Loading...
HomeMy WebLinkAboutSW8080615_HISTORICAL FILE_20080627STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SW8 0 %0l 1 S DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20 0 ,�r C) 21 YYYYMMDD Michael F Easley Governor William G Ross Jr Secretary North Carolina Department of Environment and Natural Resources Coleen 14 Sullins Director Division of Water Quahty June 27, 2008 Mike Wilkinson, Pastor First Baptist Church of Swansboro 614 West Corbett Avenue Swansboro, NC 28584 Subject Stormwater Permit No SW8 080615 First Baptist Church of Swansboro High Density Project Onslow County Dear Mr Wilkinson The Wilmington Regional Office received a complete Stormwater Management Permit Application for First Baptist Church of Swansboro on June 26,2008 Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H 1000 We are forwarding Permit No SW8 080615 dated June 27, 2008, for the construction of the subject project This permit shall be effective from the date of issuance until June 27, 2018, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P O Drawer 27447, Raleigh, NC 27611-7447 Unless such demands are made this permit shall be final and binding If you have any questions, or need additional information concerning this matter, please contact C Baker, or me at (910) 796-7215 Sin rely. Edward Beck Regional Supervisor Surface Water Protection Section ENB/csb S \WQS\STORMWAT\PERMIT\080615 jun08 cc Peter Sokalski, P E , Appian Consulting Engineers, PA Onslow County Building Inspections Chris Baker Wilmington Regional Office Central Files e rCarolina urally North Carolina Division of Water Quality 127 Cardinal Drive Fxtension Wilmington NC 28405 Phone (910) 796 7215 Customer Service Wilmington Regional Office Internet www r cwaterqualrtv or Fax (910) 350 2004 1 877 623 6748 An Equal Oppodumty/Affirmative Action Employer— 50 % Recycled/10 % Post Consumer Paper A State Stormwater Management Systems Permit No SW8 080615 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Mike Wilkinson and First Baptist Church of Swansboro First Baptist Church of Swansboro 614 West Corbett Ave, Onslow County FOR THE construction, operation and maintenance of an underground sand filter in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until June 27, 2018, and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 16 on page 3 of this permit The stormwater control has been designed to handle the runoff from 62,898 square feet of impervious area 3 The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans 4 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 5 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system Page 2 of 7 State Stormwater Management Systems Permit No SW8 080615 The following design criteria have been provided in the sand filters and must be maintained at design condition Sand Filter #2 #1 a Draina a Area, acres 1 36 1 40 Onsite ft 56628 61,177 Offsite, 2,614 None b Total Impervious Surfaces ft 23,176 39,722 c Design Storm, inches 366 366 d Sedimentation Basin Surface Area ftZ 590 1,320 e Sand Filter Surface Area ft 1 177 1,759 f Bottom Elevation, FMSL 2220 175 Bypass Weir Elevation, FMSL 2523 2020 h Permitted Storage Volume ft 6 008 8 929 i Type of Soil Engineered Sand Engineered Sand Expected Infiltration Rate, in/hr 35 35 k Seasonal High Water Table, FMSL 21 20 165 I Time to Draw Down, hours 30 28 m Receiving Stream/River Basin White Oak River/White Oak n Stream Index Number 20-18 o Classification of Water Body SA HQW II SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for Its intended use prior to the construction of any built -upon surface During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to Semiannual scheduled inspections (every 6 months) Sediment removal Mowing and revegetation of slopes and the vegetated filter Immediate repair of eroded areas Maintenance of all slopes in accordance with approved plans and specifications Debris removal and unclogging of bypass structure, filter media, flow spreader, catch basins, piping and vegetated filter A clear access path to the bypass structure must be available at all times 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken The facilities shall be constructed as shown on the approved plans This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data Page 3 of 7 State Stormwater Management Systems Permit No SW8 080615 6 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 7 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 8 Access to the stormwater facilities shall be maintained via appropriate easements at all times 9 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area or to the drainage area e Further subdivision, acquisition, lease or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 10 The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction 11 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction 12 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made III GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request will be considered on its merits and may or may not be approved The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request Page 4 of 7 State Stormwater Management Systems Permit No SW8 080615 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 3 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction 4 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 5 The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 7 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 8 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 9 The permittee shall notify the Division any name, ownership or mailing address changes within 30 days Permit issued t he 27th day of June, 2008 N H CAROLINAENVIPQNMENTAL MANAGEMENT COMMISSION torGbfeen H Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No SW8 080615 First Baptist Church of Swansboro Stormwater Permit No SW8 080615 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe full time) the construction of the project, (Project) (periodically/ weekly/ for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included in the Certification Noted deviations from approved plans and specification Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No SW8 080615 Certification Requirements 1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the protect is graded such that the runoff drains to the system 4 All roof drains are located such that the runoff is directed into the system 5 The bypass structure elevations are per the approved plan 6 The bypass structure is located per the approved plans 7 A Trash Rack is provided on the outlet/bypass structure 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 10 The inlets are located per the approved plans and do not cause short- circuiting of the system 11 The permitted amounts of surface area and/or volume have been provided 12 All required design depths are provided 13 All required parts of the system are provided 14 The required system dimensions are provided per the approved plans cc NCDENR-DWQ Regional Office Onslow County Building Inspections Page 7 of 7 DWQ USE ONLY Date Received Fee Paid Permit Number (�-� -ole )1(vv- w a o /S State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original RECEIVED JUN 18 2008 I GENERAL INFORMATION 1 Applicants name (specify the name of the corporation, individual, etc who owns th Y First Baptist Church of Swansboro 2 Print Owner/Signing Official's name and title (person legally responsible for facility and compliance) Pastor Mike Wilkinson 3 Mailing Address for person listed in item 2 above 614 West Corbett Avenue City Swansboro State NC Zip 2MM Phone (910 ) 3265768 Fax (910 1 326-M38 Email pastor@swansborof rstbaytist com 4 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc ) First Baptist Church of Swansboro 5 Location of Project (street address) 614 West Corbett Avenue City Swargsboro County Onslow 6 Directions to project (from nearest major intersection) At intersection of NC Hw 24 and Park Lane in Swansboro 7 Latitude 34 69069 Longitude-7712438 of project 8 Contact person who can answer questions about the project Name Peter Sokatski Telephone Number (252 ) 972-7703 Email psokalski@appianengmeers corn rI PERMIT INFORMATION 1 Specify whether project is (check one) ❑Renewal ❑Modification Form SWU-101 Version 8 07 Page 1 of 4 2 If this application is being subuutted as the result of a renewal or modification to an existing pernut, list the existing permit number and its issue date (if known) 3 Specify the type of project (check one) ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4 Additional Project Requirements (check applicable blanks) ❑LAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit NNPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748 III PROJECT INFORMATION 1 In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) describing stormwater management for the project The site will have two new BMP's - both sand filters All new Flow within the property will flow through one of the BMPs onsite 2 Stormwater runoff from this project drams to the White Oak River basm 3 Total Site Area 3 68 acres 4 Total Wetlands Area 5 100' Wide Strip of Wetland Area N/ A awes (not applicable if no wetlands exist on site) 6 Total Project Area" 3 68 acres 7 Project Built Upon Area 42 49 8 How many drainage areas does the project have?2 9 Complete the following information for each drainage area If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below rmer 1 CIA*, I Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name White Oak River White Oak River Stream Class 6r Index No SA, HQW 20-18 SA,HW 20-18 Drainage Area (sf) 59242 61177 Existing Impervious' Area (sf) 5421 10137 Proposed Impervious'Area (sf) 17755 29585 % Impervious' Area (total) 391 % 64 9% Impervious' Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (sf) 12,109 14783 On -sue Streets (sf) On -site Parking (sf) 7107 22681 On -site Sidewalks (sf) 1346 2258 Other on -site (sf) Off -site (sf) 2614 Total (sf) 23176 39722 ' Impermous area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc 'Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation Form SWU-101 Version 8 07 Page 2 of 4 10 How was the off -site impervious area listed above denved7By Computer IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot If lot saes vary significantly, a table hsting each lot number, size and the allowable built -upon area for each lot must be provided as an attachment Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivmons Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot V SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be subuutted for each BMP specified for this project Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms Form SW401-Low Density Low Density Supplement Form SW401-Curb Outlet System Curb Outlet System Supplement Form SW401-Off-Site System Off -Site System Supplement Form SW401-Wet Detention Basin Wet Detention Basin Supplement Form SW401-Infiltration Basin Infiltration Basin Supplement Form SW401-Infiltration Trench Underground Infiltration Trench Supplement Form SW401-Bioretention Cell Bioretention Cell Supplement Form SW401-Level Spreader Level Spreader/Filter Stnp/Restored Riparian Buffer Supplement Form SW401-Wetland Constructed Wetland Supplement Form SW401-Grassed Swale Grassed Swale Supplement Form SW401-Sand Filter Sand Filter Supplement Form SWU-101 Version 8 07 Page 3 of 4 VI SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ) A complete package includes all of the items listed below The complete application package should be submitted to the appropriate DWQ Office (Appropriate office maybe found by locating project on the interactive online map at hill) //h2o ear state nc us/sidmsi maps htm) Please indicate that you have provided the following required information by initialing in the space provided next to each item • Original and one copy of the Stormwater Management Pernut Application Form tia • Original and one copy of the Deed Restrictions &Protective Covenants Form PJA • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP • Permit application processing fee of $505 ($4,000 for Express) payable to NCDENR • Calculations &plianarrative description of stornrwater treatment/management • Copy of any applicable soil report • Three copies of plans and specifications (sealed, signed & dated), including - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, fuushed floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII AGENT AUTHORIZATION If you wish to designate authority to another individual or fum so that they may provide information on your behalf, please complete this section Designated agent (individual or firm) Appian Consulting Engineers, PA Mailing Address P O Box 7966 City Rocky Mount State NC Zip 27804 Phone (252 ) 972-7703 Fax (252 ) 972-7638 Email psokalski ft2pianenjnneers com VIII APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) Peter Sokulsla certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 21-1 1000 Signature Date 6 ' 1Z Os - Form SWU-101 Version 8 07 Page 4 of 4 P 01 TRANSACTION REPORT JUL-01-2008 TUE 12,33 PM FOR NCDENR 9103502004 SEND DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP JUL-01 12 30 PM 912529727638 2'30" 8 FAX TX OK 744 TOTAL 2M 30S PAGES 8 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Wdlwm G Ross, Jr , Secretary Michael F Easley, Governor FAX COVER SHEET Date ic A To Co Fax Re No Pages (excl cover) Express Permitting From Sandra f,um Phone (9 10) 796-726 5 Fax (9101350-2004-2004_ o % L. 