HomeMy WebLinkAbout20140650 Ver 1_Modifications_20140908Homewood, Sue
From: Crystal Fox <CFox @smeinc.com>
Sent: Monday, September 08, 2014 1:31 PM
To: Homewood, Sue; Brown, Craig J SAW
Subject: Line T021 B Buffer revisions
Attachments: BufferTableREV20140908.pdf, Impact Maps.pdf, WetlandTableREV20140908.pdf
Em
Please see the attached revised sheets and table. Some totals changed slightly to account for the drip line. If you have
any questions please just give my cell a ring. (704.302.7890).
Craig — attached is a revised wetland impact tables — where wetland occurred within the buffers - those impacts have
been reduced to depict a 30 -foot wide permanent maintained ROW through buffers and, as such, those previous
conversion impacts are now temporary impacts for temporary workspace. Overall impacts are reduced from 0.06 to
0.025 —when you and I talked —you thought this could be done by email since it is a reduction. Nothing changed with
the streams.
Let me know if there is anything different or additional you need.
Crystal
Crystal Fox, CE
Staff Scientist II
, f, S & M E,
ENGINEERING INTEGRITY.
S &ME, Inc.
9751 Southern Pine Boulevard
Charlotte NC 28273
Ph: 704 - 523 -4726
Fax: 704 - 525 -3953
Mobile: 704.302.7890
cfox smeinc.com
www.smeinc.com
This electronic message is subject to the terms of use set forth at www.smeinc.com /email. If you received this message in error please advise the
sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email.
Pre - Construction Notification: NWP No. 12NVCQ No. 3884
Line T -021 B Pipeline Project
16" T -0218 PIPELINE RIPARIAN BUFFER IMPACT TABLE
SE Project No. 7235 -14 -013, Phase 22
September 8, 2014
Page 1 of 3
Zone 1 Impacts (sf)
Zone 2 Impacts (sf)
Forested Wetland within
Buffer Zone
Stream ID
Drawing
No, �
Perpendicular Crossing?
Disturbance at
z
Crossing Type
Crossing Notes /Justification
Total Area of
Area Within Existing
Area of Temporary
Area of Permanent
Total Area of
Area Within
Existing
Area of
Area of
Permanent
Adjusted Total Area For
Mitigation (Zone 1 + Zone 2)
Crossing Greater
Disturbance s
Maintained
s
Impact **
Maintenance
Disturbance s
Maintained
Temporary
Maintenance
(sf)- Forested Wetland
than 401f
Easement
Impact
3
*'
Impact-
Impact
Zone 1 (sf)
Zone 2 (sf)
Within Buffer
ROW aligned to parallel existing
maintained ROW. Portions of new
ROW within Existing maintained
Cardinal easement.. NOTE: 20140822
Impact Map Depicts neck down to 30-
S1 (SL1)
301
No
No
HDD
foot permanent maintained corridor.
2,969
255
2,714
1,710
538
1,172
3,886
S2 (SL2)
NA
NA
NA
Avoided
N /A. Area will not be impacted.
0
0
0
0
0
0
0
Exempt from Jordan Lake Riparian
S3 (SF1)
302
Yes
Yes
Open cut
Buffers- Existing Maintained Easement
3,062
3,062
0
2,069
2,069
0
0
Existing gas lines to the north limit
degree of crossing. Temporary impacts
to clearing of TWS are included in
mitigation totals. Impact map depicts
neckdown to 30 -foot permanent
S4 (SF2)
303
No
Yes
Open cut
maintained corridor.
3,778
3,682
96
0
2,296
2,228
68
0
164
Exempt from Jordan Lake Riparian
S5 (SF3)
304
Yes
Yes
Open cut
Buffers - Existing Maintained Easement
3,207
3,207
0
2,146
2,146
0
0
Exempt from Jordan Lake Riparian
Buffers - Existing Maintained Easement.
Pipeline has been realigned at property
S6 (SF19)
305
No
Yes
Open cut
owner's request.
4,297
4,297
0
2,713
2,713
0
0
Current route avoids direct impacts to
S7. Parallel Zone 2 Impacts of 429 sf
not included in permaintenance totals or
mitigation totals. New temporary
impacts depicted on 307 are included in
mitigation totals. Areas disturbed by
temporary impacts will be reseeded in
accordance with the previously
submitted Restoration plan and the area
allowed to re- vegetate naturally.
S7(SF20)
305 -307
NA
NA
Avoided
1,456
0
21
1,435
2,632
3,061
1,301
1,760
77
4,440
Small area of Zone 2 conversion.
NOTE: 20140822 Impact Map Depicts
neck down to 30 -foot permanent
S8 (SS4)
306
NA
NA
Avoided
maintained corridor.
0
0
0
1,148
0
1,148
1,071
S9 (SC22)
307
NA
NA
Avoided
N /A. Area will not be impacted.
0
0
0
0
0
0
0
S10 (SC24)
NA
NA
NA
Avoided
N /A. Area will not be impacted.
0
0
0
0
0
0
0
Exempt from Jordan Lake Riparian
S11 (SF6)
308
Yes
Yes
Open cut
Buffers - Existing Maintained Easement
2,321
2,321
0
3,301
3,301
0
0
Exempt from Jordan Lake Riparian
S12 (SF7)
309
Yes
Yes
Open cut
Buffers - Existing Maintained Easement
3,088
3,088
0
2,095
2,095
0
0
S13 (SF8)
309
NA
NA
Avoided
N /A. Area will not be impacted.
0
0
0
0
0
0
0
Exempt from Jordan Lake Riparian
S14 (SC6)
311
Yes
Yes
Open cut
Buffers - Existing Maintained Easement
2,950
2,950
0
2,166
2,166
0
0
Current route avoids direct impacts to
S15 (SC8)
311
NA
NA
Avoided
S15.
9
9
0
1,967
1,967
0
0
Exempt from Jordan Lake Riparian
S16 (SC5)
312
Yes
Yes
Open cut
Buffers - Existing Maintained Easement
3,719
3,719
0
2,613
2,613
0
0
Exempt from Jordan Lake Riparian
S17 (SC4)
313
No
Yes
Open cut
Buffers - Existing Maintained Easement
3,784
3,784
0
6,447
6,447
0
1
0
Exempt from Jordan Lake Riparian
S18 (SC1)
315
Yes
Yes
Open cut
Buffers - Existing Maintained Easement
3,083
3,083
0
2,053
2,053
0
0
Exempt from Jordan Lake Riparian
S18A (SC1)
315
Yes
Yes
Open cut
Buffers - Existing Maintained Easement
3,020
3,020
0
2,012
2,012
0
0
Exempt from Jordan Lake Riparian
Buffers - Existing Maintained Easement.
Culvert is within Existing Maintained
S20 (SC20)
316
Yes
Yes
I Open cut
lEasement.
5,755
1 5,755
1
0
1 5,429
1 5,429
1
0
1
0
30 -foot permanent maintained corridor
S21 (SC21)
317
Yes
Yes
Open cut
neckdown depicted.
3,434
3,434
0
2,281
2,281
0
0
0
Page 1 of 3
Pre - Construction Notification: NWP No. 12NVCQ No. 3884
Line T -021 B Pipeline Project
16" T -021B PIPELINE RIPARIAN BUFFER IMPACT TABLE
SE Project No. 7235 -14 -013, Phase 22
September 8, 2014
Page 2 of 3
Zone 1 Impacts (sf)
Zone 2 Impacts (sf)
Forested Wetland within
Buffer Zone
Stream ID
Drawing
No. 1
Perpendicular Crossing?
