HomeMy WebLinkAbout20140608 Ver 1_Withdrawal Letter_20140918Cranford, Chuck
From: Dale Pennell <Dale .Pennell @Mcgillengineers.Com>
Sent: Thursday, September 18, 2014 11:04 AM
To: david.w.brown @usace.army.mi1; Cranford, Chuck
Cc: Royster, Preston B; Mark Cathey; Ferguson, Jeff C; Greg Hoffman; Dale Pennell
Subject: Withdrawal of PCN for Big Hungry River - Upper Dam Removal Project
David and Chuck,
As you know, we have submitted a Pre - Construction Notification on behalf of the North Carolina Wildlife Resources
Commission for the removal of the Upper Dam on the Big Hungry River including the resulting river restoration. Your
offices have reviewed the PCN and attended a site meeting with the parties involved on August 12, 2014. Following that
meeting, we received review comments from both offices, to which we are ready to respond.
David, on September 16, Mark Cathey of our office discussed with you an issue which has arisen regarding the
project. We have designated an upland area for disposal of the sediment which is to be removed during the project. To
create this disposal area, we must excavate a hilltop and use the excavated area to build a dike to hold the material. We
have become concerned with the potential for bedrock in the excavation, and have decided to use the services of a
geotechnical sub - consultant to determine the depth to refusal (rock). In order to gain access to the proposed disposal
area by our geotechnical consultant, we need to improve the future access road to allow his track drilling machine to get
to the site. This will involve the installation of the 3 sections of pipe for the streams which cross the existing road.
Based on your input, we have arrived at a decision that means we need to have 2 separate PCN's for the project in lieu
of the single PCN. Therefore, we are hereby withdrawing the current PCN so that we can submit 2 separate
applications. We will submit PCN #1 for the piping of 3 short stream sections on the future haul road, which will allow
the pipes to be installed for the driller's access as well as to serve as the sediment haul road. We will then submit PCN
#2, which will describe the actual removal of sediment from the river and the restoration of the river banks following
dam and sediment removal. PCN #2 will include new information which will address the questions from your review of
the original PCN submittal.
Therefore, we request that you withdraw our original PCN application and we will submit PCN #1 in the next week.
Thanks for your understanding of our situation, and we appreciate your patience as we move toward finalizing the
permitting on this important project.
Dale Pennell, PE, PLS
Mc-Gill A iXes r.A
McGill Associates, P.A.
ilm
�r
�i
55 Broad Street I Asheville, NC 28801
Phone: 828.252.0575 1 Mobile: 828.231.7050 1 Fax: 828.252.2518
Email: dale .pennell @mcgillengineers.com I Website: www.mcgillengineers.com