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-721 i -An Fqudl Opportumty Affirmauvc Action Fmployer ro�or�no CO*TINGINEERS,PA CIVIL, MUNICIPAL a STRUCTURAL ENGINEERS COMPREHENSIVE ENVIRONMENTAL SERVICES P O Box 7966 Rocky Mount, North Carolina 27804 Telephone (252) 972-7703 Fax (252) 972-7638 e-mail admin(TDappianenoineers com Web Appianengineers corn LETTER OF TRANSMITTAL DATE June 30, 2008 APPIAN JOB NO 07-105 TO - Sandy Exum NCDENR - Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 PROJECT First Baptist Church of Swansboro GENTLEMEN We are sending you ® herewith ❑ under separate cover SUBMITTAL FOR CODE FOR APPROVAL 1 FOR YOUR USE 2 ED AS REQUESTED 7 ❑ BID TAB DISTRIBUTION 4 ❑ APPROVED PERMITS 5 ❑ ACTION CODE APPROVED A ❑ APPROVED AS NOTED B ❑ NOT APPROVED C REVISE AND RESUBMIT D PLEASE SIGN AND RETURN E ❑ PRINT COPIES DRAWING NUMBER (REVISION NO OR DATE) DESCRIPTION CODE 1 Appian Check $1000 review fee REMARKS Sandy, Attached is the re -review fee of $1,000 as requested Thanks, Sent by First Class Mail ❑ UPS Next Day I AM UPS Next 2nd Day ❑ Federal Express ❑ Faxed ❑ Hand Delivered ❑ Pick Up ❑ Nandosures received are not as fisted above, kindly notlfy at once. rbank you. uare Received By Daft e File e� FROM APPIAN CONSULTING ENGINEERS FAX NO 2529727638 Jun 26 2008 04 21PM P1 Fax TMNSMISSION TO: Mr Chris Baker DATE: 6126106 wnw. NCDE'NR CONSU"ENGINEERS, PA MIL MUNICIPAL s STRUCTURAL ENGINEERS Number of pages to follow includine this page: 2 FAX NO.: (910) 350-2004 FROM: Peter W SokalskdDavid Revoir -- , S RE: First Baptist Church of Swansboro Express Permit Review — Resubmittal Fee COMMENTS uROENT PLEASE REPLY AS REQUESTED Chris- attached is a copy of the $1,000 check for the resubmittal fee as discussed are sending the original check in the mail Please continue review and approval( THANKSi We 641 South Wesleyan Boulevard P O Box 7966 Rocky Mount NC 27804 (252) 972-77a3 � (252) 972-7638 (Fax) Websxes wvvw appie6etjqLneers com vnwv constmetiondetail com State Stormwater Permit Application Tracking Cover Sheet Wilmington Regional Office Project Name FIRST BAPTIST CHURCH OF SWANSBORO Project Category NEW Project Type HD - DETENTION POND App Accept Date C', - (`a- Application Fee Aact $ qc)n0 — Fee Check Number M -ZA Reviewer Name BAKER, CHRIS Record the following information from BIMS after project has been entered' Perms Number (B/MS) I t-) n O k(j (Q L Please update the SW Access System by entering the Permit Number for the project' Date Entered in Access -I x -CS k Entered in Access By Date Printed 611912008 11 21 03 AM -Ir;�nrnrr 0000 i CONSU TI G ENGINEERS, PA CIVIL, MUNICIPAL a STRUCTURAL ENGINEERS COMPREHENSIVE ENVIRONMENTAL SERVICES P O Box 7966 Rocky Mount, North Carolina 27804 Telephone (252) 972-7703 Fax(252) 972-7638 e-mail adm n(Daoolanengmeers com Web Applanengineers com LETTER OF TRANSMITTAL DATE May 7, 2008 I APPIAN JOB NO 07-105 I TO PROJECT NCDENR - Wilmington Regional Office Land Quality 127 Cardinal Drive Extension Wilmington, NC 28405 First Baptist Church of Swainsboro GENTLEMEN We are sending you ® herewith ❑ under separate cover SUBMITTAL FOR CODE FOR APPROVAL 1 FOR YOUR USE 2 AS REQUESTED 3 ❑ BID TAB DISTRIBUTION 4 ❑ APPROVED PERMITS 5 ❑ ACTION CODE APPROVED A ❑ APPROVED AS NOTED B ❑ NOT APPROVED C ❑ REVISE AND RESUBMIT D ❑ PLEASE SIGN AND RETURN E ❑ PRINT COPIES DRAWING NUMBER (REVISION NO OR DATE) DESCRIPTION CODE 3 Sets of plans 1 Set of Calculations and site information 1 Check for $4,000 1 Storrnwater Management Permit Application REMARKS Dear Madam or Sir Attached are the calculations and permit application for stormwater for the First Baptist Church of Swansboro Thank you Sent by First Class Mad ❑ UPS Next Day I AM ❑ UPS Next 2nd Day ❑ Federal Express ❑ Faxed ❑ Hand Delivered Pick Up ❑ IF enclosures received are not as listed above, kindly notify at once Thank you cc File Received By Date 000 CONSU TI G ENGINEERS, PA CIVIL, MUNICIPAL & STRUCTURAL ENGINEERS COMPREHENSIVE ENVIRONMENTAL SERVICES P O Box 7966 Rocky Mount North Carolina 27804 Telephone (252) 972-7703 Fax (252) 972-7638 e-mail admin(0)applanenomeers com Web Applanengineers corn LETTER OF TRANSMITTAL DATE May 7, 2008 APPIAN JOB NO 07-105 TO Chris Baker NCDENR -Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 PROJECT First Baptist Church of Swainsboro GENTLEMEN We are sending you ® herewith ❑ under separate cover SUBMITTAL FOR CODE FOR APPROVAL 1 FOR YOUR USE 2 AS REQUESTED 3 BID TAB DISTRIBUTION 4 ❑ APPROVED PERMITS 5 ❑ ACTION CODE APPROVED A ❑ APPROVED AS NOTED B NOT APPROVED C REVISE AND RESUBMIT D ❑ PLEASE SIGN AND RETURN E ❑ PRINT COPIES DRAWING NUMBER (REVISION NO OR DATE) DESCRIPTION CODE 2 Sets of plans with applicable sheets only 1 Set of additional calculations to be inserted into book 1 Check for$4,000 2 (1) original and (1) copy of the Stormwater Management Permit Application REMARKS Chris, Attached are the additional data and the changed sheets as discussed Mr EG Smihson is sending in the remaining information (the original maintenance agreements as well as the agent authorization form) Thank you for your help and if you have any questions, please do not hesitate to call met Sent by First Class Mail ❑ If enclosures received are not as listed above, kindly naft at once UPS Next Day I AM ® Thank you UPS Next 2nd Day ❑ 6-17•d Federal Express ❑ Faxed ❑ By Date Hand Delivered ❑ Pick Up ❑ Received By Date cc File May 7, 2008 TO Appian Consulting Engineers, P A Post Office Box 7966 Rocky Mount, North Carolina 27804 FROM I, Charles Sheldon as a representative concerning the property at First Baptist Church of Swansboro , do hereby authorize and give permission for Appian Consulting Engineers to represent or act as agent on our behalf Charles Shelduff First Baptist Church of Swansboro 614 West Corbett Ave Swansboro, NC 28584 _OG—/7--0ir Date RE First Baptist Church of Swansboro Subject RE First Baptist Church of Swansboro From "Peter Sokalski" <psokalski@appianengmeers com> Date Fn, 13 Jun 2008 15 45 12 -0400 To "'Janet Russell"' <Janet Russell@ncmatl net> Janet, Thanks for the heads up We will be able to meet next Tuesday at 10 00 am Thank you and I hope you have a great weekend' Peter W Sokalski, PE Appian Consulting Engineers, PA P O Box 7966 Rocky Mount, NC 27804 (252) 972-7703 (252) 972-7638 fax -----Original Message----- FromJanet Russell [mailto Janet Russell@ncmatl net] Sent Thursday, June 12, 2008 12 53 PM To Peter Sokalski, pastor@swansborofirstbaptist com Subject First Baptist Church of Swansboro June 12, 2008 *First Baptist Church of Swansboro * Gentlemen The Express Stormwater submittal meeting for First Baptist of Swansboro has been scheduled with *Chris Baker on June 17, 2008 at 10 00 AM * here in the Wilmington Regional Office, 127 Cardinal Drive Ext The applicant's representative is required to attend the meeting _ Please review the submittal requirements prior to the submittal date Please respond ASAP to reserve and confirm the meeting date time Thanks, Janet Russell Express Coordinator 1 of 1 6/13/2008 4 38 PM about blank June 12, 2008 First Baptist Church of Swansboro Gentlemen The Express Stormwater submittal meeting for First Baptist of Swansboro has been scheduled with Chris Baker on June 17, 2008 at 10 00 AM here in the Wilmington Regional Office, 127 Cardinal Drive Ext The applicant's representative is required to attend the meeting Please review the submittal requirements prior to the submittal date Please respond ASAP to reserve and confirm the meeting date time Thanks, Janet Russell Express Coordinator 1 of 1 6/12/2008 12 53 PM FROM APPIAN CONSULTING ENGINEERS FAX NO 2529727638 Jun 12 2008 08 19AM P2 Awl NWENR North Caroline Deparbnent or Environment and Natural Resources 127 Cardinal Drive Extension, WiinnrsJton, NC 28405 (910) 79&7215 FAX (910)3502004 Request for Express Permit Review FILL-IN 80 ink►maeliDn below FAXte Express 0001*11111W&ong lvith a a detAWnar Ow and tAiefnity moo of Ow project to Y _ 1 Reviewer C-55 Submit G/17 Time I Z) , 06 Confirm (-Q- 13_ PROJECT Name F Churoh of Swans Coulriy QNs —W ENGINEER/CONSULTAN .1NFORMAMON, L G n 252 '10 y— 8 O'1 S Name Zip 2I8^- ❑ SCOPING MEETING My DWQ _ DLR DCM Other nSTREAM ORIGIN DETERMINATION # of Stream calls Stream Name ® STORMNATER ❑ Low Densely ❑ High Densely -Detention Pond ® High Density - Other (check alsthat a ty) sEl ay Density -Curb & Gutler ® NPDES Phase In Ian 8 Plan Revision ❑ COASTAL MGT. ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Inftxma„on ® Upland Dev ❑ LAND QUALITY ® Erosion and SedlinerMon Control Plan with 2.5 ales to be disturbed WETLANDS (401) Wetlands on Property 7 ❑ Yes ®No Isolated Wetlands on Property? ❑ Yes ® No (Check all that apply) Wetlands A be impal:W? ❑ Yes ❑ No Wetland impacts acm(s) Wellands delimalron has been wmplelled7 ❑ Yes ❑ No ❑ Buffers impacted Acre(s) USACOE Approval ofDdneauon compfeled? ❑ Yes ❑ No 404 Applicatlon In Process wft)SACOE9 ❑ Yes ❑ No ! Permit rwVd from USACOE❑Yes ❑ No 401 Application Rellur edl ❑ Yes 0 No If Yes, ❑ Regular [] Express Additional tees, not to exceed 50% of the wilpal & press Review permit appkatton fee may be charged for subsequent reviews due to the insufficiency of the penri t application Total Fee,$ StDrmwater $ e ReceNed CAMA $ E Date E I V E LQS $ JUN 12 2008 401 $ Revised 1010007 G� P , w o C9 - t z -08 FROM APPIAN CONSULTING ENGINEERS FAX NO 2529727638 Sun 12 2008 08 19AM P1 FAX mAHSM/SS/OH ror Ms Janett Russell DATE. 6111108 wfTN, NCAENR PAX No.: (910) 950-2004 PROM: Peter W Sokalski Alm mrw lFI mJua I 40, CONSIAFTAG ENGINEERS, FA CIVN, MUNI wI 6 SIRULIORAL rMINFFRS CoMPRENENSIVF FNVIRONMEeNTAI s6RVICE4 N„l""r of pop" to f0ffow /nelud/„e this page, I REr First Baptist Church of Swansboro Express Permit Review CONNENTS Ms Russell, Attached is the permit request with information as needed Thank you and / hope to hear from you soon' UMIrNr ❑ PLMSl, REPLY ACE 0.20 841 South Wwkyen Boubrid P O Box 79W Rocky Mount NC 27W (2f4 9n-7703 (252) 972-7= (Fax) WahsBes vWWep, nrtlwi tl I N ,III lu tol III Em8B OPln[nil 1111A 11 WIVI' I'W-0,1, FROM RPPIAN CONSULTING ENGINEERS FAX NO 2529727638 Jun 12 2008 10 15AM P3 project Name Stornhwater Express Questionnaire (1019r"7) What Is the applicant's full legal name? First Baptist Church of Swansboro Is the applicant associated with Sole pprroopp�netor Corporation ❑ LLC 8 Partn�Lsfnp Junc"lity M If it's an LLC, rs d ❑ Manager -managed or LLII Member -manage? U What is the applicant's tdfe within tfre Corp, 1-LC or Partnership? Will an agent (someone other than the applicant) be signing the a tan es o If Yes, what is the agents name and Me? Peter Sokolski. Engineer uPlease note the applrcabon signature requirements are Listed in NCAC 2H 1003 (e) In summary, only the sole proprietor of a sale proprietorship, the designated manager, member - manager, president or vice p/wsrdant of a corporation or LLC, the general partner of a partnership, ore ranMng otTidat o/a munlapekfy may sign ppeerind ajfplhcabons and supplements The srgrrature of the engineer or other agent can be accepted only rff aaccccoommppanied byy a signed letter of authonzabon from one of the aforementrorred rrxirvidua/s Co►porabons LLC's and ParbhershVs must be registered with the NC Secretary of Slate's Ofiioe, and the active Please Hole that speprng, capitals n, end punctuation are extremely importarht Please provide the entity name exactly as on fits with the NC Secretary of Stets 2 Project Locabon County Onakhw Nearest Town/C�y naboro (Atfach a detailed vicinity map wr s t names and SR- V or1ntefstate higohwayy numbers, plus other relevant informathorr, such as town or u7y names, directions to, etc Shw tthe nearest Intersection of two major roads on the vicinity map A major road is any 1, 2 or 3 dig/t NC, US or interstate highway) If the project is boated in Brunswi k, Onslow, or Now Hanover Counties, or a small portion of northern Pander County, NPOES Phase N post-Construehon rules will apply, unless a vested development right, as doseribad in the Session Law, can be demonstrated, which is dated prior to July 1, 2007 3 Receiving stream name _W& Oak River Rive►Basin White Oak What is the dassification of the receiving stream? SA HOW For SA or SR waters, a separate scaled topoprap tc map will be required proyed must accurately located on the map and the 34 mile radius from the property comer closest to the SA or SR r e c e iving stream must be drawn on the map If you claim that the project is not within % mile of SA or SR waters, you must conduct a serves of ddorides tests to demonstrate that the chlorides level at a point in the ricer" stream that a at least X mile from the project is less than 500 ppm Samples must be sent to a State cedrAed lab for tesbrig If the project is high density, what type of stormwater management BMP's are being proposed? (check all that apply) Wet Detention Infiltration Trench Infiltration Basin ® Sand Filter Bio-retention Wetlands Alternative Offside Dry Detention NPOES Phase II Other How many separate BMP s are being proposed? 