HomeMy WebLinkAboutSW8980434_HISTORICAL FILE_19991217STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO
SWs �8oy3
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
M99 I2l-i
YYYYMMDD
State of North Carolina
Department of Environment
and Natural Resources
Wilmington Regional Office
James B Hunt, Jr, Governor
Bill Holman, Secretary
Division of Water Qualit)
Mr Kent Mitchell, Owner
Bald Head Island Limited
Post Office Boa 3069
Bald Head Island, NC 28461
Dear Mr Mitchell
NCDENR
NORTH r-AROUNA DEPARTMENT OF
ENVIRONMENT AND N/ URAL RESOURCES
December 17, 1999
Subject Permit No SW8 980434 Modification
Row Boat Row Subdivision
Low Density Subdivision Stormwater Permit
Brunswick County
The Wilmington Regional Office received a complete Stormwater Management Permit Application for Row Boat
Row Subdivision on December 13, 1999 Staff review of the plans and specifications has determined that the
' project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H 1000 We are
forwarding Permit No SW8 980434 Modification, dated December 17, 1999, for the construction of the project
Row Boat Row Subdivision
This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and
limitations as specified therein, and does not supercede any other agency permit that may be required
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an
adludicatory heanng upon written request within thirty (30) days following receipt of this permit Thus request must
be in the form of a wntten petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed
with the Office of Administrative Hearings, P O Drawer 27447, Raleigh, NC 27611-7447 Unless such demands
are made this permit shall be final and binding
If you have any questions, or need additional information concerning this matter, please contact either Noelle
Lutheran or me at (910) 395-3900
Sincerel) ,
Rick Sluver
Water Quality Regional Supervisor
RSS/nml S \WQS\STORMWAT\PERMIT\980434 DEC
cc Perry Davis P E
Delaney Aycock Brunswick County Inspections
David Thomas NCDOT-Division 3, District 3
Wilmington Regional Office
Central Files
Noelle Lutheran
127 Cardinal Dr Ext , Wilmington North Carolina 28405 Telephone 910-395 3900 FAX 910 350-2004
An Equal Opportumti Affirmative Action Employer 50% recvcled/10 % post -consumer paper
State Stormwater Management Systems
Permit No SW8 980434 Modification
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
LOW DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other
applicable Laws, Rules and Regulations
PERMISSION IS HEREBY GRANTED TO
Bald Head Island Limited
Row Boat Row Subdivision
Brunswick County
FOR THE
construction, operation and maintenance of a 25% low density subdivision in compliance with the provisions of 15A NCAC
2H 1000(hereafterreferredtoasthe"stormwaterrules'Dandtheapprovedstormwatermanagementplansandspecifications,
and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part
of this permit for Row Boat Row Subdivision
The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific conditions
and limitations
I DESIGN STANDARDS
1 Each of the 18 lots is limited to a maximum of (*see exhibit A) square feet of built -upon area, as indicated in the
approved plans CAMA regulations may reduce the allowable built -upon area for those lots within the AEC
2 The overall tract built -upon area percentage or lot sizes for the project must be mamtamed at 25%, per the
requirements of Section 1005 of the stormwater rules
3 Approved plans and specifications for projects covered by this permit are incorporated by reference and are
enforceable parts of the permit
4 Projects covered by this permit will maintain a mimmum 30 foot wide vegetative buffer between all impervious areas
and surface waters
The only runoffconveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes
of 3 1 (H V) as defined in the stormwater rules and approved by the Division
State Stormwater Management Systems
Permit No SW8 980434 Modification
H SCHEDULE OF COMPLIANCE
1 Swales and other vegetated conveyances shall be constructed in their entirety, vegetated, and be operational for their
intended use prior to the construction of any built -upon surface
2 During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated
conveyances will be repaired immediately
3 The permittee shall at all times provide the operation and maintenance necessary to operate the permitted stormwater
management systems at optimum efficiency to include
a Inspections
b Sediment removal
c Mowing, and revegetating of the side slopes
d Immediate repair of eroded areas
e Maintenance of side slopes in accordance with approved plans and specifications
Deed restrictions are incorporated into this permit by reference and must be recorded with the Office of the Register
of Deeds prior to the sale of any lot Recorded deed restrictions must include, as a minimum, the following statements
related to stormwater management
a "The allowable built -upon area per lot is *see exhibit A square feet This allotted amount includes any built -