Disturbance at
z
Crossing Type
Crossing Notes /Justification
Total Area of
Area Within Existing
Area of Temporary
Area of Permanent
Total Area of
Area Within
Existing
Area of
Area of
Permanent
Adjusted Total Area For
Mitigation (Zone 1 + Zone 2)
Crossing Greater
Disturbance 3
Maintained
3
Impact **
Maintenance
Disturbance 3
Maintained
Temporary
Maintenance
(sf)- Forested Wetland
than 401f
Easement
Impact
Easement 3
Impact **
Impact
Zone 1 (sf)
Zone 2 (sf)
Within Buffer
Exempt from Jordan Lake Riparian
Buffers - Existing Maintained Easement.
Existing gas line to the north limits
S22 (SF9)
321
No
Yes
Open cut
crossina an le.
6,083
6,083
0
3,087
3,087
0
0
Existing gas line to the north limits
crossing angle. 30 -foot permanent
S23 (SF10)
322
No
Yes
Open cut
maintained corridor neckdown depicted.
5,125
4,155
970
0
3,144
2,558
586
0
0
1,556
Located primarily within Existing
Maintained Easement. ROW aligned to
parallell and south of existing maintained
ROW to avoid further impact with
Stream S24. Existing gas line to the
north limits crossing angle. Small
alignment change shifted line slightly
S24 (SC12)
323
No
Yes
Open cut
south.
3,446
2,643
803
500
2,144
1,632
512
1 0
1,815
Exempt from Jordan Lake Riparian
S25 (SC11)
324
Yes
Yes
Open cut
Buffers - Existing Maintained Easement.
3,339
3,339
0
2,236
2,236
0
0
Exempt from Jordan Lake Riparian
S26 (SC10)
326
Yes
Yes
Open cut
Buffers - Existing Maintained Easement
3,104
3,104
0
2,091
2,091
0
0
Exempt from Jordan Lake Riparian
S27 (SC14)
328
Yes
Yes
Open cut
Buffers - Existing Maintained Easement
3,669
3,669
0
2,515
2,515
0
0
Exempt from Jordan Lake Riparian
Buffers - Existing Maintained Easement.
Existing gas line north and south of
proposed line limit crossing angle.
Temporary workspace will impact
forested areas outside of the existing
maintained easement. The total are
impacted by temporary workspace is
reflected in mitigation totals. This area
S28 (SC15)'*
329
No
Yes
Open cut
will not be permanently maintained.
5,026
4,564
462
4,139
3,601
538
1,000
Exempt from Jordan Lake Riparian
S29 (SC13)
330
Yes
Yes
Open cut
Buffers - Existing Maintained Easement
3,095
3,095
0
2,077
2,077
0
0
Located primarily within Existing
Maintained Easement. Portions of
buffer will be cleared and permanently
maintained and are reflected in
mitigation totals. Gas line to the north
limits crossing angle. 30 -foot neckdown
for permanent maintained easement
depicted, Permanent and temporary
impacts resulting from clearing are
S30 (SF11)
331
No
Yes
Open cut
included in mitigation totals.
3,395
2,118
521
1,277
2,936
2,532
404
1,419
3,621
Current alignment avoids direct impacts
to S31. The alignment is located
primarily within existing maintained
easement and is exempt from Jordan
Lake Buffers, however, portions of the
buffer will be cleared and maintained
and are reflected in the mitigation totals.
30 -foot neckdown of pernanet
S31 (SC17)
337
NA
Yes
Avoided
maintained easement depicted.
1,417
871
546
0
2,538
2,129
409
0
955
Located primarily within Existing
Maintained Easement. Temporary
impacts due to clearing of TWS are
S32 (SC18)
337
Yes
Yes
Open cut
reflected in mitigation totals.
2,924
2,315
609
0
1,948
1,542
406
0
1,015
Exempt from Jordan Lake Riparian
S33 (SC19)
338
Yes
Yes
Open cut
Buffers - Existing Maintained Easement
11,051
11,051
0
5,576
5,576
0
0
Gas line to the north limits crossing
angle. 30 -foot permanent maintained
corridor depiicted. Temporary impacts
to clearing of TWS are included in
S34 (SF13)
339
No
Yes
Open cut
mitigation totals.
2,654
2,052
602
0
2,723
2,098
625
0
0
0
1,227
S35 (SP
339
No
Yes
Open cut
Not Subject to Jordan Lake Buffers
0
0
0
0
0
0
0
Page 2 of 3
Pre - Construction Notification: NWP No. 12NVCQ No. 3884
Line T -021 B Pipeline Project
16" T -021B PIPELINE RIPARIAN BUFFER IMPACT TABLE
SE Project No. 7235 -14 -013, Phase 22
September 8, 2014
Page 3 of 3
Zone 1 Impacts (sf)
Zone 2 Impacts (sf)
Forested Wetland within
Buffer Zone
Stream ID
Drawing
No. 1
Perpendicular Crossing?
Disturbance at
z
Crossing Type
Crossing Notes /Justification
Total Area of
Area Within Existing
Area of Temporary
Area of Permanent
Total Area of
Area Within
Existing
Area of
Area of
Permanent
Adjusted Total Area For
Mitigation (Zone 1 + Zone 2)
Crossing Greater
Disturbance 3
Maintained
3
Impact **
Maintenance
Disturbance 3
Maintained
Temporary
Maintenance
(sf)- Forested Wetland
than 401f
Easement
Impact
Easement 3
Impact **
Impact
Zone 1 (sf)
Zone 2 (sf)
Within Buffer
Exempt from Jordan Lake Riparian
Buffers - Existing Maintained Easement.
Gas line to the north limits crossing
S36 (SF14)
340
No
Yes
Open cut
angle.
3,409
3,409
0
2,344
2,344
0
0
Exempt from Jordan Lake Riparian
S37 (SF15)
341
Yes
Yes
Open cut
Buffers - Existing Maintained Easement
3,436
3,436
0
2,322
2,322
0
0
Located mostly within Existing
Maintained Easement. ROW aligned to
parallell and south of existing maintained
ROW to avoid further impact with
Stream S38 and Wetland W49. 30 -foot
permanent maintained corridor depicted.
Temporary impacts to clearing of TWS
S38 (SF16)
342
No
Yes
Open cut
are included in mitigation totals.
1,674
1,318
356
343
1,388
1,011
377
40
1,116
Not Subject to Jordan Lake Buffers.
Small area will be included in new
S39 (SF17)
342
NA
NA
Avoided
maintained 15 -foot right of way.
0
0
0
0
0
0
0
Located within Existing Maintained
Easement. Crossing angle limited by
gas line to the north. 30 -foot permanent
maintained corridor depiicted.
Temporary impacts to clearing of TWS
S40 (SF18)
343
Yes
Yes
Open cut
are included in mitigation totals.
3,342
2,278
1,064
0
3,208
2,338
870
0
1,934
Exempt from Jordan Lake Riparian
Buffers - Existing Maintained Easement.
Crossing angle at stream limited by gas
S41 (SM1)
344
No
Yes
Open cut
line to the north.