1 Q 3 4 5 8 7 8 9 10 11 12 Other Is there offside runoff from the adjacent properties or public nght-d-vim Nrat will drain into any of the proposed BMP s on the project and is not being diverted? LJ Yes ® No ❑ NIA 6 Is a road across other property required to access the project? ❑ Yes ® No ❑ N/A 7 Is there any existing deve"ment or pre-1988 existing BUA located Qnthe pro1 (Please document delineate and /deity on the peons) N Yes 0 o ❑ N/A 8 Will the high density project tolled all of the proposed SUA*) ® Yes ❑ No ❑ NIA (If not, attach a separate explanation sheet) R E C E I V ED Page 1 of 2 Revised 10/9/2007 JUN 12 2008 DWQ PROJ # FROM APPIAN CONSULTING ENGINEERS FAX NO 2529727638 Jun 12 2008 10 16AM P4 Project Name 9 Will the project involve the subdivision and sale of mperty? El Yes ® No ❑ N/A Is the subdivision ❑ residential or ❑ commerdal� How many lots are proposed? (Deed restrictions are required157aq re commercial, low density or high density sub- divisions Spec fic language for the various types of subdivisions is available from DENR ) 10 Will the plans straw all delineated wetlands9 ❑ Yes ❑ No ® N/A (All projects require either signed wetlands debnesihon map or wetlands report to be submitted with the application Only a trained professional may provde iMormation regarding the presence or absence of wetlands ) 11 Are wet detention ponds or other engineered controls proposed to b$"ted Vdacent wetlands? Yes No ® N/A ga physical means to prevent the dewatedrig of the wetland must be provided or the Wmust be provided to demonstrate that the permanent pool of the BMP is above the SHWT and will not dawater the wetlands o►er hme Where possible, all BMP's and swa/es should outlet into back th wetland (with level spreaders) 12 For infiltration proleM, a site visit must be completed with the DENR soils scientist to verity the sod type, water table and infiltration rate provided In the sods report What is/was the scheduled site visit dates 1 (Include a copy of to►tsu to soli report with the application) 13 Level Spreaders are required at the outlet of all engineered controls and swales prior to entenng surface waters or wetlands Will the plans reflect level spreaders? El Yes ® No ❑ N/A (The purpose of the level spreader is to reduce the energy of the incoming runoff and to promote dlrfinse sheet Now to prevent erosion and scour into the receiving waters or wetlands) 14 Is this project A modification to an existing permit A lot that will be treated in an existing, previously permitted BMP? What is the name of the existing permitted facility? What is the permit number of the existmg permitted facility? SW8 Is the permitted facility in compliance with its permit? Yes H No H N/A Have the deed restrictions been recorded? Yes No N/A Have the deed restrictions been submitted? Yes No N/A Has the Designer's Certification been submitted? Yes No NIA 15 Do the plans refied all information in 15A NCAC 2H 1003 (g)9 ® Yes ❑ No ❑ N/A 16 Will all of the design requirements for each proposed BMP be met? ® Yes ❑ No ❑ N/A (N not, attach a separate explanation sheet Please note that the Express program is not set up to handle any type of deviation from the standard design) 17 For each 8MP in all high density projects, and low density curb outlet swale projects, the Individual drainage area for each proposed BMP must be dearly delineated 18 Any revisions made to the application as a result of this review may cause changes to the other documentation Plans, calculations, application, and supplements should be reviewed for any necessary changes For example, changing the onfice size will require a modification to the calculations, the pond details on the plans, and page 1 of the supplement 19 IS THE PROJECT DESIGNED AND THE APPLICATION READY TO SUBMIT? ❑ Yes ® No Complete applications may be accepted earlier rfthere is a cancellation In our submittal schedule Page 2of2 Revised 10/9/2007 FROM APPIAN CONSULTING ENGINEERS FAX NO 2529727638 Jun 12 2008 10 16AM P5 First Baphst Church of Swanahoro Stor rnvater Management Narrative 1 Generallnformation a Name of Protect b Address c Acres in Tract First Baptist Church of Swansboro 614 West Corbett Avenue INC Hwy 24) Town of Swansboro, Pamlico County 3 86+/- d Acres Being Disturbed 2 61 e Acres in Wetlands N/A f Ownership Information First Baptist Church of Swansboro g Description of Development Proposal i Previous/Existing Permits NIA u Tax Parcel ID Number The project site sits on 4 separate parcels 536406470767 636406473819 536406471971 536406472731 h Pre-1988 Built Upon Area Existing Sanctuary/Parking Lot Existing House/Dnveway i Phasing of the Protect & Stormwater Facilities No phasing of the projector stormwater facilities All stormwater items will be constructed at one time 1 Proposed Waste Water Treatment & Water Supply Sewer and water will connect to the existing municipal systems k Historic Sites & Protects Being Funded with Public Monies None known in the area I Non -Compliance Issues with NCDENR Agencies None known 2 Stora water Information a The protect is located in the Whde Oak River Basin, SA HOW, 20-(18) RE C E I V ED Allan Consulting Engincers, PA JUN 12 2008 DWO PROD # FROM APPIAN CONSULTING ENGINEERS FAX NO 2529727638 Jun 12 2008 10 16AM P6 First Baptist Church of Sruansbom b Project is High Density, Commercial (church), State Stonnwater/NPDES Phase II c Proposed Total % Impervious Surface Area 42 42% d Proposed Treatment Measures/Types of Collection System The site will have (2) sand filters with (2) level spreaders at the end of the sand filters The collection system will be pipes e Will all BUA be collected) Yes, all proposed BUA will be collected for the project f Buffer Requirements (if any) No buffers onsite g Coastal Management Areas of Environmental Concern The project is not located in an Area of Environmental concern h Disclose whether or not Mite Runoff Is coming into Site/proposed BMP Offsite water Is flowing into the property from Park Lane only i Is Road Construction across other property necessary? No construction is required across property owned by others Existing sod conditions (uhlae sods report) The site has had 6 bores performed in the areas of the proposed sand filter areas The distance to seasonal high ground water elevation ranges from 124 to 28" The site Is located on a mixture of materials with soil classification as Urban in the areas of new development Based on the bores, the soils consist of loamy sand to sandy clay Appian Consulting Engineers, PA FPOM APPIAN CONSULTING ENGINEERS FAX NO 2529727638 Jun 12 2008 10 17AM P7 FOR ��5 T =APT/S T Gf�U�4'CH �F SWA NS:�C�?RO Swansboro Onslow County Jane 12, 2008 ACE JN: 0 7- 105 Appian Consulting Engineers, PA PO Box 7966 Rocky Mount, NC 27804 (252) 972-7703 (252) 972-7638 (Fax) �i 2� �o(ESSIpNr Q SEAL = 029958 IN W soo"'' n` Y ''1,nun0,0� G 1Z'6 y-T� \ State of North Carolina F Departmnt of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION Regional Review Sand Filter Project Information Project name Fust Ba list Church of Swansboro Contact name Pastor Mike Wilkinson Phone number 10 Drainage area number 11 Desi n Variable Variable I Equation Value Units Volume to Treat Volume to Treat Reported WQVaap,ned 1 6 008 ff Volume to Treat Required IWQVSMueler =3 630'Rm Rv ATaiai 7 265 ft Adequate design volume used es Volume to Treat Adjusted WQVAdI 5 449 fit Drainage area ATmai 59 242 ft Drainage area ATaai 1 36 acres Impervious area An„ 23 176 ff Percent Impervious la =Aim✓ATmai 0 39 (umtless) Design Storm Ro 3 66 in Runoff Coefficient Rv = 05+ 9(I) 0 40 (umtless) Head on the Sedimentation Basin and Sand Filter See Table 1 Below Surface area total (sedimentation basm+sand filter) Reported As+AF 1034 ff2 Maximum head on the sedimentation basin and sand filter IrMa ifte, =WQVSchueler/(As+AF) 527 If Average head on the sedimentation basin and sand filter hA =hva.Fina�2 2 63 If Sand Filter Design Coefficient of permeability of sand filter bed Reported kRawnm 3 5 fl1day Coefficient of permeability of sand filter bed Typical kTrp,rai 3 5 fU Jay Was a typical permeability of the sand filter used? (It doesn t have to be exactly this number but must make sense es Tablet Max Filter Depths and Minimum Surface Area Combinations hua.Finar (fl) As+AF (ff') WQVAII (ft') 20 2 724 5 449 22 2 477 5 449 24 2 270 5 449 26 2096 5 449 28 1 946 5 449 30 1 816 5 449 32 1 703 5 449 34 1 603 5 449 36 1 514 5 449 38 1 434 5,449 40 1 362 5 449 42 1,297 5 449 44 1 238 5,449 46 1 185 5 449 48 1 135 5 449 50 1 090 5 449 52 1 048 5 449 54 1 009 5 449 56 973 5 449 58 939 5 449 60 908 5 449 1/1 CO*' PROJECT TiNC- S t. INA'70MO TINGINEERS, PA CIVO. MUNICIPAL l SfRtCN ENGINEERS COMPREHENSIVE ENVIRONMENTAL SERVICES PO Box 7966 Rocky Mount, NC 27604 l Ayx4. 2 C 6ytJy F2 Lea 2 J SHEET NO OF 2- DATE 731,0r, m4id,&r. AeBQ- (-4o) _ ! 440Llc- m toll I7TJF) )0AdpAw dSep ° 3 Wo iu AN&UAI(Tj') Sr,p 1 => 2v° d,oStv,Ov`1 L,z4,a) = & &541 1..) AV = (12.aAV 3 Itco )( 1/1z 4/m ) iD•l0'�41�C3.1?l0)( V12xIo1,177) ll s�2 d� Oa VAS = [0.-7s)(uJ6ZV) = fb74, zMW z =7 kA z a� i Af 6ud4wk) W) Ao1,CC-F). a ev7� 4437 e>874 271 19 5 s f5W+ 1-174 °o D8-71- 147T • PU la (PrXAV ) Ce, ) (241)X41934►Z 1 40x 3.I4 ) -774 S op- 7YQS� Nxk►J A= W QJ (JF tJ Luz- L ' 4-o t4Yb It 1Ot( d �i ) (I1832 1 5� LtA= �wx/2= 1 VpuX :m 2 5'04 E C E%�5 aEn JUN-2 3 2008 I ) DWO PROJECT _ EN SljW.56 .,2 O CONSU TI GENGINEERS,PA ��'^'� �� �" 2— CM4 MUNICIPAL A STRURUR ENGINEERS COMPREHENSIVE ENVIROXMEIRAL SERVICES PO Box 7966 Rocky Moun4 NC 27804 114&ftfaz ffl&- c'mI� 6,t360 A14W As PLU.1 ,v SHEET NO 2 OF 2- DATE kw r -W► w = 2 lo' ; yoWinlc� ,F PdtAf yid vs, fief) 00V = 88% = 30loa s THE W JJAUJM art, rw lufllall e a"C f�, ,kc BLS = 1374 s f ' l "Ir ' '107T u9,LT of = 1.791 sf 5-� 3 � �Jt%Z�o nn1 s{ tr�nu c-►t�uc (—AstA f{l (14KUx-47tor� U)QNADJ ' (3 0 79 )L 2 ,q aa974- 8'12R 1 ? im74 e vl 8 l) Fbw a4 sw zm Qa %CUJ �1J)l Ct) E = IISsZ // �, (40 krXleo�`%r)CL�J IAM mm D d6Z2 4 ;lei z) 7lamtd& Gf ol�<L PCpt,) �I�Q','40 al�rc K>o.01► by D 552 3) C-rma 7Alk- 5-1 L4 4(,V6tr2- 4vrMLJAhr P]II p wlauud D 4al3,use (:2,)$"plN06 1 0 Peak Summary for Sand Filter #1 Predevelopment flow Post -development Peak with Storm Qp (cfs) flow BMP Qv cfs Q (cfs) 1 Yr — 24 410 554 356 Hr • 0 • 06S)/ Predevelopment f1E C E I V E [) JUN 2 3 2008 DWQ CSubc�t' PROJ # Reach - Pond Link Drainage Diagram for Areal Revised -Pre Prepared by Appran Consuthng Engineers PA 6202008 HydroCADO 8 00 s!n 003967 0 2006 HydroCAD Soflx re Sduhons LLC C� 0 Areal -Revised -Pre Type 1124-hr 1 yr-24 Rainfall=3 66" Prepared by Appian Consulting Engineers, PA Page 2 HydroCADO 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Subcatchment 6S Predevelopment Runoff = 4 10 cfs @ 11 96 hrs, Volume= 0 184 af, Depth= 1 62" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0 00-40 00 hrs, dt= 0 01 hrs Type II 24-hr 1 yr-24 Rainfall=3 66" Area (ac) CN Description 1 360 Pervious Area Tc Length Slope Description 50 Direct Entry, Overland Flow Subcatchment 6S. Predevelopment Hydrograph 4 Type II 24-hr 1 yr-24 Rainfall=3.66" Runoff Area=1.360 ac 3 F: Runoff Volume=0.184 of Runoff Depth=1.62" LL 2 Tc=5.0 min CN=78 1 0 .. F . 