HomeMy WebLinkAboutSW8880910_HISTORICAL FILE_19880926STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 8800110
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
1°18 8 o°IZko
YYYYMMDD
Aa mac. 4AA�'S.L
a= r
State of North Carolina
Department of Natural Resources and Community Development
V Ilmington Regional Office
-�_ -- Jamg;-G-Mamn, Gover-por -- - Bob Jamieson
S Thomas Rhodes, Secretary
DIVISION OF ENVIRONMENTAL MANAGEMENT
September 26, 1988
Mr. Chuck Angoff
Forest Plaza Associates
50 Charles Lindenburgh Ave.
Uniondale, NY 11553
Subject Determination of Compliance
with Stormwater Regulations
Project #880910
Forest Plaza
New Hanover County
Dear Mr. Angoff:
The Wilmington Regional Office received the Stormwater
Management Submittal for the subject project on September 13, 1988.
Based on our review of the project documents, we have determined
that the project complies with the Stormwater Regulations set forth
in Title 15 NCAC 2H.1000.
If you have any questions concerning this matter, please
contact Mark Hawes or me at (919) 256-4161.
/XM
Sincerely,
Original SNpotft ;
4 PREgTGN HGYfWP�JR
A. Preston Howard, Jr., P.E.
Regional Supervisor
APH.MH:sfq )i cc Bill Mills
Street Lee
WiRO, CF
7225 Wngluwi le A%enu, WilminEgon NC 28403 3696 • Telephone 919 256-/161
An Equal Opponumn Affirmanve Acnon Emplo�Tr
DIVISION OF ENVIRONMENTAL MANAGEMENT
Evaluation of Stormwater Treatment and Disposal System
Draining to Waters Other Than Class SA
_-=PROJECT"DATA
s_v Project Name: f c r�s+\4z�` Project No.
Location (County, Township/Municipality, Address):
ll 1m ncJ1vr hl C New 4-c nover Co
Applicant Name: C huceta - loscs� \cz4 /�sxe 4aes
Mailing Address: L�nOb�3c�ti
S �e 4w
submittal Date: `)^ 'i>-Q� '
�1 - 3-86
Water Body Receiving stormwater Runoff:
Name of Water Body: S" 4\) CYO a k
Classification of Water Body: C_ S�J
WET
1. e�s No
2. X No
3. yes No
4 No
5. 5XODNo
The design storage is for the runoff from all
impervious surfaces resulting from 1-inch of
rainfall and is located above the permanent pool.
The permanent pool is designed for 85% TSS removal.
The runoff completely draws down to the permanent
pool in 5 days, but not less than 2 days.
The mean depth of the permanent pool is a miniTum of
3 feet.
The inlet structure is designed to minimize
turbulence and short circuiting.
6. Yes (jg�D All overflow and discharge flows through a
vegetative filter at least 30 feet in length.
7. Yes GNy� A method is used to provide even distribution of
runoff over,the length of the vegetative filter.
8. Yes �� The slope and width of the vegetative filter
provides non -erosive flow for the 10-year 24-hr
storm with a 10 vear, 1-hr intensity.
9 Yes Ci The vegetative filter has a slope of 5% or less.
10. Yes Cj� The vegetative filter is natural, grassed or
artificially planted wetland vegetation
lls? No An appropriate operation and maintenance plan has
l/ been provided for the system.
THTS PROJECT MEETS THE STORMWATER_CONTR_OL
REQUIREMENTS OF 15 NCAC 2H. (g), (i), (7), (k), and
(1) (For yes, 1 through 11 must all be circled yes).
