April 30, 2010
Dr Stephen Greiner, President
Brunswick Community College
P O Box 30
Supply, NC 28462
Division of Water Quality
Coleen H Sullins
Director
NOTICE OF INSPECTION
Brunswick Community College — Odell Williamson Auditorium/Athletic
Field Addition
Stormwater Project No. SW8 910501MOD
Brunswick County
Dear Dr Greiner
Dee Freeman
Secretary
Please find attached a copy of the completed form entitled "Stormwater Compliance
Inspection Report" The report summarizes the findings of a recent inspection of the
project's stormwater controls conducted on April 29, 2010 to determine compliance with
Stormwater Permit Number SW8 910501 MOD issued on December 21, 2010
The required actions that are necessary to bring this site into compliance are noted on
the attached inspection report Please inform this Office in writing before Friday, May
28, 2010, of the specific actions that will be undertaken and the time frame that will be
required to correct the deficiencies Failure to provide the requested information, when
required, may initiate enforcement action including the assessment of civil penalties of
up to $10,000 per day
As indicated in the attached inspection report the following issues must be resolved
Ensure that the BUA from the previously unpermitted parking lot is incorporated into
the current modification request, or if it was included in a previous modification,
provide documentation that this was done
2 Ensure that the drawings are modified to include all inlets to the pond, including
where they come from If either of the outfalls are draining something other than
stormwater they may require coverage under a separate permit
3 When the outlet structure is modified ensure that it is installed properly
4 Ensure that trash does not accumulate in the pond
Wilmington Regional Office
127 Cardinal Drive Extension, Wilmington North Carolina 28405
Phone 910 796 72151 FAX 910 350 20041 Customer Service 1 877-623 6748
Internet v rimaterquality org
Nne
orthCarolina
Natimally
An Equal Opportunity 1 Alfinnalive Action Employer
5 Perform routine maintenance on the pond, as detailed in the signed operation and
maintenance agreement received by this office on December 1, 2006
If you have any questions please contact me at the Wilmington Regional Office,
telephone number (910) 796-7331
Sincerely,
�4 J-1, )/;2�
Aisha H Lau
Environmental Engineer
GDS/ahl S \WQS\StormWater\INSPECT\910501 MOD apr10
cc Mr J Phillip Norris, P E
Wilmington Regional Office
Central Files
Page 2 of 2
1
Compliance Inspection Report
Permit SW8910501 Effective 12/22/06 Expiration 12/22/16 Owner Brunswick Community College
Project Odell Williamson Auditorium Addition and
Athletics and Aquatics Center
County Brunswick 50 College Rd Ne
Region Wilmington
Bolivia NC 28422
Contact Person Stephen Greiner Title President Phone 910-755-7300
Directions to Project
From intersection of US17 and NC211, take US17 north approx 3 miles entrance on right
Type of Project State Stormwater - HD - Detention Pond
Dram Areas 1 - (Clark Branch) (03-07-59) ( C Sw)
On -Site Representative(s)
Related Permits
SW8000848 Brunswick Community College - Brunswick Community College &
Applied Plant Sciences Facility
Inspection Date 0412912010 EntryTime 10 15 AM Exit Time 10 55 AM
Primary Inspector Aisha H Lau Phone 910-796-7331
Secondary Inspector(s)
Reason for Inspection Routine
Permit Inspection Type State Stormwater
Facility Status 0 Compliant ❑ Not Compliant
Question Areas
M State Stormwater
(See attachment summary)
Inspection Type Stormwater
Page 1
Permit SW8910501 Owner -Project Brunswick Community College
Inspection Date 04/29/2010 Inspection Type Stormwater Reason for Visit Routine
Inspection Summary
The following deficiencies were noted during the Inspection
1 There Is an approximately 20,800 square foot parking tot located just North of the permitted parking lot In front of the
Odell Williamson Auditorium that does not appear to have been approved In either of the last two Iterations of this permit
2 There are two additional Inlets draining Into the northern leg of the pond from what was shown In the plans approved on
December 22, 2010
3 The outlet protection screen shown on the approved plan details does not appear to have been Installed As a result
the orifice was clogged
4 Refuse Is making it Into the Northern leg of the pond from the adjacent dumpster
5 The pond orifice was clogged, apparently by water hyacinth, and as a result the water level was being held about 6
Inches above the design depth, and was not flowing at all
To bring this permit Into compliance you must
1 Ensure that the BUA from the previously unpermltted parking lot Is Incorporated Into the current modification request
2 Ensure that the drawings are modified to Include all Inlets to the pond, Including where they come from If either of the
outfalls are draining something other than stormwater they may require coverage under a separate permit
3 When the outlet structure Is modified ensure that It Is Installed properly
4 Ensure that trash does not accumulate In the pond
5 Perform routine maintenance on the pond, as detailed In the signed operation and maintenance agreement received
by this office on December 1, 2006
Page 2
Permit SW8910501 Owner - Protect Brunswck Community College
Inspection Date 04/29/2010 Inspection Type Stormwater Reason for Visit Routine
File Review
Is the permit active?
