Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8130113_HISTORICAL FILE_20130405
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SWs 13 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ® HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Z.O13 0405 YYYYMMDD PWA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P E John E Skvarla, III Governor Director Secretary April 5, 2013 Mr Samuel M Marsh, Vice President The Autumn Corporation 451 N Winstead Ave Rocky Mount, NC 27804 Subject Stormwater Management Permit No SW8130113 Autumn Care Brunswick County High Density Commercial Constructed Wetlands Project Brunswick County Dear Mr Marsh The Wilmington Regional Office received a complete Stormwater Management Permit Application for Autumn Care Brunswick County on April 5, 2013 Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008 211 and Title 15A NCAC 2H 1000 We are forwarding Permit No SW8130113, dated April 5, 2013, for the construction, operation and maintenance of the BMP's and built upon area associated with the subject project This permit shall be effective from the date of Issuance until April 5, 2021, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH) The written petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www NCOAH com Unless such demands are made this permit shall be final and binding If you have any questions, or need additional information concerning this matter, please contact Kelly Johnson, at (910) 796-7215 Sincerely, , r ChaeMdakid, P E , Director Division of Water Quality GDS/kpj S 1WQS1StormwatehPennits 8 Projects120131130113 HD12013 03 permit 130113 cc Mat Trowbridge, The Curry Engineering Group, PLLC Inspector, Brunswick County Inspections Brunswick County Engineering Division of Coastal Management Wilmington Regional Office Stormwater File 1617 Mad Service Center Raleigh North Carolina 27699 1617 Locahon 512 N Salisbury St Raleigh North Carolina 27604 One Phone 919-807-6300 1 FAX 919-807-64921DENRAssistance 1b77-6236748 NorthCarohna Internet w rimaterouahiv ora a' tma/ m State Stormwater Management Systems Permit No SW8130113 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Autumn Corporation Autumn Care Brunswick County 9646 No 5 School Rd, Shallotte, Brunswick County FOR THE construction, operation and maintenance of 1 (one) constructed wetland in compliance with Session Law 2008-211 and the provisions of 15A NCAC 2H 1000 (hereafter collectively referred to as the "stormwater rulesl and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until April 5, 2021 and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 17 of this permit 3 The application form, supplement forms, approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans The project shall maintain a 50' wide vegetated buffer adjacent all surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of each side of rivers and streams and the mean high water line of tidal waters All runoff being directed into wetlands shall flow into and through those wetlands at a non -erosive velocity of 2 fps or less Page 2 of 7 State Stormwater Management Systems Permit No SW8130113 7 The following design elements have been approved for this constructed wetlands stormwater facility, and must be provided in the system at all times a Drainage Area, acres 830 Onsite, ft2 361,589 Offste,ft2 0 b Total Impervious Surfaces, ft2 202,092 Onsite, ft2 202,092 Offsite, ft2 0 c Design Storm 15 d Permitted Storage Volume, ft3 25,600 e Planting/Ponding Depth, in 1200 f Temporary Storage Elevation, fmsl 2950 (top of shallow land) g Temporary Storage Surface Area, ft2 10,210 (shallow land surface area at top) h Permanent Pool Elevation, fmsl 2850 (top of shallow water) i Permanent Pool Surface Area, ft2 10,250 (shallow water surface area at top) f Deep Pool Bottom Elevation, Forebay, fmsl 265 k Deep Pool Surface Area, Forebay, fmsl 2,580 (Deep Pool Surface Area at Top, Forebay) I Deep Pool Bottom Elevation, Non-Forebay, fmsl 265 m Deep Pool Surface Area, Non-Forebay, fmsl 2,560 (Deep Pool Surface Area at Top, Non-Forebay) n Controlling Orifice 0 Pipe, in 200 o Pre -development 1 yr 24 hr peak flow, cfs 1102 p Post -development 1 yr 24 hr peak flow, cfs 81 (orifice flowrate) q Number Herbaceous Plants Provided 4,680 r Number Shrubs & Small Trees Provided 416 s Number 2 5" cal Trees Provided 0 t Seasonal High Water Table, FMSL N/A Liner is provided u Time to Draw Down Storage Volume, day 477 v Receiving Stream/River Basin Earnest Branch w Stream Index Number 15-(1) x Classification of Water Body C, Sw II SCHEDULE OF COMPLIANCE 1 No person or other legal entity shall alter the approved stormwater management system, or fill in, alter, or pipe any drainage feature, including swales, shown on the approved plans as part of the stormwater management system, unless and until the permittee submits a modification to the permit and receives approval from the Division 2 The permittee is responsible for verifying that the proposed built -upon area for the entire project does not exceed the allowable built -upon area Page 3 of 7 State Stormwater Management Systems Permit No SW8130113 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately Infiltration systems should not be used as erosion control devices, due to the potential clogging If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to the approved plans, regardless of size b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area e Further subdivision, acquisition, or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan The Director may determine that other revisions to the project should require a modification to the permit Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and revegetation of side slopes d Maintenance of the wetlands plants and replacement of dead plants e Immediate repair of eroded areas f Maintenance of side slopes in accordance with approved plans and specifications g Trash and debris removal and unclogging of the wetlands, outlet structure, onfice, catch basins and piping h Access to all components of the system must be available at all times 10 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 11 Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 12 Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel The facility must be in compliance with all permit conditions Any items not in compliance must be repaired or replaced to design condition prior to the transfer Records of maintenance activities performed to date will be required Page 4 of 7 State Stonmwater Management Systems Permit No SW8130113 13 This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the application, approved plans and specifications, and other supporting data 14 Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools III GENERAL CONDITIONS 1 This permit is not transferable to any person or entity except after notice to and approval by the Director At least 30 days prior to a change of ownership, or a name change of the Permittee or of the project, or a marling address change, the permittee shall submit a completed and signed "Name/Ownership Change Form" to the Division of Water Quality, accompanied by the appropriate documentation as listed on the form The project must be in good standing with DWQ The approval of this request will be considered on its ments and may or may not be approved 2 The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request Neither the sale of the project area in whole or in part, nor the conveyance of common area to a third party, constitutes an approved permit transfer 3 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143- 215 6A to 143-215 6C 4 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction 5 In the event that the facilities fad to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 7 Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours 8 The permittee shall submit a permit renewal application and processing fee at least 180 days pnor to the expiration date of this permit 9 A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times Permit issued this the 511, day of April 2013 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Aarles kild, P E , Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No SW8130113 Autumn Care Brunswick County Stormwater Permit No SW8130113 Brunswick County Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (penodically/weekly/full time) the construction of the protect, (Protect) for (Protect Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the protect construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form are a part of this Certification Noted deviations from approved plans and specifications Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No SW8130113 Certification Requirements Page 2 of 2 _1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area _3 All the built upon area associated with the protect is graded such that the runoff drains to the system _4 All roof drains are located such that the runoff is directed into the system _5 The wetland zone elevations are per the approved plan _6 The wetland is located per the approved plans 7 A trash rack is provided on the outlet structure _8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 31 _10 The inlets are located per the approved plans and do not cause short circuiting of the system 11 The permitted amounts of wetland zone surface area and volume have been provided _12 Required drawdown devices are correctly sized and located per the approved plans 13 All required design depths are provided 14 All required parts of the system are provided _15 The required number of wetlands plantings have been provided cc NCDENR-DWQ Regional Office Inspector, Brunswick County Building Inspections Page 7 of 7 DWQ USE ONLY Date Received Fee Paid Permit Number ' ` N O C S l li z? Qol Applicab ules ❑ Coasta SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM Thus form may be photocopied for use as an original I GENERAL INFORMATION 1 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc) Autumn Care - Brunswick Co, NC 2 Location of Project (street address) 9646 No 5 School Road City Shallotte County Brunswick Zip 28420 3 Directions to project (from nearest major intersection) Project is at the mtersection of No 5 School Road and Ash Little on the Northeast side of the intersection 4 Latitude 330 57 12" N Longitude 78' 35' 52" W of the main entrance to the project II PERMIT INFORMATION 1 a Specify whether project is (check one) ®New ❑Modification ❑ Renewal w/ Modification tRenewals with modifications also requires SWU-102 - Renewal Application Form b If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberN/A , its issue date (if known)N/A , and the status of construction ®Not Started ❑Partially Completed* ❑ Completed* *promde a designer's certification 2 Specify the type of project (check one) ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3 If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, N/A and the previous name of the project, if different than currently proposed, N/A 4 a Additional Project Requirements (check applicable blanks, information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748) ❑CAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control 12 25 ac of Disturbed Area 0404/401 Permit Proposed Impacts b If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit N/A 5 Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S L 2012-200, Part VI http Yportal nedenr or web s LBY- R 18 2013 Fonn SWU-101 Version 06Aug2012 Page 1 of 6 -- , ---_ \I III CONTACT INFORMATION 1 a Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc who owns the project) Applicant/Organization Autumn Corporation Signing Official & Title Samuel M Marsh, Vice President b Contact information for person listed in item la above Street Address 451 N Winstead Ave City Ro ft Mount State NC Zip 27804 Mailing Address (if applicable) City Phone f ) Email State Fax Zip Please check the appropriate box The applicant listed above is ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below) 2 a Print Property Owner's name and title below, if you are the lessee, purchaser or developer (This is the person who owns the property that the project is located on) Property Owner/Organization Signing Official & Title b Contact information for person listed in item 2a above Street Address City Mailing Address (if applicable) City State State Phone ( ) Fax Email Zip Zip 3 a (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project Other Contact Person/Organization Autumn Corporation Signing Official & Title Bob Dew, Director of Construction b Contact information for person listed in item 3a above Mailing Address 451 N Winstead Ave City Rocky Mount State NC Zip 27804 Phone (52 ) 443-6265 Email bobdew@autumncorp com Fax (252 ) 443-2703 4 Local jurisdiction for building permits Brunswick County Point of Contact Helen Bunch Phone # (910 ) 253-2035 RECEIVE MAR 18 2013 Form SWU-101 Version 06Aug2012 Page 2 of 6 IV PROJECT INFORMATION 1 In the space provided below, briefly summarize how the stormwater runoff will be treated Stormwater will be collected through a network of catch basins and piped to a wetland in the southwest corner of the property Stormwater will be discharged from the wetland to a drainage ditch adjacent to the 2 a If claiming vested rights, identify the supporting documents provided and the date they were approved ❑ Approval of a Site Specific Development Plan or PUD Approval Date ❑ Valid Building Permit Issued Date ❑ Other Date b If claiming vested rights, identify the regulation(s) the project has been designed in accordance with ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3 Stormwater runoff from this project drams to the Lumber River basin 4 Total Property Area 12 65 acres 5 Total Coastal Wetlands Area 0 acres 6 Total Surface Water Area 0 acres 7 Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area' 12 65 acres Toted protect area shall be calculated to exchide the followingg the normal pool of un ounded structures, the area between the bunks of streams and rivers, the area below the Normal High Writer (NiN) tine or Mean Hugh Writer (MHW) line, and coastal wetlands landward from the NHW (or MHW) line The resultant protect area is used to calculate overall percent built upon area (BUA) Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total protect area 8 Project percent of impervious area (Total Impervious Area / Total Project Area) X 100 = 37 9 9 How many drainage areas does the project have?l (For high density, count I for each proposed engineered storrnwater BMP For low density and other protects, use 1 for the whole property area) 10 Complete the following information for each drainage area identified in Project Information item 9 If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Name Earnest Branch Stream Class * c,sw Stream Index Number * 15-23-5 Total Drainage Area (so 361,895 On -site Drainage Area (so 361,895 Off -site Drainage Area (so 0 Proposed Impervious Area** (so 1 202,092 % Impervious Area** total 56% Impervious" Surface Area Drainage Area Drainage Area Drainage Area _ Drainage Area _ On -site Bmldmgs/Lots (so 62,630 On -site Streets (so 0 On -site Parking (so 96,961 On -site Sidewalks (so 21,301 Other on -site (so 0 Future (so 21,200 Off -site (so 0 Existing BUA*** (so 0 Total (so 202,092 * Stream Class and Index Number can be determined at http 1/portal ncdenr org/webfwq[ps/csu/classifications Impervious area is defined as the built upon area including, but not limited to, bmld parkingareas sidewalks, gravel areas, etc �� *** Report only that amount of existing B UA that will remain after development Do a t repor any it 11 g EUl is to be removed and which will be replaced by new BUA MAR 19 200 Form SWU-101 Version 06Aug2012 Page 3 of 6 11 How was the off -site impervious area listed above determined? Provide documentation There is no off -site impervious area associated with this project Projects in Union County Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B 0600 V SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project The latest versions of the forms can be downloaded from hU Uportal ncdenr org/web/wg/ws/su/bmp-manual VI SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ) A complete package includes all of the items listed below A detailed application instruction sheet and BMP checklists are available from http //portal ncdenr org/web/wg/ws/su/statesw/forms docs The complete application package should be submitted to the appropriate DWQ Office (The appropriate office may be found by locating project on the mteractive online map at http / /portal ncdenr orS/web/wq/ws/su/mal2s) Please indicate that the following required information have been provided by initialing in the space provided for each item All original documents MUST be signed and initialed in blue ink Download the latest versions for each submitted application package from hn //portal ncdenr org/web/wq/ws/su/statesw/forms docs Initials 1 Original and one copy of the Stormwater Management Permit Application Form 2 Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form (if required as per Part V11 below) 3 Original of the apphcable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP 4 Permit application processing fee of $505 payable to NCDENR (For an Express review, refer to _ http / /www envhelp org/pages/onestopexpress html for information on the Express program and the associated fees Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting) 5 A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project This is required in addition to the brief summary provided in the Project Information, item 1 6 A USGS map identifying the site location If the receiving stream is reported as class SA or the _ receiving stream drams to class SA waters within th mile of the site boundary, mclude the 1/2 mile radius on the map 7 Sealed, signed and dated calculations (one copy) _ 8 Two sets of plans folded to 8 5" x 14" (sealed, signed, & dated), including _ a Development/Project name b Engineer and firm c Location map with named streets and NCSR numbers d Legend e North arrow f Scale g Revision number and dates h Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MEW or NEW line of tidal waters, and any coastal wetlands landward of the MEW or NEW lines • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MEW (or NEW) of tidal waters 1 Dimensioned property/project boundary with bearings & distances j Site Layout with all BUA identified and dimensioned k Existing contours, proposed contours, spot elevations, fmished floor elevate I Details of roads, dramage features, collection systems, and stormwater con 1 euu Ei IVI in Wetlands delineated, or a note on the plans that none exist (Must be dehr ated by a qualified person Provide documentation of qualifications and identify the ersomAhol 8 2013 made the determination on the plans n Existing drainage (mcluding off -site), drainage easements, pipe sizes, runo ulations o Drainage areas delineated (included in the main set of plans, not as a separ p Vegetated buffers (where required) Form SWU-101 Version 06Aug2012 Page 4 of 6 9 Copy of any applicable soils report with the associated SHWT elevations (Please identify _ elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs Include an 8 5"x11" copy of the NRCS County Soils map with the project area clearly delineated For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate (Infiltration Devices submitted to WiRO Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378 ) 10 A copy of the most current property deed Deed book 2887 Page No 0318 _ 11 For corporations and limited liability corporations (LLC) Provide documentation from the NC _ Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H 1003(e) The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned http / /www secretary state nc us/Corporations/CSearch aspx VII DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form The appropriate deed restrictions and protective covenants forms can be downloaded from http / /portal ncdenr org/web/wq/ws/su/statesw/forms docs Download the latest versions for each submittal In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot VIII CONSULTANT INFORMATION AND AUTHORIZATION Applicant Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information) Consulting Engineer Mat Trowbridge Consulting Firm The Curry Engineering Group, PLLC Mailing Address 205 S Fuquay Ave City Fuquay-Varma State NC Zip 27526 Phone (919 ) 552-0849 Email mat®curryeneineennggroup com Fax (919 ) 552-2043 IX PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) N/A , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed tit Contact Information, item la) N/A with (print or type name of organization listed tit Contact Information, item la) N/A to develop the project as currently proposed A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system ZECET F1 -1:. i MAR 18 2013 I BY Form SWU-101 Version 06Aug2012 Page 5 of IX PROPERTY OWNER AUTHORIZATION (f Contact Information rtern 2 hati bccn filled out complete this xctmn) . 