upon area constructed within the lot property boundaries, and that portion of the right-of-way between the
front lot line and the edge of the pavement Built upon area includes, but is not limited to, structures, asphalt,
concrete, gravel, brick, stone, slate, and coquina, but does not include raised, open wood decking, or the
water surface of swimming pools "
b "The covenants pertaining to stormwater regulations may not be changed or deleted without concurrence of
the Division of Water Quality "
c "Filling in or piping of any vegetative conveyances (ditches, swales, etc ) associated with the development
except for average driveway crossings, is strictly prohibited by any persons "
d "Lots within CAMA's Area of Environmental Concern may have the permitted built -upon area reduced due
to CAMA jurisdiction within the AEC "
e "Each lot will maintain a 30' wide vegetated buffer between all impervious areas and surface waters "
5 The permittee shall submit a copy of the recorded deed restrictions which indicates the approved built -upon area per
lot within 30 days of the date of recording
6 The permittee shall submit all information requested by the Director or his representative within the time frame
specified in the written information request
7 No piping shall be allowed except
a That minimum amount necessary to direct runoff beneath an impervious surface such as a road
b That minimum amount needed under driveways to provide access to lots
8 The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon
area Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division
of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property
owner
9 Within 30 days of completion of the project, the permittee must certify in writing that the pro9ect's stormwater
controls, and impervious surfaces have been constructed within substantial intent of the approved plans and
specifications Any deviation from the approved plans must be noted on the Certification
State Stormwater Management Systems
Permit No SW8 980434 Modification
10 The Director may notify the permittee when the permitted site does not meet one or more of the minimum
requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time
schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies
of revised plans and certification in writing to the Director that the changes have been made
11 The following items will require a modification to the permit Revised plans, specifications and calculations must
be permitted prior to beginning construction on the modification
Any revision to the approved plans, regardless of size
Project name change
Transfer of ownership
Redesign or addition to the approved amount of built -upon area
Further subdivision, acquisition, or selling of the project area
Filling in, altering or piping any vegetative conveyance shown on the approved plan
12 The Director may determine that other revisions to the project should require a modification to the permit
III GENERAL CONDITIONS
1 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an
enforcement action by the Division of Water Quality, m accordance with North Carolma General Statutes 143-215 6A
to 143-215 6C
2 The permit issued shall continue in force and effect until revoked or terminated
3 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit
modification, revocation and reissuance, or termination does not stay any permit condition
4 The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and
reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Title 15A
of the North Carolina Administrative Code, Subchapter 2H 1000, and North Carolina General Statute 143-215 1 et
al
5 The permit is not transferable to any person or entity except after notice to and approval by the Director The Director
may require modification or revocation and reissuance of the permit to change the name and incorporate such other
requirements as may be necessary A formal permit request must be submitted to the Division of Water Quality
accompanied by the appropriate fee, documentation from both parties involved, and other supporting materials as
maybe appropriate The approval of this request will be considered on its merits, and mayor may not be approved
6 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules,
regulations, or ordinances which may be unposed by other government agencies (local, state and federal) which have
jurisdiction If any of those permits result in revisions to the plans, a permit modification must be submitted
7 The permittee grants permission to DENR Staff to enter the property during business hours for the purposes of
inspecting the stormwater control system and it's components
8 The permittee shall notify the Division of Water Quality of any mailing address changes within 30 days of moving
Permit issued this the 17th day of December, 1999
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
g/Z Kerr T Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number SW8 980434 Modification
OFFICE USE ONLY
..,, 1. ,..
