Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8941008_CURRENT PERMIT_20220112
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 qy p (1 g DOC TYPE] CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2022o1I)- YYYYMMDD ROY COOPER Govnnor ElJ7ABETH S. B1SER secretory, BRIAN WRENN Director January 12, 2022 Meridian Village, L.L.0 Attn: Mark Maynard, Manager 10 S Cardinal Drive Wilmington, -NC 28403 NORTH CAROLINA EnvinanmentmI Quapty Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 941008 Meridian Village Apartments New Hanover County Dear Mr. Maynard: Effective August 1, 2613 the Post -Construction Stormwater Management Program has been transferred from the Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR"). All . previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on December 28, 2021. The Division is hereby notifying you that permit SW8941008 has been renewed, updated, and re -issued on January 12, 2022, as attached. Please be aware that the renewal and re - issuance ofthis stormwater permit does not imply that the site is currently in compliance. - This permit shall be effective until February 16, 2028 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater-control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have:the fight to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional Office, af(910) 796-7215 or ashleymsmith@ncdenr.gov. Sincerely, 5�; Brian Wrenn, Director Division of Energy, Mineral and Land Resources D_E ok North Carolina Department of Environmental Quality I Division of Energy, Mneral and land Resources �Wilmington Regional Office 1127 Cardinal Drive Extension I Wihnington, North Carolina 28405 raim=n.ius State Stormwater Permit No. SW8 941008 Page 2 of 2 Enclosures: DES/ams: GC: Attachment C — Permitting History Renewal Application Documents %Stormwater\Permits & Projects\1994\941008 HD12022 01 permit 941008 Justin C. Bishop, PE; Ntalpass Engineering & Surveying, P.C.; 1134 Shipyard Blvd; Wilmington, NC 28412 Wilmington Regional Office Stormwater File North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources _ WRmington Regional Office I IZ7 Cardinal Drive Extension I Wdmalgton. North Carolina 28405 wr� 910.7%.7215 Post -Construction Stormwater Management Permit No. SW8 941008 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Meridian Village, LLC Meridian Village Apartments New Hanover County FOR THE construction, operation and maintenance of a detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until February 16, 2028 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 211.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 2 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 129,3908,302 square feet of impervious area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 4. The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and per approved plans. Page 1 of 5 Post -Construction Stormwater Management Permit No. SW8 941008 DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES PROJECT DATA SHEET Project Name: Meridian Village Apartments Permit Number: 941008 Location New Hanover County Applicant: Mr. Mark Maynard, Managing Member Mailing Address: Meridian Village, LLC 10 S Cardinal Drive Wilmington, NC 28403 Application Date: December 28, 2021 Water Body Receiving Stormwater Runoff: Smith Creek Classification of Water Body: "C Sw" Large Pond Parking Lot Expansion Pond Depth, feet. 7.5 4 Permanent Pool Elevation, FMSL: 30.05 33.2 Total Impervious Surfaces, ft2: 129,390 8,302 Offsite Area entering Pond, ft2' n/a Required Surface Area, ft2: 4,100 719 Provided Surface Area, ft2: 4,200 713 Required Storage Volume, ft': 11,880 699 Provided Storage Volume, ft'. 11,861 1,117 Temporary Storage Elevation, FMSL: 32.29 34.4 Controlling Orifice: 1.5" pipe 0.5" pipe 5. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE The permittee will comply with the following schedule for construction and maintenance of the stormwater management system: a. The stormwater management system shall be constructed in it's entirety, vegetated and operational for it's intended use prior to the construction of any built -upon surface except roads. b During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. C. All connections into the stormwater system from future areas/outparcels shall be made such that short-circuiting of the system does not occur Page 2 of 5 Post -Construction Stormwater Management Permit No. SW8 941008 The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. 3. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s). BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. Adding the option to use permeable pavement or #57 stone within the lots as a permeable surface. The request may require a proposed amendment to the deed restrictions and protective covenants for the subdivision to be submitted and recorded. g. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. h Other modifications as determined by the Director. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale of any portion of the property. Page 3 of 5 Post -Construction Stormwater Management Permit No. SW8 941008 8. Decorative spray fountains will be allowed in the stormwater treatment system if calculations are provided documenting the permeant pool volume is greater than 30,000 cubic feet. III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved, iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, except in the case of an individual residential lot sale that is made subject to the recorded deed restrictions and protective covenants; V. The assignment of declarant rights to another individual or entity, vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2), b. TRANSFER INSPECTION Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. Page 4 of 5 Post -Construction Stormwater Management Permit No. SW8 941008 C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made f. OTHER PERMITS The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed, updated and reissued this the 12th day of January 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION rian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Attachment C - Permitting History Meridian Village Apartments Permit No. SW8 941008 Approval Date Permit Action RIMS Version Description of the Changes 11/18/1994 Original Approval 1.0 2/16/1998 Modification 1.1 10/8/2012 Renewal 2.0 Expires February 16, 2020 1/12/2022 Renewal 3.0 Expires February 16, 2028 • • n � � ��' y����.M1-'1 project Name: Parking &ctension Yaridian Village Apts.PIQJ= No. Responsible party: rbridian Village, LLC PbowNo. 