0 1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940 Time (tw rs) G Rurrort 11 L� Areal -Revised -Pre A by Appian Consulting Engineers, PA ,DO 8 00 s/n 003967 ® 2006 HydroCAD Software S4 Type 1124-hr 1 yr-24 Rainfall=3 66" Page 3 Hydrograph for Subcatchment 6S Predevelopment Time Precip Excess Runoff (hours) (inches) (inches) (cis) 000 000 000 000 050 002 000 000 1 00 004 000 000 1 50 006 000 000 200 008 000 000 250 010 000 000 300 013 000 000 350 015 000 000 400 018 000 000 450 020 000 000 Soo 023 000 000 550 026 000 000 600 029 000 000 650 033 000 000 700 036 000 000 750 040 000 000 800 044 000 000 850 048 000 000 900 054 000 000 950 060 000 000 1000 066 000 001 1050 075 001 003 11 00 086 003 006 11 50 1 04 007 014 1200 243 074 367 1250 269 091 035 1300 283 101 023 1350 292 108 017 1400 300 1 13 014 1450 307 1 18 012 1500 312 122 011 1550 318 126 010 1600 322 1 29 009 1650 326 1 32 008 1700 330 1 35 008 1750 334 1 37 007 1800 337 140 007 1850 340 1 42 006 1900 343 1 45 006 1950 346 147 005 2000 348 1 49 005 2050 351 1 50 005 21 00 353 1 52 005 21 50 355 1 54 005 2200 358 1 56 005 2250 360 1 57 005 2300 362 1 59 004 2350 364 1 60 004 2400 366 162 004 2450 366 162 000 2500 366 1 62 000 2550 366 162 000 2600 366 1 62 000 2650 366 1 62 000 Time Preap Excess Runoff (hours) Cinches) (inches) (cis) 2700 366 162 000 2750 366 162 000 2800 366 1 62 000 2850 366 1 62 000 2900 366 1 62 000 2950 366 162 000 3000 366 162 000 3050 366 162 000 31 00 366 162 000 31 50 366 162 000 3200 366 162 000 3250 366 1 62 000 3300 366 1 62 000 3350 366 162 000 3400 366 162 000 3450 366 162 000 3500 366 162 000 3550 366 162 000 3600 366 162 000 3650 366 162 000 3700 366 162 000 3750 366 162 000 3800 366 162 000 3850 366 162 000 3900 366 162 000 3950 366 162 000 4000 366 162 000 r� ��A S Area 1 ca 4P Flow Sputter 5P Sand Filter 1 Subca/t` Reach Ltnk Drainage Diagram for Areal -Revised -Post �l Prepared by Appian Consu" Engirx�ers PA 6/20/2008 -HydroCAD®8 00 s/n 003%7 02006 HydroCAD Software Solubws LLC Areal -Revised -Post •Prepared by Appian Consulting Engineers, PA Page 4 HydroCAD® 8 00 sin 003967 ® 2006 HydroCAD Software Sotuhons LLC 6/2012008 Area Luting (all nodes) Area (acres) CN Description (subcats) 0 830 78 (1S) 0 530 98 (1S) 1 360 U •_ _ E C E I V E JUN 2 3 2008 D DW Q PROJ # Areal -Revised -Post Type H 24-hr 1 yr-24 Rainfall=3 66" Prepared by Appian Consulting Engineers, PA Page 5 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Time span=0 00-40 00 hrs, dt=0 01 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S Area 1 Runoff Area=1 360 ac Runoff Depth=2 24" Tc=5 0 min CN=86 Runoff­-5 54 cfs 0 254 of Pond 4P Flow Splitter Peak Elev--20 97' Inflow--5 54 cfs 0 254 of Pnmary=2 18 cis 0 213 of Secondary--3 36 cis 0 041 of Outflow--5 54 cfs 0 254 of Pond SP Sand Filter 1 Peak Elev-20 43' Storage=4,200 cf Inflow--2 18 cfs 0 213 of Outflow-0 20 cfs 0 213 of Total Runoff Area = 1 360 ac Runoff Volume = 0 254 of Average Runoff Depth = 2 24" 61 03% Pervious Area = 0 830 ac 38 97% impervious Area = 0 530 ac C� • _ D E C E I V E JUN 2 3 2008 D DWQ PROJ a Areal -Revised -Post Type // 24-hr 1 yr-24 Rainfall=3 66" •Prepared by Appian Consulting Engineers, PA Page 6 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Subcatchmertt 1S Area 1 Runoff = 5 54 cfs @ 1196 hrs, Volume= 0 254 af, Depth= 2 24" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0 00-40 00 hrs, dt= 0 01 hrs Type II 24-hr 1 yr-24 Rainfall=3 66" Area (ac) CN Descriotion 0 530 98 0 830 78 1 360 86 Weighted Average 0 830 Pervious Area 0 530 Impervious Area Tc Length Description 50 Direct Entry, Direct Entry Subcatchmertt 1S- Area 1 Hydrograph • 6 5 54 cfs Type II 24-hr 1 yr-24 5 Rainfall=3.66" i Runoff Area=1.360 ac 4 Runoff Volume=0.254 of w Runoff Depth=2.24" LL 3 Tc=5.0 min 2 CN=86 0 0 1 2 3 4 5 6 7 8 9 1011 121314 1516 1718192021222324252627282930 313233343536 37383940 Time (hours) ❑ RunoB Areal -Revised -Post Type 1124-hr 1 yr-24 Rainfall=3 66" • • • Prepared by Appian Consulting Engineers, PA Page 7 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software SoAfions LLC 6/20/2008 Hydrograph for Subcatchment 1 S Area 1 Time Preap Excess Runoff (hours) (inches) (inches) (cfs) 000 000 000 000 050 002 000 000 1 00 004 000 000 1 50 006 000 000 200 008 000 000 250 010 000 000 300 013 000 000 350 015 000 000 400 018 000 000 450 020 000 000 Soo 023 000 000 550 026 000 000 600 029 000 000 650 033 000 000 700 036 000 000 750 040 000 001 800 044 001 001 850 048 001 002 900 054 002 003 950 060 004 004 1000 066 006 006 1050 075 009 009 11 00 086 013 015 11 50 104 022 0.28 1200 243 118 471 1250 269 1 40 044 1300 283 151 028 1350 292 160 021 1400 300 166 017 1450 307 1 72 015 1500 312 177 013 1550 318 181 012 1600 322 1 85 010 1650 326 1 89 010 1700 330 1 92 009 1750 334 1 95 009 1800 337 198 008 1850 340 201 007 1900 343 204 007 1950 346 206 006 2000 348 208 006 2050 351 211 006 21 00 353 213 006 21 50 355 215 005 2200 358 217 005 2250 360 218 005 2300 362 220 005 2350 364 222 005 2400 366 224 005 2450 366 224 000 2500 366 224 000 2550 366 224 000 2600 366 224 000 2650 366 224 000 Time Preap Excess Runoff (hours) (inches) (inches) (cis) 2700 366 224 000 2750 366 224 000 2800 366 224 000 2850 366 224 000 2900 366 224 000 2950 366 224 000 3000 366 224 000 3050 366 224 000 31 00 366 224 000 31 50 366 224 000 3200 366 224 000 3250 366 224 000 3300 366 224 000 3350 366 224 000 3400 366 224 000 3450 366 224 000 3500 366 224 000 3550 366 224 000 3600 366 224 000 3650 366 224 000 3700 366 224 000 3750 366 224 000 3800 366 224 000 3850 366 224 000 3900 366 224 000 3950 366 224 000 4000 366 224 000 (1E C E I V E� Juv 2 3 2008 DWQ PPOJ # Areal -Revised -Post Type ll 24-hr 1 yr-24 Rainfall=3 66" Prepared by Appian Consulting Engineers, PA Page 8 HydroCAD® 8 00 sin 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Pond 4P Flow Splitter Inflow Area = 1 360 ac, Inflow Depth = 2 24" for 1 yr-24 event Inflow = 5 54 cfs @ 11 96 hrs, Volume= 0 254 of Outflow = 5 54 cfs @ 11 96 hrs, Volume= 0 254 af, Aften= 0%, Lag= 0 0 min Primary = 2 18 cfs @ 11 96 hrs, Volume= 0 213 of Secondary = 3 36 cfs @ 11 96 hrs, Volume= 0 041 of Routing by Stor-Ind method, Time Span= 0 00-40 00 hrs, dt= 0 01 hrs Peak Elev= 20 97' @ 11 96 hrs lice Routing Invert Outlet Devices #1 Secondary 20 20' 24 0" x 146 0' long Culvert CPP, square edge headwall, Ke= 0 500 Outlet Invert-- 18 00' S= 0 0152 T Cc= 0 900 n= 0 013 Corrugated PE, smooth interior #2 Primary 18 96' 8 0" Vert Onfice/Grate C= 0 600 Primary OutFlow Max--2 18 cfs @ 1196 hrs HW=20 97' (Free Discharge) t2=0rifice/Grate (Orifice Controls 2 18 cfs @ 6 24 fps) Secondary OutFlow Max=3 36 cfs @ 1196 hrs HW=20 97' (Free Discharge) t1=Culvert (Inlet Controls 3 36 cfs @ 2 99 fps) • Pond 4P• Flow Splitter Hydrograph 6 5 4 r `u 3 0 LL 2 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Time (hours) 0 P Inflow C outflow LI Pnmary © Secondary _ (1E C E I V ED u' JUN232008 DWQ PPOJ # Areal -Revised -Post Type 1124-hr 1 yr-24 Rainfall=3 66" •Prepared by Appian Consulting Engineers, PA Page 9 HydroCADO 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Hydrograph for Pond 4P_ Flow Splttter Time Inflow Elevation Outflow Primary Secondary (hours) (Cfs) (feet) (cis) (Cfs) (Cfs) 000 000 1896 000 000 000 1 00 000 1896 000 000 000 200 000 1896 000 000 000 300 000 1896 000 000 000 400 000 1896 000 000 000 500 000 1896 000 000 000 600 000 1896 000 coo 000 700 000 1899 000 000 000 800 001 1902 001 001 000 900 003 1906 003 003 000 1000 006 1909 006 006 000 11 00 015 1917 015 0115 000 1200 471 2087 471 211 260 1300 028 1925 028 028 000 1400 017 1918 017 017 000 1500 013 1916 013 013 000 16 00 010 1913 010 010 000 1700 009 1912 009 009 000 1800 008 1911 008 008 000 1900 007 1910 007 007 000 2000 006 1909 006 006 000 21 00 • 006 1909 006 006 000 2200 005 1908 005 005 000 2300 005 1908 005 005 000 2400 005 1908 005 005 000 2500 000 1896 coo 000 000 2600 000 1896 000 000 000 2700 000 1896 000 000 000 2800 000 1896 000 000 000 2900 000 1896 000 000 000 3000 000 1896 000 000 000 31 00 000 1896 000 000 000 3200 000 1896 000 000 000 3300 000 1896 000 000 000 3400 000 1896 000 000 000 3500 000 1896 000 000 000 3600 000 1896 000 000 000 3700 000 1896 000 000 000 3800 000 1896 000 000 000 3900 000 1896 000 000 000 4000 000 1896 000 000 000 • nE C E I V ED luau{ JUy-2 3 2008 DWO PROJ a • • • Areal -Revised -Post Type I/ 24-hr 1 yr-24 Rainfall=3 66" Prepared by Appian Consulting Engineers, PA Page 10 HvdroCAD® 8 00 s/n 003967 ® 2006 HvdroCAD Software Solutions LLC 6/20/2008 Stage -Discharge for Pond 4P Flow Splitter Elevation Discharge Primary Secondary (feet) (cis) (cfs) (cfs) 1896 000 000 000 1901 001 0 01 000 1906 004 004 000 1911 008 008 000 1916 013 013 000 1921 020 020 000 1926 028 028 000 1931 037 037 000 1936 047 047 000 1941 057 057 000 1946 068 068 000 1951 078 078 000 1956 087 087 000 1961 095 095 000 1966 102 1 02 000 1971 1 08 1 08 000 1976 115 115 000 1981 1 21 121 000 1986 1 27 1 27 000 1991 1 32 1 32 000 1996 1 37 1 37 000 2001 142 1 42 000 2006 147 147 000 2011 1 52 1 52 000 2016 1 56 1 56 000 2021 161 1 61 000 2026 1 68 165 002 2031 1 77 1 69 008 2036 1 90 1 74 016 2041 205 178 027 2046 223 182 042 2051 244 1 85 059 2056 268 1 89 079 2061 294 1 93 1 01 2066 323 1 96 1 26 2071 354 200 1 54 2076 387 204 1 83 2081 423 207 216 2086 460 210 250 2091 500 214 287 2096 542 217 325 2101 586 220 366 21 06 631 223 408 21 11 678 227 452 21 16 727 230 497 21 21 777 233 544 21 26 828 236 593 2131 881 239 642 21 36 934 242 693 21 41 989 245 744 21 46 1044 247 797 21 51 11 00 250 850 21 56 11 56 253 903 21 61 1213 256 957 Elevation Discharge Primary Secondary (feet) (cfs) (Cfs) (cfs) 21 66 1269 259 1011 2171 1326 261 1065 2176 1382 264 11 18 2181 1437 267 11 71 21 86 1492 269 1223 2191 1545 272 1273 2196 1597 274 1323 2201 1647 277 1370 2206 1693 280 1414 2211 1737 282 1455 2216 1776 285 1490 nE C E 1_V ED �ppp;�pps► JUN 2 3 2008- DWQ PROJ # Areal -Revised -Post Type 11 24-hr 1 yr-24 Rainfall=3 66" •Prepared by Appian Consulting Engineers, PA Page 11 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 11 • Elevation Storage (feet) (cubic -feet) 1896 0 1898 0 1900 0 1902 0 1904 0 1906 0 1908 0 1910 0 1912 0 1914 0 1916 0 1918 0 1920 0 1922 0 1924 0 1926 0 1928 0 1930 0 1932 0 1934 0 1936 0 1938 0 1940 0 1942 0 1944 0 1946 0 1948 0 1950 0 1952 0 1954 0 1956 0 1958 0 1960 0 1962 0 1964 0 1966 0 1968 0 1970 0 1972 0 1974 0 1976 0 1978 0 1980 0 1982 0 1984 0 1986 0 1988 0 1990 0 1992 0 1994 0 1996 0 1998 0 2000 0 2002 0 Stage -Area -Storage for Pond 4P Flow Sputter Elevation Storage (feet) (cubic -feet) 2004 0 2006 0 2008 0 2010 0 2012 0 2014 0 2016 0 2018 0 2020 0 2022 0 2024 0 2026 0 2028 0 2030 0 2032 0 2034 0 2036 0 2038 0 2040 0 2042 0 2044 0 2046 0 2048 0 2050 0 2052 0 2054 0 2056 0 2058 0 2060 0 2062 0 2064 0 2066 0 2068 0 2070 0 2072 0 2074 0 2076 0 2078 0 2080 0 2082 0 2084 0 2086 0 2088 0 2090 0 2092 0 2094 0 2096 0 2098 0 2100 0 2102 0 21 04 0 2106 0 2108 0 21 10 0 Elevation Storage (feet) (cubic -feet) 21 12 0 21 14 0 21 16 0 21 18 0 2120 0 21 22 0 2124 0 2126 0 2128 0 21 30 0 21 32 0 21 34 0 2136 0 21 38 0 2140 0 2142 0 2144 0 2146 0 21 48 0 21 50 0 2152 0 2154 0 2156 0 2158 0 2160 0 2162 0 2164 0 2166 0 2168 0 2170 0 2172 0 2174 0 2176 0 21 78 0 21 80 0 2182 0 21 84 0 21 86 0 21 88 0 21 90 0 2192 0 21 94 0 2196 0 21 98 0 2200 0 2202 0 2204 0 2206 0 2208 0 2210 0 2212 0 2214 0 2216 0 2218 0 Elevation Storage (feet) (cubic -feet) 2220 0 Areal -Revised -Post Type 1124-hr 1 yr-24 Rainfall=3 66" •Prepared by Appian Consulting Engineers, PA Page 12 HydroCADO 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Pond 5P Sand Filter 1 Inflow Area = 1 360 ac, Inflow Depth = 1 88" for 1 yr-24 event Inflow = 2 18 cis @ 1196 hrs, Volume= 0 213 of Outflow = 0 20 cfs @ 13 63 hrs, Volume= 0 213 af, Atten= 91%, Lag= 100 1 min Discarded = 0 20 cis @ 13 63 hrs, Volume= 0 213 of Routing by Stor-Ind method, Time Span= 0 00-40 00 hrs, dt= 0 01 hrs Peak Elev= 20 43' @ 13 63 hrs Surf Area= 4,856 sf Storage= 4,200 cf Plug -Flow detention time= 246 2 min calculated for 0 213 of (100% of inflow) Center -of -Mass det time= 246 2 min ( 1,077 7 - 831 5 ) Volume Invert Avail Storage Storage Description #1 1900, 13,125 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf Area Inc Store Cum Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1900 1,767 0 0 1967 1,767 1,184 1,184 2000 4,420 1,021 2,205 2100 5,434 4,927 7,132 • 2200 6,553 5,994 13,125 Device Routing Invert Outlet Devices #1 Discarded 0 00' 1 750 m1hr Exfiitration to Drain Pipes over Surface area Discarded OutFlow Max=O 20 cfs @ 13 63 hrs HW=20 43' (Free Discharge) t-1=Exfiitration to Drain Pipes (ExFltration Controls 0 20 cfs) • j�E C E I V ED JUN 2 3 2008 DWG PROJ# • rI u 0 Areal -Revised -Post Type 1124-hr 1 yr-24 Rainfall=3 66" Prepared by Appian Consulting Engineers, PA Page 13 HvdroCAD® 8 00 s/n 003967 ® 2006 HvdroCAD Software Sohrtwns LLC 6/20/2008 Pond 5P Sand Filter 1 Hydrograph 0 1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940 Time (Acura) o Influx 10 Discarded Areal -Revised -Post Type 1124-hr 1 yr-24 Rainfall=3 66" Prepared by Appian Consulting Engineers, PA Page 14 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Sohfions LLC 6/20/2008 Hydrograph for Pond 5P Sand Filter 1 Time Inflow Storage Elevation Dscarded (hours) (cfs) (cubic -feet) (feet) (cfs) 000 000 0 1900 000 1 00 000 0 1900 000 200 000 0 1900 000 300 000 0 1900 000 400 000 0 1900 000 500 000 0 1900 000 600 000 0 1900 000 700 000 2 1900 000 800 001 8 1900 001 900 003 21 1901 003 1000 006 38 1902 005 11 00 015 139 1908 007 1200 211 2 634 2010 018 1300 028 4,120 2041 020 1400 017 4,179 2043 020 1500 013 4 004 2039 020 1600 010 3 729 2033 019 1700 009 3,387 2026 019 1800 008 3,018 2018 019 1900 007 2,622 2009 018 2000 006 2,201 2000 018 2100 006 1,819 1990 015 2200 005 1,535 1982 012 2300 005 1,338 1974 010 2400 005 1,211 1968 008 2500 000 966 1955 007 2600 000 708 1940 007 2700 000 450 1925 007 2800 000 193 1911 007 2900 000 6 1900 001 3000 000 0 1900 000 31 00 000 0 1900 000 3200 000 0 1900 000 3300 000 0 1900 000 3400 000 0 1900 000 3500 000 0 1900 000 3600 000 0 1900 000 3700 000 0 1900 000 3800 000 0 1900 000 3900 000 0 1900 000 4000 000 0 1900 000 0 �E C E I V ED JUN 2 3 2008 DWG PROJ # Areal -Revised -Post Type 1124-hr 1 yr-24 Rafnfalf=3 66" •Prepared by Appian Consulting Engineers, PA Page 15 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 • • Elevation Discarded (feet) (cfs) 1900 000 1902 007 1904 007 1906 007 1908 007 1910 007 1912 007 1914 007 1916 007 1918 007 1920 007 1922 007 1924 007 1926 007 1928 007 1930 007 1932 007 1934 007 1936 007 1938 007 1940 007 1942 007 1944 007 1946 007 1948 007 1950 007 1952 007 1954 007 1956 007 1958 007 1960 007 1962 007 1964 007 1966 007 1968 007 1970 008 1972 009 1974 009 1976 010 1978 011 1980 Oil 1982 012 1984 013 1986 013 1988 014 1990 015 1992 015 1994 016 1996 017 1998 017 2000 018 2002 018 2004 018 2006 