HomeMy WebLinkAboutSW8950818_CURRENT PERMIT_20211112STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 CI 5y S ► 8
DOC TYPE
® CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2 p 2 \ ► l 12
YYYYMMDD
ROY COOPER
Governor
ELIZMETH S. BISER
NORTH CAROLINA
&7ww mental Qunllry
November 12, 2021
Landfall Ventures, LLC
The Frank Hawkins Kenan 1988, Manager
Attn: Thomas S. Kenan III, Sole Member/Manager
P.O. Box 4150
Chapel Hill, NC 27515
Subject: Permit Renewal
State Stormwater Management Permit No. SW8 950818
Landfall Center Lots 5F At 5G
New Hanover County
Dear Mr. Kenan:
Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality
(DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will
remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit
will now reference DEMLR as the Division responsible for issuance of the permit.
On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development approval issued
by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current
and valid at any point between January 1, 2008, and December 31, 2010. The law extended the effective period of any
stormwater permit that was set to expire during this time frame to three (3) years from its current expiration date. On
August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years
extension.
The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for
the subject project on November 1, 2021. The Division is hereby notifying you that permit SW8 950818 has been
renewed on November 12, 2021, and shall be effective until November 3, 2027, which includes all available
extensions. For your records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal
application. As requested, a copy of the current operation and maintenance agreement is enclosed. Please keep this
permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new or different
terms; it merely restates some of the previous terms to provide you with a better understanding of your obligations
under the permit.
The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the
terms and conditions of this state stormwater permit. The plans originally approved on November 9, 1995 and most
recently renewed on June 10, 2009, will remain in full force and effect in accordance with the regulations set forth in
Title 15A NCAC 2H.1000.
This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the
conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed
restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish
an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions,
to transfer the permit, or to renew the permit, will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an
adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written
petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within
thirty (30) days of receipt of this permit. You should contact the OAR with all questions regarding the filing fee (if a
filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or
via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit
shall be final and binding.
D E QJ. North Carolina Department of Environmental Quality I Division of Energy, M1Uneral and Land Resources
r Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington. North Carolina 28405
910796.7215
State Stormwater Permit No. SW8 950818
Page 2 of 2
If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the
Wilmington Regional Office, at (910) 796-7215 or ashleymsmith@ncdenr.gov.
Sincerely, n
CI Yz.� I _K Jt-%l
� Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment C — Permitting History
Renewal Application Documents
DES/ams: %Stormwater\Permits & Projects\ 1 995\950818 HD\2021 I 1 permit 950818
cc: Wilmington Regional Office Stormwater File
D nn North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wdmington, North Carolina 28405
rvcmH cwaixs
-=-ate 910.796.7215
State Stormwater Management Systems
Permit No SW8 950818
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY COMMERCIAL DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Landfall Ventures, LLC
Landfall Shopping Center Landfall Center Lots 5F & 5G
1720 Drysdale Drive, New Hanover County
FOR THE
operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC
2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved
stormwater management plans, supplement, calculations, operation and maintenance agreement,
recorded documents, specifications, and other supporting data (the "approved plans and
specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and
Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and
maintained in accordance with these approved plans and specifications. The approved plans and
specifications are incorporated by reference and are enforceable part of this permit.
This permit shall be effective from the date of issuance until November 3, 2027 and shall be subject to
the following specified conditions and limitations. The permit issued shall continue in force and effect
until the permittee files a request with the Division for a permit modification, transfer, renewal, or
rescission; however, these actions do not stay any condition The issuance of this permit does not
prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or
terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A
NCAC 2H.1000 and NCGS 143-215.1 et.al
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.7 on page 2 of this permit. The stormwater control has been designed to
handle the runoff from 48,731 square feet of impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and
per approved plans.
4. All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements. The final plats for the project will be recorded showing all such
required easements, in accordance with the approved plans.
5. The runoff from all built -upon area within the permitted drainage area(s) of this project must be
directed into the permitted stormwater control system.
Page 1 of 5
State Stormwater Management Systems
Permit No. SW8 950818
The following design criteria have been provided in the wet detention pond and must be
maintained at design condition:
a. Drainage Area, acres:
Onsite, ft2:
Offsite, ft2:
b Total Impervious Surfaces, ft2
C. Design Storm, inches:
d. Average Pond Design Depth, feet:
e. TSS removal efficiency
f. Permanent Pool Elevation, FMSL:
g. Permanent Pool Surface Area, ft2:
h. Permitted Storage Volume, ft3:
i Temporary Storage Elevation, FMSL:
J. Controlling Orifice:
k. Permitted Forebay Volume, ft3:
I. Fountain Horsepower, HP
m Receiving Stream/River Basin
n. Stream Index Number:
o. Classification of Water Body:
II. SCHEDULE OF COMPLIANCE
1.13
49,658
N/A
48,731
1
7'
90
23
2,250
3913attemporarypoolel
24.4
VO pipe
N/A
N/A (N/A if PPV <30000 cf)
Bradley Creek / Cape Fear
18-87-24-4-(1)
"SC"
1. The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately.
3. The permittee shall at all time provide the operation and maintenance necessary to assure the
permitted stormwater system functions at the design condition. The approved Operation and
Maintenance Plan must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch
basins and piping.
q. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to
authorized personnel of DEMLR. The records will indicate the date, activity, name of person
performing the work and what actions were taken.