1, (print or type name of person hated in Contact Information item 2a) N/A , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information rtern la) N/A with (print or type name of organization hated in Contact Information item 1a) N/A to develop the project as currently proposed A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the partv responsible for the operation and maintenance of the stormwater system 40 • As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days, otherwise I will be operating a stormwater treatment facility without a valid permit I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215 1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day pursuant to NCGS 143-215 6 Signature a Notary Public for the State of do hereby certify that before me this _ day of Date County of personally appeared and acknowledge the due execution of the application for a stormwater permit Witness my hand and official seal SEAL My commission Form SWU-101 Vernon 06Aug2012 Page 6 of 7 JAN p y 2013 BY X APPLICANT'S CERTIFICATION 1, (print or typt mmit ofperion lr�trd in Contact Infonuahon item la) Smnuel Marsh . certify that the information included on this permit application form is to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H 1000 and any other applicable state stormwater requirements • Signature before me this _, do he y certify that , XAT day of 6n11n U13 Public for the a stormwater permit Witness my hand and official seal, Date I I I I I %_? of CQl) nw County of NANCY T MILES SEAL NOTARY PUBLIC NASH COUNTY NC My commission expires / V personally appeared -n of the application for rC �vvz' JAN 2 4 2013 BY -- Form SWU-101 VLrsion 06Aug2012 Page 7 of The Curry Engineering Group, PLLC LETTER OF TRANSMITTAL To Mr Kelly Johnson NCDENR DWQ - Wilmington Office 127 Cardinal Drive Ext Wilmington, NC 28405 Phone 910 796 7331 1 Overnight Neo yes x We are sending you the following ❑ EC Plans ❑ Prints/Plans ❑ Contracts X Permit Applications These are transmitted as checked below X For Approval ❑ As Discussed ❑ For Review and Comment Job No 2011-048 Job Name Autumn Care Brunswick Brunswick County, NC Date March 26, 2013 Sent By Mat Trowbridge, El ❑ Construction Plat ❑ Site Plan Drawings ❑ Computer Disk ❑ Site Work Calculations ❑ ❑ For Your File ❑ As Requested ❑ For Your Signature then return to ❑ For Your Use Copies Date Description 1 March 2Q13 Signed Stormwater Wetland O&M Agreement Remarks Enclosed is the Stormwater Wetland O&M Agreement signed by Sam Marsh of Autumn Corporation Please let me know if you need anything else or have any questions Thanks, Mat Copies To The Curry Engineering Croup, PLI C PO Box 2018 205 S Fuquay Av( P uquay Vanna, N( 27526 ma(neurr) eriemeennggroup com APR 0 5 2013 Don Curry, PE 919 552 0849 (0) 919 552 2043 (F) 919 880 9857 (C) www curryrnsmeermggroup corn Johnson, Kelly From Johnson, Kelly Sent Thursday, April 04, 2013 9 17 AM To 'Mat Trowbridge' Subject FW SW8 130113 Autumn Care - Brunswick County Mat, I haven't received the original signed O&M? KJ From Johnson, Kelly Sent Tuesday, March 19, 2013 10 10 AM To 'Mat Trowbridge' Subject RE SW8 130113, Autumn Care - Brunswick County No problem It happens Thanks, KJ From Mat Trowbridge [mailto matCa)curryengmeeringgroup coml Sent Tuesday, March 19, 2013 10 06 AM To Johnson, Kelly Subject RE SW8 130113, Autumn Care - Brunswick County Kelly, I apologize) That is strange We certainly intended to send revised calcs and supplement and the copy we have on file shows revised calcs so really confused how that happened Attached are electronic copies I will send you hard copy of the new O&M form as well Please let me know if there is anything else that you need and again I apologize for the inconvenience Thanks, Mat Trowbridge, El, LEED AP The Curry Engineering Group, PLLC 919 552 0849 (0) 919 552 2043 (F) 919 909 3879 (C) From Johnson, Kelly [mailto kelly p ohnson( ncdenr govl Sent Tuesday, March 19, 2013 9 43 AM To Mat Trowbridge Subject FW SW8 130113, Autumn Care - Brunswick County Mat, The supplement and calcs I received on 3/18/13 have not been revised since the last submittal Did you intend to send revised data? If so, can you email those to me? Thanks, KJ From Johnson, Kelly Sent Friday, March 15, 2013 2 23 PM To 'Mat Trowbridge' Subject RE SW8 130113, Autumn Care - Brunswick County Mat, I got your voicemail We will need two copies of the plans Thanks, KJ From Mat Trowbridge [mailto mattaDcurryengineeringgroup com] Sent Wednesday, March 13, 2013 2 35 PM To Johnson, Kelly Subject RE SW8 130113, Autumn Care - Brunswick County Hey Kelly, thanks for checking in We are waiting on signed O&M form back from owner, which we should have any day now and then we will get revised plans and calcs back to you along with a response letter Mat Trowbridge, EI, LEED AP The Curry Engineering Group, PLLC 919 552 0849 (0) 919 552 2043 (F) 919 909 3879 (C) From Johnson, Kelly [mailto kelly piohnson(&ncdenr govl Sent Wednesday, March 13, 2013 2 32 PM To mat(alcurrvenomeeringgroup com Subject SW8 130113, Autumn Care - Brunswick County Mat, I am just checking in on this project I haven't heard back from you all? Kelly K.C[LIWDVIVI,SDVk, Kelly Johnson Environmental Engineer Division of Water Quality Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Office 910 796 7331 Fax 910 350 2004 Autumn Care, Brunswick Brunswick, NC Site Location Narrative and Stormwater Permitting Questionnaire Response Proiect Narrative This project lies at the intersection of Ash Little River Road and No 5 School Road in the Town of Shallote, Brunswick County, NC The 12 65 acre site is currently undeveloped and covered mostly with pine trees with the exception of the southwest corner of the property The site as it exists is very flat, but eventually drains to a ditch along Ash Little River Road The proposed development consists of a 62,630sf nursing home centrally located on the parcel with a possible future 20,000+- sf expansion The proposed runoff will be collected in an enclosed drainage system consisting of several catch basins that convey drainage to the southern portion of the property into a proposed stormwater wetland where the first 1" is captured and treated as required by DWQ Phase II stormwater regulations 1. General Information a Name of Project Autumn Care — Brunswick Co, NC Curry Engineering Project 92011-048 b Street Address, City, County This site is located at 9646 No 5 School Road, Shallote, Brunswick County, NC c Acres in Tract 1265 d Acres Being Disturbed 1225 RECEIVED MAR 18 2013 BY__—_— — — e Acres in Wetlands 1 Wetlands Must Be Delineated & Sign -Off Obtained From The Corps r 2 Proposed Wetland Impacts Require Permits From Corps & DWQ Wetlands are not present on site f Ownership Information From NC Secretary of State Web Site The site is owned by Autumn Corporation as listed below Current Owner Autumn Corporation 451 N Winstead Ave Rocky Mount, NC 27804 g Description of Development Proposal 1 Previous or Existing Permits None 2 Tax parcel ID Number #2090000103 h Pre-1988 Built Upon Area, If Applicable N/A i Discuss Phasing of the Project & Stormwater Facilities When Applicable The proposed stormwater facilities will be constructed in a single phase I Discuss Proposed Waste Water Treatment & Water Supply Proposed sanitary and water connections will be made via existing infrastructure from Brunswick County k Identity Historic Sites & Projects Being Funded With Public Monies There are no historic sites on this property Public money is not being used for this development 1 Disclose Any/All Non -Compliance Issues with DENR Agencies Not applicable for this site 2. Stormwater Information a Provide River Basin, Stream Classification & Index Number for All water Bodies On or Adjacent To The Project or Closest to The Project Area The site drams to a drainage ditch that ultimately drains to Earnest Branch with a surface water classification of C, Sw and index number 15-23-5 b Identify Whether the Stormwater Design is High Density or Low Density, Commercial or Residential, State Stormwater or NPDES Phase II, Address Vested Rights When Applicable, Identify Pockets of High Density The site is designated High Density Commercial NPDES Phase 11 and Vested Rights are not applicable for this location c Proposed Total % Impervious Surface 4 64 ac or 37% impervious across entire site, 56% impervious to SWM d Number of Proposed Treatment Measures, Type(s) of Collection System There is a single proposed stormwater wetland treatment measure for the entire property The site drainage will be collected in an enclosed drainage system and drained into the wetland e Will All Built Upon Area Be Collected Yes f Identify Whether or Not the Project Has Buffer Requirements & Whether or Not Development Is Proposed Within A Buffer There are no buffer requirements and the proposed development is not within a buffer g Discuss Coastal Management Areas of Environmental Concern When Applicable There are no AEC's on this project h Disclose Whether or Not Off -Site Runoff Is Coming Onto The Site or Into The Proposed BMP There is no off -site runoff coming onto the site or into the proposed BMP i Discuss Whether Road Construction Across Other property Is Necessary To Access This Project Road construction across other property is not required to access this project I If An On -Site Evaluation Of The Soils Has Been Done, Discuss Infiltration Rates, Seasonal High Water Table, etc , and Include Date Of Site Evaluation (This Is Required For Infiltration Projectsl An on -site soils evaluation has been completed by ECS Carolinas, LLP This evaluation is included in the permit documentation Johnson, Kelly From Johnson, Kelly Sent Tuesday, March 19, 2013 9 59 AM To 'Mat Trowbridge' Subject FW SW8 130113, Autumn Care - Brunswick County Also, do you still have the original O&M form? I received a copy, but we will need the original signature Thanks,t �QCi ihQ c1Y� 3�9 �l3 LJ�� �oi m5 e fL K1 From Johnson, Kelly Sent Tuesday, March 19, 2013 9 43 AM To 'Mat Trowbridge' Subject FW SW8 130113, Autumn Care - Brunswick County Mat, The supplement and calcs I received on 3/18/13 have not been revised since the last submittal Did you intend to send revised data? If so, can you email those to me? Thanks, KJ From Johnson, Kelly Sent Friday, March 15, 2013 2 23 PM To 'Mat Trowbridge' Subject RE SW8 130113, Autumn Care - Brunswick County Mat, I got your voicemad We will need two copies of the plans Thanks, KJ From Mat Trowbridge rmailto mat@curryengmeennggrouo com] Sent Wednesday, March 13, 2013 2 35 PM To Johnson, Kelly Subject RE SW8 130113, Autumn Care - Brunswick County Hey Kelly, thanks for checking in We are waiting on signed O&M form back from owner, which we should have any day now and then we will get revised plans and talcs back to you along with a response letter Mat Trowbridge, El, LEED AP The Curry Engineering Group, PLLC 919 552 0849 (0) 919 552 2043 (F) 919 909 3879 (C) From Johnson, Kelly [mailto kelly p Johnson@ncdenr gov] Sent Wednesday, March 13, 2013 2 32 PM To mat@curryengmeennggrouo com Subject SW8 130113, Autumn Care - Brunswick County Mat, I am just checking in on this project I haven't heard back from you all? Kelly K,eUJohltisow Kelly Johnson Environmental Engineer Division of Water Quality stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Office 910 796 7331 Fax 910 350 2004 The Curry Engineenng Group, PLLC LETTER OF TRANSMITTAL To Ms Kelly Johnson NCDENR DWQ - Wilmington Office 127 Cardinal Drive Ext Wilmington, NC 28406 Phone 910 796 7331 Overnight No Yes X We are sending you the following ❑ EC Plans X Pnnts/Plans ❑ Contracts ❑ Permit Applications These are transmitted as checked below X For Approval ❑ As Discussed ❑ For Review and Comment Job No 2011-048 Job Name Autumn Care Brunswick Brunswick County, NC Date March 15, 2013 Sent By Mat Trowbridge, El ❑ Construction Plat ❑ Site Plan Drawings ❑ Computer Disk ❑ Site Work Calculations ❑ ❑ For Your File ❑ As Requested ❑ For Your Signature, then return to ❑ For Your Use Copies Date Description 1 March 2013 Revised Calculations Dated 03/15113 2 March 2013 Revised Planset Dated 03/1412013 Copies To The Curry Engineenng Group, PLLC r W Don Curry, PE PO Box 2018 BY 919 552 0849 (0) 205 S Fuquay Ave 919 552 2043 (F) Fuquay Varna, NC 27526 919 880 9857 (C) matncurryenemeermggroult corn www curryengmeermggroup com Prepared for AUTUMN CORPORATION Mr Bob Dew 451 N Winstead Ave Rocky Mount, NC 27804 Stormwater Management Permit Submittal Package Autumn Care - Brunswick Co., NC 9646 No. 5 School Road Shallotte, Brunswick County, NC REVISED 3/15/13 The Cum- Engmeeru Group. PLLC --- Prepared by Mat Trowbridge, El The Curry Engineering Group, PLLC PO Box 2018 205 S Fuquay Ave Fuquay-Vanna, NC 27526 (919)552-0849 L �VF Autumn Care, Brunswick Brunswick, NC Site Location Narrative and Stormwater Permitting Questionnaire Response Project Narrative This project lies at the intersection of Ash Little River Road and No 5 School Road in the Town of Shallote, Brunswick County, NC The 12 65 acre site is currently undeveloped and covered mostly with pine trees with the exception of the southwest corner of the property The site as it exists is very flat, but eventually drains to a ditch along Ash Little River Road The proposed development consists of a 62,630sf nursing home centrally located on the parcel with a possible future 20,000+- sf expansion The proposed runoff will be collected in an enclosed drainage system consisting of several catch basins that convey drainage to the southern portion of the property into a proposed stormwater wetland where the first I" is captured and treated as required by DWQ Phase II stormwater regulations 1. General Information a Name of Project Autumn Care — Brunswick Co, NC Curry Engineering Project #2011-048 b. Street Address, City, County This site :s located at 9646 No 5 School Road, Shallote, Brunswick County, NC c Acres in Tract 1265 d Acres Being Disturbed e Acres in Wetlands iMAR 18 2013 BY_ ----- 1 Wetlands Must Be Delineated & Sign -Off Obtained From The Corps 2 Proposed Wetland Impacts Require Permits From Corps & DWQ Wetlands are not present on site f Ownership Information From NC Secretary of State Web Site The site is owned by Autumn Corporation as listed below Current Owner Autumn Corporation 451 N Winstead Ave Rocky Mount, NC 27804 g Description of Development Proposal 1 Previous or Existing Permits None 2 Tax parcel ID Number #2090000103 h Pre-1988 Built Upon Area, If Applicable N/A ► Discuss Phasing of the Project & Stormwater Facilities When Applicable The proposed stormwater facil►ties will be constructed in a single phase j Discuss Proposed Waste Water Treatment & Water Supply Proposed sanitary and water connections will be made via existing infrastructure from Brunswick County k. Identify Historic Sites & Projects Being Funded With Public Monies There are no historic sites on this property Public money is not being used for this development 1 Disclose Any/All Non -Compliance Issues with DENR Agencies Not applicable for this site 2. Stormwater Information a Provide River Basin, Stream Classification & Index Number for All water Bodies On or Adjacent To The Project or Closest to The Project Area site drains to a drainage ditch that ultimately drains to b Identify Whether the Stormwater Design is High Density or Low Density, Commercial or Residential, State Stormwater or NPDES Phase II, Address Vested Rights When Appheable, Identify Pockets of High Density The site is designated High Density Commercial NPDES Phase 11 and Vested Rights are not applicable for this location c Proposed Total % Impervious Surface 4 64 ac or 37% impervious across entire site, 56% impervious to SWM d Number of Proposed Treatment Measures, Type(s) of Collection System There is a single proposed stormwater wetland treatment measure for the entire property The site drainage will be collected in an enclosed drainage system and drained into the wetland e Will All Built Upon Area Be Collected Yes f Identify Whether or Not the Project Has Buffer Requirements & Whether or Not Development Is Proposed Within A Buffer There are no buffer requirements and the proposed development is not within a buffer Discuss Coastal Management Areas of Environmental Concern When Applicable There are no AEC's on this project h Disclose Whether or Not Off -Site Runoff Is Coming Onto The Site or Into The Proposed BMP There is no off -site runoff coming onto the site or into the proposed BMP Discuss Whether Road Construction Across Other property Is Necessary To Access This Project Road construction across other property is not required to access this project I If An On -Site Evaluation Of The Sods Has Been Done, Discuss Infiltration Rates, Seasonal High Water Table, etc, and Include Date Of Site Evaluation (This Is Required For Infiltration Protects). An on -site sods evaluation has been completed by ECS Carolinas, LLP This evaluation is included in the permit documentation BRUNSWICK COUNTY STORM WATER PERMIT CERTIFICATION FORM (Form SW-001) Name of Owner (Applicant) Autumn Corporation Name of Contact Person Bob Dew Phone Number 252-443-6265 Email Address bobdew(@autumncoro com Name of Development Autumn Care - Brunswick Co , NC Parcel ID 209000103 Location of Development 9646 No 5 School Rd , Shallote NC 27804 Who will legally be responsible for or own the development after construction? Name Autumn Address 451 N Winstead Ave , Rocky Mount, NC 27804 Phone Number 252-443-6265 Email Address bobdew(Qautumncorp com Total area disturbed by development does not exceed 1225 acres 2 Is the development Commercial? n Yes -File this form along with General Storm Water Permit Application Form (SW-003) ❑ No - Continue to Question 3 3 Is the disturbed area of development equal to or greater than 1 acre (43560 square feet)p 7 Yes -File this form along with Storm Water Permit Application Form (SW-002 or SW-003) ❑ No - Continue to Question 4 4 Will the site be graded, filled, or excavated and thereby change the elevation of any location by an amount exceeding four (4) inches9 Yes -File this form along with Storm Water Permit Application Form (SW 002 or SW-003) ❑ No Continue to Question 5 5 Is the development or any related disturbance within the limits of a Riparian Buffer (within 30 feet of the banks of a natural stream or water body) ❑ Yes -File this form along with General Storm Water Permit Application Form (SW-003) P1 No - If you answered NO to questions 2 through 5 then this development does not require a Brunswick County Storm Water Permit Certification I, Mat Trowbridge, El (print name) hereby certify the information included on this and attached pages is true and correct to the best of my knowledge Signature Date 1/21/2013 Official Use Only Storm Water Permit No Date Approved Storm Water Permit Certrfi ebon Form SW 001 TNSWICK COUNTY GENERAL STORM WATER PERMIT e+eWto� APPLICATION FORM (Form SW-003, must be accompanied by completed Form SW-001) y "tc c u Name of Developer Autumn Corp( Name of Contact Person Bob Dew Phone Number 252-443-6265 Name of Development Autumn Care - Brunswick Co, NC 11 1 0 the development solely residential? Yes - You may use the Residential Application Form (Form SW-002) n❑ No This is the correct form Go to the n( ff question `What kind of development is this? ❑ ❑ Commercial El Multi -family residential ❑ Industrial ❑ Mobile home development Single lot with one single family ❑ residential structure Single family residential subdivision with multiple lots Assisted living/congregate care facility Multi Use (Residential and Commercial) Other 3 Calculate pre- and post -development Storm Water runoff from the development for the 1-year, 24-hour storm with one of the approved methods specified in the Brunswick County Storm Water Management Manual M Pre -development peak runoff 11 02 cfs (1-year, 24 hour storm) ❑ Post -development peak runoff 675 cfs (1-year, 24-hour storm) 4 Does the post development peak flow exceed the pre -development peak flow?(1-year, 24-hour storm) Yes Implementation of an approved flow control Best Management Practice (BMP) may be required to reduce peak flow to pre -development beak before continuing to next question ❑ No - A flow control BMP is not required for this development Continue to next question hoes the development meet one or both of the following criteria 1) the post -development peak runoff is less than 5 percent greater than the pre -development peak runoff (for the 1 year, 24-hour storm) or 2) the overall impervious surface is less than fifteen percent and the remaining pervious portions of the site are utilized to the maximum extent practical to convey and control the Storm Water runoff? Yes - A flow control BMP is not required for this development but the Brunswick County Storm Water Administrator must approve a variance Continue to next question No - Implementation of an approved flow control Best Management Practice (BMP) is required to reduce peak flow to no more than 105% of the pre -development peak before continuing to next question ❑' alculate pre and post -development Storm Water runoff from the development for the 10-year, 24 hour storm with one of the approved methods specified in the Brunswick County Storm Water Management Manual Pre -development peak runoff 3762 cfs (10-year, 24-hour storm) Post -development peak runoff 3524 cfs (10-year, 24-hour storm) Does the post -development peak flow exceed 105% of the pre -development peak flow? (10_%1E 40- UclgVe Yes - Implementation of an approved flow control Best Management Practice (BMP) maybe rpmef a 20ce ❑ the peak flow Continue to the next question MAR jJ �jJ 0 No - A flow control BMP is not required for this development Continue to question 9 Non Residential Storm Water Permit Application Form SW 003 Where the requirement that the 10-year, 24-hour storm post -development peak flow not exceeding the pre -development peak flow places an undue hardship upon a property owner, variances from the requirement may be granted by the Storm Water Administrator if the development meets the following requirement The proposed new development appropriately uses the parcels total remaining total impervious area to the extent practical to convey and control the Storm Water runoff, and it is demonstrated, to the satisfaction of the Storm Water Administrator, that no damage to public or private properties, including to the County s Storm Water facilities and to the quality of the public waters, will be caused by granting of the variance Is this requirement met for the proposed development Yes - A flow control BMP is not required for this development but the Brunswick County Storm Water Administrator must approve a variance Continue to next question No - Implementation of an approved Row control Best Management Practice (BMP) is required to reduce peak flow to no more than 105% of the pre -development peak before continuing to next question 9 Submit the completed Total Pollutant Export Calculation Forms (SW-004 and SW-005) with this application FEES The Developer must pay the Standard Storm Water fee plus any additional fees for Technical Review of Structural BMP designs and any offset fees to the County A fee schedule is available from the Office of the Brunswick County s Storm Water Program Administrator 1 Standard fee 5 acres built upon area or part there of = $2 500 00 2 Structural BMP Technical Review fee $1 00 structural BMPs X $200 00 per BMP = $200 00 Total Fee $2,700 00 Issuance of a Brunswick County Stormwater Permit is contingent on the approval of the State of North Carolinas Erosion Control Permit and the State Stormwater Permit Please submit both forms with this application ECEBVE MAR 112111 BY Non Residential Storm Water Permit Application Form SW 003 NCDBNR - BMP Manual Stormwater Calculations Nov 2012 Project Name Autumn Care Brunswick County The Carry Engineering Group PLLC Proposed Site Area Existing Site Area Buildings 62,630 sf Buildings 1,250 sf Buildings (Future) 21200 sf Parking/Roadway sf Parking/Roadway 96,961 Parking (Future) Sidewalks 21,301 sf Sidewalks sf Total Impervious Area 202 092 sf Food Impervious Area 1 250 sf 464 ac 003 ac Pervious Area (Landscaping Areas) to BMP 159,803 sf Total Pervious Area 549,786 sf 367 ac 1262 ac Total Drainage Area to BMP 361,895 sf Total Drainage Area 551,036 sf 831 ac 1265 ac Pervious Area Bypassing BMP 189 141 sf 434 ac % Impervious 1 a 56% % Impervious, 1 a 0 23 Calculate Pre-Dev Curve Number (CN) Impervious (Buildmg)=CN= 98 Acreage= 1250 sf 0 03 ac Open Space (Fair Condition) =CN= 79 Acreage = 22450 sf 052 ac Woods (Litter & Brush) = CN = 70 Acreage= 527336 sf 1211 ac Composite CN= 704 CN= 70 Calculate Post Dev Curve Number (CN) Paved/Bldg/Sidewalk Impervious =CN= 98 Acreage = 202092 sf 464 ac Woods (Litter & Brush) = CN = 70 Acreage = sf ac Good Condition Grass =CN= 74 Acreage= 159803 sf 3 67 ac Composite CN = 874 CN= 87 MAR 19 N13 Brunswick BMP Design Calculate Runoff Volume Simple Method R(V)=005+09'I(a) 1(a)= 56% Impervious % RM O55 V=3630•R(D)'R(V)'A R(D) = Design Rainfall Depth (1 or 15 ) R(V)= Runoff Coefficient A = Drainage Area (ac) V = Runoff Vol (cf) R(D) = 15 R(V) = 055 A= 361,895 sf=DAx%ofl Area 8 31 ac V= 24998 cf min volume Calculate Pre Dev Time of Concentration (Te Rirpich) Tc=(LA3/1l)A 385/128 Tc = Tim, of Concentration (min) L = Flow I ength (ft) H= Height difference to remote pan of watershed (ft) L= 1100 ft H= 23 ft Te = 18 5 minutes Calculate Wetland Size SA(reg)=Q(vol)/D(plants) SA = Required Surface Area (sf) Q(vol) = Required Runoff Vol to Treat (cf) D(plams) = Depth of Plants (ft) Q(vol)= 24998 cf D lants = 1 ft SA(req)= 24998 sf Drawdown Calculation Q=Cd'A'sq rt(2'g'(Ho/3)) Cd= 060 dimensionless coeff Orifice Size= tin A= 00218 sf g = 322 Ns^2 Ho= 1 ft Q = 00606 cfs Time = Volume/Flow V= 24998 sf Flow Q= 00606 cfs Time= 412178 seconds rime= 477 days RECEIVES MAR 18 Z013 BY: Brunswick BMP Design NCDI NR-B;11P Manual Storm"ater Calculations Nov 2012 Project Name Autumn Care Brunswick Canute 1 he Curry Engineering Group PLLC Proposed Site Area Buildings 62 630 sf Buildm),s (Future) 21 200 sf ParkmglRoad"a) 96961 Slde\sulks 21,301 sf Tot it lmpers mus Area 202092 sf 464 ac Pen mus%rea(I andscapmg Area"" 8;11P 159803 of 367 ac I otal Dranage Area to BNIP 361 895 sf 831 ac Pen sous Area Bvpassmg BNIP 9 141 sl 434 ac % Impervious ](a) 56 % Fustrng Site Area Buildings 1250 sf Parknrg/Roadwaj sf Parking (Future) SldewiIks sf Total Impervious Area 1,250 sf 003 ac Total Pervious Area 949786 sf 12 62 ac I otal Drainage Area 551036 sf 1265 ac Impervious Ili) U 23 Calculate Pre Des Cone Number (CN) Impervious (Buildmg)=CN= 98 \ Acreage = 1 2bO sf 003 ac Open Space (Fair Condition) =CN= 79 Acreage = 22450 st 052 ac Woods (I nter&Brush) =CN= 70 Acreage = 527 336 sf 1211 ac Composite CN = 70 4 CN = 70 dg/Sidesaalk lmpenious=CN= 98 Acn.age = 202 092 sf 464 ac Woods (I Ater&Brush) =CN= 70 Acreage = sf ac Good Condition Grass = CN = 74 Acreage= 159803 sf 3 67 ac Composite CN = 87 4 CN = 87 MAR 18 2013 6� Brunswick BMP Design Calculate Runoff Volume Simple Method R(V)=005+09*1(a) I(a) = 56% Impery ions % R(V)= 055 V=3630*R(D)*R(V)*A R(D)= Design Rainfill Depth (1 or 1 5 ) R(V)= Runoff Coeflaient A = Drainage Area (ac) V = Runoff Vol (it) R(D)= 19 R(V) = 0 55 A = 361 895 sf = DA x %of I Area 8 31 ac V= 24998 lcf min volume I c= I line of Concentration (min) L = Flow Length (0) H = Height difference to remote pan of watershed (ft) L= 1100 n H= 23it Tc = 18 5 minutes �) SA = Required Surface Area (sf) Q(vol) = Rt,quired Runoff Vol to Treat (cf) D(plams) = Depth of Plants (0) 24998 cf I ft 1e onu .r Cd= 060 dimensionless coeR Orifice Size = 2 in A= 00218 sf g= 3221Vs^2 He = I ft O= 011fi(Ifi rfc I ime = Volume/Flow V = 4 998 sf Flow Q= 0606 cfs Time 4 2178 seconds T— I !YI dace RECE�VFL MAR 18 2013 BY Brunswick BMP Design Hydraflow Table of Contents Hydraflow Hydrographs by Intehsolve v9 22 Watershed Model Schematic Hydrograph Return Period Recap 1 -Year Summary Report Hydrograph Reports Hydrograph No 1, SCS Runoff, Pre -Development Hydrograph No 2, SCS Runoff, Post -Development Hydrograph No 3, Reservoir, Wetland Outlet Pond Report - <New Pond> Hydrograph No 4, SCS Runoff, Bypass Hydrograph No 5, Combine, Total Post -Development 10 -Year Summary Report Hydrograph Reports Hydrograph No 1, SCS Runoff, Pre -Development Hydrograph No 2, SCS Runoff, Post -Development Hydrograph No 3, Reservoir, Wetland Outlet Hydrograph No 4, SCS Runoff, Bypass Hydrograph No 5, Combine, Total Post -Development OF Report Autumn Brunswick rev 02 27 13 gpw Wednesday Feb 27 2013 1 2 3 4 4 5 6 7 9 10 11 12 12 13 14 15 16 17 I Watershed Model Schematic 1 Pre Development c C.