018 Stage -Discharge for Pond SP Sand Filter 1 Elevation Discarded (feet) (cfs) 2008 018 2010 018 2012 018 2014 018 2016 019 2018 019 2020 019 2022 019 2024 019 2026 019 2028 019 2030 019 2032 019 2034 019 2036 019 2038 019 2040 020 2042 020 2044 020 2046 020 2048 020 2050 020 2052 020 2054 020 2056 020 2058 020 2060 020 2062 020 2064 021 2066 021 2068 021 2070 021 2072 021 2074 021 2076 021 2078 021 2080 021 2082 021 2084 021 2086 021 2088 022 2090 022 2092 022 2094 022 2096 022 2098 022 21 00 022 21 02 022 21 04 022 21 06 022 21 08 022 - 2110 022 21 12 023 21-14 023 Elevation Discarded (feet) (cfs) 2116 023 21 18 023 21 20 023 21 22 023 21 24 023 21 26 023 2128 023 21 30 023 21 32 023 21 34 024 21 36 024 21 38 024 2140 024 2142 024 21 44 024 2146 024 2148 024 21 50 024 21 52 024 21 54 024 21 56 025 21 58 025 2160 025 21 62 025 21 64 025 2166 025 21 68 025 21 70 025 21 72 025 21 74 025 21 76 025 21 78 026 21 80 026 21 82 026 21 84 026 21 86 026 21 88 026 21 90 026 21 92 026 21 94 026 21 96 026 21 98 026 2200 027 • • • Areal -Revised -Post Type 1124-hr 1 yr-24 Rainfall=3 66" Prepared by Appian Consulting Engineers, PA Page 16 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Stage -Area -Storage for Pond 5P Sand Filter 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 1900 1,767 0 1905 1,767 88 1910 1,767 177 1915 1,767 265 1920 1,767 353 1925 1,767 442 1930 1,767 530 1935 1,767 618 1940 1,767 707 1945 1,767 795 1950 1,767 884 1955 1,767 972 1960 1,767 1,060 1965 1,767 1,149 1970 2,008 1,241 1975 2,410 1,351 1980 2,812 1,482 1985 3,214 1,632 1990 3,616 1,803 1995 4,018 1,994 2000 4,420 2,205 2005 4,471 2,427 2010 4,521 2,652 2015 4,572 2,879 2020 4,623 3,109 2025 4,674 3,341 2030 4,724 3,576 2035 4,775 3,814 2040 4,826 4,054 2045 4,876 4,296 2050 4,927 4,541 2055 4,978 4,789 2060 5 028 5 039 2065 5,079 5,292 2070 5,130 5,547 2075 5,181 5,805 2080 5,231 6,065 2085 5,282 6,328 2090 5,333 6,593 2095 5,383 6,861 2100 5,434 7,132 2105 5,490 7,405 2110 5,546 7,681 2115 5,602 7,959 2120 5,658 8,241 2125 5,714 8,525 21 30 5,770 8 812 2135 5,826 9,102 21 40 5,882 9,395 21 45 5,938 9,690 21 50 5,994 9 989 2155 6,049 10,290 2160 6,105 10,594 2165 6,161 10,90a Elevaton Surface Storage (feet) (sq-ft) (cubic -feet) 2170 6,217 11,210 2175 6,273 11,522 2180 6,329 11,837 2185 6,385 12,155 2190 6,441 12,476 2195 6,497 12,799 2200 6,553 13,125 Areal -Revised -Post Type 1124-hr 1 5" Rainfall=l 71" Prepared by Appian Consulting Engineers, PA Page 17 HydroCADO 8 00 sin 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 • Time span=0 00-40 00 hrs, dt=0 01 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S Area 1 Runoff Area=1 360 ac Runoff Depth=0 64" Tc=5 0 min CN=86 Runoff --I 61 cfs 0 072 of Pond 4P Flow Spiitter Peak Elev--20 21' Inflow --I 61 cis 0 072 at Pnmary=l 61 cfs 0 072 of Secondary--0 00 cfs 0 000 of Outflow --I 61 cfs 0 072 of Pond SP Sand Filter 1 Peak Elev-19 76' Storage=1,365 cf Inflow=l 61 cis 0 072 of Outflow-0 10 cis 0 072 of Total Runoff Area = 1 360 ac Runoff Volume = 0 072 of Average Runoff Depth = 0 64" 61 03% Pervious Area = 0 830 ac 38 97% Impervious Area = 0 530 ac • 0 Areal -Revised -Post Type // 24-hr 1 5" Rainfall=l 71" •Prepared by Appian Consulting Engineers, PA Page 18 HydroCAD® 8 00 s/n 003967 (D 2006 HydroCAD Software Sohfions LLC 6/20/2008 r, • Subcatchment 1S Area 1 Runoff = 161 cfs @ 1197 hrs, Volume= 0 072 af, Depth= 0 64" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0 00-40 00 hrs, dt= 0 01 hrs Type II 24-hr 1 5 Rainfall=l 71" Area (ac) CN Description 0 530 98 0 830 78 1 360 B6 Weighted Average 0 830 Pervious Area 0 530 Impervious Area Tc Length Slope Velocity Capacity Description 50 Direct Entry, Direct Entry Subcatchment 1S Area 1 Hydrograph ❑ Runoff 16 cis Type II 24-hr 1.5" al Rainfall=1.71" r f Runoff Area=1.360 ac Z Runoff Volume=0.072 of ' Runoff Depth=0.64" 0 LL Tc=5.0 min CN=86 0 1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940 Time (hours) - �E C E I V ED �IJr,Bs JUN 2 3 2008 DWQ PROJ # • C� is Areal -Revised -Post Type 1124-hr 1 5" Rainfall=l 71 " Prepared by Appian Consulting Engineers, PA Page 19 HydroCAD® 8 00 sin 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Hydrograph for Subcatchment IS Area 1 Time Preap Excess Runoff (hours) (inches) (inches) (cis) 000 000 000 000 050 001 000 000 1 00 002 000 000 1 50 003 000 000 200 004 000 000 250 005 000 000 300 006 000 000 350 007 000 000 400 008 000 000 450 009 000 000 500 Oil 000 000 550 012 000 000 600 014 000 000 650 015 000 000 700 017 000 000 750 019 000 000 800 021 000 000 850 023 000 000 900 025 000 000 950 028 000 000 1000 031 000 000 1050 035 000 000 11 00 040 000 001 11 50 048 001 004 1200 1 13 027 142 12 50 126 034 014 1300 1 32 038 009 1350 1 37 041 007 1400 140 043 006 1450 143 045 005 1500 1 46 047 005 1550 148 048 004 1600 1 50 050 004 1650 152 051 003 1700 1 54 052 003 1750 1 56 053 003 1800 1 57 054 003 1850 1 59 055 003 1900 1 60 056 003 1950 162 057 002 2000 1 63 058 002 2050 1 64 059 002 21 00 1 65 059 002 21 50 1 66 060 002 2200 1 67 061 002 2250 1 68 062 002 2300 1 69 062 002 2350 1 70 063 002 2400 171 064 002 2450 1 71 064 000 2500 1 71 064 000 2550 1 71 064 000 2600 1 71 064 000 2650 1 71 064 000 Time Preap Excess Runoff (hours) finches) Cinches) (cfs) 2700 1 71 064 000 2750 1 71 064 000 2800 1 71 064 000 2850 1 71 064 000 2900 1 71 064 000 2950 1 71 064 000 3000 1 71 064 000 3050 1 71 064 000 31 00 1 71 064 000 31 50 1 71 064 000 3200 171 0 64 000 3250 1 71 064 000 3300 1 71 064 000 3350 1 71 064 000 3400 171 064 000 3450 171 064 000 3500 171 064 000 3550 171 064 000 3600 1 71 064 000 3650 1 71 064 000 3700 1 71 064 000 3750 1 71 064 000 3800 1 71 064 000 3850 1 71 064 000 3900 1 71 064 000 3950 1 71 064 000 4000 171 064 000 j�E C E I V ED lu^{u JUN12 3 2008 DWQ PROJ# Areal -Revised -Post Type 1124-hr 1 5" Rainfall=l 71" isPrepared by Appian Consulting Engineers, PA Page 20 HydroCADO 8 00 sin 003967 ® 2006 HydroCAD Software Solu6oru LLC 6/20/2008 Pond 4P Flow Sputter Inflow Area = 1 360 ac, Inflow Depth = 0 64" for 1 5" event Inflow = 161 cfs @ 11 97 hrs, Volume= 0 072 of Outflow = 161 cfs @ 11 97 hrs, Volume= 0 072 af, Atten= 0%, Lag= 0 0 min Primary = 161 cls @ 1197 hrs, Volume= 0 072 of Secondary = 0 00 cfs @ 11 97 hrs, Volume= 0 000 of Routing by Stor-Ind method, Time Span= 0 0040 00 hrs, dt= 0 01 hrs Peak Elev= 20 21' @ 11 97 hrs Device Routing Invert Outlet Devices #1 Secondary 20 20' 24 0" x 145 0' long Culvert CPP, square edge headwall, Ke= 0 500 Outlet Invert-- 18 00' S= 0 0152 7 Cc= 0 900 n= 0 013 Corrugated PE, smooth interior #2 Primary 18 96' 8 0" Vert. Orifice/Grate C= 0 600 Primary OutFlow Max--1 60 cfs @ 11 97 hrs HW=20 20' (Free Discharge) t-2=Onfice/Grate (Orifice Controls 1 60 cfs @ 4 60 fps) Secondary OutFlow Max=O 00 cls @ 1197 hrs HW=20 21' (Free Discharge) t-1=Culvert (Barrel Controls 0 00 cfs @ 0 28 fps) 0 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Time (hours) Pond 4P. Flow Splrtter Hydrograph C_1 lea Inflow G Outflow D Primary 13 Secondary �E C E 1 V ED pnuf JUN 2 3 2008 Dwa PROJ # Areal -Revised -Post Type 1124-hr 1 5" Rainfall=l 71 " Prepared by Appian Consulting Engineers, PA Page 21 • HydroCADO 8 00 sin 003967 ® 2006 HydroCAD Software Solutions LLC 6/2012008 Hydrograph for Pond 4P Flow SpIdter Time Inflow Elevation Outflow Primary Secondary (hours) (cis) (feet) (cfs) (cis) (cis) 000 000 1896 000 000 000 1 00 000 1896 000 000 000 200 000 1896 000 000 000 300 000 1896 000 000 000 400 000 1896 000 000 000 500 000 1896 000 000 000 600 000 1896 000 000 000 700 000 1896 000 000 000 800 000 1896 000 000 000 900 000 1896 000 000 000 1000 000 1896 000 000 000 1100 001 1902 001 001 000 1200 142 2001 142 142 000 1300 009 1913 009 009 000 1400 006 1909 006 006 000 1500 005 1907 005 005 000 1600 004 1906 004 004 000 1700 003 1906 003 003 000 1800 003 1905 003 003 000 1900 003 1904 003 003 000 2000 002 1904 002 002 000 21 00 002 1903 002 002 000 • 2200 002 1903 002 002 000 2300 002 1903 002 002 000 2400 002 1903 002 002 000 2500 000 1896 000 000 000 2600 000 1896 000 000 000 2700 000 1896 000 000 000 2800 000 1896 000 000 000 2900 000 1896 000 000 000 3000 000 1896 000 000 000 31 00 000 1896 000 000 000 3200 000 1896 000 000 000 3300 000 1896 000 000 000 3400 000 1896 000 000 000 3500 000 1896 000 000 000 3600 000 1896 000 000 000 3700 000 1896 000 000 000 3800 000 1896 000 000 000 3900 000 1896 000 000 000 4000 000 1896 000 000 000 • nE C E 1 V ED �jJn(► JUN 2 3 2008 DW C PROJ # • r1 U • Areal -Revised -Post Type // 24-hr 1 5" Rainfall= 171 " Prepared by Appian Consulting Engineers, PA Page 22 HydroCAD® 8 00 sin 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Stage -Discharge for Pond 4P Flow Splttter Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 1896 000 000 000 1901 001 001 000 1906 004 004 000 1911 008 008 000 1916 013 013 000 1921 020 020 000 1926 028 028 000 1931 037 037 000 1936 047 047 000 1941 057 057 000 1946 068 068 000 1951 078 078 000 1956 087 087 000 1961 095 095 000 1966 102 102 000 1971 1 08 108 000 1976 115 115 000 1981 1 21 121 000 1986 1 27 1 27 000 1991 1 32 1 32 000 1996 1 37 1 37 000 2001 142 142 000 2006 147 147 000 2011 1 52 1 52 000 2016 1 56 1 56 000 2021 161 1 61 000 2026 1 68 1 65 002 2031 177 169 008 2036 190 1 74 016 2041 205 1 78 027 2046 223 1 82 042 2051 244 1 85 059 2056 268 1 89 079 2061 294 1 93 1 01 2066 323 196 1 26 2071 354 200 1 54 2076 387 204 1 83 2081 423 207 216 2086 460 210 250 2091 500 214 287 2096 542 217 325 2101 586 220 366 2106 631 223 408 21 11 678 227 452 21 16 727 230 497 2121 777 233 544 21 26 828 236 593 2131 881 239 642 21 36 934 242 693 2141 989 245 744 21 46 1044 247 797 21 51 1100 _ 250 850 21 56 11 56 253 903 2161 1213 256 957 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 2166 1269 259 1011 2171 1326 261 1065 21 76 1382 264 11 18 21 81 1437 267 11 71 2186 1492 269 1223 21 91 1545 272 1273 21 96 1597 274 1323 2201 1647 277 1370 2206 1693 280 1414 2211 1737 282 1455 2216 1775 286 1490 RE C EI V ED JUN 2 3 2008 DWQ PROJ # Areal -Revised -Post Type 1124-hr 1 5" Rainfall=l 71 " •Prepared by Appian Consulting Engineers, PA Page 23 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Elevation Storage (feet) (cubic -feet) 1896 0 1898 0 1900 0 1902 0 1904 0 1906 0 1908 0 1910 0 1912 0 1914 0 1916 0 1918 0 1920 0 1922 0 1924 0 1926 0 1928 0 1930 0 1932 0 1934 0 1936 0 1938 0 1940 0 1942 0 1944 0 19 46 0 1948 0 1950 0 1952 0 1954 0 1956 0 1958 0 1960 0 1962 0 1964 0 1966 0 1968 0 1970 0 1972 0 1974 0 1976 0 1978 0 1980 0 1982 0 1984 0 1986 0 1988 0 1990 0 1992 0 1994 0 1996 0 1998 0 2000 0 2002 0 Stage -Area -Storage for Pond 4P Flow Spiltter Elevation Storage (feet) (cubx-feet) 2004 0 2006 0 2008 0 2010 0 2012 0 2014 0 2016 0 2018 0 2020 0 2022 0 2024 0 2026 0 2028 0 2030 0 2032 0 2034 0 2036 0 2038 0 2040 0 2042 0 2044 0 2046 0 2048 0 2050 0 2052 0 2054 0 2056 0 2058 0 2060 0 2062 0 2064 0 2066 0 2068 0 2070 0 2072 0 2074 0 2076 0 2078 0 2080 0 2082 0 2084 0 2086 0 2088 0 2090 0 2092 0 2094 0 2096 0 2098 0 21 00 0 21 02 0 21 04 0 _ 2106 0 21 08 0 21_10 0 Elevation Storage (feet) (cubes —feet) 21 12 0 21 14 0 2116 0 21 18 0 2120 0 2122 0 2124 0 2126 0 2128 0 21 30 0 2132 0 21 34 0 21 36 0 21 38 0 2140 0 21 42 0 2144 0 2146 0 21 48 0 21 50 0 21 52 0 21 54 0 21 56 0 21 58 0 2160 0 21 62 0 21 64 0 21 66 0 21 68 0 21 70 0 2172 0 2174 0 2176 0 21 78 0 2180 0 2182 0 2184 0 2186 0 2188 0 2190 0 21 92 0 21 94 0 21 96 0 21 98 0 2200 0 2202 0 2204 0 2206 0 2208 0 2210 0 2212 0 2214 0 2216 0 2218 0 Elevation Storage (feet) (cubi2:f22t 2220 0 nE C E I V ED �j��J;ppps JUNI 2 3 2008 DWO PROJ A Areal -Revised -Post Type 1124-hr 1 5" Rainfa11=1 71" isPrepared by Appian Consulting Engineers, PA Page 24 HydroCADO 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Pond 51P Sand Filter 1 Inflow Area = 1 360 ac, Inflow Depth = 0 64" for 1 5" event Inflow = 1 61 cfs @ 11 97 hrs, Volume= 0 072 of Outflow = 0 10 cfs @ 12 91 hrs, Volume= 0 072 af, Atten= 94%, Lag= 56 7 min Discarded = 0 10 cfs @ 12 91 hrs, Volume= 0 072 of Routing by Stor-Ind method, Time Span= 0 00-40 00 hrs, dt= 0 01 hrs Peak Elev= 19 76' @ 12 91 hrs Surf Area= 2,456 sf Storage= 1,365 cf Plug -Flow detention time= 169 3 min calculated for 0 072 of (100% of inflow) Center -of -Mass det time= 169 3 min ( 1,018 5 - 849 2 ) Volume Invert Avail Storage Storage Description #1 1900, 13,125 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf Area Inc Store Cum Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1900 1,767 0 0 1967 1,767 1,184 1,184 2000 4,420 1,021 2,205 2100 5,434 4,927 7,132 • 2200 6,553 5,994 13,125 Device Routing Invert Outlet Devices #1 Discarded 0 00' 1 750 m1hr Exfiiftration to Drain Pipes over Surface area Discarded OutFlow Max=O 10 cfs @ 12 91 hrs HW=19 76' (Free Discharge) t-1=Exfiltration to Drain Pipes (Exfiiltrabon Controls 0 10 cfs) 0 • Areal -Revised -Post Type 1124-hr 1 5" Rainfall=l 71 " Prepared by Appian Consulting Engineers, PA Page 25 HvdroCAD® 8 00 s/n 003967 ® 2006 HvdroCAD Software Solutions LLC 6/20/2008 Pond 5P Sand Filter 1 Hydrograph Inflow Q Da rded 0 0 1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940 Time (hours) CEIREI V ED JUN 2 3 2008, DWC PROJ # Areal -Revised -Post Type 1124-hr 1 5" Rainfall=1 71" •Prepared by Appian Consulting Engineers, PA Page 26 HydroCAD® 8 00 sin 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Hydrograph for Pond 5P Sand Filter 1 Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 000 000 0 1900 000 1 00 000 0 1900 000 200 000 0 1900 000 300 000 0 1900 000 400 000 0 1900 000 500 000 0 1900 000 600 000 0 1900 000 700 000 0 1900 000 800 000 0 1900 000 900 000 0 1900 000 1000 000 0 1900 000 1100 001 6 1900 001 1200 142 891 1950 007 1300 009 1,364 1976 010 1400 006 1 286 1972 009 1500 005 1,184 1967 007 1600 004 1,076 1961 007 1700 003 942 1953 007 1800 003 795 1945 007 1900 003 635 1936 007 2000 002 462 1926 007 21 00 . 