Loading...
HomeMy WebLinkAboutSW8980434_HISTORICAL FILE_20000407STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 9 $ p` 43` DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 200o Oy01 YYYYMMDD State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Bill Holman, Secretary Division of Water Quality April 7, 2000 Mr Kenneth A Kirkman, Attorney in Fact Bald Head Island Limited PO Box 3069 Bald Head Island, NC 28461 Q0 NCDENR NC GROUNA r)EPARTMENr or ENVIRONMENT AND N. URA RESOURCE$ Subject Permit No SW8980434MOD Row Boat Row Subdivision High Density Subdivision Stormwater Project Brunswick County Dear Mr Kirkman The Wilmington Regional Office received a complete Stormwater Management Permit Application for Row Boat Row Subdivision on April 6, 2000 Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth m Title 15A NCAC 2H 1000 We are forwarding Permit No SW8 980434MOD, dated April 7, 2000, for the construction of the project, Row Boat Row Subdivision This permit shall be effective from the date of issuance until April 7, 2010, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P O Drawer 27447, Raleigh, NC 27611-7447 Unless such demands are made this permit shall be final and binding If you have any questions, or need additional information concerning this matter, please contact Scott Vinson, or me at (910)395-3900 Sincerely, l Rick Shiver Water Quality Regional Supervisor RSS/ sav S \WQS\STORMWAT\PERMIT\980434 APR cc Perry Davis Delaney Aycock, Brunswick County Inspections Scott Vinson Wilmington Regional Office Central Files 127 Cardinal or Ext , Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10°/ post -consumer paper State Stormwater Management Systems Permit No SW8980434MOD STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Bald Head Island Limited Row Boat Row Subdivision Brunswick County FOR THE construction, operation and maintenance of one infiltration trench system and three infiltration basins in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of tlus permit Taus permit shall be effective from the date of issuance until April 7, 2010 and shall be subject to the following specified conditions and limitations L DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described on pages 3 thru 6 of this permit, the Project Data Sheets The subdivision is permitted for 18 lots, see Exhibit A for the allowable built -upon area for each lot and common area Approved plans and specifications for tlus project are incorporated by reference and are enforceable parts of the permit State Stormwater Management Systems Permit No SW8 980434MOD DIVISION OF WATER QUALITY PROJECT DATA SHEET Project Name Row Boat Row Subdivision, Drainage Basin #1 Permit Number SW8 980434MOD Location Brunswick County Applicant Mr Kenneth A Kirkman, Attorney in Fact Mailing Address Bald Head Island Limited PO Box 3069 Bald Head Island, NC 28461 Application Date April 6, 2000 Name of Receiving Stream / Index # Bald Head Island Manna / 18-88-8-5 Classification of Water Body "SC" If Class SA, chloride sampling results n/a Design Storm V Infiltration Trench Depth, feet 250 Drainage Area, acres 1 15 Total Impervious Surfaces, ft2 23,958 Offsite Area entering Trench, ft2 none, per Engineer Trench Dimensions, L x W x H, ft 420' x 2 5' x 2 5' Required Storage Volume, ft' 2,006 Provided Storage Volume, ft' 2,287 Top of Storage Elevation, FMSL 750 Controlling Orifice 18" d) inlet grate overflow (invert 7 50 FMSL) Type of Soil Sand, Newhann & Fripp Expected Infiltration Rate 20 0 inches per hour Seasonal High Wate Table 2 0 FMSL Time to Draw Down 10 hour 3 State Stormwater Management Systems Permit No SW8980434MOD DIVISION OF WATER QUALITY PROJECT DATA SHEET Project Name Row Boat Row Subdivision, Drainage Basin #2 Permit Number SW8 980434MOD Location Brunswick County Applicant Mr Kenneth A Kirkman, Attorney in Fact Mailing Address Bald Head Island Limited PO Box 3069 Bald Head Island, NC 28461 Application Date April 6, 2000 Name of Receiving Stream / Index # Cape Fear River / 18-(87 5) Classification of Water Body "SA" If Class SA, chloride sampling results n/a Design Storm 1 5" Infiltration Basin Depth, feet 100 Bottom Elevation, FMSL 900 Drainage Area, acres 091 Total Impervious Surfaces, ft2 13,939 Offsrte Area entering Basin, ft2 none, per Engineer Basin Dimensions, L x W x H, ft 250' x 5 0' x 1 0' (bottom dimensions) Required Storage Volume, ft3 1,816 Provided Storage Volume, ft3 2,000 Top of Storage Elevation, FMSL 1000 Type of Soil Sand, Newhann & Fnpp Expected Infiltration Rate 20 0 inches per hour Seasonal High Wate Table 2 0 FMSL Time to Draw Down 10 hour 0 State Stormwater Management Systems Permit No SW8 980434MOD DIVISION OF WATER QUALITY PROJECT DATA SHEET Project Name Row Boat Row Subdivision, Drainage Basin #3 Permit Number SW8 980434MOD Location Brunswick County Applicant Mr Kenneth A Kirkman, Attorney in Fact Mailing Address Bald Head Island Limited PO Box 3069 Bald Head Island, NC 28461 Application Date April 6, 2000 Name of Receiving Stream / Index # Cape Fear River / 18-(87 5) Classification of Water Body "SA" If Class SA, chloride sampling results n/a Design Storm 1 5" Infiltration Basin Depth, feet 100 Bottom Elevation, FMSL 700 Drainage Area, acres 070 Total Impervious Surfaces, ft2 13,939 Offsite Area entering Basin, ft2 none, per Engineer Basin Dimensions, L x W x H, ft 240' x 5 0' x l 0' (bottom dimensions) Required Storage Volume, ft3 1,759 Provided Storage Volume, ft3 1,920 Top of Storage Elevation, FMSL 800 Type of Soil Sand, Newhann & Fnpp Expected Infiltration Rate 20 0 inches per hour Seasonal High Wate Table 2 0 FMSL Time to Draw Down 10 hour 5 State Stonnwater Management Systems Permit No SW8980434MOD DIVISION OF WATER QUALITY PROJECT DATA SHEET Project Name Row Boat Row Subdivision, Drainage Basin #4 Permit Number SW8 980434MOD Location Brunswick County Applicant Mr Kenneth A Kirkman, Attorney in Fact Mailing Address Bald Head Island Limited PO Box 3069 Bald Head Island, NC 28461 Application Date April 6, 2000 Name of Receiving Stream / Index # Cape Fear River / 18-(87 5) Classification of Water Body "SA" If Class SA, chloride sampling results n/a Design Storm 1 5" Infiltration Basin Depth, feet 1 00 Bottom Elevation, FMSL 750 Drainage Area, acres 065 Total Impervious Surfaces, ft2 9,583 Offsite Area entering Basin, ft2 none, per Engineer Basin Dimensions, L x W x H, ft 160' x 5 0' x 1 0' (bottom dimensions) Required Storage Volume, ft' 1,255 Provided Storage Volume, ft' 1 280 Top of Storage Elevation, FMSL 850 Type of Soil Sand, Newhann & Fnpp Expected Infiltration Rate 20 0 inches per hour Seasonal High Wate Table 2 0 FMSL Time to Draw Down 10 hour I State Stormwater Management Systems Permit No SW8 980434MOD II SCHEDULE OF COMPLIANCE No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner The following items will require a modification to the permit Any revision to the approved plans, regardless of size Project name change Transfer of ownership Redesign or addition to the approved amount of built -upon area Further subdivision of the project area Filling in, altering, or piping of any vegetative conveyance shown on the approved plan The Director may determine that other revisions to the project should require a modification to the permit The Director may notify the permittee when the permitted site does not meet one or more of the mmunum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made 6 The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface except roads During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately The permittee grants permission to DENR Staff to enter the property for the purposes of inspecting the project for compliance with the conditions of this permit Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer -for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification 10 Decorative spray fountains will not be allowed in the stormwater treatment system 11 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 12 Prior to transfer of ownership, the system must be inspected by DWQ personnel, and determined to be in compliance with all permit conditions Records of maintenance activities will be required 7 State Stormwater Management Systems Permit No SW8980434MOD li The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and revegetation of side slopes d Immediate repair of eroded areas e Maintenance of side slopes in accordance with approved plans and specifications f Debris removal and unclogging of outlet structure, onfice device and catch basins and piping g Access to the outlet structure must be available at all times 14 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 15 Prior to the sale of any lot, deed restrictions must be recorded which limit the built -upon area per lot to the amount as shown on the Project Data Sheet, per Section I, Part 2 The recorded statements must follow the form "The maximum built -upon area per lot is, see Exhibit A This allotted amount includes any built - upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, and coquma, but does not include raised, open wood decking, or the water surface of swimming pools " b "The covenants pertaining to stormwater regulations may not be changed or deleted without concurrence of the State " "Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the State " d "Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built -upon area due to CAMA regulations " "All runoff on the lot must dram into the permitted systems This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to dram toward the street, or grading perimeter swales and directing them into the pond or street Lots that naturally drain into the system are not required to provide these measures " 16 A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots The recorded copy must bear the signature of the Permittee, the deed book number and page, and stamp/signature of the Register of Deeds 17 This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data State Stormwater Management Systems PermrtNo SW8980434MOD 18 A copy of the approved plans and specifications shall be maintained on file by the Pemuttee for a minimum of ten years from the date of the completion of construction III GENERAL CONDITIONS This permit is not transferable In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved, such as a copy of the deed of trust Other supporting materials, such as a signed Operation and Maintenance plan in the case of engineered systems, will also be required The project must be in good standing with DWQ The approval of this request will be considered on its merits and may or may not be approved 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 3 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have j unsdiction 4 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 5 The permit may be modified, revoked and reissued or terminated for cause The filmg of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 6 Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours The permittee shall notify the Division of any mailing address changes within 30 days Permit issued this the 7th day of April, 2000 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION - A. am r , —� Kerr T Stevens, Director `f Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 980434MOD State Stormwater Management Systems Permit No SW8 980434MOD Row Boat Row Subdivision Stormwater Permit No SW8 980434MOD Brunswick County Designer's Certification Page 1 of 2 1, as a duly registered in the State of North Carolina, having been authorized to observe (penodically/weekly/full time) the construction of the project, for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of ttus form are a part of this Certification Noted deviations from approved plans and specifications Signature Registration Number Date SEAL 10 State Stormwater Management Systems Permit No SW8980434MOD Certification Requirements Page 2 of 2 1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area All the built -upon area associated with the project is graded such that the runoff drams to the system _4 The outlet/bypass structure elevations are per the approved plan 5 The outlet structure is located per the approved plans _6 Trash rack is provided on the outlet/bypass structure _7 All slopes are grassed with permanent vegetation 8 Vegetated slopes are no steeper than 3 1 9 The inlets are located per the approved plans and do not cause short-circuiting of the system 10 The permitted amounts of surface area and/or volume have been provided ] 1 Required drawdown devices are correctly sized per the approved plans 12 All required design depths are provided 13 All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter 14 The overall dimensions of the system, as shown on the approved plans, are provided cc NCDENR-DWQ Regional Office Delaney Aycock, Brunswick County Building Inspector 11 I t Z5{ 131T A TABLE OFLOT S/ZE5 AND BU/L T UPON AREA5 FOR ROWBOAT ROWSU50IV1S/ON, BALD /-LEAD /.RAND LOT # LOT AREA (ACRE) ALLOWABLE BUILT UPON AREA (5Q FT ) 200 0 12 2500 202 0 14 2500 204 0 14 