February 18, 2022
Wilmington Development Company, Inc.
Attn: Horace Brian Prevatte, Vice President
3013-A Hall Waters hive
Wilmington, NC 28405
NORTH CAROLINA
EnvProatnental Quadty
Subject: Permit Renewal
Post -Construction Stormwater Management Permit No. SW8 950613
Steep Inn Motel
New Hanover County
Dear Mr. Prevatte:
Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the
Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR'). All
previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified.
Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit.
On August 5, 2009, the Governor signed Session Law 2009-406. This, law impacted any development approval
issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which
was current and valid at any point between January 1, 2008, and December 31, 2010. The law extended the
effective period of any permit that was set to expire during this time frame to three (3) years from its current
expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for
a total of four (4) years extension.
The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on February 8, 2022. The Division is hereby notifying you that permit SW8950613 has been
renewed, updated, and re -issued on February 18, 2022, as attached. As requested, a copy of the current operation
and maintenance agreement is also enclosed. Please be aware that the renewal and re -issuance of this stormwater
permit does not imply that the site is currently in compliance.
This permit shall be effective until November 27, 2029, which includes all available extensions, and does not
supersede any other agency permit that may be required. The project shall be subject to the conditions and
limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it
clarifies the rules and requirements of this program to provide you with a better understanding of your obligations
under this permit. Failure to comply with these requirements will result in future compliance problems. Please
note that this permit is not transferable except after notice to and approval by the Division.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the tight to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The
written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the
OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center,
Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless
such demands are made this permit shall be final and binding.
If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional
Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov.
Sincerely, 9�u-C (J�
Cth i
Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
WK Q'. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 2a405
rmm�i crwourvr.
910.796.7215
State Stormwater Permit No. SW8 950613
Page 2 of 2
Enclosures: Attachment C — Permitting History
Renewal Application Documents
Copy of the current operation and maintenance agreement
DES/ams: \\\Stormwater\Permits & Projects\1995\950613 HD\2022 02 permit 950613
cc: Wilmington Regional Office Stonmwater File
10"Rk
Mw Q'. North Carolina Department of Environmental Quality I Division of Energy. Mineral and land Resources
Wilmington Regional Office I I27 Cardinal Drive Extension I Wdrmngton. North Carolina 2&405
•�� /'� 910.7%.7215
Post -Construction Stormwater Management
Permit No. SW8 950613
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Wilmington Development Company, Inc.
Sleep Inn Motel
New Hanover County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with the provisions of
15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the
application, approved stormwater management plans, supplement, calculations, operation and
maintenance agreement, recorded documents, specifications, and other supporting data (the
"approved plans and specifications") as attached and/or on file with and approved by the Division of
Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed,
operated and maintained in accordance with these approved plans and specifications. The approved
plans and specifications are incorporated by reference and are enforceable part of this permit.
This permit shall be effective from the date of issuance until November 27, 2029 and shall be subject
to the following specified conditions and limitations. The permit issued shall continue in force and
effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or
rescission; however, these actions do not stay any condition. The issuance of this permit does not
prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or
terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A
NCAC 2H.1000 and NCGS 143-215.1 et.al.
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.6 on page 2 of this permit The stormwater control has been designed to
handle the runoff from 81,000 square feet of impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and
per approved plans.
4. All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements The final plats for the project will be recorded showing all such
required easements, in accordance with the approved plans.
The runoff from all built -upon area within the permitted drainage area of this project must be
directed into the permitted stormwater control system.
Page 1 of 5
Post -Construction Stormwater Management
Permit No SW8 950613
2. The following design criteria have been provided in the wet detention pond and must be
maintained at design condition:
a. Drainage Area, acres:
Onsite, ftZ:
Offsite, ftZ:
b. Total Impervious Surfaces, ftZ:
C. Design Storm, inches:
d. Pond Depth, feet:
e. TSS removal efficiency:
f. Permanent Pool Elevation, FMSL:
g Permanent Pool Surface Area, ftZ.
h. Permitted Storage Volume, ft3:
i. Temporary Storage Elevation, FMSL:
j. Controlling Orifice
k. Receiving Stream/River Basin
I. Stream Index Number:
M. Classification of Water Body:
II. SCHEDULE OF COMPLIANCE
342
149,000
0
81,000
1
5
90%
30
6,744
8,370 at temporary pool el
31.1
1 5 "0 pipe
Spring Creek / Cape Fear
18-74-63-1
"C, Sw'
The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately.
The permittee shall at all time provide the operation and maintenance necessary to assure the
permitted stormwater system functions at the design condition. The approved Operation and
Maintenance Plan must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b Sediment removal.
C. Mowing and re -vegetation of slopes and the vegetated filter.
d Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch
basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to
authorized personnel of DEMLR. The records will indicate the date, activity, name of person
performing the work and what actions were taken.
5. The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division.
6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and specifications must be noted on
the Certification. A modification may be required for those deviations.
