HomeMy WebLinkAboutSW8990839_CURRENT PERMIT_20211210STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8
DOC TYPE]
CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2 of 1 I Z 1 o
YYYYMMDD
ROY COOPER
Governor
ELiZABETH S B1SER
BRJAN WRENN
Wetter
December 10, 2021
Big Toy Storage, Inc
Attn Willard C Blue, Jr, President
5752 S US Hwy 117, P O Box 160
Wallace, NC 28466
NORTH CAROLINA
Environmental Quality
Subject: Permit Renewal
Post -Construction Stormwater Management Permit No. SW8 990839
Big Toy Storage
Brunswick County
Dear Mr Blue
The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on December 2, 2021 The Division is hereby notifying you that permit SW8990839 has been
renewed, updated, and re -issued on December 10, 2021, as attached Please be aware that the renewal and re -
issuance of this stormwater permit does not Imply that the site is currently in compliance
This permit shall be effective until January 13, 2030 and does not supersede any other agency permit that may be
required The project shall be subject to the conditions and limitations as specified therein This permit does not
impose new or increased stormwater control requirements, it clarifies the rules and requirements of this program
to provide you with a better understanding of your obligations under this permit Failure to comply with these
requirements will result in future compliance problems Please note that this permit is not transferable except
after notice to and approval by the Division
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH) The
written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the
OAH within thirty (30) days of receipt of this permit You should contact the OAH with all questions regarding
the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Marl Service Center,
Raleigh, NC 27699-6714, or via telephone at 919431-3000, or visit their website at www NCOAH corn Unless
such demands are made this permit shall be final and binding
If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional
Office, at (910) 796-7215 or ashleym smith@ncdem gov
Sincerely,
S Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures Attachment C — Permitmig History
Renewal Apphcation Documents
DES/ams \\\Stormwater\Permus & Projects\1999\990839 HD\2021 12 permit 990839
cc Wilmington Regional Office Stormwater File
D _E Q� North Carolina Department of Envuonmenml Quality I Division of Energy Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Eztervrion I Wihmngton. North Carolina 28405
'rain rsrnms
9107967215
Post -Construction Stormwater Management
Permit No SW8 990839
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY COMMERCIAL DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Big Toy Storage, Inc
Big Toy Storage
4500 Fish Factory Road, Southport, Brunswick County
FOR THE
construction, operation and maintenance of one (1) infiltration basin(s) in compliance with the
provisions of 15A NCAC 2H 1000 effective September 1, 2015 (hereafter referred to as the
"stormwater rules') and as outlined in the application, approved stormwater management plans,
supplement, calculations, operation and maintenance agreement, recorded documents,
specifications, and other supporting data (the "approved plans and specifications") as attached and/or
on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or
"DEMLR") The project shall be constructed, operated and maintained in accordance with these
approved plans and specifications The approved plans and specifications are incorporated by
reference and are enforceable part of this permit
This permit shall be effective from the date of issuance until January 13, 2030 and shall be subject to
the following specified conditions and limitations The permit issued shall continue in force and effect
until the permittee files a request with the Division for a permit modification, transfer, renewal, or
rescission, however, these actions do not stay any condition The issuance of this permit does not
prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or
terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A
NCAC 2H 1000 and NCGS 143-215 1 et al
I DESIGN STANDARDS
1 This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data
2 This stormwater system has been approved for the management of stormwater runoff as
described in Section 17 of this permit The stormwater control has been designed to handle
the runoff from 308,190 square feet of impervious area
3 This basin must be operated with a 50-foot vegetated filter strip
The tract will be limited to the amount of built -upon area indicated in Section 17 of this permit,
and per approved plans
Page 1 of 5
Post -Construction Stormwater Management
Permit No SW8 990839
5
11
All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements The final plats for the protect will be recorded showing all such
required easements, in accordance with the approved plans
The runoff from all built -upon area within the permitted drainage area of this protect must be
directed into the permitted stormwater control system
The following design criteria have been permitted for the infiltration basin and must be
provided and maintained at design condition
t
k
I
m
Drainage Area, acres
Onsite, ft2
Offsite, ft2
Total Impervious Surfaces, ft2
Design Storm, inches