—' 3 Wetland Outlet Legend Hvd Origin Description i SCS Runoff Pre Development 2 SCS Runoff Post Development 3 Reservoir Wetland Outlet 4 SCS Runoff Bypass 5 Combine Total Post Development 2 Post Development HydraFlow Hydrographs by Inteltsolve v9 22 4 - Bypass 'F' 4?5 Total Post Development Project Autumn Brunswick rev 02 27 13 gpw Wednesday Feb 27, 2013 M z Hydrograph Return Period Recap Hydraflow Hyd rographs by Intelisolve v9 22 Hyd Hydrograph Inflow Peak Outflow (cfs) Hydrograph No type Hyd(s) description (origin) 1 Yr 2-Yr 3 Yr 5 Yr 10 Yr 25 Yr 50 Yr 100 Yr 1 SCS Runoff - 11 02 - - - 3762 - - - - Pre Development 2 SCS Runoff — 19 12 - - 4302 — -- — - Post Development 3 Reservoir 2 4 928 - - - - 2748 - - - - - Wetland Outlet 4 SCS Runoff 6 634 - - - - 1996 - - - - - - Bypass 5 Combine 3 4 6 753 — - - - 3524 - - - - Total Post Development Pro) file Autumn Brunswick rev 02 27 13 gpw Twednesday, Feb 27, 2013 M Hydrograph Summary Report HydraFlow Hyd rographs by Intelisolve v9 22 Hyd No Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 11 02 2 734 52 101 - - - - Pre Development 2 SCS Runoff 1912 2 728 73 508 - - - Post Development 3 Reservoir 4 928 2 754 71 290 2 3001 36 284 Wetland Outlet 4 SCS Runoff 6 634 2 724 20 379 - — - - -- Bypass 5 Combine 6 753 2 724 91 669 3 4 - - Total Post Development Autumn Brunswick rev 02 27 13 gpw Return Period 1 Year Wednesday Feb 27 2013 4 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 22 Wednesday Feb 27 2013 Hyd No 1 Pre -Development Hydrograph type = SCS Runoff Peak discharge = 11 02 cfs Storm frequency = 1 yrs Time to peak = 734 min Time interval = 2 min Hyd volume = 52,101 cuft Drainage area = 12 660 ac Curve number = 70+ Basin Slope = 01 % Hydraulic length = 1000 ft Tc method = USER Time of conc (Tc) = 18 50 min Total precip = 3 70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = 1(0 030 x 98) + (0 520 x 79) + (12 110 x 70)] 112 660 Q (Cfs) 1200 1000 OM • M 200 Pre -Development Hyd No 1 -- 1 Year 000 0 120 240 360 480 600 720 840 Hyd No 1 Q (Cfs) 1200 1000 KI 200 I I I i i�6 ' 000 960 1080 1200 1320 1440 1560 Time (min) 5 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 22 Wednesday Feb 27 2013 Hyd No 2 Post -Development Hydrograph type = SCS Runoff Peak discharge = 19 12 cfs Storm frequency = 1 yrs Time to peak = 728 min Time interval = 2 min Hyd volume = 73,508 cuft Drainage area = 8 310 ac Curve number = 87' Basin Slope = 0 0 % Hydraulic length = 0 ft Tc method = USER Time of conc (Tc) = 10 35 min Total precip = 3 70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(4 640 x 98) + (3 670 x 74)1 / 8 310 Post -Development Q (cfs) Hyd No 2 -- 1 Year Q (cfs) 21 00 1800 1500 1200 900 600 300 000 21 00 1800 1500 1200 900 600 300 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No 2 0 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 22 Wednesday Feb 27 2013 Hyd No 3 Wetland Outlet Hydrograph type = Reservoir Peak discharge = 4 928 cfs Storm frequency = 1 yrs Time to peak = 754 min Time interval = 2 min Hyd volume = 71,290 cuft Inflow hyd No = 2 - Post -Development Max Elevation = 30 01 ft Reservoir name = <New Pond> Max Storage = 36,284 cuft Storage Indication method used Wetland Outlet 0 (cfs) Hyd No 3 -- 1 Year Q (cfs) 21 00 21 00 18 00 1800 1500 1500 1200 1200 900 900 600 600 300 300 0 00 000 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) — Hyd No 3 — Hyd No 2 A _L AI Total storage used = 36,284 cult Pond Report Hydraflow Hydrographs by Intellsolve v9 22 Wednesday Feb 27 2013 Pond No 1 - <New Pori Pond Data Contours User defined contour areas Average end area method used for volume calculation Beglning Elevation = 28 50 it Stage I Storage Table Stage (ft) Elevation (ft) Contour area (scift) Incr Storage (cult) Total storage (cuft) 000 2850 15 840 0 0 050 2900 24 666 10 127 10 127 1 00 2950 25 628 12 574 22 700 1 50 3000 27 374 13 251 35 951 250 31 00 29 716 28 545 64 496 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (m) = 200 Inactive Inactive Inactive Crest Len (ft) = 500 900 Inactive Inactive Span (in) = 200 000 000 000 Crest El (ft) = 2950 3050 000 000 No Barrels = 1 1 1 0 Weir Coeff = 260 260 260 333 Invert El (ft) = 2850 000 000 000 Weir Type = Broad Broad - - Length (it) = 3500 010 0 10 000 Multi Stage = No No No No Slope I%) = 050 010 0 10 n/a N Value = 013 013 013 n/a Orifice Coeff = 060 060 060 060 Exit (mlhr) = 0 000 (by Contour) Multi Stage = n/a Yes Yes No TW Elev (ft) = 000 Note Culvemonhoe outflows are analyzed under inlet (¢) and outlet (oc) control Wert risers checked for onfics conditions (a) and submergence (s) Stage I Storage I Discharge Table Stage Storage Elevation Ch., A Clv B Clv C PrfRsr Wr A Wire Wr C Wr D Exfil User Total ft cuft It cfs cfs cfs cfs cfs cfs cis cfs cfs cfs cfs 000 0 2850 000 — 000 000 000 - 0 000 005 1 013 2855 001 oc — - 000 000 000 - 0 005 0 10 2025 2860 0 02 oc - 000 000 000 0 020 0 15 3 038 2865 0 04 oc 000 000 000 - 0 038 020 4 051 2870 0 05 oc - - 000 000 000 - 0 054 025 5 063 2875 0 06 oc - - — 000 000 000 - 0 057 030 6 076 2880 0 06 oc - 000 000 000 0 065 035 7 089 2885 0 07 oc — 000 000 000 - 0 071 040 8 101 2890 0 08 oc - 000 000 000 - 0 078 045 9 114 2895 0 08 oc 000 000 000 - 0 083 050 10 127 2900 0 09 oc - - 000 000 000 - - 0 089 055 11 384 2905 0 09 oc - - - 000 000 000 - - - 0 094 060 12 641 29 10 0 10 oc - - 000 000 000 - 0 099 065 13 899 29 15 0 10 oc - - 000 000 000 - 0 103 070 15 156 2920 0 11 oc - 000 000 000 - - - 0 108 075 16 413 2925 0 11 oc - — 000 000 000 - - - 0 112 080 17 671 2930 0 12 oc - — 000 000 000 - - - 0 116 085 18 928 2935 0 12 oc - - 000 000 000 - 0 120 090 20 185 2940 0 12 oc 000 000 000 - - 0 124 095 21 443 2945 0 13 oc - - - 000 000 000 - - - 0 127 1 00 22 700 2950 0 13 oc — - — 000 000 000 - 0 131 1 05 24 025 2955 0 13 oc - - 0 15 000 000 0 280 1 10 25 350 2960 0 14 oc — 041 000 000 - 0 549 1 15 26 675 2965 0 14 oc - 076 000 000 0 897 1 20 28 000 2970 0 14 oc — 1 16 000 000 - - 1 307 1 25 29 325 2975 0 15 oc — 1 63 000 000 — 1 773 1 30 30 650 2980 0 15 oc 2 14 000 000 - - 2 287 1 35 31 975 2985 0 15 oc 269 000 000 - 2 846 1 40 33 300 2990 0 16 oc - 329 000 000 - - - 3 446 1 45 34 625 2995 0 16 oc - 392 000 000 — — - 4 084 1 50 35 951 3000 0 16 oc - - 460 000 000 - 4 759 1 60 38 805 3010 0 17 oc - - 604 000 000 6 210 1 70 41 660 3020 0 17 oc - - 761 000 000 - 7 787 1 80 44 514 3030 0 18 oc - - 930 000 000 - - 9 481 1 90 47 369 3040 0 18 oc - — 11 10 000 000 — - 11 28 200 50 223 3050 0 19 oc — 1300 000 000 - - 13 19 Continues on next page 0 <New Pond> Stage I Storage I Discharge Table Stage Storage Elevation Clv A ft cuft ft cis 2 10 53 078 3060 0 19 oc 220 55 932 3070 0 20 oc 230 58 787 3080 0 20 oc 240 61 641 3090 0 21 oc 250 64 496 31 00 0 21 oc End Clv B Clv C PrfRsr WrA Wr B Wr C Wr D Exfll User Total cis cfs cis cis cis cfs cfs cis cfs cis - 1500 074 000 - - 1593 - - 1709 209 000 - - 1938 - 1927 384 000 — - - 2332 - - 21 53 592 000 - — 2766 - 2388 827 000 - - 3237 P1 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 22 Wednesday Feb 27 2013 Hyd No 4 Bypass Hydrograph type = SCS Runoff Peak discharge = 6 634 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd volume = 20,379 cuft Drainage area = 4 340 ac Curve number = 74 Basin Slope = 0 0 % Hydraulic length = 0 ft Tc method = USER Time of conc (Tc) = 5 00 min Total precip = 3 70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Bypass Q (cfs) Hyd No 4 --1 Year Q (cfs) 700 600 500 400 300 200 1 00 000 7 00 600 500 400 300 200 1 00 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No 4 10 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 22 Wednesday Feb 27 2013 Hyd No 5 Total Post -Development Hydrograph type = Combine Peak discharge = 6 753 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd volume = 91,669 cuft Inflow hyds = 3, 4 Contrib drain area-- 4 340 ac Q (cfs) 700 6YSINN 6'I1I9I :91011 300 200 1 00 000 Total Post -Development Hyd No 5 -- 1 Year Q (cfs) 700 600 500 400 300 200 1 00 000 0 480 960 1440 1920 2400 2880 3360 3840 4320 Time (min) — Hyd No 5 —Hyd No 3 —Hyd No 4 11 Hydrograph Summary Report Hydraflow Hyd rog raphs by Intelisolve v9 22 Hyd No Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 3762 2 734 166 286 - - - Pre Development 2 SCS Runoff 4302 2 728 170 451 - — - - - Post -Development 3 Reservoir 2748 2 738 168 156 2 3090 61 522 Wetland Outlet 4 SCS Runoff 1996 2 724 59 700 - - — Bypass 5 Combine 3524 2 736 227 856 3 4 - - Total Post Development Autumn Brunswick rev 02 27 13 gpw Return Period 10 Year Wednesday, Feb 27, 2013 12 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 22 Hyd No 1 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 12 660 ac Basin Slope = 01 % Tc method = USER Total precip = 7 00 in Storm duration = 24 hrs Wednesday Feb 27 2013 Peak discharge = 37 62 cfs Time to peak = 734 min Hyd volume = 166,286 cuft Curve number = 70' Hydraulic length = 1000 ft Time of conc (Tc) = 18 50 min Distribution = Type III Shape factor = 484 Composite (Area/CN) = [(0 030 x 98) + (0 520 x 79) + (12 110 x 70)] / 12 660 Pre -Development Q (Cfs) Hyd No 1 -- 10 Year Q (cfs) 4000 4000 3000 3000 20 00 2000 1000 1000 000 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No 1 13 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 22 Wednesday Feb 27 2013 Hyd No 2 Post -Development Hydrograph type = SCS Runoff Peak discharge = 43 02 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd volume = 170,451 cuft Drainage area = 8 310 ac Curve number = 87* Basin Slope = 0 0 % Hydraulic length = 0 ft Tc method = USER Time of conic (Tc) = 10 35 min Total precip = 7 00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(4 640 x 98) + (3 670 x 74)] 18 310 Post -Development Q (Cfs) Hyd No 2 -- 10 Year Q (Cfs) 5000 5000 4000 4000 3000 3000 2000 2000 1000 1000 000 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No 2 14 Hydrograph Report HydraFlow Hydrographs by Intelisolve v9 22 Wednesday Feb 27 2013 Hyd No 3 Wetland Outlet Hydrograph type = Reservoir Peak discharge = 27 48 cfs Storm frequency = 10 yrs Time to peak = 738 min Time Interval = 2 min Hyd volume = 168,156 cuft Inflow hyd No = 2 - Post -Development Max Elevation = 30 90 ft Reservoir name = <New Pond> Max Storage = 61,522 cuft Storage Indication method used Wetland Outlet Q (cfs) Hyd No 3 -- 10 Year Q (cfs) 5000 5000 4000 4000 3000 3000 2000 2000 1000 1000 000 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No 3 — Hyd No 2 Wl( ll1.7— Total storage used = 61,522 cult Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 22 Hyd No 4 Bypass Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 4 340 ac Basin Slope = 0 0 % Tc method = USER Total precip = 7 00 in Storm duration = 24 hrs Bypass Q (cfs) Hyd No 4 -- 10 Year 21 00 1800 1500 1200 • M . M 300 wM 15 Wednesday Feb 27 2013 Peak discharge = 19 96 cfs Time to peak = 724 min Hyd volume = 59,700 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc (Tc) = 5 00 min Distribution = Type III Shape factor = 484 Q (cfs) 21 00 1500 1200 W 300 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No 4 16 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 22 Wednesday Feb 27 2013 Hyd No 5 Total Post -Development Hydrograph type = Combine Peak discharge = 35 24 cfs Storm frequency = 10 yrs Time to peak = 736 min Time interval = 2 min Hyd volume = 227,856 cuft Inflow hyds = 3, 4 Contrib dram area= 4 340 ac Total Post -Development Q (cfs) Hyd No 5 -- 10 Year Q (cfs) 4000 4000 3000 3000 2000 2000 1000 1000 000 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No 5 —Hyd No 3 —Hyd No 4 `YA Hydraflow Rainfall Report Hydraflow Hydrographs by Intelisolve v9 22 Return Intensity Duration -Frequency Equation Coefficients (FHA) Period (Yrs) B D E (NIA) 1 00000 00000 00000 - 2 698703 13 1000 08658 3 00000 00000 00000 - - 5 792597 146000 08369 -- 10 882351 155000 08279 - - — 25 1026072 165000 08217 - 50 1148193 172000 08199 100 127 1596 178000 08186 - File name Mecklenburg Co OF Intensity = B I (Tc + D)^E Wednesday Feb 27 2013 Return Intensity Values(mlhr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 000 000 000 000 000 000 000 000 000 000 000 000 2 569 461 389 338 299 269 244 224 207 1 93 1 81 1 70 3 000 000 000 000 000 000 000 000 000 000 000 000 5 657 543 465 408 365 330 302 279 259 242 227 215 10 724 604 521 459 412 374 343 317 295 277 260 246 25 825 695 603 534 480 438 402 373 348 326 307 291 50 904 765 666 592 534 487 449 416 388 365 344 325 100 983 836 730 650 587 536 494 459 429 403 380 360 Tc = time in minutes Values may exceed 60 Precio file name Samole oco Rainfall Precipitation Table (In) Storm Distribution 1 yr 2-yr 3 yr 5 yr 10 yr 25 yr 50 yr 100 yr SCS 24 hour 370 347 1 00 330 700 641 674 750 SCS 6 Hr 000 000 000 000 000 000 000 000 Huff 1st 000 000 000 275 000 000 000 000 Huff 2nd 000 000 000 000 000 000 000 000 Huff 3rd 000 000 000 000 000 000 000 000 Huff 4th 000 000 000 000 000 000 000 000 Huff Indy 000 000 000 275 000 000 000 000 Custom 000 000 000 280 000 000 000 000 PPPI" �aa Inn tl4bN5E The Curry Engineering Group, PLLC March 15, 2013 Ms Kelly Johnson Environmental Engineer NCDENR DWQ Wilmington Regional Office 127 Cardinal Drive Ext Wilmington, NC 28405 RE Autumn Care — Brunswick Co, NC Response to First Review Comments Dated 02105113 Dear Ms Johnson The purpose of this letter is to respond to your review comments dated February 5 2013, for the above referenced project Your comments and corresponding responses are summarized below 1 ) Calculations i,t<stamped/Signed/Dated Calculations have been submitted, but please submit a stamped, signed and dated copy Stamped, signed, and dated copy of revised calculations have been included in resubmittal package b) Consistent Data Please ensure that the package contains consistent data For instance, the supplement shows that the design storm in 1 Om, but the calculations show 1 51n (the correct value) Also, some of the elevations and surface areas differ between the supplement, the calculations, and the plans if correcting any of this data affects other elements of the design, please make the appropriate changes Revised plans and calculations have been revised to show consistent data including revising the supplement to show the 1 5" design storm 2) Plans• L.p.�ramage Area Map Please show the drainage area to the wetland on the plan set to be permitted Refer to new sheet C-09 Watershed Plan v.1510' Wetlands Please either delineate wetlands on the plan, or include a note that there are no wetlands onsite There are no wetlands present on site In addition to note 17 on the cover sheet, a note has been added to sheet C-01 Existing Conditions terl)am Detail Please show the elevations of the 511 and 9ft openings in order to show that the temporary pool will be maintained, and also to show the appropriate distance for the driving head of the orifice equation for the drawdown calculation Please make sure that the driving head is one-third of the distance from the permanent pool to the next available outlet above the permanent pool elevation Weir openings have been revised such that the temporary pool will be maintained (temporary pool = 29 5' <= 5' weir opening = 29 5' The Curry Engineering Group, PLLC Don L Curry, Jr , PE PO Box 2018 919 552 0849 (0) 205 S Fuquay Ave 919 552 2043 (F) Fuquay Vanna, NC 27526 919 080 9857 (C) doncurzy0curryengineennggroup corn www curryenm^ n_eermggroup com ,-d) Permanent Pool Please show the dimensions of each line and arc of the permanent pool Refer to new detail 5/13-07 I,cr Forebay Please show the depth to be at 26 5msl 26 5' contour has been added to forebay to reflect depth of 26 5' Liner Please show the Inver on the cross section in order to show the depth it will be installed as well as the depth of sod on top of the liner Please also show the areas of the wetland where the liner will be installed Clay liner has been added to the cross section as well as the plan view in detail D-07/I 3) Receiving Stream Receivmg Stream The application lists the receiving stream as Waccamaw (15-(I ), class C, Sw), but the data submitted indicates that the site may dram to Earnest Branch (15-23-5, class C, Sw) prior to the Waccamaw River Please update the application with the correct receiving stream If the site flows to the west, it likely drams to Earnest Branch, and if it flows south it likely flows to CawCaw Swamp (15-23, s C, Sw) Earnest Branch is the correct receiving stream Application has been revised 4) Signature Authority: Signature Authority Has Robert Dew been assigned signature authority to sign permit application documents on behalf of either the President or the Vice President of the corporation? All of the signatures in the application package including the O&M must be signed by an individual with signature authority, which the regulations define as being either the President or the Vice President of the corporation If either of these individuals has assigned Mr Dew this responsibility, please forward a copy of that delegation letter If not, please have either the President or the Vice President sign all of the application documents Revised O&M Agreement signed by Autumn Corp Vice President Sam Marsh is included in resubmittal package Please let me know if you have any questions or need additional information pertaining to your review Sincerely, The Curry Engineering Group, PLLC Mat Trowbridge, El, LEED AP Encl Autumn Care Brunswick— Revised Plans Dated 03/15/13 Autumn Care Brunswick— Revised Calcs Dated 03/15/13 qV0 ins #I Ar MC®ENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor February 5, 2013 Mr Samuel M Marsh, Vice President Autumn Corporation 451 N Winstead Ave Rocky Mount, NC 27804 Division of Water Quality Charles Wakild, P E Director Subject Request for Additional Information Stormwater Project No SW8130113 Autumn Care — Brunswick Co, NC Brunswick County Dear Mr Marsh John E Skvarla, III Secretary The Wilmington Regional Office received and accepted a State Stormwater Management Permit Application for Autumn Care — Brunswick Co , NC on January 24, 2013 A preliminary in-depth review of that information has determined that the application is not complete The following information is needed to continue the stormwater review 1) Calculations a Stamped/Signed/Dated Calculations have been submitted, but please submit a stamped, signed and dated copy b Consistent Data Please ensure that the package contains consistent data For instance, the supplement shows that the design storm in 1 Oin, but the calculations show 1 51n (the correct value) Also, some of the elevations and surface areas differ between the supplement, the calculations, and the plans If correcting any of this data affects other elements of the design, please make the appropriate changes 2) Plans Drainage Area Map Please show the drainage area to the wetland on the plan set to be permitted Wetlands Please either delineate wetlands on the plan, or include a note that there are no wetlands onsite Dam Detail Please show the elevations of the 5ft and 9ft openings in order to show that the temporary pool will be maintained, and also to show the appropriate distance for the driving head of the onfice equation for the drawdown calculation Please make sure that the driving head is one-third of the distance from the permanent pool to the next available outlet above the permanent pool elevation Permanent Pool Please show the dimensions of each line and arc of the permanent pool Forebay Please show the depth to be at 26 5msl Liner Please show the liner on the cross section in order to show the depth it will be installed as well as the depth of soil on top of the liner Please also show the areas of the wetland where the liner will be installed 3) Receiving Stream The application lists the receiving stream as Waccamaw (15-(1), class C, Sw), but the data submitted indicates that the site may drain to Earnest Branch (15-23-5, class C, Sw) prior to the Waccamaw River Please update the application with the correct receiving stream If the site flows to the west, it likely drains to Earnest Branch, and if it flows south it likely flows to CawCaw Swamp (15-23, class C, Sw) 1617 Mail Service Center Ralegh North Carolina 27699 1617 Location 512 N Salisbury St Raleigh North Carolina 27604 One Phone 919-807-63001 FAX 919-807-64921 DENR Assistance 1-877.623-6748 NorthCarohna Internet www ncwalemualiN oro AA,w ,.���H� /�� Equal Opportunity\ Afim!//\Y/iawe Action Employer L ` Marsh February 5, 2013 Page 2 of 2 r 4) Signature Authority Has Robert Dew been assigned signature authority to sign permit application documents on behalf of either the President or the Vice President of the corporation? All of the signatures in the application package including the ON must be signed by an individual with signature authority, which the regulations define as being either the President or the Vice President of the corporation If either of these individuals has assigned Mr Dew this responsibility, please forward a copy of that delegation letter If not, please have either the President or the Vice President sign all of the application documents Please remember that a change to one number may have a domino effect on other numbers Please check all plans, calculations and fors to ensure that the numbers are consistent throughout Please note that this request for additional information is in response to a preliminary review The requested information should be received in this Office prior to March 5, 2013, or the application will be returned as incomplete The return of a project will necessitate resubmission of all required items, including the application fee If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter The request must indicate the date by which you expect to submit the required information The Division is allowed 90 days from the receipt of a completed application to issue the permit The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-2151 and is subject to enforcement action pursuant to NCGS 143 215 6A Please reference the State assigned project number on all correspondence Any original documents that need to be revised have been sent to the engineer or agent All original documents must be returned or new originals must be provided Copies are not acceptable If you have any questions concerning this matter please feel free to call me at (910) 796 7215 or email me at kelly p johnson@ncdenr gov Sincerel , II Johnso Enwr al Engineer GDS/kpj S NQ&Stormwater\Pemmts & Projects120131130113 HD12013002 addinfo 130113 cc Mat Trowbridge, The Curry Engineering Group, PLLC Wilmington Regional Office Storwater File /Comp let ness Review Checklist Project Name /1liliiyYl(V 1�41cP �ti�(t'}1Ck Received Date Project Location nl S. Accepted Date Rule(s) [2008 Coastal Q1995 Coastal1-1 Phase II (WiRO) 1-1 Universal ❑1988 Coastal Type of Permit Cevy2 or Mod or PR Existing Permit # (Mod or PR) OPE Cert on RIO Density HD or LD ❑(% DO) Type mm rcial or Residential �NCG [::]Offsite to SW8 Exempt Stream Class C�S� EISA Map Subdivided? Subdivision or Si le L 11 JORWMap Paperwork Emaded Engineer on ?ment(s) (1 original per BMP) BMP Type(s) CIv V X\8 with correct/original signatures (1 original per BMP except LS/VFS and swales) iccation with correct/original signatures Grp or LLC Sig Adigh "a)r SoS or letter rq `505 (within 6mo) oils Report with SHWT Calculations (signed/sealed) RNo obvious errors includes common areas, etc Restrictions, if subdivided & Notarized Note to Reviewer —1011 Doil 6 , c�,a� OVI\ .5, pPlemati.