5. The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division.
6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and specifications must be noted on
the Certification. A modification may be required for those deviations
7 If the stormwater system was used as an Erosion Control device, it must be restored to design
condition prior to operation as a stormwater treatment device, and prior to occupancy of the
facility.
Page 2 of 5
State Stormwater Management Systems
Permit No. SW8 950818
8. Access to the stormwater facilities for inspection and maintenance shall be maintained via
appropriate recorded easements at all times.
9. The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made
10 Decorative spray fountains will be allowed in the stormwater treatment system if calculations are
provided documenting the permeant pool volume is greater than 30,000 cubic feet.
11. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications. Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area
c Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
g. Other modifications as determined by the Director.
12. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual
certification completed by either the permittee or their designee confirming the projects
conformance with permit conditions
III. GENERAL CONDITIONS
CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions This includes actions required by this
Division and the stormwater rules such as the construction of additional or replacement on -site
stormwater systems. These additional or replacement measures shall receive a permit from
the Division prior to construction.
2. PERMIT RENEWAL A permit renewal request must be submitted at least 180 days prior to
the expiration date of this permit. The renewal request must include the appropriate
application, documentation and the processing fee as outlined in Title 15A NCAC
02H 1045(3).
3. CURRENT PERMITTEE NAME OR ADDRESS CHANGES. The permittee shall submit a
completed Permit Information Update Application Form to the Division within 30 days to
making any one or more of the following changes:
a A name change of the current permittee;
b. A name change of the project,
c. A mailing address change of the permittee,
Page 3 of 5
State Stormwater Management Systems
Permit No. SW8 950818
TRANSFER This permit is not transferable to any person or entity except after notice to and
approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor
the conveyance of common area to a third party constitutes an approved transfer of the permit.
TRANSFER REQUEST. The transfer request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This
request must be submitted within 90 days of the permit holder meeting one or more of
the following:
i A natural person who is deceased,
ii. A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved,
iii. A person or entity who has been lawfully and finally divested of title to the
property on which the permitted activity is occurring or will occur through
foreclosure, bankruptcy, or other legal proceeding.
iv A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur,
b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site
inspection will be conducted by Division personnel to ensure the permit conditions
have been met and that the project and the on -site stormwater system complies with
the permit conditions. Records of maintenance activities performed to date may be
requested. Projects not in compliance with the permit will not be transferred until all
permit and/or general statute conditions are met.
5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of
this permit until the Division approves the transfer request
a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans,
application, supplement, operation and maintenance agreement, all applicable
recorded documents, and specifications shall be maintained on file by the permittee at
all times
b DIVISION ACCESS. The permittee grants Division Staff permission to enter the
property during normal business hours to inspect all components of the permitted
project.
C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the
provisions of a stormwater management permit or the requirements of the stormwater
rules is subject to enforcement procedures as set forth in NCGS 143 Article 21.
d. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted
site does not meet one or more of the minimum requirements of the permit. Within the
time frame specified in the notice, the permittee shall submit a written time schedule to
the Director for modifying the site to meet minimum requirements. The permittee, shall
provide copies of modified plans and certification in writing to the Director that the
changes have been made.
e. OTHER PERMITS. The issuance of this permit does not preclude the permittee from
complying with and obtaining any other permits or approvals that are required for this
development to take place, as required by any statutes, rules, regulations, or
ordinances, which may be imposed by any other Local, State or Federal government
agency having jurisdiction. Any activities undertaken at this site that cause a water
quality violation or undertaken prior to receipt of the necessary permits or approvals to
do so are considered violations of NCGS 143-215 1, and subject to enforcement
procedures pursuant to NCGS 143-215.6.
6. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater
system must follow the guidelines established in the North Carolina Erosion and Sediment
Control Planning and Design Manual.
Page 4 of 5
State Stormwater Management Systems
Permit No. SW8 950818
Permit renewed, updated and reissued this the 12th day of November 2021.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
'�
nan Wrenn, Uirector `
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 5 of 5
Attachment C - Permitting History
Landfall Center Lots 5F & 5G
Permit No. SW8 950818
Approval
Date
Permit
Action
BIMS
Version
Description of the Changes
11/9/1995
Original
Approval
1.0
6/10/2009
Renewal
2.0
11/12/2021
Renewal
3.0
PIL
State Stormwater Management Systems
Permit number SW8
WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin and inlet piping, pretreatment including
forebays and the vegetated filter where provided, and outlet pipe where discharging to infiltration basin or
other stormwater system.