�WAFA
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
I GENERAL INFORMATION
1 Applicant's name (specify the name of the corporation, individual, etc who owns the project)
Bald Head Island Limited
2 Print Owner/Signing Official s name and title (person legally responsible for facility and compliance)
Kent Mitchell owner
3 Mailing Address for person listed in item 2 above
P O Box 3069
City Bald Head Island State NC Zip 28461
Telephone Number (910) 457-7000
4 Project Name (subdivision, facility, or establishment name - should be consistent with project name
on plans, specifications, letters, operation and maintenance agreements, etc )
Row Boat Row Subdivision
5 Location of Project (street address)
Row Boat Row
City
Bald Head Island
County Brunswick
6 Directions to project (from nearest major intersection)
Take the ferry from Indigo Plantation Marina located in Southport, NC
7 Latitude 33052 25
Longitude 78000' 10 of project
8 Contact person who can answer questions about the project
Name Ken Stewart
II PERMIT INFORMATION
1 Specify whether project is (check one)
New
Telephone Number (910) 457-7326
Renewal X Modification
Form SWU-101 Version 3 99 Page 1 of 4
2 If this application is being submitted as the result of a renewal or modification to an existing permit, list the
Existing permit number SW8 980434 And its issue date (if known) 09/22/98
3 Specify the type of project (check one)
X Low Density High Density Redevelop General Permit Other
4 Additional Project Requirements (check applicable blanks)
X CAMA Major X Sedimentation/Erosion Control 404/401 Permit NPDES Stormwater
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748
III PROJECT INFORMATION
1 In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative
(one to two pages) describing stormwater management for the project
This project implements stormwater control system for low density development consisting of sheet flow runoff
to 30 foot wide veaetative buffer
2 Stormwater runoff from this project drams to the
3 Total Project Area
LI
Fear
acres 4 Project Built Upon Area
5 How many drainage basins does the project have? 1
River basin
245 %
6 Complete the following information for each drainage area If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below
Basin Information
Drainage Area 1
Drainage Area 2
Receiving Stream Name
Cape Fear River
Receiving Stream Class
Se SA
Drainage Area
4 90 acres
Existing Impervious* Area
0
Proposed Impervious* Area
1 2 acres
% Impervious* Area total
24 5%
Impervious* Surface Area
Drainage Area 1
Drainage Area 2
On -site Buildings
0 84 acres
On -site Streets
0 34 acres
On -site Parkin
On-site Sidewalks
Other on -site
0 02 acres
Off site
Total 1 2 acres
Total
* Impervious area is defined as the built upon area including but not limited to buildings roads parking areas
sidewalks gravel areas etc
Form SWU-101 Version 3 99 Page 2 of 4
7 How was the off -site impervious area listed above derived? No offsite area
IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot If lot sizes vary significantly, a table
listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment
1 The following covenants are intended to ensure ongoing compliance with state stormwater management permit number
SW8 980434 as issued by the Division of Water Quality These covenants may not be
changed or deleted without the consent of the State
2 No more than _** square feet of any lot shall be covered by structures or impervious materials
Impervious materials include asphalt gravel concrete brick stone slate or similar material but do not include wood
decking or the water surface ofswimming pools
3 Swales shall not be filled in piped or altered except as necessary to provide driveway crossings
4 Built -upon area in excess area of the permitted amount requires a state stormwater management permit modification prior to
construction
5 All permitted runofffrom outparcels or future development shall be directed into the permitted stormwater control
system These connections to the stormwater control system shall be performed in a manner that maintains the
integrity and performance of the system as permitter!
* * See attached Exhibit A
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and persons
claiming under them, that they will run with the land , that the required covenants cannot be changed or deleted
without concurrence from the State, and that they will be recorded prior to the sale of any lot
V SUPPLEMENT FORMS
The applicable state stormwater management permit supplement form(s) listed below must be submitted for each
BMP specified for this project Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status
and availability of these forms
Form SWU-102
Wet Detention Basin Supplement
Form SWU-103
Infiltration Basin Supplement
Form SWU-104
Low Density Supplement
Form SWU-105
Curb Outlet System Supplement
Form SWU-106
Off -Site System Supplement
Form SWU-107
Underground Infiltration Trench Supplement
Form SWU-108
Neuse River Basin Supplement
Form SWU-109
Innovative Best Management Practice Supplement
Form SWU-101 Version 3 99 Page 3 of
