Loading...
HomeMy WebLinkAboutSW8880910_HISTORICAL FILE_19880926STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 8800110 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 1°18 8 o°IZko YYYYMMDD Aa mac. 4AA�'S.L a= r State of North Carolina Department of Natural Resources and Community Development V Ilmington Regional Office -�_ -- Jamg;-G-Mamn, Gover-por -- - Bob Jamieson S Thomas Rhodes, Secretary DIVISION OF ENVIRONMENTAL MANAGEMENT September 26, 1988 Mr. Chuck Angoff Forest Plaza Associates 50 Charles Lindenburgh Ave. Uniondale, NY 11553 Subject Determination of Compliance with Stormwater Regulations Project #880910 Forest Plaza New Hanover County Dear Mr. Angoff: The Wilmington Regional Office received the Stormwater Management Submittal for the subject project on September 13, 1988. Based on our review of the project documents, we have determined that the project complies with the Stormwater Regulations set forth in Title 15 NCAC 2H.1000. If you have any questions concerning this matter, please contact Mark Hawes or me at (919) 256-4161. /XM Sincerely, Original SNpotft ; 4 PREgTGN HGYfWP�JR A. Preston Howard, Jr., P.E. Regional Supervisor APH.MH:sfq )i cc Bill Mills Street Lee WiRO, CF 7225 Wngluwi le A%enu, WilminEgon NC 28403 3696 • Telephone 919 256-/161 An Equal Opponumn Affirmanve Acnon Emplo�Tr DIVISION OF ENVIRONMENTAL MANAGEMENT Evaluation of Stormwater Treatment and Disposal System Draining to Waters Other Than Class SA _-=PROJECT"DATA s_v Project Name: f c r�s+\4z�` Project No. Location (County, Township/Municipality, Address): ll 1m ncJ1vr hl C New 4-c nover Co Applicant Name: C huceta - loscs� \cz4 /�sxe 4aes Mailing Address: L�nOb�3c�ti S �e 4w submittal Date: `)^ 'i>-Q� ' �1 - 3-86 Water Body Receiving stormwater Runoff: Name of Water Body: S" 4\) CYO a k Classification of Water Body: C_ S�J WET 1. e�s No 2. X No 3. yes No 4 No 5. 5XODNo The design storage is for the runoff from all impervious surfaces resulting from 1-inch of rainfall and is located above the permanent pool. The permanent pool is designed for 85% TSS removal. The runoff completely draws down to the permanent pool in 5 days, but not less than 2 days. The mean depth of the permanent pool is a miniTum of 3 feet. The inlet structure is designed to minimize turbulence and short circuiting. 6. Yes (jg�D All overflow and discharge flows through a vegetative filter at least 30 feet in length. 7. Yes GNy� A method is used to provide even distribution of runoff over,the length of the vegetative filter. 8. Yes �� The slope and width of the vegetative filter provides non -erosive flow for the 10-year 24-hr storm with a 10 vear, 1-hr intensity. 9 Yes Ci The vegetative filter has a slope of 5% or less. 10. Yes Cj� The vegetative filter is natural, grassed or artificially planted wetland vegetation lls? No An appropriate operation and maintenance plan has l/ been provided for the system. THTS PROJECT MEETS THE STORMWATER_CONTR_OL REQUIREMENTS OF 15 NCAC 2H. (g), (i), (7), (k), and (1) (For yes, 1 through 11 must all be circled yes). Brief Explanation: NGi6 ' %/o Veq �e-k ive / i�—Ee i5 USE v Si.cr ,.—HE Toni)) i5 ZJE� SHED ro,� 90% i S5 �eEhnvvwz_ DIVISION OF ENVIRONMENTAL MANAGEMENT SIGN -OFF Wilmington Regional Office a 3� i�Q:5� Date 'V2�- 4-b Date cc: Applicant/WiRO/Mills/CF Individual Evaluating Form/Plans v� ink Regional Water Qualfty/V upervisor RE`r l LI-W ED SY I PROSECT tJAME �n 9'�cuu �PL XZ A !DATE i OF (4Q,Of3S4 + Iq)(e1-7��Z �—Aee4 SHADED- SEE AAA 3S -D,f-Verervio0s A! EA ?,SoftZ � �k�►s� Lc-' 1 ; Z A I Z97-;--7-rz --PA`RY,04, L07 2 � _ L �EiWEcIJ 2 C RASsED A;zEA l o T�4 L. � van eN Io�� cr-c c c ✓�eYrri�t�e VDLUMt- ��ov� �YOi e /Mp to ✓)ov soX 4.51 K 435�o 1 Va g IS3�r3 — V,,, -REV( Eb 8Y I �R05EG-C�A, AME 17A E Q-Zo-88 Z • CGGl�— T:c�R E5-^PLAZ 14 � -44-8F3ozz-,\'0 ✓C YYti\nC VOLUrv\ f I� Low rpw<_ \��i'¢ RAJV. I \ IoYI� -7 7 TF t3/s Z� /d i.Y ow j i I STc5gFa-=IF LEntEjT%A of Inc SLot�c 3 p �.c�zXz.SY�z)CSB� 2 �sX )+Z(6z)j = 3 /__ '1� �oy\�L s "(oS ZS `�2QmovuQ CK