002 279 1916 007 2200 002 94 1905 007 2300 002 15 1901 002 2400 002 14 1901 002 2500 000 0 1900 000 2600 000 0 1900 000 2700 000 0 1900 000 2800 000 0 1900 000 2900 000 0 1900 000 3000 000 0 1900 000 31 00 000 0 1900 000 3200 000 0 1900 000 3300 000 0 1900 000 3400 000 0 1900 000 3500 000 0 1900 000 3600 000 0 1900 000 3700 000 0 1900 000 3800 000 0 1900 000 3900 000 0 1900 000 4000 000 0 1900 000 41 • • • Areal -Revised -Post Elevation Discarded (feet) (cfs) 1900 000 1902 007 1904 007 1906 007 1908 007 1910 007 1912 007 1914 007 1916 007 1918 007 1920 007 1922 007 1924 007 1926 007 1928 007 1930 007 1932 007 1934 007 1936 007 1938 007 1940 007 1942 007 1944 007 1946 007 1948 007 1950 007 1952 007 1954 007 1956 007 1958 007 1960 007 1962 007 1964 007 1966 007 1968 007 1970 008 1g72 009 1974 009 1976 010 1978 011 1980 011 1982 012 1984 013 1986 013 1988 014 1990 015 1992 015 1994 016 1996 017 1998 017 2000 018 2002 018 2004 018 2006 018 Type Il 24-hr 1 5" Rainfall=l 71 " iIUng Engineers, PA Page 27 ® 2006 HvdroCAD Software Solutions LLC 6/20/2008 Stage -Discharge for Pond 5P Sand Filter 1 Elevation Discarded (feet) (c%) 2008 018 2010 018 2012 018 2014 018 2016 019 2018 019 2020 019 2022 019 2024 019 2026 019 2028 019 2030 019 2032 019 2034 019 2036 019 2038 019 2040 020 2042 020 2044 020 2046 020 2048 020 2050 020 2052 020 2054 020 2056 020 2058 020 2060 020 2062 020 2064 021 2066 021 2068 021 2070 021 2072 021 2074 021 2076 021 2078 021 2080 021 2082 021 2084 021 2086 021 2088 072 2090 022 2092 022 2094 022 2096 022 2098 022 21 00 022 21 02 022 21 04 022 21 06 022 21 08 022 21 10 022 21 12 023 21 14 023 Elevation Discarded (feet) (cfs) 21 16 023 2118 023 21 20 023 2122 023 2124 023 2126 023 2128 023 21 30 023 21 32 023 21 34 024 21 36 024 21 38 024 21 40 024 2142 024 21 44 024 2146 024 2148 024 21 50 024 21 52 024 21 54 024 21 56 025 21 58 025 21 60 025 21 62 025 2164 025 2166 025 2168 025 21 70 025 21 72 025 21 74 025 21 76 025 21 78 026 21 80 026 21 82 026 21 84 026 21 86 026 21 88 026 21 90 026 21 92 026 21 94 026 21 96 026 21 98 026 2200 027 Areal -Revised -Post Type 1124-hr 1 5" Rainfall=l 71" •Prepared by Appian Consulting Engineers, PA Page 28 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 L..J Stage -Area -Storage for Pond 5P Sand Filter 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 1900 1,767 0 1905 1,767 88 1910 1,767 177 1915 1,767 265 1920 1,767 353 1925 1 767 442 1930 1,767 530 1935 1,767 618 1940 1,767 707 1945 1,767 795 1950 1,767 884 1955 1,767 972 1960 1,767 1,060 1965 1,767 1,149 1970 2,008 1,241 1975 2,410 1,351 1980 2,812 1,482 1985 3 214 1,632 1990 3 616 1,803 1995 4,018 1,994 2000 4,420 2,205 2005 4,471 2,427 2010 4,521 2,652 2015 4,572 2,879 2020 4,623 3,109 2025 4,674 3,341 2030 4,724 3,576 2035 4,775 3,814 2040 4,826 4,054 2045 4,876 4,296 2050 4,927 4,541 2055 4,978 4,789 2060 5 028 5 039 2065 5,079 5,292 2070 5,130 5,547 2075 5 181 5,805 2080 5,231 6,065 2085 5,282 6,328 2090 5 333 6,593 2095 5,383 6,861 2100 5,434 7,132 2105 5,490 7,405 21 10 5,546 7,681 2115 5,602 7,959 2120 5,658 8,241 2125 5,714 8,525 2130 5,770 8,812 2135 5,826 9,102 21 40 5,882 9,395 21 45 5 938 9,690 2150 5,994 9,989 21 55 - 6,049 10,290 2160 6105 10,594 21 65 6 161 10 900 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 21 70 6,217 11 210 2175 6,273 11,522 2180 6,329 11,837 2185 6,385 12,155 21 90 6,441 12 476 21 95 6 497 12 799 2200 6,553 13,125 (�E C E I V ED I►l�,lfl JUN 2 3 2008 DWp PROJ # Areal -Revised -Post Type 1l 24-hr 10 yr-24 Rainfall=6 87" •Prepared by Appian Consulting Engineers, PA Page 29 HydroCADO 8 00 sin 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Time span=0 00-40 00 hrs, dt-0 01 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S Area 1 Runoff Area=1 360 ac Runoff Depth=5 24" Tc=5 0 min CN=86 Runoff=12 33 cfs 0 594 of Pond 4P Flow Splitter Peak Eiev=21 63 Inflow=l2 33 cis 0 594 of Pnmary=2 57 cis 0 429 of Secondary--9 76 cfs 0 165 of Outflow=12 33 cfs 0 594 of Pond SP Sand Filter 1 Peak Elev--21 42 Storage=9 511 cf Inflow--2 57 cfs 0 429 of Outflovr--0 24 cfs 0 429 of Total Runoff Area = 1 360 ac Runoff Volume = 0 594 of Average Runoff Depth = 5 24" 61 03% Pervious Area = 0 830 ac 38 97% Impervious Area = 0 530 ac n U • nE C E I V ED JUN 2 3 2008 DWO PROJ # Areal -Revised -Post Type II 24-hr 10 yr 24 Rainfall=6 87" Prepared by Appian Consulting Engineers, PA Page 30 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Subcatchment 1S Areal Runoff = 12 33 cfs @ 1196 hrs, Volume= 0 594 af, Depth= 5 24" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0 00-40 00 hrs, dt= 0 01 hrs Type II 24-hr 10 yr-24 Rainfall=6 87" Area (ac) CN Descnotion 0 530 98 0 830 78 1 360 86 Weighted Average 0 830 Pervious Area 0 530 Impervious Area Tc Length Slope Velocity Capacity Description 13 12 11 10 9 _6 O 3 7 LL 6 5 4 3 2 1 12 33 ds I Direct Entry, Direct Entry Subcatchment 1S Areal Hydrograph Type 11 24-hr 10 yr-24 Rainfall=6.87" Runoff Area=1.360 ac Runoff Volume=0.594 of Runoff Depth=5.24" Tc=5.0 min CN=86 o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2122 23 24 25 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 Time (hours) L 1 ❑ RumNf Areal -Revised -Post Type 1124-hr 10 yr-24 Rainfall=6 87" • • Prepared by Appian Consulting Engineers, PA Page 31 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Hydrograph for Subcatchment 1 S Areal Time Preap Excess Runoff (hours) (inches) (inches) (cfs) 000 000 000 000 050 004 000 000 1 00 007 000 000 1 50 Oil 000 000 200 015 000 000 250 019 000 000 300 024 000 000 350 028 000 000 400 033 000 000 450 038 000 001 500 043 001 002 550 049 001 003 600 055 003 004 650 061 004 005 700 068 006 006 750 075 009 007 800 082 012 008 850 091 015 O11 900 101 020 015 950 1 12 026 016 1000 124 033 021 1050 140 043 030 11 00 1 61 057 044 11 50 1 94 081 078 1200 455 305 1031 1250 505 351 092 1300 530 375 057 1350 549 393 044 1400 563 406 034 1450 575 418 030 1500 586 428 027 1550 596 437 024 1600 605 445 021 1650 612 453 020 1700 620 460 019 1750 626 466 017 1800 633 472 016 1850 639 478 015 1900 644 483 014 1950 649 488 013 2000 654 492 012 2050 658 497 012 21 00 663 501 Oil 21 50 667 505 Oil 2200 671 509 Oil 2250 675 513 Oil 2300 679 517 010 2350 683 520 010 2400 687 524 010 2450 687 524 000 2500 687 524 000 2550 687 524 000 2600 687 524 000 2650 687 524 000 Time Preap Excess Runoff (hours) (inches) (inches) (cfs) 2700 687 524 000 2750 687 524 000 2800 687 524 000 2850 687 524 000 2900 687 524 000 2950 687 524 000 3000 687 524 000 3050 687 524 000 3100 687 524 000 31 50 687 524 000 3200 687 524 000 3250 687 524 000 3300 687 524 000 3350 687 524 000 3400 687 524 000 3450 687 524 000 3500 687 524 000 3550 687 524 000 3600 687 524 000 3650 687 524 000 3700 687 524 000 3750 687 524 000 3800 687 524 000 3850 687 524 000 3900 687 524 000 3950 687 524 000 4000 687 524 000 (�E C E I V ED ��pJ�,puS JUN 2 3 2008 DWQ PROJ # LJ Areal -Revised-Post Type 1124-hr 10 yr-24 Rainfall=6 87" Prepared by Appian Consulting Engineers, PA Page 32 HydroCADO 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Pond 4P Flow Splitter Inflow Area = 1 360 ac, Inflow Depth = 5 24" for 10 yr-24 event Inflow = 12 33 cis @ 11 96 hrs, Volume= 0 594 of Outflow = 12 33 ds @ 1196 hrs, Volume= 0 594 af, Atten= 0%, Lag= 0 0 min Primary = 2 57 cfs @ 1196 hrs, Volume= 0 429 of Secondary = 9 76 cfs @ 11 96 hrs, Volume= 0 165 of Routing by Stor-Ind method, Time Span= 0 00-40 00 hrs, dt= 0 01 hrs Peak Elev= 21 63' @ 11 96 hrs Device Routing Invert Outlet Devices #1 Secondary 20 20' 24 0" x 145 0' long Culvert CPP, square edge headwall, Ke= 0 500 Outlet Invert= 18 00' S= 0 0152 7 Cc= 0 900 n= 0 013 Corrugated PE, smooth intenor #2 Primary 18 96' 8 0" Vert Onfice/Grate C= 0 600 Primary OutFiow Max=2 57 cfs @ 1196 hrs HW=21 63' (Free Discharge) L2=Onfice/Grate (Onfice Controls 2 57 cfs @ 7 35 fps) Secondary OutFlow Max=9 74 cfs @ 11 96 hrs HW=21 63' (Free Discharge) t-1=Culvert (Inlet Controls 9 74 cfs @ 4 07 fps) 13 12 11 10 9 a 8 u 3 v 6 5 4 3 2 1 0 0 Pond 4P Flow Splitter Hydrograph 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Time (hares) L`1 IMbw L outflow ((I Pnmary © 6eomdary nE C E I V ED �ppp�,►�us� JUN 2 3 2008 DWO PROJ # a Areal -Revised -Post Type 1124-hr 10 yr-24 Rainfall=6 87" •Prepared by Appian Consulting Engineers, PA Page 33 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Hydrograph for Pond 4P Flow Splitter Time Inflow Elevation Outflow Primary Secondary (hours) (cfs) (feet) (cis) (cfs) (cis) 000 000 1896 000 000 000 1 00 000 1896 000 000 000 200 000 1896 000 000 000 300 000 1896 000 000 000 400 000 1896 000 000 000 500 002 1903 002 002 000 600 004 1906 004 004 000 700 006 1909 006 006 000 800 008 1912 008 008 000 900 015 1917 015 015 000 1000 021 1922 021 021 000 11 00 044 1935 044 0 44 000 1200 1031 2145 1031 247 784 1300 057 1941 057 057 000 1400 034 1929 034 034 000 1500 027 1925 027 027 000 1600 021 1921 021 021 000 1700 019 1920 019 019 000 1800 016 1918 016 016 000 1900 014 1917 014 014 000 2000 012 1915 012 012 000 21 00 Oil 1914 Oil Oil 000 • 2200 Oil 1914 Oil Oil 000 2300 010 1913 010 010 000 2400 010 1913 010 010 000 2500 000 1896 000 000 000 2600 000 1896 000 000 000 2700 000 1896 000 000 000 2800 000 1896 000 000 000 2900 000 1896 000 000 000 3000 000 1896 000 000 000 31 00 000 1896 000 000 000 3200 000 1896 coo 000 000 3300 000 1896 000 000 000 3400 000 1896 000 000 000 3500 000 1896 000 000 000 3600 000 1896 000 000 000 3700 000 1896 000 000 000 3800 000 1896 000 000 000 3900 000 1896 000 000 000 4000 000 1896 000 000 000 • E • • Areal -Revised -Post Type II 24-hr 10 yr-24 Ra/nfai/=6 87" Prepared by Appian Consulting Engineers, PA Page 34 HydroCAD® 8 00 s/n 003967 ® 2006 HvdroCAD Software Solutions LLC 6/20/7008 Stage -Discharge for Pond 4P Flow Sputter Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cis) 1896 000 000 000 1901 001 001 000 1906 004 004 000 1911 008 008 000 1916 013 013 000 1921 020 020 000 1926 028 028 000 1931 037 037 000 1936 047 047 000 1941 057 057 000 1946 068 068 000 1951 078 078 000 1956 087 087 000 1961 095 095 000 1966 1 02 102 000 1971 1 08 1 08 000 1976 115 115 000 1981 121 1 21 000 1986 1 27 127 000 1991 1 32 1 32 000 1996 1 37 1 37 000 2001 1 42 142 000 2006 147 147 000 2011 1 52 1 52 000 2016 1 56 1 56 000 20 21 1 61 161 000 2026 1 68 1 65 002 2031 1 77 1 69 008 2036 1 90 1 74 016 2041 205 1 78 027 2046 223 1 82 042 2051 244 1 85 059 2056 268 1 89 079 2061 294 1 93 1 01 2066 323 1 96 1 26 2071 354 200 1 54 2076 387 204 1 83 2081 423 207 216 2086 460 210 250 2091 500 214 287 2096 542 217 325 21 01 586 220 366 21 06 631 223 408 21 11 678 227 452 21 16 727 230 497 21 21 777 233 544 21 26 828 236 593 2131 881 239 642 21 36 934 242 693 21 41 989 245 744 21 46 1044 247 797 21 51 11 00 250 850 21 56 11 56 253 903 21 61 1213 256 957 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 2166 1269 259 1011 2171 1326 261 1065 21 76 1382 264 11 18 21 81 1437 267 11 71 21 86 1492 269 1223 21 91 1545 272 1273 21 96 1597 274 1323 2201 1647 277 1370 2206 1693 280 1414 2211 1737 282 1455 2216 1776 286 1490 nE C E I V ED I�l�,uf JUN 2 3 2008 DWO PROJ p • C� • Areal -Revised -Post Type if 24-hr 10 yr-24 Ratnfall=6 87" Prepared by Appian Consulting Engineers, PA Page 35 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solubons LLC 6/20/2008 Elevation Storage (feet) (cubic -feet) 1896 0 1898 0 1900 0 1902 0 1904 0 1906 0 1908 0 19 10 0 1912 0 19 14 0 1916 0 1918 0 1920 0 1922 0 1924 0 1926 0 1928 0 1930 0 1932 0 1934 0 1936 0 1938 0 1940 0 1942 0 1944 0 1946 0 1948 0 1950 0 1952 0 1954 0 1956 0 1958 0 1960 0 1962 0 1964 0 1966 0 1968 0 1970 0 1972 0 1974 0 1976 0 1978 0 1980 0 1982 0 1984 0 1986 0 1988 0 1990 0 1992 0 1994 0 1996 0 1998 0 2000 0 2002 - 0 Stage -Area -Storage for Pond 4P Flow Splitter Elevation Storage (feet) (cubic -feet) 2004 0 2006 0 2008 0 2010 0 2012 0 2014 0 2016 0 2018 0 2020 0 2022 0 2024 0 2026 0 2028 0 2030 0 2032 0 2034 0 2036 0 2038 0 2040 0 2042 0 2044 0 2046 0 2048 0 2050 0 2052 0 2054 0 2056 0 2058 0 2060 0 2062 0 2064 0 2066 0 2068 0 2070 0 2072 0 2074 0 2076 0 2078 0 2080 0 2082 0 2084 0 2086 0 2088 0 2090 0 2092 0 2094 0 2096 0 2098 0 21 00 0 21 02 0 2104 0 2106 0 21 08 0 21 10 0 Elevation Storage (feet) (cubic -feet) 2112 0 21 14 0 21 16 0 21 18 0 2120 0 2122 0 2124 0 2126 0 2128 0 21 30 0 21 32 0 21 34 0 21 36 0 21 38 0 2140 0 2142 0 2144 0 2146 0 2148 0 21 50 0 21 52 0 21 54 0 21 56 0 21 58 0 2160 0 2162 0 2164 0 2166 