Loading...
HomeMy WebLinkAboutSW8950818_HISTORICAL FILE_19951103STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 q 50 8 18 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ® HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE I°1g61103 YYYYMMDD �. §1j3tb of North Carolina Department of Environment, , • Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor [D FEE N Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director November 3, 1995 Mr. Frank H. Kenan Post Office Box 2729 Chapel Hill, North Carolina 27515-2729 Subject: Permit No. SW8 950818 Landfall Center Lots 5F & 5G High Density Stormwater Project New Hanover County Dear Mr. Kenan: The Wilmington Regional Office received the Stormwater Application for Landfall Center Lots 5F & 5G on August 4, 1995, with final information on November 9, 1995. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 950818 dated November 3, 1995 to you. This permit shall be effective from the date of issuance until November 3, 2005 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an ajudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, ave Adkins Regional Water Quality Supervisor DA/arl: S:\WQS\STORMWAT\PERMIT\950818.NOV cc: Rick Bond, P.E. Alan Golden, New Hanover County Inspections Beth Easeley Linda Lewis Wilmington Regional Office Central Files P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer State Stormwater Management Systems Permit No. SW8 950818 STATE OF NORTH CAROLINA DEPARTMENT, OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Frank Kenn Landfall Center Lots 5F & 5G New Hanover County FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Environmental Management and considered a part of this permit. This permit shall be effective from the date of issuance until November 3, 2005 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 2 State Stormwater Management Systems Permit No. SW8 950818 DIVISION OF ENVIRONMENTAL MANAGEMENT PROJECT DATA Project Name: Landfall Center Lots 5F & 5G Permit Number: 950818 Location: New Hanover County Applicant: Mr. Frank H. Kenan Mailing Address: Post Office Box 2729 Chapel Hill, North Carolina 27515-2729 Application Date: August 4, 1995 Water Body Receiving Stormwater Runoff: Mott Creek Classification of Water Body: "C Sw" If Class SA, chloride sampling results: N/A Pond Depth: 7 feet Permanent Pool Elevation: 23 MSL Total Impervious Surfaces Allowed: 48,800 square feet Offsite Area entering Pond: N/A square feet Green Area entering Pond: 3,485 square feet Required Surface Area: 2,098 square feet Provided Surface Area: 2,250 square feet Required Storage Volume: 3,951 cubic feet Provided Storage Volume: 3,913 cubic feet Temporary Storage Elevation: 24.4 MSL Controlling Orifice: 1" pipe 3 State Stormwater Management Systems Permit No. SW8 950818 4. No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 5. The tract will be limited to the amount of built -upon area indicated in the supporting calculations and per approved plans. 6. The permittee is responsible for verifying that the proposed plans do not exceed the allowable built -upon area. Once the lot transfer is complete, the plan may not be revised without approval from the permittee, and responsibility for meeting the built -upon area limit is transferred to the individual owner. 7. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of. built -upon area. e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 8. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. H. SCHEDULE OF COMPLIANCE 1. The permittee will comply with the following schedule for construction and maintenance of the stormwater management system: a. The stormwater management system shall be constructed in it's entirety, vegetated and operational for it's intended use prior to the construction of any built -upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in it's entirety and maintenance must occur at the scheduled intervals. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: El State Stormwater Management Systems Permit No. SW8 950818 a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure will be available. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEM. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Deed restrictions must be recorded which limit the built -upon area per lot to the amount as shown on the Project Data Sheet, per Part I #2. The recorded statements must follow the form: a. The allowable built -upon area is 48,800 square feet, inclusive of that portion of the right-of- way between the lot line and the edge of pavement, structures, pavement, walkways of brick, stone, or slate, but not including open wood decking." b. "The covenants pertaining to stormwater regulations may not be changed or deleted without concurrence of the State." C. "Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the State." 6. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Wilmington Regional Office, 127 Cardinal Drive Extension, Wilmington, North Carolina, 28405, attention Water Quality Section. 8. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. III. GENERAL CONDmONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Environmental Management accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 5 State Stormwater Management Systems Permit No. SW8 950818 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Environmental Management, in accordance with North Carolina General Statute 143-215.6(a) to 143-215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 3rd day of November, 1995. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION A:--Prestcd Howard, Jr., P.E., Director Division of Environmental Management By Authority of the Environmental Management Commission Permit Number SW8 950818 0 State Stormwater Management Systems Permit No. SW8 950818 Landfall Center Lots 5F & 5G Stormwater Project No. 950818 New Hanover County Engineer's Certification 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the constniction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date 7 POND MAINTENANCE REQUMEMENTS Project Name: Lqnh11 C-A-(- Project No. ResponsibleParty:_Fgak 14, Ke �n Phone No. gjlq- 9L7 — g Z Z I Address: _0 So,< ZZZ`l �-hWed - ,{/ �srs Z�Z�f II. III Monthly, or after every runoff producing rainfall event, whichever comes first: A. Inspect the trash rack; remove accumulated debris, repair/replace if it is not functioning. B. Inspect and clear the orifice of any obstructions. C. Inspect the pond side slopes and grassed inlet swales; remove trash, and repair eroded areas before the next rainfall event. D. The vegetated filter, will be checked for sediment accumulation, trash accumulation, erosion and proper operation of the flow spreader mechanism. Repairs/cleaning will be done as necessary. Quarterly: A. Inspect the collection system (ie. catch basins, piping, grassed swales) for proper functioning. Accumulated trash will be cleared from basin grates, basin bottoms, and piping will be checked for obstructions and cleared as required. B. Pond inlet pipes will be checked for undercutting, riprap or other energy dissipation structures will be replaced, and broken pipes will be repaired. Semi-annually: A. Accumulated sediment from the bottom of the outlet structure will be removed. B. The pond depth will be checked at various points. If depth is reduced to 75% of original design depth or 3 feet whichever is greater, sediment will be removed to at least the original design depth. C. Grassed swales, including the vegetated filter reseeded twice a year as necessary. AUGif zapplicable awill be 0 4 1"5 rxoJ # SU t7 8 POND MAINTENANCE REQUIREMENTS PAGE IV. General A. Mowing of the side slopes will be accomplished according to the season. Maximum grass height will be 6". B. Cattails are encouraged along the pond perimeter, however they will be removed when they cover more than 1/2 the surface area of the pond. C. The orifice is designed to draw down the pond in 2-5 days. If drawdown is not accomplished in that time, the system will be checked for clogging. The source of the clogging will be found and eliminated. D. All components of the detention pond system will be kept in good working order. Repair or replacement components will meet the original design specifications as per the approved stormwater plan. V. Special Requirements: W//q I>-!✓)1,0Ic i KrnA_(I hereby acknowledge that I am the financially responsible party for maintenance of this detention pond. I will perform the maintenance as outlined above, as part of the Certification of Compliance with Stormwater Regulations received for this project. Signature: Date: /99S C I, / a Notary Public for the State of CA; ounty of am do hereby certify that personally appeared before me this 4w,:L day of 19 �, and acknowledge the due execution of the foregoing instrument. Witness my hand and official seal, My commission expires THE JOHN R. McADAMS COMPANY, INC. CONSULTING ENGINEERS POST OFFICE BOX 14005 RESEARCH TRIANGLE PARK, NORTH CAROLINA 27709 (919) 361-5000 FAX (919) 361-2269 LETTER OF TRANSMITTAL To: Ms. Linda Lewis Division of Environmental Management Water Quality Section 127 Cardinal Drive Extension Wilmington- NC 28405-3845 Re: Landfall Center Lots 5F and 5G I am sending you the following item(s): Date: November 8. 1995 "FEDERAL EXPRESS" Job No: KNN-94010 •'I �' _M ���DESCURCION These are transmitted as checked below: x As requested For approval For review and comment Remarks: Copy To: PtUV 0 9 1995 D.EM For your use PRO] Signed: 'Rick Bo d, P.E. Project Manager a� D THE JOHN R. McADAMS COMPANY, INC. CONSULTING ENGINEERS POST OFFICE BOX 14005 RESEARCH TRIANGLE PARK, NORTH CAROLINA 27709 (919) 361-5000 FAX (919) 361-2269 October 13, 1995 Ms. Linda Lewis Division of Environmental Management 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Re: Landfall Center Lots 5F and 5G KNN-95000 Stormwater Project No. SW8 950818 Dear Linda: OCT 1 61995 D.EM PROJ# Please find enclosed revised calculations and plans which address your comments of October 3, 1995. Specifically Sheet 7 is enclosed showing the pond depth, storage elevation, and side slope. The 1" storage contour is 24.4', and this has been corrected on the plan. I have changed the parking and landscaped area runoff coefficients to 0.95 and 0.20 respectively, although the use of 0.90 for parking areas is well documented (among others by Dr. Malcolm in his "Elements of Urban