Loading...
HomeMy WebLinkAbout20140650 Ver 1_Modifications_20140908Homewood, Sue From: Crystal Fox <CFox @smeinc.com> Sent: Monday, September 08, 2014 1:31 PM To: Homewood, Sue; Brown, Craig J SAW Subject: Line T021 B Buffer revisions Attachments: BufferTableREV20140908.pdf, Impact Maps.pdf, WetlandTableREV20140908.pdf Em Please see the attached revised sheets and table. Some totals changed slightly to account for the drip line. If you have any questions please just give my cell a ring. (704.302.7890). Craig — attached is a revised wetland impact tables — where wetland occurred within the buffers - those impacts have been reduced to depict a 30 -foot wide permanent maintained ROW through buffers and, as such, those previous conversion impacts are now temporary impacts for temporary workspace. Overall impacts are reduced from 0.06 to 0.025 —when you and I talked —you thought this could be done by email since it is a reduction. Nothing changed with the streams. Let me know if there is anything different or additional you need. Crystal Crystal Fox, CE Staff Scientist II , f, S & M E, ENGINEERING INTEGRITY. S &ME, Inc. 9751 Southern Pine Boulevard Charlotte NC 28273 Ph: 704 - 523 -4726 Fax: 704 - 525 -3953 Mobile: 704.302.7890 cfox smeinc.com www.smeinc.com This electronic message is subject to the terms of use set forth at www.smeinc.com /email. If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email. Pre - Construction Notification: NWP No. 12NVCQ No. 3884 Line T -021 B Pipeline Project 16" T -0218 PIPELINE RIPARIAN BUFFER IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 September 8, 2014 Page 1 of 3 Zone 1 Impacts (sf) Zone 2 Impacts (sf) Forested Wetland within Buffer Zone Stream ID Drawing No, � Perpendicular Crossing? Disturbance at z Crossing Type Crossing Notes /Justification Total Area of Area Within Existing Area of Temporary Area of Permanent Total Area of Area Within Existing Area of Area of Permanent Adjusted Total Area For Mitigation (Zone 1 + Zone 2) Crossing Greater Disturbance s Maintained s Impact ** Maintenance Disturbance s Maintained Temporary Maintenance (sf)- Forested Wetland than 401f Easement Impact 3 *' Impact- Impact Zone 1 (sf) Zone 2 (sf) Within Buffer ROW aligned to parallel existing maintained ROW. Portions of new ROW within Existing maintained Cardinal easement.. NOTE: 20140822 Impact Map Depicts neck down to 30- S1 (SL1) 301 No No HDD foot permanent maintained corridor. 2,969 255 2,714 1,710 538 1,172 3,886 S2 (SL2) NA NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 0 0 0 Exempt from Jordan Lake Riparian S3 (SF1) 302 Yes Yes Open cut Buffers- Existing Maintained Easement 3,062 3,062 0 2,069 2,069 0 0 Existing gas lines to the north limit degree of crossing. Temporary impacts to clearing of TWS are included in mitigation totals. Impact map depicts neckdown to 30 -foot permanent S4 (SF2) 303 No Yes Open cut maintained corridor. 3,778 3,682 96 0 2,296 2,228 68 0 164 Exempt from Jordan Lake Riparian S5 (SF3) 304 Yes Yes Open cut Buffers - Existing Maintained Easement 3,207 3,207 0 2,146 2,146 0 0 Exempt from Jordan Lake Riparian Buffers - Existing Maintained Easement. Pipeline has been realigned at property S6 (SF19) 305 No Yes Open cut owner's request. 4,297 4,297 0 2,713 2,713 0 0 Current route avoids direct impacts to S7. Parallel Zone 2 Impacts of 429 sf not included in permaintenance totals or mitigation totals. New temporary impacts depicted on 307 are included in mitigation totals. Areas disturbed by temporary impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate naturally. S7(SF20) 305 -307 NA NA Avoided 1,456 0 21 1,435 2,632 3,061 1,301 1,760 77 4,440 Small area of Zone 2 conversion. NOTE: 20140822 Impact Map Depicts neck down to 30 -foot permanent S8 (SS4) 306 NA NA Avoided maintained corridor. 0 0 0 1,148 0 1,148 1,071 S9 (SC22) 307 NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 0 0 0 S10 (SC24) NA NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 0 0 0 Exempt from Jordan Lake Riparian S11 (SF6) 308 Yes Yes Open cut Buffers - Existing Maintained Easement 2,321 2,321 0 3,301 3,301 0 0 Exempt from Jordan Lake Riparian S12 (SF7) 309 Yes Yes Open cut Buffers - Existing Maintained Easement 3,088 3,088 0 2,095 2,095 0 0 S13 (SF8) 309 NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 0 0 0 Exempt from Jordan Lake Riparian S14 (SC6) 311 Yes Yes Open cut Buffers - Existing Maintained Easement 2,950 2,950 0 2,166 2,166 0 0 Current route avoids direct impacts to S15 (SC8) 311 NA NA Avoided S15. 