2500 20G 0 10 2500 207 O II 2500 208 0 10 2500 209 0 II 2500 210 O II 2500 211 0 II 2500 212 0 12 2500 213 0 11 2500 214 0 12 2500 215 0 II 2500 216 O 13 2500 217 0 11 2500 218 O 14 2500 215 0 15 1000 220 —0 17 2500 common area 0 14 500 TOTAL 44,000 Cape Fear Engineering Revised 02/08/00 File lot sizes and built upon areas doc OFFICE USE ONLY - - Received Fee PsTd Pemit Number o 0 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1 Applicant's name (specify the name of the corporation, individual, etc who owns the project) Bald Head Island Limited 2 Print Owner/Signing Official's name and title (person legally responsible for facility and compliance) ✓ Kenneth M. Kirkman, Attorney in Fact 3 Mailing Address for person listed in item 2 above P O Box 3069 City Bald Head Island State NC Zip 28461 Telephone Number (910) 457-7000 ` 4 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc ) Row Boat Row Subdivision 5 Location of Project (street address) Row Boat Row City Bald Head Island County Brunswick 6 Directions to project (from nearest major intersection) Take the ferry from Indigo Plantation Manna located in Southport, NC 7 Latitude 33052'25" Longitude 8 Contact person who can answer questions about the project Name Ken Stewart II PERMIT INFORMATION 1 Specify whether project is (check one) New 78°00'10" Telephone Number Renewal of project 1457-7326 X Modification Form SVIU-101 Version 3 99 Page 1 of 4 2 If this application is being submitted as the result of a renewal or modification to an existing permit, list the Existing permit number SW8 980434 Modification And its Issue date (if known) December 17, 1999 3 Specify the type of project (check one) Low Density X High Density Redevelop General Permit Other 4 Additional Project Requirements (check applicable blanks) X CAMA Major X Sedimentation/Erosion Control 404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748 III PROJECT INFORMATION 1 In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) describing stormwater management for the project This project implements stormwater control systems for a high density development consisting of infiltration swales and underground infiltration trenches The swales and trenches will be located in recorded drainage easements 2 Stormwater runoff from this project drains to the Cape Fear 3 Total Project Area 49 acres 4 Project Built Upon Area 5 How many drainage basins does the project have9 6 River basin 288 % 6 Complete the following information for each drainage area If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Bald Head Island Marina Cape Fear River Receiving Stream Class SC SA Drainage Area 1 15 acres 0 91 acres Existing Impervious* Area 0 0 Proposed Im ervious* Area 0 55 acres 0 32 acres % Impervious* Area total 47 8% 35 2% Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings 0 37 acres 0 23 acres On -site Streets 0 14 acres 0 07 acres On -site Parking 0 0 On -site Sidewalks 0 03 acres 0 02 acres Other on -site 0 01 acres(Amenity Area 0 Off site 0 0 Total 0 55 acres Total 0 32 acres " Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks gravel areas, etc Form SWU-101 Version 3 99 Page 2 of 4 1 6 Complete the following information for each drainage basin If there are more than two drainage basins in the project, attach an additional sheet with the information for each basin provided in the same format as below Basin Information Drainage Basin 3 Drainage Basin 4 Receiving Stream Name Cape Fear River Cape Fear River Receiving Stream Class SA SA Drainage Basin Area 0 70 acres 0 65 acres Existing Impervious* Area 0 0 Proposed Impervious* Area 0 32 acres 0 22 acres % Impervious* Area total 45 7 % 33 8 % Impervious* Surface Area Drainage Basin 3 Drainage Basin 4 On -site Buildings 0 23 acres 0 17 acres On -site Streets 0 07 acres 0 04 acres On -site Parking 0 0 On -site Sidewalks 0 02 acres 0 01 acres Other on -site 0 0 Off site 0 0 Total 0 32 acres E= 0 22 acres Basin Information Drainage Basin 5 Drainage Basin 6 Receiving Stream Name Cape Fear River Cape Fear River Receiving Stream Class SA SC Drainage Basin Area 122 acres 0 27 acres Existing Impervious* Area 0 0 Proposed Impervious* Area 0 0 % Impervious* Area (total) 0 0 Impervious* Surface Area Drainage Basin 5 - Drainage Basin 6 On -site Buildings 0 0 On -site Streets 0 0 On -site Parking 0 0 On -site Sidewalks 0 0 Other on -site 0 0 Off site 0 0 Total E= 0 E= 0 7 How was the off -site impervious area listed above derived? No offsite area IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, cimparcels and future development prior to the sale of any lot If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment 1 The following covenants are intended to ensure ongoing compliance with state stormwater management permit number SW8 980434 as issued by the Division of Water Quality These covenants may not be changed or deleted without the consent of the State 2 No more than _ ** square feet of any tot shall be covered by structures or impervious materials Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface ofswimming pools 3 Swa/es shall not be filled in, piped, or altered except as necessary to provide driveway crossings 4 Built -upon area in excess area of the permitted amount requires a state stormwater management permit modification prior to construction 5 All permitted runofffrom outparcels or future development shall be directed into the permitted stormwater control system These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted ** See attached Exhibit A By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land , that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot V SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3 99 Page 3 of 4 VI SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ) A complete package includes all of the items listed below The complete application package should be submitted to the appropriate DWQ Regional Office Please indicate that you have provided the following required information by initialing in the space provided next to each item Initials • Original and one copy of the Stormwater Management Permit Application Form SW? • One copy of the applicable Supplement Form(s) for each BMP :S�3 • Permit application processing fee of $420 (payable to NCDENR) {� • Detailed narrative description of stormwater treatment /management Sc3P • Two copies of plans and specifications, including $�3p -Development/Project name -Engineer and firm -Legend -North Arrow -Scale -Revision number & date -Mean high water line -Dimensioned property / project boundary -Location map with named streets or NCSR numbers -Origmal contours, proposed contours, spot elevations, finished floor elevations -Details of roads, drainage features, collection systems, and stormwater control measures -Wetlands delineated, or a note on plans that none exist -Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations -Drainage areas delineated -Vegetated buffers (where required) VII AGENT AUTHORIZATION If you wish to designate submittal authority to another individual or firm so that they may provide information on your behalf, please complete this section Designated agent (individual or firm) Cape Fear Engmeenn Mailing Address 5040 New Centre Dnve, Smite D City Wilmington State NC Zip 28403 Phone (910) 790-8584 Fax (910)790-8583 VIH APPLICANT'S CERTIFICATION I, (print or type name ofperson listed in General Information, item 1) Kenneth M. Kirkman , Atty, in certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NC'AC 2H 1000 Signature Date P 'ac t Form SW-101 Version 3 99 Page 4 of 4 ! t. ,fXf//B/T A TABLE OF LOT 5/ZE5 AND BU/L T UPON AREA5 FOR ROW BOAT ROW 5UBDIV15/ON, BALD HEAD 15LAN0 LOT # LOT AREA (ACRE) ALLOWABLE BUILT UPON AREA (5Q FT ) 200 0 12 2500 202 0 14 2500 204 0 14 2500 20G 0 10 2500 207 0 II 2500 208 0 10 2500 209 0 II 2500 210 0 11 2500 211 0 II 2500 212 0 12 2500 213 0 11 2500 214 0 12 2500 215 0 11 2500 21G 0 13 2500 217 0 II 2500 218 0 14 2500 219 0 15 1000 220 0 17 2500 common area 0 14 500 TOTAL 44,000 Cape Fear Engineering Revised 02/08/00 File lot saes and built upon areas doc OFFICE USE ONLY State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I GENERAL INFORMATION 1 Applicant's name (specify the name of the corporation, individual, etc who owns the project) Bald Head Island Limited 2 Print Owner/Signing Official's name and title (person legally responsible for facility and compliance) Kent Mitchell, owner 3 Mailing Address for person listed in item 2 above P O Box 3069 City Bald Head Island State NC Zip 28461 Telephone Number (910) 457-7000 4 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc ) Row Boat Row Subdivision 5 Location of Project (street address) City Bald Head Island County Brunswick 6 Directions to project (from nearest major intersection) Take the ferry from Indigo Plantation Marina located in Southport, NC 7 Latitude 33052'25" Longitude 78000' 10" 8 Contact person who can answer questions about the project Name Ken Stewart Telephone Number II PERMIT INFORMATION 1 Specify whether project is (check one) New Renewal of project (910)457-7326 X Modification Form SWU-101 Version 3 99 Page 1 of State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I GENERAL INFORMATION 1 Applicant's name (specify the name of the corporation, individual, etc who owns the project) Bald Head Island Limited 2 Print Owner/Signing Official's name and title (person legally responsible for facility and compliance) Kent Mitchell, owner 3 Mailing Address for person listed in item 2 above P O Box 3069 City Bald Head Island State NC Zip 28461 Telephone Number (910) 457-7000 4 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc ) Row Boat Row Subdivision 5 Location of Project (street address) City Bald Head Island County Brunswick 6 Directions to project (from nearest major intersection) Take the ferry from Indigo Plantation Marina located in Southport, NC 7 Latitude 33052'25" Longitude 78000' 10" 8 Contact person who can answer questions about the project Name Ken Stewart Telephone Number II PERMIT INFORMATION 1 Specify whether project is (check one) New Renewal of project (910)457-7326 X Modification Form SWU-101 Version 3 99 Page 1 of 2 If this application is being submitted as the result of a renewal or modification to an existing permit, list the Existing permit number S W8 980434 Modification And its issue date (if known) December 17, 1999 3 Specify the type of project (check one) Low Density X High Density Redevelop General Permit Other 4 Additional Project Requirements (check applicable blanks) X CAMA Major X Sedimentation/Erosion Control 404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748 III PROJECT INFORMATION 1 In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) describing stormwater management for the project This project implements stormwater control system for high density development consisting of an infiltration swale The swale and associated distribution system will be located in recorded drainage easements 2 Stormwater runoff from this project drains to the Cape Fear River basin 3 Total Project Area 49 acres 4 Project Built Upon Area 298 % 5 How many drainage basins does the project have9 2 6 Complete the following information for each drainage area If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Cape Fear River Cape Fear River Receiving Stream Class SA SA Drainage Area 3 50 acres 1 40 acres Existing Impervious* Area 0 0 Proposed Impervious* Area 1 46 acres 0 % Impervious* Area total 41 7% 0% Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings 1 00 acres 0 On -site Streets 0 45 acres 0 On -site Parkin 0 On -site Sidewalks 0 Other on -site 0 01 1 acres(Amenity Area 0 Off site 0 Total 1 46 acres Total 0 * Impervious area is defined as the built upon area including, but not hunted to, buildings, roads, parking areas sidewalks, gravel areas etc Form SWU-101 Version 3 99 Page 2 of 4 7 How was the off -site impervious area listed above derived? No offsite area IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment 1 The following covenants are intender/ to ensure ongoing compliance with state stormwater management permit number SW8 980434 as issued by the Division of Water Quality These covenants may not be changed or deleted without the consent of the State 2 No more than _ * * square feet of any lot shall be covered by structures or impervious materials Impervious materials include asphalt, gravel, conciete brick, stone slate or similar material but do not include wood decking or the water surface ofswimmmg pools 3 Swales shall not be filled in piped or altered except as necessary to lit ovide driveway crossings 4 Built -upon area in excess area of the permitted amount requu es a state stormwater management permit modification prior to construction 5 All permitted runofffrom outparcels orfuture development shall be directed into the permitted stormwater corm of system These connections to the stormwater control system shall be performed in a manner that maintains the integrity and perfoi mance of the system as permitted * * See attached Exhibit A