Basin Depth, feet
Bottom Elevation, FMSL
Bottom Surface Area, ft2
Bypass Weir Elevation, FMSL
Permitted Storage Volume, ft3
Type of Soil
Expected Infiltration Rate, in/hr
Seasonal High -Water Table, FMSL
Time to Draw Down, hours
Receiving Stream / River Basin
Stream Index Number
Classification of Water Body
II SCHEDULE OF COMPLIANCE
917
399,445
0
308,190
1 5"
3
8
13,239
11
46,406
Sand
9 inches / hour
6
4
Dutchman Creek Channel /Cape Fear
18-88-9-3-3
"SA"
1 The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface
2 During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately
3 The permittee shall at all times provide the operation and maintenance necessary to assure
the permitted stormwater system functions at the design condition The approved Operation
and Maintenance Plan must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to
4
5
0
a Semiannual scheduled inspections (every 6 months)
b Sediment removal
c Mowing and revegetation of slopes and the vegetated filter
d Immediate repair of eroded areas
e Maintenance of all slopes in accordance with approved plans and specifications
f Debris removal and unclogging of bypass structure, infiltration media, flow spreader,
catch basins, piping and vegetated filter
g A clear access path to the bypass structure must be available at all times
Records of maintenance activities must be kept and made available upon request to
authorized personnel of DEMLR The records will indicate the date, activity, name of person
performing the work and what actions were taken
The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division
If the stormwater system was used as an Erosion Control device, it must be restored to design
condition prior to operation as a stormwater treatment device, and prior to occupancy of the
facility
Page 2 of 5
Post -Construction Stormwater Management
Permit No SW8 990839
7 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting
documentation Any deviations from the approved plans and specifications must be noted on
the Certification A modification may be required for those deviations
Access to the stormwater facilities shall be maintained via appropriate recorded easements at
all times
The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made
10 No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below For changes to
the protect or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification
a Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc
b Redesign or addition to the approved amount of BUA or to the drainage area
c Further development, subdivision, acquisition, lease or sale of any, all or part of the
protect and/or property area as reported in the approved plans and specifications
d Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan
e The construction of any allocated future BUA
f The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications
g Other modifications as determined by the Director
III GENERAL CONDITIONS
1 CORRECTIVE ACTIONS REQUIRED If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions This includes actions required by this
Division and the stormwater rules such as the construction of additional or replacement on -site
stormwater systems These additional or replacement measures shall receive a permit from
the Division prior to construction
2 PERMIT RENEWAL A permit renewal request must be submitted at least 180 days prior to
the expiration date of this permit The renewal request must include the appropriate
application, documentation and the processing fee as outlined in Title 15A NCAC
02H 1045(3)
3 CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION
The permittee shall submit a completed Permit Information Update Application Form to the
Division within 30 days to making any one of these changes
Page 3 of 5
Post -Construction Stormwater Management
Permit No SW8 990839
4 TRANSFER This permit is not transferable to any person or entity except after notice to and
approval by the Director Neither the sale of the project and/or property, in whole or in part, nor
the conveyance of common area to a third party constitutes an approved transfer of the permit
TRANSFER REQUEST The transfer request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H 1045(2) This
request must be submitted within 90 days of the permit holder meeting one or more of
the following
i A natural person who is deceased,
u A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved,
ui A person or entity who has been lawfully and finally divested of title to the
property on which the permitted activity is occurring or will occur through
foreclosure, bankruptcy, or other legal proceeding
IV A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur
TRANSFER INSPECTION Prior to transfer of the permit, a file review and site
inspection will be conducted by Division personnel to ensure the permit conditions
have been met and that the protect and the on -site stormwater system complies with
the permit conditions Records of maintenance activities performed to date may be
requested Protects not in compliance with the permit will not be transferred until all
permit and/or general statute conditions are met
COMPLIANCE The permittee is responsible for compliance with the terms and conditions of
this permit until the Division approves the transfer request