9 9 0 1,967 1,967 0 0 Exempt from Jordan Lake Riparian S16 (SC5) 312 Yes Yes Open cut Buffers - Existing Maintained Easement 3,719 3,719 0 2,613 2,613 0 0 Exempt from Jordan Lake Riparian S17 (SC4) 313 No Yes Open cut Buffers - Existing Maintained Easement 3,784 3,784 0 6,447 6,447 0 1 0 Exempt from Jordan Lake Riparian S18 (SC1) 315 Yes Yes Open cut Buffers - Existing Maintained Easement 3,083 3,083 0 2,053 2,053 0 0 Exempt from Jordan Lake Riparian S18A (SC1) 315 Yes Yes Open cut Buffers - Existing Maintained Easement 3,020 3,020 0 2,012 2,012 0 0 Exempt from Jordan Lake Riparian Buffers - Existing Maintained Easement. Culvert is within Existing Maintained S20 (SC20) 316 Yes Yes I Open cut lEasement. 5,755 1 5,755 1 0 1 5,429 1 5,429 1 0 1 0 30 -foot permanent maintained corridor S21 (SC21) 317 Yes Yes Open cut neckdown depicted. 3,434 3,434 0 2,281 2,281 0 0 0 Page 1 of 3 Pre - Construction Notification: NWP No. 12NVCQ No. 3884 Line T -021 B Pipeline Project 16" T -021B PIPELINE RIPARIAN BUFFER IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 September 8, 2014 Page 2 of 3 Zone 1 Impacts (sf) Zone 2 Impacts (sf) Forested Wetland within Buffer Zone Stream ID Drawing No. 1 Perpendicular Crossing? Disturbance at z Crossing Type Crossing Notes /Justification Total Area of Area Within Existing Area of Temporary Area of Permanent Total Area of Area Within Existing Area of Area of Permanent Adjusted Total Area For Mitigation (Zone 1 + Zone 2) Crossing Greater Disturbance 3 Maintained 3 Impact ** Maintenance Disturbance 3 Maintained Temporary Maintenance (sf)- Forested Wetland than 401f Easement Impact Easement 3 Impact ** Impact Zone 1 (sf) Zone 2 (sf) Within Buffer Exempt from Jordan Lake Riparian Buffers - Existing Maintained Easement. Existing gas line to the north limits S22 (SF9) 321 No Yes Open cut crossina an le. 6,083 6,083 0 3,087 3,087 0 0 Existing gas line to the north limits crossing angle. 30 -foot permanent S23 (SF10) 322 No Yes Open cut maintained corridor neckdown depicted. 5,125 4,155 970 0 3,144 2,558 586 0 0 1,556 Located primarily within Existing Maintained Easement. ROW aligned to parallell and south of existing maintained ROW to avoid further impact with Stream S24. Existing gas line to the north limits crossing angle. Small alignment change shifted line slightly S24 (SC12) 323 No Yes Open cut south. 3,446 2,643 803 500 2,144 1,632 512 1 0 1,815 Exempt from Jordan Lake Riparian S25 (SC11) 324 Yes Yes Open cut Buffers - Existing Maintained Easement. 3,339 3,339 0 2,236 2,236 0 0 Exempt from Jordan Lake Riparian S26 (SC10) 326 Yes Yes Open cut Buffers - Existing Maintained Easement 3,104 3,104 0 2,091 2,091 0 0 Exempt from Jordan Lake Riparian S27 (SC14) 328 Yes Yes Open cut Buffers - Existing Maintained Easement 3,669 3,669 0 2,515 2,515 0 0 Exempt from Jordan Lake Riparian Buffers - Existing Maintained Easement. Existing gas line north and south of proposed line limit crossing angle. Temporary workspace will impact forested areas outside of the existing maintained easement. The total are impacted by temporary workspace is reflected in mitigation totals. This area S28 (SC15)'* 329 No Yes Open cut will not be permanently maintained. 5,026 4,564 462 4,139 3,601 538 1,000 Exempt from Jordan Lake Riparian S29 (SC13) 330 Yes Yes Open cut Buffers - Existing Maintained Easement 3,095 3,095 0 2,077 2,077 0 0 Located primarily within Existing Maintained Easement. Portions of buffer will be cleared and permanently maintained and are reflected in mitigation totals. Gas line to the north limits crossing angle. 30 -foot neckdown for permanent maintained easement depicted, Permanent and temporary impacts resulting from clearing are S30 (SF11) 331 No Yes Open cut included in mitigation totals. 3,395 2,118 521 1,277 2,936 2,532 404 1,419 3,621 Current alignment avoids direct impacts to S31. The alignment is located primarily within existing maintained easement and is exempt from Jordan Lake Buffers, however, portions of the buffer will be cleared and maintained and are reflected in the mitigation totals. 30 -foot neckdown of pernanet S31 (SC17) 337 NA Yes Avoided maintained easement depicted. 1,417 871 546 0 2,538 2,129 409 0 955 Located primarily within Existing Maintained Easement. Temporary impacts due to clearing of TWS are S32 (SC18) 337 Yes Yes Open cut reflected in mitigation totals. 