By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land , that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot V SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3 99 Page 3 of 4 Vi SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ) A complete package includes all of the items listed below The complete application package should be submitted to the appropriate DWQ Regional Office Please indicate that you have provided the following required information by initialing in the space provided next to each item Initials • Original and one copy of the Stormwater Management Permit Application Form /yyliYL • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) iyyro— • Detailed narrative description of stormwater treatment /management iYyr�ei • Two copies of plans and specifications, including -Development/Project name -Engineer and firm -Legend -North Arrow -Scale -Revision number & date -Mean high water line -Dimensioned property / project boundary -Location map with named streets or NCSR numbers -Original contours, proposed contours, spot elevations, finished floor elevations -Details of roads, drainage features, collection systems, and stormwater control measures -Wetlands delineated, or a note on plans that none exist -Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations -Drainage areas delineated -Vegetated buffers (where required) VII AGENT AUTHORIZATION If you wish to designate submittal authority to another individual or firm so that they may provide information on your behalf, please complete this section Designated agent (individual or firm) Cape Fear Engineering Mailing Address 5040 New Centre Drive, Suite D City State NC Phone (910)790-8584 Fax (910)790-8583 VIII APPLICANT'S CERTIFICATION Zip 28403 I, (print or type name ofpervon listed in General Information, item 2) Kent Mitchell certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H 1000 Signature Date / Z9 9 Form SW U-101 Version 3 99 Page 4 of 4 25VIL11,51TA TABLE OF LOT 5/ZES AND BU/L T UPON AREAS FOR ROW BOAT ROWSUBO/I//S/ON, BALD HEAD /SLANP LOT # LOT AREA (ACRE) ALLOWABLE BUILT UPON AREA (5Q FT ) 200 012 2500 202 0 14 2500 204 0 14 2500 20G 0 10 2500 207 0 II 2500 208 0 10 2500 209 011 2500 210 011 2500 211 0 II 2500 212 0 12 2500 213 0 II 2500 214 0 12 2500 215 011 2500 216 013 2500 217 0 II 2500 218 0 14 2500 219 0 15 1000 220 0 17 2500 common area 0 14 500 TOTAL 44,000 Cape Fear Engineering Revised 12/27/99 File lot sizes and built upon areas doc -C Permit No (to be pi ovided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This foi in maybe photocopied foi use as an original DWQ Stormwater Management Plan Review A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details I. PROJECT INFORMATION Project Name Row Boat Row Subdivision Contact Person Ken Stewart Phone Number (910) 457-7326 This worksheet applies to Basin No SW-4 (as identified on plans) in Drainage Area #4(SA waters) (from Form SWU-101) II. DESIGN INFOMATION —Attach supporting calculations/documentation The soils report must be based upon actual field investigation and soil borings County soil maps are not an acceptable source of soils information All elevations shall be in feet mean sea level (fmsl) Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Newhan&Fripp 20 ©or cf/hr/sf (circle appropriate units) 20 frnsl (Seasonal High Water Table elevation) 15 1255 004 160 1280 75 85 85 inch cf days ftx cf frisl fmsl fmsl (l 5 inch event for SA waters, I inch event for others) 50 ft = 800 sy ft (bottom dimensions) Form SWU-103 Rev 3 99 Page I of 3 ,r ` � � . III REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the f ollowing design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below Attach justification if a requirement has not been met. Applicants Initials a System is located 50 feet from class SA waters and 30 feet from other surface waters MQQ b System is located at least 100 feet from water supply wells c Bottom of system is at least 2 feet above the seasonal high water table 5 C7 d Bottom of the system is 3 feet above any bedrock of impervious soil horizon ,Y '�S17 e System is not sited on or in fill material or DWQ approval has been obtained 513P f System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way SI3P g Drainage area for the device is less than 5 acres h Soils have a minimum hydraulic conductivity of 0 52 inches per hour and soils report is attached 36 i System captures and infiltrates the runoff from the first 1 0 inch of rainfall (1 5 inch event for areas draining to SA waters) Design volume and infiltration calculations attached P System is sized to take into account the runoff at the ultimate built -out potential from all I surfaces draining to the system, including any off -site drainage Calculations attached �QP k All side slopes stabilized with vegetated cover are no steeper than 3 1 (H V) 1 A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided 4 in Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided S� P n vVegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters) o Flow distribution mechanism within the basin provided 3 Q p p A benchmark is provided to determine the sediment accumulation in the pretreatment device q *Runoff in excess of the design volume bypasses off-ime systems (bypass detail provided) S�3p r System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days A soils report and all pertinent draw - down calculations are attached S� s Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized * -rFE PaoSFcr A&294rivE Form SWU-103 Rev 3 99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT l After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition 2 Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed 3 After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration Remove any blockage and repair the structure to approved design specifications 4 Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth The system shall be restored to the original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i e stockpiling near a stormwater treatment device or stream, etc ) A benchmark shall be established in the pretreatment unit The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the design depth reads 025 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. If the Division determines that they system is failing, the system will immediately be repaired to original design specifications If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Print Name and Title Kenneth Address Phone Signature Kirkman, Attorney in Fact P O Box 3069, Bald Head Island 457- NC 28461 Date Note. The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivisdion has been named the president 1> �nrrA o \ hu (J�o u a Notary Public for the State of �� L County of r` , t � , do hereby certi��C—�')y )C_-.h V\ \� �F�Mf� �' j personally appeared before me this day of Q_ t ,o , ,r)nn(-) ,and acknowledge the due execution of the foregoing infiltration basin maintenance requirements Witness my hand and official seal, OFFICIAL SEAL Notary Pubic North Cmhna S h4 BRUNSWICK COUNTY My com vision expires I r LORRAINE THO p�M S�pN�` My Commission Eep�res `- t Form SWU-103 Rev 3 99 Pagc 3 of 3 Permit No (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details I. PROJECT INFORMATION Project Name Row Boat Row Subdivision Contact Person Ken Stewart Phone Number (910) 457-7326 This worksheet applies to Basin No SW-3 in Drainage Area #3(SA waters) (as identtfied on plans) (from Form SWU-101) II. DESIGN INFOMATION —Attach supporting calculations/documentation The soils report must be based upon actual field investigation and soil bonngs County soil maps are not an acceptable source of soils information All elevations shall be in feet mean sea level (finsl) Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Newhan&Fripp 20 P�R or ef/hr/sf (circle appropriate units) 20 fmsl (Seasonal High Water Table elevation) 1 5 inch (1 S inch event for SA waters 1 inch event for others) 1759 c f 004 days 240 ft X 50 ft = 1200 sq ft (bottom dimensions) 1920 c f 70 fmsl 80 fmsl 80 fins] Form SWU-103 Rev 3 99 Page I of 3 III REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the f ollowing design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below Attach justification if a requirement has not been met Applicants Initials �6> V a System is located 50 feet from class SA waters and 30 feet from other surface waters 3QP b System is located at least 100 feet from water supply wells —5136� c Bottom of system is at least 2 feet above the seasonal high water table SQp d Bottom of the system is 3 feet above any bedrock of impervious soil horizon -'C:ZQp e System is not sited on or in fill material or DWQ approval has been obtained 2% P f System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way 34 P g Drainage area for the device is less than 5 acres SAP h Soils have a minimum hydraulic conductivity of 0 52 inches per hour and soils report is attached Qp i System captures and infiltrates the runoff from the first 10 inch of rainfall (1 5 inch event for areas draining to SA waters) Design volume and infiltration calculations attached -MOP System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage Calculations attached 3R P k All side slopes stabilized with vegetated cover are no steeper than 3 1 (H V) 1 A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided P m Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided n *Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters) _3 53 P o Flow distribution mechanism within the basin provided 3 Q P p A benchmark is provided to determine the sediment accumulation in the pretreatment device S QP q *Runoff in excess of the design volume bypasses off-line systems (bypass detail provided) r System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days A soils report and all pertinent draw - down calculations are attached s Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized sEE NO 36r[r IVA44ATIVr Form S W U-103 Rev 3 99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1 After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition 2 Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed 3 After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration Remove any blockage and repair the structure to approved design specifications 4 Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth The system shall be restored to the original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (1 e stockpiling near a stormwater treatment device or stream, etc ) A benchmark shall be established in the pretreatment unit The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the design depth reads _0 25 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. If the Division determines that they system is failing, the system will immediately be repaired to original design specifications If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above I agree to notify DWQ of any problems with the system or pnor to any changes to the system or responsible party Print Name and Title Kenneth M Address Phone P O Box 3069, Bald Head 10) 457- Kirkman, Attornev in Fact NC 28461 Date Signature Note' The legally re ponsi le parry should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdrvisdion has been named the president 1, l7h rMais \ h� ,.,, ��o �J a Notary Public for the State of �� '_ , County of hr0 T t, t i_1t , do here y ce� r fy that uC-0.� t,it" personally appeared before me this Q �� day off h t-U!