Loading...
HomeMy WebLinkAboutSW8971223_CURRENT PERMIT_20211209STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SWg Cjl i��3 DOC TYPE] CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 0 21 12 0 °1 YYYYMMDD 4 ROY COOPER Governor ELIZABETH S. BISER secretary BRIAN WRENN D1recror December 9, 2021 Bald Head Island Limited LLC Attn: Charles A. Paul, III; Manager/CEO P.O. Box 3069 Bald Head Island, NC 28461 NORTH CAROLINA Environmental Qualify Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 971223 Harbour Village Eastern Basin Lots Brunswick County Dear Mr. Paul: Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR"). All previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1, 2008, and December 31, 2010. The law extended the effective period of any permit that was set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years extension. The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on November 30, 2021. The Division is hereby notifying you that permit SW8971223 has been renewed, updated, and re -issued on December 9, 2021, as attached. As requested, a copy of the current operation And maintenance agreement is also enclosed. Please be aware that the renewal and re -issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until November 6, 2029, which includes all available extensions, and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAJi.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this perm it, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov Sincerely, Brian Wrenn, Director Division of Energy, Mineral and Land Resources - '. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington. North Carolina 28405 non�cu+our. e ow �� 910.796.7215 State Stormwater Permit No. SW8 971223 Page 2 of 2 Enclosures: Attachment A — Designer's Certification Form Attachment C — Permitting History Renewal Application Documents Copy of the current operation and maintenance agreement DES/ams: \\\Stormwater\Permits & Projects\ 1 997\971223 HD\2021 12 permit 971223 CC' Bruce Marek, PE; Bruce Muck, P.E.; 5489 Eastwind Road; Wilmington, NC 28403 Wilmington Regional Office Stotmwater File �� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910.796.7215 Post -Construction Stormwater Management Permit No. SW8 971223 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Bald Head Island Limited, LLC Harbour Village Eastern Basin East side of Bald Head Island, Brunswick County FOR THE construction, operation and maintenance of one wet detention pond for the high density area and a 25 % low density area, in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until November 6, 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 2 of this permit. The low density portion is permitted for 28 single family lots, each allowed a maximum built upon area equivalent to the building envelope (see Summary of Built -Upon Area - Attachment A, dated August 14, 2007). Runoff from the high density area will be treated in a detention pond, sized to handle 203,485 square feet of built -upon area. The built -upon area for lots in the high density area is listed in Attachment A - dated August 14, 2007 and Exhibit A — dated October 24, 2007. 3. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 1 of 8 Post -Construction Stormwater Management Permit No. SW8 971223 4. Development within CAMA's Area of Environmental Concern may be subject to a reduction in the allowable built -upon area due to CAMA regulations. At a minimum, maintain a 30 foot vegetated filter between High Water Line and BUA. 5. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. Pond Low Density Drainage Area Drainage Area a. Drainage Area, acres: 6.97 3.07 Onsite, ft2: 303,614 133,745 Offsite, ft2: 0 0 b. Total Impervious Surfaces, ft2: 203,485 29,230 Lots ft2: 120,274 29,230 Streets, ft2: 53,143 0 Parking, ft2: 17,000 0 Sidewalks, ft2: 13,068 0 Offsite, ft2: 0 0 C. Design Pond Depth, feet: 7.5 max. (installed prior to 2006) d. TSS removal efficiency: 90% - e. Design Storm: 1 inch - f. Permanent Pool Elevation, FMSL: 3.9 - g. Permitted Surface Area @PP, ft2: 6640 - h. Permitted Storage Volume, ft3: 17,136 - i. Storage Elevation, FMSL: 6.08 - j. Controlling Orifice: 1.61 " ID 0 pipe - k. Permanent Pool Volume, ft3: 30,525 - l. Forebay Volume, ft3: 6,100 - m. Maximum Fountain Horsepower: 1/8 HP - n. Receiving Stream / River Basin: Bald Head Marina Bald Head Creek o. Stream Index Number: 18-88-8-5 18-88-8-4 p. Classification of Water Body: "SC" "SA,HQW' II. SCHEDULE OF COMPLIANCE The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2 of 8 Post -Construction Stormwater Management Permit No. SW8 971223 6. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 10. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 12. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 13. Decorative spray fountains are allowed in the pond, subject to the following criteria: a. The minimum permanent pool volume is 30,000 cubic feet. b. The fountain must draw its water from less than 2' below the permanent pool surface. C. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. d. The fountain may not be placed into the forebay. e. The falling water from the fountain must be centered in the main pond, away from the shoreline. f. The maximum horsepower for a fountain in this pond is 1/8 horsepower. Page 3 of 8 Post -Construction Stormwater Management Permit No. SW8 971223 14. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 971223, as issued by the Division under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Energy, Mineral, and Land Resources. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division. f. Twenty -eighty (28) of the 33 lots contribute built -upon area to the low.density area. Total lot BUA contributing to low density is 29,230 square feet. See Attachment A and Exhibit A for BUA per lot limits. The total BUA contributing to the high density pond is 203,485 square feet. This allotted amount includes any built -upon area is taken as the building envelope constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. The building envelope for the allowable built -upon area is based on current Bald Head Island lot setback lines. Bald Head Island Limited, LLC is responsible for conveying this information to the lot buyer prior to the sale of any lot. h. Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built -upon area due to CAMA regulations. i. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. j. Built -upon area in excess of the permitted amount will require a permit modification. 15. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. Adding the option to use permeable pavement or #57 stone within the lots as a permeable surface. The request may require a proposed amendment to the deed restrictions and protective covenants for the subdivision to be submitted and recorded. g. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. h. Other modifications as determined by the Director. Page 4 of 8 Post -Construction Stormwater Management Permit No. SW8 971223 III. GENERAL CONDITIONS CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part,'nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, except in the case of an individual residential lot sale that is made subject to the recorded deed restrictions and protective covenants; V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2), b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. c. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. Page 5 of 8 Post -Construction Stormwater Management Permit No. SW8 971223 d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local. State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215:6. Permit renewed, updated and reissued this the 9th day of December 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION `-C Sian Wrenn, Uirector Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 6 of 8 Post -Construction Stormwater Management Permit No. SW8 971223 Harbour Village Eastern Basin Stormwater Permit No. SW8 971223 Brunswick County Attachment A Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 7 of 8 Post -Construction Stormwater Management Permit No. SW8 971223 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Brunswick County Building Inspections Page 8 of 8 Attachment C - Permitting History Harbour Village East Basin Lots Permit No. SW8 971223 Approval Date Permit Action BIMS Version Description of the Changes 6/2/1998 Original Approval 1.0 11/6/2007 Modification 1.1 8/18/2008 Plan Revision 1.2 revisions include the development plans for commercial lots QM 1, QM3, and QM4 as well as a revised version of Exhibit A, which updates the built - upon area allocated for these lots 12/9/2021 Renewal 2.0 Expires November 6, 2029 DEMLR USE ONLY Date Re eived Fee Pa'd Permit Number D = 5 tU �'I emu) 13: 3 NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM ECEIVE NOV S G 21?�1 2 py Vf.l In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (S8 781) Section 60. (c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8-971223 Mod 2. Project name: Harbour Village East Basin Lots 3. Project street address: Keelson Row Leeward Court, Windward Court & Tanbark Court City: Bald H ZIP: 28461 County: BRUNS 4. What, if any, changes have been made to the project as permitted? Project still not built out, but wet detention pond and all street stormwater piping have long been in place. Total maximum BUA has not been exceeded. If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at. https://deg.nc.gov/abouUdivisions/energy- mineral-land-resources/energy-mineral-land-rules/stormwater-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee orproject name have been made, please complete either the Permit Update form or the Permit Transfer form available at., https://deg.nc.gov/abouUdivisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: Bald Head Island Limited LLC 2. Signing Official's Name: Charles A. Paul, III 3. Signing Official's Title: CEO/Registered Agent/Manager 4. Mailing Address: P.O. Box 3069 City: Bald Head Island State: NC ZIP 28461 5. Street Address: 6 Maritime Wav City: Bald Head Island State: INC ZIP 28461 6. Phone: (910) 457-7358 Email: cpaul(a)bhisland.com Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: X 1. A permit application processing fee of $505.00 payable to NCDEQ. X 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) —a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. X 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. X 4. O&M Agreements, Please select one: ❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ® I do not have a copy of the current recorded 0&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. X 5. Designer Certifications, Please select one: ® A copy of the certification (a) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. x 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. X 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/bv title/ Business Registration CZCtz& NOV 3 0 202, Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION Charles A. Paul, III , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, corr an plete. Signature: Date: I t- ?°1-21 NOTARIZATION: a Notary Public for the State of County of ARtvJeW .'c-k , do hereby certify that C Aar hoc, 1-1 ."(kti/ this the '_0q day of 0 pemnnp execs"r��eing instrument. Witness my hand and official seal, 4.0 V �laryl�e�a/T'9� j C a X. n COV, - My commission expires /g� !? oto a,l personally appeared before me 20_,2_[_, and acknowledge the due A0�30?0?���', Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 Permit No. SW8-971 223 MOD (to he provided by DIVQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: HARBOUR VILLAGE EASTERN BASIN LOTS Contact Person: Bruce Marek, P.E. IPhone Number: (910 ) 457-7517 For projects with multiple basins, specify which basin this worksheet applies to: OA # % N- 6lVhr,S /34cn H gfD ISe4- /J 1 Jgni4t elevations IU6, VD a q Basin Bottom Elevation _3 8y ft. Permanent Pool Elevation 3 . ft. Temporary Pool Elevation ft. (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) areas Permanent Pool Surface Area sq. ft. (water surface area at the orifice elevation) Drainage Area ac. (on -site and off site drainage to the basin) Impervious Area 4. 67 ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 3 OS ,2 Sr cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume � cu. ft. (volume detained above the permanent pool) Forebay Volume (o / 00 cu. ft. (approximately 20% oftotal volume) Other parameters fi SA/DAI 11 Diameter of Orifice �l�aSCH =�,re in. Design Rainfall Apr in. Design TSS Removal 2 �(0 % Form SWU-102 Rev3.99 (surface area to drainage area ratio from DWQ table) (2 to 5 day temporary pool draw -down required (minimum 85%required) Page I of 4 nE C E I V ED Iuu;Suu AUG 15 2007 DWQ PROJ # SW8-971223 MOD HARBOUR VILLAGE EASTERN BASIN LOTS Footnotes: I When using the Division SAIDA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90%TSS removal. The NCDENR BMP manual provides design tables for both 85%TSS removal and 90%TSS removal. 11. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Initials P anent pool depth is between 3 and 6 feet (requirdGmin mEum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. `0Z, TO v s w e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow tiv V67r, P/1 r01- calculations) 5 &x- Pcm✓S f. The basin length to width ratio is greater than 3:1. 117Y 9 ?v �• n g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. 1,114 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. 'nr/M in. A mechanism is specified which will drain the basin for maintenance or an emergency. Ill. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does 6/does not incorporate a vegetated filter at the outlet. This system (check one) 0 does (does not incorporate pretreatment other thaRtretayS,E I V E Form SWU-102 Rev 3.99 Page 2 of AUG 15 2007 DWQ PROJN 11/06/2007 12:07 9104577463 BALD HEAD ISLAND PLA PAGE 02 SWB-971223 MOD HARBOUR VILLAGE EASTERN BASIN LOTS Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, reseed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manse[ and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 57% feet in the main pond, the sediment shall t e removed. When the permanent pool depth reads 5• feet in the forebay, the sediment shall be removed. BASIN DIAGRAM 6111 to the blanks) Permanent Pool Elevarion+ 9. 7 Nr'+Y4 r+ v _ Sediment Re val El. (. j6 75° h --------^-- �---- -- Sediment Removal Elevation �;_/ f 75% Bottom BI lion �b� %_________________________________;------___ I _. Bottom Elevation 040 25'/° , FOREBAX MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50e/u of the basin atu face. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. FornSWU-102 Rav3.99 Page 3of4 RECFIV�� NOV 6 2007 BY: SW8-971223 MOD HARBOUR VILLAGE EASTERN BASIN LOTS 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Stephen 0. Robertson Chief Operating Officer, Bald Head Island Limited, LLC P.O. Box 3069, Bald Head Island, NC 28461 910-457-7358 Date: r7 a 6 (d rl Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, > . J Go r vr, ra N a Notary Public for the State of 'N)n r'' V C rrd i r btu County of � ru µusw � BIZ , do hereby certify that ��e Qk o- N Kz)be r�- so rs personally appeared before me this :�, � e" ay of :qOo 7, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, �0- 411122�� SEAL My commission expires /O �E C E I b ED Form S WU-102 Rev 3.99 Page 4 of 4 u�,uf AUG 1 5 2007 DWO PROJ # Harbour Village Eastern Basin LOts PennitNo.SW8-971223 MOD (to be provided by DWv State of North Carolina ' f lwla) Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM LOW DENSITY SUPPLEMENT This form may be photocopied for use as an