0 2168 0 21 70 0 2172 0 2174 0 2176 0 21 78 0 21 80 0 21 82 0 21 84 0 21 86 0 2188 0 2190 0 21 92 0 21 94 0 21 96 0 21 98 0 2200 0 2202 0 2204 0 2206 0 2208 0 2210 0 2212 0 2214 0 2216 0 2218 0 Elevation Storage (feet) (cubic -feet) 2220 0 ECEIVED JUN 2 3 2008 PROJ# DWO • C� • Areal -Revised -Post by Appian Consulting Engineers, PA D 8 00 s/n 003967 ® 2006 HydroCAD Soft Pond 51P Sand Filter 1 Type 1124-hr 10 yr-24 Rainfall=6 87" Page 36 Inflow Area = 1 360 ac, Inflow Depth = 3 78" for 10 yr-24 event Inflow = 2 57 cfs @ 11 96 hrs, Volume= 0 429 of Outflow = 0 24 cfs @ 15 54 hrs, Volume= 0 429 af, Atten= 91%, Lag= 215 2 min Discarded = 0 24 cfs @ 15 54 hrs, Volume= 0 429 of Routing by Stor-Ind method, Time Span= 0 00-40 00 hrs, dt= 0 01 hrs Peak Elev= 21 42' @ 15 54 hrs Surf Area= 5,904 sf Storage= 9,511 cf Plug -Flow detention time= 453 4 min calculated for 0 429 of (100% of inflow) Center -of -Mass det time= 453 4 min ( 1,270 6 - 817 2 ) Volume Invert Avail Storage Storage Description #1 1900, 13,125 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf Area Inc Store Cum Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1900 1,767 0 0 1967 1,767 1,184 1,184 2000 4,420 1,021 2,205 21 00 5,434 4,927 7,132 2200 6,553 5,994 13,125 Device Routing Invert Outlet Devices #1 Discarded 0 00' 1 750 in/hr Exfiltration to Drain Pipes over Surface area Discarded OutFlow Max=O 24 cis @ 15 54 hrs HW=21 42' (Free Discharge) L1=Exfiltration to Drain Pipes (Exfiltration Controls 0 24 cfs) nE C E I V ED ��un►►(►► JUN 2 3 2008 DWQ PROJ # Areal -Revised -Post Prepared by Appian Consulting Engineers, PA HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD SoR Pond 5P Sand Filter 1 4ydrograph Type 1124-hr 10 yr-24 Rainfall=6 87" Page 37 0 1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940 T-% c (hours) 0 Ilm—wfl—m--li [� Drs rded Areal -Revised -Post Type 1124-hr 10 yr-24 Rainfall=6 87" isPrepared by Appian Consulting Engineers, PA Page 38 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Soluhorts LLC 6/20/2008 Hydrograph for Pond 5P Sand Filter 1 Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 000 000 0 1900 000 1 00 000 0 1900 000 200 000 0 1900 000 300 000 0 1900 000 400 000 0 1900 000 500 002 10 1901 001 600 004 24 1901 003 700 006 41 1902 005 800 008 62 1904 007 900 015 209 1912 007 1000 021 566 1932 007 11 00 0 44 1,409 1977 Oil 1200 247 5,322 2066 021 1300 057 8,490 2124 023 1400 034 9 241 21 37 024 1500 027 9,478 2141 024 1600 021 9,488 2142 024 1700 019 9,338 21 39 024 1800 016 9,114 21 35 024 1900 014 8,817 21 30 023 2000 012 8,449 2124 023 21 00 Oil 8,039 21 16 023 • 2200 Oil 7,625 21 09 022 2300 010 7,208 21 01 022 2400 010 6,786 2094 022 2500 000 6,041 2080 021 2600 000 5,290 2065 021 2700 000 4,560 2050 020 2800 000 3,852 2036 019 2900 000 3 165 2021 019 3000 000 2,500 2007 018 31 00 000 1,879 1992 015 3200 000 1,413 1977 Oil 3300 000 1,111 1963 007 3400 000 854 1948 007 3500 000 596 1934 007 3600 000 338 1919 007 3700 000 81 1905 007 3800 000 1 1900 000 3900 000 0 1900 000 4000 000 0 1900 000 • �E C E 1 V ED JUN 2 3 2008 DWO PROJ # Areal -Revised -Post Type f/ 24-hr 10 yr-24 Ramfafi=6 87" •Prepared by Appian Consulting Engineers, PA Page 39 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 • • Elevation Discarded (feet) (cis) 1900 000 1902 007 1904 007 1906 007 1908 007 19% 007 1912 007 1914 007 1916 007 1918 007 1920 007 1922 007 1924 007 1926 007 1928 007 1930 007 1932 007 1934 007 1936 007 1938 007 1940 007 1942 007 1944 007 1946 007 1948 007 1950 007 1952 007 1954 007 1956 007 1958 007 1960 007 1962 007 1964 007 1966 007 1968 007 1970 008 1972 009 1974 009 1976 010 1978 011 1980 011 1982 012 1984 013 1986 013 1988 014 1990 015 1992 015 1994 016 1996 017 1998 017 2000 018 2002 _ 018 2004 018 2006 018 Stage -Discharge for Pond 5P Sand Filter 1 Elevation Discarded (feet) (cfs) 2008 018 2010 018 2012 018 2014 018 2016 019 2018 019 2020 019 2022 019 2024 019 2026 019 2028 019 2030 019 2032 019 2034 019 2036 019 2038 019 2040 020 2042 020 2044 020 2046 020 2048 020 2050 020 2052 020 2054 020 2056 020 2058 020 2060 020 2062 020 2064 021 2066 021 2068 021 2070 021 2072 021 2074 021 2076 021 2078 021 2080 021 2082 021 2084 021 2086 021 2088 022 2090 022 2092 022 2094 022 2096 022 2098 022 2100 022 21 02 022 21 04 022 21 06 022 21 08 022 21 10 022 2112 023 21 14 023 Elevation Discarded (feet) (cfs) 21 16 023 21 18 023 21 20 023 2122 023 2124 023 2126 023 2128 023 21 30 023 21 32 023 21 34 024 21 36 024 21 38 024 2140 024 2142 024 2144 024 2146 024 2148 024 21 50 024 21 52 024 21 54 024 21 56 025 21 58 025 2160 025 2162 025 2164 025 2166 025 2168 025 21 70 025 21 72 025 21 74 025 21 76 025 21 78 026 21 80 026 2182 026 21 84 026 21 86 026 21 88 026 21 90 026 21 92 026 21 94 026 21 96 026 21 98 026 2200 027 nE C E 1 V ED Iona{ JUN 2 3 2008 DWG PROJ # C, J Areal -Revised -Post Type l/ 24-hr 10 yr-24 Rainfall=6 87" Prepared by Appian Consulting Engineers, PA Page 40 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Stage -Area -Storage for Pond 5P Sand Fiker 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 1900 1 767 0 1905 1,767 88 1910 1,767 177 1915 1,767 265 1920 1,767 353 1925 1,767 442 1930 1,767 530 1935 1,767 618 1940 1,767 707 1945 1,767 795 1950 1,767 884 1955 1,767 972 1960 1,767 1,060 1965 1 767 1,149 1970 2,008 1,241 1975 2 410 1,351 1980 2,812 1,482 1985 3,214 1,632 1990 3,616 1,803 1995 4,018 1,994 2000 4,420 2,205 2005 4,471 2,427 2010 4 521 2,652 2015 4 572 2,879 2020 4,623 3,109 2025 4,674 3,341 2030 4,724 3,576 2035 4,775 3,814 2040 4,826 4,054 2045 4,876 4,296 2050 4,927 4,541 2055 4,978 4,789 2060 5 028 5 039 2065 5 079 5,292 2070 5,130 5,547 2075 5,181 5,805 2080 5,231 6,065 2085 5,282 6,328 2090 5,333 6 593 2095 5,383 6,861 2100 5,434 7,132 2105 5,490 7,405 2110 5,546 7,681 2115 5,602 7,959 2120 5,658 8,241 2125 5,714 8,525 2130 5,770 8,812 2135 5,826 9,102 2140 5,882 9,395 2145 5,938 9,690 21 50 5,994 9,989 2155 6,049 10,290 21 60 6,105 10 594 2165 6,161 - 10,900 Elevation Surface Storage (feet) (so-ft) (cubic -feet) 21 70 6,217 11 210 21 75 6 273 11,522 2180 6,329 11,837 2185 6,385 12,155 2190 6,441 12,476 2195 6,497 12,799 2200 6,563 13,125 nE C E I V ED �untp -JUN232008 DW Q PROJ# R, Z State of North Carolina Departmnt of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION Regional Review Sand Filter Project Information Project name Fist Ba list Church of Swansboro Contact name Pastor Mike Wilkinson Phone number 10 Drainage area number 12 Desi n Variable Variable Equation Value Units Volume to Treat Volume to Treat Reported WQVa,n,H,a 8 929 ft Volume to Treat Required WQVsv,,,,i„ =3 630'Ro Rv AT,,,, 11 837 fi Adequate design volume used? yes Volume to Treat Adjusted WQV�I 8 877 ft Drainage area Aro„i 61 177 It Drainage area A,.1 1 40 acres Impervious area Al, 39 722 ft Percent Impervious I, =AI.WAT,t,i 065 (unitless) Design Storm Ro i3 6611 Runoff Coefficient Rv = 05+ 90A) 10631 (unilless) Head on the Sedimentation Basin and Sand Filter See Table 1 Below Surface area total (sedimentation basin+sand filter) Reported As+AF 3079 g' Maximum head on the sedimentation basin and sand filter hM..nne, =WQVSchueler/(As+Ar) 2 88 ft Average head on the sedimentation basin and sand filter Ink =hM..c.n.W2 1 44 It Sand Filter Design Coefficient of permeability of sand filter bed Reported ka,r,,,,a 3 5 fit/day Coefficient of permeability of sand filter bed Typical kTrniui 35 ft/day Was a typical permeability of the sand filter used' (It doesn t have to be exactly this number but must make sense yes Table 1 Max Filter Deaths and Minimum Surface Area Combinations hMUFmn (ft) As+AF (ft2) WQVAII (ft) 20 4 439 8 877 22 4 035 8 877 24 3 699 8 877 26 3414 8877 28 3 171 8 877 30 2 959 8 877 32 2 774 8 877 34 2611 8877 36 2 466 8 877 38 2 336 8 877 40 2219 8877 42 2 114 8 877 44 2018 8877 46 1 930 8 877 48 1 849 8 877 50 1 775 8 877 52 1 707 8 877 54 1 644 8 877 56 1 1 585 8 877 5 8 1 531 8 877 6 01 1 480 8 877 1/1 � 1 PROJECT f`tr xQ�-�DF S�W�ppO.��iP�017r0 SHEET NO OF z- CONSU TI G ENGINEERS• PA ✓^'^'� �t � == 1 CIVIL. MUNICIPAL A STRUMRAL ENGINEERS DATE BY COMPREHENSIVE ENVIRONMENTAL SERVICES PO Box 7966 Rocky Mount NC 27804 Aene i (s�n FL 7Z�C l) 72,ac. ZIM47VA06 AeAeA '( o) art Sys Z¢Zs�' 7:3m- /t2pee-✓iaua °A - 3,? 44v)FAv- �s�o - (06 iasE IL �sn14tUJ�- /� 57?f l 7> 12V = 0.0 5 1"0.009C3Ci 1) = 0 4-011 WiA�✓ = 61-V AvX3 (ob imX VZ tn/AX 41>5(o Sflie-) CD,�oIgX 591f1-z)C3,(�(0j�' Yz) -7 Step 2 Ala : nc t7 (nH+gxFdtir = WEiV�nr z As+ hf WaV as(4 57447 5447 5447 544-7 5447 hurl. As-C240)(2v)CAvXPol) C )C oI4o tqX i 3&X 3 to(o) Y ��o la ti 4a IMF OAW Af (Ad CV-ktR hA+dF) p E C E I V ED C3.5X1•ULZ1.71-1.5") ss� JUN 2 3 2008 272� 5 vet • u7 13(01t-75 Lo m 4o 907 $3 t = 4o kra Cl 44 eta = Uwac Ft►tcr = r -MR 2 3.4o �[�rruPlatital DWiU coNSULTING ENGINEERS, PA QVII, NGNIQPAI■STR RA ENGINEERS C PRENENSIVE ENVIRONNEWI SERVIE PO Box 7966, Rocky Mount, NC 27804 PROJECT-' .'.a. .%i r . 2s i lJ TbIC¢l�e�, TSB B404 siz�> , <as}auvws SHEET NO Z OF 2, DATE BY (AstAf)- WR Avr 5447 z llooZ o(oti 1(003 sF 14AUAlty 3,4 'I'W M WUOU1Ns Ke I4st1FFIc 1&,lr 115E V4,1 FDL,lptalkjer X 6 = 6gbsf Arf : 11-771f SW 3 —#�R.Wropm Sy57" "tsa-c- 7 TtTAL = 1'/l<7 (SLIFFIC-I44(I ) 4tc+A-fXlnw Alf::,44 OL,2Jnvj- (17(o7 X 3 4D ) � 5447 G007, b Z S44i 6Ic' bTw 4 => Ate l #JVW .)l A/0 Ml1SF (hG CVIA co P.,A,,ikl IS CbSL`D PoiroM 1� T 4w uF sYSTem y p 05D4 e's 2� 1-.) v qwz. (- su.Igtt, fApr,) °rl(o�Q A ) 3/e W6UI- Vl = D D 1I l 50G s=o5Z p = 0 4" a 3) ;=-anti POLF 5-1 Dr I.lc.DaJ9- 3TmW - tkp NLA4d t 1 D 5 ►3 , (ysE ` L2) 4It i R 10 Peak Summary for Sand Filter #2 • Predevelopment flow Post -development Peak with Storm OP (Cfs) flow BMP QP(Cfs) Q Cfs) 1 Yr — 24 440 659 293 Hr nE C E I V ED IunUf JUN 2 3 2008 DWG PROJ R C • Predevelopment \tSubcat` Reacn and Link nE C E I V ED �u^�S► JUN 2 3 2008 DWQ PROJ # Areas 2-Revised-Pre Type 1124-hr 1-yr 24 hr Ralnfa11=3 66" •Prepared by Appian Consulting Engineers, PA Page 2 HydroCADO 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Subcatchment 4S Predevelopment Runoff = 4 40 cfs @ 1196 hrs, Volume= 0 197 af, Depth= 1 69" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0 00-60 00 hrs, dt= 0 01 hrs Type II 24-hr 1-yr24 hr Rainfall=3 66" Area (ac) CN Description 1 400 79 50-75% Grass cover, Fair HSG B 1 400 Pervious Area Tc Length Slope Velocity Capacity Description 50 Direct Entry, Overland Flow Subcatchment 4S: Predevelopment H yd rogra ph [§ Runoft Type II 24-hr 1-yr 24 hr Rainfall=3.66" Runoff Area=1.400 ac Runoff Volume=0 197 of Runoff Depth=1.69" Tc=5.0 min CN=79 0 //J 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) • p E C E I V E D JUN 2 3 2008 DWQ PROJ # �-- • • • Areas 2-Revised-Pre Type l/ 24-hr 1-yr 24 hr Rainfall=3 66" Prepared by Appian Consulting Engineers, PA Page 3 HydroCAD® 8 00 sln 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Hydrograph for Subcatchment 4S Predevelopment Time Precip Excess Runoff (hours) (inches) (inches) (cfs) 000 000 000 000 1 00 004 000 000 200 008 000 000 300 013 000 000 400 018 000 000 500 023 000 000 600 029 000 000 700 036 000 000 800 044 000 000 900 054 000 000 1000 066 001 002 11 00 086 004 007 1200 243 079 382 1300 283 1 06 024 1400 300 1 19 015 1500 312 128 012 1600 322 1 35 009 1700 330 141 008 1800 337 1 47 007 1900 343 1 51 006 2000 348 1 55 005 21 00 353 1 59 005 2200 358 1 63 005 2300 362 1 66 005 2400 366 169 004 2500 366 169 000 2600 366 169 000 2700 366 1 69 000 2800 366 1 69 000 2900 366 1 69 000 3000 366 1 69 000 31 00 366 1 69 000 3200 366 1 69 000 3300 366 1 69 000 3400 366 169 000 3500 366 1 69 000 3600 366 169 000 3700 366 1 69 000 3800 366 1 69 000 3900 366 1 69 000 4000 366 169 000 41 00 366 169 000 4200 366 169 000 4300 366 169 000 4400 366 1 69 000 4500 366 1 69 000 4600 366 1 69 000 4700 366 1 69 000 4800 366 169 000 4900 366 1 69 000 5000 366 1 69 000 5100 366 1 69 000 5200 366 1 69 000 5300 366 1 69 000 Time Prec ip Excess Runoff (hours) (inches) finches) (cfs) 5400 366 169 000 5500 366 169 000 5600 366 169 000 5700 366 1 69 000 5800 366 169 000 5900 366 169 000 6000 366 169 000 nE C E I V ED JUN 2 3 2008 DWQ PROJ # Post Develop r� u Flow Splatter 4 Sand Filter 2 • (Subcai` Reach and Link �E C E I V E lu^�S4 JUN 2 3 2008 DWQ PROJ H Areas 2-Revised-Post •Prepared by Appian Consulting Engineers, PA HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Sofh Area Listing (all nodes) Area (acres) CN Description (subcats) 0 490 79 50-75% Grass cover, Fair, HSG B (1 S) 0 910 98 Paved parking & roofs (1S) 1 400 U Page 4 nE C E 1 V ED �pp;pp( JUv 2 3 2008 DWQ PROJ # Areas 2-Revised-Post Type 1124-hr 1-yr 24 hr Rainfall=3 66" •Prepared by Appian Consulting Engineers, PA Page 5 HydroCAD® 8 00 s/n 003967 C 2006 HydroCAD Software Solutions LLC 6/20/2008 Time span=0 00-60 00 hrs, dt=0 01 hrs, 6001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S Post Development Runoff Area=1 400 ac Runoff Depth=2 69" Tc=5 0 min CN=91 Runoffs 59 cfs 0 314 of Pond 2P Flow Spldter Peak Elev--25 42 Inflow--6 59 cfs 0 314 of Pnmary=3 91 cfs 0 290 of Secondary--2 69 cfs 0 024 of Outflow=6 59 cfs 0 314 of Pond 3P Sand Filter 2 Peak Elev--24 88 Storage=6,048 cf Inflow--3 91 cis 0 