SA 1 DK!9� Ps V-71A� I I, O So -�n, �A a E-D SY PROSELT AME DATE la �-U,C�Si GAZt$ M 9/0 3 use 5A = II,OSO 1 \.,O 50 X +- I51SXZ V = 8 2 7 (Q Prs 11�OSOx'4' IS-75XZ — BZi��=p -7, 7 F� V = dsOC.GPB) +qF 8 z4Z{z DIVISION OF ENVIRONMENTAL MANAGEMENT /4 1986 S-V-ZEET LEE Me (M �14 C-REEb EAIE,weegS-,'P A, OAS FRC�u'f STREET 1Nit_mlwr­r(�1L C. Z$4n1 Subject Project No 89 cot FUR EST ►DIEM! kskw VEx County Dear Sir The Environmental Management Commission (EMC) recently adopted new stormwater regulations which became effective on 1 January 1988 The new rules will affect much of the development taking place in the 20 coastal counties Any development project _ located in a coastal county that is required to submit a Sedimentation and Erosion Control Plan to a State, County or City review agency, must comply with the newly adopted Stormwater Regulations The Division of Environmental Management has received a copy of your Sedimentation & Erosion Control Plan (or your Stormwater Management Plan) for the subject project. At this Lime your submittal concerning Stormwater Management Appears to be complete, and your project will be reviewed as soon as possible GIs not complete. The following information is needed to complete your submittal Please submit the following items within 30 days, or your project will be returned as incomplete For projects using density limits approach A site plan that clearly indicates all built -upon areas (i e., streets, driveways, walkways, building footprints, etc ) _ Computations showing the percent built upon areas, both existing and planned. A copy of deed restriction(s) and restrictive covenants which include the State as a beneficiary. _ The attached submittal form should be completed for projects using the density limits approach Other ✓ For projects involving an engineered Stormwater Management System _ Plan and profile drawings of the collection and/or disposal systems Computations or other criteria used to support design of the system Volume of runoff _ Volume of containment/disposal system _ Dewatering time of containment/disposal system. Length of vegetative filter strip needed Other A MA"P SHCbWI%lF F-W-U R E 4 S 3 ACRE -RA-gceL W1T CIEARLY SHOWAL _ Supporting data concerning the hydrogeology of the site. Seasonal high water table. _ Infiltration capacity - saturated hydraulic conductivity. Other Drainage pattern(s) for design storm event, and drainage pattern(s) for runoff in excess of design storm event. _ A complete stormwater maintenance manual including responsible party, quantitative and qualitative criteria which would indicate when corrective maintenance is required, and a periodic maintenance table as needed. A proposed monitoring program for the system Other Please be reminded that construction of the subject project may not commence prior to approval of the Stormwater Management Plan. We will make every attempt to assist you in any way we can If you have any questions, please call MARK ii/IWEs at telephone number (919) 256-4161. Sincerely, Donald Safrit Regional Water Quality Supervisor DS mb cc WiRO, CF Bill Mills CALCULATION PROJECT PROJ NO CLIENT DATE DES BY SUBJECT CHK BY REMARKS SEP 1 3 988 ROJ # 10 Awe, MCKIM&CREID PROJECT CLIENT _ SUBJECT. CALCULATION PROJ NO 8� l'd DATE DES BY CHK BY REMARKS (neeEz- 4) --- --cr,4 ` ---- ------KJaTE254Ey -- I 2 -_i•,-/per c �//ors - -i el _— _- — —_—_ _ -- -- -�Go� .To Pere- De' ✓et o P8v-.0/ScN4,2c; i I � —R4it oF_R+?cEctA at_ ,�✓nloF_F-f��_EDE✓FGoPEO c i. e4 s - -- l—f=T_wL__lGv_�/oF<__CKo+�/ asf dEGJYEJ KcE c 4) 4J;P McK M&CREID I 0 PROJECT CLIENT - SUBJECT_ CALCULATION PROJ NO 652q to DATE DES BY CHK BY REMARKS `4aTE.ZSj-l£l-' Q- (.3-T4 I�16-e)6441t) = zo) ;T �1 �T4L. lTtJn�OFf jLOo�y (�sT�/�C1� G�EO �f.625�16D1 ___ --- - --- - - -- �__ PP20X i••�dTE_�ET�✓T�,on.% �4�_I`o,e S_rE_�j'_ ars25tFeo: — — -------- -- - --- ---------- - - - - --- -- ---- ------ — Fo2_E..lt ti4 A-70 Q — — - — — ----p"G_Fo Z._ 270!