� r-,and acknowledge the due execution of the foregoing infiltration basin maintenance requirements Witness my hand and official seal, OFFICIAL SEAL Notary Pubic North Carolma BRUNSWICK COUNTY LORRAINE THOMPSOt My commision expires Form SWU-103 Rev 3 99 Page 3 of 3 Permit No (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form maybe photocopied foi use as an of igmal DWQ Stormwater Management Plan Review A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details I. PROJECT INFORMATION Project Name Row Boat Row Subdivision Contact Person Ken Stewart Phone Number (910) 457-7326 This worksheet applies to Basin No SW-2 in Drainage Area #2(SA waters) (as identified on plans) (from Form SWU-101) II DESIGN INFOMATION — Attach supporting calculations/documentation The soils report must be based upon actual field investigation and soil borings County soil maps are not an acceptable source of soils information All elevations shall be in feet mean sea level (fmsl) Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Newhan&Fripp 20 FUYR or ef/hr/sf (circle appropriate units) 20 fmsl (Seasonal High Water Table elevation) 15 1816 004 250 2000 90 100 100 inch cf days ftx cf finsl fins] fmsl (1 5 inch event for SA waters 1 inch event for others) 50 R = 1250 sq ft (bottom dimensions) Form SWU-I03 Rev 3 99 Page I of 3 IiI REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the f ollowing design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below Attach justification if a requirement has not been met Applicants Initials 3%'P a System is located 50 feet from class SA waters and 30 feet from other surface waters 759P b System is located at least 100 feet from water supply wells S c Bottom of system is at least 2 feet above the seasonal high water table Se� d Bottom of the system is 3 feet above any bedrock of impervious soil horizon 'S't�;p e System is not sited on or in fill material or DWQ approval has been obtained � P f System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way :SM2 g Drainage area for the device is less than 5 acres "S@P h Soils have a minimum hydraulic conductivity of 0 52 inches per hour and soils report is attached -S'Qp 1 System captures and infiltrates the runoff from the first 10 inch of rainfall (1 5 inch event for areas draining to SA waters) Design volume and infiltration calculations attached I System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage Calculations attached �Q P k All side slopes stabilized with vegetated cover are no steeper than 3 1 (H V) 'SQ 1 A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided 3Q in Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided 34P n *Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters) 'S}3 (-' o Flow distnbutron mechanism within the basin provided 3� p A benchmark is provided to determine the sediment accumulation in the pretreatment device "SAS P q *Runoff in excess of the design volume bypasses off-line systems (bypass detail provided) r System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days A soils report and all pertinent draw - down calculations are attached s Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized ire sEF PAOs6C-r n/AaRATlvF Fomi SWU-103 Rev 3 99 Page 2 of 3 v IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration Remove any blockage and repair the structure to approved design specifications Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth The system shall be restored to the original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i e stockpiling near a stormwater treatment device or stream, etc ) A benchmark shall be established in the pretreatment unit The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the design depth reads 0 25 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. If the Division determines that they system is failing, the system will immediately be repaired to original design specifications If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above I agree to notify DWQ of any problems with the system or pnor to any changes to the system or responsible party PrmtNameandTnle Kenneth M. Kirkman, Attorney in Fact Address Phone P O Box 3069, Bald Head Island, NC 28461 10)457-7000 Date Signature // 11 Z/ Note. The legally i esponsible parry should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivisdion has been named the president 1, r C aP � o r.n ra _� o �,� a Notary Public for the State of til C , County of do hereby certify that V.P.y. �� c_ d.,}� Q>\ �� y��,�,, A,J personally appeared before me this day of rl a k 'Y-o-) ,and acknowledge the due execution of the foregoing infiltration basin maintenance requirements OFFICIAL SEAL Notary Pubic North Carolma BRUNSWICK COUNTY LORRAINE THOM\PSOP v Commission Erm,.A? � ,, My commision expires Form SWU-103 Rev 3 99 Page 3 of 3 COLIiiR ivU (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM UNDERGROUND INFILTRATION TRENCH SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review A complete stormwater management plan submittal includes a stormwater management permit application, an underground infiltration trench supplement for each system, design calculations, and plans and specifications showing all stormwater conveyances and system details I. PROJECT INFORMATION Project Name Contact Person Row Boat Row Subdivision Ken Stewart Phone Number (910) 457-7326 For projects with multiple infiltration systems, a supplement form must be completed for each system This worksheet applies to Trench IT-1 thru IT-14 (from plans) in Drainage Area #1 (SC waters) (from Form SWU-10/) II. DESIGN INFOMATION (attach supporting calculations/documentation) Soils Report Summary (based upon an actual field investigation and soil borings) SOIL Type Newhan&Frtpp Infiltration Rate 20 ©or cf/hr/sf (circle appropriate units) SHWT Elevation 20 fins] (Seasonal High Water Table elevation) Trench Design Parameters Design Volume 147 c f Design Storm 1 0 inch event (1 5 inch event for SA waters, I inch event for others) Drawdown Time 00625 days Perforated Pipe Size 1 y - 30 inch diameter Perforated Pipe Length 30 ft No Observation Wells 0 (may be required on a case by case basis) Stone Type (if used) N/A Stone Void Ratio N/A Trench Elevations (in feet mean sea level) Bottom Elevation 40 fmsl Storage/Overflow Elevation 75 finsl Trench Dimensions Height 25 ft Length 3i x J9_..,k = �,Zo ft Width 25 ft Volume Provided 147` X" #/a„i,=6,Zgfg cu ft Forth SWU-107 Rev 3 99 Page I of 4 III REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N C Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below Attach justification if a requirement has not been met Applicants Initials _Zwv_'�' a �� l P c SQP d SQP e f g SY37 h System is located 50 feet from class SA waters and 30 feet from other surface waters System is located at least 100 feet from water supply wells Bottom of system is at least 2 feet above the seasonal high water table Bottom of the system is 3 feet above any bedrock or impervious soil horizon Off-line system, runoff in excess of the design volume bypasses the system (bypass detail provided) System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days based upon infiltration through the bottom only (a hydrogeologic evaluation may be required) Soils have a minimum hydraulic conductivity of 0 52 inches per hour System is not sited on or in fill material or DWQ approval has been obtained S> i Plans ensure that the installed system will meet design specifications (constructed or restored) upon imtial operation once the project is complete and the entire drainage area is stabilized —,:_::Q 'N� sQP System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way System captures and infiltrates the runoff from the first 10 inch of rainfall (1 5 inch event for areas draining to SA waters) m Drainage area for the device is less than 5 acres �Q n A pretreatment device (filter strip, grassed swale, sediment trap, etc ) is provided o Trench bottom is covered with a layer of clean sand to an average depth of 4 inches t � p Sides of the infiltration trench are lined with geotextile fabric SQ (� q Rock used is free of fines (washed stone) and has a large void ratio r Side to bottom area ratio is less than 4 1 Form SWU-107 Rev 3 99 Page 2 of 4 s Observation we]l(s) are provided (case -by -case basis) S� t #Vegetated filter is provided for overflow (50 feet for SA waters, 30 feet for other waters)and detail is shown on plans �� u A benchmark for checking sediment accumulation is provided ;* SEE Prtosecr /vAAfk,4r1✓E IV UNDERGROUND INFILTRATION TRENCH OPERATION AND MAINTENANCE AGREEMENT 1 After every runoff producing rainfall event and at least monthly inspect the bypass/overflow structure for blockage and deterioration and the infiltration system for erosion, trash accumulation, grass cover, and general condition 2 Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash and blockages as needed to maintain system performance 3 Remove accumulated sediment annually or when depth is reduced to 75% of the original design depth Restore depth to original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed 4 The water level in any monitoring wells will be recorded after a 1 inch rainfall event and at least once a month Chronic high water table elevations (within 1 foot of the bottom of the system for a period of three months) shall be reported to DWQ immediately 5 If DWQ determines that the system is failing, the system will immediately be repaired or replaced to original design specifications If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed Remove accumulated sediment from the infiltration system annually or when depth in the unit is reduced to 75% of the original design depth The system shall be restored to the original design depth without over - excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i e stockpiling near a stormwater treatment device or stream, etc ) A benchmark shall be established in the infiltration system The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the depth at the benchmark reads 4 625 msl ,the accumulated sediment shall be removed from the system Form SWU-107 Rev 3 99 Page 3 of 4 J� DWQ I acknowledge and agree by my signature below that I am responsible maintaining the stormwater collection system in accordance with the six maintenance procedures listed above I agree to notify of any problems with the system or prior to any changes to the system or responsible party Print Name and Title Kenneth M Kirkman, Attorney in Fact Address Phone Signatut P O Box 3067, Bald Head Island, NC 28461 Note* The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president ,aNotary Public for the State of �pr-�. �p,�h\�n�g County of do Hereby certify rtify that 1(E U rJ - n .t--\ ',I ti (V , personally appeared before me this day of M p,,�`� , ��� n ,and acknowledge the due execution of the foregoing infiltration basin maintenance requirements Witness my hand and officmal�seal, OFFICIAL SEAL Notary Poblz North Carolina ►tfl BRUNSWICK COUNTY y t LO�TRRAINE THOMPSON wgEETmission Expires My commission expires Form SWU-107 Rev 3 99 Page 4 of 4 CAPE FEAR Engineering, Inc. 5040 New Centre Drive Suite D Wilmington, N C 28403 Voice (910) 790-8584 Fax (910) 790-8583 E-mail cteCEDbellsouth net TO SCOTT VINSON ATTENTION MAR 0� Tr DATE 3-7-00 PROJECT NO 300-07 RE Row Boat Row Bald Head Island SW8 980434 Quantity Drawing No Description 2 Stormwater plans 2 Copy and original permit application 2 Design reports and calcs 1 Copy of three infiltration basins, and one infiltration trench 1 Power of attorney document REMARKS cc Pile CAPE FEAR Engineering, Inc Signed L V MIMStd Forms a Vans dM DESIGN REPORT FOR ROW BOAT ROW 5U13DIV1510N PREPARED FOR BALD HEAD ISLAND LIMITED Revised February 29, 2000 Iz SEAL 024908 F CAPE FEAR ENGINEERING, INC 5040 New Centre Drive, Suite D WILMINGTON, NC 28403 (910) 790-5584 wTORMVVATE8 �ECEOVED MAR 0 7 20M Cape Fear Engmeermg 03/06/00 DVVO Project Narranve_Hi_density_Rev2900 doc PRW S PROJECT NARRATIVE General Under Stormwater Management Permit #5W8 980434, Row Boat Row, an 18- lot 5m6jle family 5ubdwi5ion on Bald Head Island, NC, was approved in accordance with Stormwater Regulations set forth in Title 15A NCAC 2H 100 for low density development option Under this proposed modification, the Row Boat Row 502div15ion would be revised from low density to high density development option Storm Water Management The total area of Row Boat Row 5ubdivi5ion 15 approximately 4 9 acres The proposed impervious built upon area would be 1 4 1 acres, corresponding to an impervious ratio of 28 8% This project would be considered a high -density project with deed restrictions limiting the amount of built upon area per lot in accordance with the schedule shown in Exhibit A The existing 50115 are Newhan 4 fripp fine sands These 50115 are extremely well drained with an infiltration rate of approximately 20-30 inches / hour Storm water runoff will be conveyed to infiltration ba5in5 and underground infiltration trenches using 5heetflow The Stormwater control systems will be located in recorded drainage easements No impervious surfaces will be allowed in the Stormwater control area The following justification for design pursuant to Section 111, "Required Items Checklist" form SWU-103 Rev 3 99 15 noted below Item n ) Due to the extremely high infiltration rate of the Newhan 4� fripp sands the 25-year design storm event would be contained within the infiltration basin shown on the plans (See attached calculations) Since the Soil character15tlC5 of the entire area outside the infiltration basin consists of the same highly permeable sands, an overflow vegetated filter does not appear to be warranted Item q ) Due to the extremely high infiltration rate of the Newhan 4� fripp sands the 25-year design storm event would be contained within the infiltration basin shown on the plans Since the Soil characteri5tic5 of the entire area outside the infiltration ba5m con5i5t5 of the same highly permeable sands, a bypass for off-line systems does not appear to be warranted In the unlikely event that the infiltration basin nears capacity, the overflow volume would 5heetflow to adjacent permeable sands This 15 preferred in lieu of concentrating runoff in a by-pass system Cape Fear Engmeermg 03/06/00 Project Narrahve_Hi_density_Rev2900 doc The following J1.15t1fication for design pursuant to 5ection 111, "Required Items Checklist" Form 5WU-107 Rev 3 99 15 noted below Item t ) The design storm event would be contained within the underground infiltration trench a5 shown on the plans (5ee attached calculations) 51nce the 5011 characteri5tic5 of the entire area outside the infiltration trench con5i5t5 of highly permeable sands, an overflow vegetated filter does not appear to be warranted 5edimentation f Er05ion Control This project will disturb 1 7 acres of land 51lt fencing and vegetative 5wale5 will be the primary controls for Sedimentation and erosion control The ve10atie5 in the 5wale5 are IC55 than I-ft/5ec and will not be erosive All areas that will be disturbed will be grassed or paved according to the schedules on the drawmg5 Bald Head Island Limited will be the financially re5pon5ible party for all land ch5turbm6j activities Cape Fear Engineering 03/01/00 Project Narrative_Hr_density_Rev2900 doc CALCULATIONS l / PROJECT BFlL.D HEF}D !,5LigNQ - Row 3(orIT Roy,.