Loading...
HomeMy WebLinkAboutSW6220503_Plansheet C2.0 - Grading_Drainage Plan_20220823DocuSign Envelope ID: OB2CD44E-8CBD-4778-BEFC-9DD19553CFCO z O O W z CD z O Un z Q O I O z z z w 0 I (-D O O 0 z O O W z O z O U) z Q O I O z z z w 0 I (-D 0 0 0 U) w O 0 z W / SR 1532 SITE VICINITY MAP (NTS) - - - - - - 290 - - - - - - EXISTING CONTOUR x 291.64CL EXISTING SPOT ELEVATION X 290.51 FINISH GRADE SPOT ELEVATION 290 FINISH GRADE CONTOUR o D LIMITS OF DISTURBED AREA (1.8 AC.) "STRAW W NET" TEMP. SWALE LINER AS SHOWN SEED PER PROJECT [2555]' / SPECS / Larry S. Oephenson PERMANENT SWALE "B" D.B. 1/Y48, Pg. 641 I NTS Ma,,pp #2006-140 MB/�22 Pa e 100 ROADSIDE DITCH CALCULATION TABLE I I I ECS (2"BG) I I I _ / / / � 3 ERB (15'�$G)/ - � � o I I I ECS (' G) I I o PROJECT BOUNDARY \ 15 IV�s I � 0- STREET STA C I (IN/HR) A (AC.) Q1 CFS) =CIA SWALE SLOPE (%) n NORMAL DEPTH (FT) VELOCITY (FT/S) SHEAR STRESS REQUIRED (PSF) SWALE TYPE SHEAR STRESS PROVIDED (PSF) JUNIUS CT. 0+00 - 1+OOL 0.5 7.2 0.1 0.4 2.66 0.03 0.3 2.0 0.50 B 1.45 JUNIUS CT. 0+00 - 1+OOR 0.5 7.2 .1 0.5 2.66 0.03 0.3 2.1 0.50 B 1.45 JUNIUS CT. 1+00 - 3+OOL 0.5 7.2 0.1 0.4 1.00 0.03 0.4 1.4 0.25 B 1.45 JUNIUS CT. 1+00 - 3+OOR 0.5 71 0.5 1.8 1.00 0.03 0.6 2.1 0.37 B 1.45 111NIIIq (IT 3+00 - CDSL 0.5 .2 0.1 0.4 1.52 0.03 0.3 1.7 0.28 B 1.45 JUNIUS CT. 3+00 - CDSR 0.5 V.2 0.8 2.8 1. .03 0.7 2.7 0.66 B 1.45 PREACHER LN. 0+00 - 2+36L 0.5 .2 0.1 0.5 2.39 0.03 0.3 2.1 0.45 B 1.45 PREACHER LN. 0+00 - 2+36R 0.5 7.2 0.3 1.1 2.39 0.03 0.4 2.5 0.60 B 1.45 PREACHER LN. 2+36 - ENDL 0.5 7.2 0 1.1 3.20 0.03 0.4 2.8 0.80 B 1.45 PREACHER LN. 2+36 - ENDR 0.5 7.2 .7 2.4 3.20 0.03 0.5 3.4 1.00 B 1.45 I / / I CO I I I I/ / �34� \ I / TEMPORARY S IMMER BASI I1-214641 / L/ WB-21 D.A.=0.8AC 1 a n n Fr d Denning i n / / / INAGE AREA=I.IAC. � [25 5] / ' I g / 11 / Q71�0.3)(7.31N/HR)(1.1AC.)=2.4CFS Larry S. Stephenson �c AII�C �. Denning / / / 8 VOL. REQD=1,800CF/AC*(0.8AC)=1440CF - I SURFACE AREA REQ'D-325SF CFS* 2.4CFS =780SF D B. 110, , Pg, 641 I D�B. 133 Pg. 277 / / \ WB-20 I TOP L=40', TOP W=20', D=3 ( ) /Map 2006 140 MB 122, Page 60 / \ (2:1 SIDE SLOPES - 7 DAY STABILIZATION TIME FRAME / MB 22, Pag� 100 / I I I / / // / TYP.) SURFACE AREA PROVIDED=800SF .92 Ac. Ec sting / 0 / WB-19 \ VOL. PROVIDED=1464CF + 0 .� 5 e s / 0' / \ WEIR WIDTHZE: � \ � SKIMMER SIZE: 1.5" �c. » r�a Q/ / \ SKIMMER ORIFICE DAYS 0.75" DTEMP. DIVERSION DEWATERINGTIME: 3.3 .07 c"A *S SHOWN SEE NOTE @ TSB 1 ECS (2 ) 1.09 c res Ota I , ,/ / -0 \ TEMP. SILT FENC \ �O / I _x USE ROADSIDE DITCHES AS TEMP. DI SION BERM \ AS SHOWN TYP. 1x '-' 1 ` / / TO SKIMMER BASINS DURING CONSTRUC ON / (7 DAY STABILIZATION TIME FRAME TYP.) / W 17 I MP RY SKI ER BASIN #1 W BAFFL C) [8I I I D.A.