-0c 4 j McIQM&CR CALCULATION PROJECT CLIENT _ SUBJECT. PROJ NO EtO lO DATE DES BY CHK BY REMARKS 1�712,57- '--- -- —'�--Ili✓ (z aOYs, - -- ,- - - - - - --- - -- - I I -- 70 --- 1 12F4—eQ - - - — ---- - PE 124AAtl J - -- - ---- -- -P�� /42ea - - -- — — 4 j McK1m&c EID CALCULATION PROJECT PROJ NO eeQ9 w CLIENT DATE DES BY SUBJECT CHK BY SiJa y'�v �49.c� 3 i8s� 21S —S�zccce �e� (3 F- LOGE_ QE,q�Ft� X.c '' 3-- - - - ------ ---- - - -zg 152571 _ SEA s14Eter REMARKS O t400v ?,2O140) 5'Jo81 �j McK M&CR= PROJECT CLIENT _ SUBJECT. CALCULATION — PROJ NO WID DATE DES BY CHK BY REMARKS i N w _ I :N N 41, MCIQM&CREID CALCULATION PROJECT PROJ NO P'-l10 CLIENT DATE DES BY SUBJECT CHK BY - I REMARKS at�-3`(A - Qo-Q� Fug ��Sj EiS4�� FL 3$• 1 - - - Qe'Qc STJg4GE CI..SZC I�SToaA! F C/-31 CZ 4&� MCIQM&0= • M' FIGURES 207 ``� w'��`�=�'•.`=`%- =`. !'�' FIGURE 29 HEADWATER DEPTH FOR CIRCULAR CONCRETE ; PIPE CULVERTS WITH INLET CONTROL 180 10000 (1) (2) (3) 1 168 8000 EXAMPLE 156 6000 D = 36 Inches (3 0 feet) 6 0 60 5000 0 - 66 cfs 5 0 144 4000 6 0 5 0 HW Hw _ ` 132 3000 0 feet 5 0 4 0 4 p fi:,"x`'. 120 (1) IB 54 0 .- �.. 2000 (2) 1.55 47 3 p :. 108 (3) 16 4.8 3 0 v � ;_.mac z"rt 96 1000 •D In feet 3 0 90 800 20 20 71 600 _ rn 78 500 3 2 0 U 72 400 .'r•� N} LL 300 rn 1 15 c y w 100 J a 60 — — 1 1.0 42 50 = _. }. r N 40 To use scale (2) or (3) m 1 0 9 36 30 War a srrslgnr line p .9 wthrough known values w 9 _ w 33 20 of size and d w",ge W - k ro Intersect scale (I) r - ¢ 30 Frwn pant on scale (1) 3. $ $ $ +J_ = ' 10 wlu�t horlrontally to 27 % l w (3) = 7 7 7 6 21 5 q HW/D ENTRANCE 6 6 3 SCALE TYPE 6 Qy$•7<°1• 1$ (roove edge 2 (2) 21 Groove end .,in headwall 15 f3) Groove end 10 prolecting _ 5 5 5 12 BUREAU OF PUBLIC ROADS JAN 1963 HEADWATER SCALES 2&3 REVISED MAY 1964 .. ^w a�;ai> . - , �i•xii,.-.... r -<^wr. mot^.. � : '74•" M... ' kWILj PARTMENT OF ENGINEERING AND FACILITIES 4 CHESTNUT STREET, ROOM 101 /LMINGTON, NORTH CAROLINA 28401 RECEIVED��gio PERMIT OCT 121988 FOR A LAND DISTURBING ACTIVITY VrIImlgBmn R86101101 Offtee as authorized by the New Hanover County Erosion and Sedimentation Control Ordinance This Permit issued to North Chase Development authorizes the development of1•5 *, 2�Qres of land at N. E. of Laney High School l in New Hanover County This permit issued on 9-17-86 and effective for one year from this date, is subject to compliance with the application a9d site drawings, all applicable regulations and special conditions and notes set forth blow It is understood by the applicant that a representative of New Hanover Count,'s Engineering Department may inspect the site at any /time following the issuance of this Permit A copy of the approved Soil Erosion Plan and this Permit must be available at all times at the site. Failure to eyecute the provisions of this permit and the approved Soil Erosion Plan, or any other provisions of the New Hanover County Soil Erosion and Sedimentation _ Control Ordinance, shall result in immediate legal action by the County to the limits prescribed by the Ordinance If the measures outlined on the approved Soil Erosion Plan and this Permit prove insufficient, additional Erosion Control medbures can and will be required which in turn be considered provisions of this permit 1hib Permit does not l preclude any other'permitp or approvals necessary for beginning or completing this 4 development It is the Permittee responsibility to obtain all necessary permits and i approvals I SPECIAL CONDITIONS - That there cannot be constructed an impervious surface within 25 feet of the organic pocosin area. - That the sediment basin be cleaned out periodically. - That no soil erasion be allowed to run off site. J Expiration Date 10-9-87 ' It is the reponsibility of the permittee to renew the Permit ti as necessary for the life of i the Development r This permit may not be amended "? or transferred to arother h. 'party without approval of this of f ice, I Danicl S. is, f Con,ervation C"c_ _r New Hanover Coun cc Building I(1 i,�ctions Acknowledgment of Receipt of Permit VIYI1 i1 ♦ • '•�i I1 uDpew 2, )tnJNS 66Y (Please Print) / Ss, 1, run � �y