( DATE 672 /24100 CLIENT � /UC . PROJ NO 36o - 07 SUBJECT 0N)bE2E7?,OUNb DESIGNED BY CaT T2evacN i+ : IT] - Zraq D(ZAI%`J„c7a Bpsl" # . 1 1.1 s �IcaCs =MPE2VIOJ.S °/0 y%.g DRAi NA C1 E. roR_ 0 IIQ C. HSTOR,M VOI--. IZG0vl(ZEI� = ll-1. U U -* Ds -* Ry VOL-, RG-00tvZED VOL, p/tov1DE10 . VO L_ , RE Q = 2oo4-1 c F (D3) R v - O, os- 4 0 o00 9 (-L ) Rv = O. os f 0o09(//7,0) ti�yTizE�vGHES) = 205e C,F, 2Ooq cc G 2058cF = VOL, CAPE FEAR Engineering, Inc. 5040 New CenUe Or Suite O Wilmington NC 25403 TEL (910) 790-6584 FAX (910) 790-65M CALCULATIONS PROJECT 884-D iaGf)D Ts/AIV� Row RoNT ,Cow DATE 02�2y/co CLIENT QgL.D ,ye<)T) 1SGy)lUI) 1l/&1,-rEl`, . =NC. PROJ NO -10d - 6"/ SUBJECT (/ivL)FK>QRooN4 T_,vF(['2e-J770n) 'T/ZFNCM DESIGNED BY C° Tc%r/c rtREwcu }}$ IT1 - I T1y SYSTEM D/ZAwDoWN eo'Tri, r,t F/LTRHT/Q,V �a r� = 3p )ry 2 D ��N2 D2AW,D6w1U THE _ /e S f//2 CAPE FEAR Engineering, Inc. 5040 New CerMm Or, Suite D Wlmiryton NC 26403 TEL (910) 790-6564 PAX (910) 790-0553 PIPESTOR _ ROW BOAT ROW oalos/mo DRAINAGE BASIN-1 Infiltration Rate Q-(ctlL-7�ji LA Drainage area (Ac)= 115 Pipe size (ft) = 25 Storm event = 25 Trench width (ft) = 25 Length of pipe and trench= 420 Pipe area (U) = 49 Trench side height (ft) = 26 Stone area (ft2) = 00 A = Area of exfltration = 1649 ft2 Stone voids 40% (ft2) = 00 K = Coeff of permeability = 2 1 E-02 cm/sec Available storage per ft = 49 I = 14draulic radient = 100 Total Available Storage 2061 Q/ = 115 cfshrench Q/ = 449 d/ft2 TIME (min) ACCUMULATED MASS INFLOW (cubic feet EXFILTRATION VOLUME wbic feet STORAGE REQUIREMENTS (rabic feet) AVAILABLE STORAGE (cubic feet STORAGE SURPLUS (DEFICIT) (cubic feet) 5 1,088 344 744 2061 1,316 10 1898 687 1,211 2061 849 15 2 532 1,031 1 502 2061 559 20 3 046 1 374 1 672 2,061 389 25 3,474 1718 1756 2,061 304 30 3,838 2061 1,777 2,061 284 40 4 429 2,748 1,680 2061 380 60 5,274 4 123 1 151 2061 909 80 5 868 5,497 371 2061 1,690 100 6,320 6 871 (551) 2061 2,612 120 6,682 8245 It 563) 2,061 3623 180 7,467 12,368 (4 901) 2,061 6 962 240 8,007 16 490 (8 483) 2,061 10,544 360 8,753 24 735 (15,982) 2,061 18 043 720 10,019 49,471 (39,452) 2,061 41,513 1,440 11,322 98,942 (87,620) 2,061 89,681 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 INSY 1 xis 03/06/2000 INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row, Bald Head Island, NC FEAR WCAPE Engineering, Inc. 5040 New Cuntru Dnvu, Suitu D Wdmmgtun N C 28403 Vwce (910) 79"584 Fax (910) 790-8583 E-mail cfeC-)bellsouth net -L6912IB7a74/a1 Prot No 300-07 02/07/2000 300_07infiltration_basin2_REV2700 xis 1 of4 DainagePrea+Desgnation, y=-rk ,ems kjP N �DR�AIN�AGE;AREAr#2 Swale Desi nation "".°e$W;z ., Receiving stream class RIMSAIwaters Onsde Area = 40`9�1 acres Onsite Impervious Area = 0?32 acres Offsite Area = 000 acres Offsite Impervious Area = �0,00 acres Total Area = 0 91 acres Total Impervious Area = 0 32 acres Percent Impervious = Impervious drainage area (acres)/Drainage area (acres) = 352 A) Determine volume to be controlled from storm (1 5 inch event for SA waters, 1 inch event for others) Using the runoff volume calculations per "Simple Method" as described by Schueler (1987) where Rv = runoff coefficient = storm runoff (inches) / storm rainfall (inches) I = Percent Impervious = Drainage area (acres) / Impervious portion of the drainage area (acres) Rv=005+0009(I) Rv = 0 05 + 0 009 * 352 = 0 366 (in/in) Volume to be controlled from the design storm event where Design rainfall Rv Drainage Area = 1 5 (in) 0 366 (in/in) 0 91 (acres) Volume required (cf) = rainfall (in) x Rv (in/in) x Drainage Area (acre) x 1/12(feet/inches) x 43560 (sf/acre) Vreq'd = 1 5 * 0 366 * 0 91 * 1/12 * 43560 = 1816 cubic feet INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row, Bald Head Island, NC CAPE FEAR Engineering, Inc. 5040 New Centre Drive Suite D WJmmgtun N (' 28403 Vince (910) 790-8584 Fax (910) 790-8583 E-mail cte(q?bellsouth net Determine the volume of the proposed swale SWALE DATA Cross -sectional Area (A) = bd +HdA2 = 8 00 sf bottom width (b) = 5 0 ft depth (d) = 1 ft sideslope (H V) = 3 1 length of swale (L) = 250 ft EASEMENT -WIDTH AS INDICATED Prol No 300-07 02/07/2000 300_07infiitration_basin2_REV2700 As 2of4 INFILTRATI❑N SWALE NOT TO SCALE Volume proposed (cf) = Cross -sectional area (so x length of Swale (ft) Vprop = 8 sf 250 ft = 2000 cubic feet volume proposed to volume required from the design storm event = 2000 cf > Vreq'd = 1816 cf (OK -proposed Swale volume is greater than minimum required volume) INFILTRATION SWALE - Schueler Method Prol No 300-07 Design Calculations for Row Boat Row, 02/07/2000 Bald Head Island, NC 300_07infiltration_basin2_REV2700 As 3of4 CAPE FEAR V$/r Engineering, Inc. 5040 New Centre Dnve, Selte D Wdmingtun N C 28403 Vuice (910) 790-8584 Fax (910) 790-8583 E-mail c1e(a)bells.uth net B) Check swale infiltration rate for capacity to control the 25 year-24 hour storm event with no discharge The average weighted coefficient of runoff is determined by C ave = Sum[CA ] / Sum[A] Description AREA C CA Impervios Area 032 0�95 0 304 Pervious Area 059 0 15 0 089 Sum A = 091 Sum CA = 0 393 C ave = 091 / 0 393 = 0 431 Determine required discharge from 25 year-24 hour storm event Q regd = Cave x I x A Q regd = 0 43 * 0 33 * 0 91 where I = intensity for 25 year-24 hour storm event from Chart E-6 A = drainage area = Cave = weighted coefficient of runoff Check available rate of infiltration provided by proposed swale where I = infiltration rate of soil (Sod Type = Newhan & Fripp sands) A = bottom area of swale = 5 0 ft * 250 ft Qavail = IA = 20 in/hr • 1250 sf • 1 ft/12 in * 1 hr/3600sec rate of infiltration with runoff rate from the 25 year storm event = 0 58 cfs > Q reqd = 0 13 cfs (OK -No Discharge for 25 yr-24 hr storm event) 013 cfs 0433 in/hr = 0 91 acres = 043 0 58 cfs INFILTRATION SWALE - Schueler Method Prot No 300-07 Design Calculations for Row Boat Row, 02/07/2000 Bald Head Island, NC 300_07infiltration_basm2_REV2700 As 4of4 CAPE FEAR Engineering, Inc. 5040 Now Centre Drive, suite D Wilmington N C 28403 Voice (910) 790-8584 Fax (910) 790-8583 E-mail creCa)bellsouth net C) Check the 10 year-10 minute storm event to confirm that swale has capacity without flushing system where I = intensity for 10 year-10 minute storm event from Chart E-6 = 6*3 in/hr A = drainage area = = 0 91 acres Cave = weighted coefficient of runoff = 043 Determine discharge rate from 10 year-10 minute storm event Q 10-yr = Cave x I x A Q 10-yr = 0 43 ` 63 ` 091 = 2 47 cfs Determine discharge volume from 10 year-10 minute storm event V 10-yr = Q 10-yr ` 10 min duration ` 60 sec/min = 1484 cf Check available volume of the proposed infiltration swale V avail = design volume (from swale data table) = 2000 cf Compare design volume of infiltration swale to discharge volume from 10 year storm event of 10 minute duration Vavail = 2000 cfs > V 10-yr = 1484 cfs (OK-swale has adequate capacity for 10-yr event without flushing) Compare infiltration system drawdown to maximum drawdown period of d days T = V regd / Q avail 1 hr/ 3600 sec T = 1816 cf / 0 58 cfs 1 hr/ 3600 sec = 0 87 hours (OK- system draws down in less than 5 days) INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row, Bald Head Island, NC CAPE FEAR Engineering, Inc. 5040 New Cuntru Dnvu, Suite D Wdmmgtun N ( 28403 Voice (910) 790-8584 Fax (910) 790-8553 E-mail cleC.?betNouth net BASIN DATA Prot No 300-07 02/07/2000 300_07infiltration_basin3_REV2700 As 1 of4 Onsde Area = 0�7,,0 acres Onsde Impervious Area = 0 32 acres Offsite Area = �, '.0100 acres Offsite Impervious Area = A<."-'Wob acres Total Area = 0 70 acres Total Impervious Area = 0 32 acres Percent Impervious = Impervious drainage area (acres)/Drainage area (acres) = 457 A) Determine volume to be controlled from storm (1 5 inch event for SA waters, 1 inch event for others) Using the runoff volume calculations per "Simple Method" as described by Schueler (1987) where Rv = runoff coefficient = storm runoff (inches) / storm rainfall (inches) I = Percent Impervious = Drainage area (acres) / Impervious portion of the drainage area (acres) Rv=005+0009(I) Rv = 0 05 + 0 009 ' 457 = 0 461 (in/in) Volume to be controlled from the design storm event where Design rainfall Rv Drainage Area = 1 5 (in) 0 461 (inhn) 0 70 (acres) Volume required (cf) = rainfall (in) x Rv (in/in) x Drainage Area (acre) x 1/12(feethnches) x 43560 (sf/acre) Vreq'd = 1 5 ` 0 461 ' 0 7 ' 1/12 ' 43560 = 1759 cubic feet INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row, Bald Head Island, NC ,777,7,72 CAPE FEAR Engfneerfng, Inc. 5040 New Centre Drive, Suite D Wdmingtun, N C 28403 Vu,ce (910) 790-8584 Fax (910) 790-8583 E-mail cfeCobel/south net Determine the volume of the proposed swale SWALE DATA Cross -sectional Area (A) = bd +Hd^2 = 8 00 sf bottom width (b) = 0 ft depth (d) _1 ft sideslope (H V) _ �3 1 length of Swale (L) = 40 ft r AC71ARMT _ Wm ec iuniremn Prot No 300-07 02/07/2000 300_07infiltration_basin3_REV2700 As 2of4 INFILTRATION SWALE NOT TO SCALE Volume proposed (cf) = Cross -sectional area (sf) x length of Swale (ft) Vprop = 8 sf 240 ft = 1920 cubic feet volume proposed to volume required from the design storm event = 1920 cf > Vreq'd = 1759 cf (OK -proposed swale volume is greater than minimum required volume) INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row, Bald Head Island, NC Prot No 300-07 02/07/2000 300_07infiltration_basin3_REV2700 As 3of4 CAPE FEAR Engfneerfng, Inc. 5040 New Centre Drive Suite D Witmingtun N C 28403 Vuice (910) 790-8584 Fax (910) 790-8583 E-mail cfe(a)bellsouth net B) Check swale infiltration rate for capacity to control the 25 year-24 hour storm event with no discharge The average weighted coefficient of runoff is determined by C ave = Sum[CA ] / Sum[A] Description AREA C CA Impervios Area 0 32 0195 0 304 Pervious Area 038 0 1'5 0 057 Sum A = 07 Sum CA = 0 361 Cave = 07/ 0361 = ;Q.7d:7 Determine required discharge from 25 year-24 hour storm event Q regd = Cave x I x A Qregd= 052` 033 ` 07 where I = intensity for 25 year-24 hour storm event from Chart E-6 A = drainage area = Cave = weighted coefficient of runoff Check available rate of infiltration provided by proposed swale where I = infiltration rate of soil (Soil Type = Newhan & Fripp sands) A = bottom area of swale = 5 0 ft ` 240 ft Qavail = IA = 20 in/hr 1200 sf ` 1 ft/12 in ` 1 hr/3600sec rate of infiltration with runoff rate from the 25 year storm event = 0 56 cfs > Q reqd = 0 12 cfs (OK -No Discharge for 25 yr-24 hr storm event) 0 12 cfs = 0 33 in/hr 07 acres = 052 = 20 in/hr = 1200 sf 0 56 cfs INFILTRATION SWALE - Schueler Method Prot No 300-07 Design Calculations for Row Boat Row, 02/07/2000 Bald Head Island, NC 300_07infiltration_basin3_REV2700 As 4of4 % CAPE FEAR Engineering, Inc. 5040 New Cuntre Dnve Suite D Wdmingtun N C 28403 vuice (910) 790-8584 Fax (910) 790-8583 E-mad cleC-?beUsouth net C) Check the 10 year-10 minute storm event to confirm that swale has capacity without flushing system where I = intensity for 10 year-10 minute storm event from Chart E-6 = 6 3 in/hr A = drainage area = = 0 7 acres Cave = weighted coefficient of runoff = 0 52 Determine discharge rate from 10 year-10 minute storm event Q 10-yr = Cave x I x A Q 10-yr = 0 52 ' 63 07 = 2 27 cfs Determine discharge volume from 10 year-10 minute storm event V 10-yr = Q 10-yr ' 10 min duration ' 60 sec/min = 1365 cf Check available volume of the proposed Infiltration swale V avail = design volume (from swale data table) = 1920 cf Compare design volume of Infiltration swale to discharge volume from 10 year storm event of 10 minute duration Vavail = 1920 cfs > V 10-yr = 1365 cfs (OK-swale has adequate capacity for 10-yr event without flushing) Compare Infiltration system drawdown to maximum drawdown period of d days T = V regd / Q avail 1 hr/ 3600 sec T = 1759 cf / 0 56 cfs 1 hr/ 3600 sec = 0 88 hours (OK- system draws down in less than 5 days) INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row, Bald Head Island, NC FEAR IFCAPE Engineering, Inc. 5040 NeW centre Drive, suite D Wdmmgtun N f 28403 Voice (910) 790-8584 Fd (910) 790-8583 E-mail cte(c?belNouth net BASIN DATA Prot No 300-07 02/07/2000 300_07infiltration_basin4_REV2700 As 1 of4 Dramage'Area Dees ig anonr,F'' Swale;Desi nation N,�1;':; w ' " rt DRAINAGExQREA 94, xSW>4 e ; Receiving stream class RM4SAlwaters Onsite Area = acres Onsite Impervious Area = WPE225 acres Offsite Area = 00acres Im