Stormwater Design"), Linda, we urgently need swift approval on this plan to keep the project from being delayed. Anything you can do to expedite the process would be greatly appreciated. Please call me if you have any questions or require further information. Sincerely, THE JOHN R. McADAMS COMPANY, INC. Rick Bond, P.E. Pr �e t /MJanage/ lrJ� j k RB/pc Enclosure ECV9VE0 OCT 1 6 1995 DEM PROJ _1 'PROJECT: JOB NUMBER LOCATION: DATE: 1. DRAINAGE AREA LANDFALL CENTER LOTS 5F & 5G KNN95000 NEW HANOVER COUNTY 10/12/95 Drainage Area 1.14 Acres Impervious area 1.06 Acres % Impervious 93 % 2. POND SURFACE AREA STO IA,041ATER OCT 1 61995 PROD # 57W F T56 s i 0p Surface Area to Drainage Area Ratio (SA/DA) For Permanent Pool Sizing 90% Pollutant Removal Efficiency SA/DA% FOR BASIN DEPTHS Impervious% Permanent Pool Depths (feet) 5.5 6 6.5 7 90 5.90 5.20 4.60 3.90 100 6.60 5.80 5.10 4.30 For Depth= 7 feet SA/DA= 4.02% Impervious %= 93.0 % SA= 1,996 square ft. 90% Pollutant Removal Efficiency 3. TIME OF CONCENTRATION Use the Kirpich Eq. Tc= (L ^ 3 /H) ^ 0.385 128 L=Hydraulic length of watershed (ft) H=Height of ridge above watershed outlet (ft) •pW�e�n�°° Tc=Time of concentration (min) r`•• SN CARO( L= 300��`� �EESSIp�9,,�9 H= 3 r Tc= 3.7 minutes - SEAL 17578 Use Tc = 5 minutes IWE�Q` 4 G.��. /0 4. RUNOFF COEFFICIENT Developed Conditions Roof Parking Pavement Grass Composite "C" _ Area C CA 0.20 1.00 0.2 0.74 0.95 0.703 0.12 0.95 0.114 0.08 0.20 0.016 1.14 1.033 W01 5. RUNOFF VOLUME FOR WATER QUALITY Detain 1" runoff from site for 2-5 days. Runoff Volume = 1.14 acres * 1'712 * 43560 sf*C Runoff Volume = 3,750 cf 6. POND STAGE -STORAGE FUNCTION Since we will be working with pond volumes and depths above permanent pool only, take the permanent pool elevation as the bottom of the pond. CONTOUR CONTOUR AREA 23 2371 24 3097 25 3808 26 4757 b= 1.30 Ks= 2517 S Z INCR ACCUM STAGE In S In Z VOL VOL 0 0 0 2734 2734 1 7.913521 0 3452.5 6186.5 2 8.730124 0.693147 4282.5 10469 3 9.256173 1.098612 7. BASIN WATER QUALITY DETENTION TIME Low Flow Orifice Data Zest 0.00 1.07 2.00 3.00 Dia.= 1.00 Estimated orifice area(sf)= 0.01 CL Elev.= 0.00 Estimated orifice dia.(in)= 1.07 Cd= 0.60 0 Storage Orifice Area= Elev.= 1.36 Min.Det. Hours= 48 Water Quality Stage z = (V/K� ^ 1 /b TABLE 4 DETENTION OF 1" RUNOFF STAGE STORAGE HEAD (ft) (cf) (ft) 1.36 3750 1.36 -1.20 3189 1.20 1.00 2517 1.00 0.80 1884 0.80 0.70 1585 0.70 0.60 1297 0.60 0.40 767 0.40 0.20 312 0.20 0.00 0 0.00 TOTAL DRAWDOWN TIME z= 1.36 FLOW AVG FLOW INC VOL TIME VOL (cfs) (cfs) (cf) (hr) (cf) 0.031 0.030 561 5.25 561 0.029 0.028 672 12.03 1233 0.026 0.025 633 19.09 1865 0.023 0.023 300 22.76 2165 0.022 0.021 287 26.53 2452 0.020 0.018 531 34.51 2983 0.017 0.014 455 43.42 3438 0.012 0.006 312 58.17 3750 0.000 58.17 HRS. 8. POND STAGE -DISCHARGE FUNCTION Design principal and emergency spillways based on the orifice and weir equations.The principal spillway is sized to pass the 10 year storm. The emergency spillway shall pass the 100 year storm. Orifice Eq. Q=CdA(2gH) ^ 0.5 Weir Eq. Q=CLH ^ 1.5 TABLE 2 OUTLET STRUCTURE DESIGN PARAMETERS PRINCIPAL SPILLWAY RISER L/Dia BARREL H EMERGENCY WEIR Dim.= 24 Dia.= 18 Dim. = 50 Inv Elev= 24.40 Inv Elev= 22.90 Inv Elev= 26.00 Cwr = 3.33 Cdb = 0.60 Cwr = 3.33 Cdr = 0.60 Cdr = 0.60 CL Elev = 24.4 Orifice Orifice Orifice Area(rect)= 0.00 Area= 1.77 Area(rect)= Area(dia)= 3.14 Area(dia)= Weir Pipe CL Weir Length= 6.28 Elev= 23.65 Length= 10.00 TABLE 3 POND STAGE -DISCHARGE STAGE PRINCIPAL SPILLWAY BARREL PRIN.SPILL.EMER. SPIL TOTAL (weir) (orifice) DISCH. DISCH. DISCH. (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 24.40 0.00 0.00 7.37 0.00 0.00 0.00 25.00 9.72 11.72 9.89 9.72 0.00 9.72 25.50 24.14 15.87 11.57 11.57 0.00 11.57 26.00 42.35 19.13 13.04 13.04 0.00 13.04 9. POND ROUTING Soil To "C" The SCS dimensionless unit hydrograph for the 24 hour storm will be used for routing and runoff volume computations. A small watershed hydrograph formulation method developed by H. Rooney Malcolm will be used for pond routing. Runoff Volume Use SCS methods Q= (P-0.2S) ^ 2 P+0.8S S= 1000/CN — 10 Area (ac) Cover Description 1.06 Parking lots, roofs 0.08 Open space 1.14 Composite CN 96.32 Q = Runoff depth (in) P = Precipitation depth (in) S = Ultimate soil storage (in) CN = Curve NUmber CN CA 98 103.88 74 5.92 P10= 7.1 in 10 year storm precipitation P100= 10.2 in 100 year storm precipitation S= 0.38 in Q10= 6.66 in 10 year storm runoff depth Q100= 9.75 in 100 year storm runoff depth V10 = Q10*A V10= 7.59 ac—in = 27563 cf V100 = Q100*A V100= 11.12 ac—in = 40368 cf Developed Condition Peak Discharges Use Rational Method to calculate peak discharges Qe = CiA C= 0.91 i10 = 8.1 i100 = 10.0 Qe10 = 8.4 cfs Qe100 = 10.3 cfs Time to Peak A= 1.14ac Tp = V/(1.39Q) Tp10= 2370 s = 39 min Tp100= 2811 s = 47 min 10 Year Storm 0 STAGE ELEV 24.4 Time to peak 39 min Peak discharge 8.4 cfs Time Step 3 min 180 sec TIME INFLOW STORAGE STAGE OUTFLOW PRINCIPAL SPILLWAY BARREL (min) (cfs) (cu ft) (ft) (cfs) (weir) (orifice) (cfs) (cfs) (cfs) 0 0.00 0 0 0.00 0.00 0.00 0.00 3 0.12 21 24.4 0.08 0.08 2.41 7.49 6 0.47 105 24.5 0.53 0.53 4.45 7.78 9 1.03 93 24.5 0.46 0.46 4.25 7.75 12 1.77 195 24.5 