2,924 2,315 609 0 1,948 1,542 406 0 1,015 Exempt from Jordan Lake Riparian S33 (SC19) 338 Yes Yes Open cut Buffers - Existing Maintained Easement 11,051 11,051 0 5,576 5,576 0 0 Gas line to the north limits crossing angle. 30 -foot permanent maintained corridor depiicted. Temporary impacts to clearing of TWS are included in S34 (SF13) 339 No Yes Open cut mitigation totals. 2,654 2,052 602 0 2,723 2,098 625 0 0 0 1,227 S35 (SP 339 No Yes Open cut Not Subject to Jordan Lake Buffers 0 0 0 0 0 0 0 Page 2 of 3 Pre - Construction Notification: NWP No. 12NVCQ No. 3884 Line T -021 B Pipeline Project 16" T -021B PIPELINE RIPARIAN BUFFER IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 September 8, 2014 Page 3 of 3 Zone 1 Impacts (sf) Zone 2 Impacts (sf) Forested Wetland within Buffer Zone Stream ID Drawing No. 1 Perpendicular Crossing? Disturbance at z Crossing Type Crossing Notes /Justification Total Area of Area Within Existing Area of Temporary Area of Permanent Total Area of Area Within Existing Area of Area of Permanent Adjusted Total Area For Mitigation (Zone 1 + Zone 2) Crossing Greater Disturbance 3 Maintained 3 Impact ** Maintenance Disturbance 3 Maintained Temporary Maintenance (sf)- Forested Wetland than 401f Easement Impact Easement 3 Impact ** Impact Zone 1 (sf) Zone 2 (sf) Within Buffer Exempt from Jordan Lake Riparian Buffers - Existing Maintained Easement. Gas line to the north limits crossing S36 (SF14) 340 No Yes Open cut angle. 3,409 3,409 0 2,344 2,344 0 0 Exempt from Jordan Lake Riparian S37 (SF15) 341 Yes Yes Open cut Buffers - Existing Maintained Easement 3,436 3,436 0 2,322 2,322 0 0 Located mostly within Existing Maintained Easement. ROW aligned to parallell and south of existing maintained ROW to avoid further impact with Stream S38 and Wetland W49. 30 -foot permanent maintained corridor depicted. Temporary impacts to clearing of TWS S38 (SF16) 342 No Yes Open cut are included in mitigation totals. 1,674 1,318 356 343 1,388 1,011 377 40 1,116 Not Subject to Jordan Lake Buffers. Small area will be included in new S39 (SF17) 342 NA NA Avoided maintained 15 -foot right of way. 0 0 0 0 0 0 0 Located within Existing Maintained Easement. Crossing angle limited by gas line to the north. 30 -foot permanent maintained corridor depiicted. Temporary impacts to clearing of TWS S40 (SF18) 343 Yes Yes Open cut are included in mitigation totals. 3,342 2,278 1,064 0 3,208 2,338 870 0 1,934 Exempt from Jordan Lake Riparian Buffers - Existing Maintained Easement. Crossing angle at stream limited by gas S41 (SM1) 344 No Yes Open cut line to the north. 3,145 3,145 0 2,327 2,327 0 0 Exempt from Jordan Lake Riparian S42 (SM2) 345 Yes Yes Open cut Buffers - Existing Maintained Easement 3,045 3,045 0 2,108 2,108 0 0 Exempt from Jordan Lake Riparian Buffers - Existing Maintained Easement. Crossing angle limited by gas line to the S43 (SM3) 345 No Yes Open cut north. 0 0 0 0 0 0 0 Not subject to Jordan Lake Riparian Buffers. Crossing located completely S44 (SF22) 346 No Yes Open cut within existing maintained easement. 0 0 0 0 0 0 0 Not subject to Jordan Lake Riparian Buffers. Crossing located completely S45 (SF23) 346 Yes Yes Open cut within existing maintained easement. 0 0 0 0 0 0 0 Parallel Zone 2 impacts are completely within existing maintained easement and S46 (SF21) 346 NA NA Avoided no change of use. 0 0 0 860 860 0 0 Exempt from Jordan Lake Riparian Buffers - Existing Maintained Easement. Crossing angle limited by gas line to the north. Current alignement avoids impacts to wetlands to the north and S47 (SF24) 347 No Yes Open cut additional buffer impacts to the south. 3,416 3,416 0 2,567 2,567 0 0 S48 (SF25) 347 NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 0 0 0 Exempt from Jordan Lake Riparian S49 (SF26) 350 Yes Yes Open cut Buffers - Existing Maintained Easement. 2,170 2,170 0 2,725 2,725 0 0 Not subject to Jordan Lake Riparian Buffers. Crossing located completely within existing maintained easement. Crossing angle limited by gas line to the S50 (SF27) 351 No I Yes I Open cut 1 north. 0 0 0 0 0 0 0 Totals: 111,105 5,588 6,388 86,898 5,558 6,037 20,750 Please note the drawing numbers depicted cores and to the last three digits of the drawing number as shown on APPROXIMATE JURISDITIONAL BOUNDARIES IMPACT DRAW INGS. 2HDD (horizontal directional drill)- will not impact the jurisdictional feature. 