original A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances. Low density projects should not have a discrete stormwater collection system as defined by 15A NCAC 2H .1002(18). Low density requirements and density factors can be found in 15A NCAC 2H .1005 through .1007. I. PROJECT INFORMATION Project Name: (BHI) Harbour Village Eastern Basin Lots Contact Person: Bruce Marek, P.E. Phone Number: (910 ) 228-2484 Number of Lots: 19 Allowable Built Upon Area Per Lot*: SPP a tta nhment" *lf lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area for each lot. The attachment must include the project name, phase, page numbers and provide area subtotals and totals. II. BUILT UPON AREA See the Stormwater Management Permit Application for specific language that must be recorded in the deed restrictions for all subdivisions. For uniform lot sizes, complete the following calculation in the space provided below where: • SA Site Area - the total project area above Mean High Water. Wetlands may be excluded when the development results in high density pockets. • DF Density Factor - the appropriate percent built upon area divided by 100. • RA Road Area - the total impervious surface occupied by roadways. • OA Other Area - the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc. • No. Lots - the total number of lots in the subdivision. • BUA/Lot - the computed allowable built upon area for each lot including driveways and impervious surfaces located between the front lot line and the edge of pavement. R E C E I V ED Form SWU-104 Rev 3.99 Page 1 of 2 AUG 15 2007 DWQ PROJ # SW8-971223 MOD Harbour Village (SA x DF) - RA - OA = BUA No. Lots Lot SEE Aincc#RewrA"A0L for Aarr-s Ill. REQUIRED ITEMS CHECKLIST Eastern Basin Lots 8IWO' Initial in the space provided to indicate that the following requirements have been met and supporting documentation is provided as necessary. If the applicant has designated an agent on the Stormwater Management Permit Application Form, the agent may initial below. Applicants Initials �/)21 a. A 30 foot vegetative buffer is provided adjacent to surface waters. Projects in the Neuse River basin may require additional buffers. b. Deed restriction language as required on form SWU-101 shall be recorded as a restrictive covenant. A copy of the recorded document shall be provided to DWQ within 30 days of platting and prior to sale of any lots. c. Built upon area calculations are provided for the overall project and all lots. d. Project conforms to low density requirements within the ORW AEC (if applicable). [15A NCAC 2H .1007(2)(b)] FonnSWU-104 Rev3.99 Page 2 of 2 (�E C E 9 V ED a��Ut AUG 15 2007 DWQ PROD # ,�7 �q rl 12Z3 IrwD A-g�vimf< A SW8-971223 Mod Modification to June 2, 1998 NCDENR Stormater Permit Bruce Marek, P.E. Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Client: Bald Head Island Limited, LLC Bald Head Island, NC 26403 Location: Bald Head Island, Brunswick County, NC 8/14/2007 Attachment to SWU-104 Low Density Supplement SA Site Area = 133745 sf = DA#2 OF Density Factor = 0.25 (=1998 Unchanged SA Low Density Permit DF) RA Road Area = 0 sf OA Other Area = 0 sf No. Lots 28 that drain to DA#2 (includes 1 lot each for lot 3A & 3B) Calculation: For irregular sized/shaped lots: Drainage Area Allowable BUA - (SA'DF) • RA-OA = 33436 sf TABLE OF LOT BUA FOR HARBOUR VILLAGE LOW DENSITY LOT BUILT UPON FORM SWU-104 IMPERVIOUS IMPERVIOUS HV LOT # TO LOW HV LOT # TO LOW DENSITY DENSITY DA#2 DA#2 1A 0 sf 18 922 sf 1 B 0 sf 19 963 sf 2 0 sf 21 666 sf 3A 430 sf 22 0 sf 3B 3300 sf 23 1613 sf 5 1610 sf 24 962 sf 6 0 sf 25 962 sf 7 1237 sf 26 990 at 8 1875 sf 27 1239 sf 9 903 sf 28 1138 sf 10 910 at 29 788 sf 11 628 sf 30 1138 sf 12 690 sf 31 813 sf 13 690 sf 86 495 sf 14 690 sf 87 594 sf 15 1435 sf 23 �--5 ——PI-Art, 16 936 sf/ 17 613 sf Zy'j I-�s OIi4IN '�0 LO0UP0\517-t( SUBTOTALS: 15947 sf 13283 sf TOTAL LOT BUILT UPON AREA DRAINING TO LOW DENSITY AREA = DA#2 = 29230 sf 