ervious Area = _Offsite 00 acres Total Area = 0 65 acres Total Impervious Area = 0 22 acres Percent Impervious = Impervious drainage area (acres)/Drainage area (acres) = 338 A) Determine volume to be controlled from storm (1 5 inch event for SA waters, 1 inch event for others) Using the runoff volume calculations per "Simple Method" as described by Schueler (1987) where Rv = runoff coefficient = storm runoff (inches) / storm rainfall (inches) I = Percent Impervious = Drainage area (acres) / Impervious portion of the drainage area (acres) Rv=005+0009(I) Rv = 0 05 + 0 009 ' 338 = 0 355 (in/in) Volume to be controlled from the design storm event where Design rainfall Rv Drainage Area 1 5 (in) = 0 355 (in/in) = 0 65 (acres) Volume required (co = rainfall (in) x Rv (in/in) x Drainage Area (acre) x 1/12(feethnches) x 43560 (sf/acre) Vreq'd = 1 5 ' 0 355 ' 0 65 ' 1/12 ' 43560 = 1255 cubic feet INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row, Bald Head Island, NC V , CAPE FEAR Engineering, Inc. 5040 New Centre Drive Suite D Wilmmgfun N C 28403 Voice (910) 790-8584 Fan (910) 790-8583 E-mail c/e(.)bellcouth net Determine the volume of the proposed Swale SWALE DATA Cross -sectional Area (A) = bd +HdA2 = 8 00 sf bottom width (b) = 5 0 ft depth (d) = 1 ft sideslope (H V) = 3 1 length of Swale (L) = 160 ft EASEMENT - WIDTH AS INDICATED Prol No 300-07 02/07/2000 300_07infiltration_basin4_REV2700 xis 2of4 INLILTRATI❑N SWALE NOT TO SCALE Volume proposed (cf) = Cross -sectional area (so x length of swale (ft) Vprop = 8 sf 160 ft = 1280 cubic feet volume proposed to volume required from the design storm event = 1280 cf > Vreq'd = 1255 cf (OK -proposed swale volume is greater than minimum required volume) INFILTRATION SWALE - Schueler Method Prot No 300-07 Design Calculations for Row Boat Row, 02/07/2000300_07infiltration_basin4_REV2700 As Bald Head Island, NC 3of4 Z,3 CAPE FEAR V777,4777, Engineering, Inc. 5040 New Centro Drive Suite D Wdminlitun N C 28403 voice (910) 790-8584 Fax (910) 790-8583 E-mail c1eC-)bedcouth net B) Check Swale infiltration rate for capacity to control the 25 year-24 hour storm event with no discharge The average weighted coefficient of runoff is determined by C ave = Sum[CA ] / Sum[A] Description AREA C CA Impervios Area 022 0`95 0209 Pervious Area 043 0 15 0 065 Sum A = 065 Sum CA = 0 274 C ave = 0 65 / 0 274 = 0 421 Determine required discharge from 25 year-24 hour storm event Q regd = Cave x I x A Q regd = 0 42 ' 0 33 ' 065 where I = intensity for 25 year-24 hour storm event from Chart E-6 A = drainage area = Cave = weighted coefficient of runoff Check available rate of infiltration provided by proposed swale where I = infiltration rate of soil (Soil Type = Newhan & Fripp sands) A = bottom area of swale = 5 0 ft ' 160 ft Qavail = IA = 20 in/hr 800 sf ' 1 ft/12 in ' 1 hr/3600sec Compare rate of infiltration with runoff rate from the 25 year storm event = 0 37 cfs > Q reqd = 0 09 cfs (OK -No Discharge for 25 yr-24 hr storm event) t�rIrkZSiB in/hr 0 65 acres = 042 = 20 in/hr = 800 sf = 0 37 cfs INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row, Bald Head Island, NC `:••;.• CAPE FEAR Engineering, inc- 5040 New Centre Dnvu Suite D Wilmington, N C 28403 Voice (910) 790-8584 Fax (910) 790-8583 E-mail cfeOa?bellsouth net Prot No 300-07 02/07/2000 300_07infiltration_basin4_REV2700 As 4of4 C) Check the 10 year-10 minute storm event to confirm that Swale has capacity without flushing system where I = intensity for 10 year-10 minute storm event from Chart E-6 = N 6 3 m/hr A = drainage area = = 0 65 acres Cave = weighted coefficient of runoff = 042 Determine discharge rate from 10 year-10 minute storm event Q 10-yr = Cave x I x A Q 10-yr = 042 ' 63 ' 065 = 1 72 cfs Determine discharge volume from 10 year-10 minute storm event V 10-yr = Q 10-yr ' 10 min duration ' 60 sec/min = 1034 cf Check available volume of the proposed infiltration swale V avail = design volume (from swale data table) = 1280 cf Compare design volume of infiltration swale to discharge volume from 10 year storm event of 10 minute duration Vavail = 1280 cfs > V 10-yr = 1034 cfs (OK-swale has adequate capacity for 10-yr event without flushing) Compare infiltration system drawdown to maximum drawdown penod of d days T = V regd / Q avail 1 hr/ 3600 sec T = 1255 cf / 0 37 cfs 1 hr/ 3600 sec = 0 94 hours (OK- system draws down in less than 5 days) COASTAL ENVIRONMENTAL SERVICES CO &* f " ? ENVIRONMENTAL CONSULTING 7151 MARKET STREET WILMINGTON NC 28405 (910) 686 9617 FAX (910) 686 0042 Mr Dan Weeks Director of Planning Bald Head Island Planning Department P 0 Box 3069 Bald Head Island, NC 28461 RE Soil Borings & On -site Soils Investigations Harbour Village Area Bald Head Island, Brunswick County, NC Dear Mr Weeks April 8, 1997 In concert with your recent request, relayed to us through Mr Perry G Davis, RLS/PE with Atlantic Coast Design, Inc , Wrightsville Beach, NC, we are pleased to present this letterform report of findings and conclusions from soils investigations conducted at the subject site SITE LOCATION/SCOPE OF WORK The focus of the investigations were centered in and around the boat basin/marina that is surrounded by the Harbour Village area on Bald Head Island, Brunswick County, NC On April 1, 1997, a field hydrologist from Coastal Environmental Services Company (CESCO), working under the direction and guidance of Mr Perry G Davis, RLS/PE with Atlantic Coast Design, Inc, developed twenty three (23) hand auger soil borings at the subject site Soil samples removed at one foot depth intervals in the boreholes were classified as to soil type and texture The wells were developed into the water table and water level readings were taken in the open boreholes using an electronic sensor Two (2) of the soil borings (B-7 and B-12) were converted to temporary groundwater monitoring wells or piezometers (TMW-1 and TMW-2, respectively) for the purposes of collecting long term information on groundwater levels under varying weather (rainfall) and tidal conditions This was accomplished by inserting a 2 inch diameter PVC well screen (0 01 slot size) into the borehole along with a solid PVC riser extending above the ground surface The wells were installed such that the screened interval spanned the water table All of the borings were located using survey techniques and the water level readings were converted to groundwater elevations in terms of mean sea level (M S L ) by referencing the levels to a known benchmark RESULTS The locations of the 23 borings and the 2 temporary wells are shown on Figure 1 (NOTE A full size survey plat of the study area is also attached to this report Figure 1 IIRONMENTAL REMEDIATIONUDPERMITS - CLOSURES D WETLANDS DELINEATIONS ITIRISK ASSESSMENTS - LIST SITE S PREPARATION Mr Dan Weeks April 8, 1997, Page 2 and the full size survey plat also includes a table showing the exisitmg ground elevation and water level elevation at each data point In addition a second table shows the top of casing elevations and water levels in the temporary wells on April 1, 1997 Table 1 shows the results of the soils determinations and the approximate location of the capillary fringe depth in each borehole The capillary fringe depth is the portion of the soil column immediately above the water table DISCUSSION OF FINDINGS/CONCLUSIONS Soils on this site consist of a fine grained tan sand Some of the borings show some minor variations in soil coloration/texture and even some minor soil mottling due to iron precipitation from water table fluctuations The soil types encountered are very typical of the sands of marine depositional origin found commonly on the NC barrier islands Water table depths at this site are m the range of 0 2' to 2 7' M S L Groundwater levels in the test wells TMW-1 and TMW-2 were 0 79' and 0 82' M S L , respectively Water levels in the test wells were noted to be affected by tidal fluctuations For purposes of design of infiltration basins for stormwater control, the sod types encountered in this investigation can be expected to have infiltration rates in the general range of 17 to 20 inches per hour (43 to 51 cm/hr) This conclusion is based in part on the results of detailed investigations of infiltration rates at the same site as determined by other investigators (See Chescheir, G M, et al (1988) "Analysis of Stormwater Infiltration Ponds on the Barrier Islands" in Design of Stormwater Control Facilities, PENC, Raleigh, NC) We trust that the information in this report meets your needs at this time Please call me if you have any questions concerning the information in this report Sincerely, COASTAL ENVIRONMENTAL SERVICES COMPANY William E Burnett Senior Environmental Scientist Registered Environmental Professional Attachments ' cc Mr Perry G Davis, RLS/PE, Atlantic Coast Design, Inc TABLE 1 RESULTS OF SOIL BORINGS AND ON SITE SOILS INVESTIGATIONS HARBOUR VILLAGE AREA BALD HEAD ISLAND, BRUNSWICK COUNTY, NC BORING NUMBER/DEPTHS BLS LITHOLOGIC DESCRIPTION---------- B-1 0-6' Fine grain tan sand (Capillary fringe @ 5 5' BLS) B-2 0-6' Fine grain tan sand (Capillary fringe @ 5 5' BLS) B-3 0-5' Fine grain tan sand (Capillary fringe @ 5' BLS) B-4 0-4' Fine grain tan sand 4-5' Light brown sand (Capillary fringe @ 4 5' BLS) B-5 0-6' Fine grain tan sand (Capillary fringe @ 6' BLS) B-6 0-6' Fine grain tan sand (Capillary fringe @ 5 5' BLS) B-71TMW-1 0-10, Fine grain tan sand (Capillary fringe @ 8 5' BLS, TMW-1 Installed to 10' BLS) m B-11 0-5' Fine grain tan sand (Capillary fringe @ 4 5' BLS) 0-5' Fine gram tan sand 5-6' Light brown sand 6-12' Tan sand (Capillary fringe @ 11 5' BLS) 0-5' Fine grain tan sand (Capillary fringe @ 4 5' BLS) 0-5' Fine gram tan sand (Capillary fringe @ 4 5' BLS) TABLE 1, CONTINUED BORING NUMBER/DEPTHS BLS LITHOI OGIC DESCRIPTION ----- B-12/TMW-2 0-10, Fine grain tan sand (Capillary fringe @ 8' BLS TMW-2 Installed @ 10' BLS) B-13 04 Fine gram tan sand 4-6 Light brown sand (Capillary fringe @ 5 5' BLS) B-14 0-1' Dark brown sandy loam to light brown sand 1-2' Light brown sand 2-4' Tan sand 4 6' Tan sand with orange mottling (Capillary fringe @ 6' BLS) B-15 0-5' Fine grain tan sand 5-6' Tan sand with shell fragments (Capillary fringe @ 6' BLS) B-16 0-5' Fine grain tan sand 5-6' Tan sand with orange mottling (Capillary fringe @ 5 5' BLS) B-17 ME ME Fim M Fine grain tan sand (Capillary fringe @ 6' BLS) 0-5' Fine grain tan sand 5-6' Tan sand with orange mottling (Capillary fringe @ 5 5' BLS) 0-6' Brown to fine gram tan sand (Capillary fringe @ 5 5' BLS) 0-5' Fine grain tan sand (Capillary fringe @ 4 5' BLS) TABLE 1. CONTINUED BORING NUMBER/DEPTHS BLS LITHOLOGIC DESCRIPTION ------------ ----- B-21 0-1' Light brown sand with marl 1-3 Fine grain tan sand 3-5' Fine grain tan sand with orange mottling (Capillary fringe @ 4' BLS) B-22 0-4' Fine grain tan sand 4-5' Tan sand with orange mottling (Capillary fringe @ 4 5' BLS) B-23 0-4' Fine grain tan sand (Capillary fringe @ 3' BLS) NOTES 1 BLS = Below the land surface 2 TMW = Temporary groundwater monitoring well 3 Capillary fringe = Depth in sod profile immediately above the water table RI1143PG0916 9Ce-4�ecvr-W BC 1079 1%0496 c'LEi! �Cn REf�I$TFATi N POWER OF ATTORNEY 96 MAR 20 PM 4t 12 THE STATE OF NORTH CAROLINA AL4 J. lr,�, hSON COUNTY OF BRUNSWICK PEGIS�CP, Or' GEEOS 311 �,q1UK CGUNrL N C. KNOW ALL MEN BY THESE PRESENTS that BALD HEAD ISLAND LIMITED, a Texas Limited Partnership (hereinafter referred to as "Limited') hereby makes, constitutes and appoints KENNETH M KIRKMAN of Brunswick County, North Carolina, its true and lawful attomey-in-fact for it and in its name, place and stead and on its behalf, giving unto the said KENNETH M KIRKMAN full power to act in the name, place and stead in any way it could do if it were personally present with respect to the following matters as each of them is defined in Chapter 32A of the North Carolina General Statutes to the extent that it is permitted by law to act through an agent Real Property transactions, personal property transactions, banking transactions, business operating transactions, insurance transactions, Social Security and unemployment matters and transactions and tax matters and transactions Limited does, without limiting the foregoing, specifically authorize the said attomey-in-fact, in its name and on its behalf, to execute contracts, deeds, releases, closing documents and other agreements and documents for and relating to the sale and conveyance of property on Bald Head Island, North Carolina The power granted herein shall be deemed continuing and relate as fully to any property which Limited may hereafter acquire as to any property which it now owns The powers granted to the said attomey-in-fact may be exercised from time to time and repeatedly This Power of Attorney shall remain effective and in full force and effect until a document revoking said Power of Attorney is duly recorded in the Office of the Register of Deeds of Brunswck u t�Tlartfi'C2ru a ' ,., lHM VU n E C E I V E IUnUS ®G ,�• 3l a� MAR.0 7 2000 9 1 �7�•�v � afl DWQ { PROJ A �� W 1 143 PG0917 BR 1079 M0497 IN WITNESS WHEREOF, the parties hereto have hereunto set their hands and seals, or if corporate, signed by its duly authorized officers and its seal to be hereunto affixed by authority of its Board of Directors, this 1st day of February 1996 BALD HEAD ISLAND LIMITED (S EA L)'" A Texas Limited Partnership ATTEST- By MITCHELL ISLAND INVESTMENTS, INC General Partner f By Secret! ar P Vitale Z� Vesr Executive Vice President (S s (CorPoc-a}� y�i \ Seal #Kt Pell,eneral PWartne Marl litchell, General Partner STATE OF TEXAS COUNTY OF MONTGOMERY I, S%J 0. 