE is also available at the above website address under
Quick Links> Environmental Documents. Thank you for your assistance with this project. If you
have any questions or need additional information, please contact John Merritt at
jsmerritt@ncdot.gov or (919) 707-6140
Sincerely,
-6<1/" -
Richard W. Hancock, P.E., Manager
Project Development and Environmental Analysis Unit
cc:
NCDOT Permit Application Standard Distribution List.
8
U.S. ARMY CORPS OF ENGINEERS Form Approved -
APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT OMB No. 0710-0003
33 CFR 325. The proponent agency is CECW-CO-R. Expires: 31-AUGUST-2013
Public reporting for this collection of information is estimated to average 11 hours per response, including the time for reviewing instructions , searching
existing data sources. gathering and maintaining the data needed , and completing and reviewing the collection of information . Send comments regarding
this burden estimate or any other aspect of the collection of information . including suggestions for reducing this burden, to Department of Defense.
Washington Headquarters , Executive Services and Communications Directorate , Information Management Division and to the Office of Management and
Budget, Paperwork Reduction Project (0710-0003). Respondents should be aware that notwithstand ing any other provision of law , no person shall be
subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT
RETURN your form to either of those addresses . Completed applications must be submitted to the District Engineer having jurisdiction over the location of
the proposed activity .
PRIVACY ACT STATEMENT
Authorities : Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act , Section 404, 33 USC 1344; Marine Protection , Research, and Sanctuaries
Act, Section 103 , 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332 . Principal Purpose : Information provided on
this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other
federal , state , and local government agencies , and the public and may be made available as part of a public notice as required by Federal law . Submission
of requested information is voluntary , however, if information is not provided the permit application cannot be evaluated nor can a permit be issued . One set
of original drawings or good reproducible copies wh ich show the location and character of the proposed activity must be attached to this application (see
sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity . An application
that is not completed in full will be returned.
(ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS)
1. APPLICATION NO . 2 . FIELD OFFICE CODE 3 . DATE RECEIVED 4 . DATE APPLICATION COMPLETE
(ITEMS BELOW TO BE FILLED BY APPLICANT)
5 . APPLICANT'S NAME 8 . AUTHORIZED AGENT'S NAME AND TITLE (agent is not required)
First -Richard Middle-W . Last-Hancock, P.E. First -Middle-Last-
Company-NCDOT -PDEA Company-
E-mail Address -E-mail Address -
6 . APPLICANT'S ADDRESS: 9 . AGENT'S ADDRESS :
Address-1598 Mail Service Center Address-
City-Raleigh State -NC Zip-27699 Country-USA City-State-Zip-Country-
7 . APPLICANT'S PHONE NOs. w/AREA CODE 10 . AGENTS PHONE NOs. w/AREA CODE
a. Residence b. Business c. Fax a. Residence b. Business c . Fax
919-707-6140
STATEMENT OF AUTHORIZATION
11. I hereby authorize, to act in my behalf as my agent in the processing of this application and to furnish, upon request.
supplemental information in support of this permit application.
SIGNATURE OF APPLICANT DATE
NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY
12 . PROJECT NAME OR TITLE (see instructions)
B-5124
13. NAME OF WATERBODY , IF KNOWN (if applicable) 14 . PROJECT STREET ADDRESS (if applicable)
Swift Creek and tributari es, Lane Swamp Address U.S 301
··--·-... ····-· ... ..
15. LOCATION OF PROJECT i
Latitude : •N 36.078573 Longitude: •W -77.748548 City ~ Battleboro State-NC Zip-".27~09
16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions)
State Tax ParceiiD Municipality
Section-Township-Range-
ENG FORM 4345; JUL 2013 PREVIOUS EDITiONS ARE OBSOLETE . Page 1 of 3
17. DIRECTIONS TO THE SITE
See attached cover letter
From Battleboro, travel north on US 301 for approximately 1/2 mile to the project site.
18. Nature of Activity (Description of project, include all features)
The project involves the replacement of three bridges and two culverts.
19. Project Purpose (Describe the reason or purpose of the project, see instructions)
This project's purpose is to replace the either functionally obsolete or structurally deficient bridges and bring US 301 shoulder width up to
current design standards. See attached cover letter for more information.
USE BLOCKS 20-231F DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED
20. Reason(s) for Discharge
Roadway fill due to road construction.
21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards:
Type Type
Amount in Cubic Yards Amount in Cubic Yards
See attached cover letter & permit drawings
22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions)
Acres See attached cover letter & permit drawings
or
Linear Feet
23. Description of Avoidance, Minimization, and Compensation (see instructions) ·
See attached cover letter
ENG FORM 4345, JUL 2013
Type
Amount in Cubic Yards
Page 2 of 3
24 . Is Any Portion of the Work Already Complete? DYes ~No IF YES, DESCRIBE THE COMPLETED WORK
25 . Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more th an ca n be entered ha-e. pl eas e attach a suppl emen tal list).
a. Address-See list prov ided via em ail
City-State-Zip-
b. Address-
City-State-Zip-
c. Address-
City-State-Zip-
d. Address-
City-State-Zip -
e . Address-
City -State-Zip -
26. List of Other Certificates or Approvals/Denials received from other Federal, State , or Local Agencies for Work Described in This Application .
AGENCY TYPE APPROVAL* IDENTIFICATION
NUMBER
*Would include but is not restricted to zoning , building , and flood plain permits
DATE APPLIED DATE APPROVED DATE DENIED
27 . Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is
complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the
applicant.
Cf -/9-ZDIY.
re DATE SIGNATURE OF AGENT fl A, SjGNA Tu,qE ~~ APJ~ICANT 1 ~
-f1r ~~(I~ ou, ~(..OC;""t,
DATE
The Application must be signed by the person who desires to undertake the proposed activ ity (applicant) or it may be signed by a duly
authorized agent if the statement in block 11 has been filled out and signed . 1
18 U .S .C . Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States
knowingly and w illfully falsifies , conceals, or covers up any trick , scheme , or disguises a material fact or makes any false , fictitious or
fraudulent statements or representations or makes or uses any false writing or document k nowing same to contain any false, fictitious or
fraudulent statements or entry , shall be fined not more than $10 ,000 or imprisoned not more than five years or both.
ENG FORM 4345, JUL 2013 ~I Page 3 of 3
United States Department of the Interior
Gregory J. Thorpe, Ph .D .
FISH AND WILDLIFE SERVICE
Ra leigh Fie ld Office
Post Office Box 33726
Rale igh, N01th Caro lina 27,636-3726
September 3, 2010
North Carolina Department of Transportation
Project Development and Environmental Analysis
1598 Mail Service Center
Raleigh, North Carolina 27699-1598
Dear Dr. Thorpe:
SEP 7 2010
· . . ·DiVISION OF li~GWi'AYS
POOA·OFFICE OF NAnJRAL Em'IRONMENT ·-·---------' c.. c. ~ 1-. Lv: \ \'.oms
V Qe q -'1-I 0
This letter is in response to your letter of September 1, 2010 which provided the U.S . Fish and
Wildlife Service (Service) with the biological conclusion ofthe North Carolina Department of
Transportation (NCDOT) that the replacement of Bridge Nos. 141 and 151 on US 301 over Swift
Creek in Nash County (TIP No. B -5124) may affect, but is not likely to adversely affect the federally
endangered dwarfwedgemussel (Alasmidonta heterodon) and Tar River spinymussel (Elliptio
steinstansana). These comments are provided in accordance with Section 7 of the Endangered
Species Act (ESA) of 1973, as amended (16 U.S.C. 1531-1543).
According to information provided, mussel surveys were conducted at the crossing sites on May 6,
2009. The surveys extended 100 meters upstream and 400 meters downstream of the two crossings.
No mussels of any species were observed, and suitable habitat was absent at and near the project site.
However, the dwarfwedgemussel is known from the Swift Creek watershed several miles upstream
in Red Bud Creek, and the Tar River spinymussel is known to occur in Swift Creek several miles
upstream and downstream of the project site.
Based on the mussel survey results and other available information, the Service concurs with your
determination that the proposed project may affect, but is not likely to adversely affect the dwarf
wedgemussel and Tar River spinymussel. We believe that the requirements of Section 7(a)(2) of the
ESA have been satisfied for these species. We remind you that obligations under Section 7
consultation must be reconsidered if: (1) new information reveals impacts of this identified action
that may affect listed species or critical habitat in a manner not previously considered in this review;
(2) this action is subsequently modified in a manner that was not considered in this review; or (3) a
new species is listed or critical habitat determined that may be affected by this identified action .
The Service appreciates the opportunity to review this project. If you have any questions regarding
our response , please contact Mr. Gary Jordan at (919) 856-4520 (Ext. 32).
Sincerely,
~~-
Pete Benjamin
Field Supervisor
cc: Tom Steffens, USACE, Washington, NC
Travis Wilson, NCWRC, Creedmoor, NC
Chris Militscher, USEP A, Raleigh, NC
John Sullivan, FHW A, Raleigh, NC
David Harris, NCDOT, Raleigh, NC
Page 1of 5
Pr
o
j
e
c
t
M
a
n
a
g
e
r
:
NC
D
W
Q
S
t
r
e
a
m
I
n
d
e
x
:
22
-
3
7
(
S
w
i
f
t
C
r
e
e
k
a
n
d
O
v
e
r
f
l
o
w
)
a
n
d
2
8
-
7
8
-
5
(
L
a
n
e
S
w
a
m
p
)
Na
s
h
C
o
u
n
t
y
B-
5
1
2
4
Pr
o
j
e
c
t
N
o
.
:
Ci
t
y
/
T
o
w
n
:
Co
u
n
t
y
(
i
e
s
)
:
Ge
n
e
r
a
l
P
r
o
j
e
c
t
I
n
f
o
r
m
a
t
i
o
n
Ri
v
e
r
B
a
s
i
n
(
s
)
:
TVA County?
no
Pr
o
j
e
c
t
D
e
s
c
r
i
p
t
i
o
n
Ad
d
e
d
I
m
p
e
r
v
i
o
u
s
A
r
e
a
(
a
c
.
)
:
1.
3
1
4
m
i
l
e
s
Te
r
m
i
n
u
s
:
Pr
o
j
e
c
t
L
e
n
g
t
h
(
l
i
n
.
m
i
l
e
s
/
f
e
e
t
)
:
2.
5
5
30
3
(
d
)
S
t
r
e
a
m
?
Co
u
l
d
t
h
e
P
r
o
j
e
c
t
I
m
p
a
c
t
T
h
r
e
a
t
e
n
e
d
o
r
E
n
d
a
n
g
e
r
e
d
S
p
e
c
i
e
s
?
no
no
Ty
p
e
(
s
)
o
f
I
m
p
a
i
r
m
e
n
t
:
11
2
0
0
Pr
o
p
o
s
e
d
C
r
o
s
s
-
S
e
c
t
i
o
n
:
op
e
n
s
h
o
u
l
d
e
r
s
e
c
t
i
o
n
,
2
p
a
v
e
d
l
a
n
e
(
t
o
t
a
l
2
4
'
w
i
d
e
)
,
1
0
'
s
h
o
u
l
d
e
r
w
i
t
h
4
'
p
a
v
e
d
o
n
e
a
c
h
s
i
d
e
Su
r
r
o
u
n
d
i
n
g
L
a
n
d
U
s
e
:
Ex
i
s
t
i
n
g
S
i
t
e
Me
d
i
a
n
T
y
p
e
:
Te
r
m
i
n
u
s
:
In
t
e
r
c
h
a
n
g
e
M
o
d
i
f
i
c
a
t
i
o
n
:
Ge
n
e
r
a
l
C
o
m
m
e
n
t
s
:
Nu
t
r
i
e
n
t
S
e
n
s
i
t
i
v
e
W
a
t
e
r
s
(
N
S
W
)
Cl
a
s
s
C
Su
p
p
l
e
m
e
n
t
a
l
:
ru
r
a
l
w
o
o
d
e
d
w
i
t
h
w
e
t
l
a
n
d
s
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
p
r
o
p
o
s
e
d
)
:
Dw
a
r
f
w
e
d
g
e
m
u
s
s
e
l
:
M
A
-
N
L
A
A
;
T
a
r
R
i
v
e
r
s
p
i
n
y
m
u
s
s
e
l
M
A
-
N
L
A
A
Sw
i
f
t
C
r
e
e
k
O
v
e
r
f
l
o
w
,
S
w
i
f
t
C
r
e
e
k
,
a
n
d
L
a
n
e
S
w
a
m
p
De
s
c
r
i
p
t
i
o
n
:
De
s
c
r
i
p
t
i
o
n
:
An
a
d
r
o
m
o
u
s
F
i
s
h
P
r
e
s
e
n
t
?
Ot
h
e
r
S
t
r
e
a
m
C
l
a
s
s
i
f
i
c
a
t
i
o
n
:
NC
D
W
Q
S
u
r
f
a
c
e
W
a
t
e
r
C
l
a
s
s
i
f
i
c
a
t
i
o
n
fo
r
P
r
i
m
a
r
y
R
e
c
e
i
v
i
n
g
W
a
t
e
r
Pr
i
m
a
r
y
R
e
c
e
i
v
i
n
g
W
a
t
e
r
:
no
Ta
r
-
P
a
m
l
i
c
o
noTrent Cormier, ICA
no
Ex
i
s
t
i
n
g
C
r
o
s
s
S
e
c
t
i
o
n
:
op
e
n
s
h
o
u
l
d
e
r
s
e
c
t
i
o
n
,
2
p
a
v
e
d
l
a
n
e
(
t
o
t
a
l
2
0
'
w
i
d
e
)
,
6
'
s
h
o
u
l
d
e
r
o
n
e
a
c
h
s
i
d
e
,
4
'
p
a
v
e
d
Bu
f
f
e
r
R
u
l
e
s
i
n
E
f
f
e
c
t
?
Bu
f
f
e
r
R
u
l
e
s
:
ye
s
Ta
r
-
P
a
m
l
i
c
o
R
i
v
e
r
B
a
s
i
n
CA
M
A
C
o
u
n
t
y
?
14-Mar-14
De
s
i
g
n
e
r
:
No
r
t
h
C
a
r
o
l
i
n
a
D
e
p
a
r
t
m
e
nt
o
f
T
r
a
n
s
p
o
r
t
a
t
i
o
n
Hi
g
h
w
a
y
S
t
o
r
m
w
a
t
e
r
P
r
o
g
r
a
m
ST
O
R
M
W
A
T
E
R
M
A
N
A
G
E
M
E
N
T
P
L
A
N
Jo
n
a
t
h
a
n
W
h
i
t
t
i
n
g
t
o
n
,
I
C
A
Da
t
e
:
De
s
c
r
i
p
t
i
o
n
o
f
E
x
i
s
t
i
n
g
P
r
o
j
e
c
t
A
r
e
a
:
R
u
r
a
l
C
o
a
s
t
a
l
P
l
a
i
n
s
,
f
a
c
i
l
i
t
y
t
y
p
e
:
M
i
n
o
r
A
r
t
e
r
i
a
l
De
s
c
r
i
p
t
i
o
n
o
f
P
r
o
p
o
s
e
d
P
r
o
j
e
c
t
:
#C
-
7
0
:
r
e
t
a
i
n
a
n
d
e
x
t
e
n
d
R
C
B
C
1
8
'
u
p
s
t
r
e
a
m
;
#
8
5
:
p
r
o
p
o
s
e
d
1
@
7
0
'
,
1
@
5
5
'
(
2
4
"
P
C
C
S
w
/
2
.
5
'
c
a
p
s
)
;
#
1
4
1
:
p
r
o
p
o
s
e
d
1
@
3
5
'
,
1
@
5
5
'
,
1
@45' (21"
PC
C
S
w
/
2
.
5
'
c
a
p
s
)
;
#
1
5
1
:
p
r
o
p
o
s
e
d
1
@
4
0
'
(
2
1
"
P
C
C
S
w
/
2
.
5
'
c
a
p
s
)
,
1
@
7
0
'
(
2
4
"
P
C
C
S
w
/
2
.
5
'
c
a
p
s
)
,
1
@
3
5
'
(
2
1
"
P
C
C
S
w
/
2
.
5
'
c
a
p
s
)
;
#C-161: retain
an
d
e
x
t
e
n
d
R
C
B
C
1
9
'
u
p
s
t
r
e
a
m
Ge
n
e
r
a
l
C
o
m
m
e
n
t
s
:
ex
i
s
t
i
n
g
s
t
r
u
c
t
u
r
e
s
a
r
e
#
C
-
7
0
:
4
@
1
0
'
x
7
'
R
C
B
C
,
3
7
'
6
"
a
l
o
n
g
c
e
n
t
e
r
l
i
n
e
;
#
8
5
:
4
@
2
4
'
,
R
C
f
l
o
o
r
o
n
c
o
n
c
r
e
t
e
I
-
b
e
a
m
,
R
C
a
b
u
t
m
e
n
t
s
o
n
p
iles, interior bents:
RC
c
a
p
s
/
H
-
p
i
l
e
s
;
#
1
4
1
:
1
@
1
7
'
,
4
@
1
8
'
,
1
@
1
7
'
,
R
C
s
l
a
b
o
n
R
C
f
u
l
l
h
e
i
g
h
t
a
b
u
t
m
e
n
t
s
,
i
n
t
e
r
i
o
r
b
e
n
t
s
:
R
C
p
o
s
t
&
b
e
a
m
;
#
1
5
1
:
1
@
1
7
'
,
5@18', 1@17',
RC
s
l
a
b
o
n
R
C
f
u
l
l
h
e
i
g
h
t
a
b
u
t
m
e
n
t
s
,
i
n
t
e
r
i
o
r
b
e
n
t
s
:
R
C
c
a
p
s
o
n
R
C
e
n
c
a
s
e
d
s
t
e
e
l
H
-
p
i
l
e
s
;
#
C
-
1
6
1
:
3
@
8
'
x
6
'
R
C
B
C
4
0
.
2
'
a
l
o
n
g
c
e
n
t
erline
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
e
x
i
s
t
i
n
g
)
:
88
0
0
St
a
t
e
S
t
o
r
m
w
a
t
e
r
P
e
r
m
i
t
R
e
q
u
i
r
e
d
?
If
y
e
s
,
w
h
y
?
no
Ve
r
s
i
o
n
1
.
1
Re
l
e
a
s
e
d
:
J
u
l
y 2
0
1
0
(DR
A
F
T
)
No
r
t
h
C
a
r
o
l
i
n
a
D
e
p
a
r
t
m
e
nt
o
f
T
r
a
n
s
p
o
r
t
a
t
i
o
n
Hi
g
h
w
a
y
S
t
o
r
m
w
a
t
e
r
P
r
o
g
r
a
m
ST
O
R
M
W
A
T
E
R
M
A
N
A
G
E
M
E
N
T
P
L
A
N
Ve
r
s
i
o
n
1
.
1
Re
l
e
a
s
e
d
:
J
u
l
y 2
0
1
0
(DR
A
F
T
)
Page 2of 5
St
r
e
a
m
N
a
m
e
St
r
e
a
m
Ty
p
e
Ju
r
i
s
d
i
c
t
.
St
r
e
a
m
B
u
f
f
e
r
?
Cl
a
s
s
i
f
i
c
-
at
i
o
n
?
SC
M
T
y
p
e
Ch
e
c
k
l
i
s
t
Co
m
p
l
e
t
e
?
D
A
(
a
c
.
)
Q2 (ft3/s)Q10 (ft3/s)WQvc (ft3)
Sw
i
f
t
C
r
e
e
k
O
v
e
r
f
l
o
w
P
e
r
e
n
n
i
a
l
R
P
W
No
C
l
a
s
s
C
no
Sw
i
f
t
C
r
e
e
k
O
v
e
r
f
l
o
w
Pe
r
e
n
n
i
a
l
R
P
W
No
C
l
a
s
s
C
no
Sw
i
f
t
C
r
e
e
k
O
v
e
r
f
l
o
w
Pe
r
e
n
n
i
a
l
R
P
W
T
a
r
-
P
a
m
l
i
c
o
C
l
a
s
s
C
no
Sw
i
f
t
C
r
e
e
k
Pe
r
e
n
n
i
a
l
R
P
W
T
a
r
-
P
a
m
l
i
c
o
C
l
a
s
s
C
sw
a
l
e
y
e
s
0.260.340.44N/A
La
n
e
S
w
a
m
p
Pe
r
e
n
n
i
a
l
R
P
W
T
a
r
-
P
a
m
l
i
c
o
C
l
a
s
s
C
sw
a
l
e
y
e
s
0.130.170.22N/A
Pr
o
p
o
s
e
d
S
t
r
u
c
t
u
r
e
qu
a
d
r
u
p
l
e
1
0
'
x
7
'
R
C
B
C
,
r
e
t
a
i
n
an
d
e
x
t
e
n
d
1
8
'
u
p
s
t
r
e
a
m
17
+
1
7
.
8
1
@
7
0
'
,
1
@
5
5
'
(
2
4
"
P
C
C
S
w
/
2.
5
'
c
a
p
s
)
36
+
8
8
.
5
1
@
3
5
'
,
1
@
5
5
'
,
1
@
4
5
'
(
2
1
"
PC
C
S
w
/
2
.
5
'
c
a
p
s
)
56
+
5
0
L
T
t
o
6
0
+
8
0
L
T
22
+
4
9
61
+
0
0
L
T
t
o
6
3
+
0
0
L
T
St
a
t
i
o
n
En
v
i
r
o
n
m
e
n
t
a
l
S
u
m
m
a
r
y
Ri
p
a
r
i
a
n
B
u
f
f
e
r
a
n
d
J
u
r
i
s
d
i
c
t
i
o
n
a
l
S
t
r
e
a
m
I
m
p
a
c
t
s
a
n
d
A
s
s
o
c
i
a
t
e
d
S
C
M
s
Ge
n
e
r
a
l
C
o
m
m
e
n
t
s
:
1
@
4
0
'
(
2
1
"
P
C
C
S
w
/
2
.
5
'
c
a
p
s
)
,
1
@
7
0
'
(
2
4
"
P
C
C
S
w
/
2
.
5
'
c
a
p
s
)
,
1
@
3
5
'
(
2
1
"
P
C
C
S
w
/
2
.
5
'
c
a
p
s
)
t
r
i
p
l
e
8
'
x
6
'
R
C
B
C
,
r
e
t
a
i
n
a
n
d
ex
t
e
n
d
1
9
'
u
p
s
t
r
e
a
m
No
r
t
h
C
a
r
o
l
i
n
a
D
e
p
a
r
t
m
e
nt
o
f
T
r
a
n
s
p
o
r
t
a
t
i
o
n
Hi
g
h
w
a
y
S
t
o
r
m
w
a
t
e
r
P
r
o
g
r
a
m
ST
O
R
M
W
A
T
E
R
M
A
N
A
G
E
M
E
N
T
P
L
A
N
Ve
r
s
i
o
n
1
.
1
Re
l
e
a
s
e
d
:
J
u
l
y 2
0
1
0
(DR
A
F
T
)
Page 3of 5
Ge
n
e
r
a
l
C
o
m
m
e
n
t
s
:
St
r
e
a
m
L
e
n
g
t
h
(
f
t
)
St
a
t
i
o
n
S
t
r
e
a
m
N
a
m
e
no
s
t
r
e
a
m
r
e
l
o
c
a
t
i
o
n
f
o
r
t
h
e
p
r
o
j
e
c
t
St
r
e
a
m
R
e
l
o
c
a
t
i
o
n
Ad
d
i
t
i
o
n
a
l
I
n
f
o
r
m
a
t
i
o
n
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
Version 1.1
Released: July 2010 (DRAFT)
Page 4 of 5
General Comments:
Station
Jurisdictional Wetlands
Type of Impact Minimization of Impact
11+20 - 80+60
Roadway Fill
Asymmetric roadway widening to upstream (Left) side to avoid or minimize wetland impacts on
downstream (Right) side
No
r
t
h
C
a
r
o
l
i
n
a
D
e
p
a
r
t
m
e
nt
o
f
T
r
a
n
s
p
o
r
t
a
t
i
o
n
Hi
g
h
w
a
y
S
t
o
r
m
w
a
t
e
r
P
r
o
g
r
a
m
ST
O
R
M
W
A
T
E
R
M
A
N
A
G
E
M
E
N
T
P
L
A
N
Ve
r
s
i
o
n
1
.
1
Re
l
e
a
s
e
d
:
J
u
l
y 2
0
1
0
(DR
A
F
T
)
Page 5of 5
Ad
d
i
t
i
o
n
a
l
C
o
m
m
e
n
t
s
To
a
v
o
i
d
d
i
r
e
c
t
d
i
s
c
h
a
r
g
e
o
f
b
r
i
d
g
e
s
t
o
r
m
w
a
t
e
r
i
n
t
o
t
h
e
r
e
c
e
i
v
i
n
g
w
a
t
e
r
,
d
e
c
k
d
r
a
i
n
s
a
r
e
n
o
t
r
e
q
u
i
r
e
d
a
t
e
a
c
h
b
r
i
d
g
e
a
t
S
t
a
.
2
2+
4
9
,
3
6
+
8
8
.
5
,
a
n
d
5
4
+
8
5
.
5
.
S
t
o
r
m
w
a
t
e
r
i
m
p
a
c
t
s
t
o
t
h
e
w
e
t
l
a
n
d
s
h
a
v
e
b
e
e
n
mi
n
i
m
i
z
e
d
b
y
u
t
i
l
i
z
i
n
g
g
r
a
t
e
d
i
n
l
e
t
s
a
n
d
p
i
p
e
s
t
o
c
o
l
l
e
c
t
b
r
i
d
g
e
s
t
o
r
m
w
a
t
e
r
a
n
d
u
s
i
n
g
r
i
p
r
a
p
o
u
t
l
e
t
p
r
o
t
e
c
t
i
o
n
a
t
S
t
a
.
2
3
+
5
0
LT
&
R
T
,
3
7
+
9
5
R
T
,
a
n
d
5
3
+
7
5
R
T
t
o
d
i
s
s
i
p
a
t
e
e
n
e
r
g
y
t
o
p
r
o
v
i
d
e
a
n
o
n
-
e
r
o
s
i
v
e
sh
e
e
t
f
l
o
w
t
o
t
h
e
w
e
t
l
a
n
d
s
.
A
l
l
o
f
t
h
e
s
e
o
u
t
l
e
t
s
a
r
e
l
o
c
a
t
e
d
o
u
t
s
i
d
e
o
f
b
u
f
f
e
r
s
.
T
h
e
r
o
a
d
w
a
y
i
s
i
n
f
i
l
l
s
e
c
t
i
o
n
a
t
e
a
c
h
b
u
f
f
e
r
s
i
t
e
a
t
S
t
a
.
3
6
+
8
8
.
5
,
5
4
+
8
5
.
5
,
a
n
d
7
4
+
2
5
.
T
h
e
r
e
a
r
e
n
o
p
r
o
p
o
s
e
d
r
o
a
d
s
i
d
e
d
i
t
c
h
e
s
wi
t
h
c
o
n
c
e
n
t
r
a
t
e
d
f
l
o
w
s
o
r
s
t
o
r
m
w
a
t
e
r
c
o
n
v
e
y
a
n
c
e
s
t
h
r
o
u
g
h
t
h
e
b
u
f
f
e
r
s
a
n
d
t
h
e
d
i
f
f
u
s
e
f
l
o
w
r
e
q
u
i
r
e
m
e
n
t
f
o
r
t
h
e
b
u
f
f
e
r
r
u
l
e
i
s
sa
t
i
s
f
i
e
d
a
t
e
a
c
h
b
u
f
f
e
r
s
i
t
e
.
T
h
e
r
o
a
d
w
a
y
h
a
s
o
p
e
n
s
h
o
u
l
d
e
r
s
e
c
t
i
o
n
w
i
t
h
3
:
1
fi
l
l
s
l
o
p
e
t
o
p
r
o
m
o
t
e
s
h
e
e
t
f
l
o
w
t
h
r
o
u
g
h
g
r
a
s
s
s
h
o
u
l
d
e
r
a
n
d
g
r
a
s
s
f
i
l
l
s
l
o
p
e
t
o
p
r
o
v
i
d
e
t
r
e
a
t
m
e
n
t
f
o
r
t
h
e
s
t
o
r
m
w
a
t
e
r
r
u
n
o
f
f
f
r
o
m
t
h
e
p
a
v
e
m
e
n
t
(
i
m
p
e
r
v
i
o
u
s
)
a
r
e
a
b
e
f
o
r
e
e
n
t
e
r
i
n
g
t
h
e
w
e
t
l
a
n
d
s
.
T
h
e
p
r
o
p
o
s
e
d
bo
x
c
u
l
v
e
r
t
e
x
t
e
n
s
i
o
n
s
a
t
s
t
a
.
