Loading...
HomeMy WebLinkAboutSW8101009_CURRENT PERMIT_20210915STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 l0 ► 0 0 01 DOC TYPE ® CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2021 Og15 YYYYMMDD ROY COOPER Governor ELIZABETH S. BLSER Seac=y Dimaor NORTH CAROLINA Eovtroo nomd Quaility September 15, 2021 Great Neck Holdings, LLC Attn: Mark Alper, Manager P.O. Box 2139 Wilmington, NC 28402 Subject: Permit Renewal State Stormwater Management Permit No. SW8 101009 Cape Fear Pick N Pull New Hanover County Dear Mr. Alper: Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for issuance of the permit The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for the subject project on September 7, 2021. The Division is hereby notifying you that permit SW8 101009 has been renewed on September 15, 2021, and shall be effective until January 13, 2029. For your records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application. As requested, a copy of the current operation and maintenance agreement is enclosed Please keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the previous terms to provide you with a better understanding of your obligations under the permit. The renewal and rerssuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit The plans originally approved on January 13, 2011 will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in fixture compliance problems. if any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOA -Lcom. Unless such demands are made this permit shall be final and binding. If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, �J CRiar: Q / �� D;;; Brian Wrenn, Director Division of Energy, Mineral and Land Resources ' W ��� North Carolina Department of Environmental Quality I DrAs of Energy, Mineral and land Resources ` _' 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carohna 27699-1612 State Stormwater Permit No. SW8 101009 Page 2 of 2 Enclosures DES/ams cc: O&M Agreement Attachment C — Permitting History Renewal Application Documents %StormwaterTermits & Prolects\20I0\101009 HD\2021 09 permit 101009 Cape Fear Pick n Pull, 2829 Hwy 421 North; Wilmington, NC 29401 NCDEQ-DEMLR Wilmington Regional Office D rk �Z� North Carolina Department of Environmental Qu Irty I Divimon of Energy. Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh North Carolina 7/699-1612 ®�� 919707.9200 State Stormwater Management Systems Permit No SINS 101009 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Great Neck Holdings, LLC Cape Fear Pick and Pull 2829 N Hwy 421, Wilmington, New Hanover County FOR THE construction, operation and maintenance of one (1) infiltration basin in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H 1000 (hereafter collectively and separately referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit This permit shall be effective from the date of issuance until January 13, 2029, and shall be subject to the following specified conditions and limitations I. DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 1 8 on page 2 of this permit The stormwater control has been designed to handle the runoff from 641,274 square feet of impervious area, including future amount 3 The tract will be limited to the amount of built -upon area indicated in Section 1 8 on page 2 of this permit, and as shown on the approved plans The built -upon area for the future development is limited to 92,083 square feet 4 The stormwater system is designed to infiltrate the 10-year, 24-hour storm without discharging at half the expected infiltration rate within 5 days, and therefore no bypass, vegetated filter, or additional storage volume is required The rainfall depth of the 10-year storm is 7 08 inches over a 24-hour period 5 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 6 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system Page 1 of 5 State Stormwater Management Systems Permit No SW8 101009 The project shall provide a 50' wide vegetated buffer adjacent impounded structures, streams, rivers, and tidal waters The following design criteria have been permitted for the infiltration basin and must be provided and maintained at design condition a Drainage Area, acres Onsite, ft2 Offsite, ft2 b Total Impervious Surfaces, ft2 Onsite Current, ft2 Onsite Future, ft2 Offsite, ft2 c Design Storm, inches d 10-year, 24-hour Storm, inches e Basin Depth, feet f Bottom Elevation, FMSL g Bottom Surface Area, ft2 h Storage / Overflow Elevation, FMSL i Permitted Storage Volume (10yr 24hr storm), ft3 I Predevelopment 1 yr 24 hr peak flow, cfs k Post -development 1 yr 24 hr peak flow, cfs I Type of Soil m Expected Infiltration Rate, in/hr n Seasonal High Water Table, FMSL o Time to Draw Down, hours p Receiving Stream/ River Basin q Stream Index Number r Classification of Water Body 230 980,100 21,780 641.274 549,191 92,083 0 1 5"* 708 7 9 88,267 16 724,259 2245 0 Sand 16 7 < 1 day NE Cape Fear / Cape Fear 18-74-(61) "SC, Sw" *SL2008-211 requires that this design store and treat the 1 5" storm This infiltration basin has been designed to store the 10yr24hr storm and infiltrate that volume within 5 days without discharge as calculated using half the expected infiltration rate in order to waive the offlme bypass and vegetated filter requirements II. SCHEDULE OF COMPLIANCE 1 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 3 The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to Semiannual scheduled inspections (every 6 months) Sediment removal Mowing and revegetation of slopes Immediate repair of eroded areas Maintenance of all slopes in accordance with approved plans and specifications Debris removal and unclogging of infiltration media, catch basins, swales, and piping A clear access path to infiltration basin must be available at all times The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division Page 2 