Maintenance activities shall be performed as follows:
After every significant runoff producing rainfall event and at least monthly:
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition.
b. Check and clear the orifice [or other inlet/outlet pipe where applicable] of any obstructions such that
drawdown of the pond occurs as designed.
Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow
vegetative cover to maintain a maximum height of six inches, and remove trash as needed.
3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to
maintain proper functioning. Clear discharge piping of sediment or other build-up to ensure the pond
empties as designed.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed
of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality
(i.e. stockpiling near a wet detention basin or stream, etc.). Do not allow the sediment build-up to exceed
the level of discharge pipe to the infiltration basin.
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments.
When the permanent pool depth reads
// r
When the permanent pool depth reads 2 //
be removed. [where applicable]
feet in the main pond, the sediment shall be removed.
feet in the forebay [and micro -pool], the sediment shall
BASIN DIAGRAM
(fill in the blanks)
p Permanent Pool Elevation
Sediment moval - 'L 75% i
------------- -- Sediment Removal Elevation ° - 75 /o
Bottom E vation ��Y 5% -------------- -A ----
FOREBAY MAIN POND
5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm where applicable.
Page 1 of 2
State Stormwater Management Systems
Permit number SW8
6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment
through the emergency drain shall be minimized to the maximum extent practical.
7. All components of the wet detention basin system shall be maintained in good working order.
8. Remove all trees and heavy woody vegetation from the basins and dike walls (sideslopes).
I acknowledge and agree by my signature below that 1 am responsible for the performance of the eight
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
� q
Print name:-d04/f • � �
Title: EtiLG. - /koxnt
Address: / DO 4H, ova %7r✓y LI.�J/v�rY/,NG 2757
Note: The legally responsible party should not be a homeowners association unless more than 50% of the
1'
lots have been sold and a resident of the subdivision has been named the �prresident.
1
1, A/AL.f f-A k • [�0�1 ,` 2 , a Notary Public for the State of ( 02TY CA2Ly-11JA,
County of ORA�46C , do hereby certify that SONfJ ?• 2hkArr
personally appeared before me this (4 day of 56PTG1',W2- ;-00`? , and acknowledge the due
execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and
official seal,
SEAL
My commission expires OL" /°a
File: \wqs\stormwater\pat'sinspect\oandmwet basin.doc
Page 2 of 2
DEMLR USE ONLY
Date Received Fee Paid Permit Number
STATE STORMWATER:
PERMIT INFORMATION UPDATE APPLICATION FORM
There is NO FEE for updating project name or permittee information.
This form is to only to be used by the current permittee to notify the Division of:
1) changes to the Point of Contact (signing official) for the current permittee (LLC, Corporation, HOA or POA);
2) changes to the mailing address, phone number or email address of the current permittee;
3) changes to the name of the project; and
4) changes to the legal corporate name as documented by a Name Change or Merger filed with the NCSOS.
A. NEW PERMIT INFORMATION
State Stormwater Permit Number: 11^I [] IJyIJlO
Are you updating
(check all that apply):
If so, please provide the updated information:
❑ Project name
❑ Corporation Name'
Permit Contact Name2 3
71W S. KEIyIA
ermit Contact Title
INA�VA Z
❑ M iling Address3
Phone number
Email address
Sa-rMs+rorl E Agm i tic .Ae-1-
Provide documentation such as a Name Change /Merger filed with the NCSOS.
Provide supporting documentation such as NCSOS filing. The permit contact's position must be in accordance
with 15A NCAC 02H .1040(1).
If more than one point of contact or mailing address is being changed, please attach a separate sheet.
B. CERTIFICATION OF PERMITTEE
T"5rr
I, /frP#44S S. KCAJA411L—, the current permittee, hereby notify DEMLR that I am making the changes as listed
in Section A above. I further attest that this application for an update to the permit information currently on file is accurate
and complete to the best of my knowledge.