1
7
+
1
7
.
8
a
n
d
7
4
+
2
5
m
a
t
c
h
e
x
i
s
t
i
n
g
c
h
a
n
n
e
l
g
e
o
m
e
r
y
t
o
m
a
i
n
t
a
i
n
n
o
r
m
a
l
f
l
o
w
w
i
d
t
h
,
d
e
p
t
h
,
a
n
d
v
e
l
o
c
i
t
y
.
T
h
i
s
w
i
l
l
m
a
i
n
t
a
i
n
s
e
d
i
m
e
n
t
t
r
a
n
s
p
o
r
t
d
u
r
i
n
g
b
a
n
k
f
u
l
d
i
s
c
h
a
r
g
e
i
n
o
r
d
e
r
to
p
r
o
v
i
d
e
a
s
t
a
b
l
e
s
t
r
e
a
m
(
n
o
d
e
g
r
a
d
a
t
i
o
n
o
r
a
g
r
a
d
a
t
i
o
n
w
i
l
l
o
c
c
u
r
s
)
.
,------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
See Sfeet 1-A For Index of Sfeets STAT E OF
D I VISION
NO R TH CAROL INA
O F HIGHWAY S
NASH COUNTY
LOCATION: REPLACE BRIDGES NO. 85, 141, AND 151 OVER
SWIFT CREEK ON US-301
TYPE OF WORK: GRADING, DRAINAGE, PAVING, STRUCTURES,
AND CULVERTS.
T ~NAD s3
WETLAND AND SURFACE WATER IMPACTS PERMIT
OFFSITE DETOUR • • • •
BEGIN TIP PROJECT B-5124
-L-STA 11 +20.00
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
GRAPHIC SCALES DESIGN DATA
ADT 2015 = 8,800
ADT 2035 = 11,200
K 10 %
D 60 %
T 7 % -
V 60 MPH
•(TTST = 3% DUALS 4%)
FUNC CLASS =
MINOR ARTERIAL
STATEWIDE TIER
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT B-5124 = 1.223 MILES
LENGTH STRUCTURE TIP PROJECT B-5124 0.091 MILES
TOTAL LENGTH OF TIP PROJECT B-5124 = 1.314 MILES
Pnporr/d In tfltJ Offlotl rl•
DIVISION OF HIGHWAYS
RIGHT OP WAY DAlE: GARY LOVERING. PE
FEBRUARY 28.2014
LE1TING DATE: CHRISTOPHER H. LEE
APRIL 21, 2015
42270.2.1
-L-STA 80 + 60.00
IIYDRA.UUCS ENGINEER
ROADWAY DESIGN ENGINEER
B--5124
BRSTP-<1301 25
BRSTP-<1301 25 P/W & UTL.
N.c. DBPT.OP TRANBPORT.t.TJON
DIVIIIION OP IIIGII1I' .6. TB
NASH CGmiiT1'
Pllo.JBC1\.arnu.t ClH1SO
UPLACB BIUDWII NO.II,
14l,AND W OVD
S1JIPT CJUI,U ON UHD1
8BBBT OP
PERMIT DRAWING
SHEET 1 OF 51
WETLAND AND
.. z
0
iii ~
LEGE~JD
c .. ...
--WLB--DENOTES WETLAND BOUNDARY
1, ~.& DENOTES EXCAVATION ~ IN WETLAND l;
"' WM DENOTES FILL IN i WETLAND
-~
DENOTES TEMPORARY c ~ """ I SURF ACE WATER IMPACT
e DENOTES PERMANENT --~ ~M ~i' SURFACE WATER IMPACT
t5
! DENOTES MECHANIZED ~! .,.ee CLEARING o~! ~~;i!
SURFACE WATER IMPACTS PERMIT
I'
/
/
I'
" I
I
I * It
I
/
/If * *
* It
* *
20 IF Of INlET
CHANNEL IM~ROV6\IE~
EST. 10 TONS CL 'I' RIP W -----,
EST. 115 5Y GEomrnl.l!
SEE DETAIL
* * .. *
* * *
SEE ENLARGED AREA
PLAN VIEW
SITE 1
SHEET 4A
SEE
CROSS JtHI WIITE FISlER
SECTION .. If If It * * .. ..
* It
* .. *
It * It If
..
If
It
*
PIOJECT IU!fEIB«:E NO. SHEET NO.
B-512-4 -4
"if SHEET NO.
Rf»DNAY DESIGN HYDIAUUCS
ENGINEER 94GINEEI
N.C. DBPT.OF TRANSPORTATION
DIVISION OP HIOBW A YS
NASH COUNTY
PROJEC'l\4t10.1..l. OHu.o
RBPLACB BRIDGBS NO. Ill,
J..4J, AND 111 OVBR
SWIFT CRBB:I:. ON us-A.1
SHBET OF
PERMIT DRAWING
SHEET 2 OF 51
..
It
*
*
0
~
0
0
+
r-
N
~
Cl)
..!.
I
10
t:i w
:I:
Cl)
w w
Cl)
LLI z
::::::i
* *
EST. DOE 240 c:t
CULVERT 70 INLET CHANNEL
(LOOKING D<lWNS"ruAMj
~OT TO SCAlE)
.. z
0
!
1,
~
},
~
t c
f
. -~
~i'
!f
!H 25 50 ..,se
WETLAND AND SURFACE WATER IMPACTS PERMIT
" ....
RETAIN AND EXTEND 18' UPSTREAM
EXISTING {4) 10' x 7' RCBC
I
20 LF OF INLET----+-------.
CHANNEL IMPROVEMENT Jt.
EST. 80 TONS CL. 'I' RIP r p
EST. 115 SY GEOTEXTILE
SEE DETAIL
LL
-=~---------~-----~-~~-~-~~~~~~--:--=--~-~
ENLARGED
PLAN VIEW
SITE 1
16" Dl
PIOJECT IU!fEIB«:E NO. SHEET NO.
B-512-4 -4A
"if SHEET NO.
Rf»DNAY DESIGN HYDIAUUCS
ENGINEER 94GINEEI
N.C. DBPT.OF TRANSPORTATION
DIVISION OP HIOBW A YS
NASH COUNTY
PROJEC'l\4t10.1..l. OHu.o
RBPLACB BRIDGBS NO. Ill,
J..4l, AND 111 OVBR
SWIFT CRBB:I:. ON us-A.1
SHBET OF
PERMIT DRAWING
SHEET OF
LEG END
--wLB --DENOTES WETLAND BO UNDARY
DENOTES EXCAVATION
IN WE T LAND
W/#J DENOTES FILL IN ~ WETLAND
DENOTES TEMP ORARY
SURFACE WATER IM PACT
DENOTES PE RMANENT
SURFACE WATER IMPACT
DENOTES MECHANIZED
CLEARING
saJ! SCALE: 1•= 50' HORIZ. ~~~~--------------------------------------------------------------------------------------------------------------------------------------------------------------~
.. z
0
!
\
WETLAND AND SURFACE WATER IMPACTS PERMIT ------,, '
.... \
\ \
~ I /1// /"/ / ' / / // // /
----I I I / / ,....... ............... / / I II / / /
/ ..... ,, I .,....,..."' / I I/ // /
\ .._ __ 1 I I / I / /
\ I ./ I I I 1/
\ ,/ ........ 111/1 r--,.,.., _ _, """ """ I
\ '...,.-"' .,..."' .,..."" / I I
1 l\ / .,..."' .,"' /1 I
\ \ // ........ ............... ........ ,1
\ \ ,""""' // ,""" ,.,."' .,."" I/ ., /., _, .,..."' I ,..-' / /.,... .,... ..-
1 I I _,"""' / /" ."
1 Q l I I / I f
1 11 I/ I 1
111 I I I 1
I / I I I // 1
11 11 I 1 I
I.;, I I I 1 I
I /
"' I I I ( f
I I I 1 1
I I I I I J I
I 1 1 I I .,;
I I I I / _,
I 1 I 1 I /.,... -·~-----
/
I
I
I
I
I -"' ,--
\
\
\
\
\
\
\
I
'--....
/
------·90---' ,--------
\ \
\ \
\ \
\ \
\ \
\ \
\ \
I \ -· \ \ _.qa-__ _
' \,o--1 I
I J I
,..,./ /., I
.,,... ~'*" 4 -------__ ,. ,..
,..,.,."'" ---------
/ ,. ----------
/ / --1 / , .....
1 / / I
1 / I I ..... ~, ..... ---~
I I ,....--' / I II --I
I L I
', _J I_.. I /1 1 r,, 1..._ _____ ..-,.1 ----
\ // /I 1 I ' I ,..--
1 "///I 'I ... _____ 1_/ // _,"' _,/ I '--~
.... '---,,
)
I
I
--/ / _, I
/ / _,"' I ~~N~~~!~ / / / I
PICJJ!CT IU!f!IB«:! NO.
B-5124
"if SHEET NO.
Rf»DNAY DESIGN
!NGIN!ER
SHEET NO.
HYDIAUUCS
94GIN !EI
N.C. DBPT.OF TRANSPORTATION
DIVISION OP HIOBW A YS
NASH COUNTY
PROJEC'l\4t10J..J. OHu.o
RBPLACB BRIDGBS NO. Ill,
J..4J, AND 111 OVBR
SWIFT CRBB:I:. ON us-A1
SHBET OF
PERMIT DRAWING
SHEET OF
/ I I / I
I I I
I I I .,..2:lf.t.~5A.)ialoi!lllli~"
I I I I
I
I
----~;~~(y.p I RETAIN ~D EXT!ND 18'UI'STREAM
SEE DETAIL -I !XImNG 14)-W.._l!~~~-----,, 0
~ I / I I
I I I I
I I I I
I I I I
I I I I
I I I I
1 ~ r 1 I I I I
I I I I
I I I I
I 1 I
J 1 1
""/ I I ,..,.' \ \
""...-I \ ..... ----I \ .,,""'--" .. ../
-95" --.. ----
---------·---.... ' ,_ ,__ ,."
/ ~, __ S'd -------""' -........ ,.,...---........... --~, ,.--,
/ ...... y \ ............ \
' \ ', \
\
r I
I I
I I
l I
' I ', I
\. I
' I ~ --
-~---{-
1 .... , l o:.:""-
.......... 0 , ,' It
-.... , ......... , I i l-7'
--.. I / ~~---"""'
I --~~:~-....---~~-,J ......... \ ',1
1
\ ) ... //* \r ~
E Bjlwt CCIII'~~--------.._ ', ', ~ / I / I
+20.0011 1
1 r \ \\ I I 1
1 I 11 /'------
1 ----I I \ I 1 I II I I (
I -----I I I I 1 I I { \
I "'il& I I I I I I I I l \
I I I I I 1 l I l \ \ I I 1 l \
2 I I
I I I
I 1 1 I \
I \
SEE ENLARGED AREA
SHEET 4A
-~ I .... /
It It 1 ( It r "--*
I I / '
I l /
...__ It "i ,~ It It
\ ______ I
* It * It * It
I I I oh I 1 I I I \ \.
/ I I i 1 1 1 I 1 \ -----, t-------------------SITE 1------------------~
I I \111111 \
c .. ...
--WLB--
LEGEND
DENOTES WETLAND BOUNDARY
/ \ I \ 1 1 [ '
1
--, \
1 I \ 1 I I 1 I \ \
I \ \ 1 I I I I J 1
--I I 1 1 I 1
1
1 I I ) ---..~. \ l I I I I I
' I 1 I I ', 1 1 I I I I I // I
', \ \ \ ' '
1
l 1
1 /PLAN VIEW 1, W///.6'-1 DENOTES EXCAVATION ' 1 1 I r / ~ W///HA IN WETLAND \ 1 1 I 1 \ 1 1 l SIT P' 1 l: \ 1111 rll ,_
' \ I 1 I I I 1 I I I ~ ~ DENOTES FILL IN 1 I 1 I 1 1 1 1 I I i WETLAND l [ f 1 I II 1 : : .,/
! 1 I 1 I I I I I I /"
c I?.I"Q'/;(.61 DENOTES TEMPORARY .,., 1 I 1 I 1 1 .!> I .,,.. f VJ2"///-""'' SURF ACE WATER IMPACT ' I 1 I 1 1 11 I iSol ,/ 1 ! --\ I 1r111 rl "'I
c 1 I 11/t/ 11/1
. -~ ~//.c.'hl DENOTES PERMANENT 1 1 1 I 1 1 1 I 1 1 t ~w~, W/////11 SURFACE WATER IMPACT I \ / / / I 11 / I / / 6 J \.._ I I I / I ,..r ,..; I 1 i5 -... I 1 I I I I ,..r / I ~]" DENOTES MECHANIZED (.._.._ ' .............. _ / 1 1
1 1 1 1 , /// /,..
G ~ CLEARING ........ , -I I I I / sill{ ............... _/ I I II I I // //
CULVERT 70 INLET CHANNEL
\LO OKING D<lWNS"ruAMj
~ar TO SCAlE)
EST. DOE 2 40 c:t
0
0
+
r-
N
~
Cl)
..!.
I
10
t:i w
:I:
Cl)
w w
Cl)
w z
::::::i
~ .. f "' I I 1 I I 1 t / / ~~~~--------------------------------~----------~ .... ~~------------------------------------------------------------------------~
.. z
0
!
1,
~
},
~
t c
f
. ·~
~i' 50
!f
!H 25 50 ..,se
WETLAND AND SURFACE WATER IMPACTS PERMIT
D EXT~D 18' UP1fRENit
{4) l<V/x 7' RCBC / ........ ,
/' I
r-,, ---;._:;,.. .......... ___ ; ...... --
If ~->r-~ If
-----I
I ~-------I I -----
1 I
I If 1f
' : / \ I I
' I I
If '~, If / If
\ I ----
\ I -----
\ I ---
\1 ---:4-.r--LL " I
I
-----::.==~--------~ If If
ENLARGED
PLAN VIEW
SITE 1
JO
, .... _
..........
If ..... \ If If If
\
\
\
\
If ''* If .................. ----...... __ _
--ILB --
PIOJECT IU!fEIB«:E NO. SHEET NO.
B-5124 4A
"if SHEET NO.
Rf»DNAY DESIGN HYDIAUUCS
ENGINEER 94GINEEI
N.C. DBPT.OF TRANSPORTATION
DIVISION OP HIOBW A YS
NASH COUNTY
PROJEC'l\4t10.1..l. OHu.o
RBPLACB BRIDGBS NO. Ill,
J..4J, AND 111 OVBR
SWIFT CRBB:I:. ON us-A.1
SHBET OF
PERMIT DRAWING
SHEET OF
LEGE ND
DENOTES WETLAND BO UNDARY
DENOTES EXCAVATION
IN WE T LAND
W/#J DENOTES FILL IN ~ WETLAND
DEN OTES TEMP ORARY
SURFAC E WAT ER IM PACT
DENOTES PE RMANENT
SURFACE WATER IMPACT
DEN OTES MECHANIZED
CLEARING
sa\'! SCALE: 1•= 50' HORIZ. ~~~~--------------------------------------------------------------------------------------------------------------------------------------------------------------~
PIIOET -CE NO. I SHEET NO.
I II B-512-4 I 10
1-.-II IOAaNA.Y DESIGN HYDRAIIUCS
ENGINEER ENGINEER
BE GIN Gl lAD I SITE I I
C:T ,. '.,, nn
EL :v. ~ .4.5J' PRELIMIN.A ~~sl n.,, I'> I .. ,., 1\1., i>T ..,, L1n if" I ''"'n' IIDNOTUD"'
\ -L ST 1\. 1 ~ +9 ~.53 +I-\ /[! -S J\.1 7+ 9.1 +.£ I
I ,., '" ~.
I~ =~ r:· ~= ·~ ;;' \ 1/ ~· .. u~ F ~--m ~
I" ~-~'P
100 I' -H18 I I 'ff. P=A._ P' I = J i2:41
100
\ ~ 1 J ,_ Lfl:l. IY
90
(-J, l!!J(Jr, 'X ~ I'" ( ( f1'XJI. ~;: ~ ~ ~ ~ Y' Ill!" ~ ~ ~ 0 ~ ~ ~ ~ 0 Vh /./.; /17;: 7A 0 90
'A: ...
I
80 80
70 70
':UIJI. fff HfD ~NJL 'Cll ~A
I~ : -~ ~ 60 -=-=r::. -60
811_ I~ ~~ 'N -~ 1§_£ '2'S VEE. 1:: -~~ ~·-~ ~ 'KE OF GIJ.~ --LEGEND illi :Jk ~'B; ~I JU ~· J. Fr' I~ Hit :J£.V~ '1011 -~ ~ 50 -W Aj DENOTES FILL IN 50
~ ~-f EJ. IJ.6 WETLAND
~~ DENOTES PERMANENT
40 ------SURFACE WATER IMPACT 40
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21 +00
I II R.C. _,.,. •• ~ ... '!liB
BEC IN BRI i>GE 1---II ...... _.. ... ,.
130 IUa CCIIUJIIT 130
-L-.,,,. •"'-... ....
I EN[ BIIDGE I ~CMIIO
\ I
I 1-L-STA 23 12 69 I aDUal .,. ..... 120 SITE 2 IG,.utD Ill CJ'fll. 120
\ IWII"''CIDE-....
\ .... -110 PERMIT DRAWING 110
\ -IZ,
SHEET OF ~ -r!t:.1 , ~l w ;u;
1\ -lfm K li!i :8
100 100
\
~
90 ~./,; .. ,M,A; Vfi ~ IV'/ ~ VA '/"./. r0 /h-/./) IF"~ ~ ~ Vh r,t_/j /" /i '/"~ ~ ~ 'l:: ~ /" _/j v~ fP'l V,F/ /~ /~ V/. ~ 0: //..11 v _/.; ~_/.; ~ '/'/ IFZ 90 a ~ r-! -'"":.. '¥~
'\ / ..
80 / 80
1". / B~/00 J.l'r nRAI DATI I 'lJC .... -. ~~~~ ~.~D .. ~~ ~uc· ·uRf I~ ~ ~=~ ~ 70 70
I
{>TRl en ~RE PA'Y ITE M) I; ~-~--£. ~g. !rl ~~ ~ I I:V, ,~. lTI, ..... "" I 1; ~~~ 'f£ij_ VR"-'l ~~ 17 i=T I -"" ~'"'' .. UTI ,.. I
60 -~ ~ 60
~ ·~ BR ~ N/1/L IN 2"_~ PRE iS 1~. E."..!.~ r::..~ ~= ~ tOT S: I'" ~""' , ...... ~:~o~:r• ,,.... FT
l/.. b 'f!Et ["""~ f'U-" fU" "' 1 SE F St-EEl ~ 4 THt :ou ~7r. 5 f OR -L PLA
r.vF 50 '"' .....
I"· .. ~ .... ,._, -~-1-~I\ ~F (': 2 'HRl HI 2 FOR l"l iT 50
I
~) SE St EEl ~ s HRC ~ s STR ~Cl ~RE PU II!, ~ T UG ~ OR NS
I'J6Tj fJF r:IIINJ "B&l FT
40 40
21+00 22+00 23+00 2.4+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 3.4 +00
.g
~ t
ii;'
.J
j
!
J
f
:i
~i'
!~ ~!
.. ~I! s~J
WETLAND AND SURFACE WATER IMPACTS PERMIT
110
100
90
80
2:1 NORMAL
(TYP.)
NWS AND WSEL DATE
OF SURVEY = 90.4
(2-6-13)
PROP.IOO YR.~ ELEV. = 93.87
PROP.50 YR.~
ELEV. = 93.5 """=" =
~-------~~--~~~~-~~~~-~~ -===-=-·~-----__,. ,,
...,___ct_ STA. 17+17.8 -L-
~---==-~
RET AIN (4) 10 ' x 7' RCBC
AND EXTEND -18 ' UPSTREAM
GP ELEV. = 94.07
SKEW = 90°
EXIST. CULVER T
EXISTING LEFT
TOP OF BAN K
EXISTING RIGHT
TOP OF BANK
-r ...... -....__. ___ o:.:=.-:.:-=.-----=--:....---,.,
'-----+--~= ~--------
150
EXTEND EXISTING
RCBC -18' UPSTREAM
AT 0.13% SLOPE
I I
100 50
SITE I
I
0
ct CHANNEL
i ELEV.=B4.1
SLOPE = 0.13/.
I I
50 100
PROFILE ALONG STRUCTURE
STA 17+17a8 -L-
150
110
100
90
80
~ROJI!CT Rl!fBI!NC! NO. SHEeT HO.
8-512.4 PAS-S/
ROADWAY DESIGN IIYDIWJUCS
EIIGIN!ER eNGINEER
N.C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJBC'I'l.cl70.l.l OH1SO
RBPLACB BRIDGES N0.85,
WI. AND W OVER
SWIFT CRBBE. ON US-101
SHBBT OF
PERMIT DRAWING
SHEET OF
~ ... ~ ~~~~------------------------------------------------------------------------------------------------------------------~
PHASE 1 CONSTRUCTION SEQUENCE
PHASE 1 CONSTRUCTION SEQUENCE (STA. 17 + 17.8 -L-)
(ROAD CLOSURE -MAINTENANCE OF TRAFFIC VIA OFFSITE DETOUR.)
1. CONSTRUCT TWO SPECIAL STILLING BASINS FOR PUMPED EFFLUENT (40' X 25')
FROM DEWATERED SITE.
2. INSTALL IMPERVIOUS DIKES WHILE MAINTAINING FLOW THROUGH NORTHERN TWO BARRELS.
3. DEWATER WORK AREA.
4. EXTEND CULVERT BARRELS (2) AND INSTALL HEADWAllS. BACKFILL CULVERT.
5. INSTALL 20 LF OF INLET CHANNEL IMPROVEMENT.
6. STABIUZE THE CHANNEL BANK.
7. REMOVE IMPERVIOUS DIKES.
20 LF OF INLET
CHANNEL IMPROVEMENT
EST. 80 TONS CL. 'I' RIP RAP
EST. 115 SY GEOTEXTILE
SEE DETAIL
IMPERVIOUS
DIKE
-------7 ' --/'
-L --
NOTES:
1. CULVERT CONSTRUCTION SHALL BE PERFORMED IN ONLY
DRY OR ISOLATED SECTIONS OF CHANNEL.
2. IMPERVIOUS DIKES ARE TO BE USED TO ISOLATE WORK
FROM STREAM FLOW AS NECESSARY.
3. ALL GRADED AIREAS SHALL BE STABILIZED WITHIN 24 HOURS.
4. MAINTENANCE OF STREAM FLOW OPERATIONS SHALL BE
INCIDENTAL TO THE WORK. THIS INCLUDES POLYETHYLENE
SHEETING, PUMPS AND HOSES.
5. PUMPS AND HOSES SHALL BE OF SUFFICIENT SIZE TO
DEWATER THE WORK AREA.
6. THE CONTRACTOR SHALL NOT PUMP SEDIMENT-LADEN WATER
DIRECTLY INTO STREAM. FOR DE-WATERING OF CULVERT SITES,
THE CONTRACTOR SHALL FILTER SEDIMENT-LADEN WATER
THROUGH SPECIAL STILLING BASIN.
-
RETAI ~D ~END 1 ~
UPSTREAM EXISTING
"
PHASE 2 CONSTRUCTION SEQUENCE
PHASE 2 CONSTRUCTION SEQUENCE (STA. 17 + 17.8 -L-)
(ROAD CLOSURE -MAINTENANCE OF TRAFFIC VIA OFFSITE DETOUR.)
1. INSTALL IMPERVIOUS DIKES WHILE MAINTAINING FLOW THROUGH SOUTHERN TWO BARRELS.
2. DEWATER WORK AREA.
3. EXTEND CULVERT BARRELS (2) AND INSTALL HEADWAllS. BACKFILL CULVERT.
4. STABIUZE THE CHANNEL BANK.
5. REMOVE IMPERVIOUS DIKES, SPECIAL STILLING BASINS, AND DEWATERING PUMP.
6. COMPLETE ROADWAY.
20 LF OF INLET
CHANNEL IMPROVEMENT
EST. 80 TONS CL. 'I' RIP RAP
EST. 115 SY GEOTEXTILE
SEE DETAIL
IMPERVIOUS
DIKE
-------.7 '
N.C. DDT.CBI' TRANIPOI.TA.TION
IIIVIIICIN CQr IIIGIIWA.TI
NAill CO'ON'T1'
JIAOIBC'n..ai'IUJ. CIHIN
UPLACB UIOOD NO.II.
:w~o.um 111 ova
8WIFI' CllBBK QN ~
AND EXTEND 18'
UPSTREAM EXISTING
(4) l(l' x 7' RCieC ~
I y 1> •p PROJ . REFERENCE NO. I SHEET NO.
B-6124 I XSC SffE I
Rr»DNAY DESIGN HYDRAUUCS
!NGIN!!~ ENGINIBI.
WETLAND AND SURFACE WATER IMPACTS PERMIT I PRELIMIN
DO NV'fllliiiP< .R..!..ra~5 l
N.C. DEPT. OF TRANSPORTATION
DIVISION 011 IUGHWAYS
NASH COUNTY
PROJECT: .fti1U.1 <B-IJ.J.O
RBPLACB BRIDOBS NO.II,
1..0, AND Ill OVER
SWIFT CR&U; ON mH01
SHEBT OF
PERMIT DRAWING
SHEET OF ~
U)
U) a
!::: z
~ ~
:::::i ....
1/Q_ 1.1.1 ___L/0
C) ~
z
/ql_ ~ __Jf!)
u
I? O.DlO 0.020 _51 a,1
9Q_ -~~,./' ll --___gp ...__ _____
8Q_ ___§)
7Q_ I I I I I I I I I I I I I I I I I I I I I I I I I I I _JJJ
130 120 110 100 90 80 70 60 50 .40 30 20 10 0 10 20 30 .40 50 60 70 80 90 100 110 120 130
SITE I
X-SECTION
STA 19+00 -L-
LEGEND
~ ~~~~l~~ FILL IN
WETLAND AND
0
0
ci
0
+
.. z It It 0
iii It It It It
If If If It It ~ It I+ It It
It I+ It It If
If I+ It It I+
It I+
If I+ I+ It I+ It If If If
It It It I+ It I+
It If I+ It I+
If If I+ It If
I+ If If It It
SEE ENLARGED AREA
SHEET SA
LEGEND
--WLB--DENOTES WETLAND BOUNDARY
c ~ DENOTES EXCAVATION .. ...
IN WETLAND
1, I* •* ·I DENOTES MECHANIZED ~ CLEARING l;
"' ~ DENOTES FILL IN i WETLAND
-~
WAa DENOTES TEMPORARY c
""" I FILL IN WETLAND
e
WY.4il DENOTES TEMPORARY --~ ~i' SURFACE WATER IMPACT
t5
! ~.& DENOTES PERMANENT ~! 5~ e SURFACE WATER IMPACT
~~~-~~;i!
SURFACE WATER IMPACTS PERMIT
SITE 2
.JOHN IMTE FISlER
If It It It It It It ..
I+ It It It It I+
It It It If It If It
If It It It
I+ It It It If If
It If It It I+ It
If It It I+ If It
I+ It I+ It It It It If
If It I+ It I+ If It
It It If If .JOHN 'IIITE FISlER
PLAN VIEW
SITE 2
It I+ It It It It It
It It If
It It
If I+ * If I+ It If
PIOJECT IU!fEIB«:E NO. SHEET NO.
B-512-4 5
"if SHEET NO.
Rf»DNAY DESIGN HYDIAUUCS
ENGINEER 94GIN EEI
N.C. DBPT.OF TRANSPORTATION
DIVISION OP HIOBW A YS
NASH COUNTY
PROJEC'l\4t10.1..l. OHu.o
RBPLACB BRIDGBS NO. Ill,
J..4l, AND 111 OVBR
SWIFT CRBB:I:. ON us-A.1
SHBET OF
PERMIT DRAWING
SHEET OF
0
0
0
0
+
""'f'
M
It ~
Cl)
I+ ...!.
I
-o
I-
LL.I
LL.I
J:
Cl)
LL.I
LL.I
I+ Cl)
LL.I
It z
::::i ..
J: u
~
"' z
0
E
WETLAND AND SURFACE WATER IMPACTS PERMIT
l,
E
i c .::
1
~ .,;] 50 0
~-i' I I I
h
i:§" 25 50
WORK BRIDGE
~EXCA~TION ~N ~
WETLAND
~
~
WORK BRIDGE
~CAVATION ~
'1 N WE'tLAND
~=0 .5 ~s
V10 =1.07 fps
NON-EROSIVE
~ ~ T~WET ~ND
EXCAVATION IN WETLAND
~ ~
ENLARGED
PLAN VIEW
SITE 2
~ ~
Q 10 =0.4 cfs
V10 =0.98 fps
NON,-;EROSI'(J:
~ TO WET LA ~D
~
~
~
~ltOJECT IIERI!Ha NO. SHEET NO .