14 . (A Pic 1U , a Notary Public in and for the County and State aforesaid do hereby certify that John D Planchard, personally appeared before me this day and acknowledged that he is Secretary of MITCHELL ISLAND INVESTMENTS, INC, and that, by authority duly given and as the act of the corporation, the foregoing instrument was signed in its name and by its Executive Vice President, sealed with its corporate seal, and attested by himself as its Secretary WITNESS my hand and notanal seal this the 1 aTl+ day of M,4Q c I4 1996 i Notaryblic, St of Texas 04 1K 1 143 PG0918 BK 1079 K0498 STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK 1, 911 %AW-ti T (?AAArel I , a Notary Public for the State and County aforesaid, do certify that M. Kent Mitchell, individually and as general partner of Bald Head Island Limited, a Texas limited partnership, personally appeared before me this day and acknowledged the due execution of the foregoing instrument WITNESS my hand and notanal seal, this the SA day of %i' a L4 1995 4iotary Public My Commission Expires STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK /z-//- 96 1, 0, 44" 6N re ll . a Notary Public for the State and County aforesaid, do certify that Mark D. Mitchell, individually and as general partner for Bald Head Island Limited, a Texas limited partnership, personally appeared before me this day and acknowledged the due execution of the foregoing instrument innTMESS my hand and notanal seat, this the S'uday of ��1� 1995 My Commission Expires 12-11-% STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK The Foregoing (or annexed) Certificate(s) Notary(res) Public is (are) Certified to be Correct Thrs Instrument was filed for Registration on this 20" Day of /M Ci (-C.) 1996, in the Book and Page shown on the Fust Page hereof ((��� ROBERT J. ROBIJSONJ Register of Deeds ��;�, CAPE FEAR �� Engineering, Inc. 5040 New Centre Drive, Suite D Wilmington, N C 28403 Voice (910) 790-8584 l Fax (910) 790-8583 11 E-mail cteCDbellsouth net s t TO Scott Vinson ATTENTION APR 0 6 2000 Transmittal DATE 4/6/00 PROJECT NO 300-07 RE Row Boat Row @ Bald Head Island Original Supplements Quantity Drawing No Description 4 Original infiltration and basin supplements REMARKS cc File CAPE FEAR Engineering, Inc Signed L Wdm6Std Fa stcfe turns dx �, y���a��r,�it ,� t �,� '��- :, ,. <�n , ry' F � Y��r q +i Vo )�' d 1 � y � ��� n ,.�-�--- �� h a State of North Carolina ; ') Department of Environment W� - „o_ and Natural Resources `\ Wilmington Regional Office ' \ U"'"1 �� James B Hunt, Jr., Governor Bill Holman, Secretary g Division of Water Quality February 10, 2000 NCDENR NcR C . OUNA DEPARTMENT OF ENVIRONMENT AND N. RA RESOURCES Mr Kent Mitchell, Owner Bald Head Island Limited PO Box 3069 Bald Head Island, NC 28461 Subject ACKNOWLEDGMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No SW8 980434MOD Row Boat Row Brunswick County Dear Mr Mitchell The Wilmington Regional Office received a Stormwater Management Permit Application for Row Boat Row on December 7, 2000 A preliminary review of that information has determined that the application is not complete The following information is needed to continue the stormwater review 1 For the infiltration swale to function properly for an extended amount of time, please provide 3-4 inlets into the swale for runoff from the eastern half of the project Also please provide for positive drainage from the one pipe that is proposed so that water does not pond in the southern end of the grassed swale When infiltration basins are proposed we require a spreading mechamsm so that the entire basin is used for infiltration With half of the project draining to one end of the infiltration system the distribution requirement is not being met i Please note that this request for additional information is in response to a preliminary review The equested information should be received by this Office prior to March 10, 2000, or the application will be returned as incomplete The return of a project will necessitate resubmittal of all required items, including the application fee If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215 1 and is subject to enforcement action pursuant to NCGS 143-215 6A Please reference the State assigned project number on all correspondence Any original documents that need to be revised have been sent to the engineer or agent All original documents must be returned or new originals must be provided Copies are not acceptable If you have any questions concerning this matter please feel free to call me at (910) 395-3900 Sincerely, Scott Vinson Environmental Engineer RSS/sav S \WQS\STORMWAT\ADDINFO\980434 FEB cc Scott Vinson Perry Davis, P E 127 Cardinal or Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper CAPE FEAR Engineering, Inc. 5040 Ncw Centre Dnvc Suck D Wilrrunr7ton N G 2U403 VO106 (910) 79O-U584 Fdx (910) 790-0583 E-rnad cic(,Jbclltiauth tier TO NCDEHNR 127 Cardinal Drive Ext Wilmington, NC 28403 ATTENTION Scott Vinson JAN - Transmittal DATE January 5, 2000 PROJECT NO 300-07 RE Modification to Permit SW8 980434 Row Boat Row, Bald Head Island, NC Quantity Drawing No Description 2 SWEC-1 I - Revised Stormwater Management, Sedimentation and Erosion Control Plan REMARKS On December 30, 1999 Row Boat Row was submitted to you with a request for permit modification to reflect storm water management based on high density development Please replace the drawings transmitted on 12/30/99 with the enclosed plans The new plan is revised to reflect "as -built" typical road sections No other changes have been made This revision does not affect the calculations or built upon areas shown in the application submitted on December 30, 1999 CC Woody Fulton w/o attachments Ken Kirkman w/o attachments Andy Sayre w/o attachments Ken Stewart w/o attachments John Haley File APE FEAR En In ering, Inc Signed StepheYi McAree P UOOU00-07WdminUransmillalsYran5010400Vinson doe i CAPE FEAR Engineering, Inc. 5040 New Centre Drive Suite D Wilmington, N C 28403 Voice (910) 790-8.584 Fax (910) 790-8583 E-mail cfe@bellsouth net To NCDEHNR 127 Cardinal Drive Ext Wilmington, NC 28403 ATTENTION Scott Vinson DEC 3 0 1999 Transmittal DATE December 30, 1999 PROJECT NO 300-07 RE Modification to Permit SW8 980434 Row Boat Row, Bald Head Island, NC Quantity Drawing No Description 1 - original and copy- Application for Modification to SW8 980434 permit 1 - copy — Form SWU-103, "Infiltration Basin Supplement' 1 - $420 Application fee I 1 - Project Narrative and supporting design calculations 2 SWEC-1 - Revised Stormwater Management, Sedimentation and Erosion Control Plan 1 - Soil report prepared by Coast Environmental Services and dated April 8, 1997 1 LOG-1 - Bore Hole and Test Well Log Im 0EBVE PpW a ma REMARKS Attached is a submittal package for modifications to the approved Row Boat Row Stormwater Management Permit SW8 980434 The proposed modifications include re -designating the development from the low density option to the high density option pursuant to Rule 1005 and providing infiltration system measures consistent with a high density designation CC Woody Fulton w/o attachments Ken Kirkman w/o attachments Andy Sayre w/o attachments Ken Stewart w/o attachments John Haley File APE FEAR Engineering, "Inc Signed //W cvu a e� Stephdfh McAree P QW13300-0T dmm\Vansmi9mis%Uansl23099_Vinwn dm 5- (,f7 7 go K 3 f mil. COASTAL ENVIRONMENTAL SERVICES CO ENVIRONMENTAL CONSULTING 7151 MARKET STREET WILMINGTON NC 28405 (910) 686 9617 FAX (910) 686 0042 Mr Dan Weeks April 8, 1997 Director of Planning Bald Head Island Planning Department P 0 Box 3069 Bald Head Island, NC 28461 STO RMATE n �p RE Soil Borings & On -site Soils Investigations u�Nj H C E I V ED Harbour Village Area DEC 3 01999 Bald Head Island, Brunswick County, NC DWQ Dear Mr Weeks PRQIi® In concert with your recent request, relayed to us through Mr Perry G Davis, RLS/PE with Atlantic Coast Design, Inc , Wrightsville Beach, NC, we are pleased to present this letterform report of findings and conclusions from soils investigations conducted at the subject site SITE LOCATION/SCOPE OF WORK The focus of the investigations were centered in and around the boat basin/marina that is surrounded by the Harbour Village area on Bald Head Island, Brunswick County, NC On April 1, 1997, a field hydrologist from Coastal Environmental Services Company (CESCO), working under the direction and guidance of Mr Perry G Davis, RLS/PE with Atlantic Coast Design, Inc, developed twenty three (23) hand auger soil borings at the subject site Soil samples removed at one foot depth intervals in the boreholes were classified as to soil type and texture The wells were developed into the water table and water level readings were taken in the open boreholes using an electronic sensor Two (2) of the soil borings (8-7 and B-12) were converted to temporary groundwater monitoring wells or piezometers (TMW-1 and TMW-2, respectively) for the purposes of collecting long term information on groundwater levels under varying weather (rainfall) and tidal conditions This was accomplished by inserting a 2 inch diameter PVC well screen (0 01 slot size) into the borehole along with a solid PVC riser extending above the ground surface The wells were installed such that the screened interval spanned the water table All of the borings were located using survey techniques and the water level readings were converted to groundwater elevations in terms of mean sea level (M S L ) by referencing the levels to a known benchmark RESULTS The locations of the 23 borings and the 2 temporary wells are shown on Figure 1 (NOTE A full size survey plat of the study area is also attached to this report Figure 1 ENVIRONMENTAL REMEDIATION - PERRMITSISK ASCLOSURES D WETLANDS DELINEATIONSSESSMENTS - LIST A/EI SITES PREPARATION Mr Dan Weeks April 8, 1997, Page 2 and the full size survey plat also includes a table showing the exisiting ground elevation and water level elevation at each data point In addition a second table shows the top of casing elevations and water levels in the temporary wells on April 1, 1997 Table 1 shows the results of the soils determinations and the approximate location of the capillary fringe depth in each borehole The capillary fringe depth is the portion of the sod column immediately above the water table DISCUSSION OF FINDINGS/CONCLUSIONS Soils on this site consist of a fine grained tan sand Some of the borings show some minor variations in sod coloration/texture and even some minor sod mottling due to iron precipitation from water table fluctuations The soil types encountered are very typical of the sands of marine depositional origin found commonly on the NC barrier islands Water table depths at this site are in the range of 0 2' to 2 7' M S L Groundwater levels in the test wells TMW-1 and TMW-2 were 0 79' and 0 82' M S L , respectively Water levels in the test wells were noted to be affected by tidal fluctuations For purposes of design of infiltration basins for stormwater control, the sod types encountered in this investigation can be expected to have infiltration rates in the general range of 17 to 20 inches per hour (43 to 51 cm/hr) This conclusion is based in part on the results of detailed investigations of infiltration rates at the same site as determined by other investigators (See Chescheir, G M, et al (1988) "Analysis of Stormwater Infiltration Ponds on the Barrier Islands" in Design of Stormwater Control Facilities, PENC, Raleigh, NC) We trust that the information in this report meets your needs at this time Please call me if you have any questions concerning the information in this report Sincerely, COASTAL ENVIRONMENTAL SERVICES COMPANY William E Burnett Senior Environmental Scientist 01 Registered Environmental Professional Attachments ' cc Mr Perry G Davis, RLS/PE, Atlantic Coast Design, Inc TABLE 1 RESULTS OF SOIL BORINGS AND ON SITE SOILS INVESTIGATIONS HARBOUR VILLAGE AREA BALD HEAD ISLAND, BRUNSWICK COUNTY, NC BORING NUMBER/DEPTHS BLS LITHOLOGIC DESCRIPTION----------------- B-1 0-6' Fine grain tan sand (Capillary fringe @ 5 5' BLS) B-2 0-6' Fine grain tan sand (Capillary fringe @ 5 5' BLS) B-3 0-5' Fine grain tan sand (Capillary fringe @ 5' BLS) B-4 0-4' Fine grain tan sand 4-5' Light brown sand (Capillary fringe @ 4 5' BLS) B-5 0-6' Fine gram tan sand (Capillary fringe @ 6' BLS) B-6 0-6' Fine gram tan sand (Capillary fringe @ 5 5' BLS) B-7/TMW-1 0-10, Fine gram tan sand (Capillary fringe @ 8 5' BLS, TMW-I Installed to IO' BLS) B-8 0-5' Fine gram tan sand (Capillary fringe @ 4 5' BLS) B-g 0-5' Fine grain