7. If the stormwater system was used as an Erosion Control device, it must be restored to design
condition prior to operation as a stormwater treatment device, and prior to occupancy of the
facility
8 Access to the stormwater facilities shall be maintained via appropriate easements at all times.
Page 2 of 5
Post -Construction Stormwater Management
Permit No. SW8 950613
The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made.
10 Decorative spray fountains will be allowed in the stormwater treatment system if calculations
are provided documenting the permeant pool volume is greater than 30,000 cubic feet.
11. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications. Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
g. Other modifications as determined by the Director.
III. GENERAL CONDITIONS
CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions. This includes actions required by this
Division and the stormwater rules such as the construction of additional or replacement on -site
stormwater systems. These additional or replacement measures shall receive a permit from
the Division prior to construction.
PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to
the expiration date of this permit. The renewal request must include the appropriate
application, documentation and the processing fee as outlined in Title 15A NCAC
02H.1045(3).
CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION.
The permittee shall submit a completed Permit Information Update Application Form to the
Division within 30 days to making any one of these changes.
Page 3 of 5
Post -Construction Stormwater Management
Permit No SW8 950613
TRANSFER This permit is not transferable to any person or entity except after notice to and
approval by the Director. Neither the sale of the protect and/or property, in whole or in part, nor
the conveyance of common area to a third party constitutes an approved transfer of the permit
a. TRANSFER REQUEST. The transfer request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This
request must be submitted within 90 days of the permit holder meeting one or more of
the following:
i. A natural person who is deceased,
ii. A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved,
iii. A person or entity who has been lawfully and finally divested of title to the
property on which the permitted activity is occurring or will occur through
foreclosure, bankruptcy, or other legal proceeding.
iv. A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur.
b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site
inspection will be conducted by Division personnel to ensure the permit conditions
have been met and that the project and the on -site stormwater system complies with
the permit conditions. Records of maintenance activities performed to date may be
requested. Projects not in compliance with the permit will not be transferred until all
permit and/or general statute conditions are met.
5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of
this permit until the Division approves the transfer request.
APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans,
application, supplement, operation and maintenance agreement, all applicable
recorded documents, and specifications shall be maintained on file by the permittee at
all times.
b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the
property during normal business hours to inspect all components of the permitted
project.
C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the
provisions of a stormwater management permit or the requirements of the stormwater
rules is subject to enforcement procedures as set forth in NCGS 143 Article 21.
d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an
annual certification completed by either the permittee or their designee confirming the
projects conformance with permit conditions
e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted
site does not meet one or more of the minimum requirements of the permit. Within the
time frame specified in the notice, the permittee shall submit a written time schedule to
the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of modified plans and certification in writing to the Director that the
changes have been made.
f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from
complying with and obtaining any other permits or approvals that are required for this
development to take place, as required by any statutes, rules, regulations, or
ordinances, which may be imposed by any other Local, State or Federal government
agency having jurisdiction. Any activities undertaken at this site that cause a water
quality violation or undertaken prior to receipt of the necessary permits or approvals to
do so are considered violations of NCGS 143-215.1, and subject to enforcement
procedures pursuant to NCGS 143-215 6
Page 4 of 5
Post -Construction Stormwater Management
Permit No. SW8 950613
Permit renewed, updated and reissued this the 18th day of February 2022
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
&u
,W-. Brian Wrenn, Uirector
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 5 of 5
Attachment C - Permitting History
Sleep Inn Motel
Permit No. SW8 950613
Approval
Date
Permit Action
BIM3
Version
Description of the Changes
7/6/1995
Original
Approval
1.0
10/8/1996
Modification
NA
added pool house with a 4"
discharge line connecting to a
yard inlet.
11/27/2007
Renewal
3.0
2/18/2022
Renewal
2.0
Expires November 27, 2029
Permit No# s W 89 S0613
NNE"I' DEI ELATION BASIN OPERATION AND MAINTENANCE AGREEMENT
Maintenance activities shall be performed as follows:
I After every significant runoff producing rainfall event and at Ieast monthly:
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within
2 to 5 days as designed
2 Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterh' to maintain
proper functioning.
Remove accumulated sediment from the .vet detention basin system semi-annually or when depth is reduced to
75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an
appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or stream, etc ).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments
When the permanent pool depth reads 3•7 S feet in the main pond, the sediment shall be removed.
When the permanent pool depth reads
_-___________-
vl
FORE13AY
feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(/7l to :he blanks)
Permanent Pool Fievanon
Sc hment Rcnioval Dcv anon
Bottom 8lev9don
MAIN POND
5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall he encouraged to grow along the vegetated shelf and forebay berm.
6 If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency drain shall be minimized to the maximum extent practical.
1 � 1
DEMLR USE ONLY
Date Received
Fee Paid
Permit Number
a
0D�
St0 S06/
STATE STORMWATER:
PERMIT INFORMATION UPDATE APPLICATION FORM
There is NO FEE for updating project name or permittee information.
