Compliance Inspection Report
Permit: SW8100807 Effective: 12/07/12 Expiration: 12/31121 Owner: South Side Developers Inc
Project: Bristol Bay
County: Columbus McRae Ln
Region: Wilmington
Lake Waccamaw NC 28450
Contact Person: Jamie Malpass Title: President Phone:910-520-7663
Directions to Project:
Go approx. 7 milesmest on Sam Potts Hwy, from int. of Green Swamp & NC214 left onto Flemington & go approx..03 miles left on
Church & go approx. half mile right onto McRae & go approx..19 miles site on east side of street.
Type of Project: State Stormwater.- HD - Detention Pond
Drain Areas: 1 - (Unnamed Tributary at Wananish) (03-07-56 ) ( C;Sw:+)
2 - (Unnamed Tributary at Wananish) (03-07-56 ) ( C;Sw:+)
On -Site Representative(s):
Related Permits:
Inspection Date: 12/21/2012 Entry Time: 09:15 AM Exit Time: 09:30 AM
Primary Inspector: Steven G Pusey
Secondary Inspector(s):
Chad Coburn
Phone:
Phone:
Reason for Inspection: Follow-up Inspection Type: Modification Offsite
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant ❑ Not Compliant
Question Areas:
® State Stormwater
(See attachment summary)
Page: 1
Permit: SW8100807 Owner - Protect: South Side Developers Inc
Inspection Date: 12/21/2012 Inspection Type: Modification Offsite Reason for Ylsil: Follow-up
Inspection Summary:
The following actions need to be taken to bring the project into compliance:
1. A copy of the recorded deed restrictions needs to be submitted before any lots are sold.
2. Site instill under construction so not all permanent BMPs are complete. The pond has been built in accordance with
the approved plans of 9/23/10. The latest modification calls for increasing the pond size and eliminating 2 lots.
File Review
Is the permit active?
Signed copy of the Engineer's certification is in the file?
Signed copy of the Operation & Maintenance Agreement is in the file?
Copy of the recorded deed restrictions is in the file?
Comment: A copy of the recorded deed restrictions needs to be submitted before any
lots are sold.
SW Measures
Are the SW measures constructed as per the approved plans?
Are the inlets located per the approved plans?
Are the outlet structures located per the approved plans?
Comment: 1. Site is still under construction so not all permanent BMPs are complete.
The pond has been built in accordance with the approved plans of 9/23/10. The latest
modification calls for increasing the pond size and eliminating'2 lots.
2. Both ponds on this project outlet to an existing ditch that has been enlarged. Erosion
problems near the outlet of the irregular shape pond have been resolved.
Other WO Issues
Is the site compliant with other water quality issues as noted during the inspection?
Comment: The wetlands that were in question, in the drainage ditch close to the
irregular shape wet pond, have been filled under a wetlands permit.
Yes
No
NA
HE
®❑O❑
❑
❑
❑
®
❑
❑
❑
❑
®
❑
❑
Yes No NA NE
❑ ® ❑ ❑
m ❑ ❑ ❑
W ❑ ❑ ❑
Yes No NA NE
Q�j�j11111
Page: 2
Pusey, Steven
From: chris hollis [hollischris23@gmail.com]
Sent: Wednesday, December 19, 2012 1:35 PM
To: Pusey, Steven; jamiemalpass@bellsouth.net; jeffmalpass@bizec.rr.com
Subject: Bristol Bay fix from Malpass Construction
Attachments: Steve pusey NCDENR fix.docx
Steve here are some pictures of the finished repair.
thanks
Chris Hollis
Malpass Construction
846 Livingston Chapel Rd.
Delco, NC 28436
P:910-655-2852
F:910-655-2842
Steve, we repaired the areas in question and I am including two pictures of work performed.
AREA # 1
We reshaped and shaved the bank and armored with fabric and rip rap rock.
AREA # 2
We flattened and armored the bank with fabric and rip rap rock to give the ditch a gentler curve.