a APPROVED PLANS AND SPECIFICATIONS A copy of this permit, approved plans,
application, supplement, operation and maintenance agreement, all applicable
recorded documents, and specifications shall be maintained on file by the permittee at
all times
b DIVISION ACCESS The permittee grants Division Staff permission to enter the
property during normal business hours to inspect all components of the permitted
protect
c ENFORCEMENT Any individual or entity found to be in noncompliance with the
provisions of a stormwater management permit or the requirements of the stormwater
rules is subject to enforcement procedures as set forth in NCGS 143 Article 21
d ANNUAL CERTIFICATION The permittee shall electronically submit to the Division an
annual certification completed by either the permittee or their designee confirming the
protects conformance with permit conditions
e OBTAINING COMPLIANCE The Director may notify the permittee when the permitted
site does not meet one or more of the minimum requirements of the permit Within the
time frame specified in the notice, the permittee shall submit a written time schedule to
the Director for modifying the site to meet minimum requirements The permittee shall
provide copies of modified plans and certification in writing to the Director that the
changes have been made
OTHER PERMITS The issuance of this permit does not preclude the permittee from
complying with and obtaining any other permits or approvals that are required for this
development to take place, as required by any statutes, rules, regulations, or
ordinances, which may be imposed by any other Local, State or Federal government
agency having jurisdiction Any activities undertaken at this site that cause a water
quality violation or undertaken prior to receipt of the necessary permits or approvals to
do so are considered violations of NCGS 143-215 1, and subject to enforcement
procedures pursuant to NCGS 143-215 6
Page 4 of 5
Post -Construction Stormwater Management
Permit No SW8 990839
Permit renewed, updated and reissued this the 10th day of December 2021
NORTH CAROLINA ENVIR !MENTAL MANAGEMENT COMMISSION
3Brian renn,
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 5 of 5
Attachment C - Permitting History
Big Toys Storage
Permit No SW8990839
Approval
Date
Pernut
Action
BIMS
Version
Description of the Changes
1/13/2000
Original
Approval
10
4/12/2018
Renewal
20
12/10/2021
Renewal
3 0
-__ _-_--ULMLK
�I Date Rece
ved
Fee Paid
Permit Number
is
3I
10011 19sn5 —
to agI I b 3
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER OECD
PERMIT RENEWAL APPLICATION FORM it 2 2021
�°t
In accordance with 15A NCAC 2H 1045(3), the current permit holder shall renew their high density permit 180 days "-
pnor to its expiration Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60 (c) This application form is for permit renewals only
A PROJECT INFORMATION
1 State Stormwater Permit Number
2 Project name Biv Foy Storavc, Inc
3 Project street address 4500 Fish Factory Road
City ;
28461
County Brunswick ZIP
4 What, if any, changes have been made to the project as permitted? None
If the project has changed from the original approved plans, please complete SWU-101 for a Ma/or
Modification or Minor Modification Application form available at https //deg nc qov/about/divisions/energy
m in era Ida n d-reso u rces/ene rq v-min era I-land-ru les/stormwater-grog ram/post-construction
B PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at https //deq nc qov/about/divisions/energy-minera l-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction State Stormwater Permits do not
automatically transfer with the sale of the property
1 Current Permit Holder's Company Name/Organization Big Toy Storage Inc
2 Signing Official's Name Willard C Blue, Jr
3 Signing Official's Title President
4 Mailing Address 5752 S US Hwy 117, PO Box 160
City Wallace State NC ZIP 28466
5 Street Address 5752 S US Hwy 117
City
6 Phone (910) 285-1047 Email clay( murphyinvestmentgroup corn
NC ZIP 28466
Stormwater Permit Renewal Form Page 1 of 3 May 11 2018
C SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) orDEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW) Only applications packages that
Include all required Items listed below will be accepted and reviewed
initial each item below to indicate that the required information is provided in the application package
LJC& 1 A permit application processing fee of $505 00 payable to NCDEQ
t,2G'S 2 One original signed hard copy and one electronic copy of this completed form The signing official
named on this application to represent the current permittee must meet one of the following
a Corporation — a principle executive officer of at least the level of vice-president,
b Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G S 57D "North Carolina Limited Liability Company Act,"
c Public Entity — a principal executive officer, ranking official, or other duly authorized employee,
d Partnership or limited partnership — the general partner,
e Sole proprietor, or
f Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity
tJ 05 3 One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including deed restrictions, protective covenants,
condominium/planned community declaration and easements If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date