of 5 State Stormwater Management Systems Permit No SWB 101009 5 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 6 Records of maintenance activities must be kept for each permitted BMP The reports will indicate the date, activity, name of person performing the work and what actions were taken Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations Access to the stormwater facilities shall be maintained via appropriate easements at all times 9 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made 10 No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below For changes to the protect or SCM that impact the certifications, a new or updated certifcation(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification a Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc b Redesign or addition to the approved amount of BUA or to the drainage area c Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications d Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan e The construction of any allocated future BUA f The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications g Other modifications as determined by the Director 11 Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the protect and the on -site stormwater system complies with the permit conditions Any items not in compliance must be repaired, replaced restored, or resolved prior to the transfer Records of maintenance activities performed to date may be requested III. GENERAL CONDITIONS Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21 Page 3 of 5 State Stormwater Management Systems Permit No SW8 101009 2 The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215 1, and subject to enforcement procedures pursuant to NCGS 143-215 6 3 If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems These additional or replacement measures shall receive a permit from the Division prior to construction 4 Permit Transfer This permit is not transferable to any person or entity except after notice to and approval by the Director The permittee shall submit a completed and signed "Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events a The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants, b Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08, c Bankruptcy, d Foreclosure, subject to the requirements of Session Law 2013-121, Current Permittee Name or Address Changes The permittee shall submit a completed "Permit Information Update Application Form" (available on the Division website) to the Division within 30 days to making any one or more of the following changes a A name change of the current permittee, b A name change of the project, c A mailing address change of the permittee, 6 The permittee is responsible for compliance with all terms and conditions of this permit until the Division approves the transfer request Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit 7 The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project 8 The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission, however, these actions do not stay any permit conditions 9 Approved plans, application documents, supplements, calculations, operation and maintenance agreement, and specifications for this project are incorporated by reference and are enforceable parts of the permit A copy of this permit, application, supplements, operation and maintenance agreement, and approved plans and specifications shall be maintained on file by the permittee 10 Unless specified elsewhere, permanent seeding requirements for the on -site stormwater system must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 11 The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H 1000 and NCGS 143-215 1 et al 12 A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H 1045(3) Page 4 of 5 State Stormwater Management Systems Permit No SWB 101009 Permit renewed, updated and reissued this the 15th day of September 2021 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ria�irector Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Attachment C - Permitting History Cape Fear Pick N Pull Permit No SW8 101009 Approval Date Permit Action BIMS Version Description of the Changes 1 / 13/201 1 Original Approval 1.0 9/15/2021 Renewal 20 Permit Number..SG(/ (to be provided by DWQ) Drainage Area Number Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six mches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present Remove the trash/debris The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed remove the gully, and then plant a ground cover and water until it is established Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe Dispose of the swale applicable) sediment off -site The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. EIVED OCT 13 2010 BY: Form SW401-Infiltration Basin O&M -Rev 3 Page 1 of 3 BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth possible Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediate) An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair The outlet device Clogging has occurred Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. OCT 13 2010 Form SW401-Infiltration Basin O&M -Rev 3 Page 2 of 3 Permit Number (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Cape Fear Pick & Pull BMP drainage area number: Print name:Mark Alper Title:Member Manager Address:Great Neck Holdings, LLC, 13 Wright Street, Wilmington, NC 28401 Phone•910-762-9619 Date: a Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president I, a, rr 11,2 0— Ra 1(,t , a Notary Public for the State of 1[\,)C1Y- h (D111 6E _ County of � ur , do hereby certify that M V1/' /AIr&v - personally appeared before me this 0 day of / 2b1 t1 , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness m hand and official seal, C. �pTARY;%. ; 3 0: B0 COUN�,a� 111%10 SEAL My commission expires /0'/Y -// RECEIVED OCT 13 2010 