Signature: ku t t_J— Date: Gict aii?j pn%l
I, � �v •d1(J a Notary Public for the State of
County of... Cr-- do hereby certify that /Y/ti2o 7UliJCQcf!�
�S P' L o day of /0,— Gtlf/ 20 Z(, and acknowledge the due
p ap fore me this the y g
.5"MVrgoAtinstrument. Witness my hand and official seal,
fNotSry Seel)PUB\_
G ' •.,
NJ
NoQ ,; pA�'JNOV 01 2021
,;t tt
by//,s .5.q
My commission expires QOL L 2,6..UZ s BY:
Stormwater Permit Information Update Form Page 1 of 1 May 11, 2017
.L.: 1 -, 1 ,dl', 1_11
a �
-� - DEMLR USE ONLY .-
Date R ei d
Fee Paid
Permit Number
J—T4;—LoLq5oE
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: J W ty) 9�5O O is'
2. Project name: LQ NDGLELC- CE NTcYL L;rrs S
3. Project street address: 17 20 'D AYSDA LC -t>R =Vb
City: W'CL164 TP iG ro(%1 Countyw- ,
4. What, if any, changes have been made to the project as permitted? a
ZIP :
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: htti)s://deg.nc.gov/about/divisions/energy-
mineral-land-resources/energy-mineral-la nd-rules/stormwater-pros ram/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
f. Current Permit Holder's Company Name/Organization: LANDFEFLL VUU77h:ESr /lG-
2. Signing Official's Name: L
3. Signing Official's Title: HAn1/
4. Mailing Address: QA.
City: C N AP-Ei-
5. Street Address: / 00 i
City: COAJ01 c.- /
6. Phone: (11"1)4G7-061
3oX gls0
=tin;
2FoirAAnlKT
ZIP :e9%s/$�
/VL zip
ek
NOV 0 1 2021
BY:
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
i
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
yyK 1. A permit application processing fee of $505.00 payable to NCDEQ.
N` 2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
4. O&M Agreements, Please select one:
❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
/ keep this on file with the permit; or
Lr1- I do not have a copy of the current recorded 0&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
5. D2^ner Certifications, Please select one:
Q A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online services/search/bv title/ Business Registration
Nov 01 2021
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEE'S CERTIFICATION
s+i4S S JtC+JW^l .7X-- , the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowledge, correct and complete. //��
Signature: — Date: ()rt
i. !u/
County of
that L
this the�day of e(el Ile
ek8u`i $fl?�'# ing instrument. Witness my hand and official seal,
0/1
Q:
' : •�OTAgy'•.
(Ngtary Seal)
My cofffiNetiH �expires 2 /
a Notary Public for the State of
do hereby certify
personally appeared before me
20 ;Q , and acknowledge the due
NOV 0 1 2021
BY:
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
State Stormwater Management Systems
Permit No. SW8 950818 Renewal
Landfall Center Lots 5G & 5F
Stormwater Permit No. SW8 950818
New Hanover County
Peeigne -'c Certification
I, oYHY O bXA�Y, as a duly registered LA"P,%- 6 a;ruIWr2!eT in the
State of North Carolina, having been authorized to observe (periodically/ weekly/ full
-
4k:R&) the seas4RIstiRR-0f the project,
K�-C O Alrir.CJGYION
L.ic.VpFALL cE�.rE/c DOTS �� � 66, Oe,frvl/T NO, SWS g508/$,CEn/.ENML
(Project)
for L&/VIPWCrAL.L vB�lTv/t 5� L.L-C ...(Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specifications:
/niNo� /7Ev/AT/pN� ^"A' CPM701APCOkT/Qa/ ^,Ze-
rjvM/v7 Pc,C�'LE I7 /ti/ 7,46 A T TACHe.rj ,pEG,FMI�i'V � L 00'yj LE TTB K.
1
FAoM T/M vrAvY o c GC
Signature
Registration Number
Date Pee eMe>EJIC. Z:16 Zn09
A�Q-k
0FC l>
By 81p09
Page 6 of 7
State Stormwater Management Systems
Permit No. SW8 950818 Renewal
Certification Requirements:
✓ 1. The drainage area to the system contains approximately the permitted
acreage.
✓ 2. The drainage area to the system contains no more than the permitted
amount of built -upon area.,-16f.str o" wsuo, 06se/cVa7_10&v,
ivOT srx�ygY J
✓ 3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
✓ 4. All roof drains are located such that the runoff is directed into the system.
✓ 5. The outlet structure elevations are per the approved plan.
✓ 6. The outlet structure is located per the approved plans.
✓ 7. Trash rack is provided on the outlet structure.
✓ 8. All slopes are grassed with permanent vegetation.
✓ 9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
✓ 11. The permitted amounts of surface area and/or volume have been
provided..,'As QwaL/f/EO iN TNB O�GEMEEK r"Vr" g009 46rr'4K
r RoM T/M 4RAby AYTACfdE.D,
✓ 12. Required drawdown devices are correctly sized and located per the
approved plans.
✓ 13. All required design depths are provided.
✓ 14. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
✓ 15. The required system dimensionsareprYderdy0p0e '"Z
eplans
✓ 16. All components of the stormwater BMP are located in either recorded
common areas, or recorded easements.
cc: NCDENR-DWQ Regional Office
New Hanover County Building Inspections
Page 7 of 7