3,145
3,145
0
2,327
2,327
0
0
Exempt from Jordan Lake Riparian
S42 (SM2)
345
Yes
Yes
Open cut
Buffers - Existing Maintained Easement
3,045
3,045
0
2,108
2,108
0
0
Exempt from Jordan Lake Riparian
Buffers - Existing Maintained Easement.
Crossing angle limited by gas line to the
S43 (SM3)
345
No
Yes
Open cut
north.
0
0
0
0
0
0
0
Not subject to Jordan Lake Riparian
Buffers. Crossing located completely
S44 (SF22)
346
No
Yes
Open cut
within existing maintained easement.
0
0
0
0
0
0
0
Not subject to Jordan Lake Riparian
Buffers. Crossing located completely
S45 (SF23)
346
Yes
Yes
Open cut
within existing maintained easement.
0
0
0
0
0
0
0
Parallel Zone 2 impacts are completely
within existing maintained easement and
S46 (SF21)
346
NA
NA
Avoided
no change of use.
0
0
0
860
860
0
0
Exempt from Jordan Lake Riparian
Buffers - Existing Maintained Easement.
Crossing angle limited by gas line to the
north. Current alignement avoids
impacts to wetlands to the north and
S47 (SF24)
347
No
Yes
Open cut
additional buffer impacts to the south.
3,416
3,416
0
2,567
2,567
0
0
S48 (SF25)
347
NA
NA
Avoided
N /A. Area will not be impacted.
0
0
0
0
0
0
0
Exempt from Jordan Lake Riparian
S49 (SF26)
350
Yes
Yes
Open cut
Buffers - Existing Maintained Easement.
2,170
2,170
0
2,725
2,725
0
0
Not subject to Jordan Lake Riparian
Buffers. Crossing located completely
within existing maintained easement.
Crossing angle limited by gas line to the
S50 (SF27)
351
No
I Yes
I Open cut
1 north.
0
0
0
0
0
0
0
Totals:
111,105
5,588
6,388
86,898
5,558
6,037
20,750
Please note the drawing numbers depicted cores and to the last three digits of the drawing number as shown on APPROXIMATE JURISDITIONAL BOUNDARIES IMPACT DRAW INGS.
2HDD (horizontal directional drill)- will not impact the jurisdictional feature.
3 Areas denoted for informational purposes only. Areas within Existing Maintained Easements, are not subject to Jordan Lake Buffer Requirements or Mitigation.
'* Temporary Workspace cleared will not be permanently maintained, however temporary impacts are reflected in mitigation totals. Area will be restored in accordance with the Restoration plan and allowed to re-vegetate naturally.
Change previously submitted to DW R via email on July 28, 2014 ,August 7, 2014.
Change submitted August 11, 2014
Change associated with neckdown from 50 -feet permanent maintained ROW to 30 -foot permanent maintained ROW, August 22,2014.
Change associated with neckdown from 50 -feet permanent maintained ROW to 30 -foot permanent maintained ROW (includes areas of reclamation), September 8,2014
Page 3 of 3
STREAM S4 TOTAL JORDAN LAKE BUFFER IMPACTS
PERM. IMPACT
ZONE 1
ZONE 2
PERM. IMPACT
0 SQ. FT.
0 SQ. FT.
TEMP. IMPACT
3,778 SQ. FT.
2,296 SQ. FT.
C
10' TEMPORARY WORKSPACE EASEMENT
NO MITIGATION REQUIRED.
30' LIMIT OF PERMANENT
MAINTENANCE
_TEMPORARY WORKSPACE
aG g /7G G
G 1 1 G G r=r--G
0
r+0
I l /
N N
N
�G
til
STREAM S4 TOTAL IMPACTS
PERM. IMPACT
0 SQ. FT.
0.000 AC.
TEMP. IMPACT
1,244 SQ. FT.
0.029 AC.
� NN
N TEMPORARY WORKSPACE
7 T// 7 T/
EXISTING 24" CARDINAL PIPELINE n
c _
EXISTING - MAINTENANCE EASEMENT L
EXISTING 10" PSNC T -021 PIPELINE
G G G G G G
% 1 PROPOSED 16" T -021 B PIPELINE
? i 1 EXISTING MAINTENANCE EASEMENT
2
0
cl
A
v�
m
�2m
7
G
TEMPORARY WORKSPACE EASEMENT
50' R —
VARIES (MAINTAINED) \`� \ DISTANCE VARIES. TEMPORARY CLEARING
50' ROW OF FORESTED AREA, ZONE 1 — 96 SQ. FT.
ZONE 2 — 68 SQ. FT.
LEGEND: N
EXISTING TREE LINE N I I N N
TEMPORARY IMPACT AREA
I �
PERMANENT IMPACT AREA 50' BUFFER IL
NOTE: STREAM S4 0 50
1. PIPELINE TO BE INSTALLED 65 L.F.
BY OPEN CUT METHOD SCALE IN FEET
oamal PSNC ENERGY DRAWN BY: CAC 06/02/14
ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14
& SERVICES CO.
CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK:
109 FIELDVIEW DRIVE
P.O. BOX 1007 STREAM CROSSING S4 ALIGNMENT SHT: 58701102
VERSAILLES, KY 40383
TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.:
BRANCH OFFICES: @ STATION 47 +67, M.P 0.90 58703303
HOUSTON, TX DETROIT, MI
CHARLESTON, Y TULSA, OK ALAMANCE COUNTY NORTH CAROLINA SCALE: 1" = 50' REV. A
BAY CITY, MI
www.emseng.com ' SHEET 1 OF 1 DATE OF PLOT: 09/05/2014
ISTIN
EXISTING 10" PSNC T -021 PIPELINE
G G G G G G
PR(1P( ,zp-n 1 R" T —(171 R PIPp7I INIp-
—30' LIMIT OF PERMANENT/
MAINTENANCE
ti
WETLAND W20
STREAM S21
57 L.F. v
0
M N
50
��FFFR N
ti
i
C���L
EXISTING 24" CARDINAL PIPELINE /
G G G G G G G—
EXISTING MAINTENANCE EASEMENT _
_ WETLAND W20
TEMPORARY WORKSPACE ^ /
-----7-vL— EXISTING CULVERT
LEGEND:
I-
7
0
T,
s�
7
)3
0
2
v
10' TEMPORARY WORKSPACE
EASEMENT
G G-c,�G G G
=z—=/—/
TEMPORARY WORKSPACE
EXISTING (MAINTAINED)
50' ROW
WETLAND W20 TOTAL IMPACTS
EXISTING TREE
LINE
ti� ti
PERM.
IMPACT
0 SQ. FT.
0.000 AC.
PERMANENT
TEMP.
IMPACT
2,917 SQ. FT.
0.067 AC.
NOTE:
STREAM
S21 TOTAL IMPACTS
'9 20'
PERM.
IMPACT
0 SQ. FT.
0.000 AC.
TEMP.
IMPACT
205 SQ. FT.
0.004 AC.
STREAM
S21 TOTAL JORDAN LAKE
BUFFER IMPACTS
DRAFTING CK: SFS
06/03/14
& SERVICES CO.
ZONE 1
APPROXIMATE JURISDICTIONAL BOUNDARIES OF 1611 T -021 B PIPELINE
ZONE 2
PERM. IMPACT
0 SQ. FT.
0 SQ. FT.
TEMP.
IMPACT
3,434 SQ. FT.