0.67 acres Area Draining To Low Density = DA#2: SA Waters - Bald Head Creek 18-88-8-4 133745 sf 3.07 acres Per Cent Impervious 21.86% Changes from 1998 Permit. Note: Low Density Area DA#2 Impervious did not change except for Lot 3A, 3B Split Lot 1 Harbor Village was split into lots 1A & 1 B for construction of a Duplex. Lot wastis 100% impervious, None in DA#2. Lot 3 Harbor Village was spit into lots 3A & 3B for construction of a Duplex. DA#2 impervious has been split to numbers shown.. Lot 86 Harbor Village was was enlarged after addition of new bulkhead. along Coastal Wetland Line. No change in DA#2 Impervious. ( 1200 at impervious area was added to the high density (pond) portion of the lot.) Lot 86 Harbor Vllage was was enlarged after addition of new bulkhead along Coastal Wetand Line. No charge in DA#2 Impervious. 1000 at impervious area was added to the high dens' (pond) portion of the lot.) �OV, CA Rol F' at�Qty Vr = SEAE r 1568d II HV East Basin Lots for SWU-104 ,: '', �,. r. �, EXHIBIT A IMPERVIOUS COVERAGE FOR LOTS IN QUARTERMASTER ROW BALD HEAD ISLAND, NORTH CAROLINA QUARTERMASTER ROW LOT 1 AND LOT 3 -- 33,000 square feet, combined QUARTERMASTER ROW LOT 2 -- 11,760 square feet* PROPOSED QUARTERMASTER ROW LOT 4 -- 5,557 square feet *NOTE: The impervious coverage figure for Quartermaster Row Lot 2 does not include an additional 9,527 square feet for streets (7,175 sq. ft.) and parking (2,352 sq. ft.) on the Lot. OCT 2 4 2007 I tqq- �_�J�iza3m��� SW8-971223 Mod Modification to June 2, 1998 NCDENR Stonnater Permit Bruce Marek, P.E. Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Cl en t Bald Head Island limited, LLC Bald Head Island, NC 28403 Location: Bald Head Island, Brunswick County, NC SR12007 Rev 10.1&07 Consoled acreage calalation Project Narrative Surturnwary of Project Area: Aug2007 Permit Modifi"tion/U date 303613 at 6.97 acres 13374551 3.07 acres 437355 at 10.04 acres Summary of Streets (CAD Area Includes Curbs, bump outs, end of street turnarounds, etc.) Length Width w Curb A = LxW Cad Area Max LxW or CAD Aaes Keelson Row Sta 9-10 to 23+53 1443 it 16 It 23088 sf 25828 sf 25828 sf 0.75 acres Tanbark CI Sta 0+00 to 1+97 197 it 20 It 3940 of 4210 5f 4210 sf 0.12 acres Wirldtrad Cast Sta 0+00 to 3+20 320 it 19 It 6080 at Short Alley Sta D+DD to D+70 70 it 8 it 560 st Leeward Court Site 0+00 to 2+61 261 it 79 ft 4959 sf Bridmun Alley Sta 0+00 to 1+60 160 it 8 it 1280 sf Sum 12879 sf 15030 sf 15030 at 0.43 acres Tons" Low Sta 0+00 to 3+53 353 ft 1411 4942 of 7173 at 7173 of 0.21 saes Totals 52241 at 1.51 acres Proposed 53143 at 1.54 acres Surrurnwary of Parking: Starting from South to North Keelson Row West (Marina) Side Keelson Row West (Manna) Side Length Nominal Width A = LxW Length Nominal Width A = LxW Salt 10 ft 540,01 78 It 12 ft 897 of 40 it 6 it 220 at 72 it 12 ft 828 of 40 it 6fl 220M 60It 1211 Boost 48 it 6 it 264 at 66 It 12 it 759 at 48 it 6 it 264 sf 42 It e ft 231 sf 30 It 6 it 165 sf 12 It E it 66 at 12 it Eft 66 at 12 it Eft 66 of 54 it 12ft 621 sf 36 ft 6 it 198 511 20 it 12 it 230 sf 40 it 6 ft 220 of 20 it 12 it 230 sf 40 It 6 it 2209 30ft l4ft 405 at 361t Eft 198 sr left 12 it 184 at 28it Eft 154 of wit 12 it 414Sf 60it Eft 330 St 30 it 1411 405 of 54 it 6 it 297 at 30 it 12 it 345 5f 80 it 6 it 440 5f 48 it 24 it 1152 sf 48 it 24 it 1152 of Told Site 18 it 12 it 207 at 74 it 11 S it 851 Sf 30 it 14 it 405 sf 74 ft 11.5 fl 851 sf 30 it 12 it 345 of 102it 6fl 561 at BID it 6 It 330 sf 8726 sf 7296 sf Spaces use some of curb for Mminal width, Total Fxistin : 76022 fl which was calculated in streets. Widths in Calc is 3less. Pro sad: 77000 fl 0.39 acres •.netp,. 