Signed copy of the Engineer's certification is in the file?
Signed copy of the Operation & Maintenance Agreement is in the file?
Copy of the recorded deed restrictions is in the file?
Comment
Built Upon Area
Is the site BUA constructed as per the permit and approval plans?
Is the drainage area as per the permit and approved plans?
Is the BUA (as permitted) graded such that the runoff drains to the system?
Comment There is an approximately 20,800 square foot parking lot located just
North of the permitted parking lot in front of the Odell Williamson Auditorium that does
not appear to have been approved in either of the last two iterations of this permit
SW Measures
Are the SW measures constructed as per the approved plans?
Are the inlets located per the approved plans?
Are the outlet structures located per the approved plans?
Comment There are two additional inlets draining into the northern leg of the pond
from what was shown in the plans approved on December 22, 2010
The outlet protection screen shown on the approved plan details does not appear to
have been installed As a result the orifice was clogged
Operation and Maintenance
Are the SW measures being maintained and operated as per the permit requirements?
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
Yes No NA NE
❑ ■ ❑ ❑
Cl ■ ❑ ❑
■ ❑ ❑ ❑
Yes No NA NE
■ Cl ❑ Cl
❑ ■ ❑ ❑
❑ ■ Cl ❑
Yes No NA NE
■ ■ ■
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWO Cl ❑ ❑ ■
upon request?
Comment Refuse is making it into the Northern leg of the pond from the adjacent
dumpster
The pond orifice was clogged, apparently by water hyacinth, and as a result the water
level was being held about 6 inches above the design depth, and was not flowing at all
Woody vegetation has been eliminated from the slopes of the pond, but there is a large
stand of cattails that are covering about 40 percent of the pond's surface When they
reach 50 percent coverage of the pond they will need to be removed from the pond with
the exception of the vegetative shelf and forebay berm
Page 3
State Stormwater Inspection Report
General
Project Name y. _115ul, J (c/+, (d lira e
PemutNo SWYq(DSOI/Y01)
Expiration Date /d as aUl 6
Contact Person
Phone Number 2Y-7_g ) 00
Inspection Type rok 1, e Aq
Inspection Date - a
Time In 121
Time Out
Current Weather 3 t p di — C pQ
Recent Ram (Date)?!/ J/'
Rain — �' '� in
Facility Address / Location s Q ( Q
City d �c V Zip ,2S/2(�� CountyUYUR>w.cK Lat ,N Long - "W
Permit Information
Rule Subject to (circle one) 9988 Coastal Ru� 1995 Coastal Rule �008 Coasta R�e Session Law 2006-246
oose Creek High Quality Waters�uTstandmg Resource Waters
Density (cu cle one) C�Atgh (HD Low (LD)
Sto water Best Management Practices (BMPs) (insert number of each)
Wet Ponds _Infiltration Basins _Infiltration Trenches LD Swales _Stormwater Wetlands
_Dry Ponds Bioretention Permeable Pavement _Sand filters (circle one) Open Closed
Cistern _Level Spreader/Filter Strip Other (specify)