Brief Explanation:
NGi6 ' %/o Veq �e-k ive / i�—Ee i5 USE v Si.cr ,.—HE Toni))
i5 ZJE� SHED ro,� 90% i S5 �eEhnvvwz_
DIVISION OF ENVIRONMENTAL MANAGEMENT SIGN -OFF
Wilmington Regional Office
a 3� i�Q:5�
Date
'V2�- 4-b
Date
cc: Applicant/WiRO/Mills/CF
Individual Evaluating Form/Plans
v� ink
Regional Water Qualfty/V upervisor
RE`r l LI-W ED SY I PROSECT tJAME
�n 9'�cuu �PL XZ A
!DATE i
OF
(4Q,Of3S4 + Iq)(e1-7��Z
�—Aee4 SHADED- SEE AAA
3S
-D,f-Verervio0s A! EA
?,SoftZ
� �k�►s� Lc-' 1 ; Z A I Z97-;--7-rz
--PA`RY,04, L07 2 � _ L
�EiWEcIJ
2
C RASsED A;zEA
l o T�4 L. � van eN Io��
cr-c c c
✓�eYrri�t�e VDLUMt- ��ov� �YOi
e /Mp to ✓)ov
soX 4.51 K 435�o
1
Va
g IS3�r3 —
V,,,
-REV( Eb 8Y I �R05EG-C�A, AME 17A E Q-Zo-88 Z
• CGGl�— T:c�R E5-^PLAZ 14 �
-44-8F3ozz-,\'0
✓C YYti\nC VOLUrv\ f I� Low rpw<_ \��i'¢
RAJV.
I
\ IoYI�
-7 7 TF t3/s Z� /d i.Y ow j
i
I
STc5gFa-=IF
LEntEjT%A of Inc SLot�c
3 p
�.c�zXz.SY�z)CSB�
2 �sX
)+Z(6z)j
=
3
/__ '1� �oy\�L
s "(oS ZS `�2QmovuQ
CK SA 1 DK!9�
Ps
V-71A�
I I, O So
-�n,
�A
a
E-D SY
PROSELT AME DATE la
�-U,C�Si GAZt$
M 9/0
3
use 5A = II,OSO
1 \.,O 50 X +- I51SXZ
V = 8 2 7 (Q Prs
11�OSOx'4' IS-75XZ — BZi��=p
-7, 7 F�
V = dsOC.GPB) +qF
8 z4Z{z
DIVISION OF ENVIRONMENTAL MANAGEMENT
/4 1986
S-V-ZEET LEE
Me (M �14 C-REEb EAIE,weegS-,'P A,
OAS FRC�u'f STREET
1Nit_mlwrr(�1L C. Z$4n1
Subject Project No 89 cot
FUR EST
►DIEM! kskw VEx County
Dear Sir
The Environmental Management Commission (EMC) recently adopted
new stormwater regulations which became effective on 1 January
1988 The new rules will affect much of the development taking
place in the 20 coastal counties Any development project _
located in a coastal county that is required to submit a
Sedimentation and Erosion Control Plan to a State, County or City
review agency, must comply with the newly adopted Stormwater
Regulations
The Division of Environmental Management has received a copy of
your Sedimentation & Erosion Control Plan (or your Stormwater
Management Plan) for the subject project. At this Lime your
submittal concerning Stormwater Management
Appears to be complete, and your project will be reviewed as
soon as possible
GIs not complete. The following information is needed to
complete your submittal Please submit the following items
within 30 days, or your project will be returned as
incomplete
For projects using density limits approach
A site plan that clearly indicates all built -upon
areas (i e., streets, driveways, walkways, building
footprints, etc )
_ Computations showing the percent built upon areas,
both existing and planned.
A copy of deed restriction(s) and restrictive
covenants which include the State as a beneficiary.
_ The attached submittal form should be completed for
projects using the density limits approach
Other
✓ For projects involving an engineered Stormwater
Management System
_ Plan and profile drawings of the collection and/or
disposal systems
Computations or other criteria used to support
design of the system
Volume of runoff
_ Volume of containment/disposal system
_ Dewatering time of containment/disposal
system.
Length of vegetative filter strip needed
Other A MA"P SHCbWI%lF F-W-U R E 4 S 3 ACRE
-RA-gceL W1T CIEARLY SHOWAL
_ Supporting data concerning the hydrogeology of the
site.
Seasonal high water table.
_ Infiltration capacity - saturated hydraulic
conductivity.