�� 01 CaKs V �Q I S Plans ets Details (roads, cul de -sacs, curbs, sidewalks, BMPs, Buildings, etc) Grading Wetlands Delineated or No Wetlands MVicmity Map Layout (proposed BUA dimensions) Legend r-1DA Maps ❑Project Boundaries Infiltration Wet Pond Offsite Soils Report F1Soils Report F-1PE Cert for Master Lot # SHWT SHWT Deed Rest for Master ❑Lot #Matches Master Bo Bottom �PP BUA Permitted (Master) Visited BUA Proposed (Offsite) sf Additional Information Permitted Proposed Proposed Proposed BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) The Curry Engineering Group, PLLC LETTER OF TRANSMITTAL To Mr Jim Gregson NCDENR Wilmington Reg Office 127 Cardinal Drive Extension Wilmington, NC 28405 Phone 910 796 7215 Overnight NO x Yes We are sending you the following ❑ EC Plans X Pnnts/Plans ❑ Contracts X Permit Applications These are transmitted as checked below X For Approval ❑ As Discussed ❑ For Review and Comment Job No 2011-046 Job Name Autumn Care Brunswick Brunswick County, NC Date January 22, 2013 Sent By Mat Trowbridge, El ❑ Construction Plat ❑ Site Plan Drawings ❑ Computer Disk ❑ Site Work Calculations ❑ ❑ For Your File ❑ As Requested ❑ For Your Signature then return to ❑ For Your Use Copies Date Descnphon 2 January 2013 1 Original and 1 Copy BMP Submittal Package 2 January 2013 Planset Dated 01/2212013 JAN 21 2113 Thanks Mat Copies To The Curry En1pneenng Group, PLLC Don Curry, PE PO Box 2018 919 552 0849 (0) 205 S Fuquay Ave 919 552 2043 (F) li uquay Vanna NC 27526 919 880 9857 (C) inat(@curr)enemeennggnQu room www curryenemeermggroup com It NCDP NR - BAIP Manual Stormw ate Calculations Nov 2012 Project Name Autumn Care Brunswick County The Curry Engineering Group PLLC Proposed Site Area Existing Site Area Buildings • 62630 sf Buildings 1,290 sf Buildings (I uture) 21 200 sf Parking/Roadwa) sf Parkmg/Roadwav 96961 Parkmt,(future) Sidewalks 21 301 sf Sidewalks sf I otal Impervious Area 202092 sl I otal Impervious Area 1290 sf 464 is 003 ac Pen ions Area (Landscaping Areas) to BMP IS9803 sf Tot it Pen ions Area 549786 sf 367 ac 1262 at. I otal Drainage Area to BMP 361 895 sf Total Drainage Area 55I 036 st 12 65 ac 12 65 ac: Penaous Area Bxpassmg R)IP 189 141 sf u % Impervious, 1 a 56°/a % Im enious, 1 a 0 23% Calcul ate Pre Dex Cane Number (CN) Impervious (Buildmg)=CN= 98 Acreage = 1 250 sf 003 IL Open Sp aw(Fair Condition) =CN= 79 Acreage = 22450 sf 0 52 ac Woods (I titer&Brush) =CN= 70 Acreage = 527336 sf 1211 ac O Composite CN = 704 CN= 70 Calculate Post De, Cune Number (CN) Paved/Bldg/Sidewilk Impervious =CN= 98 Acreage = 202092 sf 464 ac Woods(l titer&Brush) =CN= 70 U Aueage= V sf ac Good Condition Grass = CN = 74 Acreage = 1>9803 sf 3 67 ac Composite CN = 874 CN = a7 �ECIF-WE: JAN 2 4 2013 • BY Brunswick BMP Design Calculte Runoff Volume Simple \lethod R(V) = 0 05 + 0 9q(a) Ila)= 56% Impervious % • R(\)= O55 V=3630•R(D)'R(V)'A R(D)= Design Rainfall Depth (I or 1 5 ) R(V) = Runoff Cobllicient A = Drainage Area (ac) V = Runoff Vol (cf) R(D)= 19 R(V)= 055 A = 361 89� st = DA x %of I Area 9 31 at V= 2J 998 cfmmvolume Calculate Pre Der lameof Concenlration(Ic hmpich) Te=(I 13/14)A 389/128 Te =Tine of Concentration (min) L = P low I ,ngth (11) H = Height difference to remote part of watershed (R) L= 1100 0 H= 230 Ic= 189 mmutes Caicul ate N etland Sate SA(req)=Q(rol)/D(plonts) SA = Required Surface Arta (st) Q(vol) = Required Runoff Vol to Treat (co D(plants) = Dept h of Plants (R) Q(voH= 24998 of D lants = I R SA(req)= 24998 sf ODraw do" in Calculation Q=Cd-A-sq rp2"g-(Ho/3)) Cd= 060 dimensionless coeff Onfict Size= 2in A= 00218 sl g = 32 2 iVsA2 Ho= 1 R Q= 00606 cfs • Time= VOILIme/Flow V = 24 998 sl Flow Q= 00606 cfs Tim,= 4 12 178 seconds Time= 477 dais Brunswick BMP Design Hydraflow Table of Contents Autumn Brunswick gpw • HydraFlow Hydrographs by Intehsolve v9 22 Tuesday Jan 22 2013 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 ie'rIT_.TA Summary Report 3 Hydrograph Reports 4 Hydrograph No 1, SCS Runoff, Pre -Development 4 Hydrograph No 2, SCS Runoff, Post -Development 5 Hydrograph No 3, Reservoir, Wetland Outlet 6 Pond Report - <New Pond> 7 Hydrograph No 4, SCS Runoff, Bypass 9 Hydrograph No 5, Combine, Total Post -Development 10 10 -Year Summary Report 11 Hydrograph Reports 12 Hydrograph No 1, SCS Runoff, Pre -Development 12 Hydrograph No 2, SCS Runoff, Post -Development 13 Hydrograph No 3, Reservoir, Wetland Outlet 14 Hydrograph No 4, SCS Runoff, Bypass 15 Hydrograph No 5, Combine, Total Post -Development 16 OF Report 17 ECFPVE JAN 2 4 2013 • BY I • Watershed Model Schematic Hydraflow Hydrographs by Intelisolve v9 22 ccc1YP+rre�e, Development 2 Post Development t -- 4 Bypass 3 Wetland Outlet Ift �!5 Total Post Development Legend Hvd Origin Description 1 SCS Runoff Pre Development 2 SCS Runoff Post Development 3 Reservoir Wetland Outlet 4 SCS Runoff Bypass 5 Combine Total Post Development Project Autumn Brunswick gpw Tuesday, Jan 22, 2013 PA 0 • Hydrograph Return Period Recap Hydraflow, Hydrographs by lntelisolve v922 Hyd Hydrograph Inflow Peak Outflow (cfs) Hydrograph No type Hyd(s) description (origin) 1-Yr 2 Yr 3 Yr 5 Yr 10 Yr 25 Yr 50 Yr 100 Yr 1 SCS Runoff 11 02 - - - - 3762 - - - Pre Development 2 SCS Runoff — 1912 - — - - - - 4302 - - - - - - Post Development 3 Reservoir 2 8372 - -- - - 2928 -- Wetland Outlet 4 SCS Runoff - 6 634 - - 1996 - - Bypass 5 Combine 3 4 1073 - - 3739 - Total Post Development Pro) file Autumn Brunswick gpw Tuesday, Jan 22, 2013 3 • 0 Hydrograph Summary Report Hydraflow Hydrographs by lntelisolve v922 Hyd No Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 11 02 2 734 52 101 - Pre Development 2 SCS Runoff 1912 2 728 73 508 - Post Development 3 Reservoir 8 372 2 746 70 023 2 2974 29 124 Wetland Outlet 4 SCS Runoff 6 634 2 724 20 379 - - - - - Bypass 5 Combine 1073 2 740 90 402 3 4 - Total Post Development Autumn Brunswick gpw Return Period 1 Year Tuesday, Jan 22, 2013 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 22 Hyd No 1 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 12 660 ac Basin Slope = 01 % Tc method = USER Total precip = 3 70 in Storm duration = 24 hrs * Composite (Area/CN) = [(0 030 x 98) + (0 520 x 79) + (12 110 x 70)] 112 660 Pre -Development Q (cfs) Hyd No 1 -- 1 Year 1200 ® 1000 AIM . M 400 200 4 Tuesday Jan 22 2013 Peak discharge = 11 02 cfs Time to peak = 12 23 hrs Hyd volume = 52,101 cult Curve number = 70* Hydraulic length = 1000 ft Time of conc (Tc) = 18 50 min Distribution = Type III Shape factor = 484 Q (cfs) 1200 1000 .1I 10 200 0 2 4 6 8 10 12 14 16 18 20 22 24 26 • — Hyd No 1 Time (hrs) Hydrograph Report 5 Hyd No 2 Post -Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 8 310 ac Basin Slope = 0 0 % Tc method = USER Total precip = 3 70 in Storm duration = 24 hrs Composite (Area/CN) = [(4 640 x 98) + (3 670 x 74)] 18 310 Tuesday Jan 22 2013 Peak discharge = 19 12 cfs Time to peak = 12 13 hrs Hyd volume = 73,508 cuft Curve number = 87' Hydraulic length = 0 ft Time of conc (Tc) = 10 35 min Distribution = Type III Shape factor = 484 Post -Development Q (cfs) Q (cfs) Hyd No 2 -- 1 Year 21 00 1800 1500 1200 900 600 300 000 21 00 1800 1500 1200 900 600 300 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 1191 Time (hrs) — Hyd No 2 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 22 Hyd No 3 Wetland Outlet Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd No = 2 - Post -Development Reservoir name = <New Pond> Storage Indication method used 6 Tuesday Jan 22 2013 Peak discharge = 8 372 cfs Time to peak = 12 43 hrs Hyd volume = 70,023 cuft Max Elevation = 29 74 ft Max Storage = 29,124 cuft Wetland Outlet Q (cfs) Hyd No 3 -- 1 Year Q (cfs) 21 00 1800 1500 1200 900 600 300 000 21 00 1800 1500 1200 900 600 300 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 • — Hyd No 3 — Hyd No 2 Total storage used = 29 124 cult Time (hrs) Pond Report Hydraflow Hydrographs by Intelisolve v9 22 Tuesday Jan 22 2013 Pond No 1 - <New Pond> • Pond Data Contours User defined contour areas Average end area method used for volume calculation Begining Elevation = 28 50 it Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr Storage (cult) Total storage (cult) 000 2850 15 840 0 0 050 2900 24 666 10 127 10 127 1 00 2950 25 628 12 574 22 700 1 50 3000 27 374 13 251 35 951 250 31 00 29 716 28 545 64 496 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (m) = 200 Inactive Inactive Inactive Crest Len (it) = 500 900 Inactive Inactive Span (in) = 200 000 000 000 Crest El (ft) = 2900 3000 000 000 No Barrels = 1 1 1 0 Weir Coeff = 260 260 260 333 Invert El (ft) = 2850 000 000 000 Weir Type = Broad Broad Length (ft) = 3500 0 10 0 10 000 Multi Stage = No No No No Slope [%) = 050 0 10 0 10 n/a N Value = 013 013 013 n/a Orifice Coeff = 060 060 060 060 Exfil (in/hr) = 0 000 (by Contour) Multi Stage = n/a Yes Yes No TW Elev (ft) = 000 Note CulvertiOntice outflows are anatyxedi untler inlet (1c) and outlet (oc) control Wen risers checked for onhce conditions oc) and subraergeaCe (s) Stage / Storage / Discharge Table Stage Storage Elevation Clv A clv B CIv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total it cuft ft cfs cfs cfs cfs cis cfs cis cis cfs cis cfs 000 0 2850 000 - 000 000 000 0 000 005 1 013 2855 0 00 oc - 000 000 000 - — 0 004 010 2025 2860 0 01 oc — - 000 000 000 — 0 013 015 3 038 2865 0 02 oc — - 000 000 000 - 0 021 020 4 051 2870 0 02 oc — — 000 000 000 - 0 022 025 5 063 2875 0 02 oc - 000 000 000 - — - 0 024 030 6 076 2880 0 03 oc 000 000 000 - 0 027 035 7 089 2885 0 03 oc - 000 000 000 - 0 029 040 8 101 2890 0 03 oc 000 000 000 - 0 031 045 9 114 2895 0 03 oc - - 000 000 000 0 033 050 10 127 2900 0 03 oc - 000 000 000 - 0 034 055 11 384 2905 0 04 oc - - 015 000 000 - 0 181 060 12 641 29 10 0 04 oc - - 041 000 000 - 0 449 065 13 899 29 15 0 04 oc - - 076 000 000 - 0 794 070 15 156 2920 0 04 oc - - 1 16 000 000 — - - 1 203 075 16 413 2925 0 04 oc - - - 1 62 000 000 - - 1 667 080 17 671 2930 0 04 oc - - 2 14 000 000 - - - 2 179 085 18 928 2935 0 04 oc - - 269 000 000 - - - 2 736 090 20 185 2940 0 05 oc - 329 000 000 - - 3 335 095 21 443 2945 0 05 oc - — 392 000 000 3 971 1 00 22 700 2950 0 05 oc - 460 000 000 4 644 1 05 24 025 2955 0 05 oc 530 000 000 5 352 1 10 25 350 2960 0 05 oc 604 000 000 6 092 1 15 26 675 2965 0 05 oc 681 000 000 6 864 1 20 28 000 2970 0 05 oc - 761 000 000 - 7 666 1 25 29 325 2975 0 05 oc - 844 000 000 - 8 498 1 30 30 650 2980 0 06 oc - 930 000 000 - — - 9 357 1 35 31 975 2985 0 06 oc - - - 10 19 000 000 - - 1024 1 40 33 300 2990 0 06 oc - - 11 10 000 000 - 11 16 1 45 34 625 2995 0 06 oc - - 1204 000 000 - 12 10 1 50 35 951 3000 0 06 oc - - 1300 000 000 - 1306 1 60 38 805 30 10 0 06 oc - - 1500 074 000 1580 . 1 70 41 660 3020 0 06 oc 1709 209 000 = 1924 1 80 44 514 3030 0 06 oc 1927 385 000 - - 23 18 1 90 47 369 3040 0 07 oc 21 53 592 000 - 2752 200 50 223 3050 0 07 oc 2388 827 000 - - 3222 Continues on next page VI <New Pond> Stage I Storage I Discharge Table Stage Storage Elevation Clv A • it cult it cis 210 53 078 3060 0 07 oc 220 55 932 3070 0 07 oc 230 58 787 3080 0 07 oc 240 61 641 3090 0 07 oc 250 64496 ;aa 31 00 0 08 oc End u Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exltl User Total cis cis cis cis cis cis cis cis cis cis - — 2631 1088 000 - - 3726 - 2881 1370 000 4259 31 39 1674 000 - 4821 - — 3405 1998 000 - 54 10 3677 2340 000 - 6025 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 22 Hyd No 4 Bypass Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 4 340 ac Basin Slope = 0 0 % Tc method = USER Total precip = 3 70 in Storm duration = 24 hrs 9 Tuesday Jan 22 2013 Peak discharge = 6 634 cfs Time to peak = 12 07 hrs Hyd volume = 20,379 cult Curve number = 74 Hydraulic length = 0 ft Time of conc (Tc) = 5 00 min Distribution = Type III Shape factor = 484 Bypass Q (cfs) Q (cfs) Hyd No 4 -- 1 Year 700 Q600 500 400 300 200 1 00 000 7 00 600 500 400 300 200 1 00 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 • Time (hrs) — Hyd No 4 10 Hydrograph Report Hyd No 5 Total Post -Development Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 2 min Inflow hyds = 3, 4 Q (cfs) 1200 10 00 800 600 400 200 Tuesday Jan 22 2013 Peak discharge = 10 73 cfs Time to peak = 12 33 hrs Hyd volume = 90,402 cuft Contrib drain area= 4 340 ac Total Post -Development Hyd No 5 -- 1 Year Q (cfs) 1200 1000 M M Ed to 200 000 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hrs) — Hyd No 5 —Hyd No 3 —Hyd No 4 11 • Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9 22 Hyd No Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd volume (cuff) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 3762 2 734 166 286 - - - Pre Development 2 SCS Runoff 4302 2 728 170 451 - - - - - Post Development 3 Reservoir 2928 2 738 166 904 2 3044 48 438 Wetland Outlet 4 SCS Runoff 1996 2 724 59 700 Bypass 5 Combine 3739 2 736 226 604 3 4 - Total Post Development Autumn Brunswick gpw Return Period 10 Year Tuesday, Jan 22, 2013 Hydrograph Report 12 Hyd No 1 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 12 660 ac Basin Slope = 01 % Tc method = USER Total precip = 7 00 in Storm duration = 24 hrs O 0 Composite (Area/CN) = [(0 030 x 98) + (0 520 x 79) + (12 110 x 70)] / 12 660 Q (cfs) 4000 [cPIII4A 2000 1000 Pre -Development Hyd No 1 --10 Year Tuesday Jan 22 2013 Peak discharge = 37 62 cfs Time to peak = 12 23 hrs Hyd volume = 166,286 cuft Curve number = 70' Hydraulic length = 1000 ft Time of conc (Tc) = 18 50 min Distribution = Type III Shape factor = 484 Q (cfs) 4000 3000 2000 1000 000 1 1 1 1 1 1 1 1000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) — Hyd No 1 13 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 22 Hyd No 2 Post -Development Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 8 310 ac Basin Slope = 0 0 % Tc method = USER Total precip = 7 00 in Storm duration = 24 hrs Composite (Area/CN) = [(4 640 x 98) + (3 670 x 74)] / 8 310 Post -Development Tuesday Jan 22 2013 Peak discharge = 43 02 cfs Time to peak = 12 13 hrs Hyd volume = 170,451 cuft Curve number = 87* Hydraulic length = 0 ft Time of conc (Tc) = 10 35 min Distribution = Type III Shape factor = 484 Q (cfs) Hyd No 2 -- 10 Year Q (cfs) 5000 5000 4000 4000 3000 3000 2000 2000 1000 1000 000 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 . — Hyd No 2 Time (hrs) Hydrograph Report 14 Hydraflow Hydrographs by Intelisolve v9 22 Hyd No 3 Wetland Outlet Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 2 min Inflow hyd No = 2 - Post -Development Reservoir name = <New Pond> Storage Indication method used Wetland Outlet Tuesday Jan 22 2013 Peak discharge = 29 28 cfs Time to peak = 12 30 hrs Hyd volume = 166,904 cuft Max Elevation = 30 44 ft Max Storage = 48,438 cuft Q (cfs) Hyd No 3 -- 10 Year 0 (cfs) 5000 5000 4000 4000 3000 3000 2000 2000 1000 1000 000 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 • — Hyd No 3 —Hyd No 2 �..:� Total storage used = 48,438 tuft Time (hrs) Hydrograph Report Hyd No 4 Bypass Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 4 340 ac Basin Slope = 0 0 % Tc method = USER Total precip = 7 00 in Storm duration = 24 hrs Tuesday Jan 22 2013 Peak discharge = 19 96 cfs Time to peak = 12 07 hrs Hyd volume = 59,700 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc (Tc) = 5 00 min Distribution = Type III Shape factor = 484 Bypass Q (cfs) Hyd No 4 -- 10 Year Q (cfs) 21 00 1800 1500 1200 900 600 300 000 21 00 1800 1500 1200 900 600 300 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 • Time (hrs) — Hyd No 4 Hydrograph Report HydraFlow Hydrographs by Intelisolve v9 22 Hyd No 5 Total Post -Development Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 2 min Inflow hyds = 3, 4 16 Tuesday Jan 22 2013 Peak discharge = 37 39 cfs Time to peak = 12 27 hrs Hyd volume = 226,604 cuft Contrib drain area= 4 340 ac Total Post -Development Q (cfs) Hyd No 5 -- 10 Year Q (cfs) 4000 4000 3000 3000 2000 2000 1000 1000 000 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 • — Hyd No 5 —Hyd No 3 —Hyd No 4 Time (hrs) Hydraflow Rainfall Report 17 O Hydraflow Hydrographs by Intelisolve v9 22 Return Period Intensity Duration Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 00000 00000 00000 - 2 698703 13 1000 08658 3 00000 00000 00000 5 792597 146000 08369 10 882351 155000 08279 - 25 1026072 165000 08217 — 50 1148193 172000 08199 - 100 127 1596 178000 08186 File name Mecklenburg Co OF Intensity = B / (Tc + D)^E Tuesday Jan 22 2013 Return Period Intensity Values(m/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 000 000 000 000 coo 000 000 000 000 000 000 000 2 569 461 389 338 299 269 244 224 207 1 93 1 81 1 70 3 000 000 000 000 000 000 000 000 000 000 000 000 5 657 543 465 408 365 330 302 279 259 242 227 2 15 10 724 604 521 459 412 374 343 317 295 277 260 246 25 825 695 603 534 480 438 402 373 348 326 307 291 50 904 765 666 592 534 487 449 416 388 365 344 325 100 983 836 730 650 5 87 536 494 459 429 403 380 360 Tc = time in minutes Values may exceed 60 Precip file name Sample pcp Rainfall Precipitation Table (In) Storm Distribution 1-yr 2 yr 3 yr 5-yr 10 yr 25 yr 50 yr 100 yr SCS 24 hour 370 347 1 00 330 700 641 674 750 SCS 6 Hr 000 000 000 000 000 000 000 000 Huff 1st 000 000 000 275 000 000 000 000 Huff 2nd 000 000 000 000 000 000 000 000 Huff 3rd 000 000 000 000 000 000 000 000 Huff-4th 000 000 000 000 000 000 000 000 Huff Indy 000 000 000 275 000 000 000 000 Custom 000 000 000 280 000 000 000 000 6IIIIII�IIIIIIIIIII °� 20 30°s �IIIIIIIIII II III Bzee1 Pa318 o ae 3a �B o00 aranda N Clamm°ns nsWck Co4nty C �,aglster o! Deeds page 1 of 2 rtY ��wL,.,. i��gh(t'nda,n el mane Register of Deeds • 02-20-2009�fh 00 34 00e Brunswick Caunty NC NC REVENUE sTRMR $37e0 Be (0159576) Pni5enle ✓ Ret d, Tole) I Rev hk, Inter +'S Cksd_ Q� JO��7P Jam' Refuntl Cash $ _ Finance ELiNon`a`:s'Slaxumem a4 ulegdo due m mnd,ron nal CiOo�f. pem mnl..ns Is ire+tied Oyodgmal a �nsWmeni da Cannot f pmdjc dofwpM NORTH CAROLINA WARRANTY DEED THIS DEED, made this ts`day of Fcljruary, 20 9�by and between I fl n t` C0)� Ia�mnm-ml'.¢�rz GRANTOR0�172F< GRANTEE BRUNSWICK PARTNERS, LLC, a North AUTUMN CORPORATION, a North Carolina Limited Liability Company Carolina Corporation PO Box 4969 Calabash, NC 28467 The designation heirs, successors and assigns, and shall Include neuter as required by context 451 N Winstead Avenue Rockv Mount, NC 27804 WITNESSETH 11 include said parties, their masculine, feminine or e The Grantor, for a valu61 able onsideratione }by the Grantee, the receipt of which is hereby acknowledged, has and byf�hese p esen't do Dt, bargain, sell and convey unto the Grantee in fee simple, subject to he re3€r4hlns and restrictions hereinafter stated, all that certain lot or parcel of land situated in Shallotte Township, Brunswick County, North Carolina, and more particularly described as follows BEING all of that lot or parceel of land co tammg,l2 65 acres, more or less, as shown and described on that rv�iV i�re��... d)�/y Jf mes R Tompkins, PLS, of Tompkins Lad Surve�Ingr,�P�A, dated OctubcmlS� 2,008, a copy of which is duly recorded m Map Cabinet 57 at Page�SlofthetBrunswick County Registry, which is incorporated herein for greater certainty of de6aption The above -described lot or parcel of land is conveyed subject to the Consolidated Master Declaration and Development Plan for Brunswick Plantation recorded in Book 2545 at Page 797 ittee Amendment thereto ecorded in Book 2639 at Page 1232 of the Brunswick CounTy�Regis ry.-Uln3el �1i¢,I;rovisions of those documents, the Grantee is and willbe is C�ppla"s ) b j orn er of the Association, and is hereby ss�odi assigned one vote in th�A�ation, together v"it - Ife obligation to pay the Association assessment for one Cla s lAyMemtJe��Resulcmial lot per year As a Class B Member the Grantee shall not be liable for any Special Assessment by the Association without its consent Any improvement placed or constructed on The Premises shall not be a Common Area of Brunswick Plantation For back reference see Boob 2440, Page 1282, look �863, Page 275, Book 2368, Page 535, Book 2563, Page 786 nnduBookyB� 1�P�age839Iah of the Brunswick County Registry YJg0��r� • U/nMOo����� Prepared by The Anderson Law Firm, PLLC (SSB) Without Opinion on Title JAN 2 4 2013 BY _ 02-20-2009 1111111,11141 illil 16111, hill 82887 P0319 ,9 ae as ©an J6 u, eounty " Cistar of Dmdn paga m2 not 2 //t%(C )R &CC,°Z" 4 • TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee si�mpsubject to the reservations and restrictions set out herein nor And the Grantor covei(`ants;,ith the rant eepthatS,rantor is seized of the premises in fee simple, has the right to convey the same in in st - le, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, except for the restrictions of record, applicable coning and land use'laws, ordinances and regain fions and 2009 ad valorem taxes LCREfln \"��� �]�lJ�``a� IN TESTIMONY WHdF, thcGr� r'CasT7�uaid this instrument to be signed in its company name on the day and year first above vo �e written BY PARTNERS, McLamb, Manager e STATE OF NORTH CAROLIIYW" COUNTY OFBRUNSWICK 0U nn I��II�I� �aG�a�muew,ic This the Ip� day of February, iri'the year 20Bi�j3¢A'sgppl�lyfr ppeared before me Mason H Anderson, Member/Manager and Jimmy A McLamb, Member aua�er of Brunswick Partners, LLC a North Carolina Limited Liability Company principal, who being duly sworn and personally known to me ph identrf¢anon'�'— ) says that they are the duly authorized members of said Brunswick Partners, LLC, a North Carolina Limited Liability Company and that they signed the foregoing instrument on behalf of said company and that they'acknowledged the said writing to be the act and deed of said company herein stated Witness my hand and official seal Or stump thisrLLL���... daJg'o`fFE°bm"ttn�``2009 �rG�G�BG,�Q NOTARY fip s u(Lgctfa W��r�KS •- Alotary Publ c-pnnt&c� e i} name ``��YY � lJ P �G 12i UBL Mycommission c�puesiro+��,�011 Prepared for AUTUMN CORPORATION Mr Bob Dew 451 N Winstead Ave Rocky Mount, NC 27804 Stormwater Management Permit Submittal Package Autumn Care — Brunswick Co., NC 9646 No. 5 School Road Shallotte, Brunswick County, NC The Cum- Enanneeruig Group. PLLC Prepared by Mat Trowbridge, El The Curry` Engineering Group, PLLC PO Box 2018 205 S Fuquay Ave Fuquay-Vanna, NC 27526 (919)552-0849 Ff--97qVEM JAN 2 4 2013 BY— 0 CThe Curry Engmeenng Group, PLLC Autumn Care — Brunswick Co, NC DATE 1/26/12 9646 No 5 School Road PAGE 2 of 2 • Shallotte Brunswick County NC REVISION 0 TABLE OF CONTENTS Tab I Permit Application and Required Forms Tab II Wet Detention Basin Supplement & Calculations Tab III Soils Report Tab IV Drainage Calculations Tab V Soils & Topographic Maps 10 ,rt • Autumn Care, Brunswick Brunswick, NC Site Location Narrative and Stormwater Permitting Questionnaire Response Protect Narrative this project lies at the intersection of Ash Little River Road and No 5 School Road in the Town of Shallote, Brunswick County, NC The 12 65 acre site is currently undeveloped and covered mostly with pine trees with the exception of the southwest corner of the property The site as it exists is very flat