3 Areas denoted for informational purposes only. Areas within Existing Maintained Easements, are not subject to Jordan Lake Buffer Requirements or Mitigation. '* Temporary Workspace cleared will not be permanently maintained, however temporary impacts are reflected in mitigation totals. Area will be restored in accordance with the Restoration plan and allowed to re-vegetate naturally. Change previously submitted to DW R via email on July 28, 2014 ,August 7, 2014. Change submitted August 11, 2014 Change associated with neckdown from 50 -feet permanent maintained ROW to 30 -foot permanent maintained ROW, August 22,2014. Change associated with neckdown from 50 -feet permanent maintained ROW to 30 -foot permanent maintained ROW (includes areas of reclamation), September 8,2014 Page 3 of 3 STREAM S4 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 3,778 SQ. FT. 2,296 SQ. FT. C 10' TEMPORARY WORKSPACE EASEMENT NO MITIGATION REQUIRED. 30' LIMIT OF PERMANENT MAINTENANCE _TEMPORARY WORKSPACE aG g /7G G G 1 1 G G r=r--G 0 r+0 I l / N N N �G til STREAM S4 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 1,244 SQ. FT. 0.029 AC. � NN N TEMPORARY WORKSPACE 7 T// 7 T/ EXISTING 24" CARDINAL PIPELINE n c _ EXISTING - MAINTENANCE EASEMENT L EXISTING 10" PSNC T -021 PIPELINE G G G G G G % 1 PROPOSED 16" T -021 B PIPELINE ? i 1 EXISTING MAINTENANCE EASEMENT 2 0 cl A v� m �2m 7 G TEMPORARY WORKSPACE EASEMENT 50' R — VARIES (MAINTAINED) \`� \ DISTANCE VARIES. TEMPORARY CLEARING 50' ROW OF FORESTED AREA, ZONE 1 — 96 SQ. FT. ZONE 2 — 68 SQ. FT. LEGEND: N EXISTING TREE LINE N I I N N TEMPORARY IMPACT AREA I � PERMANENT IMPACT AREA 50' BUFFER IL NOTE: STREAM S4 0 50 1. PIPELINE TO BE INSTALLED 65 L.F. BY OPEN CUT METHOD SCALE IN FEET oamal PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 STREAM CROSSING S4 ALIGNMENT SHT: 58701102 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 47 +67, M.P 0.90 58703303 HOUSTON, TX DETROIT, MI CHARLESTON, Y TULSA, OK ALAMANCE COUNTY NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com ' SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 ISTIN EXISTING 10" PSNC T -021 PIPELINE G G G G G G PR(1P( ,zp-n 1 R" T —(171 R PIPp7I INIp- —30' LIMIT OF PERMANENT/ MAINTENANCE ti WETLAND W20 STREAM S21 57 L.F. v 0 M N 50 ��FFFR N ti i C���L EXISTING 24" CARDINAL PIPELINE / G G G G G G G— EXISTING MAINTENANCE EASEMENT _ _ WETLAND W20 TEMPORARY WORKSPACE ^ / -----7-vL— EXISTING CULVERT LEGEND: I- 7 0 T, s� 7 )3 0 2 v 10' TEMPORARY WORKSPACE EASEMENT G G-c,�G G G =z—=/—/ TEMPORARY WORKSPACE EXISTING (MAINTAINED) 50' ROW WETLAND W20 TOTAL IMPACTS EXISTING TREE LINE ti� ti PERM. IMPACT 0 SQ. FT. 0.000 AC. PERMANENT TEMP. IMPACT 2,917 SQ. FT. 0.067 AC. NOTE: STREAM S21 TOTAL IMPACTS '9 20' PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 205 SQ. FT. 0.004 AC. STREAM S21 TOTAL JORDAN LAKE BUFFER IMPACTS DRAFTING CK: SFS 06/03/14 & SERVICES CO. ZONE 1 APPROXIMATE JURISDICTIONAL BOUNDARIES OF 1611 T -021 B PIPELINE ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 3,434 SQ. FT. 2,281 SQ. FT. ISTIN EXISTING 10" PSNC T -021 PIPELINE G G G G G G PR(1P( ,zp-n 1 R" T —(171 R PIPp7I INIp- —30' LIMIT OF PERMANENT/ MAINTENANCE ti WETLAND W20 STREAM S21 57 L.F. v 0 M N 50 ��FFFR N ti i C���L EXISTING 24" CARDINAL PIPELINE / G G G G G G G— EXISTING MAINTENANCE EASEMENT _ _ WETLAND W20 TEMPORARY WORKSPACE ^ / -----7-vL— EXISTING CULVERT LEGEND: I- 7 0 T, s� 7 )3 0 2 v 10' TEMPORARY WORKSPACE EASEMENT G G-c,�G G G =z—=/—/ TEMPORARY WORKSPACE EXISTING (MAINTAINED) 50' ROW EXISTING TREE LINE ti� ti wlTEMPORARY IMPACT AREA PERMANENT 3 , IMPACT AREA tiF ti 7 NOTE: ti� 50 25 0 50 1. PIPELINE TO BE INSTALLED '9 20' BY OPEN CUT METHOD �F2 SCALE IN FEET i PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. APPROXIMATE JURISDICTIONAL BOUNDARIES OF 1611 T -021 B PIPELINE ENTAL CK: ENVIINONMING CORPORATE OFFICE: 109 E DRIVE P.O. BOX 1007 WETLAND CROSSING W20 & STREAM CROSSING S21 ALIGNMENT SHT: 58701111 VERSAILLLES, S, KY KY 40383 TEL:(859) 873 -0076 • FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 278 +00, M. P 5.27 58703317 HOUSTON, TX • DETROIT, MI CHARLESTON, WV TULSA, OK Y BA CITY, U ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1 ° = 50' REV. A www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 TEMPORARY WORKSPACE \ \ / \\ \ N c c G — LEGEND: 10' TEMPORARY WORKSPACE — EASEMENT. NO MITIGATION REQUIRED. EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD STREAM S23 TOTAL JORDAN LAKE BUFFER IMPACTS STREAM S23 TOTAL IMPACTS PERM. IMPACT PERM. IMPACT 0 SQ. FT. 5,125 SQ. FT. 0.000 AC. TEMP. IMPACT 1,751 SQ. FT. 0.040 AC. WETLAND W26 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 1,002 S0. FT. 0.023 AC. TEMPORARY WORKSPACE \ \ / \\ \ N c c G — LEGEND: 10' TEMPORARY WORKSPACE — EASEMENT. NO MITIGATION REQUIRED. EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD STREAM S23 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 S0. FT. 0 SQ. FT. TEMP. IMPACT 5,125 SQ. FT. 3,144 SQ. FT. STREAM S23 93 L.F. EXISTING (MAINTAINED) 30' ROW c c EXISTING 24" CARDINAL PIPELINE \ Z2 O \ 22 20' OFF \ ZONE 2 NOTE: � MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. 