Loading...
HomeMy WebLinkAbout20140979 Ver 1_More Info Received_20140918Sullivan, Shelton From: Steve Meachum <smeachum @mvmomentum.com> Sent: Thursday, September 18, 2014 3:21 PM To: Sullivan, Shelton Cc: kermitt.taylor @duke - energy.com Subject: RE: 4101 Arbor Spring Ct. - Shoreline Stabilization Questions Attachments: 20140918_154621.pdf Hi Shelton, Please see my responses below. Also, I have attached the sketch to help clarify. Please let me know of other questions. Thanks for your help. 610 B Minuet Lane Suite 106 Charlotte, NC Office: 704- 672 -6033 Fax: 704 - 672 -6035 www.mvmomentum.com smeachum @mvmomentum.com This message is for the named person's use only. It may contain confidential, proprietary or legally privileged information. No confidentiality or privilege is waived or lost by any mistransmission. If you receive this message in error, please immediately delete it and all copies of it from your system, destroy any hard copies of it and notify the sender. You must not, directly or indirectly, use, disclose, distribute, print, or copy any part of this message if you are not the intended recipient. From: Sullivan, Shelton [ mai Ito: shelton.suIlivan(d)ncdenr.aov] Sent: Thursday, September 18, 2014 9:53 AM To: smeachum(a)mvmomentum.com Cc: kermitt .taylor(a)duke- energy.com Subject: 4101 Arbor Spring Ct. - Shoreline Stabilization Questions Importance: High Steve, I am reviewing your application and have a few questions. I tried calling you at 704 - 672 -6033 but not sure if this is the correct number? Number is correct. Probably no one at office. Here are my questions: 1. Impacts are listed as 600 sq. ft. above and below normal pool. Is this correct or is it 600 sq. ft. total? That is the tota 1. 2. What is the shoreline length to be stabilized? 118' And the width of riprap proposed above and below? 2 -1/2 each side. See the below example or the attached document. 1 a. In the following example, the shoreline is 150 ft. in length and there are 4 ft. of impacts above the full pond water level and 3 ft. below the normal water level, measuring horizontally from the top of the slope but not down the slope. 9 MM e �, iprap y &w add i Piq fT� AL V ft, add tionaI clearing b iow full pond 4, ft, above IfuII Pond iat r 'Llf neces.sarV* %vater lave I fs N 3. The one photograph included really does not show erosion. Is the lake level just high in this shot? Do you have any additional pictures showing erosion and showing the existing bank height? The water level was very close to Full Pond vs Normal level. The bank is undercut from the water and has undermined several areas and tree roots. We would like to lay the slop back slightly to remove the undercut areas and rip those areas. You can just respond to this email with the information included or give me a call with any questions. Thank you, Shelton Su]li�Tan 401 & Buffer Permitting Unit NCDENR I DMsion of grater Resources I grater Quality Permitting Section 1617 Mail Sei0ce Center, Raleigh, NC 27699 -1617 Phone: (919)807 -6361 Fax: (919)807 -6494 Email: shelton.sullivan @ncdenr.gov �/Vebsite: httn: / /nortal.ncdenr.orz /web /wcj /swn /ws /webscane E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties AJ Please ionsidet the e ki o ?matt e ore printing this e