B-5124 SA
WN SHEET NO.
WN:IWAY DESIGN
E NGINE E~
HYDIAUUCS
E N GI NE E~
N .C. DEPT. OF TRANSPORTATION
DIVISION OJI HIGHWAYS
NASH COUNTY
PROJBC'I\.m7UJ. ~ru.o
REPLACE BRIDGBS NO. 81,
1..0, AND 111 OVBR
SWIPT CREE.: ON U&-1111
SHEBT OJI
PERMIT DRAWING
SHEET OF
LEGEND
--wLB --DENOTES WETLAND BOUNDARY
Wff/M DENOTES EX CAVAT ION ~IN WETLAND
I* * * •I DEN OTES MECHANIZED
. . CLEARING
W/Yj DENOTES FI L L IN
rL""/ LLLl WETLAND
~~ DENOTES TEMP OR AR Y ~//~ FILL IN WET LAND
~~/*~ DEN OTES TEMP ORA RY
Vff///hi SURFACE WATER IM PACT
~~ DENOTES PERMA NENT
SURFA CE WATE R IMPACT ~~~ SCALE: 111= 50' HORIZ.
~~ . ._--------------------------------------------------------------------------------------------------------------------------------------------------------------~
85
8
5
8
5
90
90 9
0
90
90
90909090909090
9
0
90 90 90 90 90 90 90
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
5
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
7
/2
2
/2
0
1
4
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
5
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
7
/2
2
/2
0
1
4
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
WETLAND AND SURFACE WATER IMPACTS PERMIT
SITE 2
PLAN VIEW
ENGLISH
SHEET __ OF __
PERMIT DRAWING
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
5
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
7
/2
2
/2
0
1
4
TS TS
LEGEND
SURFACE WATER IMPACT
DENOTES TEMPORARY
E E
IN WETLAND
DENOTES EXCAVATION
WETLAND
DENOTES FILL INFF
DENOTES WETLAND BOUNDARY
CLEARING
DENOTES MECHANIZED***
SHEET 5A
SEE ENLARGED AREA
SECTION
CROSS
SEE
SITE 2
EXCAVATION IN WETLAND
WETLAND
EXCAVATION IN
IN WETLAND
EXCAVATION
S S
SURFACE WATER IMPACT
DENOTES PERMANENT
T T FILL IN WETLAND
DENOTES TEMPORARY
*
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
5B-5124
NAD 83
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
6
-
L-
S
T
A
.
3
4
+
0
0
.
0
0
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
4
-
L-
S
T
A
.
2
1
+
0
0
.
0
0
JOHN WHITE FISHER
JOHN WHITE FISHER
WOODS
WOODS
WOO
D
S
WOODSWOODS
WOODS
WOO
D
S
US 301 24’ BST US 301 24’ BST
EXIST. R/W
EXIST. R/W
BEAVER DAM
S
WI
F
T
C
R
E
E
K
S
W
A
MP
16" DI 16" DI
12" DI 12" DI 12" DI
EXIST. R/W
EXIST. R/W
F F F
C
F
C
F
C
F
C
F
C
F
C
FF
CC FF
F
F
2
5
3
0
25:1 PS TAPER
TAPER
25:1 PS
25:1 PS TAPER
TAPER
25:1 PS
T
B
T
B
T
B
T
B
15
"
15
"
2GI
2GI
TS
E
E
E
E
S
S
S
TS
TS
TS
TS
TS
TS
TS
TS TS
T
T
T TTFT
WORK BRIDGECOFFERDAM
WORK BRIDGE
TS
TS
TS
TS
R:
\
H
y
d
r
a
u
li
c
s
\
P
ERM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t_
p
s
h
5
a
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
7
/2
2
/2
0
1
4
SHEET __ OF __
PERMIT DRAWING
ENGLISH
SHEET OF
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
PROJECT: 42270.1.1 (B-5124)
NASH COUNTY
DIVISION OF HIGHWAYS
N. C. DEPT. OF TRANSPORTATION
SITE 2
PLAN VIEW
ENLARGED0
5025
50
SCALE: 1"= 50’ HORIZ.
WETLAND AND SURFACE WATER IMPACTS PERMIT
TO WET LAND
NON-EROSIVE
V =0.98 fps
Q =0.4 cfs10
10
TO WET LAND
NON-EROSIVE
V =1.07 fps
Q =0.5 cfs
10
10
5A
WETLAND
EXCAVATION IN
IN WETLAND
EXCAVATION
EXCAVATION IN WETLAND
TS TS
LEGEND
SURFACE WATER IMPACT
DENOTES TEMPORARY
E E
IN WETLAND
DENOTES EXCAVATION
WETLAND
DENOTES FILL INFF
DENOTES WETLAND BOUNDARY
CLEARING
DENOTES MECHANIZED
S S
SURFACE WATER IMPACT
DENOTES PERMANENT
T T FILL IN WETLAND
DENOTES TEMPORARY
****
85
8
5
8
5
90
90
90
9
0
90
TBM-2
WOO
D
S
WO
O
D
S
BEAVER DAM
S
W
I
F
T
C
R
E
E
K
S
W
A
M
P
16" DI
12" DI
EXIST. R/W
EXIST. R/W
10
0
.
0
0
’
F F F
C
F
CC F
F
C
5
0
’
TAPER
25:1 PS
TS
E
E
E
E
S
S
S
TS
TS
TS
TS
TS
TS
TS
TS TS
T
T
T TTFT
WORK BRIDGECOFFERDAM
WORK BRIDGE
TS
TS
TS
TS
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
B-5124SKETCH OF PAVEMENT/BRIDGE RELATIONSHIP
NAD 83
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
4
-
L-
S
T
A
.
2
1
+
0
0
.
0
0
T
B
T
B
T
B
T
B
15
"
15
"
2GI
2GI
PROJ. REFERENCE NO.SHEET NO.00 5 10
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120 130120130
100
110
100
110
WETLAND
DENOTES FILL INFF
90
80
70
90
80
70
STA 28+00 -L-
X-SECTION
SITE 2
WETLAND AND SURFACE WATER IMPACTS PERMIT
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
ENGLISHSHEET __ OF __
PERMIT DRAWING
R:
\
H
y
d
r
a
u
li
c
s
\
P
ERM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
x
s
e
c
t
i
o
n
s
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
3
/14
/2
0
1
4
B-5124 XSC SITE 2
LEGEND
C
LE
A
R
IN
G
LIM
ITS
93.183:1
0.0200.020 0.080
F F F
W
E
T
L
A
N
D
S
-L-
ENGLISH
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
SITE 3
PLAN VIEW
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
6
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
7
/2
2
/2
0
1
4
WETLAND AND SURFACE WATER IMPACTS PERMIT
SHEET __ OF __
PERMIT DRAWING
SHEET 6A
SEE ENLARGED AREA
SECTION
CROSS
SEE
SITE 3
TS TS
LEGEND
SURFACE WATER IMPACT
DENOTES TEMPORARY
E E
IN WETLAND
DENOTES EXCAVATION
WETLAND
DENOTES FILL INFF
DENOTES WETLAND BOUNDARY
CLEARING
DENOTES MECHANIZED***
S S
SURFACE WATER IMPACT
DENOTES PERMANENT
T T FILL IN WETLAND
DENOTES TEMPORARY
*
3
5
4
0
4
5
25:1 PS TAPER
TAPER
25:1 PS
JOHN WHITE FISHER
JOHN WHITE FISHER
JOHN WHITE FISHER
JOHN WHITE FISHER
WOODS
WOODS
W
OODS
WOO
DS
WOO
DS
WOO
D
S
WOODS
WOODS
US 301 24’ BST
EXIST. R/W
EXIST. R/W
10
0
.
0
0
’
S
WIF
T CRE
E
K S
WAMP
S
WIF
T
CR
E
E
K S
WAMP
16" DI 16" DI
12" DI 12" DI 12" DI
EXIST. R/W
EXIST. R/W
10
0
.
0
0
’
F
C
F
C
F
F
C
F
F
C
F
C
F
C
F
C
F
FFFF
C
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
6B-5124
NAD 83
2
4
’
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
7
-
L-
S
T
A
.
4
7
+
0
0
.
0
0
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
5
-
L-
S
T
A
.
3
4
+
0
0
.
0
0
TAPER
25:1 PS
5
0
’
F
STS
TS
TS
F FE
S
S
S
S
S
S
S
S
TS
TS
TSTS
TS
TSTS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS TS
T
E
E
E
COFFER DAM
WORK BRIDGE
COFFERDAM
COFFERDAM
WORK BRIDGE
COFFERDAM
15
"
RC
P
-
I
V
T
B
T
B
15
"
TB
T
B
T
B
T
B
TB
2GI
2GI
SHEET __ OF __
PERMIT DRAWING
ENGLISH
SHEET OF
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
PROJECT: 42270.1.1 (B-5124)
NASH COUNTY
DIVISION OF HIGHWAYS
N. C. DEPT. OF TRANSPORTATION
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
6
a
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
7
/2
2
/2
0
1
4
WETLAND AND SURFACE WATER IMPACTS PERMIT
TO WET LAND
NON-EROSIVE
V =1.33 fps
Q =0.9 cfs10
10
SITE 3
PLAN VIEW
ENLARGED0
5025
50
SCALE: 1"= 50’ HORIZ.
BANK STABILIZATION, L=73’
6A
TS TS
LEGEND
SURFACE WATER IMPACT
DENOTES TEMPORARY
E E
IN WETLAND
DENOTES EXCAVATION
WETLAND
DENOTES FILL INFF
DENOTES WETLAND BOUNDARY
CLEARING
DENOTES MECHANIZED***
S S
SURFACE WATER IMPACT
DENOTES PERMANENT
T T FILL IN WETLAND
DENOTES TEMPORARY
*
JOHN WHITE FISHER
JOHN WHITE FISHER
WOO
D
S
WO
OD
S
WOODS
S
WIF
T
CR
E
E
K S
WAMP
S
WIF
T
CR
E
E
K S
WAMP
16" DI
12" DI
F
C
F
C
F
F
C
FFF
-L-
TAPER
25:1 PS
F
STS
TS
TS
F FE
S
S
S
S
S
S
S
S
TS
TS
TSTS
TS
TSTS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS TS
T
E
E
E
COFFER DAM
WORK BRIDGE
COFFERDAM
COFFERDAM
WORK BRIDGE
COFFERDAM
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
6B-5124
NAD 83
1
5
"
R
C
P
-
I
V
T
B
T
B
15
"
TB
T
B
T
B
T
B
TB
2GI
2GI
85
8
5
85
85
85
9090
90
9090
90
90
9090
9
0
90
90
90 90 90 90
90
9
0
-L-
ENGLISH
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
SITE 3
PLAN VIEW
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
6
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
7
/2
2
/2
0
1
4
WETLAND AND SURFACE WATER IMPACTS PERMIT
SHEET __ OF __
PERMIT DRAWING
SHEET 6A
SEE ENLARGED AREA
SECTION
CROSS
SEE
SITE 3
TS TS
LEGEND
SURFACE WATER IMPACT
DENOTES TEMPORARY
E E
IN WETLAND
DENOTES EXCAVATION
WETLAND
DENOTES FILL INFF
DENOTES WETLAND BOUNDARY
CLEARING
DENOTES MECHANIZED***
S S
SURFACE WATER IMPACT
DENOTES PERMANENT
T T FILL IN WETLAND
DENOTES TEMPORARY
*
3
5
4
0
4
5
25:1 PS TAPER
TAPER
25:1 PS
JOHN WHITE FISHER
JOHN WHITE FISHER
JOHN WHITE FISHER
JOHN WHITE FISHER
WOODS
WOODS
W
OODS
WOO
DS
WOO
DS
WOO
D
S
WOODS
WOODS
US 301 24’ BST
EXIST. R/W
EXIST. R/W
10
0
.
0
0
’
S
WIF
T CRE
E
K S
WAMP
S
WIF
T
CR
E
E
K S
WAMP
16" DI 16" DI
12" DI 12" DI 12" DI
EXIST. R/W
EXIST. R/W
10
0
.
0
0
’
F
C
F
C
F
F
C
F
F
C
F
C
F
C
F
C
F
FFFF
C
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
6B-5124
NAD 83
2
4
’
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
7
-
L-
S
T
A
.
4
7
+
0
0
.
0
0
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
5
-
L-
S
T
A
.
3
4
+
0
0
.
0
0
TAPER
25:1 PS
5
0
’
F
STS
TS
TS
F FE
S
S
S
S
S
S
S
S
TS
TS
TSTS
TS
TSTS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS TS
T
E
E
E
COFFER DAM
WORK BRIDGE
COFFERDAM
COFFERDAM
WORK BRIDGE
COFFERDAM
15
"
RC
P
-
I
V
T
B
T
B
15
"
TB
T
B
T
B
T
B
TB
2GI
2GI
SHEET __ OF __
PERMIT DRAWING
ENGLISH
SHEET OF
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
PROJECT: 42270.1.1 (B-5124)
NASH COUNTY
DIVISION OF HIGHWAYS
N. C. DEPT. OF TRANSPORTATION
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
6
a
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
7
/2
2
/2
0
1
4
WETLAND AND SURFACE WATER IMPACTS PERMIT
TO WET LAND
NON-EROSIVE
V =1.33 fps
Q =0.9 cfs10
10
SITE 3
PLAN VIEW
ENLARGED0
5025
50
SCALE: 1"= 50’ HORIZ.
BANK STABILIZATION, L=73’
6A
TS TS
LEGEND
SURFACE WATER IMPACT
DENOTES TEMPORARY
E E
IN WETLAND
DENOTES EXCAVATION
WETLAND
DENOTES FILL INFF
DENOTES WETLAND BOUNDARY
CLEARING
DENOTES MECHANIZED***
S S
SURFACE WATER IMPACT
DENOTES PERMANENT
T T FILL IN WETLAND
DENOTES TEMPORARY
*
85
8
5
85
85
85
90
90
90
9
0
90
9
0
JOHN WHITE FISHER
JOHN WHITE FISHER
WOO
D
S
WO
OD
S
WOODS
S
WIF
T
CR
E
E
K S
WAMP
S
WIF
T
CR
E
E
K S
WAMP
16" DI
12" DI
F
C
F
C
F
F
C
FFF
-L-
TAPER
25:1 PS
F
STS
TS
TS
F FE
S
S
S
S
S
S
S
S
TS
TS
TSTS
TS
TSTS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS TS
T
E
E
E
COFFER DAM
WORK BRIDGE
COFFERDAM
COFFERDAM
WORK BRIDGE
COFFERDAM
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
6B-5124
NAD 83
1
5
"
R
C
P
-
I
V
T
B
T
B
15
"
TB
T
B
T
B
T
B
TB
2GI
2GI
F F F F F F F F F F F F F F F F F F F F F
F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
LEGEND
S S SURFACE WATER IMPACT
DENOTES PERMANENT
SITE 3
SITE 4
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
PROJECT: 42270.1.1 (B-5124)
NASH COUNTY
R:
\
H
yd
r
a
u
li
c
s
\
P
ERM
ITS
_
E
n
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
r
o
fil
e
.
d
g
n
IC
A
EN
G
IN
EE
RIN
G
,
IN
C
.
3
/14
/2
0
1
4
WETLAND
DENOTES FILL INFF
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
SHEET __ OF __
PERMIT DRAWING ENGLISH
SHEET OF
34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00
40
50
60
70
80
90
100
40
50
60
70
80
90
100
47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00
50
60
70
80
90
100
110
120
130
140
50
60
70
80
90
100
110
120
130
140
11B-5124
-L-
-L-
2) SEE SHEETS S-? THROUGH S-? FOR STRUCTURE PLANS
1) SEE SHEETS 6 THROUGH 7 FOR -L- PLAN
NOTES:
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
5
/
2
8
/
9
9 SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
W.S. ELEVATION
AT DATE OF SURVEY FT
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
W.S. ELEVATION
AT DATE OF SURVEY FT
= 90.4
= 9832
= 50
= 93.5
= 11777
= 100
= 93.87
DESIGN DISCHARGE = 9832
= 50
= 93.5
= 11777
= 100
= 93.87
= 9900
= 93.5
= 9900
DATE OF SURVEY:2-6-2013
DATE OF SURVEY:2-6-2013
= 88.8
ELEVATION 88.70’
-LR- STA. 37+35.84 74.38’ RIGHT
BM # 3 BRIDGE SPIKEIN BASE OF 10" WATER OAK
ELEVATION 90.25’
-LR- STA. 54+39.84 22.55’ LEFT
BM # 4 BRIDGE SPIKE IN BASE OF 8" OAK
1.
5:
1
= 50+
= 50+
= 93.5
1.
5:
1 1.5:1
1.5:1
EXCAVATION LIMITS
(STRUCTURE PAY ITEM)
EXCAVATION
UNCLASSIFIED STRUCTURE
(STRUCTURE PAY ITEM)
EXCAVATION
UNCLASSIFIED STRUCTURE
PI = 35+10.00
EL = 93.55’
(+)0.0177%(-)0.0233%
VC = 200’
K = 4874
PI = 38+10.00
EL = 93.48’
(-)0.0233%
(+)0.0171%
VC = 200’
K = 4941
PI = 43+35.00
EL = 93.57’
(+)0.0171%(-)0.0140%
VC = 200’
K = 6422
LEFT DITCH
-L- STA. 36+19.75
BEGIN BRIDGE
-L- STA. 37+57.25
END BRIDGE
PI = 48+35.00
EL = 93.50’
(-)0.0140%(+)0.1825%
VC = 200’
K = 1018
PI = 52+35.00
EL = 94.23’
(+)0.1825%(+)0.5054%
VC = 200’
K = 619
PI = 57+00.00
EL = 96.58’
(+)0.5054%(+)2.3613%
VC = 220’
K = 119
(+)2.3613%
E
l
=
10
0
.0
0
(+) 3.1800%(+) 0.3000%
E
L
E
V
.
9
8
.4
1
’
S
T
A
.
5
8
+
0
0
-
L
R
-
L
E
F
T
B
E
G
IN
D
I
T
C
H
S
T
A
.
5
8
+
5
0
-L- STA. 54+11.75
BEGIN BRIDGE
-L- STA. 55+59.25
END BRIDGE
PROJ. REFERENCE NO.SHEET NO.00 5 10
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120 130120130
100
110
100
110
WETLAND
DENOTES FILL INFF
90
80
70
90
80
70
STA 42+00 -L-
X-SECTION
SITE 3
WETLAND AND SURFACE WATER IMPACTS PERMIT
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
ENGLISHSHEET __ OF __
PERMIT DRAWING
R:
\
H
y
d
r
a
u
li
c
s
\
P
ERM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
x
s
e
c
t
i
o
n
s
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
3
/14
/2
0
1
4
B-5124 XSC SITE 3
LEGEND
C
LE
A
R
IN
G
LIM
ITS
3:1
0.0200.020 0.080
F F F F
W
E
T
L
A
N
D
S
-L-
ENGLISH
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
7
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
7
/2
2
/2
0
1
4
WETLAND AND SURFACE WATER IMPACTS PERMIT
SHEET __ OF __
PERMIT DRAWING
SHEET 7A
SEE ENLARGED AREA
SECTION
CROSS
SEE
SITE 4
SITE 4
PLAN VIEW
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
3:
1 D
FROM -L- STA. 58+00 TO STA. 60+80 LT.
Min. D= 1 Ft.
DETAIL A
Ground
Natural
Flatter3:1 or
Slope
Fill
LEGEND
DENOTES WETLAND BOUNDARY
E E
IN WETLAND
DENOTES EXCAVATION
CLEARING
DENOTES MECHANIZED
WETLAND
DENOTES FILL INFF
T T FILL IN WETLAND
DENOTES TEMPORARY
TS TS SURFACE WATER IMPACT
DENOTES TEMPORARY
S S
SURFACE WATER IMPACT
DENOTES PERMANENT
****
5
0
5
5
6
0
PC Sta. 56+95.29
-L-
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
25
:1 PS
TAPER
S
WIF
T
CR
E
E
K
S
WIF
T
CR
EE
K
S
IGN
GPS 3
T-1203
T-1204
TBM-4
JOHN WHITE FISHER
JOHN WHITE FISHER
(HEIRS)
LENA C. BRADLEY
R.R. BRADLEY AND
FULL CIRCLE SOLUTIONS, INC.
TREES
TREES
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
W
OOD
S
W
OO
DS
US 301 24’ BST
EXIST. R/W
EXIST. R/W
10
0
.
0
0
’
8’ SOIL PATH 8
’ SOIL
PATH
8’ S
OIL P
AT
H
8’ SOIL PATH
1
0
’
G
R
7
’ GR
TREES
WE
L
L
6
0
.
0
0
’
16" DI
16" DI 16" DI
12" DI
12" DI
12" DI
US 301 24’ BST
F
C
F
C
F
C
F
C
F
F
F
F
C
F
C
F
F
C F
F
F
C
C
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
7B-5124
2) SEE SHEETS S-XX THROUGH S-XX FOR STRUCTURE PLANS
1) SEE SHEET 11 FOR -L- PROFILE
NOTES:
2
4
’
2
4
’
M
A
TC
H
LIN
E
S
EE
S
H
EE
T
-
L-
S
TA
. 6
0
+
0
0
.0
0
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
6
-
L-
S
T
A
.
4
7
+
0
0
.
0
0
RE
VIS
IO
N
S
NAD 83
R
/W
REV
IS
IO
N
(A
P
RIL
1,
2
0
1
4
):
C
O
N
S
TR
U
C
TIO
N
EA
S
E
M
EN
T
A
D
D
ED
TO
P
A
RC
E
L
2
F
RO
M
-
L-
S
TA
5
8
+
5
0
TO
6
3
+
6
5
LT
.
h
c
n
5
0
’F
F
FF
E
EE
EE
E F
S
S
STT
TS
TS
TS TS
TS
TS
TS
TS
TS
T
TT
COFFERDAM
WORK BRIDGE
COFFERDAM
COFFERDAM
COFFERDAM
WORK BRIDGE
TT
T
15" RCP
15" RCP
1
5
"
T
B
T
B
T
B
T
B
RETAIN
REMOVE
15"
RCP-IV
15"
SEE DETAIL A
SPECIAL LATERAL ’V’ DITCH
FROM -L- STA. 58+00 TO STA. 60+80 LT.
CLEANOUT
2GI 2GI
0
5025
50
SCALE: 1"= 50’ HORIZ.
SITE 4
PLAN VIEW
ENLARGED
SHEET __ OF __
PERMIT DRAWING
ENGLISH
SHEET OF
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
PROJECT: 42270.1.1 (B-5124)
NASH COUNTY
DIVISION OF HIGHWAYS
N. C. DEPT. OF TRANSPORTATION
TO WET LAND
NON-EROSIVE
V =1.48 fps
Q =1.2 cfs10
10
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
7
a
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
7
/2
2
/2
0
1
4
WETLAND AND SURFACE WATER IMPACTS PERMIT
EXCAVATION IN WETLAND
EXCAVATION IN WETLAND
7A
LEGEND
DENOTES WETLAND BOUNDARY
E E
IN WETLAND
DENOTES EXCAVATION
CLEARING
DENOTES MECHANIZED
WETLAND
DENOTES FILL INFF
T T FILL IN WETLAND
DENOTES TEMPORARY
TS TS SURFACE WATER IMPACT
DENOTES TEMPORARY
S S
SURFACE WATER IMPACT
DENOTES PERMANENT
****
S
WIF
T
CR
E
E
K
S
WIF
T
CR
E
E
K
TBM-4
TREES
TREES
WOODS
WOODS
W
OOD
S
8’ SOIL PATH
16" DI
12" DI
F
C
F
F
F
F
C
F
F
-L-
F
F
FF
E
EE
EE
E F
S
S
STT
TS
TS
TS TS
TS
TS
TS
TS
TS
T
TT
COFFERDAM
WORK BRIDGE
COFFERDAM
COFFERDAM
COFFERDAM
WORK BRIDGE
TT
T
1
5
"
T
B
T
B
T
B
T
B
RCP-IV
15" 2GI 2GI
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
7B-5124
SKETCH OF PAVEMENT/BRIDGE RELATIONSHIP
2) SEE SHEETS S-XX THROUGH S-XX FOR STRUCTURE PLANS
1) SEE SHEET 11 FOR -L- PROFILE
NOTES:
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
6
-
L-
S
T
A
.
4
7
+
0
0
.
0
0
NAD 83
8
5
8
5
8
5
85
90
9
0
9
0
9
0
9
0
90
90
9
0
9 0
90
90
90
90
90
90
90
90
90
90
90
9
0
9
0
90
90
9090
90
90 90 90
9
0
9
0
90
90
9090
90
90
9
0
9
0
90
9
5
9
5
95
9
5
95
95
9
5
95
95
95
95
95
95
100
100
10
0
100100
100
100 100
100 100
100
100
10
0
10
0
1
0
0
105
105
105
105
-L-
ENGLISH
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
7
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
7
/2
2
/2
0
1
4
WETLAND AND SURFACE WATER IMPACTS PERMIT
SHEET __ OF __
PERMIT DRAWING
SHEET 7A
SEE ENLARGED AREA
SECTION
CROSS
SEE
SITE 4
SITE 4
PLAN VIEW
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
3:
1 D
FROM -L- STA. 58+00 TO STA. 60+80 LT.
Min. D= 1 Ft.
DETAIL A
Ground
Natural
Flatter3:1 or
Slope
Fill
LEGEND
DENOTES WETLAND BOUNDARY
E E
IN WETLAND
DENOTES EXCAVATION
CLEARING
DENOTES MECHANIZED
WETLAND
DENOTES FILL INFF
T T FILL IN WETLAND
DENOTES TEMPORARY
TS TS SURFACE WATER IMPACT
DENOTES TEMPORARY
S S
SURFACE WATER IMPACT
DENOTES PERMANENT
****
5
0
5
5
6
0
PC Sta. 56+95.29
-L-
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
25
:1 PS
TAPER
S
WIF
T
CR
E
E
K
S
WIF
T
CR
EE
K
S
IGN
GPS 3
T-1203
T-1204
TBM-4
JOHN WHITE FISHER
JOHN WHITE FISHER
(HEIRS)
LENA C. BRADLEY
R.R. BRADLEY AND
FULL CIRCLE SOLUTIONS, INC.
TREES
TREES
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
W
OOD
S
W
OO
DS
US 301 24’ BST
EXIST. R/W
EXIST. R/W
10
0
.
0
0
’
8’ SOIL PATH 8
’ SOIL
PATH
8’ S
OIL P
AT
H
8’ SOIL PATH
1
0
’
G
R
7
’ GR
TREES
WE
L
L
6
0
.
0
0
’
16" DI
16" DI 16" DI
12" DI
12" DI
12" DI
US 301 24’ BST
F
C
F
C
F
C
F
C
F
F
F
F
C
F
C
F
F
C F
F
F
C
C
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
7B-5124
2) SEE SHEETS S-XX THROUGH S-XX FOR STRUCTURE PLANS
1) SEE SHEET 11 FOR -L- PROFILE
NOTES:
2
4
’
2
4
’
M
A
TC
H
LIN
E
S
EE
S
H
EE
T
-
L-
S
TA
. 6
0
+
0
0
.0
0
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
6
-
L-
S
T
A
.
4
7
+
0
0
.
0
0
RE
VIS
IO
N
S
NAD 83
R
/W
REV
IS
IO
N
(A
P
RIL
1,
2
0
1
4
):
C
O
N
S
TR
U
C
TIO
N
EA
S
E
M
EN
T
A
D
D
ED
TO
P
A
RC
E
L
2
F
RO
M
-
L-
S
TA
5
8
+
5
0
TO
6
3
+
6
5
LT
.
h
c
n
5
0
’F
F
FF
E
EE
EE
E F
S
S
STT
TS
TS
TS TS
TS
TS
TS
TS
TS
T
TT
COFFERDAM
WORK BRIDGE
COFFERDAM
COFFERDAM
COFFERDAM
WORK BRIDGE
TT
T
15" RCP
15" RCP
1
5
"
T
B
T
B
T
B
T
B
RETAIN
REMOVE
15"
RCP-IV
15"
SEE DETAIL A
SPECIAL LATERAL ’V’ DITCH
FROM -L- STA. 58+00 TO STA. 60+80 LT.
CLEANOUT
2GI 2GI
8
5
8
5
85
85
90
90
90
9
0
90
9
0
90
90
9
0
9
0
90
9090
90
90
9
0
9
0
90
9
5
95
95
1
0
0
100
0
5025
50
SCALE: 1"= 50’ HORIZ.