0 30' LIMIT OF PERMANENT MAINTENANCE TEMPORARY WORKSPACE ;7�7 C Z-1,� EXISTING MAINTENANCE EASEMENT a �o w a .z 0 v EXISTING 10" PSNC T -021 PIPELINE c c c c___� PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE EASEMENT—'----- NEW PERMANENT EASEMENT 10' TEMPORARY WORKSPACE EASEMENT. TEMPORARY CLEARING OF FORESTED AREA ZONE 1 — 970 SQ. FT., ZONE 2 — 586 SQ. FT. WETLAND W26 50 25 0 50 SCALE IN FEET o PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O' BOX 1007 4 0383 WETLAND CROSSING W26 & STREAM CROSSING S23 ALIGNMENT sHT: 5801115 VERSAILLES, KY 4 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 374 +97, M.P 7.12 58703322 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S24 TOTAL JORDAN LAKE BUFFER IMPACTS STREAM S24 TOTAL IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SO. FT. 0.00 AC. PERM. IMPACT 500 SO. FT. 0 SQ. FT. TEMP. IMPACT 905 SQ. FT. 0.021 AC. TEMP. IMPACT 3,446 SQ. FT. 2,144 SO. FT. 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. I / 71 I I T T /TAT _LG EXISTING 24" CARDINAL PIPELINE c EXISTING MAINTENANASEMENT EXISTING 10" PSNC T -021 PIPELINE c — �— c�c c - PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE EASEMENT PA T EMPORARY WORKSPACE N LEGEND: EXISTING (MAINTAINED 30' ROW EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD N N N N I I 30' 20' ZONE 2 ZONE 1 45 L.F.JET 0 _G mac —c N / � o N N N I I50 BUFFER 30' LIMIT OF PERMANENT MAINTENANCE vo s� F C) v� G -TEMPORARY WORKSPACE G c c _ c c —c —c 10" TEMPORARY WORKSPACE EASEMENT. AREA OF IMPACT FOR ZONE 1 — 803 SQ. FT. (TEMPORARY) ZONE 2 — 512 SQ. FT. (TEMPORARY) NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. 50 25 0 50 SCALE IN FEET o PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S24 AALIGNMENT sHT: 5801115 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 398 +60, M.P 7.55 58703323 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S25 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 0 SO. FT. 0 SQ. FT. TEMP. IMPACT 3,339 SO, FT. 2,236 SQ. FT. STREAM S25 TOTAL IMPACTS PERM. IMPACT 0 SO. FT. 0.000 AC. TEMP. IMPACT 325 SO. FT. 0.007 AC. — z EXISTING 24" CARDINAL PIPELINE ;XISTING 10" PSNC T -021 PIPELINE G G G G— PROPOSED 16" T -021 B PIPELINE TEMPORARY WORKSPACE LEGEND: EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD 9a 20 NE 2 �7 N 9 ti� 3p. pN F ti r 6U Spy STREAM S25 62 L F / 7-- 7 1 G G G n� EXISTING WETLAND W28 , /// CULVERT i I TEMPORARY WORKSPACE I I 1 I I v V I I I I I � I I I I I I � I I I I 50 215 0 50 I MI I " SCALE IN FEET Y m PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S25 AALIGNMENT sHT: 5801116 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 407 +60, M.P 7.72 58703324 HOUSTON, TX MI DETROIT, CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50 REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 N' N N XISTING (MAINTAINED) EXISTING MAINTENANCE 0' ROW EASEMENT �G G GG � G G G G G I O -G- 7-- 7 1 G G G n� EXISTING WETLAND W28 , /// CULVERT i I TEMPORARY WORKSPACE I I 1 I I v V I I I I I � I I I I I I � I I I I 50 215 0 50 I MI I " SCALE IN FEET Y m PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S25 AALIGNMENT sHT: 5801116 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 407 +60, M.P 7.72 58703324 HOUSTON, TX MI DETROIT, CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50 REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR L / RIPARIAN BUFFER ZONES. AREAS WILL S0 / BE RE— SEEDED IN ACCORDANCE WITH ti eC/FF THE RESTORATION PLAN AND ALLOWED / E41 / / 0 3o. titi TO RE— VEGETATE NATURALLY. Av <>, 30' LIMIT OF PERMANENT ADDITIONAL TEMPORARY N STREAM S30 TOTAL IMPACTS PERM. IMPACT 0 S0. FT. 0.000 AC. TEMP. IMPACT 1,165 SQ. FT. 0.027 AC. STREAM S30 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 1,277 SQ. FT. 1,419 SO. FT. TEMP. IMPACT 3,395 SQ. FT. 2,936 SO. FT. v 0 cl 7A v z� Z 7 0 7 Y WORKSPACE EXISTING 24" CARDINAL PIPELINE TEMPORARY WORKSPACE G G' —c Gam- -c EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G G�G G G G G cn o PROPOSED 16" T -021 B PIPELINE O r) 0 G TEMPORARY WORKSPACE EXISTING MAINTAINED LEGEND: 50' ROW EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD EXISTING MAINTENANCE EASEMENT \ �— TEMPORARY WORKSPACE EASEMENT — �� \ DISTANCE VARIES. TEMPORARY CLEARING \ <",,STREAM S30 \ OF FORESTED AREAS, ZONE 1 — 67 L.F. 521 SQ.FT., ZONE 2 — 404 SQ. FT. 