Loading...
HomeMy WebLinkAboutSW6220503_Email_20220823 Farkas, Jim J From:Fleet Temple <fleet@ftempleengineering.com> Sent:Tuesday, August 23, 2022 4:27 PM To:Farkas, Jim J Cc:dglsons@gmail.com Subject:\[External\] RE: SW6220503 Evits Place CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Jim, Revised plans/forms uploaded to Stormwater Portal – hard copies mailing out tomorrow. Thanks, -Fleet Fleet Temple Engineering, PLLC 5245 Red Hill Church Rd. Coats, NC 27521 910-658-2446 From: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Sent: Monday, August 22, 2022 2:51 PM To: fleet@ftempleengineering.com Cc: dglsons@gmail.com Subject: RE: SW6220503 Evits Place Fleet, I was looking over the information you provided on 5/30/2022. Everything looks good except for a few small issues: Please correct the following: - General project design: o The provided detail for Permanent Swale “B” on plan sheet C2.0 indicates that one of the side slopes of these vegetated conveyances is 2:1. Per 15A NCAC 02H .1003(2)(c)(i), side slopes for vegetated swales cannot exceed 3:1 without an on-site soil investigation and engineering calculations demonstrating stability in perpetuity. Please either provide these items (demonstrating stability in perpetuity) or revise these vegetated conveyances to have side slopes of 3:1 or flatter. - Application, Section IV, 10: o For a low-density project, the “drainage area” is equal to the project area (there are typically no off-site components to a low-density project even if adjacent off-site areas drain to the project area/vegetated conveyances). Please revise the “Total Drainage Area” and “Off-site Drainage Area” items in this table. o For the “On-site Buildings/Lots” item, please just show the total amount of BUA allocated to the individual lots (63,600 sf). The per lot BUA allocation can be determined from the provided deed restriction document and calculations. 1 - Supplement-EZ Form: o Cover Page:  Line 7 – Please include the width of the vegetated setback from surface waters as required per 15A NCAC 02H .1017(10). This item should be shown on the Supplement-EZ Form even if there are no surface waters located on-site. o Drainage Area Page:  Lines 6 & 7 – See earlier comment. o Low-Density Page:  Line 4 – There is a know formatting issue with this cell of the spreadsheet. Please indicate the side slope of the vegetated conveyances (you may need to either manually enter it or elaborate in the Additional Information section (Line 15) if there are multiple cross-slopes.  Line 5 – The provided calculations show a maximum flow velocity of 3.7 fps (this line of the form shows 4.3 fps). Please revise as needed.  Line 15 – This project is not located within a HQW area and is not subject to the maximum 12% BUA allowance that low-density projects in HQW areas are. Please remove this item.  NOTE: Depending on how the swale cross-slope issue is handled, the swale calculations may need to be updated. Please provide the following: - 1x hard copy & 1x electronic copy of the revised Supplement-EZ Pages. - 1x hard copy & 1x electronic copy of the revised Application page. - 2x hard copies & 1x electronic copies of the revised plan sheets. - 1x hard copy & 1x electronic copy of anything else needed to address these comments. Hard copies should be mailed to me at the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640M Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group) will be able to receive the submission. Do not leave the package in the foyer with the security guard. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. Electronic copies should be uploaded at the following location: https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload Since these are really minor things, once I get the hard copies, anything else that may have changed from addressing these issues, and the documents are uploaded to Laserfiche (Provided everything is still in order), we can issue the permit without doing another formal review. Let me know if you have any questions. 2 Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Tran, Kieu M <kieu.tran@ncdenr.gov> Sent: Friday, June 3, 2022 3:30 PM To: dglsons@gmail.com; fleet@ftempleengineering.com Cc: Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Lawyer, Mike <mike.lawyer@ncdenr.gov> Subject: SW6220503 Evits Place Good afternoon, We received your post-construction stormwater permit application for the above mentioned project on 5/30/2022. Reviews under the standard permitting process generally take 45 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 45 days). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. 3 Please type in permit #: SW6220503 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Mrs. Kieu Tran Stormwater Program Administrative Assistant Office: (919) 707- 3640 Kieu.Tran@ncdenr.gov North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Stormwater Program 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties 4