VI SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ)
A complete package includes all of the items listed below The complete application package should be
submitted to the appropriate DWQ Regional Office
Please indicate that you have provided the following required information by initialing in the space provided
next to each item
Initials
• Original and one copy of the Stormwater Management Permit Application Form el&edff�
• One copy of the applicable Supplement Form(s) for each BMP
• Permit application processing fee of $420 (payable to NCDENR)
• Detailed narrative description of stormwater treatment /management+—
• Two copies of plans and specifications, including
-Development/Project name
-Engineer and firm
-Legend
-North Arrow
-Scale
-Revision number & date
-Mean high water line
-Dimensioned property / project boundary
-Location map with named streets or NCSR numbers
-Original contours, proposed contours, spot elevations, finished floor elevations
-Details of roads, drainage features, collection systems, and stormwater control measures
-Wetlands delineated, or a note on plans that none exist
-Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
-Dramage areas delineated
-Vegetated buffers (where required)
VH AGENT AUTHORIZATION
If you wish to designate submittal authority to another individual or firm so that they may provide information on your
behalf, please complete this section
Designated agent (individual or firm) Cape Fear Engineering
Mailing Address 5040 New Centre Drive, Suite D
City Wilmington State
Phone (910)790-8584 Fax (910)790-8583
VHI APPLICANT'S CERTIFICATION
Zip 28403
I, (print or type name ofperson listed in General Information item 2) Kent Mitchell
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A
NC'AC7H 1000
Signature
Date /2 /
Form SWU 101 Version 3 99 Page 4 of
Permit No . Jx0�n W'VA ,/
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
LOW DENSITY SUPPLEMENT
This form maybe photocopied for use as an original
A low density project is one that meets the appropriate criteria for built upon area and transports stormwater
runoff primarily through vegetated conveyances Low density projects should not have a discrete stormwater
collection system as defined by 15A NCAC 2H 1002(18) Low density requirements and density factors can
be found in 15A NCAC 2H 1005 through 1007
PROJECT INFORMATION
Project Name
Contact Person
Number of Lots
Row Boat Row Subdivision
Ken Stewart
K
_ Phone Number (910) 457-7326
Allowable Built Upon Area Per Lot* **Vanes
*If lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area
for each lot The attachment must include the project name, phase, page numbers and provide area subtotals
and totals
II BUILT UPON AREA
See the Stormwater Management Permit Application for specific language that must be recorded in the deed
restrictions for all subdivisions
For uniform lot sizes, complete the following calculations in the space provided below where
• SA Site Area -the total project area above Mean High Water Wetlands maybe excluded when the
development results in high density pockets
• DF Density Factor - the appropriate percent built upon area dived by 100
• RA Road Area - the total impervious surface occupied by roadways
• OA Other Area - the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc
• No Lots - the total number of lots to the subdivision
• BUA/Lot - the computed allowable built upon area for each lot including driveways and impervious
surfaces located between the front lot line and the edge of pavement
Form SWU 104 Rev 3 99 Page 1 of 2
A N�
(SA x DF) - RA - OA = BUA
No Lots Lots
Calculation
Where
SA =
213,444 sf (4 9ac)
DF =
25%
RA =
15,960 sf
OA =
1,000 sf (Amenity Area)
No Lots =
18
(213,444 sf * 0 25) — (15,960 so — (1,000 sf) = 36,400 sf = 2022 sf / LOT
18 Lots 18 Lots
BUA/LOT= 2022 sf / Lot
**NOTE See attached Exhibit A for table of lot sizes and allocation of BUA for Row Boat Row
III REQUIRED ITEMS CHECKLIST
Initial in the space provided to indicate that the following requirements have been met and supporting
documentation is provided as necessary If the applicant has designated an agent on the Stormwater
Management Permit Application Form, the agent may initial below
Applicants Initials
�yYyy�^ a A 30 foot vegetative buffer is provided adjacent to surface waters Projects in the Neuse
River basin may require additional buffers
/f//� b Deed restriction language as required on form SWU-101 shall be recorded as a restrictive
covenant A copy of the recorded document shall be provided by DWQ within 30 days of
platting and prior to sale of any lots
c Built upon area calculations are provided for the overall project and all lots
-Iwo/ d Project conforms to low density requirements within the ORW AEC (if applicable)
[15A NCAC 2H 1007(2)(b)]
Form SWU-104 Rev 3 99 Page 2 of 2
FXH/B/T A
TABLE OFLOT 5/ZE5 AND BU/LT UPON AREAS
FOR ROW BOAT ROW SUZ301V1S/ON,
BALD 1-1EAO LSLAND
ITEM
LOT NO
LOT AREA
(ACRE)
ALLOWABLE BUILT UPON AREA
(5Q PT )
1
200
0 12
2200
2
202
0 14
2500
3
204
0 14
2500
4
20G
0 10
1800
5
207
0 II
1800
6
208
0 10
2500
7
209
011
1800
8
210
011
2200
9
211
011