910-799-5264 Adder: P. 0. Box 5601 Wilmington N. C. 28403 I. Monthly, or after every runoff producing rainfall event, whichever comes first: A. Inspect the trash rack; remove accumulated debris, repair/replace if it is not functioning. B. Inspect and clear the orifice of any obstructions. If a pump is used as the drawdown mechanism, pump operation will be checked. A log of test ruts of the pomp will be kept on site and made available to DEM personnel upon request. C. Inspect the pond side slopes and grassed inlet swales; remove trash, and repair eroded areas before the MU rainfall event. D. If the pond is operated with a vegetated filter, the filter will be checked for sediment accumulation, trash accumulation, erosion and proper operation of the flow spreader mechanism. Rcpairs/cleaning will be done as necessary. II. Quarterly: A. Inspect the collection system (ic. catch .basins, piping, grassed swales) for proper functioning. Accumulated trash will be cleared from basin grates, basin bottoms, and piping will be checked for obstructions and cleated as required. B. Pond inlet pipes will be checked for undercutting, riprap or other energy dissipation structures will be replaced, and broken pipes will be repaired. M. Semi-annually: A. Accumulated sediment from the bottom of the outlet structure will be removed. B. 'Ile pond depth will be checked at various points. If depth is reduced to 75 % of original design depth or 3 feet whichever is greater, sediment will be removed to at least the original design depth. C. Grassed swales, including the vegetated filter if applicable, will be reseeded twice a year as necessary. E C E I V E OCT 31 1997 D PROD # E D r4 I, 0 s 1 . • 1. 7 1: ti IV. General: A. Mowing of the side slopes will be accomplished according to the season. Maximum grass height will be 6'. B. Canals arc encouraged along the pond perimeter, however they will be removed when they cover more than 1/2 the surface area of the pond. C. The ontice/pump is designed to draw down the pond in 2-5 days. If drawdown is not accomplished in that time, the system will be checked for clogging. The source of the clogging will be found and eliminated. D. All components of the drwnuon pond system will be kept in good working order. Repair or rcplaccmcnt components will meet the original design specifications as per the approved atormwater plan, if previously approved components Are determined to be ineffective, the component must be redesigned and/or replaced. V. Special Requirements: I Meridian Village, LLC , hereby acknowledge that I am the financially responsible piny for maintenance of this de-wnuon pond. I will perform the maintenance as outlined above, as pan of the Certification of Compliance with Stormwatcr Regulations received for this project. Signature: Mark L. Maynard County of personally appeared before me due exccuuon of the foregoing a Notary Public for theStatcof _, do hcrrby rxrtif that da , 19_, and acknowledge the cypLc- 1utess my hand and official seal, SEAL My commission expires DA/arl: S:\WQS\STORMWAT\FORMS\0&M-POND.FOR DEMLR USE ONLY _ Date eceiv d Fee Paid Permit Number ��a t oo 19 8� 5a5— _cWS, 94l00g- II NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high densitypermit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60. (c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State StormwaterPermit Number: #SW8 941008 2. Project name: Meridian Village Apartments 3. Project street address: 2620 Northchase Pkwv City: Wilmington County: New Hanover ZIP: 28405 4. What, if any, changes have been made to the project as permitted? No changes If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at: https://deg.nc.gov/about/divisions/energv- m inera I-land-resources/energy-mineral-land-rules/stormwater-pros ram/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/energy-mineral-land- resources/energv-mineral-land-rules/stormwater-Droaram/post-construction. State Stormwater Permits do not 1. Current Permit Holder's Company Name/Organization: Meridian Village, L.L.C. 2. Signing Official's Name: Mark Maynard 3. Signing Official's Title: Manager 4. Mailing Address: 10 S. Cardinal Dr City: Wilmington State: NC ZIP: 28403 5. Street Address: 10 S. Cardinal Dr City: 6. Phone: 9( 10 ) 251-5030 Email: NC —Zip: 28403 ECEIVE ©EC 2 11111 t Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORK9. Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: �- 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. N/A 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. $A' 4. O&M Agreements, Please select one: ® 1 have a copy of the current ree_.ded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, -which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www,sosnc.gov/online services/search/by title/ Business Registration Ti A+Aw DEC 2 8 2021 By: Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION I, Mark Maynard , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project. SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, correct complete , Signature: Z J ztl_� Date: l Z 7i/ NOTARIZATION: that a Notary Public for the State of County of do hereby certify personally appeared before me this the `� day o7 �S�{' 41fV� 1� 20_�_, and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) Notary Signature: 11),1 jam My commission expires acAza.0 0N L I Go `i\ 10Mtssio�F,4F 2 OTA +O t) zme�� s�R - + %BL\G :1 �i'9 �82526•'�� �� iOr . •• •.OJ `�. DEC 18 2021 0 Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 State Stormwater Management Systems permit No SW8 941008 Modification Meridian Village Apartments Stormwater Permit No. SW8 941008 Modification New Hanover County Engineer's Certification For Parlvhg Lo Facpgnsiett pmdl po„ d enly� I, Ju5}in C. Bi511op , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe ttte as -boil} condititA� of hire farkiq La} 4pagsien fend o-F the projecl) (Project) for MerA n U109e. , k-L(-(Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the o s rvation of the project qs-bvjl+ such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: The rvDa-Ff drains ink �� pond via a curb cu+ inSiegd OF bt;n� pipe in}e •�be P°hd' �e Pond slope adjq[eD+ }0 }Ire pgr)vh9 !d? is line WA f Wf;ANC, the At slopes above l�e permanrm+ pool ore sleeper +itgn 'z l and -Ae vef4kil SlelP and wgnd flgh+s are Do+ prov, 4) bu+ Dav;J Co)( said Ais is 6kgy daing �is s;ie vis;�, Since D4vid`s sk slope adpcon+ 'iv At pgrk:ty I* was remove, Signature Registration Number 03U32 Date 9/31/12 vis;+ +be Np rap rock on i' & poe SEAL \\A CAR0��i�� 0��'Jy�, .4 SEAL Tv- ;(�„_g3623 'dit�f�. C ECEIVE AUG 3 1 20!2 BY: Ci