1.09 1.09 5.64 8.02 15 2.64 317 24.6 1.91 1.91 6.81 8.30 18 3.60 449 24.7 2.85 2.85 7.78 8.57 21 4.60 584 24.7 3.87 3.87 8.62 8.82 24 5.57 716 24.8 4.89 4.89 9.32 9.04 27 6.46 838 24.8 5.87 5.87 9.90 9.24 30 7.23 945 24.9 6.75 6.75 10.37 9.40 33 7.82 1033 24.9 7.47 7.47 10.73 9.53 36 8.21 1096 24.9 8.00 8.00 10.98 9.61 39 8.36 1133 24.9 8.31 8.31 11.12 9.67 42 8.28 1142 24.9 8.39 8.39 11.15 9.68 45 7.97 1123 24.9 8.23 8.23 11.08 9.65 48 7.45 1077 24.9 7.84 7.84 10.91 9.59 51 6.78 1006 24.9 7.25 7.25 10.62 9.49 54 6.14 922 24.9 6.55 6.55 10.27 9.36 57 5.56 848 24.8 5.95 5.95 9.95 9.25 60 5.04 779 24.8 5.39 5.39 9.62 9.14 100 Year Storm Time to peak Peak discharge Time Step 47 min 10.3 cfs 3 min 180 sec TIME INFLOW STORAGE STAGE OUTFLOW PRINCIPAL SPILLWAY BARREL (min) (cfs) (cu ft) (ft) (cfs) (weir) (orifice) (cfs) (cfs) (cfs) 0 0.00 0 0 0.00 0.00 0.00 0.00 3 0.10 19 24.4 0.07 0.07 2.29 7.48 6 0.41 93 24.5 0.46 0.46 4.24 7.75 9 0.91 84 24.5 0.41 0.41 4.08 7.72 12 1.58 174 24.5 0.95 0.95 5.41 7.97 15 2.40 287 24.6 1.70 1.70 6.56 8.24 18 3.33 413 24.6 2.59 2.59 7.54 8.50 21 4.33 546 24.7 3.57 3.57 8.39 8.75 24 5.36 682 24.8 4.62 4.62 9.14 8.99 27 6.39 815 24.8 5.68 5.68 9.80 9.20 30 7.37 943 24.9 6.72 6.72 10.36 9.39 33 8.26 1059 24.9 7.69 7.69 10.84 9.56 36 9.02 1161 25.0 8.55 8.55 11.23 9.70 39 9.63 1245 25.0 9.27 9.27 11.53 9.82 42 10.06 1309 25.0 9.83 9.83 11.76 9.90 45 10.29 1351 25.0 9.96 10.19 11.90 9.96 48 10.31 1411 25.0 10.03 10.72 12.10 10.03 51 10.13 1462 25.1 10.10 11.16 12.27 10.10 54 9.75 1468 25.1 10.10 11.22 12.29 10.10 0 State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. DIVISION OF ENVIRONMENTAL MANAGEMENT Jonathan B. Howes Governor WATER QUALITY SECTION Secretary October 2, 1995 Mr. Rick Bond, P.E. The John R. McAdams Company Post Office Box 14005 Raleigh, North Carolina 27709 Subject: ADDITIONAL INFORMATION Stormwater Project No. SW8 950818 Landfall Center Lots 5F and 5G New Hanover County Dear Mr. Bond: The Wilmington Regional Office received previously requested additional information for Landfall Center Lots 5F and 5G on September 18, 1995. A preliminary review of that information has determined that the submittal for the subject project is not complete. The following information is needed to continue the stormwater review: 1. Sheet C-7 was not indluded with the submittal package. The pond depth, storage elevation, and side slope note must be shown. 2. It appears from the revised plan sheets that the 1" storage contour is at 23.4, which will yield insufficient storage. The calculations appear to suggest that this elevation should be 24.4, which will also, unfortunately, yield insufficient storage volume. The runoff coefficient you assigned to the parking areas and the grassed areas is too low. Asphalt surfaces use C=0.95 and landscaped areas use C=0.2. Please revise. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Bond October 2, 1995 Stormwater Project No. SW8 950818 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to November 2, 1995, or the submittal will be returned as incomplete. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\950818.00T cc: UnR_LeWiS) Central Files SEP 1 8 1995 iJ --------------------------- THE JOHN R. McADAMS COMPANY, INC. CONSULTING ENGINEERS POST OFFICE BOX 14005 RESEARCH TRIANGLE PARK, NORTH CAROLINA 27709 yyy�����PP11 p R p ^y�ppp��� (919) 361-5000 FAX (919) 361-2269 T¢ j'y tl"vf�` UATER September 15, 1995 fCi�r: 7h C Fi11 !9� Ms. Linda Lewis Division of Environmental Management Water Quality Section 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Re: Landfall Center Lots 5F and 5G Stormwater Project No. SW8 950818 KNN-95000 Dear Linda: SEP 1 8 1995 DEIVI RRoi Sw 8 95G r3 l7 We have revised the above referenced plans and supporting calculations per your comments of August 28 as follows: 1. The narrative statement regarding the lots served by the existing pond has been corrected. 2. The 3:1 slope requirement has been added to the detail on Sheet C-7. 3. Please see subheading 4 in the calculations. 4. The 1" storage contour has been added and delineated. ,/ 5. The pond has been revised to meet the 90% removal criteria by increasing the pond depth and surface area thereby eliminating the need for the vegetative filter. 6. The inlet piping from CB-21 has been moved to reduce the risk of short circuiting. 7. Pond dimensions have been added to Sheet C-3, and Sheet C-2 has all of the other dimensioning. Please feel free to call me if you have any questions. Sincerely, T OHN R. McADAMS COMPANY, INC. Rick Bond, P.E. Project Manager RB/pc cc: Jack Graham STORM WATER MANAGEMENT and EROSION CONTROL REPORT for LANDFALL CENTER EXPANSION August, 1995 SEP 1 8 1995 UD DEM VROJ # THE JOHN R. McADAMS COMPANY, INC. Consulting Engineers Research Triangle Park, North Carolina 27709 NARRATIVE This erosion control plan is submitted for the Landfall Shopping Center Expansion project in New Hanover County at the intersection of eastwood Road and Military Cutoff Road. The project consists of the expansion of the Landfall Shopping Center with additional retail space and associated parking, drives, storm drainage, landscaping, and utilities. The existing water quality pond will