WJ»CA-, 4 O&M Agreements, Please select one
I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit, or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me I agree to keep this on file with the permit
5 Designer Certifications, Please select one
[� A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division, or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed, or
❑ The project has not yet been built
6 [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit
VJZ8 7 [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC)
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C 2 per 15A NCAC 2H 1043(3)(b)
https //www sosnc gov/online services/search/by title/ Business Registration
DEC 0 2 2021 N j
Stormwater Permit Renewal Application Form Page 2 of 3 May 11 2018
D PERMITTEE'S CERTIFICATION
LJ. I `A ✓a C (� 1 H a, ar , the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership All information provided on this permit renewal application is, to the best of my
knowledge, correct and complete
Signature WJ�aj C. tAO _ Date I)-
NOTA ZATION
I. Me .U,55e, S
a Notary Public for the State of
'(Y ( oyol I t Q , County of 11 ri , do hereby certify
that t0ji A 6-✓J (,l t V personally appeared before me
this the '7'l t= day of lhi it C✓ , 20 2 , and acknowledge the due
�ouuwuii
exe t��pyfth*oing instrument Witness my hand and official seal,
� FY
cr Notary Public T
0lotary SU)agiin
County =
My Comm Exp _
�f, 11-26-2026
N6te
QiwSianature. 4
My com'I CANA
mi§918n expires ll 2(0 20 Z(o
n_ _
Df� 0 2 20?1
ayIf
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
Permit No 5(JJY qc(o'? s%
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
INFILTRATION BASIN SUPPLEMENT
This form may be photocopied for use as an original
DWO Stormwater Management Plan Review
A complete stormwater management plan submittal includes a stormwater management permit application, an
infiltration basin supplement for each system, design calculations, soils report and plans and specifications
showing all stormwater conveyances and system details
I. PROJECT INFORMATION
Project Name
Contact Person Tnpp Enemeerm Phone Number 910 _763-5100
This worksheet applies to Basin No 1 in Drainage Area 1
(as identified on plans) (%rom Form SWU-101)
H. DESIGN INFORMATION — Attach supporting calculations/documentation The soils report must be
based upon an actual field investigation and soil borings County sod maps are not an acceptable
source of soils information All elevations shall be in feet mean sea level (frisl)
Sods Report Summary
Sod Type
Infiltration Rate
SHWT Elevation
Basin Design Parameters
Design Storm
Design Volume
Drawdown Time
Basin Dimensions
Basin Size
Basin Volume Provided
Basin Elevations
Bottom Elevation
Storage Elevation
Top Elevation
Form SWU-103 Rev 3 99
Brown slightly
silty fine sand
in/hr or cf/hr/sf (circle appropriate units)
fmsl (Seasonal High Water Table elevation)
inch (1 S inch event for SA waters, 1 inch event for otherv)
38,524 c f
167 days
78 ft x 169 av _ ft = _13,211 sq ft (bottom danenvions)
7 6�9_9(v,4oc c f
fmsl
11 0 fmsl
11 5 frisl
Page 1 of 3
III REQUIRED ITEMS CHECKLIST
it I
The following bheclklist outlines design requirements per the Stormwater Best Management Practices Manual
(N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section 15 A NGAC 2H 1008
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below Attach justification if a requirement has not been met.
Applicants Initials
C1x a System is located 50 feet from class SA waters and 30 feet from other surface waters
C—Cb System is located at least 100 feet from water supply wells
COG c Bottom of system is at least 2 feet above the seasonal high water table
G� d Bottom of system is 3 feet above any bedrock or impervious sod horizon
GGI: e System is not sited on or in fill material or DWQ approval has been obtained
6J5r__ f System is located in a recorded drainage easement for the purposes of operation and
maintenance and has recorded access easements to the nearest public right-of-way
g Drainage area for the device is less than 5 acres
Gi_;� h Soils have a minimum hydraulic conductivity of 0 52 inches per hour and soils report is
attached
t—VG i System captures and infiltrates the runoff from the first 1 0 inch of rainfall (1 5 mch event
for areas draining to SA waters) Design volume and infiltration calculations attached
GAG I System is sized to take into account the runoff at the ultimate built -out potential from all
surfaces draining to the system, including any off -site drainage Calculations attached
(irx_ k All side slopes stabilized with vegetated cover are no steeper than 3 1 (H V)
GOC- I A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or
sediment trap is provided
cdX m Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches
or dense vegetative cover is provided
CMG n Vegetated filter is provided for overflow and detail is shown on plans (Required minimum
length is 50 feet for SA waters, 30 feet for other waters)
o Flow distribution mechanism within basin is provided
GIG p A benchmark is provided to determine the sediment accumulation in the pretreatment
device
GQL
q Runoff in excess of design volume bypasses off-line systems (bypass detail provided)