SITE 4
PLAN VIEW
ENLARGED
SHEET __ OF __
PERMIT DRAWING
ENGLISH
SHEET OF
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
PROJECT: 42270.1.1 (B-5124)
NASH COUNTY
DIVISION OF HIGHWAYS
N. C. DEPT. OF TRANSPORTATION
TO WET LAND
NON-EROSIVE
V =1.48 fps
Q =1.2 cfs10
10
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
7
a
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
7
/2
2
/2
0
1
4
WETLAND AND SURFACE WATER IMPACTS PERMIT
EXCAVATION IN WETLAND
EXCAVATION IN WETLAND
7A
LEGEND
DENOTES WETLAND BOUNDARY
E E
IN WETLAND
DENOTES EXCAVATION
CLEARING
DENOTES MECHANIZED
WETLAND
DENOTES FILL INFF
T T FILL IN WETLAND
DENOTES TEMPORARY
TS TS SURFACE WATER IMPACT
DENOTES TEMPORARY
S S
SURFACE WATER IMPACT
DENOTES PERMANENT
****
S
WIF
T
CR
E
E
K
S
WIF
T
CR
E
E
K
TBM-4
TREES
TREES
WOODS
WOODS
W
OOD
S
8’ SOIL PATH
16" DI
12" DI
F
C
F
F
F
F
C
F
F
-L-
F
F
FF
E
EE
EE
E F
S
S
STT
TS
TS
TS TS
TS
TS
TS
TS
TS
T
TT
COFFERDAM
WORK BRIDGE
COFFERDAM
COFFERDAM
COFFERDAM
WORK BRIDGE
TT
T
1
5
"
T
B
T
B
T
B
T
B
RCP-IV
15" 2GI 2GI
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
7B-5124
SKETCH OF PAVEMENT/BRIDGE RELATIONSHIP
2) SEE SHEETS S-XX THROUGH S-XX FOR STRUCTURE PLANS
1) SEE SHEET 11 FOR -L- PROFILE
NOTES:
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
6
-
L-
S
T
A
.
4
7
+
0
0
.
0
0
NAD 83
PROJ. REFERENCE NO.SHEET NO.00 5 10
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120 130120130
100
110
100
110
WETLAND
DENOTES FILL INFF
90
80
70
90
80
70
STA 50+00 -L-
X-SECTION
SITE 4
WETLAND AND SURFACE WATER IMPACTS PERMIT
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
ENGLISHSHEET __ OF __
PERMIT DRAWING
R:
\
H
y
d
r
a
u
li
c
s
\
P
ERM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
x
s
e
c
t
i
o
n
s
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
3
/14
/2
0
1
4
B-5124 XSC SITE 4
LEGEND
C
LE
A
R
IN
G
LIM
ITS
3:1
0.0200.020 0.080
F F F
W
E
T
L
A
N
D
S
-L-
ENGLISH
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
PROJECT: 42270.1.1 (B-5124)
NASH COUNTY
DIVISION OF HIGHWAYS
N. C. DEPT. OF TRANSPORTATION
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
8
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
SITE 5
PLAN VIEW
WETLAND AND SURFACE WATER IMPACTS PERMIT
SHEET __ OF __
PERMIT DRAWING
LEGEND
DENOTES WETLAND BOUNDARY
CLEARING
DENOTES MECHANIZED*
*
*
*
***
**
*
*
SECT
ION
CROSS
SEE
S
ITE
5
FF
WETLAND
DENOTES FILL IN
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
8B-5124
M
A
TC
H
LIN
E
S
EE
S
H
EE
T
9
-
L-
S
TA.
7
3
+
0
0
.0
0
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
7
-
L-
S
T
A.
6
0
+
0
0.
0
0
NAD 83
R/W
R
EV
IS
IO
N
(A
P
RIL
1,
2
0
1
4
)
:
C
O
N
S
TRU
C
TIO
N
EA
S
EM
EN
T
A
D
D
E
D
TO
P
A
RC
EL
2
F
R
O
M
-
L-
S
TA
.
5
8
+
5
0
TO
6
3
+
6
5
LT
.
h
c
n
2
6
’ S
OIL
18
" RCP
18
"
R
C
P
36" RCP
R
IP
-
R
AP
10’ S
OIL
WOODS
WOODS
W
E
L
L
WE
L
L
WELL
WELL
WELL
WELL
T T
WELL
WELL
T T
(HE
IRS
)
LENA
C
. BRAD
LEY
R
.R
. BRAD
LEY
AND
(HEIRS)
LENA C. BRADLEY
R.R. BRADLEY AND
FULL
C
IRCLE
SOLUTIONS
, INC
.
FULL CIRCLE SOLUTIONS, INC.
PB 31 PG 203
DB 2026 PG 708
DB
2026
PG
708
1
5
"
R
C
P
DI
DI
DI1
5
"
R
C
P
18
’ S
OIL (P
R
IVA
TE
)
B
R
AD
LE
Y-CUT
CH
IN LAN
E
NO RECORDDOMINION POWER EASEMENT
T T
V
A
L
V
E
B
L
O
W-
OF
F
S
S
M
H
W/
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C F
5
0
’
5
0
’
6
0
6
5
7
0
PI Sta 75+40.38
PI Sta 63+08.80
R = 1,568.00’
PT Sta. 68+64.88
-L-
25
:1 PS TAPER
25
:1 PS
TAPER
R
E
T
A
I
N
TB JB w/MH
18"
SEE DETAIL A
SPECIAL LATERAL ’V’ DITCH
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
D
FROM -L- STA. 61+00 TO STA. 63+55 LT.
Min. D= 1 Ft.
DETAIL A
Ground
Natural
Flatter3:1 or
Slope
Fill
REMOVE
3:
1
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C F
ENGLISH
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
9
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
WETLAND AND SURFACE WATER IMPACTS PERMIT
SHEET __ OF __
PERMIT DRAWING
SHEET 9A
SEE ENLARGED AREA LEGEND
DENOTES WETLAND BOUNDARY
E E
IN WETLAND
DENOTES EXCAVATION
WETLAND
DENOTES FILL INFF
TS TS SURFACE WATER IMPACT
DENOTES TEMPORARY
CLEARING
DENOTES MECHANIZED*
*
*
*
***
**
*
*
SITE 5
PLAN VIEW
SITE 5
S S
SURFACE WATER IMPACT
DENOTES PERMANENT
7
5
8
0
PT Sta. 80+51.97
POT Sta. 81+76.68
PI Sta 75+40.38
R = 10,000.00’
PI Sta 78+74.57
T = 177.43’
R = 10,000.00’
PC Sta. 73+83.59
PRC Sta. 76+97.14
END TIP PROJECT B-5124
-L-
-L- POT STA. 80+60.00
25:1 PS TAPER
25:1 PS TAPER
DEBRIS
DEBRIS
1
0
’
S
OI
L
WOODS
WOODS
WOODS
WOOD
S
FRANCES B.WOODARD
JUDGE FARM LIMITED PARTNERSHIP
PB 31 PG 203
CE1
BEAVER DAM
MHUTILU
N
K
N
BL-10
BL-11
LIMITED PARTNERSHIP
JUDGE FARM
PB 31 PG 203
PARTNERSHIP
LIMITED
FARM
JUDGE
F F
F
F
F
F
F
F
F
F
F
F
F
F
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
9B-5124NAD 83
2) SEE SHEETS C-XX THROUGH C-XX FOR CULVERT PLANS
1) SEE SHEET 12 FOR -L- PROFILE
NOTES:
BEGIN CULVERT
-L- STA. 74+11.69+/-
-L- STA. 74+37.97+/-
END CULVERT
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
8
-
L-
S
T
A
.
7
3
+
0
0
.
0
0
RE
VIS
IO
N
S
E
E
TS
TS
TS S
S S S S
SS
SS
S
S
S S S
SS
TS TS TS F F F F F F F F F F F F F
TSTS
TS
T
B
T
B
T
B
TB
( Not to Scale)
TOE PROTECTION
d
FROM STA. 79+00 LT. TO STA. 80+60 LT.
Nat
ural
Gr
ou
n
d Fill Slope3:1 OR FLATTER
d= 1 Ft.
Type of Liner= PSRM
DETAIL B
PSRM
L
AN
E
S
W
AMP
SEE DETAIL
EST. 15 SY GEOTEXTILE
EST. 20 TONS CL. ’1’ RIP RAP
CHANNEL IMPROVEMENT
35 LF OF INLET
(LOOKING DOWNSTREAM)
(NOT TO SCALE)
2
:12:1
N
G NG
1.5’ THICK
w/GEOTEXTILE
CLASS ’I’ RIP RAP 26’
EXCAVATION
SEE DETAIL B
TOE PROTECTION w/ PSRM
CULVERT 161 INLET CHANNEL
EXISTING (3) 8’ x 6’ RCBC
RETAIN AND EXTEND IN KIND
0
5025
50
SCALE: 1"= 50’ HORIZ.
SITE 5
PLAN VIEW
ENLARGED
SHEET __ OF __
PERMIT DRAWING
ENGLISH
SHEET OF
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
PROJECT: 42270.1.1 (B-5124)
NASH COUNTY
DIVISION OF HIGHWAYS
N. C. DEPT. OF TRANSPORTATION
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
9
a
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
WETLAND AND SURFACE WATER IMPACTS PERMIT
BANK STABILIZATION, L=46’
LEGEND
DENOTES WETLAND BOUNDARY
E E
IN WETLAND
DENOTES EXCAVATION
WETLAND
DENOTES FILL INFF
TS TS SURFACE WATER IMPACT
DENOTES TEMPORARY
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
S S
SURFACE WATER IMPACT
DENOTES PERMANENT
9ANAD 83
WOODS
WELL
TBM-5
FRANCES B.WOODARD
FULL CIRCLE SOLUTIONS, INC.
CE1
BEAVER DAM
MHUTILU
N
K
N
6
0
.
0
0
’
PB 31 PG 203
PARTNERSHIP
LIMITED
FARM
JUDGE
F
F
F F
F
FF
F
F
5
0
’
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
E
E
TS
TS
TS S
S S S S
SS
SS
S
S
S S S
SS
TS TS TS F F F F F F F F F
TSTS
TS
T
B
T
B
T
B
TB
L
ANE
S
W
AMP
SEE DETAIL
EST. 15 SY GEOTEXTILE
EST. 20 TONS CL. ’1’ RIP RAP
CHANNEL IMPROVEMENT
35 LF OF INLET
EXISTING (3) 8’ x 6’ RCBC
RETAIN AND EXTEND IN KIND
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
9B-5124
2) SEE SHEETS C-XX THROUGH C-XX FOR CULVERT PLANS
1) SEE SHEET 12 FOR -L- PROFILE
NOTES:
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
8
-
L-
S
T
A
.
7
3
+
0
0
.
0
0
RE
VIS
IO
N
S
90 9
0
90
9
0
90
9
0
90
90
90
90
90
90
90
90
90
95
95
9
5
9
5
95
95
95
95
95
95
95
95
9
5
95
95
9
5
95
95
95
95
9
5
9
5
95
1
0
0
10
0
100
100
100
100
1
0
0
100
100
100
100
100
100
100
100
100
100
100
1
0
0
1
0
0
100100
1
0
0
100
100
1
0
0
100
100
100
10 0
10
0
100
1
0
0
105
105
105
105
105
1
0
5
105
1
0
5
1
0
5
105
105
105
10
5
1
0
5
105
105
105
10
5
105
105
105
11
0
11
0
110
110
1
1
0
115115
-L-
ENGLISH
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
PROJECT: 42270.1.1 (B-5124)
NASH COUNTY
DIVISION OF HIGHWAYS
N. C. DEPT. OF TRANSPORTATION
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
8
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
SITE 5
PLAN VIEW
WETLAND AND SURFACE WATER IMPACTS PERMIT
SHEET __ OF __
PERMIT DRAWING
LEGEND
DENOTES WETLAND BOUNDARY
CLEARING
DENOTES MECHANIZED*
*
*
*
***
**
*
*
SECT
ION
CROSS
SEE
S
ITE
5
FF
WETLAND
DENOTES FILL IN
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
8B-5124
M
A
TC
H
LIN
E
S
EE
S
H
EE
T
9
-
L-
S
TA.
7
3
+
0
0
.0
0
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
7
-
L-
S
T
A.
6
0
+
0
0.
0
0
NAD 83
R/W
R
EV
IS
IO
N
(A
P
RIL
1,
2
0
1
4
)
:
C
O
N
S
TRU
C
TIO
N
EA
S
EM
EN
T
A
D
D
E
D
TO
P
A
RC
EL
2
F
R
O
M
-
L-
S
TA
.
5
8
+
5
0
TO
6
3
+
6
5
LT
.
h
c
n
2
6
’ S
OIL
18
" RCP
18
"
R
C
P
36" RCP
R
IP
-
R
AP
10’ S
OIL
WOODS
WOODS
W
E
L
L
WE
L
L
WELL
WELL
WELL
WELL
T T
WELL
WELL
T T
(HE
IRS
)
LENA
C
. BRAD
LEY
R
.R
. BRAD
LEY
AND
(HEIRS)
LENA C. BRADLEY
R.R. BRADLEY AND
FULL
C
IRCLE
SOLUTIONS
, INC
.
FULL CIRCLE SOLUTIONS, INC.
PB 31 PG 203
DB 2026 PG 708
DB
2026
PG
708
1
5
"
R
C
P
DI
DI
DI1
5
"
R
C
P
18
’ S
OIL (P
R
IVA
TE
)
B
R
AD
LE
Y-CUT
CH
IN LAN
E
NO RECORDDOMINION POWER EASEMENT
T T
V
A
L
V
E
B
L
O
W-
OF
F
S
S
M
H
W/
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C F
5
0
’
5
0
’
6
0
6
5
7
0
PI Sta 75+40.38
PI Sta 63+08.80
R = 1,568.00’
PT Sta. 68+64.88
-L-
25
:1 PS TAPER
25
:1 PS
TAPER
R
E
T
A
I
N
TB JB w/MH
18"
SEE DETAIL A
SPECIAL LATERAL ’V’ DITCH
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
D
FROM -L- STA. 61+00 TO STA. 63+55 LT.
Min. D= 1 Ft.
DETAIL A
Ground
Natural
Flatter3:1 or
Slope
Fill
REMOVE
3:
1
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C F
8
5
85
85
90 90
90
90
9
0
90
90
9
0
90
9 0
90
90
90 90
90
9
0
9
0 90
90
90
90
95
9
5
9
5
95
9
5
95
95
95
95
10
0
100
100
100
100
100
1
0
0
10
0
10
0
100
10
5
1
0
5
1
0
5 105
10
5
105
1
0
5 10
5
105
110
110
11
0
1
1
0
110
110
ENGLISH
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
9
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
WETLAND AND SURFACE WATER IMPACTS PERMIT
SHEET __ OF __
PERMIT DRAWING
SHEET 9A
SEE ENLARGED AREA LEGEND
DENOTES WETLAND BOUNDARY
E E
IN WETLAND
DENOTES EXCAVATION
WETLAND
DENOTES FILL INFF
TS TS SURFACE WATER IMPACT
DENOTES TEMPORARY
CLEARING
DENOTES MECHANIZED*
*
*
*
***
**
*
*
SITE 5
PLAN VIEW
SITE 5
S S
SURFACE WATER IMPACT
DENOTES PERMANENT
7
5
8
0
PT Sta. 80+51.97
POT Sta. 81+76.68
PI Sta 75+40.38
R = 10,000.00’
PI Sta 78+74.57
T = 177.43’
R = 10,000.00’
PC Sta. 73+83.59
PRC Sta. 76+97.14
END TIP PROJECT B-5124
-L-
-L- POT STA. 80+60.00
25:1 PS TAPER
25:1 PS TAPER
DEBRIS
DEBRIS
1
0
’
S
OI
L
WOODS
WOODS
WOODS
WOOD
S
FRANCES B.WOODARD
JUDGE FARM LIMITED PARTNERSHIP
PB 31 PG 203
CE1
BEAVER DAM
MHUTILU
N
K
N
BL-10
BL-11
LIMITED PARTNERSHIP
JUDGE FARM
PB 31 PG 203
PARTNERSHIP
LIMITED
FARM
JUDGE
F F
F
F
F
F
F
F
F
F
F
F
F
F
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
9B-5124NAD 83
2) SEE SHEETS C-XX THROUGH C-XX FOR CULVERT PLANS
1) SEE SHEET 12 FOR -L- PROFILE
NOTES:
BEGIN CULVERT
-L- STA. 74+11.69+/-
-L- STA. 74+37.97+/-
END CULVERT
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
8
-
L-
S
T
A
.
7
3
+
0
0
.
0
0
RE
VIS
IO
N
S
E
E
TS
TS
TS S
S S S S
SS
SS
S
S
S S S
SS
TS TS TS F F F F F F F F F F F F F
TSTS
TS
T
B
T
B
T
B
TB
( Not to Scale)
TOE PROTECTION
d
FROM STA. 79+00 LT. TO STA. 80+60 LT.
Nat
ural
Gr
ou
n
d Fill Slope3:1 OR FLATTER
d= 1 Ft.
Type of Liner= PSRM
DETAIL B
PSRM
L
AN
E
S
W
AMP
SEE DETAIL
EST. 15 SY GEOTEXTILE
EST. 20 TONS CL. ’1’ RIP RAP
CHANNEL IMPROVEMENT
35 LF OF INLET
(LOOKING DOWNSTREAM)
(NOT TO SCALE)
2
:12:1
N
G NG
1.5’ THICK
w/GEOTEXTILE
CLASS ’I’ RIP RAP 26’
EXCAVATION
SEE DETAIL B
TOE PROTECTION w/ PSRM
CULVERT 161 INLET CHANNEL
EXISTING (3) 8’ x 6’ RCBC
RETAIN AND EXTEND IN KIND
8
5
85
8
5
90 90
90
9
0
90
90
90 90
90
95
0
5025
50
SCALE: 1"= 50’ HORIZ.
SITE 5
PLAN VIEW
ENLARGED
SHEET __ OF __
PERMIT DRAWING
ENGLISH
SHEET OF
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
PROJECT: 42270.1.1 (B-5124)
NASH COUNTY
DIVISION OF HIGHWAYS
N. C. DEPT. OF TRANSPORTATION
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
9
a
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
WETLAND AND SURFACE WATER IMPACTS PERMIT
BANK STABILIZATION, L=46’
LEGEND
DENOTES WETLAND BOUNDARY
E E
IN WETLAND
DENOTES EXCAVATION
WETLAND
DENOTES FILL INFF
TS TS SURFACE WATER IMPACT
DENOTES TEMPORARY
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
S S
SURFACE WATER IMPACT
DENOTES PERMANENT
9A
WOODS
WELL
TBM-5
FRANCES B.WOODARD
FULL CIRCLE SOLUTIONS, INC.
CE1
BEAVER DAM
MHUTILU
N
K
N
6
0
.
0
0
’
PB 31 PG 203
PARTNERSHIP
LIMITED
FARM
JUDGE
F
F
F F
F
FF
F
F
5
0
’
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
E
E
TS
TS
TS S
S S S S
SS
SS
S
S
S S S
SS
TS TS TS F F F F F F F F F
TSTS
TS
T
B
T
B
T
B
TB
L
ANE
S
W
AMP
SEE DETAIL
EST. 15 SY GEOTEXTILE
EST. 20 TONS CL. ’1’ RIP RAP
CHANNEL IMPROVEMENT
35 LF OF INLET
EXISTING (3) 8’ x 6’ RCBC
RETAIN AND EXTEND IN KIND
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
9B-5124NAD 83
2) SEE SHEETS C-XX THROUGH C-XX FOR CULVERT PLANS
1) SEE SHEET 12 FOR -L- PROFILE
NOTES:
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
8
-
L-
S
T
A
.
7
3
+
0
0
.
0
0
RE
VIS
IO
N
S
F F F F F F F F F
LEGEND
S S SURFACE WATER IMPACT
DENOTES PERMANENT
S
S
SITE 5
F F F F F F F FFFFFFFFFF
F F F F F
SITE 5
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
PROJECT: 42270.1.1 (B-5124)
NASH COUNTY
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
p
r
o
fil
e
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
3
/14
/2
0
1
4
WETLAND
DENOTES FILL INFF
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
SHEET __ OF __
PERMIT DRAWING ENGLISH
SHEET OF
60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00
50
60
70
80
90
100
110
50
60
70
80
90
100
110
73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00
50
60
70
80
90
100
110
120
130
140
50
60
70
80
90
100
110
120
130
140
12B-5124
-L-
-L-
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
5
/
2
8
/
9
9 SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
2) SEE SHEETS C-? THROUGH C-? FOR CULVERT
1) SEE SHEETS 8 THROUGH 9 FOR -L- PLAN
NOTES:
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
CULVERT HYDRAULIC DATA
= 750
= 50
= 91.5
= 900
= 100
= 92.02
= 1125
= 92.9
ELEVATION 88.88’
-LR- STA. 76+15.19 25.05’ LEFT
BM # 5 RR SPIKE IN 21" SWEET GUM
ELEVATION 107.04’
-LR- STA. 80+80.32 52.96’ RIGHT
BM # 6 RR SPIKE IN 15" GUM
= 200+/-
(-)1.0092%
PI = 71+00.00
EL = 92.90’
(-)1.0092%(-)0.0303%
VC = 180’
K = 184
PI = 60+10.00
EL = 103.90’
VC = 390’
K = 116
E
l
=
9
6
.8
8
(-) 0.9600%
(-) 4.7818
%
E
L
E
V
.
10
0
.6
9
’
S
T
A
.
5
8
+
5
0
-
L
R
-
L
E
F
T
E
N
D
D
IT
C
H
ELEV. 98.80’
STA. 61+00 -LR- LEFT
BEGIN DITCH
S
T
A
.
6
3
+
0
0
E
L
E
V
.
9
4
.2
5
’
S
T
A
.
6
3
+
5
5
-
L
R
-
L
E
F
T
E
N
D
D
IT
C
H
(+) 0.3000%
LEFT DITCH
PI = 74+30.00
EL = 92.80’
(-)0.0303%(+)0.0482%
VC = 300’
K = 3822
PI = 78+45.00
EL = 93.00’
(+)0.0482%(+)3.0233%
VC = 350’
K = 118
ELEV. 99.50’
-L- STA. 80+60.00
END GRADE
-L- STA. 74+37.97+/-
END CULVERT
-L- STA. 74+11.69+/-
BEGIN CULVERT
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
SHEET OF
SHEET __ OF __
PERMIT DRAWING ENGLISH
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
WETLAND AND SURFACE WATER IMPACTS PERMIT
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B5
1
2
4
_
h
y
d
_
p
r
m
_
p
fl_
a
lo
n
g
_
s
t
r
_
s
it
e
5
_
p
s
h
9
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
3
/14
/2
0
1
4
B-5124 PAS-S5
80
90
100
050’100’50’100’150’150’
(TYP.)
2:1 NORMAL
L
TOP OF BANK
EXISTING LEFT
TOP OF BANK
EXISTING RIGHT
EXIST. CULVERT
ELEV. = 91.5
PROP. 50 YR.
C CHANNELL
C ELEV.=83.4L
30.4’
SLOPE = 0.25%
WIER ELEV. = 89.4
BEAVER DAM
9.7’
AT 2.85% SLOPE
CHANNEL IMPROVEMENT
35 LF OF INLET
AT 0.25% SLOPE
RCBC ~19’ UPSTREAM
EXTEND EXISTING
SKEW = 70°
GP ELEV. = 92.83
AND EXTEND ~ 19’ UPSTREAM
RETAIN (3) 8’ x 6’ RCBC
C STA. 74+25 -L-
(7/2/2013)
WS ELEV. = 89.3
0.8’0.8’
ELEV. = 92.02
PROP. 100 YR.
80
90
100
STA 74+25 -L-
PROFILE ALONG STRUCTURE
SITE 5
WOODS
WELL
BEAVER DAM
MHUTILUN
K
N
25:1 PS TAPER 25:1 PS TAPER
25:1 PS TAPER
T
B
T
B
T
B
TB
L
AN
E
S
W
A
MP
5
0
’WOODS
WELL
BEAVER DAM
MHUTILUN
K
N
5
0
’
25:1 PS TAPER 25:1 PS TAPER
25:1 PS TAPER
T
B
T
B
T
B
TB
L
A
NE
S
W
A
MP
NAD 83CONST.9B-5124
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
SEE DETAIL
EST. 15 SY GEOTEXTILE
EST. 20 TONS CL. ’1’ RIP RAP
CHANNEL IMPROVEMENT
35 LF OF INLET
EXISTING (3) 8’ x 6’ RCBC
RETAIN AND EXTEND IN KIND
EXISTING (3) 8’ x 6’ RCBC
RETAIN AND EXTEND IN KIND
THROUGH SPECIAL STILLING BASIN.
THE CONTRACTOR SHALL FILTER SEDIMENT-LADEN WATER
DIRECTLY INTO STREAM. FOR DE-WATERING OF CULVERT SITES,
THE CONTRACTOR SHALL NOT PUMP SEDIMENT-LADEN WATER
DEWATER THE WORK AREA.
PUMPS AND HOSES SHALL BE OF SUFFICIENT SIZE TO
SHEETING, PUMPS AND HOSES.
INCIDENTAL TO THE WORK. THIS INCLUDES POLYETHYLENE
MAINTENANCE OF STREAM FLOW OPERATIONS SHALL BE
ALL GRADED AREAS SHALL BE STABILIZED WITHIN 24 HOURS.
FROM STREAM FLOW AS NECESSARY.
IMPERVIOUS DIKES ARE TO BE USED TO ISOLATE WORK
DRY OR ISOLATED SECTIONS OF CHANNEL.
CULVERT CONSTRUCTION SHALL BE PERFORMED IN ONLY
NOTES:
6.
5.
4.
3.
2.
1.
(ROAD CLOSURE - MAINTENANCE OF TRAFFIC VIA OFFSITE DETOUR.)
PHASE 2 CONSTRUCTION SEQUENCE
(ROAD CLOSURE - MAINTENANCE OF TRAFFIC VIA OFFSITE DETOUR.)
PHASE 1 CONSTRUCTION SEQUENCE
DIKE
IMPERVIOUS
PUMP
DEWATERING
DIKE
IMPERVIOUS
DIKE
IMPERVIOUS
PUMP
DEWATERING
DIKE
IMPERVIOUS
PHASE 1 CONSTRUCTION SEQUENCE (STA. 74+25 -L-) PHASE 2 CONSTRUCTION SEQUENCE (STA. 74+25 -L-)
7.
6.
5.
4.
3.
2.
1.
7.
6.
5.
4.
3.
2.
1.
SEE DETAIL
EST. 15 SY GEOTEXTILE
EST. 20 TONS CL. ’1’ RIP RAP
CHANNEL IMPROVEMENT
35 LF OF INLET
COMPLETE ROADWAY.
REMOVE IMPERVIOUS DIKES, SPECIAL STILLING BASIN, AND DEWATERING PUMP.
STABILIZE THE CHANNEL BANK.
INSTALL 35 LF OF INLET CHANNEL IMPROVEMENT.
EXTEND CULVERT BARREL AND INSTALL HEADWALL. BACKFILL CULVERT.
DEWATER WORK AREA.
INSTALL IMPERVIOUS DIKES WHILE MAINTAINING FLOW THROUGH SOUTHERN TWO BARRELS.
(150 CY) OF PUMPED EFFLUENT
SPECIAL STILLING BASIN FOR
(150 CY) OF PUMPED EFFLUENT
SPECIAL STILLING BASIN FOR
(150 CY) OF PUMPED EFFLUENT
SPECIAL STILLING BASIN FOR
REMOVE IMPERVIOUS DIKES.
STABILIZE THE CHANNEL BANK.
INSTALL 35 LF OF INLET CHANNEL IMPROVEMENT.
EXTEND CULVERT BARRELS (2) AND INSTALL HEADWALLS. BACKFILL CULVERT.
DEWATER WORK AREA.
INSTALL IMPERVIOUS DIKES WHILE MAINTAINING FLOW THROUGH NORTHERN MOST BARREL.
FROM DEWATERED SITE.