Other
Drainage pattern(s) for design storm event, and
drainage pattern(s) for runoff in excess of design
storm event.
_ A complete stormwater maintenance manual including
responsible party, quantitative and qualitative
criteria which would indicate when corrective
maintenance is required, and a periodic maintenance
table as needed.
A proposed monitoring program for the system
Other
Please be reminded that construction of the subject project may
not commence prior to approval of the Stormwater Management Plan.
We will make every attempt to assist you in any way we can If
you have any questions, please call MARK ii/IWEs at
telephone number (919) 256-4161.
Sincerely,
Donald Safrit
Regional Water Quality Supervisor
DS mb
cc WiRO, CF
Bill Mills
CALCULATION
PROJECT PROJ NO
CLIENT DATE
DES BY
SUBJECT
CHK BY
REMARKS
SEP 1 3 988
ROJ # 10
Awe, MCKIM&CREID
PROJECT
CLIENT _
SUBJECT.
CALCULATION
PROJ NO 8� l'd
DATE
DES BY
CHK BY
REMARKS
(neeEz- 4)
---
--cr,4 `
---- ------KJaTE254Ey
--
I 2 -_i•,-/per c �//ors -
-i
el
_— _- — —_—_ _ -- -- -�Go� .To Pere- De' ✓et o P8v-.0/ScN4,2c;
i
I � —R4it oF_R+?cEctA
at_ ,�✓nloF_F-f��_EDE✓FGoPEO c i.
e4 s - --
l—f=T_wL__lGv_�/oF<__CKo+�/ asf dEGJYEJ KcE c 4)
4J;P
McK M&CREID
I
0
PROJECT
CLIENT -
SUBJECT_
CALCULATION
PROJ NO 652q to
DATE
DES BY
CHK BY
REMARKS
`4aTE.ZSj-l£l-'
Q- (.3-T4 I�16-e)6441t) = zo) ;T
�1 �T4L. lTtJn�OFf jLOo�y (�sT�/�C1� G�EO �f.625�16D1 ___
--- - --- - - --
�__ PP20X i••�dTE_�ET�✓T�,on.% �4�_I`o,e S_rE_�j'_ ars25tFeo:
— — -------- -- - --- ---------- - - - - --- -- ---- ------ —
Fo2_E..lt ti4 A-70
Q
— — - — — ----p"G_Fo Z._ 270!-0c
4 j McIQM&CR
CALCULATION
PROJECT
CLIENT _
SUBJECT.
PROJ NO EtO lO
DATE
DES BY
CHK BY
REMARKS
1�712,57-
'--- -- —'�--Ili✓ (z aOYs, - -- ,- - - - - - --- - -- -
I I
--
70
--- 1 12F4—eQ - - - — ---- -
PE 124AAtl J -
-- - ---- -- -P�� /42ea - - -- — —
4 j McK1m&c EID
CALCULATION
PROJECT PROJ NO eeQ9 w
CLIENT DATE
DES BY
SUBJECT
CHK BY
SiJa y'�v �49.c�
3 i8s�
21S
—S�zccce �e� (3
F-
LOGE_
QE,q�Ft� X.c
'' 3--
- - - ------
---- - -
-zg
152571 _
SEA s14Eter
REMARKS
O
t400v
?,2O140)
5'Jo81
�j McK M&CR=
PROJECT
CLIENT _
SUBJECT.
CALCULATION
— PROJ NO WID
DATE
DES BY
CHK BY
REMARKS
i
N
w
_
I
:N
N
41, MCIQM&CREID
CALCULATION
PROJECT PROJ NO P'-l10
CLIENT DATE
DES BY
SUBJECT
CHK BY
- I REMARKS
at�-3`(A -
Qo-Q� Fug ��Sj EiS4��
FL 3$• 1 - - -
Qe'Qc STJg4GE CI..SZC
I�SToaA! F C/-31 CZ
4&� MCIQM&0=
•
M'
FIGURES 207 ``� w'��`�=�'•.`=`%- =`. !'�'
FIGURE 29
HEADWATER DEPTH FOR CIRCULAR CONCRETE ;
PIPE CULVERTS WITH INLET CONTROL
180 10000 (1) (2) (3)
1 168 8000 EXAMPLE
156 6000 D = 36 Inches (3 0 feet) 6 0 60
5000 0 - 66 cfs 5 0
144 4000 6 0 5 0
HW Hw _
` 132 3000 0 feet 5 0 4 0 4 p fi:,"x`'.