000 15684 r; RECIFTVEI� OCT 17 2007 B`r : HV East Basin Streets -Panting 0 0 4T�Ac4nAGTJT .Ic if SW8-971223 Mod Modification to June 2, 1998 NCDENR Stormater Permit Bruce Marek, P.E. Project: Harbor Village Eastern Basin Lots P.O. Box 3069 Client: Bald Head Island Limited, LLC Bald Head Island, NC 28403 Location: Bald Head Island, Brunswick County, NC 8/7/2007 SUMMARY OF HARBOR VILLAGE LOT BUILT UPON ASSESSMENTS HV LOT # LOT TO TO LOW HV LOT # LOT TO TO LOW IMPERVIOUS POND DENSITY IMPERVIOUS POND DENSITY 1 A 3242 sf 3242 sf 0 sf 18 2060 sf 1138 sf 922 sf 1 B 2881 sf 2881 sf 0 sf 19 2165 sf 1202 sf 963 sf 2 4150 sf 4150 sf 0 sf 21 4315 sf 3649 sf 666 sf 3A 3584 sf 3154 sf 430 sf 22 2745 sf 2745 sf 0 sf 38 4650 sf 1350 sf 3300 sf 23 3130 sf 1517 sf 1613 sf 5 3030 sf 1420 sf 1610 sf 24 2165 sf 1203 sf 962 sf 6 2885 sf 2885 sf 0 sf 25 2165 sf 1203 sf 962 sf 7 2715 sf 1478 sf 1237 sf 26 1835 sf 845 sf 990 sf 8 4005 sf 2130 sf 1875 sf 27 2620 sf 1381 sf 1239 sf 9 2120 sf 1217 sf 903 sf 28 2515 sf 1377 sf 1138 sf 10 3290 sf 2380 sf 910 sf 29 1815 sf 1027 sf 788 sf 11 1520 sf 892 sf 628 sf 30 2515 sf 1377 sf 1138 sf 12 1615 sf 925 sf 690 sf 31 1865 sf 1052 sf 813 sf 13 1615 sf 925 sf 690 sf 86 3060 sf 2505 sf 495 sf 14 1615 sf 925 sf 690 sf 87 3000 sf 2406 sf 594 sf 15 2985 sf 1550 sf 1436 sf 16 1710 sf 774 sf 936 sf 17 1465 sf 852 sf 613 sf SUBTOTALS: 49077 sf 33130 sf 15947 sf 37910 sf 24627 sf 13283 sf TOTAL LOT BUILT UPON AREAS DRAINING TO POND = DA#1 = 57757 sf 1.33 acres TOTAL LOT BUILT UPON AREA DRAINING TO LOW DENSITY AREA = DA#2 = 29230 sf 0.67 acres TOTAL LOT BUILT UPON AREA = 86987 sf 2.00 acres 1998 Permit Original Numbers that have changed above. Changes shown above in bold. HV1 6123 sf 6123 sf 0 sf HV3 8235 sf 4504 sf 3730 sf HV86 1800 sf 1305 sf 495 sf HV87 2000 sf 1406 sf 594 sf Note: this is an increase of 2200 sf impervious in DA#1 (draining to the pond) Notes: Lot 1 Harbor Village was split into lots to & 1 B for construction of a Duplex. Lot wasris 100% impervious. Lot 3 Harbor Village was split into lots 3A & 3B for construction of a Duplex. 100% Lot impervious has been split. Lot 86 Harbor Village was was enlarged after addition of new bulkhead along Coastal Wetland Line and 1200 sf impervious area added to the high density (pond) portion of the lot Lot 86 Harbor Village was was enlarged after addition of new bulkhead along Coastal Wetland Line and 1000 sf impervious area added to the high density (pond) portion of the lot. �E C E 1 V ED Ju 1 5{pll J� 1 5 2007 ©WQ PROJ # HV East Basin Lots - Lots N CA1?01 •.4 SEAL 15681 ��. Bruce Marek, P.E. 5489 Eastwind Rd Wilmington, NC 28403 910-799-9245, cell 910-228-2484 11-28-21 NCDEQ DEMLR STORMWATER 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Stormwater Permit Renewal SCM Inspection: SW8-971223 Mod Harbour Village East Basin Lots - Bald Head Island, NC; Bald Head Island Limited LLC Bald Head Island Limited LLC has asked me to submit for renewal of SW8-971223 Mod, Harbour Village East Basin Lots, which is a hybrid Low Density & High Density permit first permitted by Klein Engineering in 1997. I periodically drive the roads that have stormwater piping: Keelson Row, Leeward Court, Windward Court and Tanbark Court. I have not noticed any stormwater piping/grating issues since a 2013 pipe collapse along Keelson Row that has since been repaired. At that time, the entire system was camera inspected/"scoped". The SW8-971223 Mod Wet Pond still appears to be per my prior certification. I last observed the pond on Nov. 23, 2021. I, Bruce James Marek, as a duly licensed professional engineer in the State of North Carolina, having been authorized to observe periodically this project, Harbour Village East Basin Lots, for Bald Head Island Limited LLC, hereby state that, to the best of my abilities, due care and diligence was observed in the observation of said project, and that the project was built with substantial compliance and intent of the approved plans and specifications. Seal/Signature/Date Registration Number: NC15684 CAgj �� ••'FGS9�' Gi, - e ..gip O,y •. c9's SEAL 15684 - ;03 ............ +[VIES - NOV 30 4?04?1am~. SW8-971223 Harbour Village East Basin Lots BHI Permit SCM Inspections — BMPE 11-28-21