2,281 SQ. FT.
ISTIN
EXISTING 10" PSNC T -021 PIPELINE
G G G G G G
PR(1P( ,zp-n 1 R" T —(171 R PIPp7I INIp-
—30' LIMIT OF PERMANENT/
MAINTENANCE
ti
WETLAND W20
STREAM S21
57 L.F. v
0
M N
50
��FFFR N
ti
i
C���L
EXISTING 24" CARDINAL PIPELINE /
G G G G G G G—
EXISTING MAINTENANCE EASEMENT _
_ WETLAND W20
TEMPORARY WORKSPACE ^ /
-----7-vL— EXISTING CULVERT
LEGEND:
I-
7
0
T,
s�
7
)3
0
2
v
10' TEMPORARY WORKSPACE
EASEMENT
G G-c,�G G G
=z—=/—/
TEMPORARY WORKSPACE
EXISTING (MAINTAINED)
50' ROW
EXISTING TREE
LINE
ti� ti
wlTEMPORARY
IMPACT AREA
PERMANENT
3 ,
IMPACT AREA tiF ti
7
NOTE:
ti�
50 25 0 50
1. PIPELINE TO BE INSTALLED
'9 20'
BY OPEN CUT METHOD
�F2
SCALE IN FEET
i
PSNC ENERGY
DRAWN BY: CAC
06/02/14
ENERGY MANAGEMENT
DRAFTING CK: SFS
06/03/14
& SERVICES CO.
APPROXIMATE JURISDICTIONAL BOUNDARIES OF 1611 T -021 B PIPELINE
ENTAL CK:
ENVIINONMING
CORPORATE OFFICE:
109 E DRIVE
P.O. BOX 1007
WETLAND CROSSING W20 & STREAM CROSSING S21
ALIGNMENT SHT: 58701111
VERSAILLLES, S, KY KY 40383
TEL:(859) 873 -0076 • FAX:(859) 873 -5872
DRAWING NO.:
BRANCH OFFICES:
@ STATION 278 +00, M. P 5.27
58703317
HOUSTON, TX • DETROIT, MI
CHARLESTON, WV TULSA, OK
Y
BA CITY, U
ALAMANCE COUNTY, NORTH CAROLINA
SCALE: 1 ° = 50' REV. A
www.emseng.com
SHEET 1 OF 1
DATE OF PLOT: 09/05/2014
TEMPORARY WORKSPACE \ \
/ \\ \
N c c G
—
LEGEND:
10' TEMPORARY WORKSPACE —
EASEMENT. NO MITIGATION REQUIRED.
EXISTING TREE LINE
_ TEMPORARY IMPACT AREA
PERMANENT IMPACT AREA
NOTE:
1. PIPELINE TO BE INSTALLED
BY OPEN CUT METHOD
STREAM S23 TOTAL JORDAN LAKE BUFFER IMPACTS
STREAM
S23 TOTAL
IMPACTS
PERM. IMPACT
PERM.
IMPACT
0 SQ. FT.
5,125 SQ. FT.
0.000
AC.
TEMP.
IMPACT
1,751 SQ.
FT.
0.040
AC.
WETLAND W26 TOTAL
IMPACTS
PERM.
IMPACT
0 SQ. FT.
0.000
AC.
TEMP.
IMPACT
1,002 S0.
FT.
0.023
AC.
TEMPORARY WORKSPACE \ \
/ \\ \
N c c G
—
LEGEND:
10' TEMPORARY WORKSPACE —
EASEMENT. NO MITIGATION REQUIRED.
EXISTING TREE LINE
_ TEMPORARY IMPACT AREA
PERMANENT IMPACT AREA
NOTE:
1. PIPELINE TO BE INSTALLED
BY OPEN CUT METHOD
STREAM S23 TOTAL JORDAN LAKE BUFFER IMPACTS
ZONE 1
ZONE 2
PERM. IMPACT
0 S0. FT.
0 SQ. FT.
TEMP. IMPACT
5,125 SQ. FT.
3,144 SQ. FT.
STREAM S23
93 L.F.
EXISTING (MAINTAINED)
30' ROW
c c EXISTING 24" CARDINAL PIPELINE
\ Z2
O \
22
20' OFF \
ZONE 2
NOTE: �
MITIGATION FOR TEMPORARY WORKSPACE
IMPACTS WILL BE PROVIDED FOR
RIPARIAN BUFFER ZONES. AREAS WILL
BE RE— SEEDED IN ACCORDANCE WITH
THE RESTORATION PLAN AND ALLOWED
TO RE— VEGETATE NATURALLY.
0
30' LIMIT OF PERMANENT
MAINTENANCE
TEMPORARY WORKSPACE
;7�7 C Z-1,�
EXISTING MAINTENANCE EASEMENT
a
�o
w
a
.z
0
v
EXISTING 10" PSNC T -021 PIPELINE
c c c c___�
PROPOSED 16" T -021 B PIPELINE
EXISTING MAINTENANCE EASEMENT—'-----
NEW PERMANENT EASEMENT
10' TEMPORARY WORKSPACE EASEMENT.
TEMPORARY CLEARING OF FORESTED AREA
ZONE 1 — 970 SQ. FT., ZONE 2 — 586 SQ. FT.
WETLAND W26
50 25 0 50
SCALE IN FEET
o PS N C ENERGY DRAWN BY: CAC 06/02/14
ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14
& SERVICES CO.
CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK:
109 FIELDVIEW DRIVE
P.O' BOX 1007 4 0383 WETLAND CROSSING W26 & STREAM CROSSING S23 ALIGNMENT sHT: 5801115
VERSAILLES, KY 4
TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.:
BRANCH OFFICES: @ STATION 374 +97, M.P 7.12 58703322
HOUSTON, TX DETROIT, MI
CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A
BAY CITY, MI
www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014
STREAM S24 TOTAL JORDAN LAKE BUFFER IMPACTS
STREAM S24 TOTAL IMPACTS
ZONE 1
ZONE 2
PERM. IMPACT
0 SO. FT.
0.00 AC.
PERM. IMPACT
500 SO. FT.
0 SQ. FT.
TEMP. IMPACT
905 SQ. FT.
0.021 AC.
TEMP. IMPACT
3,446 SQ. FT.
2,144 SO. FT.
10' TEMPORARY WORKSPACE
EASEMENT. NO MITIGATION REQUIRED. I
/ 71 I I
T T /TAT _LG
EXISTING 24" CARDINAL PIPELINE c
EXISTING MAINTENANASEMENT
EXISTING 10" PSNC T -021 PIPELINE c — �—
c�c c -
PROPOSED 16" T -021 B PIPELINE
EXISTING MAINTENANCE EASEMENT
PA
T
EMPORARY WORKSPACE N
LEGEND:
EXISTING (MAINTAINED
30' ROW
EXISTING TREE LINE
_ TEMPORARY IMPACT AREA
PERMANENT IMPACT AREA
NOTE:
1. PIPELINE TO BE INSTALLED
BY OPEN CUT METHOD
N
N
N
N
I I
30'
20' ZONE 2 ZONE 1
45 L.F.JET
0
_G mac
—c
N
/ � o
N N
N
I
I50 BUFFER
30' LIMIT OF PERMANENT
MAINTENANCE
vo
s�
F
C)
v�
G
-TEMPORARY WORKSPACE
G
c c _ c c —c —c
10" TEMPORARY WORKSPACE
EASEMENT. AREA OF IMPACT FOR
ZONE 1 — 803 SQ. FT. (TEMPORARY)
ZONE 2 — 512 SQ. FT. (TEMPORARY)
NOTE:
MITIGATION FOR TEMPORARY WORKSPACE
IMPACTS WILL BE PROVIDED FOR
RIPARIAN BUFFER ZONES. AREAS WILL
BE RE— SEEDED IN ACCORDANCE WITH
THE RESTORATION PLAN AND ALLOWED
TO RE— VEGETATE NATURALLY.