CONSTRUCT SPECIAL STILLING BASIN (40’ X 25’) FOR PUMPED EFFLUENT NAD 83 N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
SHEET 34 OF 51
PERMIT DRAWING ENGLISH
F
F
F F
F
FF
F
F
F
F F
F
FF
F
PROJ. REFERENCE NO.SHEET NO.00 5 10
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120 130120130
100
110
100
110
WETLAND
DENOTES FILL INFF
90
80
70
90
80
70
STA 71+00 -L-
X-SECTION
SITE 5
WETLAND AND SURFACE WATER IMPACTS PERMIT
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
ENGLISHSHEET __ OF __
PERMIT DRAWING
R:
\
H
y
d
r
a
u
li
c
s
\
P
ERM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B5
1
2
4
_
h
y
d
_
p
r
m
_
w
e
t
_
x
s
e
c
t
i
o
n
s
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
3
/14
/2
0
1
4
B-5124 XSC SITE 5
LEGEND
C
LE
A
R
IN
G
LIM
ITS
3:
13:1
0.0200.020
F F
W
E
T
L
A
N
D
S
Ha
n
d
Existing Existing
Pe
r
m
a
n
e
n
t
T
e
m
p
.
E
x
c
a
v
a
t
i
o
n
M
e
c
h
a
n
i
z
e
d
C
l
e
a
r
i
n
g
P
e
r
m
a
n
e
n
t
T
e
m
p
.
C
h
a
n
n
e
l
C
h
a
n
n
e
l
N
a
t
u
r
a
l
Si
t
e
S
t
a
t
i
o
n
S
t
r
u
c
t
u
r
e
F
i
l
l
I
n
F
i
l
l
I
n
i
n
C
l
e
a
r
i
n
g
i
n
S
W
S
W
I
m
p
a
c
t
s
I
m
p
a
c
t
s
S
t
r
e
a
m
No
.
(
F
r
o
m
/
T
o
)
S
i
z
e
/
T
y
p
e
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
n
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
m
p
a
c
t
s
i
m
p
a
c
t
s
P
e
r
m
a
n
e
n
t
T
e
m
p
.
D
e
s
i
g
n
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
f
t
)
(
f
t
)
(
f
t
)
1
-
L
-
1
6
+
0
8
T
O
2
1
+
0
0
E
X
T
E
N
D
E
X
.
4
@
1
0
'
x
7
'
R
C
B
C
0
.
2
5
0
.
0
2
0
.
1
2
0
.
0
3
0
.
0
2
1
8
3
2
1
-
L
-
1
7
+
1
0
T
O
1
7
+
5
9
B
A
N
K
S
T
A
B
I
L
I
Z
A
T
I
O
N
<
0
.
0
1
2
0
2
-
L
-
2
1
+
0
0
T
O
3
4
+
0
0
2
4
"
P
C
C
S
B
R
I
D
G
E
,
1
@
7
0
'
,
1
@
5
5
'
0
.
6
0
0
.
0
2
<
0
.
0
1
0
.
5
0
<
0
.
0
1
0
.
0
5
5
6
3
-
L
-
3
4
+
0
0
T
O
4
7
+
0
0
2
1
"
P
C
C
S
B
R
I
D
G
E
,
1
@
3
5
'
,
1
@
5
5
'
,
1
@
4
5
'
0
.
7
5
<
0
.
0
1
<
0
.
0
1
0
.
4
7
<
0
.
0
1
0
.
1
0
5
1
2
4
-
L
-
4
7
+
0
0
T
O
5
5
+
7
6
1@
4
0
'
(
2
1
"
P
C
C
S
)
,
1
@
7
0
'
(
2
4
"
P
C
C
S
)
,
1@
3
5
'
(
2
1
"
P
C
C
S
)
0.
4
0
0
.
0
1
<
0
.
0
1
0
.
3
5
<
0
.
0
1
<
0
.
0
1
7
3
5
-
L
-
6
8
+
5
4
T
O
7
8
+
2
0
E
X
T
E
N
D
E
X
.
3
@
8
'
x
6
'
R
C
B
C
0
.
3
7
<
0
.
0
1
0
.
3
2
0
.
0
2
0
.
0
3
1
9
5
4
5
-
L
-
7
3
+
7
7
T
O
7
4
+
3
0
B
A
N
K
S
T
A
B
I
L
I
Z
A
T
I
O
N
0
.
0
3
4
6
TO
T
A
L
S
*
:
2
.
3
7
0
.
0
3
0
.
0
4
1
.
7
6
0
.
0
9
0
.
2
1
1
0
8
2
2
7
0
*R
o
u
n
d
e
d
t
o
t
a
l
s
a
r
e
s
u
m
o
f
a
c
t
u
a
l
i
m
p
a
c
t
s
NO
T
E
S
:
AT
N
R
e
v
i
s
e
d
3
/
1
2
/
1
3
SH
E
E
T
36 OF 51
NC
D
E
P
A
R
T
M
E
N
T
O
F
T
R
A
N
S
P
O
R
T
A
T
I
O
N
DIVISION OF HIGHWAYS B-5124, NASH COUNTY
W
E
T
L
A
N
D
P
E
R
M
I
T
I
M
P
A
C
T
S
U
M
M
A
R
Y
WE
T
L
A
N
D
I
M
P
A
C
T
S
S
U
R
F
A
C
E
W
A
T
E
R
I
M
P
A
C
T
S
RE
P
L
A
C
E
B
R
I
D
G
E
S
N
O
.
8
5
,
1
4
1
,
A
N
D
1
5
1
OVER SWIFT CREEK ON US-301 8/28/2014
BUFFER IMPACTS PERMIT ENGLISH
SHEET __ OF __
BUFFER DRAWING
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
SHEET OF
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
R:
\
H
y
d
r
a
u
l
i
c
s
\
P
ERM
IT
S
_
E
n
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
i
n
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
b
u
ff
e
r
_
t
s
h
.
d
g
n
IC
A
E
N
G
IN
E
E
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
SITE 1 SITE 2
SITE 3
VICINITY MAP
NOT TO SCALE
NASH COUNTY
25 50 10050
25 50 10050
5 10 2010
D
T
V
=
=
=
=
=
=
11,200
10
60
7
60
%
%
MPH
ADT
ADT 2035
% *
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
FUNC CLASS =
MINOR ARTERIAL
0
0
0
PROFILE (HORIZONTAL)
42270.1.1 P.E.
BRSTP-0301(25)
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA Prepared in the Office of:
SIGNATURE:
SIGNATURE:
P.E.
P.E.
DIVISION OF HIGHWAYS
2012 STANDARD SPECIFICATIONS
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ROADWAY DESIGN ENGINEER
LOCATION:
TYPE OF WORK:
0
9
/
0
8
/
9
9
B-5124DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
See Sheet 1-A For Index of Sheets
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
1000 Birch Ridge Dr., Raleigh NC, 27610
C
O
N
T
R
A
C
T
:
T
I
P
P
R
O
J
E
C
T
:
B
-
5
1
2
4
A
R
T
MEN
N
A
S
O
H
D
E
P
T
O
F TRA SPORT
T
I
O
N
T
A TEOFN RT
CAR
O
LI
N
A
OFFSITE DETOUR
BEGIN TIP PROJECT B-5124
U.S. 301
U.S. 30
1
END TIP PROJECT B-5124
U.S. 301
STATEWIDE TIER
AND CULVERTS.
GRADING, DRAINAGE, PAVING, STRUCTURES,
GARY LOVERING, PE
SWIFT CREEK ON US-301
REPLACE BRIDGES NO. 85, 141, AND 151 OVER
8,8002015
*(TTST =3%DUALS 4%)
4 5 6 7
8
9
S WA MP
CR
EEK
S WIFT
-L- STA. 80+60.00
-L- STA. 11+20.00
C
O
U
N
T
Y4
1546
1522
1547
2322
School
North Whitakres
School
Hubbard
Mann
Cemetery
Greene
Cemetery
Williams
Cemetery
Braswell
Cemetery
Powell
Cemetery
Davis
W
.
N
ash S
t.
Church
Shiloh
Church
Zion Cross
Blac
k
C
ree
k
Sw
a
m
p
Beaverdam
L
a
n
e
4
48
4
48
4
48
301
301
301
48
4
4
Cemetery
Harper
33
33
95
95
95
Church
New Hope
Battleboro
Whitakers
Hickory
C
IT
Y
LIM
IT
Johnston Rd.
E.
Main
St.
S H
ath aw
ay S tMainW.St.
C
IT
Y
LIMIT
W
atson
Farm
R d.
Seed
PROJECT
BEGIN
PROJECT
END
R
a
ilro
a
d
C
S
X
C
IT
Y
LIMIT
Swift Creek
CHRISTOPHER H. LEE
TOTAL LENGTH OF TIP PROJECT B-5124 = 1.314 MILES
K
42270.2.1 BRSTP-0301(25)R/W & UTL.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
-L- STA. 17+39.19+/-
END CULVERT
TO BATTLEBORO
-L- STA. 16+96.53+/-
BEGIN CULVERT
SW
AM
P
C
R
EE
K
SW
IFT
-L-
S
WA MP
CR
EE
K
S WIF
T
-L-
CR
EE
K
S WIF
T
-L- STA. 74+37.97+/-
END CULVERT
BEGIN CULVERT
-L- STA. 74+11.69+/-
-L-
TO
W HITA
KERS
BRIDGE #85
BRIDGE #141
BRIDGE #151
CULVERT #70 SWAMPLANECULVERT #161
APRIL 21, 2015
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
-L- STA. 21+85.31
BEGIN BRIDGE
-L- STA. 23+12.69
END BRIDGE
-L- STA. 36+19.75
BEGIN BRIDGE
-L- STA. 37+57.25
END BRIDGE
-L- STA. 54+11.75
BEGIN BRIDGE
-L- STA. 55+59.25
END BRIDGE
LENGTH STRUCTURE TIP PROJECT B-5124 = 0.091 MILES
LENGTH ROADWAY TIP PROJECT B-5124 = 1.223 MILES
FEBRUARY 28, 2014
NAD 83
-L-
ENGLISH
SHEET __ OF __
BUFFER DRAWING
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
SITE 1
PLAN VIEW
BUFFER IMPACTS IMPACTS
SHEET 6A
SEE ENLARGED AREA
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
b
u
ff
e
r
_
p
s
h
6
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
LEGEND
(30’)
RIPARIAN BUFFER ZONE 1
(20’)
RIPARIAN BUFFER ZONE 2
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
(BRIDGE)
ALLOWABLE IMPACTS ZONE 1
(BRIDGE)
ALLOWABLE IMPACTS ZONE 2
3
5
4
0
4
5
25:1 PS TAPER
TAPER
25:1 PS
JOHN WHITE FISHER
JOHN WHITE FISHER
JOHN WHITE FISHER
JOHN WHITE FISHER
WOODS
WOODS
W
OODS
WOO
DS
WOO
DS
WOO
D
S
WOODS
WOODS
US 301 24’ BST
EXIST. R/W
EXIST. R/W
10
0
.
0
0
’
S
WIF
T CRE
E
K S
WAMP
S
WIF
T
CR
E
E
K S
WAMP
16" DI 16" DI
12" DI 12" DI 12" DI
EXIST. R/W
EXIST. R/W
10
0
.
0
0
’
F
C
F
C
F
F
C
F
F
C
F
C
F
C
F
C
F
FFFF
C
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
6B-5124
NAD 83
2
4
’
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
7
-
L-
S
T
A
.
4
7
+
0
0
.
0
0
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
5
-
L-
S
T
A
.
3
4
+
0
0
.
0
0
15
"
RC
P
-
I
V
T
B
T
B
15
"
TB
T
B
T
B
T
B
TB
2GI
2GI
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
+00
END SBG
+00
END SBG
STRUCTURE PAY ITEM
CLASS II RIP RAP
STRUCTURE PAY ITEM
UNCLASSIFIED STRUCTURE EXCAVATION
5
0
’
-L-
ENGLISH
SHEET __ OF __
BUFFER DRAWING
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
BUFFER IMPACTS IMPACTS
LEGEND
CROSSING
ROADBRIDGE
0
5025
50
SCALE: 1"= 50’ HORIZ.
SITE 1
PLAN VIEW
ENLARGED
CROSSING
ROAD
R:
\
H
y
d
r
a
u
li
c
s
\
P
ERM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
b
u
ff
e
r
_
p
s
h
6
A
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
6A
3
6
3
7
3
8
SITE 1
(30’)
RIPARIAN BUFFER ZONE 1
(20’)
RIPARIAN BUFFER ZONE 2
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
STA. 36+88.5 -L-
10
10
NON-EROSIVE
V =1.33 fps
Q =0.9 cfs
(BRIDGE)
ALLOWABLE IMPACTS ZONE 1
(BRIDGE)
ALLOWABLE IMPACTS ZONE 2
TBM-3
JOHN WHITE FISHER
JOHN WHITE FISHER
W
OODS
WOO
D
S
WO
O
D
S
WO
O
D
S
S
WIF
T
CR
E
E
K S
WAMP
S
WIF
T
CR
E
E
K S
WAMP
16" DI
12" DIC
F
C
F
C
FF
F
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
6B-5124
NAD 83
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
5
-
L-
S
T
A
.
3
4
+
0
0
.
0
0
TAPER
25:1 PS
15
"
R
C
P
-
I
V
T
B
T
B
15
"
TB
T
B
T
B
T
B
TB
2GI
2GI
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
+00
END SBG
+00
END SBG
STRUCTURE PAY ITEM
CLASS II RIP RAP
STRUCTURE PAY ITEM
UNCLASSIFIED STRUCTURE EXCAVATION
85
8
5
85
85
85
9090
90
9090
90
90
9090
9
0
90
90
90 90 90 90
90
9
0
-L-
ENGLISH
SHEET __ OF __
BUFFER DRAWING
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
SITE 1
PLAN VIEW
BUFFER IMPACTS IMPACTS
SHEET 6A
SEE ENLARGED AREA
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
b
u
ff
e
r
_
p
s
h
6
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
LEGEND
(30’)
RIPARIAN BUFFER ZONE 1
(20’)
RIPARIAN BUFFER ZONE 2
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
(BRIDGE)
ALLOWABLE IMPACTS ZONE 1
(BRIDGE)
ALLOWABLE IMPACTS ZONE 2
3
5
4
0
4
5
25:1 PS TAPER
TAPER
25:1 PS
JOHN WHITE FISHER
JOHN WHITE FISHER
JOHN WHITE FISHER
JOHN WHITE FISHER
WOODS
WOODS
W
OODS
WOO
DS
WOO
DS
WOO
D
S
WOODS
WOODS
US 301 24’ BST
EXIST. R/W
EXIST. R/W
10
0
.
0
0
’
S
WIF
T CRE
E
K S
WAMP
S
WIF
T
CR
E
E
K S
WAMP
16" DI 16" DI
12" DI 12" DI 12" DI
EXIST. R/W
EXIST. R/W
10
0
.
0
0
’
F
C
F
C
F
F
C
F
F
C
F
C
F
C
F
C
F
FFFF
C
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
6B-5124
NAD 83
2
4
’
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
7
-
L-
S
T
A
.
4
7
+
0
0
.
0
0
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
5
-
L-
S
T
A
.
3
4
+
0
0
.
0
0
15
"
RC
P
-
I
V
T
B
T
B
15
"
TB
T
B
T
B
T
B
TB
2GI
2GI
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
+00
END SBG
+00
END SBG
STRUCTURE PAY ITEM
CLASS II RIP RAP
STRUCTURE PAY ITEM
UNCLASSIFIED STRUCTURE EXCAVATION
5
0
’
-L-
ENGLISH
SHEET __ OF __
BUFFER DRAWING
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
BUFFER IMPACTS IMPACTS
LEGEND
CROSSING
ROADBRIDGE
0
5025
50
SCALE: 1"= 50’ HORIZ.
SITE 1
PLAN VIEW
ENLARGED
CROSSING
ROAD
R:
\
H
y
d
r
a
u
li
c
s
\
P
ERM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
b
u
ff
e
r
_
p
s
h
6
A
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
6A
3
6
3
7
3
8
SITE 1
(30’)
RIPARIAN BUFFER ZONE 1
(20’)
RIPARIAN BUFFER ZONE 2
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
STA. 36+88.5 -L-
10
10
NON-EROSIVE
V =1.33 fps
Q =0.9 cfs
(BRIDGE)
ALLOWABLE IMPACTS ZONE 1
(BRIDGE)
ALLOWABLE IMPACTS ZONE 2
TBM-3
JOHN WHITE FISHER
JOHN WHITE FISHER
W
OODS
WOO
D
S
WO
O
D
S
WO
O
D
S
S
WIF
T
CR
E
E
K S
WAMP
S
WIF
T
CR
E
E
K S
WAMP
16" DI
12" DIC
F
C
F
C
FF
F
85
8
5
85
85
85
90
90
90
9
0
90
9
0
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
6B-5124
NAD 83
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
5
-
L-
S
T
A
.
3
4
+
0
0
.
0
0
TAPER
25:1 PS
15
"
R
C
P
-
I
V
T
B
T
B
15
"
TB
T
B
T
B
T
B
TB
2GI
2GI
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
+00
END SBG
+00
END SBG
STRUCTURE PAY ITEM
CLASS II RIP RAP
STRUCTURE PAY ITEM
UNCLASSIFIED STRUCTURE EXCAVATION
-L-
BUFFER IMPACTS IMPACTS
ENGLISH
SHEET __ OF __
BUFFER DRAWING
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
SHEET 7A
SEE ENLARGED AREA
SITE 2
PLAN VIEW
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
b
u
ff
e
r
_
p
s
h
7
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
LEGEND
(30’)
RIPARIAN BUFFER ZONE 1
(20’)
RIPARIAN BUFFER ZONE 2
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
(BRIDGE)
ALLOWABLE IMPACTS ZONE 1
(BRIDGE)
ALLOWABLE IMPACTS ZONE 2
GRASS SWALE DATA
DA= 0.26 AC
SLOPE= 0.023
SIDE SLOPE= 3:1 & 4:1
L REQ.= 26’
L PRO.= 430’
Q2= 0.34 cfs
V2= 1.4 fps
Q10= 0.44 fps
V10= 1.5 fps
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
3:
1 D
FROM -L- STA. 58+00 TO STA. 60+80 LT.
Min. D= 1 Ft.
DETAIL A
Ground
Natural
Flatter3:1 or
Slope
Fill
5
0
5
5
6
0
PC Sta. 56+95.29
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
25
:1 PS
TAPER
S
WIF
T
CR
E
E
K
S
WIF
T
CR
EE
K
S
IGN
BL-7
BL-8
GPS 3
TBM-4
JOHN WHITE FISHER
JOHN WHITE FISHER
(HEIRS)
LENA C. BRADLEY
R.R. BRADLEY AND
FULL CIRCLE SOLUTIONS, INC.
TREES
TREES
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
W
OOD
S
W
OOD
S
US 301 24’ BST
114
.6
6
’
43
0
.84
’
EXIST. R/W
EXIST. R/W
10
0
.
0
0
’
8’ SOIL PATH 8
’ SOIL
PATH
8’ S
OIL P
AT
H
8’ SOIL PATH
1
0
’
G
R
7
’ GR
TREES
WE
L
L
6
0
.
0
0
’
16" DI
16" DI 16" DI
12" DI
12" DI
12" DI
US 301 24’ BST
36
.19
’
+
76
.70
3
2
.7
3
’
+
6
0
.17
F
C
F
C
F
C
F
C
F
F
F
F
C
F
C
F
F
C F
F
F
C
C
15" RCP
15" RCP
1
5
"
T
B
T
B
T
B
T
B
RETAIN
REMOVE
15"
RCP-IV
15"
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
SEE DETAIL A
SPECIAL LATERAL ’V’ DITCH
FROM -L- STA. 58+00 TO STA. 60+80 LT.
CLEANOUT
2GI 2GI
+49
BEGIN SBG
STRUCTURE PAY ITEM
UNCLASSIFIED STRUCTURE EXCAVATION
STRUCTURE PAY ITEM
CLASS II RIP RAP
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
7B-5124
2) SEE SHEETS S-XX THROUGH S-XX FOR STRUCTURE PLANS
1) SEE SHEET 11 FOR -L- PROFILE
NOTES:
2
4
’
2
4
’
M
A
TC
H
LIN
E
S
EE
S
H
EE
T
-
L-
S
TA
. 6
0
+
0
0
.0
0
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
6
-
L-
S
T
A
.
4
7
+
0
0
.
0
0
RE
VIS
IO
N
S
NAD 83
R
/W
REV
IS
IO
N
(A
P
RIL
1,
2
0
1
4
):
C
O
N
S
TR
U
C
TIO
N
EA
S
E
M
EN
T
A
D
D
ED
TO
P
A
RC
E
L
2
F
RO
M
-
L-
S
TA
5
8
+
5
0
TO
6
3
+
6
5
LT
.
h
c
n
5
0
’
-L-
BUFFER IMPACTS IMPACTS
ENGLISH
SHEET __ OF __
BUFFER DRAWING
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
b
u
ff
e
r
_
p
s
h
7
A
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
SITE 2
PLAN VIEW
ENLARGED
CROSSING
ROAD BRIDGE
CROSSING
ROAD
7A
TO WET LAND
NON-EROSIVE
V =1.48 fps
Q =1.2 cfs10
10
0
5025
50
SCALE: 1"= 50’ HORIZ.
LEGEND
(30’)
RIPARIAN BUFFER ZONE 1
(20’)
RIPARIAN BUFFER ZONE 2
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
(BRIDGE)
ALLOWABLE IMPACTS ZONE 1
(BRIDGE)
ALLOWABLE IMPACTS ZONE 2
5
5
S
WIF
T
CR
E
E
K
S
WIF
T
CR
E
E
K
TREES
TREES
WOODS
WOODS
W
OOD
S
8’ SOIL PATH
16" DI
12" DI
F
F
F
F
F
C
F
F
1
5
"
T
B
T
B
T
B
T
B
RCP-IV
15"
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
2GI 2GI
+49
BEGIN SBG
STRUCTURE PAY ITEM
UNCLASSIFIED STRUCTURE EXCAVATION
STRUCTURE PAY ITEM
CLASS II RIP RAP
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
7B-5124
2) SEE SHEETS S-XX THROUGH S-XX FOR STRUCTURE PLANS
1) SEE SHEET 11 FOR -L- PROFILE
NOTES:
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
6
-
L-
S
T
A
.
4
7
+
0
0
.
0
0
RE
VIS
IO
N
S
NAD 83
R
/W
REV
IS
IO
N
(A
P
RIL
1,
2
0
1
4
):
C
O
N
S
TR
U
C
TIO
N
EA
S
E
M
EN
T
A
D
D
ED
TO
P
A
RC
E
L
2
F
RO
M
-
L-
S
TA
5
8
+
5
0
TO
6
3
+
6
5
LT
.
h
c
n
8
5
8
5
8
5
85
90
9
0
9
0
9
0
9
0
90
90
9
0
9 0
90
90
90
90
90
90
90
90
90
90
90
9
0
9
0
90
90
9090
90
90 90 90
9
0
9
0
90
90
9090
90
90
9
0
9
0
90
9
5
9
5
95
9
5
95
95
9
5
95
9
5
9
5
95
95
95
95
95
100
100
10
0
100100
100
100 100
100 100
100
100
10
0
10
0
1
0
0
105
105
105
105
-L-
BUFFER IMPACTS IMPACTS
ENGLISH
SHEET __ OF __
BUFFER DRAWING
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
SHEET 7A
SEE ENLARGED AREA
SITE 2
PLAN VIEW
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
b
u
ff
e
r
_
p
s
h
7
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
LEGEND
(30’)
RIPARIAN BUFFER ZONE 1
(20’)
RIPARIAN BUFFER ZONE 2
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
(BRIDGE)
ALLOWABLE IMPACTS ZONE 1
(BRIDGE)
ALLOWABLE IMPACTS ZONE 2
GRASS SWALE DATA
DA= 0.26 AC
SLOPE= 0.023
SIDE SLOPE= 3:1 & 4:1
L REQ.= 26’
L PRO.= 430’
Q2= 0.34 cfs
V2= 1.4 fps
Q10= 0.44 fps
V10= 1.5 fps
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
3:
1 D
FROM -L- STA. 58+00 TO STA. 60+80 LT.
Min. D= 1 Ft.
DETAIL A
Ground
Natural
Flatter3:1 or
Slope
Fill
5
0
5
5
6
0
PC Sta. 56+95.29
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
25
:1 PS
TAPER
S
WIF
T
CR
E
E
K
S
WIF
T
CR
EE
K
S
IGN
BL-7
BL-8
GPS 3
TBM-4
JOHN WHITE FISHER
JOHN WHITE FISHER
(HEIRS)
LENA C. BRADLEY
R.R. BRADLEY AND
FULL CIRCLE SOLUTIONS, INC.
TREES
TREES
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
W
OOD
S
W
OOD
S
US 301 24’ BST
114
.6
6
’
43
0
.84
’
EXIST. R/W
EXIST. R/W
10
0
.
0
0
’
8’ SOIL PATH 8
’ SOIL
PATH
8’ S
OIL P
AT
H
8’ SOIL PATH
1
0
’
G
R
7
’ GR
TREES
WE
L
L
6
0
.
0
0
’
16" DI
16" DI 16" DI
12" DI
12" DI
12" DI
US 301 24’ BST
36
.19
’
+
76
.70
3
2
.7
3
’
+
6
0
.17
F
C
F
C
F
C
F
C
F
F
F
F
C
F
C
F
F
C F
F
F
C
C
15" RCP
15" RCP
1
5
"
T
B
T
B
T
B
T
B
RETAIN
REMOVE
15"
RCP-IV
15"
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
SEE DETAIL A
SPECIAL LATERAL ’V’ DITCH
FROM -L- STA. 58+00 TO STA. 60+80 LT.
CLEANOUT
2GI 2GI
+49
BEGIN SBG
STRUCTURE PAY ITEM
UNCLASSIFIED STRUCTURE EXCAVATION
STRUCTURE PAY ITEM
CLASS II RIP RAP
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
7B-5124
2) SEE SHEETS S-XX THROUGH S-XX FOR STRUCTURE PLANS
1) SEE SHEET 11 FOR -L- PROFILE
NOTES:
2
4
’
2
4
’
M
A
TC
H
LIN
E
S
EE
S
H
EE
T
-
L-
S
TA
. 6
0
+
0
0
.0
0
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
6
-
L-
S
T
A
.
4
7
+
0
0
.
0
0
RE
VIS
IO
N
S
NAD 83
R
/W
REV
IS
IO
N
(A
P
RIL
1,
2
0
1
4
):
C
O
N
S
TR
U
C
TIO
N
EA
S
E
M
EN
T
A
D
D
ED
TO
P
A
RC
E
L
2
F
RO
M
-
L-
S
TA
5
8
+
5
0
TO
6
3
+
6
5
LT
.
h
c
n
5
0
’
8
5
8
5
8
5
85
90
90
90
90
90
9
0
90
9
0
90
90
9
0
9
0
90
9090
90
90
9
0
9
0
90
9
5
95
9
5
95
1
0
0
100
-L-
BUFFER IMPACTS IMPACTS
ENGLISH
SHEET __ OF __
BUFFER DRAWING
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
b
u
ff
e
r
_
p
s
h
7
A
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
SITE 2
PLAN VIEW
ENLARGED
CROSSING
ROAD BRIDGE
CROSSING
ROAD
7A
TO WET LAND
NON-EROSIVE
V =1.48 fps
Q =1.2 cfs10
10
0
5025
50
SCALE: 1"= 50’ HORIZ.
LEGEND
(30’)
RIPARIAN BUFFER ZONE 1
(20’)
RIPARIAN BUFFER ZONE 2
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
(BRIDGE)
ALLOWABLE IMPACTS ZONE 1
(BRIDGE)
ALLOWABLE IMPACTS ZONE 2
5
5
S
WIF
T
CR
E
E
K
S
WIF
T
CR
E
E
K
TREES
TREES
WOODS
WOODS
W
OOD
S
8’ SOIL PATH
16" DI
12" DI
F
F
F
F
F
C
F
F
1
5
"
T
B
T
B
T
B
T
B
RCP-IV
15"
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
2GI 2GI
+49
BEGIN SBG
STRUCTURE PAY ITEM
UNCLASSIFIED STRUCTURE EXCAVATION
STRUCTURE PAY ITEM
CLASS II RIP RAP
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
7B-5124
2) SEE SHEETS S-XX THROUGH S-XX FOR STRUCTURE PLANS
1) SEE SHEET 11 FOR -L- PROFILE
NOTES:
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
6
-
L-
S
T
A
.
4
7
+
0
0
.
0
0
RE
VIS
IO
N
S
NAD 83
R
/W
REV
IS
IO
N
(A
P
RIL
1,
2
0
1
4
):
C
O
N
S
TR
U
C
TIO
N
EA
S
E
M
EN
T
A
D
D
ED
TO
P
A
RC
E
L
2
F
RO
M
-
L-
S
TA
5
8
+
5
0
TO
6
3
+
6
5
LT
.
h
c
n
BUFFER IMPACTS IMPACTS
SHEET 9A
SEE ENLARGED AREA
SITE 3
PLAN VIEW
ENGLISH
SHEET __ OF __
BUFFER DRAWING
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
R:
\
H
y
d
r
a
u
li
c
s
\
P
ERM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
b
u
ff
e
r
_
p
s
h
9
.
d
g
n
IC
A
EN
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
8
-
L-
S
T
A
.