but eventually drains to a ditch along Ash Little River Road The proposed development consists of a 62,630sf nursing home centrally located on the parcel with a possible future 20,000+- sf expansion The proposed runoff will be collected in an enclosed drainage system consisting of several catch basins that convey drainage to the southern portion of the property into a proposed stormwater wetland where the first 1" is captured and treated as required by DWQ Phase II stormwater regulations 1. General Information a Name of Project Autumn Care — Brunswick Co, NC Curry Engineering Project42011-048 b Street Address, City, County This site is located at 9646 No S School Road, Shallote Brunswick County, NC c Acres in Tract 1265 d Acres Being Disturbed 1212 e Acres in Wetlands ECIFpVE 'AN 21 2111 BY 1 Wetlands Must Be Delineated & Sign -Off Obtained From The Corps • 2 Proposed Wetland Impacts Require Permits From Corps & DWQ O 0 Wetlands are not present on site f Ownership Information From NC Secretary of State Web Site The site is owned by Autumn Corporation as listed below Current Owner Autumn Corporation 451 N Winstead Ave Rocky Mount, NC 27804 g Description of Development Proposal 1 Previous or Existing Permits None 2 Tax parcel 1D Number 42090000103 h Pre-1988 Built Upon Area, If Applicable N/A • i Discuss Phasing of the Project & Stormwater Facilities When Applicable The proposed Stormwater facdities will be constructed in a single phase j Discuss Proposed Waste Water Treatment & Water Supply Proposed sanitary and water connections will be made via existing infrastructure from Brunswick County k Identify Historic Sites & Projects Being Funded With Public Monies 7here are no historic sites on this property Public money is not being used for this development I Disclose Any/All Non -Compliance Issues with DENR Agencies Not applicable for this site 2. Stormwater Information a Provide River Basin, Stream Classification & Index Number for All water Bodies On or Adjacent To The Project or Closest to The Project Area The site drains to a drainage ditch that ultimately ultimately drains to the Waccamaw River Waccamaw River has a surface water classification of C, Sw Identify Whether the Stormwater Design is High Density or Low Density, Commercial or Residential, State Stormwater or NPDES Phase II, Address Vested Rights When Applicable, Identify Pockets of High Density The site is designated High Density Commercial NPDES Phase Hand Vested Rights are not applicable for this location c Proposed Total % Impervious Surface 4 64 ac or 37% impervious across entire site 56% impervious to SWM d Number of Proposed Treatment Measures, Type(s) of Collection System There is a single proposed stormwater wetland treatment measure for the entire property The site drainage will be collected in an enclosed drainage system and drained into the wetland • e Will All Built Upon Area Be Collected Yes f Identify Whether or Not the Project Has Buffer Requirements & Whether or Not Development Is Proposed Within A Buffer There are no buffer i equirements and the pt oposed development a not within a buffer g Discuss Coastal Management Areas of Environmental Concern When Applicable There are no AEC 's on this project h Disclose Whether or Not Off -Site Runoff Is Coming Onto The Site or Into The Proposed BMP There is no off -site runoffcommg onto the site or into the proposed BMP i Discuss Whether Road Construction Across Other property Is Necessary To 40 Access This Project Road construction across other properly is not required to access this project j If An On -Site Evaluation Of The Soils Has Been Done, Discuss Infiltration Rates, Seasonal High Water Table, etc, and Include Date Of Site Evaluation (This Is Required For Infiltration Protects) An on -site sods evaluation has been completed by ECS Carolinas, LLP This evaluation is included in the permit documentation Print Preview Page 1 of 2 • • Brunswick County, NC Legend _ Acreage Text pie � Easement Text Jurisdiction Text Road Text Co RR Highways AF Main Roads Streets �COSBR-6000N ./ US Hwy N NC Hwy c Overview 12 SSA i i CO CLD �-- 4 "71' Parcel Number 2090000103 Plat Date 2/20/2009 Account Number Land Value $113 850 PIN 102700147505 Building Value $0 Owner AUTUMN CORPORATION Other Value $5630 Owner Address 1 Deferred Value $0 Owner Address 2 451 N WINSTEAD AVENUE Total Taxable Value $119 480 City ROCKY MOUNT Heated Sq Ft State NC Year Built Zip 27804 Bedrooms Legal Descnption Full Baths Parcel Street Number 9646 Stones Parcel Street NO 5 SCHOOL Ext Wall 1 Street Type RD Ext Wall 2 Street Dir NW Neighborhood Subdivision Municipality Deed Book Deed Page 2887 0318 Fire Tax District Township Calabash SHALLOTTE Deed Date 2/20/2009 Acreage 1265 Plat Book 0057 Sale Price Plat Page 0068 JAN 2 4 2013 U Mac Scale 1 inch = 328 feet BY — --- http //gis brunsco net/printPreview aspx9Pnnt0ptData=Brunswick County, NC10101truelfals 1/21/2013 USGS Real -Time Water Data - Lumber Watershed, North Carolina Page 1 of 1 0 • North Carolina Water Science Center Real -Time Water Data for Lumber Watershed (030402) High Pant glWtd( i7 xuYCt a.as' pp99 „ qy FaieitT` `i''"—'iTareoro , p=, DataStatus —Archdaies ° ha PI�ADS� + ` ,bpi 0 Types s'NtesvNie ® N ve p ) � ycr i, Qn d j� ,Q WAPsson h . a ,'�y Surface y fewile' �s ,t * ' .i-91'' 's t �" , p p p Ap .✓-arl'4"+, p , jr` "r „ (: `` G,seWpvllle Water J �t • C�7 d tt % 7 VJeaMn i,,� Isnnaaous�''w rag'F, SLa.,�c`"" 4i s'r sonsram =I'�F,S'p`""� p,-.Y �,� �� p Groundwater nc 1. f i }�" Goldsboro i p +' ♦ I_✓1 Water cgld ahemari u.mmnep tt�s'�Dunn �! yr tp``'w. Wnaton ,p, Quality i� 6� N�adp'wtFdew Soulnem 'y& Y p�^--s' 02 d A � i p ♦ °` � p �y,..PreUpitatlon Fayetteville t 1r ltJ i. y Tray p p @@�p/ a ,� f �---W PAJ It Clanton - p n G� V=Download Monroe 1".�r �� �,. n/./ C v NAno"nal Successful ® p,T >i nisi ` la X=Data Missing ockl dl , xn Ho roam p � Leunnbvrp � � p �Oii1 From Map Lancaster ,} If missing data persists Jetkaunwlle � \ Jp please try again later r :'''� z✓r �� f p � z __ . ' a boon Hartsville p+ r Ham staid I / ,f "dWhievnie p L View By Camtlen �.. �� Day4gton Watershed �Fbrenoee� —r \\..-c — /" �a ,.� WllmmIon Basin Map �r p All North Carolina tole "'�; Broad tumble -ram Suer _r i any k ,f >tM r 4oer�lAa�i Cape Fear lH a..:. NOM 'e t y'i 1 , 2 '� coewey g�Kh Catawba � ,live Chowan d r� zy, ei tl i, i Pasauotank r Myrtle c I Beec`n I �'�; French Broad Murreils (r Hiwassee Inlet N Little Tennessee Georgetown + Lumber `f Map data ©2012 Googie Neuse The data you have obtained from this automated US Geological Survey database have not received Directors approval New and as such are provisional and subject to revision The data are released on the condition that neither the USGS nor the Roanoke United States Government may be held liable for any damages resulting from Its use Savannah Tar Pamlico Watauga Yadkin Peedee HINTS QN USE References to non U S Department of the Interior (DOI) products do not constitute an endorsement by the DOI By viewing the Google Maps API on this web site the user agrees to these Terms of Service set forth by G000le U S Department of the Interior I U S Geolo¢icnl Sur%,e\ URL blip//nc water usgs gos/reiltime/real_tinie_lumber litml PIgu Contactlnfotmation NOrlb Carolina Web Detelopment Teun Page Last Modified Weduesdi) ig Dee 201214 01 05 CST http //nc water usgs gov/realtime/real_Ume_lumber html 1/3/2013 Lumber River Basin Name Index Number Classification Class Date • Descnpuon Speual Designation Unnamed Tributary near Artesia 15-2-1 C,Sw + 08/01/00 From source to Lake Waccamaw special mgmnt strategy ORW r Big Creek source to Marlow Branch 15-21-1 C,Sw 12/01/63 Stanland Branch 15-22 C,Sw 12/01/63 From source to Waccamaw River Unnamed Tributary at Wananish 15-2-2 C,Sw + 08/01/00 From source to Lake Waccamaw I special mgmnt strategy ORW r Cawcaw Swamp From source to Waccamaw River 15-23 C,Sw 12/01/63 Little Creek 15-2-3 C,Sw + 08/01/00 iFrom source to Lake Waccamaw special mgmnt strategy ORW r Little Cawcaw Swamp 15-23-1 C,Sw 12/01/63 From source to Cawcaw Swamp Shingletree Swamp 15-23-2 C,Sw 12/01/63 QFrom source to Cawcaw Swamp Persimmon Swamp 15-23-2-1 C,Sw 12/01/63 From source to Shingletree Swamp Hickmans Branch 15-23-3 C,Sw 12/01/63 From North Carolina South Carolina State Line to Cawcaw Swamp Indigo Branch (Indian Branch) 15-23-4 C,Sw 12/01/63 From North Carolina South Carolina State Line to Cawcaw Swamp Earnest Branch 15-23-5 C,Sw 12/01/63 From source to Cawcaw Swamp Second Creek 15-2-4 C,Sw + 08/01/00 From source to Lake Waccamaw special mgmnt strategy ORW r Camp Swamp 15-24-1 C,Sw 12/01/63 From source to North Carolina South Carolina State Line Deep Branch IFrom source to North Carolina South Carolina State Line Intracoastal Waterway • 15-24-2 C,Sw 12/01/63 15-25 SA,HQW 12/01/63 From Cape Fear River Basin at Buoy FI R ev 4 sec 22 to North Carolina South Carolina State Line including all sloughs sounds inlets and connecting channels Wednesday February 08 2012 Based on Classifications as of 20120208 Page 25 of 38 l \kux'I WETI*TEtMON SUPPLEMENT & CALCULATIONS 0 • Is 25 October 2012 The Curry Engineering Group, PLLC c/o Don L Curry Jr , P E PO Box 2018 133 Spring Ave Fuquay-Vanna, NC 27526 Re Storm Water Evaluation Autumn Care, Brunswick County, NC Mr Curry, Please find below a report referencing a soil and site evaluation for the above referenced site, located at the corner of Ash -Little River Road and No 5 School Road in Brunswick County, North Carolina 1 0 Introduction/Purpose �- The purpose of the soil and site evaluation was to determine the feasibility of disposing and/or storing storm waterwlthln appropriate storm water devices located on the site 2 0 Methods (Refer to Appendix A and Figure 1) The site was evaluated using hand auger borings Auger borings were made at varying locations throughout the site to a depth of at least 48 inches and profile descriptions recorded The seasonal high water table was determined by the indication of redoximorphlc features and/or colors of chroma 2 or less (Munsell Color Book) at >2% of the sod volume in mottles or matrix of a horizon or horizon subdivision Field work was conducted at the site on October 24, 2012 3 0 Results/Findings (CFQVE (Refer to Appendix A and Figure 1) IA" 2 11111 The site was characterized by a sandy loam topsoil underlain »_sandy clay loam Applied Resource Manay,-tnent, PC P 0 Box 682 257 Transfer 9tatlon Road Hampstead NC 25443 910 270 2919 Fax 910 270 2988 O 0 / clay loam subsoil The seasonal high water table was noted to be less than twelve inches from the ground surface 4 0 Limitations The areas analyzed as part of this investigation only provide isolated data sets and points and do not represent subsurface conditions at every location in the project area Analyses and conclusions of this report, interpretation between data points, and subjective subsurface interpretation, may not be completely representative of all subsurface conditions This investigation, furthermore does not provide conclusive data on limits of impact or other interpolations where indicated by question marks or where otherwise qualified Conclusions and recommendations of this investigation and report are based on the best available data in an effort to assist in the understanding, control and/or site planning and preparation No guarantee is expressed or implied that new or additional data and/or scientific measures will not be required for ultimate solution of the existing project Should you have any questions or -concerns please do not hesitate to contact me at (910)270-2919 Sincerely, wA:t_' P. 319n 1(- s Walter D Giese, LSS Project Manager t:D SOIL ZER 0 Ip /274 \�'� 2S O<iat er 20 lz i S62 to I TSB 1 --ND I , • to 3 I --- _ _______, , __ _ ----- yh \ •� 1``Y -. �- _- •- - = r�� fir- - -- �=R 1905 60RW NO 5°,CHOp.R-0 Soil Boring (SB) location SHWT SB 1 <12" SB 2 <12 SB 3 <12" ® Compact Constant Head Permeameter Location (located wrth Thales Mobile Mapper CE GIPS Unit) Map adapted from previous design plan by The Cuffy Englne fin Group dated June 2012 TITLE Autumn Care i FIGURE App/ied Re5aurce Sod Boring locations Management, PC IgoeSCALE - DATE---rRAWNBY Hampstead NG2644 12186 1 1" = 200' 10/25/12 I GY • 0 Autumn Care Ash -Little River Road Brunswick County, North Carolina 25 October 2012 Logged By Gene Young, REHS Soil Boring 1 Soil Description 0 - 10 inches Dark gray (10YR 4/1) sandy loam, sub -angular blocky, friable, slightly expansive 10 - 34 inches Yellowish brown (10YR 514) clay loam, sub -angular blocky, firm, slightly expansive with light brownish gray (10YR 6/2) and reddish yellow (7 5YR 6/6) mottles 34 - 40 inches Yellowish brown (10YR 5/4) clay, sub -angular blocky, firm, slightly expansive with gray (10YR 6/1) and dark red (2 5YR 3/6) mottles 40 - 48 inches Yellowish brown (10YR 516) clay loam, sub -angular blocky, firm, slightly expansive with dark red (2 5YR 3/6) and gray (10YR 6/1) mottles Seasonal High Water Table <12" • 0 Autumn Care Ash -Little River Road Brunswick County, North Carolina 25 October 2012 Logged By Gene Young, REHS Sod Boring 2 Sod Description 0 — flinches Very dark gray (10YR 3/1) sandy loam, sub -angular blocky, friable, slightly expansive 8 - 12 inches Yellowish brown (10YR 5/6) sandy clay loam/clay loam, sub - angular blocky, firm, slightly expansive with pale brown (10YR 6/3) and strong brown (7 5YR 4/6) mottles 12 - 48 inches Yellowish brown (10YR 516) sandy clay loam/clay loam, sub - angular blocky, firm, slightly expansive with light brownish gray (10YR 6/2) and -strong brown (7 5YR 4/6) mottles Seasonal High Water Table 12" 0 Autumn Care Ash -Little River Road Brunswick County, North Carolina 25 October 2012 Logged By Gene Young, REHS Sod Boring 3 Sod Description 0 - 6 inches Very dark gray (10YR 311) sandy loam, sub -angular blocky, friable, slightly expansive 6 - 10 inches Yellowish brown (10YR 5/6) sandy clay loam/clay loam, sub - angular blocky, firm, slightly expansive 10 - 30 inches Yellowish brown (10YR 5/6) sandy clay loam/clay loam, sub - angular blocky, firm, slightly expansive with light brownish gray (10UYR 6/2) and brownish yellow (10YR 6/8) mottles 30 - 38 inches Pale brown (10YR 6/3) sandy clay loam, sub -angular blocky, firm, slightly expansive with yellowish brown (10YR 5/6) and gray (10YR 6/1) mottles and light gray (10YR 7/1) sandy loam lenses, sub -angular blocky, friable, slightly expansive 38 —48 inches Light gray (10YR 7/1) clay loam, sub -angular blocky, firm, slightly expansive with dark red (2 5YR 3/6) mottles Seasonal High Water Table 10" REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS AUTUMN CORPORATION ASH, BRUNSWICK COUNTY, NORTH CAROLINA p7 O L�Y�. a♦ �x 'i'. 4�1v64 '`itti xo- ki�r� TM PREPARED FOR MR DON L CURRY, JR , P E THE CURRY ENGINEERING GROUP, PLLC P O BOX 2018 FUQUAY-VARINA, NORTH CAROLINA 27526 ECS CAROLINAS, LLP PROJECT NO 22 18213 OCTOBER 31, 2012 0 C cfr,{fwR I, 9 • ICt1MlltAn month l • t-aco I, uo " ` , ` —1 ,, , October 31, 2012 Mr Don L Curry, Jr, P E The Curry Engineering Group, PLLC P O Box 2018 Fuquay-Vanna, North Carolina 27526 Re Report of Subsurface Exploration and Geotechnical Engineering Analysis Autumn Corporation Ash, Brunswick County, North Carolina ECS Project No 22 18213 Dear Mr Curry As authorized by your acceptance of our proposal number 15378, dated November 10, 2011, ECS Carolinas, LLP (ECS) has completed a subsurface exploration for the subject protect This report presents the results of the field exploration and engineering Analysis, along with our recommendations for design of geotechnical related items O We appreciate the opportunity to be of service to you during the design phase of this protect and look forward to our continued involvement during the construction phase If you have any questions concerning the information and recommendations presented in this report, please contact us at (910) 686-9114 for further assistance Respectfully submitted, ECS CAROLINAS, LLP UU Winslow E Goins, P E Project Engineer North Carolina License No 033571 Aw M gl'- Walid M Sobh, P E Principal Engineer North Carolina License No 022983 7211 Qfidt`n 3tl.. tiESd tR' dlk swill A; i b„ td' nV 11 7 rj r) p$ 0 iS , Z h figb r$-il 'm r_' C.kr"sa Jr ^ 4>nt1_, 14rt }US r,-, R- Imo. wdAtil lit IG:., d1 X f`GS �iJFiU,t.4EI,1S` E" sea tc! REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS AUTUMN CORPORATION ASH, BRUNSWICK COUNTY, NORTH CAROLINA PREPARED FOR MR DON L CURRY, JR , P E THE CURRY ENGINEERING GROUP, PLLC P O BOX 2018 FUQUAY-VARINA, NORTH CAROLINA 27526 PREPARED BY, 0 ECS CAROLINAS, LLP 7211 OGDEN BUSINESS PARK SUITE 201 WILMINGTON, NORTH CAROLINA 28411 ECS CAROLINAS, LLP PROJECT NO 22 18213 FIRM NO F-1078 WINSLOWiE, COINS, P E G33 u9 = �¢,,�� clt.E: vV f1 NC LICENSEtNO\033751 OCTOBER 31, 2012 0 U 10 EXECUTIVE SUMMARY 2 0 PROJECT OVERVIEW 21 Protect Information 2 Zoope of Work 2 31urpose of Exploration 3 0 EXPLORATION PROCEDURES 31 Subsurface Exploration Procedures 31 1 Cone Penetration Tests 4 0 EXPLORATION RESULTS 41 Site Conditions 4 2 Regional Geology 4 3 Sod Conditions 44 Groundwater Conditions 5 0 ANALYSIS AND RECOMMENDATIONS TABLE OF CONTENTS 51 52 Subgrade Preparation Engineered Fill Placement 53 Foundations Design 54 Floor Slab Design 55 Seismic Site Class Determination and Liquefaction Potential 55 Pavement Design Considerations 56 Site Drainage 57 Construction Considerations 6 0 CLOSING APPENDICES APPENDIX A FIGURES ES APPENDIX B CPT SOUNDING LOGS APPENDIX GENERAL CONDITIONS 0 Report of Subsurface Exploration and Geotechnical Engineering Analysis sis • ANumn , Brunswick Ash, Brunswick County, No Carrrlfiah ECS Project No 2218213 10 EXECUTIVE SUMMARY This report contains the resdlts of our subsurface exploration and geotechnical engineering analysis for the proposed site located at the intersection of the intersection of No 5 School Road and Ash Little River Road in Ash, Brunswick County, North Carolina At the time of our field exploration, the site was wooded and relatively level with typical elevations ranging from 31 to 33 feet above MSL We understand that an approximately 61,800 structure will be constructed on the proposed site with associated parking and drive ways Additional project information including grading information was not available at the time this report was prepared Approximately 6 to 12 inches of pine straw/organic topsoil was reported by the drillers at the CPT sounding locations Beneath the surface to depths of about 10 feet, the test soundings typically encountered intermittent layers of loose to medium dense silty and slightly silty sands (SM, SP-SM) and medium stiff to hard sandy silts, silty clays and clays (ML CL MIL, CL, CH) From 10 feet to depths of approximately 36 feet, the test soundings typically encountered layers of very soft to medium stiff silty clays and clays (CL MIL, CL, CH) and intermittent layers of loose to medium dense silty sands (SM) From a depth of 36 feet to a refusal depth of approximately 62 feet, test sounding S 3 encountered intermittent layers of medium dense to very dense silty, clean and clayey sands (SM, SP, SC) In summary, due to the presence of soft clays excessive settlement will oceur at the site if column loads exceed 80 kips or wall loads exceed 3 0 kips per foot or fill exceeding 3 feet is anticipated If the structural loads are anticipated to exceed these values, ECS recommends that fill material be used as a surcharge load prior to construction of the structure Surcharging for at least 3 to 6 months should be anticipated Provided surcharge operations have been completed as descrlbed in this report, the proposed structure can be supported on conventional shallow foundations For foundations designed and constructed in accordance with the recommendations provided in this report, a net allowable soil bearing pressures of 2,000 pounds per squ% foot (psf) is recommended for use in proportioning shallow foundations Alternatively to surcharging the site, the proposed structure can be supported on a deep foundation system consisting of driven timber piles For 8 inch tip timber piles installed to a depth of 40 feet, the allowable axial compressive load is 30 tons Specific information regarding the subsurface exploration procedures used, the site and subsurface conditions at the time of our exploration, and our conclusions and recommendations concerning the geotechnical design and construction aspects of the project are discussed in detail in the subsequent sections of this report Please note this Executive Summary is an important part of this report and should be considered a "summary" only The subsequent sections of this report constitute our findings, conclusions, and recommendations their entirely Prepared By Reviewed By Winslow E Goins, P E Walid M Sobh, P E • Project Engineer Principal Engineer Report of Subsurface Exploration and Geotechnical Engineering Analysis sis Autumn Corporation Ash, Brunswick County North Carolina ECS Project No 22 18213 2 0 PROJECT OVERVIEW 21 Protect Information Our understanding of the proposed construction is based upon our discussion, representatives of The Curry Engineering Group, PLLC and a site map provided to ECS I Curry Engineering Group, PLLC The proposed site is located at the intersection intersection of No 5 School Road and Ash Little River Road in Ash, Brunswick County, Carolina At the time of our field exploration, the site was wooded and relatively level with elevations ranging from 31 to 33 feet above MSL We understand that an approximately 61,800 structure will be constructed on the proposi with associated parking and drive ways Additional project information including g information was not available at the time this report was prepared 2 2 Scope of Work The conclusions and recommendations contained in this report based on the teselts following • eight electronic cone penetration test (CPT) test sounding • engineering analyses of the field findings with respect to the provided project informato 2 3 Purposes of Exploration The purpose of this exploration program was to determine the soil and groundwater cons at the site and to develop engineering recommendations to assist in the desigr construction of the proposed project We accomplished these objectives as follows • performing a site reconnaissance to evaluate the existing site conditions • performing soundings to explore the subsurface soil and groundwater conditions analyzing the field to develop appropriate geotechnical engineenng design and construction recommendations Report of Subsurface Exploration and Geolechnical Engineering Analysis Autumn Corporation • Ash, Brunswick County, North Carolina ECS Project No 22 18213 3 0 EXPLORATION PROCEDURES 3 1 Subsurface Exploration Procedures 3 1 1 Cone Penetration Testing Nine electronic cone penetration test soundings were performed in the proposed building area during our field exploration The cone penetration test soundings were performed in general conformance with ASTM D 5778 by our subcontractor The soundings were advanced to depths of about 35 to 40 feet The soundings were performed with a track mounted rig The approximate locations of the CPT soundings are indicated on the Exploration Location Diagram in Appendix A of this report The cone used in the sounding has a tip area of 10 CM2 and a sleeve area of 150 cm2 The CPT soundings recorded tip resistance and sleeve friction measurements to assist in determining pertinent index and engineering properties of the site soils The ratio of the sleeve friction to tip resistance is then used to aid in assessing the soil types through which the tip is advanced Within the CPT sounding S-3, seismic tests were performed at approximately three foot intervals to refusal to measure the shear wave velocity (vs) of the subsurface materials to aid in assessing the dynamic response properties of the site subsurface materials The seismic shear waves are generated by making impact with a 20-pound sledgehammer onto a steel beam The impacts are initiated on the right and left sides of the CPT rig and the corresponding wave traces recorded on an oscilloscope are analyzed to determine the shear wave velocity of the tested material The waves are measured with three geophones that are installed in the cone The results of the CPT and seismic testing are presented in Appendix B 0 sa <[ 41 Site Conditions 4 0 EXPLORATION RESULTS 315 T . ;, CrC.. .'c S IC:" _ _. _ ri.