receive runoff from Lots 5A, 513, 5C, 5D, and 5E. A new water quality pond will be constructed for Lots 5F and 5G. Each pond is designed to retain the first inch of runoff from the drainage areas for a minimum of 48 hours and each will pass the 100 year storm without overtopping its banks. This phase of the project will disturb approximately 7.85 acres. Initial erosion control measures will include three temporary gravel construction exits, silt fence, and the pond on Lot 5G. After initial measures are in place, the site will be rough graded and storm drainage with inlet protection will be installed. All denuded areas will be vegetatively stabilized within 30 days. LANDFALL CENTER EXPANSION 1. RUNOFF COEFICIENTS CB8 Cover Area C CA Type (ac) roof 0.00 1.00 0.00 parking 0.26 0.90 0.23 pavement 0.00 0.95 0.00 grassed 0.02 0.10 0.00 Totals 0.28 0.24 Composite C = 0.84 CB9 Cover Area C CA Type (ac) roof 0.00 1.00 0.00 parking 0.28 0.90 0.25 pavement 0.06 0.95 0.06 grassed 0.06 0.10 0.01 Totals 0.40 0.32 Composite C = 0.79 i Cover Area C CA Type (ac) roof 0.00 1.00 0.00 parking 0.22 0.90 0.20 pavement 0.04 0.95 0.04 grassed 0.01 0.10 0.00 Totals 0.27 0.24 Composite C = 0.88 CB11 Cover Area C CA Type (ac) roof 0.00 1.00 0.00 parking 0.25 0.90 0.23 pavement 0.00 0.95 0.00 grassed 0.00 0.10 0.00 Totals 0.25 0.23 Composite C = 0.90 Cover Area C CA Type (ac) roof 0.00 1.00 0.00 parking 0.25 0.90 0.23 pavement 0.00 0.95 0.00 grassed 0.04 0.10 0.00 Totals 0.29 0.23 Composite C = 0.79 CB13 Cover Area C CA Type (ac) roof 0.00 1.00 0.00 parking 0.18 0.90 0.16 pavement 0.00 0.95 0.00 grassed 0.01 0.10 0.00 Totals 0.19 0.16 Composite C = 0.86 CB14 Cover Area C CA Type (ac) roof 0.00 1.00 0.00 parking 0.20 0.90 0.18 pavement 0.00 0.95 0.00 grassed 0.06 0.10 0.01 Totals 0.26 0.19 Composite C = 0.72 CB15 Cover Area C CA Type (ac) roof 0.00 1.00 0.00 parking 0.28 0.90 0.25 pavement 0.02 0.95 0.02 grassed 0.04 0.10 0.00 Totals 0.34 0.28 Composite C = 0.81 CB16 Cover Area C CA Type (ac) roof 0.00 1.00 0.00 parking 0.19 0.90 0.17 pavement 0.05 0.95 0.05 grassed 0.03 0.10 0.00 Totals 0.27 0.22 Composite C = 0.82 CB17 Cover Area C CA Type (ac) roof 0.03 1.00 0.03 parking 0.17 0.90 0.15 pavement 0.02 0.95 0.02 grassed 0.04 0.10 0.00 Totals 0.26 0.21 Composite C = 0.79 CB18 Cover Area C CA Type (ac) roof 0.03 1.00 0.03 parking 0.06 0.90 0.05 pavement 0.02 0.95 0.02 grassed 0.06 0.10 0.01 Totals 0.17 0.11 Composite C = 0.64 CB19 Cover Area C CA Type (ac) roof 0.02 1.00 0.02 parking 0.31 0.90 0.28 pavement 0.02 0.95 0.02 grassed 0.01 0.10 0.00 Totals 0.36 0.32 Composite C = 0.89 CB20 Cover Area C CA Type (ac) roof 0.04 1.00 0.04 parking 0.14 0.90 0.13 pavement 0.01 0.95 0.01 grassed 0.01 0.10 0.00 Totals 0.20 0.18 Composite C = 0.88 CB21 Cover Area C CA Type (ac) roof 0.03 1.00 0.03 parking 0.19 0.90 0.17 pavement 0.01 0.95 0.01 grassed 0.01 0.10 0.00 Totals 0.24 0.21 Composite C = 0.88 CB22 Cover Area C CA Type (ac) roof 0.02 1.00 0.02 parking 0.16 0.90 0.14 pavement 0.01 0.95 0.01 grassed 0.01 0.10 0.00 Totals 0.20 0.17 Composite C = 0.87 CB23 Cover Area C CA Type (ac) roof 0.06 1.00 0.06 parking 0.09 0.90 0.08 pavement 0.01 0.95 0.01 grassed 0.02 0.10 0.00 Totals 0.18 0.15 Composite C = 0.85 LOCATION WILMINGTON SHEEI 1 of PROJECT LANDFALL CENTER DATE JOB NO. KNN94010 BY RB DESIGN STORM 10 YEAR CHECKED BY INLET AREA CA C TIME OF CONC. INT "r Q (cfs) PIPE n = Inverts 0.013 L S Dia. (in) Vfull From To Sub Total Sub Total Sub Com Inlet Pipe Total (ac) (ac) (min) (min) (min) (in/ o (ft) (fps) From To Req Nom CB8 C69 0.28 0.28 0.23 0.24 0.84 0.84 - - 5 8.1 1.90 24.00 23.79 140 0.0015 13.5 15 1.55 CB9 CB10 0.40 0.68 0.31 0.55 0.79 0.81 - - 5 8.1 4.46 23.59 23.35 120 0.0020 17.6 18 2.52 CB 10 CB 15 0.27 0.95 0.23 0.79 0.88 0.83 - - 5 8.1 6.38 23.15 22.70 120 0.0037 17.9 18 3.61 CB 11 CB 12 0.25 0.25 0.22 0.23 0.90 0.90 - - 5 8.1 1.82 24.30 24.05 140 0.0018 12.8 15 1.48 CB 12 CB 13 0.29 0.54 0.22 0.45 0.79 0.84 - - 5 8.1 3.67 23.80 23.75 120 0.0020 16.4 18 2.08 CB13 CB 14 0.19 0.73 0.16 0.62 0.86 0.85 - - 5 8.1 5.00 23.65 23.35 120 0.0025 17.6 18 2.83 CB 18 CB 14 0.17 0.17 0.10 0.11 0.64 0.64 - - 5 8.1 0.88 24.30 23.80 160 0.0031 8.83 12 1.12 0.90 0.73 CB 14 CB 15 0.26 1.16 0.18 0.91 0.72 0.79 - - 5 8.1 7.39 23.25 22.70 120 0.0046 18.2 18 4.18 2.11 1.70 CB 15 CB 16 0.34 2.45 0.27 1.98 0.81 0.81 - - 5 8.1 16.0 22.50 21.80 120 0.0058 23.3 24 5.09 CB 17 CB 16 0.26 0.26 0.20 0.21 0.79 0.79 - - 5 8.1 1.66 23.30 23.00 95 0.0032 11.1 12 2.11 2.71 2.18 CB16 CB2 0.27 2.98 0.22 2.40 0.82 0.81 - - 5 8.1 19.4 21.60 21.25 155 0.0023 29.9 30 3.96 CB19 CB20 0.20 0.20 0.17 0.17 0.87 0.87 - - 5 8.1 1.40 23.85 23.70 60 0.0025 10.9 12 1.79 CB20 CB21 0.20 0.40 0.17 0.35 0.88 0.88 - - 5 8.1 2.83 23.45 23.20 125 0.0020 14.8 15 2.31 CB22 C621 0.36 0.36 0.32 0.32 0.89 0.89 - - 5 8.1 2.59 23.50 23.20 110 0.0027 13.5 15 2.11 0.76 0.67 CB21 FES 0.24 1.00 0.21 0.88 0.88 0.88 - - 5 8.1 7.14 23.10 22.80 25 0.0120 15.0 15 5.81 C823 FES 0.18 0.18 0.15 0.15 0.85 0.85 - - 5 8.1 1.23 23.90 23.00 80 0.0112 7.90 12 1.57 OS MH24 0.00 0.00 0 0.00 0.85 - - 5 8.1 8.4 22.90 22.31 70 0.0084 17.0 18 4.75 MH24 MH25 0.00 0.00 0 0.00 0.85 - - 5 8.1 8.4 22.21 21.30 108 0.0084 17.0 18 4.75 MH25 FES 0.00 0.00 