1800
10
212
012
2200
II
213
011
1800
12
214
012
2200
13
215
011
1800
14
216
013
2200
15
217
011
1600
16
215
014
2500
17
219
015
300
18
220
017
2500
TOTAL
36,400
Avg BUA / Lot = 36 400 / 18 Lots = 2 022 sf / Lot
Cape Fear Engineering
Revised 12/13/99
File Low_density_BUA_TBL121399 doc
Permit No`C�
(to be provided by DW
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
INFILTRATION BASIN SUPPLEMENT
Thu form maybe photocopied for use as an original
DWO Stormwater Management Plan Review
A complete stormwater management plan submittal includes a stormwater management permit application, an
infiltration basin supplement for each system, design calculations, soils report and plans and specifications
showing all stormwater conveyances and system details
I PROJECT INFORMATION
Project Name Row Boat Row Subdivision
Contact Person Ken Stewart
This worksheet applies to Basin No
SW-1
(as identified on plans)
(910)457-7326
m Dramage Area #I(SA waters)
(from Form SWU-101)
II DESIGN INFOMATION —Attach supporting calculations/documentation The soils report must be
based upon actual field investigation and soil borings County soil maps are not an acceptable source
of soils information All elevations shall be in feet mean sea level (fmsl)
Soils Report Summary
Soil Type Newhan&Fripp
Infiltration Rate 20 Fn/hd or cf/hr/sf (circle appropriate units)
SHWT Elevation 20 fmsl (Seasonal High Water Table elevation)
Basin Design Parameters
Design Storm
Design Volume
Drawdown Time
Basin Dimensions
Basin Size
Basin Volume Provided
Basin Elevations
Bottom Elevation
Storage Elevation
Top Elevation
15
inch
8108
c f
004
days
670 ft x 7
8522 c f
50
frisl
62
fins]
62
fmsl
(1 S inch event for SA ivaters I inch event for others)
ft = 4690 sq It (bottom dimensions)
Form SWU 103 Rev 3 99 Pat,c 1 of 3
III REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section 15 A NCAC 2H 1008
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below Attach justification if a requirement has not been met
Applicants Initials
'"� a System is located 50 feet from class SA waters and 30 feet from other surface waters
14'k42- b System is located at least 100 feet from water supply wells
li,2,� c Bottom of system is at least 2 feet above the seasonal high water table
?-ram- d Bottom of the system is 3 feet above any bedrock of impervious soil horizon
e System is not sited on or in fill material or DWQ approval has been obtained
'�- f System is located in a recorded drainage easement for the purposes of operation and
maintenance and has recorded access easements to the nearest public right-of-way
��--- g Drainage area for the device is less than 5 acres
?---- h Soils have a minimum hydraulic conductivity of 0 52 inches per hour and soils report is
attached
A� i System captures and infiltrates the runoff from the first 10 inch of rainfall (1 5 inch event
for areas draining to SA waters) Design volume and infiltration calculations attached
I System is sized to take into account the runoff at the ultimate built -out potential from all
surfaces draining to the system, including any off -site drainage Calculations attached
?-r+� k All side slopes stabilized with vegetated cover are no steeper than 3 1 (H V)
;4v// I A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or
sediment trap is provided
in Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or
dense vegetative cover is provided
Vegetated filter is provided for overflow and detail is shown on plans (Required minimum
length is 50 feet for SA waters, 30 feet for other waters)
%aylyr� o Flow distribution mechanism within the basin provided
p A benchmark is provided to determine the sediment accumulation in the pretreatment device
7kle— q Runoff in excess of the design volume bypasses off-line systems (bypass detail provided)
7*;4. r System is designed to draw down the design storage volume to the proposed bottom elevation
under seasonal high water conditions within five days A soils report and all pertinent draw -
down calculations are attached
s Plans ensure that the installed system will meet design specifications (constructed or
restored) upon initial operation once the project is complete and the entire drainage area is
stabilized
Form SWU 103 Rev 3 99 Page 2 of 3
IV INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT
1 After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion,
trash accumulation, vegetative cover, and general condition
2 Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow
vegetative cover to maintain a maximum height of six inches, and remove trash as needed
3 After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow
structures for blockage and deterioration Remove any blockage and repair the structure to approved design
specifications
4 Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth
in the pretreatment unit is reduced to 75% of the original design depth The system shall be restored to the
original design depth without over -excavating Over -excavating may cause the required water table
separation to be reduced and may compromise the ability of the system to perform as designed Removed
sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will
adversely impact water quality (i e stockpiling near a stormwater treatment device or stream, etc )
A benchmark shall be established in the pretreatment unit The benchmark will document the original
design depth so that accurate sediment accumulation readings can be taken The measuring device used to
determine the depth at the benchmark shall be such that it will give an accurate depth reading and not
readily penetrate into accumulated sediments
When the design depth reads 0 25_ feet in the pretreatment unit, the sediment shall be
removed from both the pretreatment unit and the infiltration basin
If the Division determines that they system is failing, the system will immediately be repaired to original
design specifications If the system cannot be repaired to perform its design function, other stormwater
control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed
I acknowledge and agree by my signature below that I am responsible for the performance of the five
maintenance procedures listed above I agree to notify DWQ of any problems with the system or pnor to any
changes to the system or responsible party
Print Name and Title Kent Mitchell, owner
Address P O Box 3069, Bald Head Island, NC 28461
Phone (910) 457-7000 Date
Signature �jyL
Note The legally responsib party should not be a homeowners association unless more than 50% of the lots have been sold and a
resident of the subdivisdion has been named the president
1 / . Sea *I-,(✓gn tj ez&, f _ , a Notary Public for the State of A/)A77i Caicol,,wi County of
t✓aJ iiu.vo✓tt , do hereby certify that /%/ hg,7>4 /YJi><GAe// personally appeared before me this Z91!4
day of tJBe[mbGr _ /999 ,and acknowledge the due execution of the foregoing infiltration basin maintenance requirements
Witness my hand and official seal,
SEAL
' po t
U
My commision expires Z7 ZOOZ
Form SWU 103 Nev 3 99
ct-
Page 3 of 3
400 CAPE FEAR
Engineering, Inc
5040 New Centre Drive Suite D
Wilmington N C 28403
Voice (910) 790 8584
Fax (910) 790 8583
E mad cfepbellsouth net
To NCDEHNR
127 Cardinal Drive Ext
Wilmington, NC 28403
ATTENTION Noelle Lutheran
RECEIVED
D" 1 3 1999
BY
Transmittal
DATE December 13, 1999
PROJECT NO 300-07
RE
Modification to Permit SW8 980434
Row Boat Row, Bald Head Island, NC
Quantity
Drawing No
Description
1
original and copy- Application for Modification to SW8 980434 permit
1
- Low Density Supplement Form SWU 104
1
- $420 Application fee
1
- Project Narrative
2
4
Revised Stormwater Management Plan
REMARKS Attached is a submittal package for modifications to the approved Row Boat Row
Stormwater Management Permit SW8 980434 The proposed modifications involves adding 700 sq ft
of BUA to Lot 208 and subtracting 700 sq ft of BUA from Lot 219 The net BUA remains the same
If you have any questions please call
CC Woody Fulton
Ken Kirkman
Andy Sayre
Ken Stewart
File
w/o attachments
w/o attachments
w/o attachments
CAPE FEAR Engineering Inc
Signed .`zEA/M—Ct tiro -
Pli O0l MEm,MNns dwls%vws1213� Wheen d.
DESIGN REPORT
FOR
ROW BOAT ROW SUBDIVISION
PREPARED FOR
BALD HEAD 15LAND LIMITED
Revised December 13, 1999
row
CAPE 'EAR ENGINEERING INC N, 040 New Centre Drive Suite D ,hb°E���AR
WILMINGTON NC 28403 j� 2 �o�f�SS/t
(910) 790-8584 Q SEA!
20%3
Cape Fear Engmeenng
12/13/99
Project Narrahve_Rev121399 doe
PROJECT NARRATIVE
General
Under 5tormwater Management Permit #5W8 980434 Row Boat Row, an 18-
lot Single family subdivision on Bald Head Island, NC was approved in accordance
with 5tormwater Regulations set forth in Title 15A NCAC 2H 100 for low density
development option Under this proposed modification the built upon area (BUA)
lot coverage table 15 revi5ed to show a reduction in the BUA for Lot 2 19 of 700
5quare feet and a corresponding mcrea5e of 700 scfuare feet to the BUA for Lot
208 The net BUA for the 18-lot 5ubdiv15ion remains unchanged
Storm Water Management
The total area of Row Boat Row 5ubdivi5ion is approximately 4 9 acres The
proposed impervious built upon area would be 1 2 acres corresponding to an
impervious ratio of 24 5% This project would be considered a low -density
project with deed restrictions limiting the amount of built upon area per lot in
accordance with the schedule shown in Exhibit A The existing soils are Newhan
Fripp fine sands These soils are extremely well drained with an infiltration rate of
approximately 20 /hour Storm water runoff will sheet flow to vegetative buffers
located along the property Imes No impervious surfaces will be allowed in the
vegetative buffer area
Sedimentation t Erosion Control
This project will disturb 1 7 acres of land Silt fencing and vegetative 5wale5 will
be the primary controls for Sedimentation and erosion control The velocities in
the 5wale5 are 1e55 than I-ft/5ec and will not be erosive All areas that will be
disturbed will be grassed or paved according to the schedules on the drawmgs
Bald Head Island Limited will be the financially re5pon511Ple party for all land
disturbing activities
Cape Fear Engineering
12/13/99
Project Narratrve_Rev 121399 doc