- Inlc ce. cf :f re If "'4,,,:nC. R:.: ar0 _fLrc ^a :r^ .. a.Cllla r �.c .Tie :° �IcC E%:IC a l: .e .^,0-L ar. ., e le' el" i -I^,' e'B'a on .3r_l^y nc-) . 1: ...eet I JI_ 4 2 Realona' Geoloov T-- i r :asla :Ia r : ...:r. :r- ir,e c Acrn .: I". Tie C:.. ceic a 9 . S C c. —Flc , —a er.c S I he c -as Trope _c. .s a'� i l-I:+ie :r a 'li' C(E- a�'j rie Eslcif c_c❑ rE E:_. rC.c icf _ eci ieai to cecl"lo'x I-19r tc "e !r:orj1': 'c ae. "l.fn E.. a C erll 1;�5_ l_ C _-I C rlZ. t I:CC:'c:n. 7 c: E'l o t: ^aCo .r :r ele 3 ^ s :n_ i :I al c icf:c_ I".: < c_' . : i= c ra : a'. o_ to I'E plc a 'i :1 re cl G a er a: t' arSle^• ? ^ a" -ct ltf IuC1Ja. C'c ' C2.:IL-(I: Q4 3 $oil Concloons CPT Soundings hF_ .r,Tv: _ _ 2 r in :` _ re nr^, : 2i ":s:I cc 'r= lrll; .: re C:T _:r1r: r - — 3 =_ r sL-, _-- rs � -A `zet - k- a:! r: -": ,Ci�a ei C" E a" rler'.I-e' a $ __r_ i_ "'e_ LT CenC- I ari SI:rL ° -ar:c ,S l J: S, _ rca .-n , : rar: . _ . _Ic c t 11. C. l L J_ _- 7n _:J _ a . - : <, :.�.::ErE a . e-I _ :� al._ . Fr.n . fco Cf a0c:? .Ta E i °: c re teal e r --. ^.-,rm - c r Ci ' 'lc_ '9 � I I �_�� ar' 1. C_ I ��_ �,_ ..?c:7T .-i- c1 S' ' 7re -:JI cci CC .. ar:a," :°r- aE tC 1-^ _. F -T E :c: r :t 3^ .-c _ c L-a of 'at-l' '2 ecl -. c.Lra'C S (S S: JC T-e e-v c_ _r?:lB. van arc :ei❑ anCr. e4 -c1 ar E tnecc-I-:--c-1'. ". 'C rc{^cc.C, I.r_C Tie :E3^ _tr•s a" l:e: a _ : ;Ezra S:rr— C:'^. a: Jr Clr:>T - ;.PT::GT c 'l - ^.Ir C CC"Iol1 Ce c e: l 'rrav:, a ec:r Ic^d :f 4 Report of Subsurface Exploration and Geotochnlcal Engineering Analysis Autumn Corporation • Ash, Brunswick County, North Carolina ECS Project No 22 18213 4 4 Groundwater Conditions Porewater pressure measurements were made at all sounding locations during exploration Furthermore, visual observations of the samples retrieved during drilling exploration were also used in evaluating the groundwater conditions The groundwater depths were observed to range from about 9 6 to 10 6 feet below the existing grade in the CPT soundings A "perched" water condition may exist In the upper 5 feet after heavy precipitation due to the presence of relatively impervious clays The highest groundwater observations are normally encountered in the late winter and early spring Variations In the location of the long-term water table may occur as a result of changes in precipitation, evaporation, surface water runoff, and other factors not immediately apparent at the time of this exploration If long term water levels are crucial to the development of this site, it would be prudent to verify water levels with the use of perforated pipes or piezometers 0 Report of subsurface Exploration and Geotechnical Engineering Analysi- Isis Autumn Corporation • Ash Brunsmck County, North Carolina ECS Project No 2218213 5 0 ANALYSIS AND RECOMMENDATIONS 0 u The recommendations provided in this report are based upon our understanding of the proposed construction, the information provided to us during this study and our past experience with similar conditions Should any of the information provided to us be changed prior to final design, ECS should be notified to review these recommendations and make appropriate revisions, if necessary 51 Subarade Preparation The first step in preparing the site for the proposed construction should be to remove vegetation, rootmat, topsoil, deleterious materials, and any other soft or poor materials from the existing ground surface These operations should extend at least 10 feet, where possible, beyond the planned limits of the proposed buildings and pavements After proper clearing, stripping, grubbing, and prior to fill placement, foundation, slab, or pavement construction, the exposed subgrade soils should be carefully evaluated by an experienced geotechnical engineer to identify any localized unstable or otherwise unsuitable materials After evaluating the exposed soils, loose and yielding areas should be identified by proofrolling the exposed subgrades, if site and subsurface conditions allow, with an approved piece of equipment, such as a loaded dump truck, having a single axle weight of at least 10 tons Any soft or unsuitable materials identified during proofrolling operations should be either repaired in place or removed and replaced with an approved backfill placed and compacted in accordance with recommendations of this report - Site subgrade conditions will be significantly influenced by weather conditions Subgrades that are evaluated after periods of rainfall will not respond as well to proofrolling as subgrades that are evaluated after periods of more favorable weather We strongly recommend that rubber tire equipment not be used if subgrade conditions exhibit elevated moisture conditions The contractor should use trackek equipment to minimize the degradation of marginally steady subgrade The preparation of fill subgrades, as well as proposed building subgrades, should be observed on a full time basis by ECS personnel These observations should be performed by an experienced geotechnical engineer or qualified person to ensure that substandard materials have been removed and that the prepared subgrade meets project requirements br support of the proposed construction and/or fills 5 2 En sneered FIII Placement Following the removal of deleterious surface and subsurfaa materials, and afteeeehieving a stable subgrade, engineered fills can be placed and compacted to achieve the desired site grades Fill for support of the proposed construction and for backfill of utility lines within expanded building and pavement limits should consist of an approved material, free of organic matter and debris and cobbles greater than 3 inches, and have a Liquid Limit (ILL) and Plasticity Index (PI) less than 35 and 9, respectively We also recommend that fills within structural areas have a standard Proctor (ASTM D 698) maximum dry density of at least 105 pounds per cubic foot (pcf) Report of Subsurface Exploration and Geotechmcal Engineenrg Analysis sis Autumn Corporation • Ash, Bmnsvock County, North Carolina ECS Protect No 22 18213 0 Materials that should not be used engineemsl include topscfijlorganic materials (OH, ( and high plasticity clays and silts (CH, MH) Such materials removed during grading operate should be either stockpiled for later use in landscape fills, or placed in approved on or off disposal areas Existing sods containing significant amounts of organic matter will not be adequate for re -use as engineered fill As such, the organic content of the near surface soils should be evaluated to determine if some of these soils will be adequate for re -use as engineered fill Natural fine- grained soils classified as clays or silts (CL, ML) with ILL and PI greater than 35 and 9, respectively, should be evaluated by the geotechnical engineer at the time of construction to determine their suitability for use as engineered fill Prior to the commencement of fill operations and/or utilization of any off site borrow materials, the contractor should provide representative samples of the proposed fill soils to the geotechnical engineer The geotechnical engineer can determine the material's suitability for use as an engineered fill and develop moisture -density relationships in accordance with the recommendations provided herein Samples should be provided to the geotechnical engineer at least 3 to 5 days prior to their use in the field to allow for the appropriate laboratory testing to be performed FIII materials placed within the building and pavement areas should be placed in lifts not exceeding 8 inches in loose hft,thickness and moisture conditioned to within their working range of optimum moisture content The fills should then be compacted to a minimum of 98 percent of the soil's standard proctor (ASTM D 698) maximum dry density The typical working range of optimum moisture for the natural Coastal Plain soils at the site is expected to be within approximately 3 percent of the optimum moisture content Care should also be taken to provide a smooth, gently sloping ground surface at the end of each day's earthwork activities to help reduce the potential for ponding and absorption of surface water Grade controls should also be maintained throughout the filling operations Filling operations should be observed on a full time basis by qualified ECS personnel to determine that the required degrees of compaction are being achieved We recommend that a minimum of one compaction test per 2,500 square foot area be performed for each lift of controlled fill The elevation and location of the tests should be clearly identified at the time of fill placement Areas which fad to achieve the required degree of compaction should be re -worked until the specified degree of compaction is achieved Fading test areas may require moisture adjustments or other remedial activities in order to achieve the required compaction Fill materials should not be placed on frozen, frost -heaved, and/or soils which have been recently subjected to precipitation Wet or frozen sods should be removed prior to the continuation of site grading and fill placement Borrow fill materials, if required, should not contain excessively wet or frozen materials at the time of placement Additionally, if grading operations occur during the winter months, frost -heaved soils should be removed prior to placement of engineered fill, granular sub base materials, foundation or slab concrete and asphalt pavement materials If problems are encountered during the site grading operations, or if the actual site conditions differ from those encountered during our subsurface exploration, the geotechnical engineer should be notified immediately Report of Subsurface Exploration and Geotechnical Engineering Analysis sis Autumn Corporation • Ash Brunswick County North Carolina ECS Project No 2218213 63 Foundations Recommendations In summary, due to the presence of soft clays, settlerimbeillsmvarr at the site column loads exceed 80 kips or wall loads exceed 3 0 kips per foot or fill exceeding 3 feet i anticipated If the structural loads are anticipated to exceed these values, the propose structure cannot be supported on shallow foundations without first surcharging the site li order to achieve a stable subgrade for shallow foundations, the building footprint will require surcharge load We recommend that the preload fill be placed to 10 feet above the proposes finished floor elevation The fill should extend at full height for a distance of 10 feet beyond thi outside edge of the proposed structure The fill should have a minimum in place moist densit of 110 pounds per cubic foot We recommend that a minimum of five settlement momtonnl points be established within each preloaded building area The elevations of these monument: should be surveyed immediately after the preload is constructed, and at least once a week afte the surcharge fill is in place to determine when the magnitude and rate of settlement ha: reached a level that the budding can tolerate We do not anticipate that significant rebound vel occur after the preload is removed For planning purposes, a preload period of 3 to 6 month: should be anticipated, but the actual preload period should be based on the settlement: observed at the monuments It is generally desirable to material which mebe easilt rehandled for the surcharge fill The surface of the preload fill should be rolled smooth anc shaped to promote drainage and minimize erosion If desired, the rate of consolidation within the clay layers may be accelerated and the time required for surcharge loading may be reduced by installing wick drains or sand drains at the site ECS recommends that a specialty design/building contractor be consulted Provided the subgrade preparation and earthwork operations are completed in strict accordance with the recommendations of this report and the need for surcharging has been addressed, the proposed structures can be supported on conventional shallow foundations bearing on approved natural materials and/or properly compacted fill at either site We recommend a maximum net allowable design soil bearing pressure of 2,000 psf for proportioning continuous and isolated column footings To reduce the possibility of foundation bearing failure and excessive settlement due to local shear or "punching" failures, we recommend that continuous footings have a minimum width of 18 inches and that isolated column footings have a minimum lateral dimension of 30 inches Furthermore, foobngs should bear at a depth to provide adequate frost cover protection For this region, we recommend the bearing elevation be a minimum depth of 12 inches below the finished exterior grade or in accordance with the local building code requirements Undercutting of the footings should be anticipated due to the presence of soft clays in the upper 3 feet Once structural loads and site grades are finalized, we request that they be provided to us to review our recommendations and make any necessary changes The net allowable soil bearing pressure refers to that pressure which may be transmitted to the foundation bearing soils in excess of the final minimum surrounding overburden pressure The final footing elevation should be evaluated by ECS personnel to verify, that the bearing soils are capable of supporting the recommended net allowable bearing pressure and are adequate for foundation construction This analysis should include visual observations, hand rod probing, and dynamic cone penetrometer (ASTM STP 399) testing, or other methods deemed appropriate by the geotechnical engineer at the time of construction, in each column footing excavation and at intervals not greater than 20 feet in continuous footing excavations Report of subsurface Exploration and Geotechmcal Engineering Analysis • Autumn Corporation Ash Bmnsvack County, North Carolina ECS Project No 2218213 5 3 Foundations Recommendations In summary, due to the presence of soft clays, settlemenbxcesswet the site column loads exceed 80 kips or wall loads exceed 3 0 kips per foot or fill exceeding 3 feet is anticipated If the structural loads are anticipated to exceed these values, the proposed structure cannot be supported on shallow foundations without first surcharging the site In order to achieve a stable subgrade for shallow foundations, the building footprint will require a surcharge load We recommend that the preload fill be placed to 10 feet above the proposed finished floor elevation The fill should extend at full height for a distance of 10 feet beyond the outside edge of the proposed structure The fill should have a minimum in place moist density of 110 pounds per cubic foot We recommend that a minimum of five settlement monitoring points be established within each preloaded building area The elevations of these monuments should be surveyed immediately after the preload is constructed, and at least once a week after the surcharge fill is in place to determine when the magnitude and rate of settlement has reached a level that the building can tolerate We do not anticipate that significant rebound will occur after the preload is removed For planning purposes, a preload period of 3 to 6 months should be anticipated, but the actual preload period should be based on the settlements observed at the monuments It is generally desirable to use material which can be easily rehandled for the surcharge fill The surface of the preload fill should be rolled smooth and shaped to promote drainage and minimize erosion Provided the subgrade preparation and earthwork operations completed in strict accordance with the recommendations of this report and the need for surcharging has been addressed, the proposed structures can be supported on conventional shallow foundations bearing on approved natural materials and/or properly compacted fill at either site We recommend a maximum net allowable design sod bearing pressure of 2,000 psi for proportioning continuous and isolated column footings To reduce the possibility of foundation bearing failure and excessive settlement due to local shear or "punching" failures, we recommend that continuous footings have a minimum width of 18 inches and that isolated column footings have a minimum lateral dimension of 30 inches Furthermore, footings should bear at a depth to provide adequate frost cover protection For this region, we recommend the bearing elevation be a minimum depth of 12 inches below the finished exterior grade or in accordance with the local building code requirements Undercutting of the footings should be anticipated due to the presence of soft clays in the upper 3 feet Once structural loads and site grades are finalized, we request that they be provided to us to review our recommendations and make any necessary changes The net allowable sod bearing pressure refers to that pressure which may be transmitted to the foundation bearing soils in excess of the final minimum surrounding overburden pressure The final footing elevation should be evaluated by ECS personnel to verify that the bearing soils are capable of supporting the recommended net allowable bearing pressure and are adequate for foundation construction This analysis should include visual observations, hand rod probing, and dynamic cone penetrometer (ASTM STP 399) testing, or other methods deemed appropriate by the geotechnical engineer at the time of construction, in each column footing excavation and at intervals not greater than 20 feet continuous foofingiexcavations 0 Report of Subsurface Exploration and Geotechmcal Engineering Analysis Nis Autumn Corporation • Ash, Brunswick County North Carolina ECS Project No 221e213 The settlement of a structure is a function of the compressibility of the bearing matenals, bearing pressure, actual structural loads, fill depths, and the bearing elevation of footings with respect to the final ground surface elevation Estimates of settlement for foundations bearing on engineered or non engineered fills are strongly dependent on the quality of fill placed Factors which may affect the quality of fill Include maximum loose Irfl thickness of the fills placed and the amount of compactive effort placed on each lift Provided that the recommendations outlined in this report are strictly adhered to, we expect that total settlements for the proposed construction are expected to be in the range of 1 inch or less, while the differential settlement will be approximately 112 of the anticipated total settlement This analysis is based on our engineering experience and assumed structural loadings for this type of structure, and is intended to aid the structural engineer with his design Exposure to the environment may weaken the soils at the foundation bearing elevation if the foundation excavations remain exposed during periods of inclement weather Therefore, foundation concrete should be placed the same day that proper excavation is achieved and the design beanng pressure verified If the bearing soils area softened by surface water absorption or exposure to the environment, the softened soils must be removed from the foundation excavation bottom immediately prior to placement of concrete If the excavation must remain open ovemight, or if inclement weather becomes imminent while the bearing sods are exposed, we recommend that a 2 to 3 inch thick 'mud mat" of 'lean' concrete be placed over the exposed bearing soils before the placement of reinforcing steel Deep Foundations Alternatively, The proposed structure can be supported on a deep foundation consisting of driven 8 inch tip timber piles Our evaluation indicates that at a depth of 40 feet below current site grades, the soils are capable of supporting a maximum of 30 tons in compression, 20 tons in tension and 6 tons of lateral support for a timber pile In our opinion, piles installed to shallower depths would not provide long term stability Pile capacity analyses were performed assuming a fixed head condition We recommend that the pile during hammer used to install each pile have a minimum rated energy blow of 8,000 foot/pounds Driving cnteria and bearing elevations should be established prior to driving piles It is suggested that several over length piles be driven prior to the start of production pile driving, to establish the driving criteria, pile lengths to be ordered and to determine if auger 'pilot' holes are justified Production piles should not be ordered until the pile lengths can be determined Two piles are recommended for the structure The over length piles could be driven in production pile locabons Pile installation operations and load test, if necessary, should be monitored by a senior soil technician working under the supervision of a Licensed Engineer ECS would be pleased to develop driving criteria for the project, once the method of installation and the contractor has been selected Construction of pile caps or grade beams could begin only after the piles have been installed 0 Report of Subsurface Exploration and Geolechnical Engineering Analysis Autumn Corporation . Ash Brunswick Counly, North Carolina ECS Project No 2218213 5 4 Floor Slab Deslan • 0 Provided a suitable subgrade will be prepared recommended heas9l, ground level slabs be designed as slabs on -grade Our findings indicate that a modulus of subgrade reaction of 125 pci is appropriate for design provided that upper 12 inches of the slab subgrade have been uniformly compacted to at least 98 percent of their standard Proctor maximum density and are unyielding during proofrolling We recommend that slabs on grade be isolated from the foundations so that tpotenbal differential settlement of the structure will not induce shear stresses in the floor slab Also, to minimize the crack width of any shrinkage cracks that may develop near the surface of the slab, wire mesh reinforcement may be included in the slab design The mesh should be located in the top third of the slab to be effective We also recommend that slabs on -grade be underlain by a minimum of 6 inches of open graded aggregate to help prevent the capillary rise of subsurface moisture from adversely affecting the slab If open graded aggregate is not available, clean sand with less than 3 percent fines can be used provided the placement and compaction of the sand complies with the above recommendations If floor covering such as file or carpet will be utilized for interior finishes, a polyethylene vapor barrier may be used beneath the floor slab for moisture control considerations 5 5 Seismic Site Class Determination and Liauefactlon Potential The North Carolina Budding Code (2009 International Building Code with North Carolina Amendments) requires that a seismic Site Class be assigned for new structures The seismic Site Class for the site was determined by calculating a weighted average of the shear velocities of the overburden to the depth of rock/refusal The CPT test data indicates that the existing natural, overburden sods at the site have shear velocities ranging from approximately 418 fusec to 2,266 ftlsec The method for determining the weighted average value is presented in Section 161315 of the IBC 2009 The weighted average value for the site is 837 fvsec Based on the results of the CPT soundings and our evaluation of the site, the site shall be assigned a seismic class "D" Based on the USGS Seismic Hazard Curves and Uniform Hazard Response Spectra 2003 NEHRP Seismic Design Provisions and the IBC 2009, for a seismic site class °D" at latitude 34 954 degrees and longitude 78 598 degrees, the SDs value is 0 432 and the Se, value is 0 202 The seismic design category depends on the design use of the building and should be determined by the structural engineer The potential for Ilquefaction at the site is considered low based upon the CPT results and the liquefaction index