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. �z1 —Z1 ?2� 50 25 0 50 SCALE IN FEET 4E& PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 STREAM CROSSING S30 ALIGNMENT SHT: VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 528 +91, M.P 10.02 58703331 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = so REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 (REAM WETLAND W41 TOTAL IMPACTS O PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP, IMPACT 457 SO. FT. 0.010 A -_ 1,417 SQ. FT. STREAM S32 TOTAL IMPACTS WETLAND W42 TOTAL IMPACTS PERM. IMPACT 0 S0. FT. 0.000 AC. TEMP. IMPACT 435 SQ. FT. 0.009 AC. 32, ZONE 2 — WETLAND W44 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 643 SO. FT. 0.015 AC. (REAM S31 TOTAL JORDAN LAKE BUFFER IMPACTS O PERM. IMPACT O Lo ZONE 1 W43C ZONE 2 DERM. IMPACT 0 SQ. FT. 10' TEMPORARY WORKSPACE 0 SQ. FT. TEMP. IMPACT 1,417 SQ. FT. 2,538 SQ. FT. WETLAND WETLAND W42 TOTAL IMPACTS 31, ZONE 1 — PERM. IMPACT 0 SQ. FT. 0.000 AC. IMPACT AREA T -MP. IMPACT 12 SO. FT. 0.003 AG. 54 L.F. 30' LIMIT OF PERMANENT MAINTENANCE EXISTING MAINTENANCE EASEMENT_ _ _ EXISTING PSNC 10" T -021 PIPELINE G G G G G� O ,---PROPOSED 16" T -021 B PIPELINEw M EXISTING MAINTENANCE EASEMENT WETLAND W44 WETLAND W41—I. G NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. 30' 20' ONE 1 ZONE 2 8' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. G N N � � N N N / WETLAND W45 / OFFER / / titi STREAM S32 51 L. F. v 0 C", s� YA 7 2 EXISTING (MAINTAINED) I 50' ROW —\r' G G ZONE 1 O PERM. IMPACT O Lo WETLAND W43C LEGEND: 1,948 SQ. FT. WETLAND W43 10' TEMPORARY WORKSPACE EXISTING TREE LINE TEMPORARY CLEARING OF FORESTED AREAS: WETLAND W42- 31, ZONE 1 — TEMPORARY SQ. FT. N STREAM _ IMPACT AREA STREAM S31— 32, ZONE 1 — PERMANENT 54 L.F. /STREAM STREAM 32, ZONE 2 — IMPACT AREA SQ. FT. NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD WETLAND W44 WETLAND W41—I. G NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. 30' 20' ONE 1 ZONE 2 8' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. G N N � � N N N / WETLAND W45 / OFFER / / titi STREAM S32 51 L. F. v 0 C", s� YA 7 2 EXISTING (MAINTAINED) I 50' ROW —\r' G G ZONE 1 G G PERM. IMPACT O Lo 0 SQ. FT. TEMP. IMPACT r 1,948 SQ. FT. 10' TEMPORARY WORKSPACE EASEMENT. TEMPORARY CLEARING OF FORESTED AREAS: STREAM 31, ZONE 1 — 546 SQ. FT. N STREAM 31, ZONE 2 — 409 SQ. FT. 32, ZONE 1 — 609 SQ. FT. /STREAM STREAM 32, ZONE 2 — 406 SQ. FT. STREAM S32 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 2,924 SQ. FT. 1,948 SQ. FT. G 50 25 0 50 SCALE IN FEET o PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 LES, KY DRIVE WETLAND CROSSING W41, W42, W44 & W45 & STREAM CROSSINGS S31 & S32 P.O. BOX 1007 ALIGNMENT SHT: 58701124 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 631 +95, M.P 12.06 58703337 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S34 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 755 SQ. FT. 0.017 AC. STREAM S34 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 2,654 SQ. FT. 2,723 SQ. FT. 9' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G G G G G G PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE EASEMENT STREAM S34 58 L.F. LEGEND: WETLAND W46 EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SO• �� NI G G G�06 1 rG NOTE: % 1 ^ / �9� Am �a cl s� Cy C) J3 7 EXISTING (MAINTAINED) 50' ROW 30' LIMIT OF PERMANENT tMAINTENANCE G G G G- 0 Ln 10' -------- - - - - -- 10' TEMPORARY WORKSPACE EASEMENT. TEMPORARY CLEARING OF FORESTED AREAS, ZONE 1 — 602 SQ. FT. ZONE 2 — 625 SQ. FT. I 1 �� 2 STREAM S35 /Z2-50 L.F. WETLAND W46 MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. STREAM S35 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 345 SO. FT. 0.008 AC. WETLAND W46 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 4,041 SQ. FT. 0.093 AC. 50 25 0 50 SCALE IN FEET i PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 LES, KY DRIVE WETLAND