120 (1) IB 54 0 .- �..
2000 (2) 1.55 47 3 p :.
108 (3) 16 4.8 3 0 v � ;_.mac z"rt
96 1000 •D In feet 3 0
90
800 20 20
71 600
_ rn 78 500 3 2 0
U 72 400 .'r•� N}
LL 300 rn 1 15 c y
w 100
J a 60 — — 1 1.0
42 50 = _. }.
r
N 40 To use scale (2) or (3) m 1 0 9
36 30 War a srrslgnr line p .9
wthrough known values w 9 _
w 33 20 of size and d w",ge W - k
ro Intersect scale (I) r
- ¢ 30 Frwn pant on scale (1) 3. $ $ $ +J_ = '
10 wlu�t horlrontally to
27 %
l w (3) = 7 7 7
6
21 5
q HW/D ENTRANCE 6 6
3 SCALE TYPE 6 Qy$•7<°1•
1$ (roove edge
2 (2) 21 Groove end .,in
headwall
15 f3) Groove end
10 prolecting _ 5 5 5
12
BUREAU OF PUBLIC ROADS JAN 1963 HEADWATER SCALES 2&3
REVISED MAY 1964
.. ^w a�;ai> . - , �i•xii,.-.... r -<^wr. mot^.. � : '74•" M... '
kWILj PARTMENT OF ENGINEERING AND FACILITIES
4 CHESTNUT STREET, ROOM 101
/LMINGTON, NORTH CAROLINA 28401
RECEIVED��gio PERMIT
OCT 121988
FOR A LAND DISTURBING ACTIVITY
VrIImlgBmn R86101101 Offtee
as authorized by the New Hanover County Erosion and Sedimentation Control Ordinance
This Permit issued to North Chase Development
authorizes the development of1•5 *, 2�Qres of land at N. E. of Laney High School
l
in New Hanover County This permit issued on 9-17-86
and effective for one year from this date, is subject to compliance with the application
a9d site drawings, all applicable regulations and special conditions and notes set forth
blow
It is understood by the applicant that a representative of New Hanover Count,'s
Engineering Department may inspect the site at any /time following the issuance of this
Permit A copy of the approved Soil Erosion Plan and this Permit must be available at
all times at the site.
Failure to eyecute the provisions of this permit and the approved Soil Erosion Plan,
or any other provisions of the New Hanover County Soil Erosion and Sedimentation _
Control Ordinance, shall result in immediate legal action by the County to the
limits prescribed by the Ordinance If the measures outlined on the approved Soil Erosion
Plan and this Permit prove insufficient, additional Erosion Control medbures can and will
be required which in turn be considered provisions of this permit 1hib Permit does not
l preclude any other'permitp or approvals necessary for beginning or completing this
4 development It is the Permittee responsibility to obtain all necessary permits and
i approvals
I
SPECIAL CONDITIONS
- That there cannot be constructed an impervious surface within 25 feet of the
organic pocosin area.
- That the sediment basin be cleaned out periodically.
- That no soil erasion be allowed to run off site.
J Expiration Date 10-9-87
' It is the reponsibility of the
permittee to renew the Permit
ti as necessary for the life of
i the Development
r This permit may not be amended
"? or transferred to arother
h. 'party without approval of this
of f ice,
I
Danicl S. is, f
Con,ervation C"c_ _r
New Hanover Coun
cc Building I(1 i,�ctions
Acknowledgment of Receipt of Permit
VIYI1 i1 ♦ • '•�i I1
uDpew 2, )tnJNS
66Y (Please Print) /
Ss, 1, run � �y