50 25 0 50
SCALE IN FEET
o PS N C ENERGY DRAWN BY: CAC 06/02/14
ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14
& SERVICES CO.
CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK:
109 FIELDVIEW DRIVE
P.O. BOX STREAM CROSSING S24 AALIGNMENT sHT: 5801115
4
VERSAILLES, KY 40383
TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.:
BRANCH OFFICES: @ STATION 398 +60, M.P 7.55 58703323
HOUSTON, TX DETROIT, MI
CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A
BAY CITY, MI
www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014
STREAM S25 TOTAL JORDAN LAKE BUFFER IMPACTS
PERM. IMPACT
ZONE 1
ZONE 2
PERM. IMPACT
0 SO. FT.
0 SQ. FT.
TEMP. IMPACT
3,339 SO, FT.
2,236 SQ. FT.
STREAM S25 TOTAL IMPACTS
PERM. IMPACT
0 SO. FT.
0.000 AC.
TEMP. IMPACT
325 SO. FT.
0.007 AC.
— z
EXISTING 24" CARDINAL PIPELINE
;XISTING 10" PSNC T -021 PIPELINE
G G G G—
PROPOSED 16" T -021 B PIPELINE
TEMPORARY WORKSPACE
LEGEND:
EXISTING TREE LINE
_ TEMPORARY IMPACT AREA
PERMANENT IMPACT AREA
NOTE:
1. PIPELINE TO BE INSTALLED
BY OPEN CUT METHOD
9a
20
NE 2 �7
N 9
ti� 3p.
pN F
ti r
6U
Spy
STREAM S25
62 L F /
7--
7 1 G G G
n�
EXISTING
WETLAND W28 , /// CULVERT
i
I TEMPORARY WORKSPACE
I I 1
I I v V
I I
I I
I � I
I I
I I
I � I
I I
I 50 215 0 50
I MI
I " SCALE IN FEET
Y m PS N C ENERGY DRAWN BY: CAC 06/02/14
ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14
& SERVICES CO.
CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK:
109 FIELDVIEW DRIVE
P.O. BOX STREAM CROSSING S25 AALIGNMENT sHT: 5801116
4
VERSAILLES, KY 40383
TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.:
BRANCH OFFICES: @ STATION 407 +60, M.P 7.72 58703324
HOUSTON, TX MI
DETROIT,
CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50 REV. A
BAY CITY, MI
www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014
N'
N
N
XISTING (MAINTAINED)
EXISTING MAINTENANCE
0' ROW
EASEMENT
�G G
GG �
G G
G G
G I O -G-
7--
7 1 G G G
n�
EXISTING
WETLAND W28 , /// CULVERT
i
I TEMPORARY WORKSPACE
I I 1
I I v V
I I
I I
I � I
I I
I I
I � I
I I
I 50 215 0 50
I MI
I " SCALE IN FEET
Y m PS N C ENERGY DRAWN BY: CAC 06/02/14
ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14
& SERVICES CO.
CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK:
109 FIELDVIEW DRIVE
P.O. BOX STREAM CROSSING S25 AALIGNMENT sHT: 5801116
4
VERSAILLES, KY 40383
TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.:
BRANCH OFFICES: @ STATION 407 +60, M.P 7.72 58703324
HOUSTON, TX MI
DETROIT,
CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50 REV. A
BAY CITY, MI
www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014
NOTE:
MITIGATION FOR TEMPORARY WORKSPACE
IMPACTS WILL BE PROVIDED FOR L /
RIPARIAN BUFFER ZONES. AREAS WILL S0 /
BE RE— SEEDED IN ACCORDANCE WITH ti
eC/FF
THE RESTORATION PLAN AND ALLOWED / E41 / / 0 3o. titi
TO RE— VEGETATE NATURALLY.
Av
<>,
30' LIMIT OF PERMANENT
ADDITIONAL TEMPORARY N
STREAM S30 TOTAL IMPACTS
PERM. IMPACT
0 S0. FT.
0.000 AC.
TEMP. IMPACT
1,165 SQ. FT.
0.027 AC.
STREAM S30 TOTAL JORDAN LAKE BUFFER IMPACTS
ZONE 1
ZONE 2
PERM. IMPACT
1,277 SQ. FT.
1,419 SO. FT.
TEMP. IMPACT
3,395 SQ. FT.
2,936 SO. FT.
v
0
cl
7A
v
z�
Z
7
0
7
Y
WORKSPACE EXISTING 24" CARDINAL PIPELINE
TEMPORARY WORKSPACE G G' —c Gam- -c
EXISTING MAINTENANCE EASEMENT
EXISTING 10" PSNC T -021 PIPELINE
G G�G
G G G G
cn o PROPOSED 16" T -021 B PIPELINE
O r)
0
G
TEMPORARY WORKSPACE EXISTING MAINTAINED
LEGEND: 50' ROW
EXISTING TREE LINE
_ TEMPORARY IMPACT AREA
PERMANENT IMPACT AREA
NOTE:
1. PIPELINE TO BE INSTALLED
BY OPEN CUT METHOD
EXISTING MAINTENANCE EASEMENT
\ �— TEMPORARY WORKSPACE EASEMENT —
�� \ DISTANCE VARIES. TEMPORARY CLEARING
\ <",,STREAM S30 \ OF FORESTED AREAS, ZONE 1 —
67 L.F. 521 SQ.FT., ZONE 2 — 404 SQ. FT.
10' TEMPORARY WORKSPACE
EASEMENT. NO MITIGATION REQUIRED.
�z1
—Z1
?2�
50 25 0 50
SCALE IN FEET
4E& PS N C ENERGY DRAWN BY: CAC 06/02/14
ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14
& SERVICES CO.
CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK:
109 FIELDVIEW DRIVE
P.O. BOX 1007 STREAM CROSSING S30 ALIGNMENT SHT:
VERSAILLES, KY 40383
TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.:
BRANCH OFFICES: @ STATION 528 +91, M.P 10.02 58703331
HOUSTON, TX DETROIT, MI
CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = so REV. A
BAY CITY, MI
www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014
(REAM
WETLAND W41
TOTAL IMPACTS
O
PERM.
IMPACT
0
SQ. FT.
0.000
AC.
TEMP,
IMPACT
457
SO. FT.
0.010
A -_
1,417 SQ. FT.
STREAM
S32 TOTAL IMPACTS
WETLAND W42 TOTAL IMPACTS
PERM.
IMPACT
0
S0. FT.
0.000
AC.
TEMP.
IMPACT
435
SQ. FT.
0.009
AC.
32, ZONE 2 —
WETLAND W44
TOTAL IMPACTS
PERM.
IMPACT
0
SQ. FT.
0.000
AC.
TEMP.
IMPACT
643
SO. FT.
0.015
AC.