7
1
+
0
0
.
0
0
(30’)
RIPARIAN BUFFER ZONE 1
(20’)
RIPARIAN BUFFER ZONE 2
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
LEGEND
7
5
8
0
PT Sta. 80+51.97
POT Sta. 81+76.68
PC Sta. 73+83.59
PRC Sta. 76+97.14
END TIP PROJECT B-5124
-L- POT STA. 80+60.00
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
1
0
’
S
OI
L
WOODS WOODS
WOODS
WOODS
WOOD
S
WELL
FRANCES B.WOODARD
JUDGE FARM LIMITED PARTNERSHIP
FULL CIRCLE SOLUTIONS, INC.
DB 2026 PG 708
PB 31 PG 203
FES IN
V=88.98’
BEAVER DAM
MHUTILU
N
K
N
6
0
.
0
0
’
6
0
.
0
0
’
LIMITED PARTNERSHIP
JUDGE FARM
PB 31 PG 203
PARTNERSHIP
LIMITED
FARM
JUDGE
F
F
F
F
F F
F
F
F
F
F
F
F
F
F
F
F
F
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
9B-5124NAD 83
2) SEE SHEETS C-XX THROUGH C-XX FOR CULVERT PLANS
1) SEE SHEET 12 FOR -L- PROFILE
NOTES:
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
8
-
L-
S
T
A
.
7
3
+
0
0
.
0
0
RE
VIS
IO
N
S
5
0
’
T
B
T
B
T
B
TB
( Not to Scale)
TOE PROTECTION
d
FROM STA. 79+00 LT. TO STA. 80+60 LT.
Nat
ural
Gr
ou
n
d Fill Slope3:1 OR FLATTER
d= 1 Ft.
Type of Liner= PSRM
DETAIL B
PSRM
L
AN
E
S
W
AMP
SEE DETAIL
EST. 15 SY GEOTEXTILE
EST. 20 TONS CL. ’1’ RIP RAP
CHANNEL IMPROVEMENT
35 LF OF INLET
(LOOKING DOWNSTREAM)
(NOT TO SCALE)
2
:12:1
NG NG
1.5’ THICK
w/GEOTEXTILE
CLASS ’I’ RIP RAP 26’
EXCAVATION
SEE DETAIL B
TOE PROTECTION w/ PSRM
CULVERT 161 INLET CHANNEL
EXISTING (3) 8’ x 6’ RCBC
RETAIN AND EXTEND IN KIND
BUFFER IMPACTS IMPACTS
ENGLISH
SHEET __ OF __
BUFFER DRAWING
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
b
u
ff
e
r
_
p
s
h
9
A
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/3
/2
0
1
4
SITE 3
PLAN VIEW
ENLARGED
9A
LEGEND
(30’)
RIPARIAN BUFFER ZONE 1
(20’)
RIPARIAN BUFFER ZONE 2
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
0
5025
50
SCALE: 1"= 50’ HORIZ.
7
5
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
WOODS
WELL
BEAVER DAM
MHUTILU
N
K
N
6
0
.
0
0
’
F
F
F F
F
F
F
F
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
9B-5124NAD 83
2) SEE SHEETS C-XX THROUGH C-XX FOR CULVERT PLANS
1) SEE SHEET 12 FOR -L- PROFILE
NOTES:
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
8
-
L-
S
T
A
.
7
3
+
0
0
.
0
0
RE
VIS
IO
N
S
5
0
’
T
B
T
B
T
B
TB
L
AN
E
S
W
AMP
SEE DETAIL
EST. 15 SY GEOTEXTILE
EST. 20 TONS CL. ’1’ RIP RAP
CHANNEL IMPROVEMENT
35 LF OF INLET
EXISTING (3) 8’ x 6’ RCBC
RETAIN AND EXTEND IN KIND
8
5
85
85
90 90 90
9
0
90
9
0
90
90
9
0
90
90
9 0
90
90
90 90
90 90
90
9
0
9
0 90
90
90
90
90
90
95
95
95
95
9
5
9
5
95
9
5
95
95
95
95
10
0
100
10
0
100
100
100
10
0
10
0
10
0
100
10
0
100
105
1
0
5
1
0
5
105
10
5
105
1
0
5 10
5
1
0
5
11
0
110
BUFFER IMPACTS IMPACTS
SHEET 9A
SEE ENLARGED AREA
SITE 3
PLAN VIEW
ENGLISH
SHEET __ OF __
BUFFER DRAWING
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
R:
\
H
y
d
r
a
u
li
c
s
\
P
ERM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
b
u
ff
e
r
_
p
s
h
9
.
d
g
n
IC
A
EN
G
IN
EE
RIN
G
,
IN
C
.
4
/2
/2
0
1
4
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
8
-
L-
S
T
A
.
7
1
+
0
0
.
0
0
(30’)
RIPARIAN BUFFER ZONE 1
(20’)
RIPARIAN BUFFER ZONE 2
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
LEGEND
7
5
8
0
PT Sta. 80+51.97
POT Sta. 81+76.68
PC Sta. 73+83.59
PRC Sta. 76+97.14
END TIP PROJECT B-5124
-L- POT STA. 80+60.00
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
1
0
’
S
OI
L
WOODS WOODS
WOODS
WOODS
WOOD
S
WELL
FRANCES B.WOODARD
JUDGE FARM LIMITED PARTNERSHIP
FULL CIRCLE SOLUTIONS, INC.
DB 2026 PG 708
PB 31 PG 203
FES IN
V=88.98’
BEAVER DAM
MHUTILU
N
K
N
6
0
.
0
0
’
6
0
.
0
0
’
LIMITED PARTNERSHIP
JUDGE FARM
PB 31 PG 203
PARTNERSHIP
LIMITED
FARM
JUDGE
F
F
F
F
F F
F
F
F
F
F
F
F
F
F
F
F
F
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
9B-5124NAD 83
2) SEE SHEETS C-XX THROUGH C-XX FOR CULVERT PLANS
1) SEE SHEET 12 FOR -L- PROFILE
NOTES:
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
8
-
L-
S
T
A
.
7
3
+
0
0
.
0
0
RE
VIS
IO
N
S
5
0
’
T
B
T
B
T
B
TB
( Not to Scale)
TOE PROTECTION
d
FROM STA. 79+00 LT. TO STA. 80+60 LT.
Nat
ural
Gr
ou
n
d Fill Slope3:1 OR FLATTER
d= 1 Ft.
Type of Liner= PSRM
DETAIL B
PSRM
L
AN
E
S
W
AMP
SEE DETAIL
EST. 15 SY GEOTEXTILE
EST. 20 TONS CL. ’1’ RIP RAP
CHANNEL IMPROVEMENT
35 LF OF INLET
(LOOKING DOWNSTREAM)
(NOT TO SCALE)
2
:12:1
NG NG
1.5’ THICK
w/GEOTEXTILE
CLASS ’I’ RIP RAP 26’
EXCAVATION
SEE DETAIL B
TOE PROTECTION w/ PSRM
CULVERT 161 INLET CHANNEL
EXISTING (3) 8’ x 6’ RCBC
RETAIN AND EXTEND IN KIND
8
5
85
85
90 90
90
9
0
90
90
90
90
95
BUFFER IMPACTS IMPACTS
ENGLISH
SHEET __ OF __
BUFFER DRAWING
N. C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
NASH COUNTY
PROJECT: 42270.1.1 (B-5124)
SWIFT CREEK ON US-301
141, AND 151 OVER
REPLACE BRIDGES NO. 85,
SHEET OF
R:
\
H
y
d
r
a
u
li
c
s
\
P
E
RM
ITS
_
En
v
ir
o
n
m
e
n
t
a
l\
D
r
a
w
in
g
s
\
B
5
1
2
4
_
h
y
d
_
p
r
m
_
b
u
ff
e
r
_
p
s
h
9
A
.
d
g
n
IC
A
E
N
G
IN
EE
RIN
G
,
IN
C
.
4
/3
/2
0
1
4
SITE 3
PLAN VIEW
ENLARGED
9A
LEGEND
(30’)
RIPARIAN BUFFER ZONE 1
(20’)
RIPARIAN BUFFER ZONE 2
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
0
5025
50
SCALE: 1"= 50’ HORIZ.
7
5
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
WOODS
WELL
BEAVER DAM
MHUTILU
N
K
N
6
0
.
0
0
’
F
F
F F
F
F
F
F
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
9B-5124NAD 83
2) SEE SHEETS C-XX THROUGH C-XX FOR CULVERT PLANS
1) SEE SHEET 12 FOR -L- PROFILE
NOTES:
M
A
T
C
H
LIN
E
S
E
E
S
H
E
E
T
8
-
L-
S
T
A
.
7
3
+
0
0
.
0
0
RE
VIS
IO
N
S
5
0
’
T
B
T
B
T
B
TB
L
AN
E
S
W
AMP
SEE DETAIL
EST. 15 SY GEOTEXTILE
EST. 20 TONS CL. ’1’ RIP RAP
CHANNEL IMPROVEMENT
35 LF OF INLET
EXISTING (3) 8’ x 6’ RCBC
RETAIN AND EXTEND IN KIND
RO
A
D
CR
O
S
S
I
N
G
B
R
I
D
G
E
PA
R
A
L
L
E
L
IM
P
A
C
T
ZO
N
E
1
(f
t
2)
ZO
N
E
2
(f
t
2)
TO
T
A
L
(f
t
2)
ZO
N
E
1
(f
t
2)
ZO
N
E
2
(f
t
2)
TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)
1
21
"
P
C
C
S
B
R
I
D
G
E
,
1
@
3
5
'
,
1
@
5
5
'
,
1@
4
5
'
-L
-
3
5
+
6
3
T
O
3
8
+
0
3
X
25
9
6
7
2
6
0
3
X
20
8
5
2
7
8
4
4
8
6
9
2
1@
4
0
'
(
2
1
"
P
C
C
S
)
,
1
@
7
0
'
(
2
4
"
P
C
C
S
)
,
1@
3
5
'
(
2
1
"
P
C
C
S
)
-L
-
5
3
+
8
9
T
O
5
5
+
9
9
X
52
2
4
1
6
7
8
6
9
0
2
X
47
4
1
2
6
0
1
7
3
4
3
E
X
T
E
N
D
E
X
.
3
@
8
'
x
6
'
R
C
B
C
-
L
-
7
2
+
7
2
T
O
7
5
+
0
9
X
46
2
3
3
2
2
0
7
8
4
3
TO
T
A
L
:
15
0
0
1
8
9
4
9
2
3
9
5
0
0
.
0
0
.
0
0
.
0
IM
P
A
C
T
BU
F
F
E
R
I
M
P
A
C
T
S
S
U
M
M
A
R
Y
TY
P
E
SI
T
E
N
O
.
S
T
R
U
C
T
U
R
E
S
I
Z
E
/
T
Y
P
E
S
T
A
T
I
O
N
(
F
R
O
M
/
T
O
)
AL
L
O
W
A
B
L
E
MI
T
I
G
A
B
L
E
BUFFER REPLACEMENT
S
H
E
E
T
O
F
NASH COUNTY
RE
P
L
A
C
E
B
R
I
D
G
E
S
N
O
.
8
5
,
1
4
1
,
A
N
D
1
5
1
OVER SWIFT CREEK ON US-301 3/13/2014N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS B-5124 Rev. May 2006
ZO
N
E
1
(f
t
2)
ZO
N
E
2
(f
t
2)
1
-
L
-
3
5
+
6
3
T
O
3
8
+
0
3
29
8
4
2
0
0
8
2
-
L
-
5
3
+
8
9
T
O
5
5
+
9
9
10
3
3
4
6
3
3
-
L
-
7
2
+
7
2
T
O
7
5
+
0
9
43
6
7
2
7
4
4
TO
T
A
L
:
83
8
4
5
2
1
5
WE
T
L
A
N
D
S
I
N
B
U
F
F
E
R
I
M
P
A
C
T
S
S
U
M
M
A
R
Y
S
H
E
E
T
O
F
NASH COUNTY
RE
P
L
A
C
E
B
R
I
D
G
E
S
N
O
.
8
5
,
1
4
1
,
A
N
D
1
5
1
OV
E
R
S
W
I
F
T
C
R
E
E
K
O
N
U
S
-
3
0
1
3/13/2014
N.
C
.
D
E
P
T
.
O
F
T
R
A
N
S
P
O
R
T
A
T
I
O
N
DI
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
B-5124
WE
T
L
A
N
D
S
I
N
BU
F
F
E
R
S
SI
T
E
N
O
.
ST
A
T
I
O
N
(F
R
O
M
/
T
O
)
Rev. Jan 2009
VICINITY MAPNOT TO SCALE
N
A
S
H
C
O
U
N
T
Y
2550100502550100505102010DTV======11,2001060760%%MPH ADTADT2035% *
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
FUNC CLASS =MINOR ARTERIAL 000PROFILE (HORIZONTAL)
4
2
2
7
0
.
1
.
1
P
.
E
.
B
R
S
T
P
-
0
3
0
1
(
2
5
)
P
R
O
J
E
C
T
L
E
N
G
T
H
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
L
E
T
T
I
N
G
D
A
T
E
:
S
T
A
T
E
S
T
A
T
E
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
S
T
A
T
E
P
R
O
J
.
N
O
.
F
.
A
.
P
R
O
J
.
N
O
.
DE
S
C
R
I
P
T
I
O
N
N
O
.
T
O
T
A
L
S
H
E
E
T
S
N
.
C
.
SH
E
E
T
1
DESIGN DATA
P
r
e
p
a
r
e
d
i
n
t
h
e
O
f
f
i
c
e
o
f
:
S
I
G
N
A
T
U
R
E
:
S
I
G
N
A
T
U
R
E
:
P
.
E
.
P
.
E
.
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
2
0
1
2
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
P
R
O
J
E
C
T
E
N
G
I
N
E
E
R
P
R
O
J
E
C
T
D
E
S
I
G
N
E
N
G
I
N
E
E
R
GRAPHIC SCALES PLANSPROFILE (VERTICAL)
H
Y
D
R
A
U
L
I
C
S
E
N
G
I
N
E
E
R
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
L
O
C
A
T
I
O
N
:
T
Y
P
E
O
F
W
O
R
K
:
09/08/99
B
-
5
1
2
4
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
000 See Sheet 1-A For Index of Sheets05-MAR-2014 13:56R:\Roadw ay\Proj\B5124_Rdy_tsh.dgn$$$$USERNAM E$$$$
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
R
a
l
e
i
g
h
N
C
,
2
7
6
1
0
CONTRACT:TIP PROJECT:B-5124
ARTMEN
N
A
S
O
H
DEP
T
O
F
T
R
A
S
P
OR
T
T
IO N
T
ATE
O
F
N
R
T
C
AROLINA
OFFSITE DETOURBEGIN TIP PROJECT B-5124 U.S. 301
U.S. 301
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
5
1
2
4
U
.
S
.
3
0
1
STATEWIDE TIER
A
N
D
C
U
L
V
E
R
T
S
.
G
R
A
D
I
N
G
,
D
R
A
I
N
A
G
E
,
P
A
V
I
N
G
,
S
T
R
U
C
T
U
R
E
S
,
G
A
R
Y
L
O
V
E
R
I
N
G
,
P
E
S
W
I
F
T
C
R
E
E
K
O
N
U
S
-
3
0
1
R
E
P
L
A
C
E
B
R
I
D
G
E
S
N
O
.
8
5
,
1
4
1
,
A
N
D
1
5
1
O
V
E
R
8,8002015*(TTST =3%DUALS 4%)4
5
6
7
8
9
SWAMPCREEKSWIFT
-
L
-
S
T
A
.
8
0
+
6
0
.
0
0
-L- STA. 11+20.00 C O U N T Y4 1546152215472322 SchoolNorth WhitakresSchoolHubbard MannCemeteryGreene Cemetery WilliamsCemeteryBraswellCemetery PowellCemetery Davis
W
.
N
a
s
h
S
t.
Church ShilohChurchZion CrossBlackCreekSwampBeaverdamLane4484484483013013014844CemeteryHarper3333959595ChurchNew Hope Battle
b
o
r
o
W
h
i
t
a
k
e
r
s
HickoryCITYLIMITJohnstonRd.E.MainSt.S Hathaway StMainW.St.CITY LIMIT Watson FarmRd.SeedPROJECT BEGIN PROJECT END Ra ilroa dCSX
CI
T
Y
L
I
M
I
T
SwiftCreek
C
H
R
I
S
T
O
P
H
E
R
H
.
L
E
E
T
O
T
A
L
L
E
N
G
T
H
O
F
T
I
P
P
R
O
J
E
C
T
B
-
5
1
2
4
=
1
.
3
1
4
M
I
L
E
S
K
4
2
2
7
0
.
2
.
1
B
R
S
T
P
-
0
3
0
1
(
2
5
)
R
/
W
&
U
T
L
.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUND
A
R
I
E
S
.
-L- STA. 17+39.19+/-END CULVERT TO BATTLEBORO -L- STA. 16+96.53+/-BEGIN CULVERTSWAMPCREEKSWIFT-L-
SW
A
M
P
C
R
EEK
SW
I
FT
-
L
-
C
R
EEK
SW
I
FT
-
L
-
S
T
A
.
7
4
+
3
7
.
9
7
+
/
-
E
N
D
C
U
L
V
E
R
T
B
E
G
I
N
C
U
L
V
E
R
T
-
L
-
S
T
A
.
7
4
+
1
1
.
6
9
+
/
-
-L-
TO W
HITAKERS
BRIDGE #85
B
R
I
D
G
E
#
1
4
1
B
R
I
D
G
E
#
1
5
1
CULVERT #70
CREEKLANE
C
U
L
V
E
R
T
#
1
6
1
A
P
R
I
L
2
1
,
2
0
1
5
CLEARING ON THIS PROJECT SHALL BE PERFORMED T
O
T
H
E
L
I
M
I
T
S
E
S
T
A
B
L
I
S
H
E
D
B
Y
M
E
T
H
O
D
I
I
.
-L- STA. 21+85.31 BEGIN BRIDGE-L- STA. 23+12.69 END BRIDGE
-
L
-
S
T
A
.
3
6
+
1
9
.
7
5
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
.
3
7
+
5
7
.
2
5
E
N
D
B
R
I
D
G
E
-
L
-
S
T
A
.
5
4
+
1
1
.
7
5
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
.
5
5
+
5
9
.
2
5
E
N
D
B
R
I
D
G
E
L
E
N
G
T
H
S
T
R
U
C
T
U
R
E
T
I
P
P
R
O
J
E
C
T
B
-
5
1
2
4
=
0
.
0
9
1
M
I
L
E
S
L
E
N
G
T
H
R
O
A
D
W
A
Y
T
I
P
P
R
O
J
E
C
T
B
-
5
1
2
4
=
1
.
2
2
3
M
I
L
E
S
F
E
B
R
U
A
R
Y
2
8
,
2
0
1
4
N
A
D
8
3
Existin
g
E
d
g
e
o
f
P
a
v
e
m
e
n
t
Existin
g
C
u
r
b
Propos
e
d
S
l
o
p
e
S
t
a
k
e
s
C
u
t
Propos
e
d
S
l
o
p
e
S
t
a
k
e
s
F
i
l
l
Existin
g
M
e
t
a
l
G
u
a
r
d
r
a
i
l
Existin
g
C
a
b
l
e
G
u
i
d
e
r
a
i
l
Propos
e
d
G
u
a
r
d
r
a
i
l
Equalit
y
S
y
m
b
o
l
Pavem
e
n
t
R
e
m
o
v
a
l
Baselin
e
C
o
n
t
r
o
l
P
o
i
n
t
RIGH
T
O
F
W
A
Y
:
Existin
g
R
i
g
h
t
o
f
W
a
y
M
a
r
k
e
r
Existin
g
R
i
g
h
t
o
f
W
a
y
L
i
n
e
h
Existin
g
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
Propos
e
d
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
CF
Existin
g
E
a
s
e
m
e
n
t
L
i
n
e
Propos
e
d
T
e
m
p
o
r
a
r
y
C
o
n
s
t
r
u
c
t
i
o
n
E
a
s
e
m
e
n
t
Propos
e
d
T
e
m
p
o
r
a
r
y
D
r
a
i
n
a
g
e
E
a
s
e
m
e
n
t
Propos
e
d
P
e
r
m
a
n
e
n
t
D
r
a
i
n
a
g
e
E
a
s
e
m
e
n
t
Propos
e
d
P
e
r
m
a
n
e
n
t
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
HYDROLOGY:Stream or Body of WaterHydro, Pool or ReservoirFlow ArrowDisappearing StreamSpring
;
zvWKProposed Lateral, Tail, Head DitchFalse Sump Propos
e
d
C
a
b
l
e
G
u
i
d
e
r
a
i
l
M
A
J
O
R
:
B
r
i
d
g
e
,
T
u
n
n
e
l
o
r
B
o
x
C
u
l
v
e
r
t
B
r
i
d
g
e
W
i
n
g
W
a
l
l
,
H
e
a
d
W
a
l
l
a
n
d
E
n
d
W
a
l
l
M
I
N
O
R
:
H
e
a
d
a
n
d
E
n
d
W
a
l
l
P
i
p
e
C
u
l
v
e
r
t
F
o
o
t
b
r
i
d
g
e
P
a
v
e
d
D
i
t
c
h
G
u
t
t
e
r
U
T
I
L
I
T
I
E
S
:
ROA
D
S
A
N
D
R
E
L
A
T
E
D
F
E
A
T
U
R
E
S
:
E
x
i
s
t
i
n
g
P
o
w
e
r
P
o
l
e
P
r
o
p
o
s
e
d
P
o
w
e
r
P
o
l
e
P
U
/
G
P
o
w
e
r
C
a
b
l
e
H
a
n
d
H
o
l
e
P
o
w
e
r
M
a
n
h
o
l
e
P
o
w
e
r
L
i
n
e
T
o
w
e
r
P
o
w
e
r
T
r
a
n
s
f
o
r
m
e
r
E
x
i
s
t
i
n
g
J
o
i
n
t
U
s
e
P
o
l
e
P
r
o
p
o
s
e
d
J
o
i
n
t
U
s
e
P
o
l
e
E
x
i
s
t
i
n
g
T
e
l
e
p
h
o
n
e
P
o
l
e
P
r
o
p
o
s
e
d
T
e
l
e
p
h
o
n
e
P
o
l
e
T
e
l
e
p
h
o
n
e
M
a
n
h
o
l
e
T
e
l
e
p
h
o
n
e
B
o
o
t
h
T
e
l
e
p
h
o
n
e
P
e
d
e
s
t
a
l
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
H
a
n
d
H
o
l
e
R}T pQle]/b
H
-
F
r
a
m
e
P
o
l
e
O
O
P
O
W
E
R
:
T
E
L
E
P
H
O
N
E
:
T
e
l
e
p
h
o
n
e
C
e
l
l
T
o
w
e
r
R
e
c
o
r
d
e
d
U
/
G
P
o
w
e
r
L
i
n
e
R
e
c
o
r
d
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
D
e
s
i
g
n
a
t
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
(
S
.
U
.
E
.
*
)
R
e
c
o
r
d
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
o
n
d
u
i
t
D
e
s
i
g
n
a
t
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
o
n
d
u
i
t
(
S
.
U
.
E
.
*
)
R
e
c
o
r
d
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
s
C
a
b
l
e
W
A
T
E
R
:
W
a
t
e
r
M
a
n
h
o
l
e
W
a
t
e
r
M
e
t
e
r
W
a
t
e
r
V
a
l
v
e
W
a
t
e
r
H
y
d
r
a
n
t
R
e
c
o
r
d
e
d
U
/
G
W
a
t
e
r
L
i
n
e
4IHa
T
V
:
T
V
S
a
t
e
l
l
i
t
e
D
i
s
h
T
V
P
e
d
e
s
t
a
l
T
V
T
o
w
e
r
U
/
G
T
V
C
a
b
l
e
H
a
n
d
H
o
l
e
R
e
c
o
r
d
e
d
U
/
G
T
V
C
a
b
l
e
R
e
c
o
r
d
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
C
a
b
l
e
D
e
s
i
g
n
a
t
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
C
a
b
l
e
(
S
.
U
.
E
.
*
)
r|I]
G
A
S
:
G
a
s
V
a
l
v
e
G
a
s
M
e
t
e
r
R
e
c
o
r
d
e
d
U
/
G
G
a
s
L
i
n
e
n c
S
A
N
I
T
A
R
Y
S
E
W
E
R
:
S
a
n
i
t
a
r
y
S
e
w
e
r
M
a
n
h
o
l
e
S
a
n
i
t
a
r
y
S
e
w
e
r
C
l
e
a
n
o
u
t
U
/
G
S
a
n
i
t
a
r
y
S
e
w
e
r
L
i
n
e
R
e
c
o
r
d
e
d
S
S
F
o
r
c
e
d
M
a
i
n
L
i
n
e
D
e
s
i
g
n
a
t
e
d
S
S
F
o
r
c
e
d
M
a
i
n
L
i
n
e
(
S
.
U
.
E
.
*
)
do
A
/
G
W
a
t
e
r
A
b
o
v
e
G
r
o
u
n
d
G
a
s
L
i
n
e
A
/
G
G
a
s
A
b
o
v
e
G
r
o
u
n
d
W
a
t
e
r
L
i
n
e
A
b
o
v
e
G
r
o
u
n
d
S
a
n
i
t
a
r
y
S
e
w
e
r
A
/
G
S
a
n
i
t
a
r
y
S
e
w
e
r
M
I
S
C
E
L
L
A
N
E
O
U
S
:
U
t
i
l
i
t
y
P
o
l
e
OFS3
U
t
i
l
i
t
y
P
o
l
e
w
i
t
h
B
a
s
e
U
t
i
l
i
t
y
L
o
c
a
t
e
d
O
b
j
e
c
t
U
t
i
l
i
t
y
T
r
a
f
f
i
c
S
i
g
n
a
l
B
o
x
U
t
i
l
i
t
y
U
n
k
n
o
w
n
U
/
G
L
i
n
e
?
C
O
N
C
C
O
N
C
W
W
v
v
D
r
a
i
n
a
g
e
B
o
x
:
C
a
t
c
h
B
a
s
i
n
,
D
I
o
r
J
B
S
t
o
r
m
S
e
w
e
r
S
t
o
r
m
S
e
w
e
r
M
a
n
h
o
l
e
m
U
/
G
T
a
n
k
;
W
a
t
e
r
,
G
a
s
,
O
i
l
A
/
G
T
a
n
k
;
W
a
t
e
r
,
G
a
s
,
O
i
l
BOUNDARIES AND PROPERTY:State LineCounty LineTownship LineCity LineReservation LineProperty LineExisting Iron PinProperty CornerProperty MonumentExisting Fence LineProposed Woven Wire FenceProposed Chain Link FenceProposed Barbed Wire Fence gF123Existing Wetland BoundaryProposed Wetland BoundaryExisting Endangered Animal BoundaryExisting Endangered Plant BoundaryBUILDINGS AND OTHER CULTURE:Area Outline Gas Pump Vent or U/G Tank CapChurchSchoolDamSignSmall Mine Well VMWWSxFoundationSBuildingyyVEGE
T
A
T
I
O
N
:
Single
T
r
e
e
XY
V
i
n
e
y
a
r
d
Single
S
h
r
u
b
HedgeWoods
L
i
n
e
O
r
c
h
a
r
d
V
i
n
e
y
a
r
d
RAIL
R
O
A
D
S
:
Standa
r
d
G
a
u
g
e
RR Sig
n
a
l
M
i
l
e
p
o
s
t
SwitchRR Ab
a
n
d
o
n
e
d
RR Dis
m
a
n
t
l
e
d
S
FLOW
D
e
s
i
g
n
a
t
e
d
U
/
G
P
o
w
e
r
L
i
n
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
s
C
a
b
l
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
W
a
t
e
r
L
i
n
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
T
V
C
a
b
l
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
G
a
s
L
i
n
e
(
S
.
U
.
E
.
*
)
U
/
G
T
e
s
t
H
o
l
e
(
S
.
U
.
E
.
*
)
*S.U.E. = Subsurface Utility EngineeringWLBEIPBECM
C
O
N
C
H
W
C
B
C
S
X
T
R
A
N
S
P
O
R
T
A
T
I
O
N
M
I
L
E
P
O
S
T
3
5
S
W
I
T
C
H
Cemetery
E
X
I
S
T
I
N
G
S
T
R
U
C
T
U
R
E
S
:
Parcel / Sequence Number
E
A
A
T
U
R
E
n
d
o
f
I
n
f
o
r
m
a
t
i
o
n
E
.