File Review uiw klty
I Is the permit active9
2 Signed Engineer's Certification on file9
3 Signed Operation and Maintenance agreement on file?
4 Recorded Deed Restrictions on 1110
Site Visit Built Union Area (RIJAl
Yes No N/A N/E
5 BUA is constructed and consistent with the permit requirements?
6 BUA aspermitted) is graded such that the runoff drams to the system? (high density only)
7 Drainage area is consistent with pernut9 i e no un ermitted drainage to the SW BMPs
8 Drainage area is stabilized to reduce risk of sedimentation to the SW BMPs
Site Visit Stormwater BMPs
9
Stormwater BMPs are located per the approvedplans?
10
Stormwater BMPs have dimensions (eg
length, width, area) matching the approved plans9
11
Stormwater BMPs are constructed per the approved plans9
44e Vwit rinernhnn nnri
12 Access points to the site are clear and well maintained?
13 Trash has been removed as needed
14 Excessive landscape debris(grass clippings, leaves, etc is controlled9
15 Stormwater BMPs being operated and maintained as per the permit requirements?
16 Inspection and Maintenance records are available for ins ection9 (high density only, 1995 — present onl
Yes No, N/A N/E
one visit utner water wuainy issues Ye No N/A N/E
18 Is the site compliant with other water quality issues as noted dunne the msuecnonv i
Slate Stormwate, Inspection Report, Version 3 0 Page 1 of 2
State Stormwater Inspection Report
the site
Compliance Status ❑ Compliant ❑ Non -Compliant
Letter Sent (circle one) Yes No Letter type CEI NOV NOVRE Other
Date Sent Reference Number
Inspector Name and Signature
Date
State Stormwater Inspection Report, Version 3 0 Page 2 of 2
State of North Carolina
Department of Environment, Health, and Natural Resources
Wilmington Regional Office
James B Hunt, Jr , Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson
Jonathan B Howes, Secretary Regional Manager
January 11, 1995
Mr Ben DeBlols, Vice -President Administration Services
Brunswick Community College
Post Office Box 30
Supply, North Carohna 28462
Subject COMPLIANCE STATUS
Odell Williamson Auditorium
Stormwater Project No 910501
Brunswick County
Dear Mr DeBlots
On November 17, 1994, a Compliance Inspection Report was sent to you concerning the project,
Odell Williamson Auditorium As of this date, the items cited in the letter have been resolved, the
Professional Engineer's Certification has been received, and the project has been determined to be in
comphance with the Stormwater Certification issued on June 7, 1991
The quick response of Mr Curtis Workman is most appreciated If you have any questions
concerning this matter, please do not hesitate to call Linda Lewis or me at (910) 395-3900
Sincerely,
Dave Adkins
Water Quality Supervisor
DA/arl S \WQS\STORMWAT\STATUS\910501 JAN
cc Lmda Lewis
Ken Justice, P E , Talbert and Bright
Delaney Aycock, Brunswick County Building Inspections
Wilmington Regional Office
Central Ftles
127 Cardinal on,. Extension, Wilmington N C 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004
An Equal Opportunity Affirmative Action Employer
BR U N S W I C K
COMMLNITY COLLEGE
January 9, 1995
Ms Linda Lewis, Environmental Engineer
D E H N R
Water Quality Section
127 Cardinal Drive Ext
Wilmington, NC 28405-3845
Dear Ms Lewis,
JAN 10 1995
An inspection of the orifice pipe at the Odell Williamson Auditorium (storm -water
retention pond) January 2, 1995 revealed a blockage Flow was restored at 2 00 p m ,
and the pond level was closely monitored for four days The average drop indicated
approximately 3" per day
We receivei2+" of rain January 7-8 which raised the pond level M 6 1/2" The
orifice is now functioning as designed
Based on my calculations throughout the seven day monitoring period, I believe
that the 1" orifice is sufficient to maintain the desired storage capacity and run-off rate
Thank you for your time today regarding this matter