-0.4AC.�9T07AL D�AGE AREA=I.IAC.�rankie A. Gwaltney OUTLET PROTEON #1 Q10=A.3)(7.31N/HR)(1.1AC.)=2.4C10 / v \` \ • TEMPORARY SILT FENCE B. 376 P 299 J I Q10=11.5cfs I / 0 REQD=1,800CF/AC*(0.4 )=720CF WB-16 TEMPORARY DIVERSION BERM �' g V10=9.5fps / / / SURFACE AREA REQD=325 C 2.4CFS)=780SF (7 DAY STABILIZATION TIME FRAME TYP.) Map # 005-281 / d QfuIl2 f Cfs / / /IOP L=40', TOP W=20�/ _ 1 @s® TEMPORARY ROCK CHECK DAM (TRCD) / ( t B) / I `�' Vfull=10.4fps / , - 7 (TMP)SIDE SLOPES --/ D =111 ATION TIME FRAME c�� j�� \ /��_ �� / o/ �- WOODS / SKIMMER BASIN DRAINAGE AREAS / / I ZONE=' / ZONE=2 / / SURFACE AR PROVIDED=800SF ROADSIDE DITCH DRAINAGE AREAS / / I I CLASS-B / / VOL. PROVID=1163CF I La=6XDO 12ft / / EIR WIDTF1 4' / �o ? \ \ OUTLET PRICTION 3&4 \ D50=6" / / S SIZE: 1.5" � � DEPTH- 8" / / A- SKIM ORIFICE DIAMETER 9.5 \ \ 1 DA=0.7ac(ma) IMPERVIOUS AREA E "BG / VY1=6, , NOTE C TIME: 3.5 D Q10=3.1fps 4-15 / ( ) I I W2= .25XW =7.5' / NOTE: CLEA =SIN W)JEN 50% FULL DURING �. \ I NE=1 PROPERTY AREA 363092SF �j / / CONSTRUCTION. E UPSTREAM AREAS ARE STABLE \ I MAX IMPERVIOUS=24% e R� / / / RGAINST OMIST JCPROSIODfOVED PERMISSION MISSIBASIN,AS BEENLL OBTAINED � C '=A / 363092 X 0.24-87142SF / a \ I / / 0.10 Acre / / / L RADES SEED ALL TURBED AREAS PER SEED 2 I I W=10 \ I Wetland Impact / / SPECS Q 8 �J� I I D50=3 I 63,600SF HOUSE/DRIVE (12 LOTS 05,300SF/LOT) � I / / 86,363 F ASPHALT / EL: 235.78' / p / I DEPTH= \ 86,363SF \ -/ X / / / \ I I I WE3 4 e / 86,363SF/363092SF = 23.8% IMPERVIOUS `` G. .6 3 p RBC (8" U) / /� RCDI Nii / -11 D I / N 24" �� / TEMP. DIVERSION TEMP. SILT FENCE EL: 237.38' INV.= 38.5 O c m� BERM A HOWN TYP. 1 �• AS SHOWN TYP. IN ._ :;:i":::. 242 I I / I EC (2" G) urIrY� NT _ \ I I WB-13- - - - - - - - - CAROI v _ 43 / S Ct. - AIL KIOSK - - - - ��' ublic 4o - - N • �•• 3 0 -,� u 3 N 244 h \ ��� W B -12 - 4 w =� °= 24 46 P % I 5 \ I 0 / e 0 444 e;__J ECS (2"B ) a-� NEW 0' UTILISEMEN j I / /►►1111111��� / / 44/ INV.=23 .5(bUTLRYPROTECTION / / I / TEMP. SILT FENCE FL 694 NVW 24.00 1 8/23/2022 Beverly L. Stephenson / / / /2 DAo0154cfs // 0 242�� q I I AS S OWN TYP. / / B-10 / & Cecil Wayne 24 4EP \ / PROVIDE 20' V10=3.1fpps� Stephenson I / WIDE 8" ABC S AGE AREA Qfull=7: cfs / / � / ► � STONE ACCES ''•"•� 5 AC V�1�4.2fps 1 \ -09 � 1.00 / D.B. 3997, Pg. 805 I / / / DUKE Q10=1.4 CFS/DO / / MB 22, Pg. 60 I I / / /SIDES T BOTDH Q25=1.7 GPS Z \ ?3``��q�E / / B-O$ (2'E) _ I / / HW`D=O� CLASS=A USE :RDJAIDE DITC S TEMP. \ 6 �` / / UJ La=4XDO=6ft DIVERSION BERM TO S IMM�BASINS `�p ® L� D50=3" DURING fONSTRUCTION DRAM E AREA DEPTH=12" (7 DAY STABILIZATION IME FRAMEVP.) \ �x I `\�0 36:: \'� l / \ I J rn / 4 AC. / =4.5' PERMANENT RI RAP TR NS TION "T" Q10 11.CFS XW1=6' 1 IN ROADSIDE DITCH �' ! ::: / B-07 Q =13.4 CFS �/ \ _I_ '•;;:.ram / / n � � � (4' WIDE - 1q' EACH IRtJI%TION) I I o /N �''���'•... ...:.::.. I / I' HW/D=1.05 /� / 50=6" DEPTH=18 ��o� ' . \ / \ Ln LLI W \ N / / ` \ I I I I I \ WB-06 ` II II II I I I I (I I \ Ln E/ TEMPIRY SKIMMER BASIN WBAFFLEry o3 DO=INAGE AREA=I.IAC. NzQ100.3)(7.31N/HR)(1.1AC.)=2.4CFS TTA DRAI WB 05VOL. B SURFAOE AREAREQ'D=325SF/CFS*(2.4CFS)=780SF W I -I 0) TOP L=4 ', TOP W=20', D=2' \ LJ U a) (2:1 SIDE 'SLOPES - 7 DAY STABILIZATION TIME FRAME > W LJ a� TYP.) T SURFACE AR �ROVIDED=800SF z o m � VOL. PROVIDED=1 63CF / \ \ NOgR I \ W -04 WEIR WIDTH=4' LL ' ' I /�1- I I y I \ SKIMMER SIZE: 1.5" / W SKIMMER ORIFICE DIAMETTR=0.5" V ENG TIME: SDAYS \ SEEE NOTE 0TSB#1 1 GRAPHIC SCALE\ � 1 B� I 00 _ 50 0 25 50 100 200 00 10 En "STRAW W NET" / 1 \ \ NN a TEMP. SWALE LINER / / / I \ \ \ W�-02 u•' 01 AS SHOWN / / ( IN I'I,I,'I' ) 3 I:...... .... 3 4° PROPERTY OWNER: PROPERTY DEVELOPER: LOCATION: REVISIONS SEE PER ��ON Must CARSON GREGORY RD. (SR1547) GRADING/ DRAINAGE/ A N D 04.28.2022: HRW/NCDOT/NCDEQ COMMENTS PERMANENT SWALE "A" PROJECT DANNY FRED DENNING & RL PROPERTIES � �\CITY p F NTS SPECS ALICE B. DENNING DUVALL DESS LANGDON �,�`��O RO�F9p� GROVE TOWNSHIP 967 DENNING ROAD 130 POPE LAKE ROAD c � o Clo HARNETT COUNTY 05.17.2022: NCDEQ STORMWATER COMMENTS EROSION CONTROL PLAN ANGIER NC. 27501 ANGIER NC. 27501 w g = 08.23.2022: DUKE ENERGY/NCDEQ COMMENTS SWALE CALCULATION TABLE DANNY DENNING@GMAIL COM DGLSONS@GMAIL COM a 0 m FOR PROPERTY OWNER/DEVELOPER: 919-390-9270 919-427-3287 EV I T' S PLACE BEFORE YOU DIG! RL PROPERTIES CONTACT ONE-CALL 4949CENTER 130 POPE LAKE ROAD HORIZONTAL SCALE. 1" = 50' • 0 ANGIER, NC. 27501 VERTICAL SCALE: N/A DATE: 03.28.2022 NOTE: This document, in physical or electronic form, discloses subject matter considered confidential to FLEET TEMPLE ENGINEERING, PLLC and on which FLEET TEMPLE ENGINEERING, PLLC has exclusive property rights. Neither receipt nor possession thereof confers or transfers any rights to reproduce this document or any part thereof, or to disclose any information contained therein to others, or to use it for any purpose without the written permission of FLEET TEMPLE ENGINEERING, PLLC LOT # C I (IN/HR) A (AC.) Q10(CFS) -CIA SWALE SLOPE (%) n NORMAL DEPTH (FT) VELOCITY (FT/S) SHEAR STRESS REQUIRED (PSF) SWALE TYPE SHEAR STRESS PROVIDED (PSF) 3/4 0.5 1 7.2 1.1 4.0 5.0 0.03 0.2 3.7 0.65 A 1.45 O