BY: Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 )-Ml k Date Re iv d I Fee Paid Permit Number Q aJ /O /v0 STATE STORMWATER: PERMIT INFORMATION UPDATE APPLICATION FORM There is NO FEE for updating project name or permittee information. This form is to only to be used by the current permittee to notify the Division of 1) changes to the Point of Contact (signing official) for the current permittee (LLC, Corporation, HOA or POA); 2) changes to the mailing address, phone number or email address of the current permittee, 3) changes to the name of the project, and 4) changes to the legal corporate name as documented by a Name Change or Merger filed with the NCSOS A. NEW PERMIT INFORMATION (� State Stormwater Permit Number 'gkZ9 l cil ooq Are you updating (check all that apply) If so, please provide the updated Information ❑ Project name ❑ Corporation Name' ❑ Permit Contact Name2,3 ❑ Permit Contact Title Mailing Address3 a D t 11 1 R Mc L Ph ne numberp3� =—CDJ01'1 El"Email address j (f\ U l. Ebion Provide documentation such as a Name Change / Merger filed with the NCSO Provide supporting documentation such as NCSOS filing The permit contact's position must be in accordance with 15A NCAC 02H 10400) If more than one point of contact or mailing address is being changed, please attach a separate sheet B. �CtE�RTI\FI,CATTI`ON OF PERMITTEE x I, I �ptt K lkj�t% , the current permittee, hereby notify DEMLR that I am making the changes as listed in Section A above 11urther attest that this application for an update to the permit information currently on file is accurate and complete to the best of my knowledge /�..� 4& Date Signature Jf a Notary Public for the State of ��rY l 9� ✓D4 a County of do hereby certify that 'MCLA gyey personally appeared before me this the 1134- day of geaVgAkf ✓ 20_ZL, and acknowledge the due execution of the forgoing instrument Witness my hand and official seal, JENNIFER A BELL Selotery Public, North Carolina New Hanover County My Cenj�ission��s Notary SEP 0 ) 2021 My commission expires Stormwater Permit Information Update Form Page 1 of 1 1 May 11, 2017 )FMI R Date eceved Fee Paid Permit Number '7U(0 c `% 1 n 1 o U ` NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H 1045(3), the current permit holder shall renew their high density permit 180 days pnor to its expiration Renewed permits are valid for a penod of 8 years per Session Law 2011-398 (Sl3 781) Section 60 (c) This application form is for permit renewals only A. PROJECT INFORMATION 1 State Stormwater Permit Number SID9 16 2 Project name 3 Project stre taddress� &tisgnm MUV `1d-1 I Vb► t vx City IX�I AInA ISM_ County 4 What, if any, changes have been made to the project as permitted? ZIP a -$JD) If the project has changed from the original approved plans, please complete SWU-101 for a Ma/or Modification or Minor Modification Application form available at https //deg nc gov/about/divisions/energv- mineral-land-resources/energy-mineral-la nd-rules/stormwater-program/post-construction B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at https //deo nc gov/about/divisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property 1 Current Permit Holder's Company Name/Organization Cafe0.T tJe �,� �V��QI VIQS I LL 2 Signing Official's Name 3 Signing Official's Title. 4 Mailing Addr s city i,A yl ne 5. Street Addre s �J City 6 Phone (lb-) =ttvc SEP 0 7 2021 BY: Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW) Only applications packages that include all required items listed below will be accepted and reviewed Initial each item below to indicate that the required information is provided in the application package 1. A permit application processing fee of $505 00 payable to NCDEQ /0 2 One original signed hard copy and one electronic copy of this completed form The signing official named on this application to represent the current permittee must meet one of the following a Corporation — a principle executive officer of at least the level of vice-president, b Limited Liability Company (LLC) — a manager or company official as those terms are defined in G S 57D "North Carolina Limited Liability Company Act," c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee, d. Partnership or limited partnership — the general partner, e Sole proprietor, or f Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity 3 One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including deed restrictions, protective covenants, condominium/planned community declaration and easements If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date C4 O&M Agreements, Please select one ❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit, or I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent tome I agree to keep this on file with the permit 5 Designer Certifications, Please select one ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division, or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed, or ❑ The project has not yet been built 6 [IF APPLICABLE] If the project has been built one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit 7 [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC) Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C 2 per 15A NCAC 2H 1043(3)(b) https //www sosnc gov/online services/search/by title/ Business Registration SEP 0 7 202, Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION I, M V 1cPA V" O, the person legally responsible for the permit, certify that I have a copy of the Permit and Q_&M Agreement on site (or I will obtain a copy and It will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership All information provided on this permit renewal application is, to the best of my knowledge, correct and complete Signature Date 91, Y�-/ 1t , County of 1\QtJ that Nnll C 141 V this the 1s day of 21pkwbev execution of the forgoing mstrume ess my hand and official seal, JENNIFER A BELL ry Public. North Caro SElina (Not g}%NewHanoverCounty My Commt ton E P'( Notary My commission expires a Notary Public for the State of do hereby certify personally appeared before me 20�, and acknowledge the due "P 0 7 2021 I BV.•� Slormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 Perms No5uk 1'wn97 (to be pray by DM) °P W�2Fq ®fin STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM ° INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information I. PROJECT INFORMATION Protect Name Cape Fear Pick N Pull Contact Person Phillip Tripp Phone Number 910-763-5100 Date Drainage Area Number 1 II. DESIGN INFORMATION Site Characteristics Drainage area 1,001,88000 hi Impervious area 641,27400 h Percent Impervious 064 % Design rainfall depth 152 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 376 in 1-yr. 24-hr intensity 610 irdhr Predevelopmenl l-yr, 24-hr discharge 2245 h'/sec Posldevelopment l-yr, 24-hr discharge 000 h'/sec Pre/Post 1-yr, 24-hr peak flow control -22 45 f1'Isec Storage Volume Non -SA Waters Minimum design volume requited 7944200 h' Design volume provided 724.25900 h' Storage Volume SA Waters 1 Y ninon volume g' Predevelopment 1-yr. 24-hr tuns volume it, Post -development 1-yr. 24-hr rwwfi volume 0' Minimum required volume it Volume provided it Solis Report Summary Soil type Sand Infiltration rate 1600 Buhr SHWT elevation 700 finsl Basin Design Parameters Drawdown hire 006 days Basin side slopes 300 1 Basin bottom elevation 900 finsl Storage elevation 1600 first Storage Surface Area 119,225 00 112 Top elevation 1600 first Basin Bottom Dimensions Basin length 49000 It Basin width 27500 h Bottom Surface Area 88.26700 h2 OK for non -SA waters OK OK OK RECE D JAN " 12011 BY: F4m eW4e1-W Walm Bamhrnev 4 Parts I a 11 Design sumrnmy. Page 10 t Permit No SwFS I D100 2 (to be provileC ey DM) Additional Information Minimum runoff to each inlet to the basin? 200 ac-m OK Length of vegetative filter for overflow na ff OK Distance to structure no If OK Distance from surface waters 2,48100 it OK Distance from water supply well(s) 100, fi OK Separation from impetuous sod layer 3 17- fi OK Naturally occurring soil above shwt 200 it OK Bottom covered with 4-in of clean sand? y (Y or N) OK Proposed drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build -out? y (Y or N) OK Bypass provided for larger storms? na (Y or N) OK - Pretreatment device provided Conveyance swales and drop inlets RECEIVED JAN 1 1 2011 BY; _ Fain SW<Ot-Infiftati n Baevi 4 Parts I a 11 Design Summary, Pape 2 0 2 Permit No 5tuT (01001 (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST ' A ' s - Please Indicate the page or plan sheet numbers where the supporting documentation can be found An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to Indicate the following design requirements have been met If the applicant has designated an agent, the agent may Initial below If a requirement has not been met, attach justification. Pagel Plan Initial;, aC Sheet No. ( 1. Plans (1" - 50' or larger) of the entire site showing- - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (Include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement 2 Partial plan (1" = 30' or larger) and details for the infiltration basin showing. - Bypass structure, - Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and - Pretreatment device. 3 Section view of the infiltration basin (1" = 20' or larger) showing - Pretreatment and treatment areas, and - Inlet and outlet structures. _ . le, 4 A table of elevations, areas, incremental volumes & accumulated volumes to venfy the volume provided. 5 A soils report that is based upon an actual field investigation, soil bonngs, and infiltration tests The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form County soil maps are not an acceptable source of soils information �d U CZ 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized ^ A A c-_ 7 The supporting calculations. a �°�` 8 A copy of the signed and notarized operation and maintenance (0&M) agreement 9. A copy of the deed restrictions (d required) A\, Form SW401-Infiltration Basin -Rev 4 Page 1 of 1 Part III Required Items Chec�I�, cost, Page 1 of 1 TE 10023 State Stormwater Management Systems Permit No SW8 101009 Cape Fear Pick and Pull Stormwater Project No. SW8 101009 New Hanover County Engineer's Certification I, Phillip G. Tripp , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/week1y/fuA W-44e) the construction of the protect, Cape Fear Pick and Pull (Project) for Great Neck Holdings LLC (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number 17374 Date IZ• S • N DECEIVED DEC 15 2011 BY: SEAL +moo;•oFEssro�;% SEAL -a 17374 ? a FVGINEEE / ff, R 1 `O+`+++ State Stormwater Management Systems Permit No. SW8 101009 Certification Requirements: Page 2 of 2 -0-1 The drainage area to the system contains approximately the permitted acreage. �2. The drainage area to the system contains no more than the permitted amount of built -upon area. -6-3. All the built -upon area associated with the project is graded such that the runoff drains to the system �4. All roof drains are located such that the runoff is directed into the system. -9-5. The bypass structure elevations are per the approved plan. 'A-6. The bypass structure is located per the approved plans. � 7. A Trash rack is provided on the bypass structure. 98. All slopes are grassed with permanent vegetation. 4-9. Vegetated slopes are no steeper than 3:1. -C-10. The inlets are located per the approved plans and do not cause short- circuiting of the system. -A-11. The permitted amounts of surface area and/or volume have been provided -9-13. All required design depths are provided. f14 All required parts of the system are provided. &-15. The required system dimensions are provided per the approved plans