This form is to only to be used by the current permittee to notify the Division of:
1) changes to the Point of Contact (signing official) for the current permittee (LLC, Corporation, HOA or PDA),
2) changes to the mailing address, phone number or email address of the current permittee;
3) changes to the name of the project; and
4) changes to the legal corporate name as documented by a Name Change or Merger filed with the NCSOS.
A. NEW PERMIT INFORMATION
State Stormwater Permit Number: SW g 950613
Are you updating
(check all that apply):
If so, please provide the updated information:
❑ Project name
❑ Corporation Name'
2"Permit Contact Name2.3
Akx� 0L
❑ Permit Contact Title
QMailing Address3
DI -A 14411 1rWa'Ftees br. W. m;n C a85 06-
RrPhone number
/D 2CA-6839
Q Email address
r: aA, re vwlf7c 49 W; t.n; A 0ond-e ✓e-0. God
Provide documentation such as a Name Change /Merger filed with the N&OS.
Provide supporting documentation such as NCSOS filing. The permit contact's position must be in accordance
with 15A NCAC 02H .1040(1).
If more than one point of contact or mailing address is being changed, please attach a separate sheet.
B. CERTIFICATION OF PERMITTEE
F'�edn?Y:!f , the current permittee, hereby notify DEMLR that I am making the changes as listed
in Section A above. I further attest that this application for an update to the permit information currently on file is accurate
and complete to the best of my knowledge. . ,
Signature:
Date: LL-' 0 - )-a'
I, I QY ii o1). A (-L) QLA C{ , a Notary Public for Ithe State of `(loy
County of `— lU U.) AA-A6,�42n do hereby certify that i7 _ 1 fit.; G\ v� t'Y/JLtTr2�
1111111
personally appeared, *`Fycq���rt�t day of �a.bouc� 20 D of and acknowledge the due
execution of the fo strum �ess my hand and official seal,
y9
(Notary Seal) 2 = "0T,gg4
_
�Nexpire-11f
LIC
Notary Signatur :B p g 2OZ2My commission
Stormwater Permit Information Update Form Page 1 of 1 May 11, 2017
w UtML'K'UJCUNrY 11
Date Re iv
Fee Paid
Permit Number
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW S 9-S06l3
2. Project name: _5 1'e�c p Inn T a-te. /
3. Project street address: S_9L25 Mark-e-f 5rreai_
City: County: New/ Aaenovcr ZIP: a?yoS
4. What, if any, changes have been made to the project as permitted?
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: httos:Hdeg.nc.gov/abouttdivisions/energv-
m ineral-land-resources/energy-m ineral-land-rules/stormwater-program/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https://deg.nc.gov/abouVdivisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/postconstruction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: W; 6,14on Leareloa., ,nr �nv c-
.
2. Signing Official's Name: Horace 8r;o, )ol`eya--i'e-
3. Signing Official's Title: V ce- - f l�• S:g4a,:r
4. Mailing Address: 3013-A Nall WoL fTees ..br;✓',_
City: W:lin;ngfon State: /V ZIP : a8yoS
5. Street Address: 3013-
City: W;lm
6. Phone: t 9L0)
State: /VL ZIP: oZ B$—
Email: 6r;41%.10rev&tU P w: ln.;naiandeyeo. cow
r
V IL—
FEB 0 8 2022
BY:
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
1. A permit application processing fee of $505.00 payable to NCDEQ.
2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
4. O&M Agreements, Please select one:
❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
5. Designer Certifications, Please select one:
[✓] A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
httos://www.sosnc.gov/online services/search/by title/ Business Registration
c—�
FEB 0 8 2022
BY.._
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEE'S CERTIFICATION
I, if • &,/ . i f KG" i/a7%e , the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowledge, correct and complete. 11
Signature: !�• UJ/Liw.. �in1�%�/� Date: JL- r(' 0^^10
NOTARIZATION:
that —n• n\,lGx-" 4&
this the �` +- day of
County of
Witness my hand and official seal,
y
7 ell V � `
. d
Notary�9 ature: . \ l/t INnI/l
My commi�SfonOipli ".0`
a Notary Public for the State of
do hereby certify
personally appeared before me
20 ate, and acknowledge the due
FEB U g 2OU
Slormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
Sleep Inn Motel
New Hanover County
Stormwater Project No. SW8 950613
Engineer's Certification
I, John Phillip Norris , as a duly registered Professional Engineer in the State
of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the
project,
Sleep Inn Motel, New Hanol!er County (Project)
for Wilmington Development Co, (Project Owner) hereby state that, to the best of my abilities,
due care and diligence was used in the observation of the project construction such that the construction was
observed to be built within substantial compliance and intent of the approved plans and specifications.
Please note any deviations from the approved plans below:
eea.nonnq.
CARpI
SEA EAL
11966
cc: Brian Prevatte/Wilmington Development Company