O
.
I
.
Note: Not to Scale
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
1
-
B
B
-
5
1
2
4
A
b
a
n
d
o
n
e
d
A
c
c
o
r
d
i
n
g
t
o
U
t
i
l
i
t
y
R
e
c
o
r
d
s
WLBEABEPB
RW
RW
RW
CAE
T
D
E
P
D
E
P
U
E
SPPTTT
C
T
C
T
F
O
T
F
O
WWT
V
T
V
T
V
F
O
T
V
F
O
GG
S
S
F
S
S
F
S
S
?
U
T
L
Jurisdictional StreamJS 04/16/11Buffer Zone 1Buffer Zone 2 BZ 1BZ 2Wetland Propos
e
d
P
e
r
m
a
n
e
n
t
E
a
s
e
m
e
n
t
w
i
t
h
Iron
P
i
n
a
n
d
C
a
p
M
a
r
k
e
r
Propos
e
d
T
e
m
p
o
r
a
r
y
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
T
U
E
Iron
P
i
n
a
n
d
C
a
p
M
a
r
k
e
r
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
w
i
t
h
D
U
E
Propos
e
d
P
e
r
m
a
n
e
n
t
D
r
a
i
n
a
g
e
/
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
A
U
E
Propos
e
d
A
e
r
i
a
l
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
C
R
Propos
e
d
C
u
r
b
R
a
m
p
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
CO
N
V
E
N
T
I
O
N
A
L
P
L
A
N
S
H
E
E
T
S
Y
M
B
O
L
S
U
n
d
e
r
g
r
o
u
n
d
S
t
o
r
a
g
e
T
a
n
k
,
A
p
p
r
o
x
.
L
o
c
.
G
e
o
e
n
v
i
r
o
n
m
e
n
t
a
l
B
o
r
i
n
g
U
S
T
Known Soil Contamination: Area or SitePotential Soil Contamination: Area or Site Conc
r
e
t
e
o
r
G
r
a
n
i
t
e
R
/
W
M
a
r
k
e
r
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
w
i
t
h
CA
Conc
r
e
t
e
C
/
A
M
a
r
k
e
r
Propos
e
d
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
L
i
n
e
w
i
t
h
TYPIC
A
L
S
E
C
T
I
O
N
N
O
.
1
TYPIC
A
L
S
E
C
T
I
O
N
N
O
.
1
TYPICAL SECT
I
O
N
N
O
.
2
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
05-M AR-2014 13:56R:\Roadway\Proj\b5124_rdy_typ_LR.dgn$$$$USERNAM E$$$$
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
2
B
-
5
1
2
4
TYPICAL SEC
T
I
O
N
N
O
.
3
CL
G
R
A
D
E
P
O
I
N
T
12’
1
2
’
0.080.02
0
.
0
2
0
.0
8
13’ W/GR4’
1
3
’
W
/
G
R
8
’
GRADE TO T
H
I
S
L
I
N
E
/
/
/
/
/
/
/
/
/
/
/
/
M
I
N
.
M
I
N
.
M
I
N
.
M
I
N
.
D
E
T
A
I
L
S
H
O
W
I
N
G
M
E
T
H
O
D
O
F
W
E
D
G
I
N
G
U
CL
CL E1D1 C1
C
1
D
1
E
1
3:1SEE X-SECTIONS0.02
S
E
E
S
T
R
U
C
T
U
R
E
P
L
A
N
S
S
L
A
B
B
R
I
D
G
E
P
R
O
P
O
S
E
D
C
O
R
E
D
45’-0’’ (OUT TO
O
U
T
)
41’-10’’ (CLEAR RO
A
D
W
A
Y
)
8’-11"
0
.
0
2
8
’
-
1
1
"
12’
1
2
’
1’-7"
1
’
-
7
"
C
2
C
2
C
1
C
1
D
2
D
2
D
1
E
2
D
1
E
2
4
"
2
.
5
"
2
.
5
"
4
"
9
.
5
"
8’
8
’
12’
1
2
’
0.080.02
0
.
0
2
13’ W/GR4’
1
3
’
W
/
G
R
GRADE TO THIS LINE
U
E1D1
9
.
5
"
V
C1 8’
CL
CL
1
0
’
GRADEPOINTW
C
1
3:
1
4
:1
GROUND EXISTING 3:1SEE X-SECTIONS
G
R
O
U
N
D
E
X
I
S
T
I
N
G
GROUND EXISTING
8
’
4
:1
3:
1
G
R
O
U
N
D
E
X
I
S
T
I
N
G
E
X
I
S
T
.
C
O
N
C
.
E
X
I
S
T
.
C
O
N
C
.
1
0
’
-L- STA. 11+20
.
0
0
T
O
S
T
A
.
2
1
+
5
0
.
0
0
-L- STA. 37+85
.
0
0
T
O
S
T
A
.
5
3
+
7
5
.
0
0
-L- STA. 23+45
.
0
0
T
O
S
T
A
.
3
5
+
8
0
.
0
0
1
0
’
ASPHALT WIDENING REMOVE OUTER 3’-4’
A
S
P
H
A
L
T
W
I
D
E
N
I
N
G
R
E
M
O
V
E
O
U
T
E
R
3
’
-
4
’
FDPS9.5"
C
R
O
W
N
E
X
I
S
T
P
O
I
N
T
U
S
3
0
1
-
L
-
U
S
3
0
1
-
E
X
-
U
S
3
0
1
-
L
-
U
S
3
0
1
-
L
-
FDPS
F
D
P
S
PO
I
N
T
GR
A
D
E
U
S
3
0
1
-
L
-
0
.0
8
*
8
’
T
O
-
L
-
S
T
A
.
1
3
+
9
9
.
8
0
N
O
T
E
:
*
4
’
F
D
P
S
-
L
-
S
T
A
.
1
1
+
7
0
.
0
0
2
0
’
-
2
2
’
A
D
D
I
T
I
O
N
A
L
M
I
L
L
I
N
G
.
N
O
T
E
:
S
E
E
C
R
O
S
S
S
E
C
T
I
O
N
S
F
O
R
T
H
E
G
U
A
R
D
R
A
I
L
.
N
O
T
E
:
P
A
V
E
D
T
O
T
H
E
F
A
C
E
O
F
-L- STA. 21+50.00 TO STA. 21
+
8
5
.
3
1
(
B
E
G
I
N
B
R
I
D
G
E
)
-L- STA. 23+12.69 (END BRID
G
E
)
T
O
S
T
A
.
2
3
+
4
5
.
0
0
-L- STA. 35+80.00 TO STA. 3
6
+
1
9
.
7
5
(
B
E
G
I
N
B
R
I
D
G
E
)
-L- STA. 37+57.25 (END BRID
G
E
)
T
O
S
T
A
.
3
7
+
8
5
.
0
0
-L- STA. 53+75.00 TO STA. 54
+
1
1
.
7
5
(
B
E
G
I
N
B
R
I
D
G
E
)
-L- STA. 55+59.25 (END BRID
G
E
)
T
O
S
T
A
.
5
8
+
0
0
.
0
0
-L- STA. 21+85.31 (BEGIN BRIDGE) TO
S
T
A
.
2
3
+
1
2
.
6
9
(
E
N
D
B
R
I
D
G
E
)
-L- STA. 36+19.75 (BEGIN BRIDGE) TO
S
T
A
.
3
7
+
5
7
.
2
5
(
E
N
D
B
R
I
D
G
E
)
STRUCTURE PAY ITEM SURFACE CONCRETE WEARING
C
1
C
2
D
1
D
2
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
1
6
8
L
B
S
.
P
E
R
S
Q
.
Y
D
.
I
N
E
A
C
H
O
F
T
W
O
L
A
Y
E
R
S
.
P
R
O
P
.
A
P
P
R
O
X
.
3
"
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
S
U
R
F
A
C
E
C
O
U
R
S
E
,
T
Y
P
E
S
9
.
5
B
,
E
1
E
2
I
N
D
E
P
T
H
.
P
L
A
C
E
D
I
N
L
A
Y
E
R
S
N
O
T
L
E
S
S
T
H
A
N
1
.
5
"
I
N
D
E
P
T
H
O
R
G
R
E
A
T
E
R
T
H
A
N
2
.
0
"
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
1
1
2
L
B
S
.
P
E
R
S
Q
.
Y
D
.
P
E
R
1
"
D
E
P
T
H
.
T
O
B
E
P
R
O
P
.
V
A
R
.
D
E
P
T
H
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
S
U
R
F
A
C
E
C
O
U
R
S
E
,
T
Y
P
E
S
9
.
5
B
,
P
A
V
E
M
E
N
T
S
C
H
E
D
U
L
E
(
F
I
N
A
L
P
A
V
E
M
E
N
T
D
E
S
I
G
N
1
1
/
2
4
/
1
2
)
E
A
R
T
H
M
A
T
E
R
I
A
L
.
T
E
X
I
S
T
I
N
G
P
A
V
E
M
E
N
T
.
U
N
O
T
E
:
P
A
V
E
M
E
N
T
E
D
G
E
S
L
O
P
E
S
A
R
E
1
:
1
U
N
L
E
S
S
S
H
O
W
N
O
T
H
E
R
W
I
S
E
.
W
V
A
R
I
A
B
L
E
D
E
P
T
H
A
S
P
H
A
L
T
P
A
V
E
M
E
N
T
.
V
M
I
L
L
I
N
G
B
I
T
U
M
I
N
O
U
S
P
A
V
E
M
E
N
T
.
V
A
R
I
A
B
L
E
D
E
P
T
H
.
S
H
O
U
L
D
E
R
B
E
R
M
G
U
T
T
E
R
.
R
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
2
8
5
L
B
S
.
P
E
R
S
Q
.
Y
D
.
P
R
O
P
.
A
P
P
R
O
X
.
2
.
5
"
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
I
N
T
E
R
M
E
D
I
A
T
E
C
O
U
R
S
E
,
T
Y
P
E
I
1
9
.
0
B
,
I
N
D
E
P
T
H
.
P
L
A
C
E
D
I
N
L
A
Y
E
R
S
N
O
T
L
E
S
S
T
H
A
N
2
.
5
"
I
N
D
E
P
T
H
O
R
G
R
E
A
T
E
R
T
H
A
N
4
"
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
1
1
4
L
B
S
.
P
E
R
S
Q
.
Y
D
.
P
E
R
1
"
D
E
P
T
H
.
T
O
B
E
P
R
O
P
.
V
A
R
.
D
E
P
T
H
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
I
N
T
E
R
M
E
D
I
A
T
E
C
O
U
R
S
E
,
T
Y
P
E
I
1
9
.
0
B
,
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
4
5
6
L
B
S
.
P
E
R
S
Q
.
Y
D
.
P
R
O
P
.
A
P
P
R
O
X
.
4
"
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
B
A
S
E
C
O
U
R
S
E
,
T
Y
P
E
B
2
5
.
0
B
,
I
N
D
E
P
T
H
.
P
L
A
C
E
D
I
N
L
A
Y
E
R
S
N
O
T
L
E
S
S
T
H
A
N
4
"
I
N
D
E
P
T
H
O
R
G
R
E
A
T
E
R
T
H
A
N
5
.
5
"
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
1
1
4
L
B
S
.
P
E
R
S
Q
.
Y
D
.
P
E
R
1
"
D
E
P
T
H
.
T
O
B
E
P
R
O
P
.
V
A
R
.
D
E
P
T
H
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
B
A
S
E
C
O
U
R
S
E
,
T
Y
P
E
B
2
5
.
0
B
,
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
05-M AR-2014 13:56R:\Roadway\Proj\b5124_rdy_typ_LR.dgn$$$$USERNAM E$$$$
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
2
-
A
B
-
5
1
2
4
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
5
CL
G
R
A
D
E
P
O
I
N
T
1
2
’
1
2
’
0
.
0
8
0
.
0
2
0
.
0
2
0
.0
8
1
3
’
W
/
G
R
G
R
O
U
N
D
E
X
I
S
T
I
N
G
4
’
1
3
’
W
/
G
R
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
U
E
1
D
1
C
1
C
1
W
9
.
5
"
8
’
CL
9
.
5
"
1
0
’
S
E
E
X-
S
E
C
TI
O
N
S
3:
1
8
’
3:
1
4
:1
GROUND EXISTING
W
-
L
-
S
T
A
.
5
8
+
0
0
.
0
0
T
O
S
T
A
.
8
0
+
6
0
.
0
0
1
0
’
V
A
R
.
4
’
-
8
’
E
X
I
S
T
.
C
O
N
C
.
E
X
I
S
T
.
C
O
N
C
.
A
S
P
H
A
L
T
W
I
D
E
N
I
N
G
R
E
M
O
V
E
O
U
T
E
R
3
’
-
4
’
A
S
P
H
A
L
T
W
I
D
E
N
I
N
G
R
E
M
O
V
E
O
U
T
E
R
3
’
-
4
’
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
D
E
T
A
I
L
S
H
O
W
I
N
G
S
H
O
U
L
D
E
R
B
E
R
M
G
U
T
T
E
R
(
S
B
G
)
O
N
T
O
P
O
F
S
U
B
G
R
A
D
E
U
S
3
0
1
-
L
-
U
S
3
0
1
-
E
X
-
9
.
5
"
C
1
E
1
D
1
F
D
P
S
C
R
O
W
N
E
X
I
S
T
P
O
I
N
T
F
D
P
S
R
-
L
-
S
T
A
.
2
3
+
2
8
.
5
5
T
O
-
L
-
S
T
A
.
2
3
+
5
5
.
5
0
(
L
T
&
R
T
)
-
L
-
S
T
A
.
3
7
+
7
0
.
5
8
T
O
-
L
-
S
T
A
.
3
8
+
0
0
.
0
0
(
L
T
&
R
T
)
-
L
-
S
T
A
.
5
3
+
4
9
.
0
0
T
O
-
L
-
S
T
A
.
5
3
+
9
1
.
7
2
(
R
T
)
2
0
’
-
2
2
’
+
/
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
4
CL
-
L
-
0
.
0
2
S
E
E
S
TRU
C
TU
RE
P
LA
N
S
S
LA
B
B
RID
G
E
P
RO
P
O
S
E
D
C
O
R
E
D
P
O
I
N
T
G
R
A
D
E
4
5
’
-
0
’
’
(
O
U
T
T
O
O
U
T
)
4
1
’
-
1
0
’
’
(
C
L
E
A
R
R
O
A
D
W
A
Y
)
8
’
-
1
1
"
0
.
0
2
8
’
-
1
1
"
1
2
’
1
2
’
1
’
-
7
"
1
’
-
7
"
-
L
-
S
T
A
.
5
4
+
1
1
.
7
5
(
B
E
G
I
N
B
R
I
D
G
E
)
T
O
S
T
A
.
5
5
+
5
9
.
2
5
(
E
N
D
B
R
I
D
G
E
)
STRUC
T
U
R
E
P
A
Y
I
T
E
M
S
U
R
F
A
C
E
CONCR
E
T
E
W
E
A
R
I
N
G
P
A
V
E
M
E
N
T
S
C
H
E
D
U
L
E
D
1
2
.
5
"
I
1
9
.
0
B
C
1
3
"
S
9
.
5
B
C
2
V
A
R
S
9
.
5
B
D
2
V
A
R
I
1
9
.
0
B
E
1
4
"
B
2
5
.
0
B
E
2
V
A
R
B
2
5
.
0
B
T
E
A
R
T
H
M
A
T
E
R
I
A
L
U
E
X
I
S
T
.
P
A
V
E
M
E
N
T
W
W
E
D
G
I
N
G
V
V
A
R
M
I
L
L
I
N
G
R
S
B
G
E
X
I
S
T
I
N
G
(
4
)
1
0
’
x
7
’
R
C
B
C
R
E
T
A
I
N
A
N
D
E
X
T
E
N
D
1
8
’
U
P
S
T
R
E
A
M
4
B
-
5
1
2
4
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
05-M AR-2014 13:56R:\Roadway\Proj\B-5124_LR_PSH4.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
B
E
G
I
N
C
U
L
V
E
R
T
-
L
-
S
T
A
.
1
6
+
9
6
.
5
3
+
/
-
-
L
-
S
T
A
.
1
7
+
3
9
.
1
9
+
/
-
E
N
D
C
U
L
V
E
R
T
2
)
S
E
E
S
H
E
E
T
S
C
-
X
X
T
H
R
O
U
G
H
C
-
X
X
F
O
R
C
U
L
V
E
R
T
P
L
A
N
S
1
)
S
E
E
S
H
E
E
T
1
0
F
O
R
-
L
-
P
R
O
F
I
L
E
N
O
T
E
S
:
M ATCH LINE SEE SHEET 5 -L- STA. 21+00.00
10
15
20
DL
=
3
1
6
.
2
4
’
T
=
1
5
8
.
1
3
’
R
=
1
0
,
0
0
0
.
0
0
’
P
I
S
t
a
1
2
+
9
1
.
4
9
DL
=
3
1
6
.
2
4
’
T
=
1
5
8
.
1
3
’
R
=
1
0
,
0
0
0
.
0
0
’
-
L
-
G
R
A
U
3
5
0
T
L
-
3
G
R
A
U
3
5
0
T
L
-
3
50’ PS TAPER
4’ PS24’4’ PS
24’10’ PS
02 INC.27’0203EXIST.
P
R
C
S
t
a
.
1
4
+
4
9
.
5
9
POT Sta. 10+00.00PC Sta. 11+3
3
.
3
5
BEGIN TIP PROJECT B-5124
P
T
S
t
a
.
1
7
+
6
5
.
8
4
02 02
-
L
-
-L- POT STA. 11+20.00
10’ PS
2
5
:
1
P
S
TA
P
E
R
2
5
:1
P
S
TA
P
ER
24’10’ PS10’ PS
B
L
-
1
J
O
H
N
W
H
I
T
E
F
I
S
H
E
R
J
O
H
N
W
H
I
T
E
F
I
S
H
E
R
D
B
1
0
1
5
P
G
9
6
D
B
1
0
1
5
P
G
9
6
M
B
1
1
P
G
4
1
2
M
B
1
1
P
G
4
1
2
W
O
O
D
S
W
O
O
D
S
W
O
O
D
S
W
O
O
D
S
U
S
3
0
1
2
4
’
B
S
T
EXIST. R/W
W
O
O
D
S
W
O
O
D
S
WOODST18" CMP15" CMP
T
B
M
-
1
T EXIST. R/W 100.00’E B GRAIN COMPANY INCDB 1395 PG 71 10 T1112T
1
2
"
D
I
1
6
"
D
I
100.00’
SW
IF
T
C
R
E
E
K
SW
AM
P
1
+24.44
51.83’
100.00’
E
X
I
S
T
.
R
/
W
E
X
I
S
T
.
R
/
W
-
L
-
+
5
0
.
0
0
5
0
.
0
0
’
L
T
.
50’
-
L
-
+
6
5
.
0
0
6
0
.
0
0
’
L
T
.
-
L
-
+
9
0
.
0
0
6
0
.
0
0
’
L
T
.
5
0
.
0
0
’
L
T
.
5
0
.
0
0
’
L
T
.
EX
I
S
T
.
R
/
W
TB
T
B
T
B
T
B
S
E
E
D
E
T
A
I
L
E
S
T
.
1
1
5
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
8
0
T
O
N
S
C
L
.
’
I
’
R
I
P
R
A
P
C
H
A
N
N
E
L
I
M
P
R
O
V
E
M
E
N
T
2
0
L
F
O
F
I
N
L
E
T
(
L
O
O
K
I
N
G
D
O
W
N
S
T
R
E
A
M
)
(
N
O
T
T
O
S
C
A
L
E
)
2:
1
w
/
G
E
O
T
E
X
T
I
L
E
(
T
Y
P
.
)
C
L
A
S
S
’
I
’
R
I
P
R
A
P
N
G
4
2
.
5
’
E
X
C
A
V
A
T
I
O
N
1
.
5
’
T
H
I
C
K
(
T
Y
P
.
)
E
S
T
.
D
D
E
2
4
0
C
Y
CU
L
V
E
R
T
7
0
I
N
L
E
T
C
H
A
N
N
E
L
CF
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
F
F
C
N
A
D
8
3
+55.5 END SBG+55.5 END SBG
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
05-M AR-2014 13:56R:\Roadway\Proj\B-5124_LR_PSH5.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5
B
-
5
1
2
4
E
N
D
A
P
P
R
O
A
C
H
S
L
A
B
BE
G
I
N
A
P
P
R
O
A
C
H
S
L
A
B
E
N
D
B
R
I
D
G
E
SK
E
T
C
H
O
F
P
A
V
E
M
E
N
T
/
B
R
I
D
G
E
R
E
L
A
T
I
O
N
S
H
I
P
N
O
T
E
:
S
K
E
T
C
H
N
O
T
T
O
S
C
A
L
E
24’
12’12’
0202
0202
8’-11"8’-11"
2
)
S
E
E
S
H
E
E
T
S
S
-
X
X
T
H
R
O
U
G
H
S
-
X
X
F
O
R
S
T
R
U
C
T
U
R
E
P
L
A
N
S
1
)
S
E
E
S
H
E
E
T
1
0
F
O
R
-
L
-
P
R
O
F
I
L
E
N
O
T
E
S
:
BEG
I
N
B
R
I
D
G
E
T
Y
P
E
B
-
7
7
T
Y
P
E
B
-
7
7
M ATCH LIN E SEE SHEET 6 -L- STA. 34+00.00
M ATCH LIN E SEE SHEET 4 -L- STA. 21+00.00
41’ 10"
CLR RDW Y
-
L
-
S
T
A
.
2
1
+
6
1
.
3
1
-L- STA.
2
1
+
8
5
.
3
1
-
L
-
S
T
A
.
2
3
+
1
2
.
6
9
-
L
-
S
T
A
.
2
3
+
3
6
.
6
9
25
30
GRAU 350 TL-3
G
R
A
U
3
5
0
T
L
-
3
G
R
A
U
3
5
0
T
L
-
3
24’
4’ PS24’10’ PS
02 02
0202
10’ PS10’ PS
-
L
-
2
5
:
1
P
S
TA
P
ER
TA
P
E
R
2
5
:1
P
S
2
5
:1
PS
TA
P
ER
TAPER 25:1 PS BL-2
B
L
-
3
B
L
-
4
TBM-2
J
O
H
N
W
H
I
T
E
F
I
S
H
E
R
J
O
H
N
W
H
I
T
E
F
I
S
H
E
R
D
B
1
0
1
5
P
G
9
6
D
B
1
0
1
5
P
G
9
6
M
B
1
1
P
G
4
1
2
M
B
1
1
P
G
4
1
2
W
O
O
D
S
W
O
O
D
S
WOODS
W
O
O
D
S
W
O
O
D
S
W
O
O
D
S
WOODS
U
S
3
0
1
2
4
’
B
S
T
U
S
3
0
1
2
4
’
B
S
T
E
X
I
S
T
.
R
/
W
E
X
I
S
T
.
R
/
W
100.00’
CONC WINGWALLS (4) SPANS W/CONCRETE DECK BRIDGE #85BEAVER DAMSWIFT CREEK SWAMP 16" DI
1
6
"
D
I
12" DI
1
2
"
D
I
1
2
"
D
I
L
E
V
E
L
C
A
P
P
R
O
X
.
L
O
C
A
T
I
O
N
EXIST. R/WEXIST. R/W 100.00’
1
50.00’ LT.60.00’ LT.-L- +35.0050.00’ LT.60.00’ LT.-L- +65.0050’
50’
0501 050205030504TBTBTBTB15"15"2GI2GI EST. 7 SY GEOTEXTILE EST. 2 TONS CLASS B RIP RAPEST. 7 SY GEOTEXTILE EST. 2 TONS CLASS B RIP RAP STRUCTURE PAY ITEM CLASS II RIP RAPSTRUCTURE PAY ITEM UNCLASSIFIED STRUCTURE EXCAVATION FFFC
F
C
F
C
F
C
F
C
FC
F
FCC
F
FF
F
N
A
D
8
3
+
0
0
E
N
D
S
B
G
+
0
0
E
N
D
S
B
G
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
05-M AR-2014 13:56R:\Roadway\Proj\B-5124_LR_PSH6.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
6
B
-
5
1
2
4
SKETCH OF PAVEMENT/BRIDGE R
E
L
A
T
I
O
N
S
H
I
P
NOTE: SKETCH NOT TO SC
A
L
E
TYPE B-77
T
Y
P
E
B
-
7
7
TYPE B-77BEGIN APPROACH SLABE
N
D
A
P
P
R
O
A
C
H
S
L
A
B
BEGIN BRIDGE
E
N
D
B
R
I
D
G
E
12’12’24’
T
Y
P
E
B
-
7
7
0202 8’-11"8’-11"
2
)
S
E
E
S
H
E
E
T
S
S
-
X
X
T
H
R
O
U
G
H
S
-
X
X
F
O
R
S
T
R
U
C
T
U
R
E
P
L
A
N
S
1
)
S
E
E
S
H
E
E
T
1
1
F
O
R
-
L
-
P
R
O
F
I
L
E
N
O
T
E
S
:
24’
M ATCH LIN E SEE SHEET 7 -L- STA. 47+00.00
M ATCH LIN E SEE SHEET 5 -L- STA. 34+00.00 41’ 10"CLR RDW YTAPER25:1 PS -L- STA. 36+19.75-L- STA. 35+95.75
-
L
-
S
T
A
.
3
7
+
5
7
.
2
5
-
L
-
S
T
A
.
3
7
+
8
1
.
2
5
35
40
45
GRAU 350 TL-3
G
R
A
U
3
5
0
T
L
-
3
G
R
A
U
3
5
0
T
L
-
3
24’10’ PS
10’ PS 4’ PS
0202
0202-L-
2
5
:1
P
S
TA
P
ER
T
A
P
E
R
2
5
:
1
P
S
BL-5
B
L
-
6
TBM-3JOHN WHITE FISHER
J
O
H
N
W
H
I
T
E
F
I
S
H
E
R
J
O
H
N
W
H
I
T
E
F
I
S
H
E
R
DB 1015 PG 96 JOHN WHITE FISHER
D
B
1
0
1
5
P
G
9
6
D
B
1
0
1
5
P
G
9
6
DB 1015 PG 96MB 11 PG 412
M
B
1
1
P
G
4
1
2
M
B
1
1
P
G
4
1
2
MB 11 PG 412
W
O
O
D
S
WOODSWOODSWOODS WOODS WOODS
W
O
O
D
S
W
O
O
D
S
U
S
3
0
1
2
4
’
B
S
T
EXIST. R/WEXIST. R/W 100.00’CONC WINGWALLS (6) SPANS W/CONCRETE DECK BRIDGE #141 SWIFT CREEK SWAMPSWIFT CREEK SWAMP 16" DI
1
6
"
D
I
12" DI
1
2
"
D
I
1
2
"
D
I
LEVEL C APPROX. LOCATION
E
X
I
S
T
.
R
/
W
E
X
I
S
T
.
R
/
W
100.00’
1
1
50’15" RCP-IV TBTB 060
1
0
6
0
2
0
6
0
3
15"TB TBTBTBTB
2
G
I
2
G
I
E
S
T
.
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
C
L
A
S
S
B
R
I
P
R
A
P
STRUCTURE PAY ITEM CLASS II RIP RAPSTRUCTURE PAY ITEM UNCLASSIFIED STRUCTURE EXC
A
V
A
T
I
O
N
FCFCF
F
C
F
F
C
F
C
F
C
F
C
F
F
FFF
C
N
A
D
8
3
SEE DETAIL A
SPECIAL LATERAL ’V’ DITCH
Slope
Fill
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
1
-
A
P
R
-
2
0
1
4
1
3
:
4
9
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
B
-
5
1
2
4
_
L
R
_
P
S
H
7
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
7B-5124
SKETCH O F PAVEM EN T/BRIDG E RELATIO N SHIP
N O TE: SKETCH N O T TO SCALE
TYPE B-77 TYPE B-77
TYPE B-77
BEG IN APPRO ACH SLAB EN D APPRO ACH SLAB
BEG IN BRIDG E EN D BRIDG E
1
2
’
1
2
’
2
4
’
TYPE B-77
8
’
-
1
1
"
8
’
-
1
1
"
0
2
0
1
2) SEE SHEETS S-XX THRO UG H S-XX FO R STRUCTURE PLAN S
1) SEE SHEET 11 FO R -L- PRO FILE
N O TES:
2
4
’
2
4
’
M
A
TC
H
LIN
E
S
EE
S
H
EET
-
L-
S
TA
. 6
0
+
0
0
.0
0
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
6
-
L
-
S
T
A
.