(REAM
S31 TOTAL JORDAN LAKE
BUFFER IMPACTS
O
PERM. IMPACT
O
Lo
ZONE 1
W43C
ZONE 2
DERM.
IMPACT
0 SQ. FT.
10' TEMPORARY WORKSPACE
0 SQ. FT.
TEMP.
IMPACT
1,417 SQ. FT.
2,538 SQ. FT.
WETLAND
WETLAND W42 TOTAL IMPACTS
31, ZONE 1 —
PERM.
IMPACT
0 SQ. FT.
0.000 AC.
IMPACT AREA
T -MP.
IMPACT
12 SO. FT.
0.003 AG.
54 L.F.
30' LIMIT OF PERMANENT
MAINTENANCE
EXISTING MAINTENANCE EASEMENT_ _ _
EXISTING PSNC 10" T -021 PIPELINE
G G G G G�
O
,---PROPOSED 16" T -021 B PIPELINEw M
EXISTING MAINTENANCE EASEMENT
WETLAND W44
WETLAND W41—I.
G
NOTE:
MITIGATION FOR TEMPORARY WORKSPACE
IMPACTS WILL BE PROVIDED FOR
RIPARIAN BUFFER ZONES. AREAS WILL
BE RE— SEEDED IN ACCORDANCE WITH
THE RESTORATION PLAN AND ALLOWED
TO RE— VEGETATE NATURALLY.
30' 20'
ONE 1 ZONE 2
8' TEMPORARY WORKSPACE EASEMENT.
NO MITIGATION REQUIRED.
G
N
N
� � N
N
N / WETLAND W45 /
OFFER / / titi
STREAM S32
51 L. F.
v
0
C",
s�
YA
7
2
EXISTING (MAINTAINED)
I
50' ROW
—\r'
G G
ZONE 1
O
PERM. IMPACT
O
Lo
WETLAND
W43C
LEGEND:
1,948 SQ. FT.
WETLAND
W43
10' TEMPORARY WORKSPACE
EXISTING TREE LINE
TEMPORARY CLEARING OF FORESTED
AREAS:
WETLAND
W42-
31, ZONE 1 —
TEMPORARY
SQ. FT.
N STREAM
_
IMPACT AREA
STREAM
S31—
32, ZONE 1 —
PERMANENT
54 L.F.
/STREAM
STREAM
32, ZONE 2 —
IMPACT AREA
SQ. FT.
NOTE:
1. PIPELINE TO BE
INSTALLED
BY OPEN CUT
METHOD
WETLAND W44
WETLAND W41—I.
G
NOTE:
MITIGATION FOR TEMPORARY WORKSPACE
IMPACTS WILL BE PROVIDED FOR
RIPARIAN BUFFER ZONES. AREAS WILL
BE RE— SEEDED IN ACCORDANCE WITH
THE RESTORATION PLAN AND ALLOWED
TO RE— VEGETATE NATURALLY.
30' 20'
ONE 1 ZONE 2
8' TEMPORARY WORKSPACE EASEMENT.
NO MITIGATION REQUIRED.
G
N
N
� � N
N
N / WETLAND W45 /
OFFER / / titi
STREAM S32
51 L. F.
v
0
C",
s�
YA
7
2
EXISTING (MAINTAINED)
I
50' ROW
—\r'
G G
ZONE 1
G G
PERM. IMPACT
O
Lo
0 SQ. FT.
TEMP. IMPACT
r
1,948 SQ. FT.
10' TEMPORARY WORKSPACE
EASEMENT.
TEMPORARY CLEARING OF FORESTED
AREAS:
STREAM
31, ZONE 1 —
546
SQ. FT.
N STREAM
31, ZONE 2 —
409
SQ. FT.
32, ZONE 1 —
609
SQ. FT.
/STREAM
STREAM
32, ZONE 2 —
406
SQ. FT.
STREAM S32 TOTAL JORDAN LAKE BUFFER IMPACTS
ZONE 1
ZONE 2
PERM. IMPACT
0 SQ. FT.
0 SQ. FT.
TEMP. IMPACT
2,924 SQ. FT.
1,948 SQ. FT.
G
50 25 0 50
SCALE IN FEET
o PS N C ENERGY DRAWN BY: CAC 06/02/14
ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14
& SERVICES CO.
CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK:
109 LES, KY DRIVE WETLAND CROSSING W41, W42, W44 & W45 & STREAM CROSSINGS S31 & S32
P.O. BOX 1007 ALIGNMENT SHT: 58701124
VERSAILLES, KY 40383
TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.:
BRANCH OFFICES: @ STATION 631 +95, M.P 12.06 58703337
HOUSTON, TX DETROIT, MI
CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A
BAY CITY, MI
www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014
STREAM S34 TOTAL IMPACTS
PERM. IMPACT
0 SQ. FT.
0.000 AC.
TEMP. IMPACT
755 SQ. FT.
0.017 AC.
STREAM S34 TOTAL JORDAN LAKE BUFFER IMPACTS
PERM. IMPACT
ZONE 1
ZONE 2
PERM. IMPACT
0 SQ. FT.
0 SQ. FT.
TEMP. IMPACT
2,654 SQ. FT.
2,723 SQ. FT.
9' TEMPORARY WORKSPACE EASEMENT.
NO MITIGATION REQUIRED.
EXISTING MAINTENANCE EASEMENT
EXISTING 10" PSNC T -021 PIPELINE
G G G G G G
PROPOSED 16" T -021 B PIPELINE
EXISTING MAINTENANCE EASEMENT
STREAM S34
58 L.F.
LEGEND:
WETLAND W46
EXISTING TREE LINE
TEMPORARY IMPACT AREA
PERMANENT IMPACT AREA
NOTE:
1. PIPELINE TO BE INSTALLED
BY OPEN CUT METHOD
SO• ��
NI
G G G�06 1 rG
NOTE: % 1 ^ /
�9� Am
�a
cl
s�
Cy
C)
J3
7
EXISTING (MAINTAINED)
50' ROW
30' LIMIT OF PERMANENT
tMAINTENANCE
G G G G-
0
Ln
10' -------- - - - - --
10' TEMPORARY WORKSPACE EASEMENT. TEMPORARY
CLEARING OF FORESTED AREAS, ZONE 1 — 602 SQ. FT.
ZONE 2 — 625 SQ. FT.
I
1 ��
2 STREAM S35
/Z2-50 L.F.
WETLAND W46
MITIGATION FOR TEMPORARY WORKSPACE
IMPACTS WILL BE PROVIDED FOR
RIPARIAN BUFFER ZONES. AREAS WILL
BE RE— SEEDED IN ACCORDANCE WITH
THE RESTORATION PLAN AND ALLOWED
TO RE— VEGETATE NATURALLY.
STREAM S35 TOTAL IMPACTS
PERM. IMPACT
0 SQ. FT.
0.000 AC.
TEMP. IMPACT
345 SO. FT.
0.008 AC.
WETLAND W46 TOTAL IMPACTS
PERM. IMPACT
0 SQ. FT.
0.000 AC.
TEMP. IMPACT
4,041 SQ. FT.
0.093 AC.
50 25 0 50
SCALE IN FEET
i PSNC ENERGY DRAWN BY: CAC 06/02/14
ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14
& SERVICES CO.
CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK:
109 LES, KY DRIVE
WETLAND CROSSING W46 & STREAM CROSSINGS S34 & S35
P.O. BOX 1007 ALIGNMENT SHT: 58701126
VERSAILLES, KY 40383
TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.:
BRANCH OFFICES: @ STATION 673 +46, M.P 12.83 58703339
HOUSTON, TX DETROIT, MI
CHARLESTON, wV • TULSA, DI( ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A
BAY CITY, MI
www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014
WETLAND W49 TOTAL IMPACTS
PERM. IMPACT
0 S0. FT.
0.000 AC.
TEMP, IMPACT
685 SO. FT.
0.016 AC.
EXISTING (MAINTAINED)
35' ROW
G G1 1G
-- - -mot --
NEW 15' ROW
LEGEND:
G G G
cn
EXISTING TREE LIN
c
WE \TLAND W49
STREAM S38 TOTAL IMPACTS
PERM. IMPACT
0 SO. FT.
0.000 AC.
TEMP. IMPACT
540 SQ. FT.
0.012 AC.
G G
O
cl,"I
T,
2�
10' TEMPORARY WORKSPACE EASEMENT. ?
,NO MITIGATION REQUIRED.
PERMANENT CLEARING OF
�\ FORESTED AREA - 383 SQ, FT,
50, 30' LIMIT OF PERMANENT
BuFF�R \ MAINTENANCE
EXISTING_ MAINTENANCE EASEMENT
EXISTING 10" PSNC T -021 PIPELINE
G c c c c G
o PROPOSED 16" T -021 B PIPELINE
M EXISTING MAINTENANCE EASEMENT
— — — — — — — — — — —
NEW PERMANENT EASEMENT
STREAM S39 � \ � /
TEMPORARY WORKSPACE EASEMENT DISTANCE VARIES
0 L. F. Z0 30l TEMPORARY CLEARING OF FORESTED AREAS,
NF ZONE 1 - 356 SQ. FT., ZONE 2 - 377 SQ. FT.
STREAM S38
E 52 L.F. �020 NOTE:
�F2 MITIGATION FOR TEMPORARY WORKSPACE
— TEMPORARY IMPACT AREA IMPACTS WILL BE PROVIDED FOR
RIPARIAN BUFFER ZONES AREAS WILL
PERMANENT IMPACT AREA
NOTE:
1. PIPELINE TO BE INSTALLED
BY OPEN CUT METHOD
STREAM S38 TOTAL JORDAN LAKE BUFFER IMPACTS
ZONE 1
ZONE 2
PERM. IMPACT
343 SO. FT,
40 SO. FT.
TEMP. IMPACT
1,674 SO. FT.
1,388 SO. FT,
BE RE- SEEDED IN ACCORDANCE WITH
THE RESTORATION PLAN AND ALLOWED
TO RE- VEGETATE NATURALLY.
50 25 0 50
SCALE IN FEET
aKs PSNC ENERGY DRAWN BY: CAC 06/02/14
ENERGY DRAFTING CK: SFS 06/03/14
& SERVICES CO.
CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENGINEERING AL CK:
109 LES, KY DRIVE WETLAND CROSSING W49 & STREAMS CROSSING S38 & S39
R.O. BOX 1007 ALIGNMENT SHT: 58701128
VERSAILLES, KY 40383
TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.:
BRANCH OFFICES: @ STATION 733 +56, M.P 13.96 58703342
HOUSTON, TX DETROIT, MI
CHARLESTON, TULSA, OK WV TU SCALE: 1 ° = 50' REV. A
BAY CITY, MI ORANGE COUNTY, NORTH CAROLINA
www.emseng.COM SHEET 1 OF 1 DATE OF PLOT: 09/05/2014
STREAM S40 TOTAL IMPACTS
PERM. IMPACT
0 SQ. FT.
0.000 AC.
TEMP. IMPACT
486 SQ. FT.
0.011 AC.
EXISTING (MAINTAINED)
35' ROW
50' BUFFER
N
STREAM S40 TOTAL JORDAN LAKE BUFFER IMPACTS
ZONE 1
ZONE 2
PERM. IMPACT
0 SO. FT.
0 SQ. FT.
TEMP. IMPACT
3,342 SO. FT.
3,208 SQ. FT.
1
s�
.Z
7
0
Z
v
6" TEMPORARY WORKSPACE EASEMENT.
NO MITIGATION REQUIRED.
20'
Z0 30' LIMIT OF PERMANENT
30' MAINTENANCE
ZONE 1 EXISTING MAINTENANCE EASEME
aKs PSNC ENERGY DRAWN BY: CAC 06/02/14
ENERGY DRAFTING CK: SFS 06/03/14
& SERVICES CO.
CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK:
109 FIELDVIEW DRIVE
P.o' BOX 1007 STREAM CROSSING S40 ALIGNMENT SHT: 58701128
4
VERSAILLES, KY 40383
TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.:
BRANCH OFFICES: @ STATION 732 +81, M.P 14.13 58703343
HOUSTON, TX DETROIT, MI
CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A
6AY CITY. MI ORANGE COUNTY, NORTH CAROLINA
www.emseng.COM SHEET 1 OF 1 DATE OF PLOT: 09/05/2014
EXISTING 10" PSNC T -021 PIPELINE
G
G G G G G G
G G G G G
PROPOSED 16" T -021 B PIPELINE G
0
CD.
EXISTING MAINTENANCE EASEMENT
NEW PERMANENT EASEMENT
—
—
V A
7
�o
10' TEMPORARY WORKSPACE EASEMENT.
\ \ _ — — — —
STREAM S40
TEMPORARY CLEARING OF FORESTED AREAS,
\ _ _
—
56 L.F.
LEGEND:
ZONE 1 - 1,064 SQ. FT., ZONE 2 - 870 SQ.
FT..\ �� _ T
��
� A NOTE:
EXISTING TREE LINE
MITIGATION FOR TEMPORARY WORKSPACE
TEMPORARY IMPACT AREA
�Z �\
IMPACTS WILL BE PROVIDED FOR
RIPARIAN BUFFER ZONES. AREAS WILL
BE RE- SEEDED IN ACCORDANCE WITH
THE RESTORATION PLAN AND ALLOWED
PERMANENT IMPACT AREA
\� L2_ —�
TO RE- VEGETATE NATURALLY.
NOTE:
50 25 0 50
1. PIPELINE TO
BE INSTALLED
BY OPEN CUT
METHOD
SCALE IN FEET
aKs PSNC ENERGY DRAWN BY: CAC 06/02/14
ENERGY DRAFTING CK: SFS 06/03/14
& SERVICES CO.
CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK:
109 FIELDVIEW DRIVE
P.o' BOX 1007 STREAM CROSSING S40 ALIGNMENT SHT: 58701128
4
VERSAILLES, KY 40383
TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.:
BRANCH OFFICES: @ STATION 732 +81, M.P 14.13 58703343
HOUSTON, TX DETROIT, MI
CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A
6AY CITY. MI ORANGE COUNTY, NORTH CAROLINA
www.emseng.COM SHEET 1 OF 1 DATE OF PLOT: 09/05/2014
Pre - Construction Notification: NWP No. 12 /WCQ No. 3884
Line T -021 B Pipeline Project
WETLAND IMPACT TABLE
SE Project No. 7235 -14 -013, Phase 22
September 8, 2014
Page 1 of 2
Classification
Impacts
Wetland ID
Sheet No.'