tan sand 5-6' Light brown sand 6-12' Tan sand (Capillary fringe @ 11 5' BLS) B-10 0-5' Fine gram tan sand (Capillary fringe @ 4 5' BLS) B-11 0-5' Fine grain tan sand (Capillary fringe @ 4 5' BLS) TABLE 1, CONTINUED BORING N MBER/DEPTHS BLS LITHOI OGIC DESCRIPTION --- ---------- - B-12/TMW-2 0-10, Fine grain tan sand (Capillary fringe @ 8' BLS TMW-2 Installed @ 10' BLS) B-13 04 Fine grain tan sand 4-6 Light brown sand (Capillary fringe @ 5 5' BLS) B-14 0-1' Dark brown sandy loam to light brown sand 1-2' Light brown sand 2-4' Tan sand 4-6' Tan sand with orange mottling (Capillary fringe @ 6' BLS) B-15 0-5' Fine grain tan sand 5-6' Tan sand with shell fragments (Capillary fringe @ 6' BLS) B-16 0-5' Fine grain tan sand 5-6' Tan sand with orange mottling (Capillary fringe @ 5 5' BLS) B-17 mug : e M Fine grain tan sand (Capillary fringe @ 6' BLS) 0-5' Fine grain tan sand 5-6' Tan sand with orange mottling (Capillary fringe @ 5 5' BLS) 0-6' Brown to fine grain tan sand (Capillary fringe @ 5 5' BLS) 0-5' Fine grain tan sand (Capillary fringe @ 4 5' BLS) TABLE 1. CONTINUED BORING NUMBER/DEPTHS BLS LITHOLOGIC DESCRIPTION ------------ ----- B-21 0-1' Light brown sand with marl 1-3 Fine grain tan sand 3-5' Fine grain tan sand with orange mottling (Capillary fringe @ 4' BLS) B-22 0-4' Fine grain tan sand 4-5' Tan sand with orange mottling (Capillary fringe @ 4 5' BLS) B-23 0-4' Fine grain tan sand (Capillary fringe @ 3' BLS) NOTES 1 BLS = Below the land surface 2 TMW = Temporary groundwater monitoring well 3 Capillary fringe = Depth in soil profile immediately above the water table It DE51GN REPORT FOR ROW BOAT ROW SUBDIVISION PREPARED FOR DALD HEAD 15LAND LIMITED Revised November 30, 1999 M CAPE FEAR ENGINEERING, INC 5040 New Centre Drive, 5uite D WILMINGTON, NC 25403 (910) 790-8584 Cape Fear Engineering 12/16/99 Project Nanativc_I1i_dursrty_Rev121699 doe nE C E 9 V ED IIIIInUOS DEC 3 D 1999 PRW # DWO 12 �D 9q1 1111//It,� ? •pF-S'Zs �9 SEAL 20563 t PROJECT NARRATIVE General Under 5tormwater Management Permit #5W8 950434, Row Boat Row, an 1 B- lot single family 5Ubd1V151or1 on Bald Head Island, NC, was approved in accordance with 5tormwater Regulations set forth in Title 15A NCAC 2H 100 for low density development option Under this proposed modification, the Row Boat Row 5ubdivi5ion would be revised from low density to high density development option Storm Water Management The total area of Row Boat Row subdivision 15 approximately 4 9 acres The proposed impervious built upon area would be 14G acres, correspondmg to an impervious ratio of 29 8% This project would be considered a high -density project with deed restrictions limiting the amount of built upon area per lot in accordance with the schedule shown in Exhibit A The ex15tmg soils are Newhan # Fripp fine sands These soils are extremely well drained with an infiltration rate of approximately 20-inche5 / hour Storm water runoff will be conveyed to an infiltration basin u5mg a combination of 5heetflow, vegetated 5wale5, and storm pipe The 5tormwater control system will be located in recorded dramage easements and will dl5charge to the common area to the west of the project No impervious surfaces will be allowed in the 5tormwater control area The following justification for design pursuant to 5ection III, "Required Items Checklist" Form 5WU- 103 Rev 3 99 15 noted below Item n ) Due to the extremely high infiltration rate of the Newhan * Fripp sands the 25-year design storm event would be contained within the infiltration basm shown on the plans (See attached calculations) 5mce the 5011 characteristics of the entire area outside the infiltration basm con515t5 of the same highly permeable sands, an overflow vegetated filter does not appear to be warranted Item q ) Due to the extremely high infiltration rate of the Newhan * Pripp sands the 25-year design storm event would be contained within the infiltration basm shown on the plans 5mce the Soil characteristics of the entire area outside the infiltration basm consists of the same highly permeable sands, a bypass for off-line systems does not appear to be warranted In the unlikely event that the infiltration basm nears capacity, the overflow volume would 5heetflow to adjacent permeable sands This 15 preferred in lieu of concentrating runoff in a by-pass system Cape Fear Engineering 12/16/99 Project Nanattvc_IL_dcnsny_Rcv121699 doc 5edimentation 4- Ero51on Control This project will disturb 1 7 acres of land 51lt fencing and vegetative 5wale5 will be the primary controls for Sedimentation and erosion control The velocities in the 5wale5 are 1e55 than I-ft/5ec and will not be er05ive All areas that will be disturbed will be grassed or paved according to the schedules on the drawings Bald head Island Limited will be the financially re5pon5ible party for all land disturbing activities Cape Fear Engineering 12/16/99 Project Narratrve_Hi_densny_Rev 121699 doc INFILTRATION SWALE - Schueler Method Prol No 300-07 12/27/ Design Calculations for Row Boat Row, infiltration -basin As Bald Head Island, NC 1of4 CAPE FEAR Englneertng, Inc 5040 Now Corrtrc Dave Surte D Wilming1w, N (' 28403 Vwct (990) 790 H5494 Fax (910) 790-8533 E-mail cYcC lbc/IsuutYr net BASIN DATA „ t r s DRAINAGEfAREA�#,1^-A, ` Y Drainageli .;Desidnation �'. �u F ,t„ ; , ' > . " $waleb'esl nati6n ° t. =i-,fi, wg cr SAlwaters Receiving stream class t =' I-a,^'st 3+SOracres Onsite Area = �,`�c�1�46 acres Onsite Impervious Area100 acres Offsde Area = 4111+0+00 acres Offsite Impervious Area = 3 50 acres Total Area = 1 46 acres Total Impervious Area = 41 7 Percent Impervious = Drainage area (acres) / Impervious drainage area (acres) _ A) Determine volume to be controlled from storm (1 5 inch event for SA waters, 1 inch event for others) Using the runoff volume calculations per "Simple Method" as described by Schueler (1987) where Rv = runoff coefficient = storm runoff (inches) I storm rainfall (inches) I = Percent Impervious = Drainage area (acres) / Impervious portion of the drainage area (acres) Rv = 0 05 + 0 009(I) - 0 425 (in/in) Rv= 005+0009' 417 - Volume to be controlled from the design storm event where Design rainfall Rv Drainage Area 1 5 (in) = 0 425 (in/in) 3 50 (acres) Volume required (cf) = rainfall (in) x Rv (in/in) x Drainage Area (acre) x 1/12(feeUinches) x 43550 (sf/acre) Vreq'd = 1 5 ' 0 425 " 3 5 " 1 /12 ` 43560 8108 cubic feet INFILTRATION SWALE - Schueler Method Prot No 300-07 99 Design Calculations for Row Boat Row, n—bas n As infiltration —basin As Bald Head Island, NC 2of4 4�pCAPE FEAR Englneering, Inc. 5040 Now r.Otltr. Onvo Sutto D Wdtmngtur, N U 2840d V,,,,, (910) 790 8584 F� (910) 790-8583 E-toad Ge(}belRuuth "ct Determine the volume of the proposed swale SWALE DATA Cross -sectional Area (A) = bd +Hd^2 = 1272 sf bottom width (b) = ft depth (d) J'1670 ft sideslope (HV) _ ° 1 length of swale (L) _ ft EASEMENT - WIDTH AS INDICATED INFILTRATION SWALE NOT TO SCALE Volume proposed (cf) = Cross -sectional area (sf) x length of swale (ft) 8522 cubic feet Vprop = 12 72 sf 670 ft Compare volume proposed to volume required from the design storm event 8522 cf > Vreq'd = 8108 cf (OK -proposed swale volume is greater than minimum required volume) INFILTRATION SWALE - Schueler Method Prol No 300-07 12/27/1999 Design Calculations for Row Boat Row, infiltration—basin Bald Head Island, NC nfiltration—basms Axis 3of4 CAPE FEAR Engfneerfng, Inc. 5040 Now Q�ntro Dr/✓o Sumo D W.An.rngtun N (' 28403 V,,,00 (910) 790 8584 Fex (910) 790-8r8J E-mad c fo(10t,01suuth nc[ B) Check Swale infiltration rate for capacity to control the 25 year-24 hour storm event with no discharge The average weighted coefficient of runoff /s determined by C ave = Sum[CA ] / Sum[A] Description AREA C CA Impervios Area 1 46 r`0 951 1 387 Pervious Area 204 0°15{ 0 306 Sum A = 35 Sum CA = 1 693 C ave = 3 5/ 1 693 = 0 484 Determine required discharge from 25 year-24 hour storm event Q regd = Cave x I x A Qregd= 048' 033 ` 35 where I = intensity for 25 year-24 hour storm event from Chart E-6 A = drainage area = Cave = weighted coefficient of runoff Check available rate of infiltration provided by proposed swale where I = infiltration rate of soil (Soil Type = Newhan & Fripp sands) A = bottom area of Swale = 7 0 ft " 670 ft Qavail = IA = 20 in/hr 4690 sf 1 fU12 in " 1 hr/3600sec rate of infiltration with runoff rate from the 25 year storm event 2 17 cfs > Q reqd = 0 56 cfs (OK -No Discharge for 25 yr-24 hr storm event) �o,,,, v*- desl� voluw+e 4,0 = 0 56 cfs 0,331 in/hr 3 5 acres 048 in/hr 4690 sf = 2 17 cfs Val. 4 %gip 14 00 6a(31L,s ;% P ' INFILTRATION SWALE - Schueler Method Prol No 300-07 12/27/1999 Design Calculations for Row Boat Row, infiltration —basin As Bald Head Island, NC 4of4 77 CAPE FEAR Engfneerfng, Inc. 5040 Now Centro Dnvo Swto D Wr/nrorptwr N C 2H40 3 Vuru, (910) 790-85H4 FNx (910) 700-858.3 E-mad ora(.)belhuuth net C) Check the 10 year-10 minute storm event to confirm that swale has capacity without flushing system where I = intensity for 10 year-10 minute storm event from Chart E-6 A = drainage area = Cave = weighted coefficient of runoff Determine discharge rate from 10 year-10 minute storm event Q 10-yr = Cave x I x A Q10-yr= 048' 63 ' 35 Determine discharge volume from 10 year-10 minute storm event V 10-yr = Q 10-yr ' 10 min duration ' 60 sec/min Check available volume of the proposed infiltration swale V avail = design volume (from swale data table) = U�,j6 3]in/hr 3 5 acres 048 = 10 67 cfs = 6400 cf 8522 cf Compare design volume of infiltration swale to discharge volume from 10 year storm event of 10 minute duration Vavail = 8522 cfs > V 10-yr = 6400 cfs (OK-swale has adequate capacity for 10-yr event without flushing) It fl 1 H- r , -�w AJL wjir - ayar. w/n rtr s nth Compare infiltration system drawdown time to maximum drawdown period of 5 days T = V regd / Q avail 1 hr/ 3600 sec T = 8108 cf / 2 17 cfs 1 hr/ 3600 sec = 1 04 hours (OK- system draws down in less than 5 days) 11 "'r4�.. � i �►w�%�rQ �i,,. w �'�a �a w,c.Nr�va a-�. i �/�'' � hw� .Z Zx� �, S�t1c5, eio n•�f `I'Q^k �y'�. ,�►pof�d �Q.S� wtq a'"'� °"a w/ j ati� I IN 4 � Sw, l e bit: 0 p p ri dPi IN I>� it 0, A 4e era_ ewe la . 4{,lf 0, k, t4taj' , do w. l st • °I' 6w1� I. N¢ e�F{aa rowboat_swale Worksheet for Triangular Channel N 'iL>> f� �� 1•�� Tb ttJt it_T7 T7c ob S�s-T � 1 Project Description Project File p \300\300-07\talcs\rowboats fm2 Worksheet grass swale Flow Element Triangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0 030 Channel Slope 0 000900 ft/ft Left Side Slope 3 000000 H V Right Side Slope 3 000000 H V Discharge 2 75 cfs L Results ✓ Depth 1 01 ft Flow Area 3 03 ft' Wetted Perimeter 636 ft Top Width 603 ft Critical Depth 0 55 ft Critical Slope 0 021582 ft/ft Velocity 091 ft/s L= OK Velocity Head 001 ft Specific Energy 1 02 ft Froude Number 023 Flow is subcntical 7'7ZI0>. Ti/ ^,J, 7N c 4FOI-OrF , �s Fr- i 2� _ C�� � '\ � r!r; " , � � <✓/ii✓ ATE 5' Yir rirEGt 57z4v, ) // / 4, 1, = z5 4- ,, v = &' / (" t T'� , l f- ??/o ZS 2/( 3o i Ih) - - , J,- I j1H -4 T s 41A = ,45 (i I+) ( ! Iu)) - 2,'75 r--FS Cape Fear Engineering FlowMaster v5 08 09 34 56 Page 1 of 1 09 34 56 AM Haeslad Methods Inc 37 Brookside Road Waterbury CT 06708 (203) 755 7666 Cross Section Cross Section for Triangular Channel ttLa¢tt�s Zt�1.tit� 'I'b Ir �CDr26�o� S fS'f�t� �f Protect Description Protect File p \300\300-07\calcs\rowboats fm2 Worksheet grass swale Flow Element Triangular Channel Method Manning's Formula Solve For Channel Depth Section Data Mammngs Coefficient 0 030 Channel Slope 0 000900 ft/ft Depth 1 01 ft Left Side Slope 3 000000 H V Right Side Slope 3 000000 H V Discharge 2 75 cfs 101ft 1 N V H 1 NITS Cape Fear Engineering FlowMaster v5 08 i 09 35 02 AM Haestatl Methods Inc 37 Brookside Road Waterbury CT 06708 (203) 755-1666 Page 1 of 1 PIPE TO SWALE Worksheet for Circular Channel Protect Description Project File p \300\300-07\calcs\rowboats fm2 Worksheet PIPE TO INFILTRATION Flow Element Circular Channel Method Manning's Formula Solve For Channel Slope Input Data Mannings Coefficient 0 010 Depth 120 in Diameter 12 00 in Discharge 2 75 cfs Results Channel Slope 0 003526 ft/ft Flow Area 0 79 ft' Wetted Perimeter 3 14 ft Top Width 000 ft Critical Depth 071 ft Percent Full 10000 Critical Slope 0 004830 ft/ft Velocity 3 50 ftis Velocity Head 0 19 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 296 cfs Full Flow Capacity 275 cfs Full Flow Slope 0 003526 ft/ft Cape Fear Engineering FlowMaster v5 08 09 35 39 Page 1 of 1 09 35 39 AM Haestad Methods Inc 37 Brookside Road Waterbury CT 06708 (203) 755-1666 9 Cross Section Cross Section for Circular Channel Project Description Project File p \300\300-07\calcs\rowboats fm2 Worksheet PIPE TO INFILTRATION Flow Element Circular Channel Method Manning's Formula Solve For Channel Slope Section Data Mannings Coefficient 0 010 Channel Slope 0 003526 fUft Depth 120 in Diameter 1200 in Discharge 275 cis 12 00 in 1 N V H 1 NTS Cape Fear Engineering FlowMaster v5 08 09 35 45 Page 1 of 1 09 35 45 AM Haeslad Methods Inc 37 Brookside Road Waterbury CT 06708 (203) 755-1666 9