4
7
+
0
0
.
0
0
0
2
4
1
’
-
1
0
"
C
L
R
R
D
W
Y
0
2
0
2
0
3
R
E
V
I
S
I
O
N
S
-L- STA. 53+87.75
-L- STA. 54+11.75 -L- STA. 55+59.25
-L- STA. 55+83.25
R
/
W
R
E
V
I
S
I
O
N
(
A
P
R
I
L
1
,
2
0
1
4
)
:
C
O
N
S
T
R
U
C
T
I
O
N
E
A
S
E
M
E
N
T
A
D
D
E
D
T
O
P
A
R
C
E
L
2
F
R
O
M
-
L
-
S
T
A
5
8
+
5
0
T
O
6
3
+
6
5
L
T
.
h
c
n
5
0
5
5
6
0
0
2
0
2
0
2
0
2
0
2
0
1
0
1
0
0
-L-
PI Sta 63+08.80
D
L = 1,169.59’
T = 613.51’
R = 1,568.00’
6
0
G RAU 350 TL-3
G RAU 350 TL-3
G RAU 350 TL-3
1
0
’
P
S
4
’
P
S
2
4
’
8
’
P
S
27’ INC.
+
6
7
.
0
0
8
’ P
S
PC Sta. 56+95.29
+
7
2
.
0
0
0
2
0
2
-L-
27’
IN C.
0
2
0
2
0
3
0
4
0
5
0
6
0
7
0
8
0
8
GRAU 350 TL-3
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
25:1 PS TAPER
S
WIF
T
C
R
E
E
K
S
WIF
T
C
R
E
E
K
S
IG
N
BL-7
BL-8
TBM -4
JOHN W HITE FISHER
JOHN W HITE FISHER
(HEIRS)
LENA C. BRADLEY
R.R. BRADLEY AND
FULL CIRCLE SOLUTIONS, INC.
DB 2026 PG 708
PB 31 PG 203
DB 518 PG 428
DB 1015 PG 96
DB 1015 PG 96
M B 11 PG 412
M B 11 PG 412
TREES
TREES
W OODS
W OODS
W OODS
W OODS
W OODS
W OODS
W
O
O
D
S
W
O
O
D
S
US 301 24’ BST
114
.6
6
’
430.84’
EXIST. R/W
EXIST. R/W
10
0
.
0
0
’
8’ SOIL PATH 8’
SOIL
PATH
8’ S
OIL P
AT
H
8’ SOIL PATH
1
0
’
G
R
7
’ G
R
1
2
3
4
5
6
7
8
9
TREESCONC W INGW ALLS
(7) SPANS W /
CONCRETE DECK
BRIDGE #151
W
E
L
L
6
0
.
0
0
’
16" DI
16" DI 16" DI
12" DI
12" DI 12" DI
LEVEL C APPROX. LOCATION
LEVEL C APPROX. LOCATION
LEVEL C APPROX. LOCATION
US 301 24’ BST
48.25’
+19.28
2
1.8
2
’
+
0
0
.3
7
1 2
5
10
0
.
0
0
’
15" RCP
15" RCP
1
5
"
0701
0702
0703
T
B
T
B
T
B
T
B
RETAIN
REMO VE
15"
RCP-IV
15"
EST. 7 SY GEO TEXTILE
EST. 2 TO N S
CLASS B RIP RAP
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
D
FRO M -L- STA. 58+00 TO STA. 60+80 LT.
M in. D= 1 Ft.
DETAIL A
Ground
Natural
Flatter3:1 or
CLEAN O UT
2G I 2GI
0704
0705
+49
BEGIN SBG
STRUCTURE PAY ITEM
UN CLASSIFIED STRUCTURE EXCAVATIO N
STRUCTURE PAY ITEM
CLASS II RIP RAP
3:
1
-L- +95.29
50.00’ LT
65.00’ LT
-L- +50.00
5
0
’
60.00’ RT.
40.00’ RT.
-L- +30.00
60.00’ RT.
-L- +78.82
50.00’ LT
65.00’ LT
F
C
F
C
F
C
F
C
F
F
F
F
C
F
C
F
F
C F
F
F
C
C
N AD 83
SEE DETAIL A
SPECIAL LATERAL ’V’ DITCH
Slope
Fill
REM O VE
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
1
-
A
P
R
-
2
0
1
4
1
3
:
5
1
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
B
-
5
1
2
4
_
L
R
_
P
S
H
8
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
8B-5124
1) SEE SHEET 12 FO R -L- PRO FILE
N O TES:
2
4’
M
A
TC
H
LIN
E
S
EE
S
H
EET
9
-
L-
S
TA
. 7
3
+
0
0
.0
0
M
A
T
C
H
LI
N
E
S
E
E
S
H
E
E
T
7 -
L-
S
T
A.
6
0
+
0
0.
0
0
R
/
W
R
E
V
I
S
I
O
N
(
A
P
R
I
L
1
,
2
0
1
4
)
:
C
O
N
S
T
R
U
C
T
I
O
N
E
A
S
E
M
E
N
T
A
D
D
E
D
T
O
P
A
R
C
E
L
2
F
R
O
M
-
L
-
S
T
A
.
5
8
+
5
0
T
O
6
3
+
6
5
L
T
.
h
c
n
6
0
6
5
7
0
0
2
0
2
0
2
0
1
0
10
0
0
2
PI Sta 75+40.38
L = 313.55’
T = 156.79’
R = 10,000.00’
-L-
D
PI Sta 63+08.80
L = 1,169.59’
T = 613.51’
R = 1,568.00’
D
-L-
GRAU
350 TL-3
GRAU
350
TL-3
27’ INC.
4’
P
S
8’
P
S
+
9
3
.0
0
PT Sta. 68+64.88
0
2
8
’ P
S
2
4
’
4
’ P
S
0
2
0
2
-L-
0
8
0
8
0
7
0
6
0
5
0
4
0
3
0
2
25:1 PS TAPER
25
:1
PS
TAPER
2
6
’ S
OIL
18" RCP
18
"
R
C
P
36" RCP
R
IP
-
R
A
P
10’ S
OIL
WOODS
WOODS
WE
L
L
WE
L
L
WELL
WELL
WELL
WELL
T T
WELL
WELL
T T
(HEIRS)
LENA
C
.
BRADLEY
R
.R
.
BRADLEY
AND
(HEIRS)
LENA C. BRADLEY
R.R. BRADLEY AND
DB 518 PG 428
DB
518
PG
428
FULL CIRCLE SOLUTIONS, INC.
FULL CIRCLE SOLUTIONS, INC.
PB 31 PG 203
DB 2026 PG 708
DB 2026 PG 708
1
5
"
R
C
P
1
5
"
R
C
P
13
18’ SO
IL (PR
IV
A
TE)
B
R
A
D
LEY
-CU
TC
H
IN
LA
N
E
S
BL-9
NO RECO RDDOMINION POW ER EASEM ENT
T T
V
AL
V
E
BL
O
W-
OFF
SS
M
H
W/
LEV EL C A PPRO X . LO CA TIO N
22
-L- +64.88
50.00’ LT
5
0
’
5
0
’
-L- +65.00
50.00’ LT
65.00’ LT
R
E
T
A
I
N
TB JB w/M H
18"
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
D
FRO M -L- STA. 61+00 TO STA. 63+55 LT.
M in. D= 1 Ft.
DETAIL A
Ground
Natural
Flatter3:1 or
0801
0802
3:
1
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C F
NAD 83
P
S
R
M
S
E
E
D
E
T
A
I
L
B
T
O
E
P
R
O
T
E
C
T
I
O
N
w
/
P
S
R
M
EXISTING (3) 8’ x 6’ RCBC RETAIN AND EXTEND IN KIND
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
05-M AR-2014 13:56R:\Roadway\Proj\B-5124_LR_PSH9.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
9
B
-
5
1
2
4
2
)
S
E
E
S
H
E
E
T
S
C
-
X
X
T
H
R
O
U
G
H
C
-
X
X
F
O
R
C
U
L
V
E
R
T
P
L
A
N
S
1
)
S
E
E
S
H
E
E
T
1
2
F
O
R
-
L
-
P
R
O
F
I
L
E
N
O
T
E
S
:
BEGIN CULVERT-L- STA. 74+11.69+/--L- STA. 74+37.97+/-END CULVERTMATCH LIN E SEE SHEET 8 -L- STA. 73+00.00 75
80
P
T
S
t
a
.
8
0
+
5
1
.
9
7
P
O
T
S
t
a
.
8
1
+
7
6
.
6
8
PI Sta 75+40.38L = 313.55’T = 156.79’R = 10,000.00’D -L-
P
I
S
t
a
7
8
+
7
4
.
5
7
L
=
3
5
4
.
8
3
’
T
=
1
7
7
.
4
3
’
R
=
1
0
,
0
0
0
.
0
0
’
D
-
L
-
GRAU 350 TL-3 GRAU 350 TL-3GRAU 350 TL-3 GRAU 350 TL-310’ PS 24’10’ PS
I
N
C
.
2
7
’
5
0
’
P
S
T
A
P
E
R
4’ PS 24’4’ PS
02
EXIST.
03
02
PC Sta. 73+83.59
P
R
C
S
t
a
.
7
6
+
9
7
.
1
4
0202
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
5
1
2
4
-
L
-
-
L
-
P
O
T
S
T
A
.
8
0
+
6
0
.
0
0
25:1 PS TAPER 25:1 PS TAPER
4’ PS 24’4’ PS
D
E
B
R
I
S
D
E
B
R
I
S
10’ SOIL
W
O
O
D
S
W
O
O
D
S
W
O
O
D
S
WO
O
D
S
TBM-5 FRANCES B.WOODARDNOT AVAILABLEDEED REFERENCE
J
U
D
G
E
F
A
R
M
L
IM
IT
E
D
P
A
R
T
N
E
R
S
H
IP
D
B
12
7
5
P
G
5
5
7
DB 1275 PG 557PB 31 PG 203 #C-161BOX CULVERTTHREE BARREL HW2CE2CE1HW1
T
B
M
-
6
BEAVER DAMMHUTILUNKNBL-10
B
L
-
1
1
N 5245’00" W 88.57’S 1230’24" E 113.38’S 1230’24" E 217.37’
60.00’
60.00’LIMITED PARTNERSHIPJUDGE FARM DB 1275 PG 557PB 31 PG 203 PARTNERSHIP LIMITED FARM JUDGE20.52’+68.7324.94’+17.8746.64’+17.87 34
4
TB TB TB TB
(
N
o
t
t
o
S
c
a
l
e
)
T
O
E
P
R
O
T
E
C
T
I
O
N
d
F
R
O
M
S
T
A
.
7
9
+
0
0
L
T
.
T
O
S
T
A
.
8
0
+
6
0
L
T
.
N
atural G
round
Fill Slope
3:1
O
R F
L
A
T
TE
R
d
=
1
F
t
.
T
y
p
e
o
f
L
i
n
e
r
=
P
S
R
M
D
E
T
A
I
L
B
LANE SWAMP SEE DETAIL EST. 15 SY GEOTEXTILE EST. 20 TONS CL. ’1’ RIP RAP CHANNEL IMPROVEMENT 35 LF OF INLET (LOOKING DOWNSTREAM)(NOT TO SCALE)2:12:1 NGNG1.5’ THICKw/GEOTEXTILE CLASS ’I’ RIP RAP26’EXCAVATIONCULVERT 161 INLET CHANNEL-L- +83.59
-
L
-
+
9
7
.
1
4
-
L
-
+
0
0
.
0
0
50.00’ LT
5
0
.
0
0
’
L
T
-L- +50.0070.00’ LT.-L- +75.0070.00’ LT.50.00’ LT.50.00’ LT.
EX
I
S
T
.
R
/
W
5
0
.
0
0
’
L
T
FFFFF
F
F
F
F
F
F
FFF NAD 83
10+0011+0012
+
0
0
1
3
+
0
0
1
4
+
0
0
1
5
+
0
0
1
6
+
0
0
1
7
+
0
0
1
8
+
0
0
1
9
+
0
0
2
0
+
0
0
2
1
+
0
0
40 50 60 70 80 90 100
4
0
5
0
6
0
7
0
8
0
9
0
1
0
0
21+0022+0023+0024+0025
+
0
0
2
6
+
0
0
2
7
+
0
0
2
8
+
0
0
2
9
+
0
0
3
0
+
0
0
3
1
+
0
0
3
2
+
0
0
3
3
+
0
0
3
4
+
0
0
40 50 60 70 80 90 100 110 120 130
4
0
5
0
6
0
7
0
8
0
9
0
1
0
0
1
1
0
1
2
0
1
3
0
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
05-MAR-2014 13:56R:\Roadway\Proj\B-5124_LR_profile1.dgn$$$$USERNAM E$$$$
1
0
B
-
5
1
2
4
-
L
-
-
L
-
3
)
S
E
E
S
H
E
E
T
S
S
-
?
T
H
R
O
U
G
H
S
-
?
F
O
R
S
T
R
U
C
T
U
R
E
P
L
A
N
S
2
)
S
E
E
S
H
E
E
T
S
C
-
?
T
H
R
O
U
G
H
C
-
?
F
O
R
C
U
L
V
E
R
T
1
)
S
E
E
S
H
E
E
T
S
4
T
H
R
O
U
G
H
5
F
O
R
-
L
-
P
L
A
N
N
O
T
E
S
:
DESIGN DISCHARGEDESIGN FREQUENCYBASE DISCHARGE
C
F
S
Y
R
S
Y
R
S
BASE FREQUENCYOVERTOPPING ELEVA
T
I
O
N
OVERTOPPING FREQ
U
E
N
C
Y
OVERTOPPING DISCH
A
R
G
E
C
F
S
C
F
S
Y
R
S
F
T
F
T
F
T
DESIGN HW ELEVAT
I
O
N
BASE HW ELEVATIO
N
BRIDGE HY
D
R
A
U
L
I
C
D
A
T
A
DATE OF SURVEYW.S. ELEVATIONAT DATE OF SURVE
Y
F
T
=
=
=
=
=
=
=
=
=
=
DESIGN DISCHARGEDESIGN FREQUENCYBASE DISCHARGE
C
F
S
Y
R
S
Y
R
S
BASE FREQUENCYOVERTOPPING ELEVA
T
I
O
N
OVERTOPPING FREQ
U
E
N
C
Y
OVERTOPPING DISCH
A
R
G
E
C
F
S
C
F
S
Y
R
S
F
T
F
T
F
T
DESIGN HW ELEVAT
I
O
N
BASE HW ELEVATIO
N
BRIDGE HY
D
R
A
U
L
I
C
D
A
T
A
DATE OF SURVEYW.S. ELEVATIONAT DATE OF SURVE
Y
F
T
=
=
=
=
=
=
=
=
=
=
DESIGN DISCHARGEDESIGN FREQUENCYBASE DISCHARGE
C
F
S
Y
R
S
Y
R
S
BASE FREQUENCYOVERTOPPING ELEVA
T
I
O
N
OVERTOPPING FREQ
U
E
N
C
Y
OVERTOPPING DISCH
A
R
G
E
C
F
S
C
F
S
Y
R
S
F
T
F
T
F
T
DESIGN HW ELEVAT
I
O
N
BASE HW ELEVATIO
N
BRIDGE HY
D
R
A
U
L
I
C
D
A
T
A
W.S. ELEVATIONAT DATE OF SURVE
Y
F
T
D
E
S
I
G
N
D
I
S
C
H
A
R
G
E
D
E
S
I
G
N
F
R
E
Q
U
E
N
C
Y
B
A
S
E
D
I
S
C
H
A
R
G
E
C
F
S
Y
R
S
Y
R
S
B
A
S
E
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
O
V
E
R
T
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
C
F
S
C
F
S
Y
R
S
F
T
F
T
F
T
D
E
S
I
G
N
H
W
E
L
E
V
A
T
I
O
N
B
A
S
E
H
W
E
L
E
V
A
T
I
O
N
C
U
L
V
E
R
T
H
Y
D
R
A
U
L
I
C
D
A
T
A
=
9
8
3
2
=
5
0
=
9
3
.
5
=
1
1
7
7
7
=
1
0
0
=
9
3
.
8
7
O
V
E
R
T
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
=
9
9
0
0
=
9
3
.
5
=
9
8
3
2
=
5
0
=
9
3
.
5
=
1
1
7
7
7
=
1
0
0
=
9
3
.
8
7
=
9
9
0
0
=
9
3
.
5
2
-
6
-
2
0
1
3
=
8
8
.
7
DATE OF SURVEY:ELE
V
A
T
I
O
N
8
9
.
9
2
’
-LR
-
S
T
A
.
1
2
+
7
2
.
7
6
3
0
.
0
3
’
L
E
F
T
BM
#
1
R
R
S
P
I
K
E
I
N
B
A
S
E
O
F
1
2
"
S
W
E
E
T
G
U
M
ELEVATION 87.67’-LR- STA. 22+25.84 88.36’ RIGHT BM # 2 BRIDGE NAIL IN 12" CYPRESS
=
5
0
+
=
5
0
+
1.5:11.5:1
E
X
C
A
V
A
T
I
O
N
L
I
M
I
T
S
(STRUCTURE PAY ITEM)EXCAVATION UNCLASSIFIED STRUCTURE
P
I
=
1
2
+
5
0
.
0
0
E
L
=
9
3
.
9
1
’
(-)0
.5
0
7
7
%
(
+
)
0
.
0
2
5
5
%
V
C
=
2
0
0
’
K
=
3
7
5
P
I
=
1
4
+
8
5
.
0
0
E
L
=
9
3
.
9
7
’
(
+
)
0
.
0
2
5
5
%
(
+
)
0
.
0
4
9
1
%
V
C
=
2
0
0
’
K
=
8
4
7
8
P
I
=
1
7
+
7
0
.
0
0
E
L
=
9
4
.
1
1
’
(
+
)
0
.
0
4
9
1
%
(
-
)
0
.
1
4
8
4
%
V
C
=
2
0
0
’
K
=
1
0
1
3
P
I
=
2
0
+
8
0
.
0
0
E
L
=
9
3
.
6
5
’
(
-
)
0
.
1
4
8
4
%
V
C
=
2
0
0
’
K
=
2
2
4
1
-
L
-
S
T
A
.
1
7
+
3
9
.
1
9
+
/
-
E
N
D
C
U
L
V
E
R
T
-
L
-
S
T
A
.
1
6
+
9
6
.
5
3
+
/
-
B
E
G
I
N
C
U
L
V
E
R
T
ELEV. 94.57’-L- STA. 11+20.00 BEGIN GRADE(-)0.0592%PI = 24+35.00EL = 93.44’(-)0.0592%(+)0.0020%VC = 200’K = 3272
P
I
=
2
9
+
4
5
.
0
0
E
L
=
9
3
.
4
5
’
(
+
)
0
.
0
0
2
0
%
(
+
)
0
.
0
1
7
7
%
V
C
=
2
0
0
’
K
=
1
2
7
0
8
-L- STA. 21+85.31 BEGIN BRIDGE-L- STA. 23+12.69 END BRIDGE
34+0035+0036+0037+0038
+
0
0
3
9
+
0
0
4
0
+
0
0
4
1
+
0
0
4
2
+
0
0
4
3
+
0
0
4
4
+
0
0
4
5
+
0
0
4
6
+
0
0
4
7
+
0
0
40 50 60 70 80 90 100
4
0
5
0
6
0
7
0
8
0
9
0
1
0
0
47+0048+0049+0050+0051
+
0
0
5
2
+
0
0
5
3
+
0
0
5
4
+
0
0
5
5
+
0
0
5
6
+
0
0
5
7
+
0
0
5
8
+
0
0
5
9
+
0
0
6
0
+
0
0
50 60 70 80 90 100 110 120 130 140
5
0
6
0
7
0
8
0
9
0
1
0
0
1
1
0
1
2
0
1
3
0
1
4
0
1
1
B
-
5
1
2
4
-
L
-
-
L
-
2
)
S
E
E
S
H
E
E
T
S
S
-
?
T
H
R
O
U
G
H
S
-
?
F
O
R
S
T
R
U
C
T
U
R
E
P
L
A
N
S
1
)
S
E
E
S
H
E
E
T
S
6
T
H
R
O
U
G
H
7
F
O
R
-
L
-
P
L
A
N
N
O
T
E
S
:
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
05-MAR-2014 13:56R:\Roadway\Proj\B-5124_LR_profile1.dgn$$$$USERNAM E$$$$
D
E
S
I
G
N
F
R
E
Q
U
E
N
C
Y
B
A
S
E
D
I
S
C
H
A
R
G
E
C
F
S
Y
R
S
Y
R
S
B
A
S
E
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
O
V
E
R
T
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
C
F
S
C
F
S
Y
R
S
F
T
F
T
F
T
D
E
S
I
G
N
H
W
E
L
E
V
A
T
I
O
N
B
A
S
E
H
W
E
L
E
V
A
T
I
O
N
B
R
I
D
G
E
H
Y
D
R
A
U
L
I
C
D
A
T
A
W
.
S
.
E
L
E
V
A
T
I
O
N
A
T
D
A
T
E
O
F
S
U
R
V
E
Y
F
T
D
E
S
I
G
N
D
I
S
C
H
A
R
G
E
D
E
S
I
G
N
F
R
E
Q
U
E
N
C
Y
B
A
S
E
D
I
S
C
H
A
R
G
E
C
F
S
Y
R
S
Y
R
S
B
A
S
E
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
O
V
E
R
T
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
C
F
S
C
F
S
Y
R
S
F
T
F
T
F
T
D
E
S
I
G
N
H
W
E
L
E
V
A
T
I
O
N
B
A
S
E
H
W
E
L
E
V
A
T
I
O
N
B
R
I
D
G
E
H
Y
D
R
A
U
L
I
C
D
A
T
A
W
.
S
.
E
L
E
V
A
T
I
O
N
A
T
D
A
T
E
O
F
S
U
R
V
E
Y
F
T
=
9
0
.
4
=
9
8
3
2
=
5
0
=
9
3
.
5
=
1
1
7
7
7
=
1
0
0
=
9
3
.
8
7
D
E
S
I
G
N
D
I
S
C
H
A
R
G
E
=
9
8
3
2
=
5
0
=
9
3
.
5
=
1
1
7
7
7
=
1
0
0
=
9
3
.
8
7
=
9
9
0
0
=
9
3
.
5
=
9
9
0
0
D
A
T
E
O
F
S
U
R
V
E
Y
:
2
-
6
-
2
0
1
3
D
A
T
E
O
F
S
U
R
V
E
Y
:
2
-
6
-
2
0
1
3
=
8
8
.
8
ELEVATION 88.70’-LR- STA. 37+35.84 74.38’ RIGHT BM # 3 BRIDGE SPIKEIN BASE OF 10" WATER OAKELEVATION 90.25’-LR- STA. 54+39.84 22.55’ LEFT BM # 4 BRIDGE SPIKE IN BASE OF
8
"
O
A
K
1.5:1
=
5
0
+
=
5
0
+
=
9
3
.
5
1.5:1
1
.5
:1
1.5:1
E
X
C
A
V
A
T
I
O
N
L
I
M
I
T
S
(STRUCTURE PAY ITEM)EXCAVATION UNCLASSIFIED STRUCTURE
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
E
X
C
A
V
A
T
I
O
N
U
N
C
L
A
S
S
I
F
I
E
D
S
T
R
U
C
T
U
R
E
PI = 35+10.00EL = 93.55’(+)0.0177%(-)0.0233%VC = 200’K = 4874 PI =
3
8
+
1
0
.
0
0
EL =
9
3
.
4
8
’
(-)0.023
3
%
(
+
)
0
.
0
1
7
1
%
VC
=
2
0
0
’
K =
4
9
4
1
P
I
=
4
3
+
3
5
.
0
0
E
L
=
9
3
.
5
7
’
(
+
)
0
.
0
1
7
1
%
(
-
)
0
.
0
1
4
0
%
V
C
=
2
0
0
’
K
=
6
4
2
2
L
E
F
T
D
I
T
C
H
-L- STA. 36+19.75 BEGIN BRIDGE-L- STA
.
3
7
+
5
7
.
2
5
END BR
I
D
G
E
PI = 48+35.00EL = 93.50’(-)0.0140%(+)0.1825%VC = 200’K = 1018
P
I
=
5
2
+
3
5
.
0
0
E
L
=
9
4
.
2
3
’
(
+
)
0
.
1
8
2
5
%
(
+
)
0
.
5
0
5
4
%
V
C
=
2
0
0
’
K
=
6
1
9
P
I
=
5
7
+
0
0
.
0
0
E
L
=
9
6
.
5
8
’
(
+
)
0
.
5
0
5
4
%
(
+
)
2
.
3
6
13
%
V
C
=
2
2
0
’
K
=
1
1
9
(
+
)
2
.
3
6
13
%
El = 100.00
(
+
)
3
.
1
8
0
0
%
(
+
)
0
.3
0
0
0
%
ELEV. 98.41’
STA. 58+00 -LR- LEFT
BEGIN DITCH
STA. 58+50
-
L
-
S
T
A
.
5
4
+
1
1
.
7
5
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
.
5
5
+
5
9
.
2
5
E
N
D
B
R
I
D
G
E
60+0061+0062+0063+0064
+
0
0
6
5
+
0
0
6
6
+
0
0
6
7
+
0
0
6
8
+
0
0
6
9
+
0
0
7
0
+
0
0
7
1
+
0
0
7
2
+
0
0
7
3
+
0
0
50 60 70 80 90 100 110
5
0
6
0
7
0
8
0
9
0
1
0
0
1
1
0
73+0074+0075+0076+0077
+
0
0
7
8
+
0
0
7
9
+
0
0
8
0
+
0
0
8
1
+
0
0
50 60 70 80 90 100 110 120 130 140
5
0
6
0
7
0
8
0
9
0
1
0
0
1
1
0
1
2
0
1
3
0
1
4
0
1
2
B
-
5
1
2
4
-
L
-
-
L
-
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
05-MAR-2014 13:56R:\Roadway\Proj\B-5124_LR_profile1.dgn$$$$USERNAM E$$$$
2
)
S
E
E
S
H
E
E
T
S
C
-
?
T
H
R
O
U
G
H
C
-
?
F
O
R
C
U
L
V
E
R
T
1
)
S
E
E
S
H
E
E
T
S
8
T
H
R
O
U
G
H
9
F
O
R
-
L
-
P
L
A
N
N
O
T
E
S
:
DESIGN DISCHARGEDESIGN FREQUENCYBASE DISCHARGE CFSYRSYRSBASE FREQUENCYOVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGECFS CFS YRSFTFTFTDESIGN HW ELEVATIONBASE HW ELEVATION CULVERT HYDRAULIC DATA= 750= 50= 91.5= 900= 100= 92.02= 1125= 92.9 ELEVATION 88.88’-LR- STA. 76+15.19 25.05’
L
E
F
T
BM # 5 RR SPIKE IN 21" S
W
E
E
T
G
U
M
E
L
E
V
A
T
I
O
N
1
0
7
.
0
4
’
-
L
R
-
S
T
A
.
8
0
+
8
0
.
3
2
5
2
.
9
6
’
R
I
G
H
T
B
M
#
6
R
R
S
P
I
K
E
I
N
1
5
"
G
U
M
= 200+/-(-)1.0092%
P
I
=
7
1
+
0
0
.
0
0
E
L
=
9
2
.
9
0
’
(-
)1.0
0
9
2
%
(
-
)
0
.
0
3
0
3
%
V
C
=
1
8
0
’
K
=
1
8
4
PI = 60+10.00EL = 103.90’VC = 390’K = 116El = 96.88 (-) 0.9600%(-) 4.7818%ELEV. 100.69’STA. 58+50 -LR- LEFTEND DITCH ELEV. 98.80’STA. 61+00 -LR- LEFT BEGIN DITCHSTA. 63+00ELEV. 94.25’STA. 63+55 -LR- LEFTEND DITCH (+) 0.3000%
L
E
F
T
D
I
T
C
H
PI = 74+30.00EL = 92.80’(-)0.0303%(+)0.0482%VC = 300’K = 3822
P
I
=
7
8
+
4
5
.
0
0
E
L
=
9
3
.
0
0
’
(
+
)
0
.
0
4
8
2
%
(
+
)
3
.
0
2
3
3
%
V
C
=
3
5
0
’
K
=
1
1
8
E
L
E
V
.
9
9
.
5
0
’
-
L
-
S
T
A
.
8
0
+
6
0
.
0
0
E
N
D
G
R
A
D
E
-L- STA. 74+37.97+/-END CULVERT-L- STA. 74+11.69+/-BEGIN CULVERT