procedure developed by Iwasaki (1982) Based on our CPT results and our evaluation using a site peak ground acceleration of 017 g, an earthquake event with a magnitude of 7 0 and procedures developed by Robertson and Wride (1998), the liquefaction induced settlement at the subject site estimated to basapproximately 1 inch 10 Report of Subsurface Exploration and Geotechnical Engineering Analysis Autumn Corporation • Ash, Brunsmck County, North Carolina ECS Project No 22 18213 5 6 Pavement Design Considerations For the design and construction of exterior pavements the subgrades should be prepared strict accordance with the recommendations in the'Subgrade Preparation' and 'Engineered Fill Placement' sections of this report An Important consideration with the design and construction of pavements is surface and subsurface drainage Where standing water develops, either on the pavement surface or within the base course layer, softening of the subgrade and other problems related to the detenoration of the pavement can be expected Furthermore, good drainage should minimize the possibility of the subgrade materials becoming saturated during the normal service period of the pavement Actual traffic conditions were not provided to ECS However, based on our experience for light duty traffic for similar protects, a flexible pavement section may consist of at least 2 inches of surface mix overlying at least 6 Inches of compacted graded aggregate base in the parking and roadway areas Similarly, a heavy duty, flexible pavement section may consist of at least 3 inches of surface mix overlying at least 8 Inches of compacted graded aggregate base in the parking and roadway areas For a rigid pavement section, we recommend 6 inches of 650 psi flexible strength concrete overlying at least 6 inches of compacted graded aggregate base is used for road areas All aggregate base course materials beneath pavements should be compacted to at least 98 percent of their modified Proctor maximum dry density (ASTM D 1557) • Regardless of the section and type of construction utilized, saturation of the subgrade materials and asphalt pavement areas results in a softening of the subgrade material and shortened life span for the pavement Therefore, we recommend that both the surface and subsurface materials for the pavement be properly graded to enhance surface and subgrade drainage By quickly removing surface and subsurface water, softening of the subgrade can be reduced and the performance of the parking area can be improved Site preparation for the parking areas should be similar to that for the building area including stripping, proofrolling, and the placement of compacted structural ral fill 0 Please note that large, front loading trash dumpsters frequently impose concentrated front wheel loads on pavements during loading This type of loading typically results in rutting of bituminous pavements and ultimately pavement failures and costly repairs Consequently, we recommend the use of an 8 inch thick, mesh reinforced concrete slab that extends the entire length of the truck Concrete pavements should be properly jointed and reinforced needed to help reduce the potential for cracking and to permit proper load transfer 11 Report of Subsurface Exploration and Geotechnlcal Engineering Analysis sis Autumn Corporation • Ash, Brunswick County, North Carolina ECS Project No 22 1a213 5 7 Site Drainage E Positive drainage should be provided around the perimeter of the structure to help minimize the potential for moisture infiltration into the foundation and slab subgrade soils We recommend that landscaped areas adjacent to these structures be sloped away from the construction and maintain a fall of at least 6 inches for the first 10 feet outward from the structures Roof water should be discharged directly into below -grade stormwater piping or be directed a sufficient distance away from the building with downspouts The parking lots, sidewalks, and any other paved areas should also be sloped to divert surface water away from the proposed building The proper diversion of surface water during site grading and construction will help reduce the potential for delays associated with penods of inclement weather The proper diversion of surface water is especially critical since portions of the site soils are expected to be moisture sensitive Based upon our past experience, the use of "crowning" large areas of exposed soils should be useful to help divert surface water from the prepared subgrades 5 8 Construction Considerations It is imperative to maintain good site drainage during earthwork operations to help maintain the integrity of the surface soils The surface of the site should be kept properly graded to enhance drainage of surface water away from the proposed construction areas during the earthwork phase of this project We recommend that surface drainage be diverted away from the proposed building and pavements areas without significantly interrupting its Flow Other practices would involve sealing the exposed soils daily with a smooth drum roller at the end of the day's work to reduce the potential for infiltration of surface water into the exposed soils The key to minimizing disturbance problems with the soils is to have a proper earthwork operations plan Specifically, it should be the earthwork contractor's responsibility to maintain the site soils within a workable moisture content range to obtain the required in -place density and maintain a durable subgrade Scarifying and drying operations should be included in the contractor's price and not be considered an extra to the contract In addition, construction equipment cannot be permitted to travel across the site, especially once the desired final grades have been established Construction equipment should be limited to designated lanes and areas, especially during wet periods to minimize disturbance of the site subgrades It will likely be necessary to utilize tracked equipment during grading operations particularly the subgrade soils exhibit elevated moisture conditions 12 Report of Subsurface Exploration and Geotechnical Engineering Analysis Autumn Corporation • Ash, Brunswick County, North Carolina ECS Project No 22 18213 6 0 CLOSING • Our geotechnical Analysis of the site has been based on our understanding of the site, the project Information provided to us, and the data obtained during our exploration The general subsurface conditions utilized in our analysis have been based on interpolation of subsurface data between the soundings If the protect information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our review, Analysis and revision of our recommendations, if necessary The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site Is beyond the scope of this geotechnical exploration 13 r \ � APPROX SOUNDING LOCATION z y APPROX SOUNDING LOCATION WITH SHEAP WAVES 5-8 J I °f y 5-6 : 5-4 • I S-7 5-3 5-2 5-5 lit 5-9 EN61NEER SCALE WE6 N • DRAFTSMAN PROTECT NO WEG 22182 REVISIONS SHEET Carolina DATE 10/31 Operator Job Number Water Table AutumCorporation R, n S11 w111 11 1118" _ 22 18211 104)n _ Cone Number 1.111,01z 1 13 `] PM - Date and Time F I CPT DATA n r.n O OI i ,r TSr 60 a ) 1 1 w PSI o I I I 1 � r. i ! r I 20 _ 25 y I I I Jel i sensdlve fine grained c 2. organic material 9 3 clay a a silly clay to eley 35 clayey slit to silty clay 96 sandy slit to clayey silt Location Hole Number County - /lab North C mvin.a st _ nl,lnR.,lrw CIO 10/ 1l uvmm JO SPTW owa (n m F 1 ! ;tll' 3 t � !I i tl I I il�a!i I II,I,1 12 mdy sans 10 sanaY sett 010 gravelly sand to sand 8 sand to silty sand 011 very stdf fine grained (') 0 sand M 12 sand to clay ey sand C) REMARKS Autumn Corporation Operator Ron Stewart Cone Number 22-18213 DSG0867 Location Ash, North Carolina _ Job Number -- Date and Time 1012312012 11 07 07 AM Hole Number S g Water Table 10 ao n County Brunswick = CPT DATA � a O d v 0 Tip Resistance Local Friction Pore Pressure Q W REMARKS Ot TSF 701 as 0 Fs TSF 2 2 Pw PSI 8 0 60" mer a:d o —,---—.--1----�Mf7i fn m i}- I--T 5 15 I I I � . i'E) 25 30 # i 1 = 2 1113 sensitive f1na grained organic material clay MA 511, C", 'n c'al A 5 - clayey slit to silty clay 06 sandy silt to clayey silt 1117 8 - r9. sury sand to sandy sin sand to silty sand sand 0 10 all n 12 gravelly sand to sand very stiff fine grained (`) sand to clayey sand {� H a y Tip Resistance 0 Ot TRF Autumn Corporation Operator _ Ron Stewart _ Cone Number DSG0887 Job Number 22 18213 Date and Time 1012312012 11 40 31 AM Water Table 10 30 it Local Friction CPT DATA Pore Pressure • o x2- organic material s r '9 3 - clay it 6 sandy silt to clayey silt a Seismic Velocity SPT (R1s) 250010 60% Hammer 250 Ash, North Carolma S-3 Brunswick 13 a 1312 sand to clayey sand (`( REMARKS e • Autumn Corporation S-3 'CO Im ® —�`.. ' '-v""� �y�1t\` t�"4•-\wry �.a • Not 140 LLP Autumn Corporation Operator Ron Stewart DSG0867 2218213 Cone Number '10l2312012 9 46 22 AM Job Number Water Table 9 94 ItDate and Time Location Ash North Carolina Hole Number 3 4 County Brvnsvnck F CPT DATA a O 0— Tip Resistance Local Friction Pore Pressure SPT W > 0 0 Qt TSF 7010 �� Fs TSF 27 -r- P. PSI 1010 60%Hammer 25, J = d _ O W }> o m F , 1 i I , 2. c � � 20 25 i 1 i 39 1 sensitive fine grained 2 organic material 413- clay 04 _o', Oz, cc'ay 45 clayey silt to silty clay 1116 sandy silt to clayey silt 0 7 - sury sand to sandy silt 8 sand to silty sand 09 sand O 10 - gravelly sand to sand t111 - very stiff fine grained r) to 12 - sand to clayey sand(') REMARKS J � Rrn Sp.w nl Operator 21 hill l Job Number 9 se n Water Table Autumn Corporation DS<-080 Cone Number 1O12A7012 10 14 ] AM Date and Time CPT DATA 1— u _ Ip _ Iq. Hoarvl .o.0 "_ n UI IsY 1'pn Imati, ionlo r Isr /Il rwrclnt• 1 � i t !r I •-L_- i Sensitive fine gramod 2 organic material N3- clay Local Friction r i m4 ndty rlay +c cl^� s olaysy slit to silty clay 11116 sandy silt to clayey silt Location Hole Number County ' l a cob 11 ..rims.. SPT N' CAI l i 0 i - iely Sara to sandy slit "8- sand to silty sand a g sand Anti Nu.tM1 (. Hobo . tis nnm w.rF a 10 - gravelly sand to Sand C 11 - very stiff fine grained (7 012 sand to clayey sand (ry REMARKS Autumn Corporation Operator Ron Stewart Cone Number DSG0867 Job Number 22-18213 Date and Time f 0/23/2012 9 25 09 AM Water Table g f4 tt F- a W Tip Resistance CPT DATA Local Friction 90 0 Fs TSF TT-'"-- 10 S '7 r �I I t Pore Pressure + 1 + k, Location Ash North Carolina Hole Number gy - County Brunswick SPT N• , 1310- gravelly sand to sand 612 1311 very stiff fine grained (7 012 - sand to clayey sand (') sensitive line gnined organic material R 4 s +ty c+a, ,c ciao 45 clayey slit to silty clay 147 8 silty sand to sandy slit sand to silty sand W 3 - clay ■ 8 - sandy silt to clayey silt t g - sand __. REMARKS Autumn Corporation Operator Ron Stewart Cone Number OSG0867 Job Number 22 18213 Date and Time 10/23/2012 1 00 36 PM Water Table 994ft Location Ash, North Carolina Hale Number 5-7 County Brunswick CPT DATA o (L 13 v Tip Resistance 0 Local Friction Pore Pressure _.i = 2 REMARKS 6 Qt TSF 90 ��� 0 Fs TSF 2 2 Pw PSI 1 0 60% Hammer 25 rn m F- �s " I � d ! • I i 1 l 1 I 2 �� �� � -•.. "lit 1 1 _ I I r( I ! 10 12 1 sensitive fine gramed o 4 s01g. c'ay o clay t 2 - organic material z 5 clayey silt to silty clay +J 3 clay 1111116 sandy silt to clayey slit M 7 silty sand to sandy silt M 1 O gravelly sand to sand T 8 - sand to sllty sand 011 very stiff fine gmiried (ry n 9 - sand 012 sand to clayey sand (7 fqj Autumn Cot poratfon Ron Stowart _ DSG 0867 71 Operator 9 ft3 Cone Number _'10/23/20t2 i ae 24 PM_ Job Number Date and Time - Water -Table 2 a c _ Tip Resistance CPT DATA Pore Pressure s TSP -- 2 5 T P. PSI 110 Local Friction f 1 I n Ash Rorth Cerollna Location S-8 — Hole Number Brunsw.ck — -Gounty- -- SPT W 60% Hammer I , r F REMARKS 1 sensitive fine grained ! 4 c"'r c'ar -o -ler P 7 - silty sand to sandy silt 010 gravelly sand to sand I 2 organic material e 5 cla yey silt to silty, clay '-a sand to silty sand p 11 -very stiff fine grained (') 13 clay ®8 sandy silt to clayey silt— rr 9 sand _. to 12 - sand to clayey sand(') Autumn Corporation Operator Ron Stewart Cone Number DSGO867 Ash North Carobna 22-18213 Location Job Number B 58 R Date and Time 10123l2012 2 07 48 PM 8-9 Water Table Counotnty Number Brunswick county - = CPT DATA WO Tip Resistance Lonl Friction Pore Pressure 0 QI TSF 60 0 Fs TSF 215 Pw PSI 0i � 1 - sens,twe Ono grained 84 SUN f Iny in clay 2 organic material Mt 5 clayey silt to silty clay ni 3 - clay ■ 6 - sandy silt to clayey sit O SPT P 1 � ¢ w REMARKS 6 Hammer 25 O W d � m H z I t I r i II t j1j f I IJ , I % Ifli I, lij i I 4 1 B : - siiry sana to sandy silt 1710 - gravelly sand to sand 6 - sand to silty sand rill very stiff Tine grained (7 9 - sand 012 sand to clayey sand (') n • General Conditions The Analysis, conclusions, and recommendations submitted in this report are based on the exploration previously outlined and the data collected at the points shown on the attached location plan This report does not reflect specific variations that may occur between test locations The soundings were located at the requested locations selected by the client where site conditions permitted and where It is believed representative conditions occur, but the nature and extent of variations between soundings and of subsurface conditions not encountered by any sounding may not become evident until the course of construction variations become evident at any time before or during the course of construction, it will be necessary to make a re -Analysis of the conclusions and recommendations of this report and further exploration, observation, and/or testing may be required This report has been prepared in accordance with generally accepted soil and foundation engineering practices and makes no other warranties, either expressed or implied, as to the professional advice under the terms of our agreement and included in this report The recommendations contained herein are made with the understanding that the contract documents between the owner and foundation or earthwork contractor or between the owner and the general contractor and the foundation, excavating and earthwork subcontractors, if any, shall require that the contractor certify that all work in connection with foundations, compacted fills and other elements of the foundation or other support components are in place at the locations, with proper dimensions and plumb, as shown on the plans and specifications for the protect Further, it is understood the contract documents will specify that the contractor will, upon becoming aware of apparent or latent subsurface conditions differing from those disclosed by the original soil exploration work, promptly notify the owner, both verbally to permit immediate verification of the change, and in writing, as to the nature and extent of the differing conditions and that no claim by the contractor for any conditions differing from those anticipated in the plans and specifications and disclosed by the soil studies will be allowed under the contract unless the contractor has so notified the owner both verbally and in writing, as required above, of such changed conditions The owner will, in turn, promptly notify this firm of the existence of such unanticipated conditions and will authorize such further exploration as may be required to property evaluate these conditions Further, it is understood that any specific recommendations made in this report as to on -site construction review by this firm will be authorized and funds and facilities for such review will be provided at the times remmended if we to be hand responsible for the design recommendations USDA United States r Department of Agriculture l I RCS Natural Resources Conservation Service • • A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Brunswick County, North Carolina January 21, 2013 Preface Soil surveys contain information that affects land use planning in survey areas They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment Various land use regulations of Federal, State and local governments may impose special restrictions on land use or land treatment Soil surveys identify soil properties that are used in making various land use or land treatment decisions The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses The landowner or user is responsible for identifying and complying with existing laws and regulations Although soil survey information can be used for general farm, local, and under area planning, onsite investigation is needed to supplement this information in some cases Examples include soil quality assessments (http //soils usda gov/sqi/) and certain conservation and engineering applications For more detailed information, contact your local USDA Service Center (http //offices sc egov usda gov/locator/app'7 agency=nres) or your NRCS State Soil Scientist (http //soils usda gov/contact/ state_offices/) Great differences in soil properties can occur within short distances Some soils are seasonally wet or subject to flooding Some are too unstable to be used as a foundation for buildings or roads Clayey or wet soils are poorly suited to use as septic tank absorption fields A high water table makes a soil poorly suited to basements or underground installations The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey Information about soils is updated periodically Updated information is available through the NRCS Soil Data Mart Web site or the NRCS Web Soil Survey The Soil Data Mart is the data storage site for the official soil survey information The U S Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, mantal status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program (Not all prohibited bases apply to all programs ) Persons with disabilities who require alternative means • for communication of program information (Braille, large print, audiotape, etc ) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD) To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S W , Washington, D C 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD) USDA is an equal opportunity provider and employer E 0 E Contents Preface 2 Soil Map 5 Soil Map 6 Legend 7 Map Unit Legend 8 Map Unit Descriptions 8 Brunswick County, North Carolina 10 GoA—Goldsboro fine sandy loam, 0 to 2 percent slopes 10 Ly—Lynchburg fine sandy loam 11 References 13 • .J Soil Map The soil map section includes the sod map for the defined area of interest, a list of sod map units on the map and extent of each map unit, and cartographic symbols displayed on the map Also presented are various metadata about data used to produce the map, and a description of each sod map unit 0 Custom Soource Report i• SS ap 33' 57 18' M. 8T 11" Map SW e. 1 1.550 if pnniea on Awe (8.5" x W) sheet. N Meters 0 20 40 80 120 Feet 6 50 100 200 300 33' 57 18" 3Y 57' 11" • Custom Soil R• Resource Report MAP LEGEND MAP INFORMATION Area of Interest (AOI) m Very Stony Spot Map Scale 1 1,560 if printed on A size (8 5 x 11 ) sheet 0 Area of Interest (AOI) -f Wet Spot The soil surveys that compose your AOI were mapped at 1 24,000 Soils � Other 0 Sal Map Units Special Line Features Warning Sod Map may not be valid at this scale Special Point Features w Gully U Blowout - Short Steep Slope Enlargement of maps beyond the scale of mapping can cause ® Borrow Pit '= -' misunderstanding of the detail of mapping and accuracy of sod line ;;Z� other placement The maps do not show the small areas of contrasting X clay Spot soils that could have been shown at a more detailed scale Political Features ♦ Closed Depression Cities X Gravel Pit water Features Please rely on the bar scale on each map sheet for accurate map measurements Gravel) Sot y p Streams and Canals ® Landfill Transportation Source of Map Natural Resources Conservation Service + + Rails Web Sod Survey URL http 1twebsolisurvey nres usda gov A Lava Flow Coordinate System UTM Zone 17N NAD83 ,�, Marsh or swamp /v Interstate Highways 2 Mine or Quarry US Routes This product Is generated from the USDA NRCS certified data as of the version date(s) listed below 0 Miscellaneous Water >> :� Major Roads p Perennial water Local Roads Soil Survey Area Brunswick County North Carolina Survey Area Data Version 14 Jun 15 2012 .i Rock Outcrop } Saline Spot Date(s) aenal images were photographed 6/30/2006 Sandy Spot The orthophoto or other base map on which the soil lines were Severely Eroded Spot compiled and digitized probably differs from the background imagery displayed on these maps As a result some minor shifting p Sinkhole of map unit boundaries may be evident it Slide or Slip 0 Sodic Spot S Spoil Area 4 Stony Spot Custom Soil Resource Report 0 Map Unit Legend Brunswick County, North Carolina (NC019) Map Unit Symbol Map Unit Name Acres in AOI Percent of A01 GoA Goldsboro fine sandy loam 0 to 2 percent slopes 48 64 1 % Ly Lynchburg fine sandy loam 27 35 9% Totals for Area of Interest 76 100 0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas A map unit is Identified and named according to the taxonomic classification of the dominant soils Within a taxonomic class there are precisely defined limits for the properties of the soils On the landscape, however, the soils are natural phenomena, and they have the characteristic variability • of all natural phenomena Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management These are called noncontrasting, or similar, components They may or may not be mentioned in a particular map unit description Other minor components, however have properties and behavioral characteristics divergent enough to affect use or to require different management These are called contrasting, or dissimilar components They generally are in small areas and could not be mapped separately because of the scale used Some small areas of strongly contrasting soils or miscellaneous areas are identfed by a special symbol on the maps If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data The objective of mapping is not to delineate pure taxonomic classes but ratherto separate the landscape into landforms or landform segments that have similar use and management requirements The delineation of such segments • on the map provides sufficient information for the development of resource plans If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas Custom Sod Resource Report • An identifying symbol precedes the map unit name in the map unit descriptions Each description includes general facts about the unit and gives important soil properties and qualities Soils that have profiles that are almost alike make up a sod series Except for differences in texture of the surface layer, all the sods of a series have major horizons that are similar in composition, thickness, and arrangement Sods of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use On the basis of such differences, a soil senes is divided into sod phases Most of the areas shown on the detailed sod maps are phases of soil senes The name of a soil phase commonly indicates a feature that affects use or management For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series Some map units are made up of two or more major soils or miscellaneous areas These map units are complexes, associations, or undifferentiated groups A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps The pattern and proportion of the sods or miscellaneous areas are somewhat similar in all areas Alpha -Beta complex, 0 to 6 percent slopes, is an example An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the sods or miscellaneous areas separately The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar Alpha - Beta association, 0 to 2 percent slopes, is an example An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform An area can be made up of only one of the major sods or miscellaneous areas, or it can be made up of all of them Alpha and Beta sods, 0 to 2 percent slopes, is an example Some surveys include miscellaneous areas Such areas have little or no sod material and support