0 0.00 0.85 - - 5 8.1 8.4 21.20 20.85 42 0.0083 17.1 18 4.75 CB24 CB3 0.17 0.17 0.14 0.14 0.85 0.95 - - 5 8.1 1.30 23.90 23.00 80 0.0112 8.06 12 1.66 CB25 CB4 0.08 0.08 0.06 0.07 0.85 0.95 - - 5 8.1 0.61 24.50 23.63 150 0.0058 6.88 12 0.78 THE JOHN R. McADAMS COMPANY, INC. P O. Box 14005 Research Triangle Park, North Carolina 27709 (919) 361-5000 Fax (919) 361-2269 2 p QQ PAGE J R McA JOB NO. DATE ✓� ` BY KN CHECKED BY_ CLIENT PROJECT SUBJECT OF (Date) I, U ; y,o �cr �9 vry 3 - Zone iJJ G Cl I k' p ea p 5- l I x S' L x l 3 r TA 2, L-8 23 fa DES V /0 = /, 57 Fp5 USG CL / lhip Rap 3, AM 7S tp F-Es Pip e (0 = /8 '' Vio = 4, 7S -601 S' kv x. S' L r / 3" Th , 0-rc CL l .9'„o Wap S't,l x S' L x / 3'' Th , PROJECT: JOB NUMBER: LOCATION: DATE: 1. DRAINAGE AREA LANDFALL CENTER LOTS 5F & 5G KNN95000 NEW HANOVER COUNTY 09/12/95 Drainage Area 1.18 Acres Impervious area 1.12 Acres % Impervious 95 % 2. POND SURFACE AREA Surface Area to Drainage Area Ratio (SA/DA) For Permanent Pool Sizing 85% Pollutant Removal Efficiency SA/DA% FOR BASIN DEPTHS Impervious% Permanent Pool Depths (feet) 5.5 6 6.5 7 90 5.90 5.20 4.60 3.90 100 6.60 5.80 5.10 4.30 For Depth= 7 feet SA/DA= 4.10% Impervious %= 94.9 % SA= 2,107 square ft. 90% Pollutant Removal Efficiency 3. TIME OF CONCENTRATION Use the Kirpich Eq. Tc= (L ^ 3 /H) ^ 0.385 128 L=Hydraulic length of watershed (ft) H=Height of ridge above watershed outlet (ft) Tc=Time of concentration (min) L= 300 H= 3 Tc= 3.7 minutes Use Tc = 5 minutes 4. RUNOFF COEFFICIENT Developed Conditions Area Roof 0.17 Parking 0.89 Pavement 0.06 Grass 0.06 Composite "C" _ C 1.00 0.90� Nv 64- in 2V;n Z 0.95 Ina{ ( pirjha5c��°�L 0.10 0.88 (see storm drainage calculations) 5. RUNOFF VOLUME FOR WATER QUALITY Detain 1" runoff from site for 2-5 days. Runoff Volume = 1.18 acres * 1712 * 43560 sf*C Runoff Volume = 3,769 cf 6. POND STAGE -STORAGE FUNCTION Since we will be working with pond volumes and depths above permanent pool only, take the permanent pool elevation as the bottom of the pond. S Z CONTOUR CONTOUR INCR ACCUM STAGE In S In Z Zest AREA VOL VOL 23 2288 0 0 0 0.00 24 2971 2629.5 2629.5 1 7.874548 0 1.06 25 3767 3369 5998.5 2 8.699264 0.693147 2.00 26 4617 4192 10190.5 3 9.229211 1.098612 3.00 b= 1.31 Ks= 2424 7. BASIN WATER QUALITY DETENTION TIME Low Flow Orifice Data Dia.= Estimated orifice area(sf)= 0.01 Estimated orifice dia.(in)= 1.07 1.00 CL Elev.= 0.00 Cd= 0.60 Storage Orifice Area= Elev.= 1.40 M in. Det. Hours= 48 Water Quality Stage z = (V/I) ^ 1 /b TABLE 4 DETENTION OF 1" RUNOFF STAGE STORAGE HEAD (ft) (cf) (ft) 1.40 3769 1.40 1.30 3416 1.30 1.20 3077 1.20 1.00 2424 1.00 0.80 1811 0.80 0.60 1243 0.60 0.40 732 0.40 0.20 296 0.20 0.00 0 0.00 TOTAL DRAWDOWN TIME z= mm 1.40 FLOW AVG FLOW INC VOL TIME VOL (cfs) (cfs) (cf) (hr) (cf) 0.031 0.031 353 3.22 353 0.030 0.029 339 6.43 693 0.029 0.028 652 13.01 1345 0.026 0.025 613 19.86 1958 0.023 0.022 568 27.06 2526 0.020 0.018 512 34.75 3037 0.017 0.014 436 43.29 3474 0.012 0.006 296 57.29 3769 0.000 57.29 HRS. 8. POND STAGE -DISCHARGE FUNCTION Design principal and emergency spillways based on the orifice and weir equations.The principal spillway is sized to pass the 10 year storm. The emergency spillway shall pass the 100 year storm. Orifice Eq. Q=CdA(2gH) ^0.5 Weir Eq. Q=CLH ^ 1.5 TABLE 2 OUTLET STRUCTURE DESIGN PARAMETERS PRINCIPAL SPILLWAY RISER UDia BARREL H EMERGENCY WEIR Dim. = 24 Dia.= 18 Dim.= 50 Inv Elev= 24.40 Inv Elev= 22.90 Inv Elev= 26.00 Cwr = 3.33 Cdb = 0.60 Cwr = 3.33 Cdr = 0.60 Cdr = 0.60 CL Elev = 24.4 Orifice Orifice Orifice Area(rect)= 0.00 Area= 1.77 Area(rect)= Area(dia)= 3.14 Area(dia)= Weir Pipe CL Weir Length = 6.28 Elev= 23.65 Length= 10.00 TABLE 3 POND STAGE -DISCHARGE STAGE PRINCIPAL SPILLWAY BARREL PRIN.SPILL.EMER. SPIL TOTAL (weir) (orifice) DISCH. DISCH. DISCH. (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 24.40 0.00 0.00 7.37 0.00 0.00 0.00 25.00 9.72 11.72 9.89 9.72 0.00 9.72 25.50 24.14 15.87 11.57 11.57 0.00 11.57 26.00 42.35 19.13 13.04 13.04 0.00 13.04 9. POND ROUTING The SCS dimensionless unit hydrograph for the 24 hour storm will be used for routing and runoff volume computations. A small watershed hydrograph formulation method developed by H. Rooney Malcolm will be used for pond routing. Runoff Volume Use SCS methods Q= (P-0.2S) -2 P+0.8S S= 1000/CN — 10 Q = Runoff depth (in) P = Precipitation depth (in) S = Ultimate soil storage (in) CN = Curve NUmber Soil Area (ac) Cover Description CN 1.12 Parking lots, roofs 98 To "C" 0.06 Open space 74 1.18 Composite CN 96.78 CA 109.76 4.44 114.2 P10= 7.1 in 10 year storm precipitation P100= 10.2 in 100 year storm precipitation S= 0.33 in Q10= 6.72 in 10 year storm runoff depth Q100= 9.81 in 100 year storm runoff depth V10 = Q10*A V10= 7.92 ac—in = 28766 cf V100 = Q100*A V100= 11.58 ac—in = 42026 cf Developed Condition Peak Discharges Use Rational Method to calculate peak discharges Qe = CiA C= 0.88 i10 = 8.1 000 = 10.0 Qe10 = 8.4 cfs Qe100 = 10.4 cfs Time to Peak A= 1.18ac Tp = V/(1.39Q) Tp10= 2460 s = 41 min Tp100= 2912 s = 49 min 10 Year Storm 0 STAGE ELEV 24.4 Time to peak 41 min Peak discharge 8.4 cfs Time Step 3 min 180 sec TIME INFLOW STORAGE STAGE OUTFLOW PRINCIPAL SPILLWAY