Sin�ly14�'
'�
Curtis L Workman,
Director of Physical Plant
CLW/af
cc Ben DeBlois STORMATER
0JAN 1 0 1995
P 0 BOX 30 SUPPLY NC 28462 ^^ (910) 754-6900 (910) 457-6329 V- 1910) 343-OZ03
Leslie N Boney AIA
1880 1964
William J Boney AIA
1922 1993
Leslie N Boney Jr FAIA
Charles H Boney FAA
Paul Davis Boney AIA
Charles H Boney Jr AIA
James A Claywell AIA
George J Jernigan Jr AIA
Kenneth M Phelps AIA
120 South Fifth Avenue
P O Box 2047
Wilmington NC 28402-2047
Telephone 910-763 9901
FAX 910-763-7852
5511 Capital Center Drive
Suite 102
Raleigh INC 27606-3393
Telephone 910 851 9393
FAX 910-851 1336
boneu architects
14 December 1994
Mr Ben De Blois
V P Admm Services
Brunswick Community College
P O Box 30
Supply, NC 28462
RE- Odell Williamson Auditorium
Stormwater Control
BA #8967*5.1
Dear Mr DeBlois
+� UtL 16 1994 U
...........................
We received today a copy of a Stormwater Compliance Inspection Report dated
November 8 1994, which was sent to our civil engineers under a cover letter dated
November 17, 1994 We transmit herewith the engineer's response dated
December 12, 1994
The problem observed by NC DEI-INR may be due to a blockage or clot in the 1"
discharge pipe from the stormwater retention basin Please have that checked by
your maintenance personnel, and let us know if this is the case Thank you
Sincerely,
BONEY ARCHITECTS
Kenneth M Phelps
encIosure
PC Mr Tom Roark, w/enclosure
t;ill'�Lmda Lewts
S U O U IiMW ll ll ER
9"E"EDD
DEC 1 b 1"4
2115 Rexford Road d\14dc8967 doc (D f.
Suite 316 PROj ��5 0 /
Charlotte NC 28211-3476 J
Telephone 704-366 5132
FAX 704 366-7832
Founded in 1922 by Leslie N Boney Architect (1880-1964)
TALBERTS BRUAT /NC.
engineering & planning consultants
December 12, 1994
Ms Linda Lewis
Environmental Engineer
North Carolina Department of Environment, Health, and Natural Resources
Water Quality Section
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
RE O'Dell Williamson Auditorium
Stormwater Project No 910501
Brunswick County
TBI No 5101-9006
Dear Ms Lewis
DEC 15 1994
In follow up to our telephone conversation on December 8, 1994, Talbert & Bright, Inc, would like
to respond to your stormwater compliance inspection report dated November 8, 1994 As we
discussed, we will notify the owner that an inspection is needed on the 1" orifice in order to
determine whether or not there is a clog or other type of blockage that would prevent the pond from
drawing down to the proper level after five days
We make these recommendations based on the original design calculations The calculations were
double checked and show that a 1 " orifice should drain a volume of 10,954 cubic feet in the required
two day minimum However, since it was observed that the drawdown level was not adequate after
five days, we believe that the 1" orifice is blocked
If, after inspection, it is determined that the onfice is not blocked, we will discuss with you alternate
options Until such time however, we will notify you of the result of the inspection
Kenneth" Justice, P E
Mr Ben DeBlois
Boney Architects
E C E0Vl�ln�
IunUl DEC 1 5 M LUJ
D E M
PROD # _ 9 to Q /
The Cotton Exchange • 321 N Front Street • Wilmington, NC 28401 • (910) 763-5350 • Fax 762-6281
0
State of North Carolina
Department of Environment, Health, and Natural Resources
Wilmington Regional Office
James B Hunt, Jr , Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson
Jonathan B Howes, Secretary WATER QUALITY SECTION Regional Manager
November 17, 1994
Mr Ben DeBlois, Vice -President, Administrative Services
Brunswick Community College
Post Office Box 30
Supply, North Carolina 28462
Subject COMPLIANCE INSPECTION
Odell Williamson Auditorium
Stormwater Project No 910501
Brunswick County
Dear Mr DeBlots
Please fmd attached a copy of the completed form entitled "Stormwater Compliance Inspection