CROSSING W46 & STREAM CROSSINGS S34 & S35 P.O. BOX 1007 ALIGNMENT SHT: 58701126 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 673 +46, M.P 12.83 58703339 HOUSTON, TX DETROIT, MI CHARLESTON, wV • TULSA, DI( ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 WETLAND W49 TOTAL IMPACTS PERM. IMPACT 0 S0. FT. 0.000 AC. TEMP, IMPACT 685 SO. FT. 0.016 AC. EXISTING (MAINTAINED) 35' ROW G G1 1G -- - -mot -- NEW 15' ROW LEGEND: G G G cn EXISTING TREE LIN c WE \TLAND W49 STREAM S38 TOTAL IMPACTS PERM. IMPACT 0 SO. FT. 0.000 AC. TEMP. IMPACT 540 SQ. FT. 0.012 AC. G G O cl,"I T, 2� 10' TEMPORARY WORKSPACE EASEMENT. ? ,NO MITIGATION REQUIRED. PERMANENT CLEARING OF �\ FORESTED AREA - 383 SQ, FT, 50, 30' LIMIT OF PERMANENT BuFF�R \ MAINTENANCE EXISTING_ MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G c c c c G o PROPOSED 16" T -021 B PIPELINE M EXISTING MAINTENANCE EASEMENT — — — — — — — — — — — NEW PERMANENT EASEMENT STREAM S39 � \ � / TEMPORARY WORKSPACE EASEMENT DISTANCE VARIES 0 L. F. Z0 30l TEMPORARY CLEARING OF FORESTED AREAS, NF ZONE 1 - 356 SQ. FT., ZONE 2 - 377 SQ. FT. STREAM S38 E 52 L.F. �020 NOTE: �F2 MITIGATION FOR TEMPORARY WORKSPACE — TEMPORARY IMPACT AREA IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES AREAS WILL PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD STREAM S38 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 343 SO. FT, 40 SO. FT. TEMP. IMPACT 1,674 SO. FT. 1,388 SO. FT, BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. 50 25 0 50 SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENGINEERING AL CK: 109 LES, KY DRIVE WETLAND CROSSING W49 & STREAMS CROSSING S38 & S39 R.O. BOX 1007 ALIGNMENT SHT: 58701128 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 733 +56, M.P 13.96 58703342 HOUSTON, TX DETROIT, MI CHARLESTON, TULSA, OK WV TU SCALE: 1 ° = 50' REV. A BAY CITY, MI ORANGE COUNTY, NORTH CAROLINA www.emseng.COM SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S40 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 486 SQ. FT. 0.011 AC. EXISTING (MAINTAINED) 35' ROW 50' BUFFER N STREAM S40 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SO. FT. 0 SQ. FT. TEMP. IMPACT 3,342 SO. FT. 3,208 SQ. FT. 1 s� .Z 7 0 Z v 6" TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. 20' Z0 30' LIMIT OF PERMANENT 30' MAINTENANCE ZONE 1 EXISTING MAINTENANCE EASEME aKs PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 FIELDVIEW DRIVE P.o' BOX 1007 STREAM CROSSING S40 ALIGNMENT SHT: 58701128 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 732 +81, M.P 14.13 58703343 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A 6AY CITY. MI ORANGE COUNTY, NORTH CAROLINA www.emseng.COM SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 EXISTING 10" PSNC T -021 PIPELINE G G G G G G G G G G G G PROPOSED 16" T -021 B PIPELINE G 0 CD. EXISTING MAINTENANCE EASEMENT NEW PERMANENT EASEMENT — — V A 7 �o 10' TEMPORARY WORKSPACE EASEMENT. \ \ _ — — — — STREAM S40 TEMPORARY CLEARING OF FORESTED AREAS, \ _ _ — 56 L.F. LEGEND: ZONE 1 - 1,064 SQ. FT., ZONE 2 - 870 SQ. FT..\ �� _ T �� � A NOTE: EXISTING TREE LINE MITIGATION FOR TEMPORARY WORKSPACE TEMPORARY IMPACT AREA �Z �\ IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED PERMANENT IMPACT AREA \� L2_ —� TO RE- VEGETATE NATURALLY. NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 FIELDVIEW DRIVE P.o' BOX 1007 STREAM CROSSING S40 ALIGNMENT SHT: 58701128 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 732 +81, M.P 14.13 58703343 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A 6AY CITY. MI ORANGE COUNTY, NORTH CAROLINA www.emseng.COM SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021 B Pipeline Project WETLAND IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 September 8, 2014 Page 1 of 2 Classification Impacts Wetland ID Sheet No.' Vegetative Type Relation to Waterbody Temporary Impacts Conversion Crossing Type* sf ac sf ac W1 (WL1) NA NA Scrub Shrub- ent Riparian 0 0 0 0.000 Avoided W2 (WF1) 302 Forested /Emergent Riparian 1,516 0.035 0 0.000 Open cut W3 (WF2) 304 Emergent Riparian 12,565 0.288 0 0.000 Open cut W4 (WF14) 305 Forested /Emergent Riparian 780 0.018 0 0.000 Open cut W5 (WF15) NA Forested Riparian 0 0.000 0 0.000 Avoided W6 (WF16) NA Forested Riparian 0 0.000 0 0.000 Avoided W7 (WS1) 306 Forested Riparian 0 0.000 9 0.000 Conversion W8 (WS2) 307 Forested Riparian 0 0.000 0 0.000 Avoided W9 (WC27) 307 Forested Riparian 0 0.000 0 0.000 Avoided