BARREL (min) (cfs) (cu ft) (ft) (cfs) (weir) (orifice) (cfs) (cfs) (cfs) 0 0.00 0 0 0.00 0.00 0.00 0.00 3 0.11 20 24.4 0.08 0.08 2.41 7.49 6 0.44 98 24.5 0.53 0.53 4.44 7.78 9 0.96 82 24.5 0.43 0.43 4.14 7.73 12 1.66 178 24.5 1.04 1.04 5.57 8.01 15 2.48 288 24.6 1.81 1.81 6.70 8.28 18 3.40 409 24.7 2.71 2.71 7.65 8.53 21 4.37 533 24.7 3.68 3.68 8.48 8.78 24 5.32 657 24.8 4.67 4.67 9.18 9.00 27 6.21 773 24.8 5.63 5.63 9.77 9.19 30 7.00 877 24.9 6.51 6.51 10.25 9.36 33 7.64 965 24.9 7.27 7.27 10.63 9.49 36 8.11 1033 24.9 7.86 7.86 10.91 9.59 39 8.36 1077 24.9 8.25 8.25 11.09 9.66 42 8.40 1098 24.9 8.43 8.43 11.17 9.68 45 8.22 1093 24.9 8.38 8.38 11.15 9.68 48 7.82 1063 24.9 8.12 8.12 11.03 9.63 51 7.24 1009 24.9 7.65 7.65 10.82 9.56 54 6.59 935 24.9 7.01 7.01 10.50 9.45 57 5.99 860 24.9 6.37 6.37 10.17 9.33 60 5.45 792 24.8 5.80 5.80 9.86 9.22 100 Year Storm Time to peak 49 min Peak discharge 10.4 cfs Time Step 3 min TIME INFLOW STORAGE (min) (cfs) (cu ft) 0 0.00 0 3 0.10 18 6 0.39 87 9 0.86 74 12 1.49 160 15 2.26 262 18 3.14 376 21 4.10 498 24 5.10 624 27 6.11 749 30 7.08 870 33 7.97 982 36 8.77 1082 39 9.43 1168 42 9.93 1236 45 10.25 1285 48 10.38 1340 51 10.32 1406 54 10.06 1445 180 sec STAGE OUTFLOW PRINCIPAL SPILLWAY BARREL (ft) (cfs) (weir) (orifice) (cfs) (cfs) (cfs) 0 0.00 0.00 0.00 0.00 24.4 0.07 0.07 2.30 7.48 24.5 0.46 0.46 4.24 7.75 24.5 0.38 0.38 3.98 7.70 24.5 0.92 0.92 5.34 7.96 24.6 1.63 1.63 6.46 8.22 24.6 2.47 2.47 7.42 8.47 24.7 3.40 3.40 8.26 8.71 24.8 4.41 4.41 9.00 8.94 24.8 5.44 5.44 9.65 9.15 24.9 6.45 6.45 10.22 9.35 24.9 7.42 7.42 10.71 9.52 24.9 8.29 8.29 11.11 9.66 25.0 9.05 9.05 11.44 9.78 25.0 9.66 9.66 11.69 9.88 25.0 9.94 10.09 11.86 9.94 25.0 10.01 10.60 12.06 10.01 25.1 10.10 11.20 12.28 10.10 25.1 10.15 11.55 12.41 10.15 State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. DIVISION OF ENVIRONMENTAL MANAGEMENT Jonathan B. Howes Governor WATER QUALITY SECTION Secretary August 22, 1995 Mr. Rick Bond, P.E. The John R. McAdams Company Post Office Box 14005 Research Triangle Park, North Carolina 27709-4005 Subject: ADDITIONAL INFORMATION Stormwater Project No. SW8 950818 Landfall Center Lots 5F and 5G New Hanover County Dear Mr. Bond: The Wilmington Regional Office received a Stormwater Submittal for the Landfall Center Lots 5F and 5G on August 4, 1995. A preliminary review of that information has determined that the submittal for the subject project is not complete. The following information is needed to continue the stormwater review: 1. The narrative statement is incorrect. The existing pond will provide stormwater control for Lots 5A, 5B, 5C, 51), and 5E. The new pond is for lots 5F and 5G. 2. Please add a 3:1 slope requirement to the outlet detail. 3. Please break down the impervious areas into buildings, parking, and concrete. 4. Please delineate and label the 1" storage contour. 5. The vegetated filter is not a swale. Please see the enclosed detail. The existing "vegetated filter" for the old'pond was allowed to remain, since it had been permitted that way. 6. Please relocate the inlet piping from CB-21 to enter the pond at the narrow part. Short- circuiting is a concern. 7. Please add dimensions of the pond, buildings, sidewalks, parking spaces, and aisles. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Bond August 22, 1995 Stormwater Project No. SW8 950818 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to September 22, 1995, or the submittal will be returned as incomplete. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\950818.AUG cc: 4Linda-Lewis_ Central Files vp�SwdW, �voc� sn�wa�� alzrns Zsi2 = �z IVs ✓n 2} voa2�� s � �1-C;o, S a >1 -a p. 1710-)d — "✓n2f v0� �z✓�iJs ��� ayf aG,� � a 2-G'I�a� 29 1 Z��pv uo 5, — p LET-5 UlgoSh �� �b-Z2 1 -JS s 401 olc� _A5, jf Om x1a3 f C z( 1421- (4�lz 9) + \ C"J \ (... Zlk0((gz) Z ++ CI9)619) �Z (C�/SZ- ) 4 (5l/25) 4- C43x C+ 43) � C2s,-$) � �1-137,(4(, �7 (lY ✓ x t�_'L 1, Z� a ZI J,& 7 ! Z� + l �� '� �� 4� , Ci ( 4(, I S Z I s �� eke = C 4-0 C34x5� f C13e ll) -f ZC-7 --lz) 4 (/S,�JZ dub XS� = 31 F)(o �cl 4�¢i�� 4-S 8O0 01sir- G= z3Oct -CPo,-4' (1Z�1z) -1- 44 (o2 j- r)� -Y C4y��Z�+ C35�t2� 4- a- ('�D A4;) ac THE JOHN R. McADAMS COMPANY, INC. CONSULTING ENGINEERS POST OFFICE BOX 14005 RESEARCH TRIANGLE PARK, NORTH CAROLINA 27709 (919) 361-5000 FAX (919) 361-2269 LETTER OF TRANSMITTAL To: Ms. Linda Lewis Division of Environmental Management Water Quality Section 127 Cardinal; Drive Extension Wilmington, North Carolina 28405-3845 Re: Landfall Center Lots 5F and 50 I am sending you the following item(s): Date: August 1, 1995 �To1A1`4i-&/ATER ECEOWEU AUG 0 4 1995 DEM PROD Job No: KNN 95000 COPIES DATE NO. DESCRIPTION 3 Sets of Plans 3 Calculation Packa es 1 Pond Maintenance A reement 1 Application These are transmitted as checked below: As requested For approval For review and comment For your use Remarks: Linda: Landfall Center is on a fast track schedule with this project. They want to have shops open by Spring 1996. Anything you can:'do to help expedite the permit would be greatly appreciated. Copy to: J-ack Grit �tl1m Signed: Rick Bond, PE Project Manager X. DIVISION OF ENVIRONMENTAL MANAGEMENT DENSITY ENGINEERED PROJECT DATA