Report" The report summarizes the fmdmgs of a recent inspection of the project's stormwater controls
conducted on November 8, 1994 to determine compliance with Stormwater Certification Number 910501
issued on June 7, 1991
A summary of the findings and comments are noted under Section 6 of the report Please inform
this Office in writing before December 17, 1994 of the specific actions that will be undertaken and the
time frame required to correct the deficiencies Failure to provide the requested information, when
required, may initiate enforcement action If you have any questions please contact me at the Wilmington
Regional Office, telephone number (910) 395-3900
Sincerely,
Linda Lewis
Environmental Engineer
DA/arl S \WQS\STORMWATdNSPECT\910501 NOV
cc Mr Dan Latta, P E
Central Files
Bradley Bennett
(2) Linda Lewis
127 Cardinal Drive Extension, Wilnungton, N C 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004
An Equal Opportunity Affirmative Action Employer
STORMWATER COMPLIANCE INSPECTION REPORT
1 Project Name Odell Williamson Auditorium
Project Number 910501 Control Measure Detention Pond
Water Body Clark Branch Classification C NSW
Directions to site, address Old Highway 17 South, near Supply
2 Inspection Date November 8, 1994
Weather Conchtions Cool, sunny
3 Comparison of Approved plans vs As -Built Compared well
4 Maintenance Problems
1 The water level after 5 dyas without ram was above the permanent pool The onfice is
not drawing down the storaged volume within the required time
5 PE Certification Received9 9/23/93 Deed Restrictions Received9 N/A
6 Comments
1 A review of the files shows that tlus Office was concerned about the small onfice size due
to the amount of volume being provided in the pond (twice as much as required) Staff
suggested at that time to increase the 1" orifice to between 1 2" and 1 9" in order to draw
down the proposed volume The engineer responded that he believed that the required
volume of 10,954 cubic feet would exit the pond in less than the required 2 day mimmum
if a larger onfice were put in to draw down the 21,200 cubic feet of storage provided
Apparently, this argument was accepted and the pond was certified Now, however, the
accepted thinking is that the volume that is provided will be used to determine the correct
onfice size so that the volume being held can exit the pond before the next storm event
If water is allowed to remain in the pond beyond the 5 day limit, then the 10,954 cubic
feet necessary to store the 1" runoff volume may not be available, and untreated runoff
may exit the pond Please replace the existing 1" onfice with a larger one between 12
and 1 9", preferably closer to the larger end (re , 1 75")
Inspector Linda Lewis 40-
Water Quahty/Wilmington Regional Office/(910) 395-3900
DA/arl S \WQS\STORMWAT\INSPECT\910501 NOV
Leslie N Boney AIA
1880 1964
William J Boney AIA
1922 1993
Leslie N Boney Jr FAIA
Chades H Boney FAIA
Paul Davis Boney AIA
Charles H Boney Jr AIA
James A Claywell AIA
George J Jernigan Jr AIA
Kenneth M Phelps AIA
120 South Fifth Avenue
P O Box 2047
Wilmington NC 28402-2047
Telephone 910-763 9901
FAX 910 763-7852
5511 Capital Center Drive
Suite 102
Raleigh NC 27606-3393
Telephone 919 851 9393
FAX 919-851 1336
boneu architects
1 February 1994
Ms Linda Lewis
Environmental Engineer
DEPT OF ENVIRONMENT, HEALTH
AND NATURAL RESOURCES
127 Cardinal Drive Extension
Wilmington, NC 28405
RE: Brunswick Community College
Odell Williamson Auditorium
BA # 8967*3.6
Stormwater Project No. 910501
Dear Ms Lewis
FEB 0 3 1994
We are making progress in our efforts to repair the erosion control
measures of the above referenced project
The site subcontractor, who worked under the previous General
Contractor, has agreed to return to the site and repair the damaged areas
We have met with him and with a representative of the Division of State
Construction at the jobsite, to discuss the scope of work Our