Pusey, Steven
From: Chris ]hollischris23@gmail.com]
sent: Tuesday, December 18, 2012 3:00 PM
To: Pusey, Steven
Subject: Re: Notice of Inspection - Non Compliant Bristol Bay
I received your email and we will fix area 2 by flaying and fanning the curve as you requested
Hollis
On Dec 18, 2012, at 2:22 PM, "Pusey, Steven" <steven.pusev@ncdenr.aov> wrote:
We are in agreement except we recommend that "area 2" should be flattened and fanned out
somewhat by removing or pushing dirt on the back side of ditch. The goal is to make the curve in the
swale smoother so that flow is guided gently towards the ditch. Then, armour with riprap.
Please confirm.
Thanks,
Steve Pusey
DWQ
From: chris hollis[mailto:hollischris23(lamail.coml
Senb Tuesday, December 18, 2012 2:05 PM
To: Pusey, Steven; iamiemalpass(ftellsouth.net: ieffmalpassabizec.rr.com
Subject: Notice of Inspecbon - Non Compliant Bristol Bay
Please delete first email.
<image001 Jpg>
Chris Hollis
Malpass Construction
846 Livingston Chapel Rd.
Delco, NC 28436
P:910-655-2852
F:910-655-2842
1. We will give you a recorded deed before any lots are sold.
We have attached a photo of the area specified on line two of the report. This is out of pond q 1
but, I think this is the area in question. If it is not please contact me (Jamie Malpass (910)520-
7663).
Area # 1. We will slope back wall and armor with fabric and rip rap rock.
Area q 2. We will Armor the back side of the ditch with fabric and rip rap rock
3. After my conversation with Jeff Malpass he informed me that the wetlands do not need to be
flagged as per his conversation with you.
4. Project will be completed before January 4m
10
lk
AW
19'�TL,®�i°IR��WA�
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
December 4, 2012
Division of Water Quality
Charles Wakild, P. E.
Director
Dee Freeman
Secretary
Jamie Malpass, President
South Side Developers, Inc.
846 Livingston Chapel Road
Delco, NC 28436
Subject: Notice of Inspection — Non Compliant
Bristol Bay
Stormwater Permit No. SW8100807
Columbus County
Dear Mr. Malpass:
On November 30, 2012, Steve Pusey of the Wilmington Regional Office of the Division of Water Quality
(DWQ) inspected Bristol Bay in Columbus County to determine compliance with Stormwater Management
Permit Number SW8 100807 issued on September 23, 2010. DWQ file review and site inspection
revealed that the site is not in compliance with the terms and conditions of this permit. Please find a copy
of the completed form entitled "Compliance Inspection Report' attached to this letter, which summarizes
the findings of the recent inspection.
As indicated in the attached inspection report, the following deficiencies must be resolved:
1. A Copy of the recorded deed restrictions needs to be submitted to this office before any lots are
l AW sold.
2. ) The ponds outlet to an existing ditch that has been enlarged. There is an erosion issue in the
ditch near the pond #2 outlet / overflow location. This erosion issue needs to be fixed. The ditch
has an abrupt turn and the flow is eroding the bank. This turn needs to be made into a smoother
transition and the bank needs to be reinforced.
3. The wetlands need to be flagged in the field near the drainage ditch along the eastern side of the
�tlie� property.
1 y (r^
Please inform this Office in writing before December 18, 2012 of the specific actions that will be
I undertaken and the time frame that will be required to correct the deficiencies. Failure to provide the
requested information, or to respond to this letter by the due date, may initiate enforcement action
including the assessment of civil penalties of up to $25,000 per day. If a written plan of action is not
submitted to this office by December 18, 2012, then DWQ staff will re-inspectthe site and issue a Notice
of Deficiency (NOD) if the listed deficiencies have not been addressed.
Please be reminded that if an ownership change, or a name change or a mailing address change has
occurred, it is your responsibility to submit a completed and signed Name/Ownership Change form to the
Division. Please include the name, mailing address and phone number of the party who is now
responsible for this permit. If you have any questions, please contact me at the Wilmington Regional
Office, telephone number (910) 796-7215.