W10 (WC28) 307 Forested Riparian 0 0.000 77 0.002 Conversion W11 (WC29) NA Forested Riparian 0 0.000 0 0.000 Avoided W12 (WF3) 308 Forested /Emergent Riparian 23,006 0.528 166 0.004 Open cut W13 (WF4) 309 Forested Riparian 0 0.000 0 0.000 Avoided W14 (WF5) 310 Forested /Emergent Non - riparian 3,751 0.086 0 0.000 Open cut W15 (WC5) 311 Forested /Emergent Riparian 3,306 0.076 0 0.000 Open cut W16 (WC4) 311 Forested /Emergent Riparian 9,806 0.225 0 0.000 Open cut W17 (WC2) NA Forested Non - riparian 0 0.000 0 0.000 Avoided W18 (WC1) 314 Forested /Emergent Non - riparian 14,477 0.332 0 0.000 Open cut W19 (WC25) 316 Open Water Non - riparian 0 0.000 0 0.000 Avoided W20 (WC26) 317 Forested /Emergent Riparian 2,917 0.067 0 0.000 Open cut W21 (WFA) 318 Shrub -Scrub Non - riparian 0 0.000 0 0.000 Avoided W22 (WC6A) 318 Open Water Non - riparian 0 0.000 0 0.000 Avoided W23 (WC6) 319 Forested /Shrub- Scrub /Emergent Non - riparian 1,612 0.037 0 0.000 Open cut W24 (WC27) 320 Shrub -scrub Non - riparian 0 0.000 0 0.000 Avoided W25 (WF6) 321 Forested /Emergent Riparian 511 0.012 218 0.005 Conversion W26 (WP1) 322 Forested /Emergent Riparian 1,002 0.023 0 0.000 Open cut W27 (WF34) NA Forested Riparian 0 0.000 0 0.000 Avoided W28 (WF33) 324 Forested Riparian 0 0.000 0 0.000 Avoided W29 (WC11) 325 Forested Riparian 0 0.000 333 0.008 Open cut W30 (WC11A) 325 Open Water Non - riparian 0 0.000 0 0.000 Avoided W31 (WC9) 326 Forested /Emergent Riparian 2,928 0.067 0 0.000 Open cut Page 1 of 2 Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021 B Pipeline Project WETLAND IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 September 8, 2014 Totals: 1 125,767 1 2.887 1 1,085 1 0.025 1 11 lorizontal directional drill (HDD) that will not impact the wetland. Please note, the drawing numbers depicted corespond to the last three digits of the drawing number as shown on Approximate Jurisdictional Boundaries Drawings Indicates change attibutable to re- routing. Change associated with DWR requested neckdown from 50 -feet permanent maintained ROW to 30 -foot permanent maintained ROW (includes areas of reclamation), September 8,2014 Page 2 of 2 Classification Impacts Wetland ID Sheet No.' Vegetative Type Relation to Waterbody Temporary Impacts Conversion Crossing Type* sf ac sf ac W32 (WC10) 326 Forested Riparian 0 0.000 0 0.000 Avoided W33 (WC13) 327 Forested /Emergent Non - riparian 4,476 0.103 0 0.000 Open cut W34 (WC12) 330 Forested /Emergent Riparian 8,048 0.185 0 0.000 Open cut W35 (WF7) 332 Emergent Non - riparian 435 0.010 0 0.000 Open cut W36 (WF8) NA Open Water Non - riparian 0 0.000 0 0.000 Avoided W37 (WC14A) NA Open Water Non - riparian 0 0.000 0 0.000 Avoided W38 (WC14) 334 Emergent Riparian 6,349 0.146 0 0.000 Open cut W39 (WC15) 335 Forested /Emergent Riparian 3,331 0.076 264 0.006 Open cut W40 (WC16) 336 Emergent Non - riparian 852 0.020 0 0.000 Open cut W41 (WC17) 337 Forested /Emergent Riparian 457 0.010 0 0.000 Open cut W42 (WC18) 337 Forested /Emergent Riparian 12 0.000 0 0.000 Open cut W43 (WC20) 337 Forested Riparian 0 0.000 0 0.000 Avoided W44 (WC22) 337 Forested /Emergent Riparian 643 0.015 0 0.000 Open cut W45 (WC21) 337 Forested /Emergent Riparian 0 0.000 18 0.000 Open cut W46 (WF9) 339 Forested /Emergent Riparian 4,041 0.093 0 0.000 Open cut W47 (WF10) 340 Forested /Emergent Riparian 1,869 0.043 0 0.000 Open cut W48(WF11) 341 Forested Riparian 0 0.000 0 0.000 Avoided W49 (WF12) 342 Emergent Riparian 685 0.016 0 0.000 Open cut W50 (WF17) 346 Forested Riparian 0 0.000 0 0.000 Avoided W51 (WF20) 347 Forested /Emergent Riparian 6,536 0.150 0 0.000 Open cut W52 (WF19) 347 Forested Riparian 0 0.000 0 0.000 Avoided W53 (WF21) 348 Forested /Emergent Non - riparian 4,473 0.103 0 0.000 Open cut W54 (WF22) 349 Forested /Emergent Non - riparian 406 0.009 0 0.000 Open cut W55 (WF24) 350 Forested /Emergent Riparian 4,977 0.114 0 0.000 Open cut W56 (WF23) 350 Open Water Non - riparian 0 0.000 0 0.000 Avoided Totals: 1 125,767 1 2.887 1 1,085 1 0.025 1 11 lorizontal directional drill (HDD) that will not impact the wetland. Please note, the drawing numbers depicted corespond to the last three digits of the drawing number as shown on Approximate Jurisdictional Boundaries Drawings Indicates change attibutable to re- routing. Change associated with DWR requested neckdown from 50 -feet permanent maintained ROW to 30 -foot permanent maintained ROW (includes areas of reclamation), September 8,2014 Page 2 of 2