GO` r System is designed to draw down the design storage volume to the proposed bottom
elevation under seasonal high water conditions within five days A soils report and all
pertinent draw -down calculations are attached
CDL s Plans ensure that the installed system sill meet design specifications (constructed or
restored) upon initial operation once the project is complete and the entire drainage area
is stabilized
Form SWU-103 Rev 3 99 Page 2 of 3
IV' INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT
1 After every runoff producing rainfall event and at least monthly, inspect the infiltration system for erosion,
trash accumulation, grass cover, and general condition
2 Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow
vegetative cover to maintain a maximum height of six inches, and remove trash as needed
3 After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow
structures for blockage and deterioration Remove any blockage and repair the structure to approved
design specifications
4 Remove accumulated sediment from the pretreatment system and infiltration basin annually or when
depth in the pretreatment unit is reduced to 75% of the original design depth The system shall be restored
to the original design depth without over -excavating Over excavating may cause the required water
table separation to be reduced and may compromise the ability of the system to perform as designed
Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner
That will adversely impact water quality (i a stockpiling near a stormwater treatment device or stream,
etc )
A benchmark shall be established in the pretreatment unit The benchmark will document the original
design depth so that accurate sediment accumulation readings can be taken The measuring device used
to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not
readily penetrate into accumulated sediments
When the design depth reads 0, 3-15 feet in the pretreatment unit, the sediment shall be
removed from both the pretreatment unit and the infiltration basin
5 If the Division determines that the system is failing, the system will immediately be repaired to original
design specifications If the system cannot be repaired to perform its design function, other stormwater
control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed
I acknowledge and agree by my signature below that I am responsible for the performance of the five
maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party
���4d_
Print Name and Title TerryOuinn, iq Big Toys Storage, Inc
Address 1985 Eastwood Raoad, Suite 206, Wilmington, NC 28403
Phone 910-256-6477 Date 7U., II
Signature
Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and
a resident of the subdivision has been named the prevident
I, Monica V Loughlin a Notary Public for the State of North Carolina . County of
New Hanover /� do hereby certify that Terry m Oun personally appeared
before me this p4 day of jkA LkCA , 1999i� and acknowledge the due execution of the forgoing infiltration
basin n1�9@16,Biauirements Witness my hand and fficial
NpTgyY
8 S My commission expires _08/07/01
ER
jDUBL�G �i'=off /V 11 v
'�iER
Form S41Q uul%1F1 3 99 Page 3 of 3
State Stormwater Management Systems
Permit No SW8990839
Big Toys Storage
Stormwater Permit No SW8 990839
Brunswick County
Designer's Certification
1,—:K,u�= 1 e-lr� as a duly registered }�l+rF6Sn•raL .tit.. sw� in
the State of North Carolina, having been authorized to the construction
the project, =',vTPof
etT
14 % rJ STo RAK e
for -$14 np r TT?AAir , _.4'4 (Project Owner) hereby state that, to the best ofmy abilities, due cai e
and diligence was used in the observation of the project construction such that the construction was observed to be
built within substantial compliance and intent of the approved plans and specifications
The checklist of items on page 2 of this form is included in the Certification
Noted deviations from approved plans and specification
Signature
Registration Number gI?&—$
Date / i� /
F
State Stormwater Management Systems
permit No SW8 990839
Certification Requirements
l The drainage area to the system contains approximately the permitted acreage
,_2 The drainage area to the system contains no more than the permitted amount of built -upon area
'� 3 All the built -upon area associated with the project is graded such that the runoff drains to the system
S �4 1 he outlet/bypass structure elevations are per the approved plan
S51? 5 The outlet structure is located per the approved plans
17elA 6 Trash rack is provided on the outletfbypass structure
ef- 7 All slopes are grassed with permanent vegetation
Ma—D 8 Vegetated slopes are no steeper than 3 1
' aV9 The inlets are located per the approved plans and do not cause short-circuiting of the system
�10 The permitted amounts of surface area and/or volume have been provided
11 Required drawdown devices are correctly sized per the approved plans
12 All required design depths are provided
!ZA13 All required parts of the system are provided, such as a vegetated shelf, and a forebay
-513(714 The overall dimensions of the system, as shown on the approved plans, are provided
cc NCDENR-DWQ Regional Office
Delaney Aycock, Brunsvnck County Building Inspector
te/✓eZ atjcwr vm�iVt'fl . i4v J3as✓ ..✓erpt 5�.✓O /3es.e.,
OF Ir"F.l. ",+1. rYX7biw (2c-Br�.cCrurNe^n.