Vegetative Type
Relation to
Waterbody
Temporary Impacts
Conversion
Crossing Type*
sf
ac
sf
ac
W1 (WL1)
NA
NA
Scrub Shrub-
ent
Riparian
0
0
0
0.000
Avoided
W2 (WF1)
302
Forested /Emergent
Riparian
1,516
0.035
0
0.000
Open cut
W3 (WF2)
304
Emergent
Riparian
12,565
0.288
0
0.000
Open cut
W4 (WF14)
305
Forested /Emergent
Riparian
780
0.018
0
0.000
Open cut
W5 (WF15)
NA
Forested
Riparian
0
0.000
0
0.000
Avoided
W6 (WF16)
NA
Forested
Riparian
0
0.000
0
0.000
Avoided
W7 (WS1)
306
Forested
Riparian
0
0.000
9
0.000
Conversion
W8 (WS2)
307
Forested
Riparian
0
0.000
0
0.000
Avoided
W9 (WC27)
307
Forested
Riparian
0
0.000
0
0.000
Avoided
W10 (WC28)
307
Forested
Riparian
0
0.000
77
0.002
Conversion
W11 (WC29)
NA
Forested
Riparian
0
0.000
0
0.000
Avoided
W12 (WF3)
308
Forested /Emergent
Riparian
23,006
0.528
166
0.004
Open cut
W13 (WF4)
309
Forested
Riparian
0
0.000
0
0.000
Avoided
W14 (WF5)
310
Forested /Emergent
Non - riparian
3,751
0.086
0
0.000
Open cut
W15 (WC5)
311
Forested /Emergent
Riparian
3,306
0.076
0
0.000
Open cut
W16 (WC4)
311
Forested /Emergent
Riparian
9,806
0.225
0
0.000
Open cut
W17 (WC2)
NA
Forested
Non - riparian
0
0.000
0
0.000
Avoided
W18 (WC1)
314
Forested /Emergent
Non - riparian
14,477
0.332
0
0.000
Open cut
W19 (WC25)
316
Open Water
Non - riparian
0
0.000
0
0.000
Avoided
W20 (WC26)
317
Forested /Emergent
Riparian
2,917
0.067
0
0.000
Open cut
W21 (WFA)
318
Shrub -Scrub
Non - riparian
0
0.000
0
0.000
Avoided
W22 (WC6A)
318
Open Water
Non - riparian
0
0.000
0
0.000
Avoided
W23 (WC6)
319
Forested /Shrub-
Scrub /Emergent
Non - riparian
1,612
0.037
0
0.000
Open cut
W24 (WC27)
320
Shrub -scrub
Non - riparian
0
0.000
0
0.000
Avoided
W25 (WF6)
321
Forested /Emergent
Riparian
511
0.012
218
0.005
Conversion
W26 (WP1)
322
Forested /Emergent
Riparian
1,002
0.023
0
0.000
Open cut
W27 (WF34)
NA
Forested
Riparian
0
0.000
0
0.000
Avoided
W28 (WF33)
324
Forested
Riparian
0
0.000
0
0.000
Avoided
W29 (WC11)
325
Forested
Riparian
0
0.000
333
0.008
Open cut
W30 (WC11A)
325
Open Water
Non - riparian
0
0.000
0
0.000
Avoided
W31 (WC9)
326
Forested /Emergent
Riparian
2,928
0.067
0
0.000
Open cut
Page 1 of 2
Pre - Construction Notification: NWP No. 12 /WCQ No. 3884
Line T -021 B Pipeline Project
WETLAND IMPACT TABLE
SE Project No. 7235 -14 -013, Phase 22
September 8, 2014
Totals: 1 125,767 1 2.887 1 1,085 1 0.025 1 11
lorizontal directional drill (HDD) that will not impact the wetland.
Please note, the drawing numbers depicted corespond to the last three digits of the drawing number as shown on Approximate Jurisdictional Boundaries Drawings
Indicates change attibutable to re- routing.
Change associated with DWR requested neckdown from 50 -feet permanent maintained ROW to 30 -foot permanent maintained ROW (includes areas of reclamation), September 8,2014
Page 2 of 2
Classification
Impacts
Wetland ID
Sheet No.'
Vegetative Type
Relation to
Waterbody
Temporary Impacts
Conversion
Crossing Type*
sf
ac
sf
ac
W32 (WC10)
326
Forested
Riparian
0
0.000
0
0.000
Avoided
W33 (WC13)
327
Forested /Emergent
Non - riparian
4,476
0.103
0
0.000
Open cut
W34 (WC12)
330
Forested /Emergent
Riparian
8,048
0.185
0
0.000
Open cut
W35 (WF7)
332
Emergent
Non - riparian
435
0.010
0
0.000
Open cut
W36 (WF8)
NA
Open Water
Non - riparian
0
0.000
0
0.000
Avoided
W37 (WC14A)
NA
Open Water
Non - riparian
0
0.000
0
0.000
Avoided
W38 (WC14)
334
Emergent
Riparian
6,349
0.146
0
0.000
Open cut
W39 (WC15)
335
Forested /Emergent
Riparian
3,331
0.076
264
0.006
Open cut
W40 (WC16)
336
Emergent
Non - riparian
852
0.020
0
0.000
Open cut
W41 (WC17)
337
Forested /Emergent
Riparian
457
0.010
0
0.000
Open cut
W42 (WC18)
337
Forested /Emergent
Riparian
12
0.000
0
0.000
Open cut
W43 (WC20)
337
Forested
Riparian
0
0.000
0
0.000
Avoided
W44 (WC22)
337
Forested /Emergent
Riparian
643
0.015
0
0.000
Open cut
W45 (WC21)
337
Forested /Emergent
Riparian
0
0.000
18
0.000
Open cut
W46 (WF9)
339
Forested /Emergent
Riparian
4,041
0.093
0
0.000
Open cut
W47 (WF10)
340
Forested /Emergent
Riparian
1,869
0.043
0
0.000
Open cut
W48(WF11)
341
Forested
Riparian
0
0.000
0
0.000
Avoided
W49 (WF12)
342
Emergent
Riparian
685
0.016
0
0.000
Open cut
W50 (WF17)
346
Forested
Riparian
0
0.000
0
0.000
Avoided
W51 (WF20)
347
Forested /Emergent
Riparian
6,536
0.150
0
0.000
Open cut
W52 (WF19)
347
Forested
Riparian
0
0.000
0
0.000
Avoided
W53 (WF21)
348
Forested /Emergent
Non - riparian
4,473
0.103
0
0.000
Open cut
W54 (WF22)
349
Forested /Emergent
Non - riparian
406
0.009
0
0.000
Open cut
W55 (WF24)
350
Forested /Emergent
Riparian
4,977
0.114
0
0.000
Open cut
W56 (WF23)
350
Open Water
Non - riparian
0
0.000
0
0.000
Avoided
Totals: 1 125,767 1 2.887 1 1,085 1 0.025 1 11
lorizontal directional drill (HDD) that will not impact the wetland.
Please note, the drawing numbers depicted corespond to the last three digits of the drawing number as shown on Approximate Jurisdictional Boundaries Drawings
Indicates change attibutable to re- routing.
Change associated with DWR requested neckdown from 50 -feet permanent maintained ROW to 30 -foot permanent maintained ROW (includes areas of reclamation), September 8,2014