Project Name Lund fail Cealf Location (County, Owner's Name FrwA i 4, K oan Address, State MailingAddress {!O Boa 27 ` 11 C A/.4cl ffill ABC Z%S/,S'— Z%Z�/ Phone Number 4Iq - qG 7 - S 221 Submittal Description (include map and appropriate drawings) EX /JG-r S I on 91'� 5�ht3MPLI 41� Name of Water Body Receiving Stormwater Runoff Classification of Water Body se If SA waters, engineered system, and distance is <0.5 miles, attach report of chloride sampling results mg/1 State/Federal Permits/Approvals Required (Check appropriate blanks) CAMA Major 404 Permit Other (SDeCifV) CALCULATION OF BUILT UPON AREA Sedimentation/Erosion Control DEM/DHS Sewage Disposal_ Built upon area means that portion of a development that is covered by impervious or partially pervious cover including buildings, pavement, recreation facilities, gravel, etc., but not including wood decking. If the project includes areas draining to different water classifications, please note them separately below. Subwatershed Subwatershed Classification SC p o w Built upon area I , 1 2 at, Total Project Area I ,? 3 ac, % Built upon Area (05 7e Allowable B/U Area Is the Project B/U Area < the Allowable B/U Area?V65 (If no, % Built upon area = (built upon area / total project az a) + 100 an engineered system is required.) Built upon area limits for projects to meet density: SA waters --- 25%, Other ---30% STORMWATER COLLECTION SYSTEM Describe how the runoff will be treated WG% d-cfen-6 on PonA ECEoWEU AUG 0 4 1995 D E M Sw8g5v 818 {SUFFER AREA Is the built upon area at least 30 feet from mean high water of all surface waters? VLT 5 If no, please provide a description (Note: Only boat ramps, public roads, public bridges, and walkways to water related facilities are allowed within 30 feet of the mean high water line if the project is intended to meet stormwater control requirements through density limits.) DEED RESTRICTIONS AND PROTECTIVE COVENANTS %r- Lots SF ana( 6G By my signature below, I certify that the r rded deed restrictions and protective covenants for this project shall limit the allowable built -upon to 48T square feet inclusive of rightof-way, structures, pavement, walkways or patios of brick, stone, or slate, not including wood decking, state that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, and that benefits may be enforced by the State of North Carolina, therefore, the covenant cannot be changed or deleted without consent of the State. CERTIFICATION 4 F/-.n k 44, kcAaA certify that the information included on this submittal form is correct, that the project will be constructed in conformance with this information, and that to the best of my knowledge, the proposed project complies with the requirements of 15 NCAC 2H.1003 (b). I authorize the below named person or firm to submit stormwater plans on my behalf, and agree to abide by the deed restriction statement above. Date Owner's Signature Provide authorized person or firm name and address below: 'n1a J_Mn k. AlcAAgms Company r rnc, F 0, Box 1¢006' eG/ch TR"Ic, I dCG 27z0Y- 400S I,Z=4 , allotary Public for theState of a� County o do hereby certify that cr, _ personally appeared before me thisoVlVcL day of 19f-16: , and acknowledges the due execution of the foregoing instrument. Witness my hand an official seal, My commission expires �i�co / 7 o2000 DIVISION OF ENVIRONMENTAL MANAGEMENT SIGN -OFF Regional Office q Qcov C6 Date / Individual Evaluating F et 19 9r Date Regional Water Quality cc: Applicant/WiRO/Bradley Bennett/Central Files i ENGINEERING 3 FACILITIES APPLICATION FOR PERMIT - FOR ALAND—DISTURBING ACTIVITY ';:.,;;...:._;'..._:...MER:THE..CONDITIONS._SET-FORTH BY ... :-THE NEW HANOVER COUNTY .r�: r. .• _:= SOIL�EROSION'AND-SEDIMENTATION CONTROL ORDINANCE 1iiJ�2 0 File Number Fee Paid Date Applicant: nti '7 LIaA Applicant''s Agent: _ ll�l:�1/I i. 6/AM Address:_pd n nx 2-! 2�% Address: P6 Olam' l'1�i;nr Af /j . AkG 275/5_. ej M:-!l h(G Z75 -7 Zy Telephone Number: C%/q& j - 822/ Telephone Number: '7 L9 - 4G 7- 8 ZZ / Total Acres of Land _ Disturbance- Purpose of Development:S/IQ JINIG Cr/L iC('• LxMit.<_rp /) Location and Description of Land Disturbance: . TA Cd-1 n v� 74 TA 'a M,lrf-ary e. -f -ai� lPoad (/ vin�p 1/1 0')Gs )�JQ_n /4/1Ids,C p/na Approximate Start Up Date:p bq,5� Approximate Completion Date: 8/1( STATEMENT OF FINANCIAL RESPONSIBILITY Land owner(s) of Record Person or-firm(s) financially responsible for the land -disturbing activity Name: /' �( ^ /�I.(,N Name: 36 h n 6".2thrm Address: Po Box 2-72-9- Address: Pa 66A 2729 7_ZS1S Z?Zi c / hS7/ . N C 2ZsrS- Z7 Zf Telephone Numb' Telephone — g 2Z I Location.of'deed(s) or,instrument(s): County&Gu A74dVCr ,Book Page . :... .. '--`.=_•.':.,-. : county �' .- 'Book Page The above information is true. and correct to the best of my knowledge and belief and was provided.by:me while under. oath.:' -',(This form must be -signed by the financially responsible -person if an individual and by an *officer,, director, partnek, attorney -in -fact, or other person of -authority- to �execute,anstrumsnts for the -financially responsible person if not an.-indivppidual.) Date: 'V/�'-/qS �. - Name'(Type or Print) Vo ii/) P �jsvi wvu� Title: _.,.Signature• �-✓