specifications call for the installation of a temporary, erosion -control
seeding However, we are negotiating with the Contractor for the
Owner to provide a mix of permanent seed to be sewn, rather than a
temporary grass
Whether they use a temporary -type of grass, or a permanent mix
provided by the Owner, this work will be completed soon
We appreciate your assistance in this matter, and trust that the work,
when completed, will meet with your approval If you have any
questions or comments, please contact us at your convenience Thank
you
Sincerely,
2115 Rexford Road /jr(112-1)
Suite 316
Charlotte NC 28211-3476
Telephone 704-366 5132
FAX 704-366-7832
J 1 16 U IL-' d W L5 U
I I,
F E 8 0 3 -1994
VE im
nT # ` (0501
Founded in 1922 by Leslie N Boney, Architect (1880-1964)
State of North Carolina
Department of Environment, Health, and Natural Resources
Wilmington Regional Office
James B Hunt, Jr , Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson
Jonathan B Howes, Secretary Regional Manager
September 3, 1993
Mr Ben DeBIOIS, Vice -President for Administrative Services
Brunswick Community College
Post Office Box 30
Supply, North Carolina 28462-0030
Subject COMPLIANCE INSPECTION
Odell Williamson Auditorium
Stormwater Project No 910501
Brunswick County
Dear Mr DeBlois
Please find attached a copy of the completed form entitled "Stormwater Compliance Inspection
Report" The report summarizes the findings of a recent inspection of the project's stormwater controls
conducted on August 30, 1993 to determine compliance with Stormwater Certification Number 910501
issued on June 7, 1991
A summary of the findings and comments are noted under Section 6 of the report Appropriate
action, if required, should be completed by October 3, 1993 Please Inform this Office by letter when
required action is completed If you have any questions please contact me at the Wilmington Regional
Office, telephone number (919) 395-3900
Sincerely, QQ
dL.trvlU� 6'�.�cAA4; _
Linda Lewis
Environmental Engmeer
DA/arl S \WQS\STORMWAT\INSPECT\910501 SEP
cc Mr Dan Latta, P E , Talbert and Bright
Central Files
Bradley Bennett
,—(2)-L-mda-Lewis--D
127 Cardinal Dnve Extension Wilmington N C 28405-3845 • Telephone 919-395-3900 • Fax 919-350-2004
An Equal Opportunity Affirmative Action Employer
I
' STORMWATER COMPLIANCE INSPECTION REPORT
I Project Name Odell Williamson Auditorium
Project Number 910501 Control Measure 85 % Pond
Water Body Clark Branch Classification C NSW
Directions to site, address Off Business 17 North, 2 8 miles north of Supply
t3rUn Sw,r,1c- COM^' Cc((ele
2 Inspection Date August 30, 1993 11 45 am
Weather Conditions Hot, humid
3 Comparison of Approved plans vs As -Built Compared well
4 Maintenance Problems
1 Pond side slopes nearest the building are severely eroded
5 PE Certification Received) NO Deed Restrictions Received) N/A
6 Comments
1 Please repair eroded areas and stabilize the side slopes immediately Due to the nature of
the soil, tlus Office recommends sodding the slopes
2 Please complete and return the attached Engineer's Certification, as required by the terms
of your Stormwater Certification
Inspector Linda Lewis
Water Quality/Wilmmgton Regional Office/(919) 395-3900
DA/arl S \WQS\STORMWAT\INSPECT\910501 SEP
Odell Wilhamson Auditorium
Stormwater Project No 910501
Engineer's Certification
I, , as a duly registered Professional Engineer in the State
of North Carolina, having been authorized to observe (penodically/weekly/full tune) the construction of
the project,
(Project)
for (Project Owner) hereby state that, to the best of my abilities,
due care and diligence was used in the observation of the project construction such that the construction
was observed to be built within substantial compliance and intent of the approved plans and specifications
Signature
Registration Number
Date