Siinncceeerrrell�y,
/�.
Steve G. Pusey /
Environmental Engineer
Enc: Compliance Inspection Report
GDS/sgp: S:\WQS\Stormwater\Permits 8 Projects\2010\100807 HD\2012 12 CEI—deficient 100807
cc: WiRO Stormwater File
Wilmington Regional Office
127 Cardinal Drive Extension, Wilmington, North Carolina 28405
Phone: 910-796-7215 \ FAX: 910350-2004 \ DENR Assistance: 1-877-623fi148
Internet www.ncwaterquality.org
An Pn—,n—..i;b%pl-6.. am nP-1—,
Permit: SW8100807
County: Columbus
Region: Wilmington
Compliance Inspection Report
Effective:09/23/10 Expiration: 12/31/21
Contact Person: Jamie Malpass
Title: President
Owner: South Side Developers Inc
Project: Bristol Bay
McRae Ln
Lake Waccamaw NC 28450
Phone:910-520-7663
Directions to Project:
Go approx. 7 miles west on Sam Potts Hwy, from int. of Green Swamp & NC214 left onto Flemington& go approx..03 miles left on
Church & go approx. half mile right onto McRae & go approx..19 miles site on east side of street.
Type of Project: State Stormwater - HD - Detention Pond
Drain Areas: 1 - (Unnamed Tributary at Wananish) (03-07-56 ) (,C;Sw:+)
2 - (Unnamed Tributary at Wananish) (03-07-56 ) ( C;Sw:+)
On -Site Representative(s):
Related Permits:
Inspection Date: 11/30/2012 Entry Time: 02:00 PM
Primary Inspector: Steven G Pussy
Secondary Inspector(s):
Chad Coburn
Reason for Inspection: Other
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant ■ Not Compliant
Question Areas:
State Stormwater
(See attachment summary)
Exit Time: 03:30 PM
Phone:
Phone:
Inspection Type: Modification Offsite
Page: 1
Permit: SW8100807 Owner -Project: South Side Developers Inc
Inspection Data: 11/30/2012 Inspection Type: Modification Offsite Reason for Visit: Other
Inspection Summary:
Recorded deed restrictions are changing in accordance with the proposed plans. A deed restriction statement has been
provided with the application.
Site is still under construction so not all of the permanent BMPs are complete. It appears the pond has been built in
accordance with the approved plans of 9/23/10. Proposed plans call for increasing the pond size and eliminating 2 lots.
The ponds outlet to an existing ditch that has been enlarged. There is an erosion problem in the ditch near the overflow 1
outlet location of the pond. The ditch has an abrupt turn and the flow is eroding the bank. This turn needs to be made
smoother and the bank reinforced.
Wetlands near the ditch should be flagged in the field.
File Review
Is the permit active?
Signed copy of the Engineer's certification is in the file?
Signed copy of the Operation & Maintenance Agreement is in the file?
Copy of the recorded deed restrictions is in the file?
Comment: Need to submit a copy of the recorded deed restrictions before any lots are
sold.
SW Measures
Are the SW measures constructed as per the approved plans?
Are the inlets located per the approved plans?
Are the outlet structures located per the approved plans?
Comment: 1. Site is still under construction so not all of the permanent BMPs are
complete.
2. The pond has been built in accordance with the approved plans of 9/23/10.
Proposed plans call for increasing the pond size and eliminating 2 lots.
3. The ponds outlet to an existing ditch that has been enlarged. There is an erosion
issue in the ditch neat the pond outlet. This erosion issue should be fixed.
Other WQ Issues
Is the site compliant with other water quality issues as noted during the inspection?
Comment: Please flag the wetlands in the field near the drainage ditch along the
eastern side of the property.
Yes
No
NA
NE
s❑❑0
❑
❑
❑
®❑❑❑
❑le❑❑
Yes
No
NA
NE
❑
■
❑
❑
®
❑
❑
❑
®
❑
❑
❑
Yes No NA NE
❑ M ❑ ❑