little or no vegetation Rock outcrop is an example Custom Soil Resource Report • Brunswick County, North Carolina GoA—Goldsboro fine sandy loam, 0 to 2 percent slopes Map Unit Setting Landscape Coastal plains Elevation 20 to 330 feet Mean annual precipitation 38 to 55 inches Mean annual air temperature 59 to 70 degrees F Frost -free period 200 to 280 days Map Unit Composition Goldsboro and similar sods 90 percent Minor components 5 percent Description of Goldsboro Setting Landform Flats on marine terraces, broad interstream divides on marine terraces Landform position (two-dimensional) Summit Down -slope shape Linear Across -slope shape Linear Parent material Loamy marine deposits Properties and qualities Slope 0 to 2 percent • Depth to restrictive feature More than 80 inches Drainage class Moderately well drained Capacity of the most limiting layer to transmit water (Ksat) Moderately high to high (0 57 to 1 98 in/hr) Depth to water table About 24 to 36 inches Frequency of flooding None Frequency of ponding None Available water capacity Moderate (about 8 1 inches) Interpretive groups Farmland classification All areas are prime farmland Land capability (nonimgated) 2w Hydrologic Sod Group B Typical profile 0 to 7 inches Fine sandy loam 7 to 13 inches Fine sandy loam 13 to 40 inches Sandy clay loam 40 to 80 inches Sandy clay loam Minor Components Rains, undramed Percent of map unit 3 percent Landform Flats on marine terraces, carolina bays on marine terraces, broad mterstream divides on marine terraces Landform position (two-dimensional) Summit . Down -slope shape Linear Across -slope shape Linear 10 Custom Sod Resource Report • Woodington, undrained Percent of map unit 2 percent Landform Flats on marine terraces, depressions on marine terraces, broad interstream divides on marine terraces Down -slope shape Linear Across -slope shape Concave Ly—Lynchburg fine sandy loam Map Unit Setting Landscape Coastal plains Elevation 20 to 330 feet Mean annual precipitation 38 to 55 inches Mean annual air temperature 59 to 70 degrees F Frost -free period 200 to 280 days Map Unit Composition Lynchburg, drained, and similar sods 85 percent Lynchburg, undrained, and similar soils 5 percent Minor components 7 percent • Description of Lynchburg, Drained Setting Landform Flats on marine terraces, broad interstream divides on marine terraces Landfomi position (two-dimensional) Summit Down -slope shape Concave Across -slope shape Linear Parent matenal Loamy marine deposits Properties and qualities Slope 0 to 2 percent Depth to restrictive feature More than 80 inches Drainage class Somewhat poorly drained Capacity of the most limiting layer to transmit water (Ksat) Moderately high to high (0 20 to 1 98 in/hr) Depth to water table About 6 to 18 inches Frequency of flooding None Frequency of ponding None Available water capacity Moderate (about 7 4 inches) Interpretive groups Farmland classification Prime farmland if drained Land capability (nonimgated) 2w Hydrologic Soil Group A/D Typical profile • 0 to 9 inches Fine sandy loam 9 to 14 inches Sandy loam 14 to 65 inches Sandy clay loam 11 Custom Sod Resource Report • 65 to 80 inches Clay Description of Lynchburg, Undramed Setting Landform Flats on marine terraces, broad mterstream divides on marine terraces Landform position (two-dimensional) Summit Down -slope shape Concave Across -slope shape Linear Parent material Loamy marine deposits Properties and qualities Slope 0 to 2 percent Depth to restrictive feature More than 80 inches Drainage class Somewhat poorly drained Capacity of the most limiting layer to transmit water (Ksat) Moderately high to high (0 20 to 1 98 in/hr) Depth to water table About 6 to 18 inches Frequency of flooding None Frequency of ponding None Available water capacity Moderate (about 7 4 inches) Interpretive groups Farmland classification Prime farmland if drained Land capability (nonimgated) 3w Hydrologic Sod Group A/D Typical profile • 0 to 9 inches Fine sandy loam 9 to 14 inches Sandy loam 14 to 65 inches Sandy clay loam 65 to 80 inches Clay • Minor Components Rains, undramed Percent of map unit 5 percent Landform Flats on marine terraces, carolina bays on marine terraces, broad mterstream divides on marine terraces Landform position (two-dimensional) Summit Down -slope shape Linear Across -slope shape Linear Woodrngton, undramed Percent of map unit 2 percent Landform Flats on marine terraces, depressions on marine terraces, broad mterstream divides on marine terraces Down -slope shape Linear Across -slope shape Concave 12 References American Association of State Highway and Transportation Officials (AASHTO) 2004 Standard specifications for transportation materials and methods of sampling and testing 24th edition American Society for Testing and Materials (ASTM) 2005 Standard classification of sods for engineering purposes ASTM Standard D2487-00 Cowardin, L M , V Carter, F C Golet, and E T LaRoe 1979 Classification of wetlands and deep -water habitats of the United States U S Fish and Wildlife Service FWS/OBS-79/31 Federal Register July 13, 1994 Changes in hydnc soils of the United States Federal Register September 18, 2002 Hydnc sods of the United States Hurt, G W , and L M Vasilas, editors Version 6 0, 2006 Field indicators of hydric sods in the United States is Soil Research Council 1995 Wetlands Characteristics and boundaries Sod Survey Division Staff 1993 Soil survey manual Sod Conservation Service U S Department of Agriculture Handbook 18 http //sods usda gov/ Soil Survey Staff 1999 Sod taxonomy A basic system of soil classification for making and interpreting sod surveys 2nd edition Natural Resources Conservation Service U S Department of Agriculture Handbook 436 http //soils usda gov/ Sod Survey Staff 2006 Keys to sod taxonomy 10th edition U S Department of Agriculture, Natural Resources Conservation Service http //sods usda gov/ Teter, R W , Jr 1985 Wetlands of Delaware U S Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section United States Army Corps of Engineers, Environmental Laboratory 1987 Corps of Engineers wetlands delineation manual Waterways Experiment Station Technical Report Y-87-1 United States Department of Agriculture, Natural Resources Conservation Service National forestry manual http //soils usda gov/ United States Department of Agriculture, Natural Resources Conservation Service National range and pasture handbook http //www glti nres usda gov/ United States Department of Agriculture, Natural Resources Conservation Service National soil survey handbook, title 430-VI http //sods usda gov/ United States Department of Agriculture, Natural Resources Conservation Service • 2006 Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin U S Department of Agriculture Handbook 296 http //soils usda gov/ 13 Custom Sod Resource Report • United States Department of Agriculture, Soil Conservation Service 1961 Land capability classification U S Department of Agriculture Handbook 210 • 14 rem .. . ..... ... .. .. x9ns stls9 xs Yn n _ tl . . 4 .. . a. _, .. .•.• �- 8 Yx--. .stltl .. .. n ., ,. . .. : :. . . .... .. 5 e ;-M s»sa as 's'n _ a a s _ s _. a ;"s A 3 8 :888 Snf9 :8 9Y . 8 8 a 8 Sa 8 88 88 :8 Y -.:a8 as � x aens SSiS as 8'S a Y _ 8 Y ba a -: 88 .. 8 a8p9 a8 �� ...e..28,e . v. _ ..: 8 aYP: 888E .. 88 8 8 8 8Y a 88 BS a. 8 888$ L8 �_� 8a-n §ui8 99 a , 8 . . a SS . Sa Sa4g yG "YYY 9YYY YY Yn Y Y Y Y Y Y YY Y WY n9 nn 9 "YYY 99 9 Bass na88 88 8a 8 8 8 n 8 8 88 8 88 aE SS 8 8888 88 9 BSYY aSSB 9 as x tl ' =Y tl8 8a tl _YxY ss . ykaa YY98 as at . . 8 ., 8 . .. s 8a YL at _ 9L8a [8 lop 99YY 9nYY YY Y Y Y Y Y Y Y YY YY Y99 8 -'-Tt n 8 9888 9na8 88 8Y 9 8 8 8 8 9 8 8 88 8 89 85 b9 L 5815E 88 �qq tl tl""Y tltlYa -a •" Y a s tl Y I a YY tltl aY tl BYYY tlSRE" I k5°k Y=Pk yk k: k Y k s ktl k at of ka f 69L8 Lk HC�F11 L J • • SBna Y888 88 9Y _ . 8 8 8 . 88 n Sa -'9 Sa 8 S88a 88 2 Autumn wick 0 • INLET OR JUNCT 0 OUTLET ELEVATION OUTLET +0 BD OUTLET YLE fax D (In) O (cfs) L (ft) K Sf Vfull OUTLET (fps) V/ull INLET Ltag Hf (Friction Loss) HEAD LOSSES He He Change In (Contraction (Expansion direction of K for Hb Loss) Loss) How feno.l Hb (Bend Loss) At (Total Loss) INLET W S ELEV RIM ELEV DIFF 35 2863 3023 3023 24 3084 35 4444 0 005 3 50 5 72 017 005 018 90 070 036 075 3098 3397 299 34 2926 3026 3098 15 258 95 1138 0001 572 501 005 013 014 30 028 011 042 3140 3560 420 33 3021 3074 3140 8 242 7D 386 0004 501 501 027 010 014 0 000 000 051 3191 3450 259 32 3091 31 44 31 91 8 1 79 35 386 0 002 501 614 007 010 020 90 070 041 079 3269 3450 181 31 31 26 31 79 3269 8 1 51 33 386 0 002 614 000 005 015 000 0 000 000 020 3289 34 50 161 30 2931 3091 3098 24 1325 200 444 4 0 001 350 3 50 018 005 007 90 070 013 042 31 40 3335 195 29 2971 3131 31 31 24 1217 165 4" 4 0 001 350 350 012 005 007 0 000 000 024 31 55 3470 315 28 3004 3164 31 64 24 11 10 170 4444 0 001 3 50 289 Oil 005 005 90 070 009 029 31 93 3400 207 27 3038 31 58 31 93 18 1087 88 2451 0 002 289 256 017 003 004 90 070 007 031 3225 34 06 181 26 30 27 3080 3225 8 284 53 386 0 005 224 224 029 002 003 90 070 005 039 3263 3400 1 37 25 3038 3091 3263 8 170 fit 386 0002 224 000 012 002 000 0 000 000 014 3278 b400 122 24 3056 31 56 3263 15 744 58 1138 0 004 256 256 025 003 004 0 000 000 031 3294 3420 1 26 23 3068 31 68 3294 15 692 92 1138 0 004 256 256 034 003 004 90 070 007 047 3342 3370 028 22 3086 3186 3342 15 371 145 1138 0001 256 224 015 003 003 45 038 003 024 3365 3406 041 21 3115 3168 3365 8 184 50 386 0002 224 0OD 011 002 000 0 000 000 013 3379 3400 021 20 3093 3146 3365 8 061 35 386 Dow 224 000 001 002 000 0 000 000 003 3368 34M 082 19 3031 3131 3342 15 196 255 1138 0000 256 000 008 003 000 0 000 000 010 3352 3432 080 18 2938 3038 3098 15 565 135 1138 0002 2% 539 033 003 016 0 000 000 052 3149 3400 251 17 3061 3114 3149 8 414 70 386 0012 224 000 081 002 000 0 000 000 083 3232 3400 168 16 2985 3085 3232 15 339 65 1138 0 001 539 404 006 Oil 009 0 000 000 026 3258 3400 1 42 15 3027 31 27 32 58 15 295 86 1138 0 001 404 3 55 006 006 007 45 038 007 026 3284 3450 1 66 14 3090 31 90 3284 15 126 35 1138 0 000 572 000 000 013 000 0 000 000 013 3297 3450 1 53 13 31 38 3191 3264 8 146 40 386 0 001 355 355 006 005 007 90 070 014 031 3315 3450 1 35 12 31511 3211 3315 8 114 35 386 0001 355 000 003 005 000 0 000 000 008 3323 3450 127 11 2870 2990 3098 18 1020 173 2451 O 002 289 289 030 003 005 30 028 004 041 31 39 3315 1 76 10 2904 3024 31 39 18 896 185 2451 0 001 289 313 025 003 005 90 070 Oil 0 44 31 83 3348 1 65 9 3039 3139 31 83 15 352 105 1138 0 DOI 313 275 010 004 004 90 070 008 026 32 D9 3365 156 8 3070 3123 3209 8 227 70 386 0003 275 000 024 003 000 0 000 000 027 3236 3366 130 7 2941 3041 3183 15 447 200 1138 0002 256 400 031 003 009 90 070 017 059 3243 3390 147 6 3059 3159 3243 15 219 98 1138 0000 400 400 004 006 009 30 028 007 026 3268 3600 232 5 3107 3207 3268 15 212 70 1138 0000 40D 355 002 006 007 0 000 000 015 3283 3450 167 4 31 42 31 95 32 83 8 1 50 37 386 0 002 3 55 355 006 005 007 90 070 014 031 3314 3450 1 36 3 31 60 3213 3314 8 027 30 386 0 000 356 000 000 005 000 0 000 000 005 3319 3450 1 31 2 2981 3081 3243 15 205 171 1138 0000 443 2% 006 008 004 20 016 002 018 3261 3350 089 1 3D 84 3184 3243 15 080 55 1138 0000 256 000 000 003 000 0 000 0DO 003 3245 3395 150 I 1/22/2013 • EC �� Margate Jefferson FROM TO AREA IMH(cc)MEA TOTAL lac LIMN CAIMH CA.— NUT TIME (min) MO PIPE TIME (min) TOTAL Tic)(min) TOTE OF CONIC (min) DESUN TIME (Inn) gRENSR VgNM1Q OIMh (l"d OtWI (AQ SLOPE OIM1ee. (In) BQE pn) 15-min mml n VM1dI (Nwc) LENGTH NG ELEV OUPT TOP ELEV NUT MEW ELEV OUTLET TOP ELEV OUTLET MEW Roo 30 028 028 OPo 015 015 1D 015 low low 1000 ]30 I00 100 0]5% a0 Is RLP d0 AB.BT I0150 31 0W 030 OPo00202] ID Od0 1015 1015 1015 ]20 Ofd fad OBBIS RLP /BB 115 d0150 N011 40350 Ja]/221 23 OPt 0]] 0a0 003 030 10 010 10/0 10/0 10 /0 ]10 021 213 23]% 0/ 15 RCP 013 00 dW 50 JWR Ja550 3Ba4 23 2l 042 D]5 0as10ufe10501050 2]0 4as OW% f/e 15 RCP d0a d0 3d050 18512 d0250 NSOB 3] 2a O10 O85 OPo OOa 0]] 1D D23 tOR 10 ]2 tOR ]10 09/ Sit] 0]0% 151 IS RLP M001345] //2 Po M250 ]aLW din 42 IW5 30 09 OS1 0Po 02D 02D 10 034 low low 1003 ]YO iH IH 041% 101 15 RCP 338 OS 40050 403SO 40]42 /031224 Y OW DOO DPo 0. ow 10 013 low 1003 1003 7M 050 Se O50% eB IS RCP 3]3 28 403 Ba AaaO 402 Ba ]W ]aam 114 ON ON 103 10 04D 1so 1085 tOBS042 ]21 O50% f]8 1B RLP 421 100 40i 42 ]O111 4O3 BB ]alA1 2] 22 011 oil ON 010 010 10 050 100] 100] low ]20 0]2 0II 040% TB 15 RCP 33d 112 3a850 3a350 3a25D 39306 29 ON oil ON 0. oID 10 048 1059 1058 1059 ]10 aC0 O]1 040% TB 15 RCP 33/ Ga 3aa50 Jai BS 50 3a'. 3a25T EXPLANATION OF COLUMN HEADINGS From Inlet from SMich the pipe is exiling To Inlet to wtlich Me pipe is entenng Area mdw Jac) Incremental area for Me From inlet Total Area (so) Total area in the system up to this poml C indw IndwslualrunoffooleficlenL C value for From inlet CAmd,v C%Afor From Inlet CA sum CA indiv + CA aum from previous stretch Inlet Time (min) Time for water in watershed to reach inlet 10 min inlet hire assumed for this area Ind Rpe Time (min) Segment Time for paidcular sacDon of pipe IPT=LengMNelgaty/60 Total T(c) (min) Time for water in previous pipe to reach inlet in question (the From inlet) Pipe Time = Inlet time + Segment time Time of Conic (min) The mawmum amount of time behWen (Inlet time + Rpe Time) and Pipe Time Intensity (m1n) The intensity for Me design year sown (in this case a 10 min duration 10 yr storm was used) Omdiv (ofs) The amount of flow into the inlet O=CAmMv 1=(CAmdw Intensity) D total (of$) The amount of total flow in Me pipe section Slope(fVM Longitudinal Slope of pipe section DM. (in) The Macrebul pipe sure required t0 handle the Discharge D (theo) =16 (0 n/sgQslope))" 375 Size (in Nexlavailablestandard size (15 min) me0 Rpe Material o n value for pipe roughness V full Ilya) Velocity of pipe low (assuming full Box) V futl = (1 49/n) (D/48)•(2/4) (sgrdslope)) Length (ft) Length of pips Elev Inlet Top Top Elevation of Inlet Elev Inlet Invert The invert elevahan of the pipe at the exiling inlet (mv out) Bev Outlet Top Top Elevation of Outlet Elev Outlet Invert The invert elevation of the pipe at the entenng inlet Onv in) Lower Invert =Upper Invert Slope Length SAMPLE CALCULATIONS (pipe segment 20 to 21) 20 21 =002so = 30 = 90 =090 002=018=02 �25, 02=027 = 10 min =116 14 89 h/sec / 80 = 0 40 min =10 15 min =10 15 min = ] 20 imlir =02] ]20 inmr=014 cis =180-014=194 ofs =086% =16 (194 013/(sort(0086)' 3T5=9Jim =15m =RCP =0 013 =(194/013) (15/48)A(2/3) (sgif(0086))=489Ns =116ft = 401 50 = 398 42 = 400 50 =39842 00086 116=39742 EL Sample Ca. • Margate Jefferson EC H*Ia Col. M INLET M INLET JUNCT 4 OUTLET ELEVATION OUTLET 0RD OUTLET W5ELEV D(In) D(ch) L(R) K $1 VI.II OUTLET (fall VNII INLET (N.) HEAD LOSSES INLET WS ELEV RIM ELEV DIFF NI(FrlNan Lex.l He (on Loin H. *toOR (o Lwn.) Charlie le tllnNon of flow arp) N for Hb Hbetand L. 10(TOtal Lusl 40 37011 37171 37171 24 3485 1% 2451 0020 21 01 1021 361 171 057 % 055 089 681 37852 39032 1180 38 38661 W21 3%21 24 2825 52 2451 0013 1021 7" 0% 040 032 % 055 050 191 39012 39443 431 36 UT75 389M 39012 24 23M 112 2451 0ON 7" 6% 102 023 024 55 047 032 181 39193 39)33 540 N 38911 39071 39193 24 M03 140 2451 0007 6% 457 093 017 011 0 070 023 145 39330 40298 9% 33 39040 392W MW 24 1278 B4 2451 0003 457 395 023 0% 0% 15 010 002 042 39300 no 67 487 32 J%84 3W dd 393% 24 938 140 2451 00m 395 412 021 006 009 15 010 003 0W 39118 397W 332 29 M20t 39301 39118 15 231 ]6 ]0 0W1 412 JJ4 0% O 1 000 20 016 003 020 31 2 11Mil 3% 28 M25] 3%5) 3%42 15 0)1 % ]0 0000 33d JJ4 OOt 001 006 BO Oas Ot0 021 39d 63 3%50 48) 2) I Ju I 39l OS I 39l 63 1 15 1 0)2 I 112 I ]0 I 0000 I 33d I am I 001 I 000 I 0 I 000 OIXI 0% 391% 39a50 102 UPLANATION OF COLUMN HEADINGS SAMPLE CALCULATIONS junction 34) Inlet or Junction R The inlet o junction examined 34 Outlet Eievabon The elevation of the outlet and of the pipe from the inlet or function = 389 11 Cattle +0 SO Assume the pipe is 80%full a38911+0824112=39071 Outlet+08D=Outlet Elevabon+O8O Diameter of pipe(Dy12 Outlet W S Elevaton Outlet Water Surface Elevation = 391 93 Outlet WS Elev= Maximum of(Oudet+08 D)or the (inlet W S Elea) from the upstream pipe D (in) Pipe Diameter of downstream pipe = 24 m O (cis) Discharge of water entering inlet or )unction from pipes and catch basin = 20 03 cis L(R) Length of pipe exiting the inlet or function =140It K Constant value for friction slope based on pipe diameter = 2451 for 24 in pipe K=1486/n Area (hyd radius)A2/3 Sf Friction Slope =(200312451)A2=0007 Sf = (OIK)A2 Vfull Outlet (fps) Velocity of water leaving the inlet or junction = 6 66 fbs Wall Inlet (fps) Velocity of water entering the inlet or junction = 4 57 his Hf Friction Loss Loss due to flew in the pipe = 140 007 = 0 93 Hf=L Sf He Conbacbon Loss Loss due to c Vachon of flow at inlet of outflow pipe = 0 25 6 6612/2 g = 0 17 He=025 (Viull outlet-W2 g) He Expansion Loss Loss due to expansion of flow, into Me junchon or inlet (primary inflow, tine) = 0 35 4 57A212 g = 0 l l He = 0 35 (Vfull inletA212 g) Change in direction of flow Change in angle of primary flow line =95 degrees K for Hb Constant based on change in pipe flow for calculating bend loss = 0 70 C%lstant vanes depending on change in angle of primary flaw, line Hb Bend Loss Loss due to change in direcbon of flow = 0 70 (4 57A2/(2 32 2)) = 0 23 Hb=K (VoA2/2322) Ht Total Loss The sum of Fnction contraction expansion and bend losses = 0 93+ 017+0 11+0 23 = 145 Inlet W S Elev Inlet water surface elevation = 391 93 + 1 45 = 393 38 Inlet W S Elea, = Outlet W S Elev + Ht Rom Elea Top elevation of the inlet W junction = 402 98 DO Distance from Water elevation to top of inlet = 402 98 393 38 = 9 60 Difl= Rim Elev InletW S elev Nome li% paraur. wepwarmm ncooT aid wi eNi E C HGL Sample Calce Z\Projects Fdo-Zebulon\2011\2011-048 Autumn -Brunswick Co\Design\AREA*g, 1/21/2013 33742 PM, 1100 m rn>_ r II a Z\Projects F(O-Zebulon\2011\2011-048 Autumn -Brunswick Co\Design\AREPag, 1/21/2013 4 5243 PM, 1100 i� s A0 i5l 00 D CO Z N 70 -TI D II m_ JZ tP :U 01D r s 11 g 0 Ira ff<{9 ' ifrIq ,7;�F -L rt ,]�'Ff[- -: i �` fit \I lit « j 1 \ fit 5y{ 9 E r o . e r ✓ ,e E i y T g yY ". C t \ ( E 1 1 Y Y 5 Y \ erg Y-� ElQII J! t (� � c E •� � K —{ Illy '¢ \I � E .E 1t t l5y \ � ' .1�),• I l g � ' yam' L '— '� ,r �i •• do E r1, , S �l a to � \' t � t � l • i1 e��Y.l • 's .• '-. \E.Ei,.,, �f�fl�fsfE4E�i" �J ✓ ® t l � .� f: 1 PL �� I lcil 3tlrif. [fi "' irr Lf 4t E `' �^ Eliy ;FS] �f1� io T�a�A e / 4 f 0 UNITED STATES STATE OF NORTH CAROLINA y, DEPARTMENT OF THE INTERIOR DEPARTMENT OF NATURAL RESOURCES CALABASH QUADRANGLE v� �R AND COMMUNITY DEVELOPMENT NORTH CAROUNASOUIH CARODtU b m 11 ^� RATE OF NDRTICMI%1NA fpY PANEL • eNY.. ' —. v x 6 I w1,w�1w DATUY pFOmU1TMNi 1N pn..Y, utl0 F Y .�aaYm / K � wY K llnb fNY N4 M1.. 6FdItlEf]NI A. WsW Ym �YIb4 Mbr IM.mI Trmm�lYrb�a� � �.Fp.f dw tl FNIY 4.}s1 1.1.1y.1 bw..l.4nllr Yns M bstlM K mq tl K FPL MmOYYmK mq tl.FW N.mF.r.l,.. 1484'tl/Fe1 IpyfflYr. mYM�a Y.nw.o.dr.Prm YdYP... K.Tr. m wM,m.wa Y+.d.Nc TIm • LEGEND © Nfa`L noon NnrAm MEM ywq NIBLC! ro .s�cT MNMTIanT1E 1NNMMLflIYli nom n.Y..r Y.Y Pm�.a r.a.mrr.rr .Yew Ywmr �a ... aws n � sd.~wow �Y wi..p..Ar•v.w... M K W Ya.4b.4.Yw1 aY K.iypy.ym..l aM nel .{Fn d I b f YY p.iY/ a d pYNL W IW N.Y....YY.Y aM Fby YY.dlbllY l.M dYI Y.m My� �bYmY.6 h.r d.Yml bn YP6 mbM Yeti )w M.YiW K M1.�i.Y 4. � YM YY w +YFAK P+.KMM1n..r M.. PbrY6 a ybwpbW MYw.r m.s K.M F.I.d `pvn p.m wit miM.[ Y W M1Y fYb. S © nOOV//AYMEAf NIdEIE 11.rMYYYYnnd.Ya�1M1A.Ps.4.rF.a KYY4 Yp�KdasYa. o.YY If .eb Jme K. a Y W ie. Y .Vb 2„ © OIIIERROm MNS i a• Aa dnnrrm r.rd�Y...d errw YY.•r M�ba..Y b+r.arM a ry .e YrY. ® mv.Keuwm PElJLLNFl snl[u lmNalMue © o1NFFMTEtaofECIFn ME.a IOFN) w.mmr eY.. YYYrw..M1i.Ys.Y Yrruw..r w.ewFrY. w.m M.rYl fYrrn.b ID.nwu, W M, PAM, s. ds .r..Ni r rr mn. y y,OV➢YY..�Ywwn Yw.� suna• � r'..mbir wrr +.�• NM FCYe 1 . IwF n aNn L5 M mq Yb Y.F YYYw.pK lYer Fbl K.ws PyYn • �b.Y/Y dM1 bW bbYO s.b.lYM�vldYp wad mY.hw 1M maup � bIrK1 MY r wM b ab WYY s M1YYp �. mTM des qaw .tl .r 14J Ora oav ..dua MFuIYM w. WYmFA..Y mJY.bw .M T.b MwnwYdK Nbd Ibd Fuwe KPa {Ye..y.lY. a d1Y...M sbYM d.mmK�.YMb wpb A. weYrm.nimFW �YYbrwmW dM1mw d.tlt�Ol.a.YM1aa�YWbgW .p w .YIYY YY rw deY mn1 M1 .q.bNY m.mpyy mm.'rwe Yp reTua.wb..ya.Ps.p.u�a Yi NiYNM0.aNwYdV VY�wdKPY.N Vr�.bwdKiWln+/ r brtl. NY K IbM tdb FY.rYb YaY1 .qr .4 d .11bdbYImC.Am.b� 11..PnY06apwWfFM11.LIiY.bv 6.Y/.PPbbM1I.IYbY madyd.W.aYY�bM/e.wl m�bddNlLLb.I b.tl.1.m04a YpY��.mYINNpn Yy KdmCpolJ)wNN1lb „� ,.�,. Ts an ®. aY.. w.rm n wa.W Fa ru FYr..IFiF.).iw it F b.0 ties Fme Y.v M1�' e. sdsa M Fw w �Merae.a MFvd 16meam .. I^r�T M. bw�a.nM YY. w/�.Y..bmYdM1 iW fNd. PYYM1 M1.wb Yfw.. TiY 1TYfnYrn.'dM1iL FuweM Mia iY.Y a.OYfMYara.Y�dY.wI..Y4.Yw M.s �� FYMYy OY wM Yw.d N.dwEW.Wb mWwY .dbalinl .MIb.lanse�mY W.AdPWrFN4WY.Y .bm mY p.Mw RdbKI.YW lr Mai wdKrl. FYw. ,yy,dNy,IFgy M Np nbY.vds M1Y 114 pIN�rpasf Nsa u4w Fawu YM/pll ryel M1l.maYmKFWI U...n= rw.M1IN6 Yr�mM1flp wp�.s.d..dY.Ytl dnW.w ME.a.YWb �-M NtlndaapY�sd MUW bYMyKFIn1 a. M.IW Fm ..InYMM1AWwF1n.,Aln�. Ys�y.sbmlambls.rbsn dadmWin. Y.n.4wM1 K.wtlY�YPYMmrwsamymay�® aadlw aaWb Cr.n M1 M1b d H Y F.YY bl Yvws KN aa.. >M N Yetl M Y d.1 Y M1 Y a.e d wal wPdMb bMV M1 P.NYYO bl a^Ybbd tld. wd M.d wFYVYRM.aFbCY.OYYYFM1ftd K.ws Mdl T� IdYn YLv1M Im/nb Y.) ^ry �M Yai RCfGiVItW2MlEYY FM6 ",fAbM1^ bs0.9 rAl.a.KaY PF.M1 fiY.r .Y.Yu.M1.viYWq KY rwb�Yb pm.YYFYNSYI detlr R.bY.wW Mb..a T. P.^wY0a4KfNYYWF4Y.RYYm ttld tlY.YN4rbt Y. M.YdYd.smKni A.ILa Fy.Ai1M. ba rm 4Pan d M4F ^Y.M^.. Y Mea. d4Y b a1.d. +1F M1 FWY a VNYb d �m YWr waW M�M1 Ni.d PhCa FA/w 1NYm..Wdvlvb�b M1FMY M bbndb�dtl Ra.ipbK 11YW 4mFY.rldK w6.FrV FFiERM1FprlEpv YTmNgrobO.Ng dddYtl .M MV MYreYreMY NrY mn ^RmYY asi. Y4.MYMM1bI ma.dyKllY nY .YE-WW�mmKb. baYN..M MYp.dm4pM.an.Yrym4�mMwYaa.d IMydImn.Y wq...w�w.wdd rwm Ymga�r.Y. mmY. b'a M16p.n d.YdM1 baI1F.L Y.pvIdKYaIM1 W dwn wbrbMF CagYMbT.mYdWgsa. CYmtlMW ..Y 6bYr doom Kw9 M/.%YMaFd QO Nab a.arL.YKpdmN o.eb6mMYYdM1 Fb PsrY sarbM1�YdY AYw FNYb.JMJFbniYm YIY m.MVMr.IMK.ws IgYn Mmb an aab Yw.Y WFme ��=�.mm MvbYMaa .MFFW bPebe.MmYNFKdPYfNM NgY1N..ndlW pmm NLYs.tlK fb PetlY �.K.e�d .bI W.SPMYF, NF9dM1id.YmMiTaF YboY! Ywm..Nd.m.�w.w.r�.pewp.Y.sd.Irr.ss� w.Y'tIF... ri bmla n M1 NFFA d ®s emYF. m. n M1 rbY .Yams F.4 iYelb KMYdYa. Fbab.ISFFM1Mw1d OYd IWIw aYa YaKivPWYYiaPYM1lYouIIYM Yvmo -�ewrrgYa....mx6.Ydwas M1wm... a+. m....... FY.w. s d.W r wda a mMYaF.db raYb �s.Ymr waY KPa F Ir4 d� a. ImA. NM nmaNln . r M1 rou wNw ncRoodmNp&. YY�Ma11d�.MYdbMdr�m KiMLL .Y�bdalp® YYr./M1.mm�brm. wrYw.. s'.mY..� m PANS 1N FIRM m ROOD INSURANCE RATE YAP NORTH CAROLINA ® m m PANEL 1026 Ra,Mrw..a.Y.m.wr.r vnnu.wm m mrwn mN Me. Nm am m.a CD EFFECTIVE DATE NWNUMBEF AINE T, 2p6 MT6f10p ♦V^ BmeaMYN Catla FN V J CavFaY Mm.Far AIaY e r Date Filed 5/17/2012 8 38 00 AM CDA79 (50) Business Corporation North Carolina Annual Rf Elaine F Marshall North Carolina Secretary of State 11 22 10 This report may be filed online at the Secretary of State website www sos Wlt 7 1 d'i OM 79; Name of Business Corporation AUTUMN CORPORATION Fiscal Year Ending 09/30/11 Slate of Incorporation NC htanlh / Day / Year Secretary of State ID Number 0008051 OI hereby certify that an annual report completed in its entirety has been submitted and the information requested below (required by NCGS 5 16 22) has not changed and is therefore complete Nature of Business Registered Agent Registered Office Mailing Address County City State Zip Code Registered Office Street Address County City State Zip Code Signature of New Registered Agent (SpnaNre constitutes cmxnl to the appointment) Principal Office Telephone Number Principal Office Mailing Address City State Zip Code Principal Office Street Address City, State Zip Code Name Title and Business Address of Principal Officers Name Tifie Address City State Zip Name Title Address City State Zip Name Title Address City State Zip Certification of annual report (must be cam[ea by an business [.orporauons) ,w. \yI 1P �4-4.-1a TSlpnalura (Fain rtAll by an I wipomtim) Date Type or Print Name Title NCCZ0501 1221/10