290 of Outflow--0 24 cfs 0 290 of Total Runoff Area = 1 400 ac Runoff Volume = 0 314 of Average Runoff Depth = 2 69" 35 00% Pervious Area = 0 490 ac 65 00% Impervious Area = 0 910 ac • nE C E I V ED • �unju JUN 2 3 2008 — DWQ PROJ # r1 LJ • Areas 2-Revised-Post Prepared by Appian Cor HydroCAD® 8 00 s/n 00396 Type/1 24-hr 1-yr 24 hr Rainfall=3 66" Engineers, PA Page 6 Subcatchment 1S Post Development Runoff = 6 59 cfs @ 1196 hrs, Volume= 0 314 af, Depth= 2 69" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0 00-60 00 hrs, dt= 0 01 hrs Type II 24-hr 1-yr 24 hr Rainfall=3 66" Area (ac) CN Descnr)tlon 0 910 98 Paved parking & roofs 0 490 79 50-75% Grass cover, Fair HSG B 1 400 91 Weighted Average 0 490 Pervious Area 0 910 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftfsec) (cfs) 50 Direct Entry, Direct Entry Subcatchment 1S Post Development Hydrograph ❑ Runo1F 7 6 5 a 4 3 0 LL 3 2 1 1 6 59 cfs I Type 11 24-hr 1-yr 24 hr Rainfall=3.66" Runoff Area=1 400 ac Runoff Volume=0.314 of Runoff Depth=2.69" Tc=5.0 min CN=91 a 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) nE C E I V ED �pnuf JUN 2 3 2008 DWQ PROJ# • • Areas 2-Revised-Post Prepared by Appian Cor HydroCAD® 8 00 s/n 00396 Type 1124-hr 1-yr 24 hr Rainfall=3 66" Engineers, PA Page 7 Hydrograph for Subcatchment 1 S Post Development Time Preap Excess Runoff (hours) (inches) (inches) (cfs) 000 000 000 000 1 00 004 000 000 200 008 000 000 300 013 000 000 400 018 000 000 500 023 000 000 600 029 001 001 700 036 002 003 800 044 005 004 900 054 009 007 1000 066 015 Oil 11 00 086 027 023 1200 243 1 54 653 1300 283 191 031 1400 300 207 019 1500 312 219 015 1600 322 228 Oil 1700 330 235 010 1800 337 242 009 1900 343 248 008 2000 348 253 006 2100 353 257 006 2200 358 261 006 2300 362 265 006 2400 366 269 005 2500 366 269 000 2600 366 269 000 2700 366 269 000 2800 366 269 000 2900 366 269 000 3000 366 269 000 31 00 366 269 000 3200 366 269 000 3300 366 269 000 3400 366 269 000 3500 366 269 000 3600 366 269 000 3700 366 269 000 3800 366 269 000 3900 366 269 000 4000 366 269 000 41 00 366 269 000 4200 366 269 000 4300 366 269 000 4400 366 269 000 4500 366 269 000 4600 366 269 000 4700 366 269 000 4800 366 269 000 4900 366 269 000 5000 366 269 000 5100 366 - 2 69 000 5200 366 269 000 5300 366 2 69- 000 Time Preap Excess Runoff (hours) Cinches) (inches) (cfs) 5400 366 269 000 5500 366 269 000 5600 366 269 000 5700 366 269 000 5800 366 269 000 5900 366 269 000 6000 366 269 000 nE C E I V ED I�u�,Spu JUN 2 3 2008 DWQ PROJ# Areas 2-Revised-Post Type 11 24-hr 1-yr 24 hr Ra/nfafi=3 66" •Prepared by Appian Consulting Engineers, PA Page 8 HydroCADO 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/2012008 Pond 2P: Flow Sputter Inflow Area = 1 400 ac, Inflow Depth = 2 69" for 1-yr 24 hr event Inflow = 6 59 cfs @ 11 96 hrs, Volume= 0 314 of Outflow = 6 59 cfs @ 1196 hrs, Volume= 0 314 af, Atten= 0%, Lag= 0 0 min Primary = 3 91 cfs @ 1196 hrs, Volume= 0 290 of Secondary = 2 69 cfs @ 11 96 hrs, Volume= 0 024 of Routing by Stor-Ind method, Time Span= 0 00-60 00 hrs, dt= 0 01 hrs Peak Elev= 25 42' @ 11 96 hrs Device Routing Invert Outlet Devices #1 Secondary 23 52' 24 0" x 120 0' long Culvert CPP, square edge headwall, Ke= 0 500 Outlet Invert-- 21 25' S= 0 0189'r Cc= 0 900 n= 0 010 PVC, smooth interior #2 Device 1 25 25' 14 0' long x 0 5' breadth Broad -Crested Rectangular Weir Head (feet) 0 20 0 40 0 60 0 80 1 00 Coef (English) 2 80 2 92 3 08 3 30 3 32 #3 Primary 23 85' 12 0" Vert Onfice C= 0 600 Primary OutFlow Max--3 91 ds @ 1196 hrs HW=25 42' (Free Discharge) L3=Onfice (Onfice Controls 3 91 cfs @ 4 97 fps) • Secondary OutFlow Max--2 68 ds @ 1196 hrs HW=25 42' (Free Discharge) L1=Culvert (Passes 2 68 ds of 14 44 cfs potential flow) L2=Broad-Crested Rectangular Weir (Weir Controls 2 68 cfs @ 1 14 fps) • Pond 2P Flow Sputter Hydrograph 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) Inflow C ounow to Primary OO secondary Areas 2-Revised-Post Type H 24-hr 1-yr 24 hr Rainfall=3 66" Prepared by Appian Consulting Engineers, PA Page 9 • HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Hydrograph for Pond 2P Flow Splitter Time Inflow Elevation Outflow Primary Secondary (hours) (cfs) (feet) (cfs) (cfs) (cfs) 0 00 000 2352 000 0 00 000 2 00 000 2352 000 000 000 400 000 2352 000 000 000 600 001 2391 001 001 000 800 0 04 2394 0 04 0 04 000 1000 011 2401 Oil 011 000 1200 5 53 2537 5 53 383 170 1400 019 24 O6 019 019 0 00 1600 011 2401 O11 011 000 1800 009 2399 0 09 009 000 2000 006 2397 0 06 0 06 000 2200 006 2397 0 06 0 06 000 2400 005 2396 0 05 0 05 000 2600 000 2385 000 000 000 28 00 000 2385 000 000 000 3000 000 2385 000 000 000 3200 000 2385 000 000 000 3400 000 2385 000 000 000 3600 000 2385 000 000 000 3800 000 2385 000 000 000 4000 000 2385 000 000 000 4200 000 2385 000 000 000 • 4400 000 23 85 000 000 000 4600 000 2385 000 0 00 000 4800 000 2385 000 000 000 5000 000 2385 000 000 000 52 00 000 2385 000 000 000 54 00 000 2385 000 000 000 56 00 000 2385 000 000 000 5800 000 2385 000 000 000 6000 000 2385 000 000 000 E C E I V E - JUN 2 3 2008 DWG PROJ # Areas 2-Revised-Post Type 1124-hr 1-yr,24 hr Rainfall=3 66" •Prepared by Appian Consulting Engineers, PA Page 10 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 • • Stage -Discharge for Pond 2P Flow Splitter Elevation Discharge Pnmary Secondary (feet) (cfs) (cfs) (cfs) 2352 000 000 000 2354 000 000 000 2356 000 000 000 2358 000 000 000 2360 000 000 000 2362 000 000 000 2364 000 000 000 2366 000 000 000 2368 000 000 000 2370 000 000 000 2372 000 000 000 2374 000 000 000 2376 000 000 000 2378 000 000 000 2380 000 000 000 2382 000 000 000 2384 000 000 000 2386 000 000 000 2388 000 000 000 2390 001 001 000 2392 002 002 000 2394 004 004 ON 2396 005 005 000 2398 007 007 000 2400 010 010 000 2402 012 0112 ON 2404 015 015 000 2406 019 019 000 2408 022 022 000 2410 026 026 000 2412 030 030 000 2414 035 035 000 2416 039 039 000 2418 044 044 000 2420 049 049 000 2422 055 055 000 2424 060 060 000 2426 066 066 000 2428 072 072 000 2430 078 078 000 2432 085 085 000 2434 091 091 000 2436 098 098 000 2438 1 05 1 05 000 2440 1 12 1 12 000 2442 1 19 1 19 000 2444 1 26 1 26 000 2446 1 33 1 33 000 2448 141 1 41 000 2450 148 148 000 2452 1 56 1 56 000 2454 163 163 000 2456 1 71 1 71 000 2458 1 79 1 79 000 Elevation Discharge Pnmary Secondary (feet) (cis) (cfs) (cfs) 2460 186 186 000 2462 1 94 1 94 000 2464 201 201 000 2466 209 209 000 2468 216 216 000 2470 223 223 000 2472 230 230 000 2474 237 237 000 2476 244 244 000 2478 250 250 000 2480 256 256 000 2482 261 261 000 2484 266 266 000 2486 270 270 000 2488 275 275 000 2490 280 280 000 2492 286 286 000 2494 290 290 000 2496 295 295 000 2498 300 300 000 2500 305 305 000 2502 310 310 000 2504 314 314 000 2506 319 319 000 2508 323 323 000 2510 328 328 000 2512 332 332 000 2514 336 336 000 2516 340 340 000 2518 345 345 - 000 2520 349 349 000 2522 353 353 000 2524 357 357 000 2526 365 361 004 2528 385 365 020 2530 412 369 044 2532 445 372 073 2534 482 376 1 06 2536 523 380 143 2538 568 384 1 84 2540 615 388 228 2542 666 391 275 2544 719 395 325 2546 776 398 378 2548 837 402 435 2550 901 406 495 2552 967 409 568 r 1 • LJ Areas 2-Revised-Post Type 1124-hr 1 yr 24 hr Rainfall=3 66" Prepared by Appian Consulting Engineers, PA Page 11 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Elevation Storage (feet) (cubic -feet) 2352 0 2353 0 2354 0 2355 0 2356 0 2357 0 2358 0 2359 0 2360 0 2361 0 2362 0 2363 0 2364 0 2365 0 2366 0 2367 0 2368 0 2369 0 2370 0 2371 0 2372 0 2373 0 2374 0 2375 0 2376 0 2377 0 2378 0 2379 0 2380 0 2381 0 2382 0 2383 0 2384 0 2385 0 2386 0 2387 0 2388 0 2389 0 2390 0 2391 0 2392 0 2393 0 2394 0 2395 0 2396 0 2397 0 2398 0 2399 0 2400 0 2401 0 2402 0 2403 0 2404 0 2405 0 Stage -Area -Storage for Pond 2P Flow Splitter Elevation Storage (feet) (cubic -feet) 2406 0 2407 0 2408 0 2409 0 2410 0 2411 0 2412 0 2413 0 2414 0 2415 0 2416 0 2417 0 2418 0 2419 0 2420 0 2421 0 2422 0 2423 0 2424 0 2425 0 2426 0 2427 0 2428 0 2429 0 2430 0 24 31 0 2432 0 2433 0 2434 0 2435 0 2436 0 2437 0 2438 0 2439 0 2440 0 2441 0 2442 0 2443 0 2444 0 2445 0 2446 0 2447 0 2448 0 2449 0 2450 0 2451 0 2452 0 2453 0 2454 0 2455 0 2456 0 2457 -0 2458 0 2459 0 Elevation Storage (feet) (cubic -feet) 2460 0 2461 0 2462 0 2463 0 2464 0 2465 0 2466 0 2467 0 2468 0 2469 0 2470 0 2471 0 2472 0 2473 0 2474 0 2475 0 2476 0 2477 0 2478 0 2479 0 2480 0 2481 0 2482 0 2483 0 2484 0 2485 0 2486 0 2487 0 2488 0 2489 0 2490 0 2491 0 2492 0 2493 0 2494 0 2495 0 2496 0 2497 0 2498 0 2499 0 2500 0 2501 0 2502 0 2503 0 2504 0 2505 0 2506 0 2507 0 2508 0 2509 0 2510 0 2511 0 2512 0 2513 0 Elevation Storage (feet) (cubic -feet) 2514 0 2515 0 2516 0 2517 0 2518 0 2519 0 2520 0 2521 0 2522 0 2523 0 2524 0 2525 0 2526 0 2527 0 2528 0 2529 0 2530 0 2531 0 2532 0 2533 0 2534 0 2535 0 2536 0 2537 0 2538 0 2539 0 2540 0 2541 0 2542 0 2543 0 2544 0 2545 0 2546 0 2547 0 2548 0 2549 0 2550 0 2551 0 2552 0 �E C E I V ED JUN 2 3 2008 DWQ PROJ N Areas 2-Revised-Post Type 1/24-hr 1-yr 24 hr Rainfa11=3 66" •Prepared by Appian Consulting Engineers, PA Page 12 HydroCADO 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Pond 3P Sand Filter 2 Inflow Area = 1 400 ac, Inflow Depth = 2 48" for 1-yr 24 hr event Inflow = 3 91 cfs @ 1196 hrs, Volume= 0 290 of Outflow = 0 24 cfs @ 13 44 hrs, Volume= 0 290 af, Atten= 94%, Lag= 89 1 min Discarded = 0 24 cfs @ 13 44 hrs, Volume= 0 290 of Routing by Stor-Ind method, Time Span= 0 00-60 00 hrs, dt= 0 01 hrs Peak Elev= 24 88' @ 13 44 hrs Surf Area= 6,009 sf Storage= 6,048 cf Plug -Flow detention time= 241 8 min calculated for 0 290 of (100% of inflow) Center -of -Mass det time= 241 8 min ( 1,0417 - 799 9 ) Volume Invert Avail Storage Storage Description #1 23 70' 17,912 cf Custom Stage Data (Pnsmatic) Listed below (Recalc) Elevation Surf Area Inc Store Cum Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 2370 2,670 0 0 2400 5,136 1,171 1,171 2500 6,134 5,635 6,806 2600 7,189 6,662 13,467 • 2660 7,626 4,445 17,912 Device Routing Invert Outlet Devices #1 Discarded 0 00' 1 750 mlhr Exfiltration over Surface area Discarded OutFlow Max=O 24 cfs @ 13 44 hrs HW=24 88' (Free Discharge) t1=Exfltration (Exfitrabon Controls 0 24 cfs) Areas 2-Revised-Post Prepared by Appian Consulting Engineers, PA HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Soft 0 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) Pond 3P Sand Filter 2 Hydrograph Type 1124-hr 1-yr 24 hr Rainfall=3 66" Page 13 cnnnnno • I�ax G Discarded nE C E I V ED �'ruf r 2 3 2008 DWG PRO I a --- Areas 2-Revised-Post Type 1124-hr 1-yr 24 hr Rainfall=3 66" •Prepared by Appian Consulting Engineers, PA Page 14 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Hydrograph for Pond 3P Sand Filter 2 Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 000 000 0 2370 000 200 000 0 2370 000 400 000 0 2370 000 600 001 9 2370 001 800 004 25 2371 004 1000 Oil 66 2372 010 1200 383 4,112 2464 023 1400 019 5,987 2486 024 1600 Oil 5,315 2475 024 1800 009 4,347 2459 023 2000 006 3,258 2439 022 2200 006 2,118 2418 022 2400 005 1,011 2397 020 2600 000 14 2370 002 2800 000 0 2370 000 3000 000 0 2370 000 3200 000 0 2370 000 3400 000 0 2370 000 3600 000 0 2370 000 3800 000 0 2370 000 4000 000 0 2370 000 • 4200 000 0 2370 000 4400 000 0 2370 000 4600 000 0 2370 000 4800 000 0 2370 000 5000 000 0 2370 000 5200 000 0 2370 000 5400 000 0 2370 000 5600 000 0 2370 000 5800 000 0 2370 000 6000 000 0 2370 000 • nE C E I V ED �u^{p 1u°' 2 3 zu38 DW Q PROJ # • • is Areas 2-Revised-Post Type 1124-hr 1-yr 24 hr Rainfall=3 66" Prepared by Appian Consulting Engineers, PA Page 15 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Elevation Discarded (feet) (CIS) 2370 000 2372 Oil 2374 012 2376 013 2378 013 2380 014 2382 015 2384 015 2386 016 2388 017 2390 017 2392 018 2394 019 2396 019 2398 020 2400 021 2402 021 2404 021 2406 021 2408 021 2410 021 2412 021 2414 021 2416 021 2418 022 2420 022 2422 022 2424 022 2426 022 2428 022 2430 022 2432 022 2434 022 2436 022 2438 022 2440 022 2442 023 2444 023 2446 023 2448 023 2450 023 2452 023 2454 023 2456 023 2458 023 2460 023 2462 023 2464 023 2466 023 2468 024 2470 024 2472 024 2474 024 2476 024 Stage -Discharge for Pond 3P Sand Filter 2 Elevation Discarded (feet) (cfs) 2478 024 2480 024 2482 024 2484 024 2486 024 2488 024 2490 024 2492 025 2494 025 2496 025 2498 025 2500 025 2502 025 2504 025 2506 025 2508 025 2510 025 2512 025 2514 025 2516 026 2518 026 2520 026 2522 026 2524 026 2526 026 2528 026 2530 026 2532 026 2534 026 2536 026 2538 026 2540 027 2542 027 2544 027 2546 027 2548 027 2550 027 2552 027 2554 027 2556 027 2558 027 2560 027 2562 027 2564 028 2566 028 2568 028 2570 028 2572 028 2574 028 2576 028 2578 028 2580 028 2582 028 2584 028 Elevation Discarded (feet) (CIS) 2586 029 2588 029 2590 029 2592 029 2594 029 2596 029 2598 029 2600 029 2602 029 2604 029 2606 029 2608 029 2610 029 2612 029 2614 030 2616 030 2618 030 2620 030 2622 030 2624 030 2626 030 2528 030 2630 030 2632 030 2634 030 2636 030 2638 030 2640 030 2642 030 2644 030 2646 030 2648 031 2650 031 2652 031 2654 031 2656 031 2658 031 2660 031 • • • Areas 2-Revised-Post Type 11 24-hr 1-yr 24 hr Rainfall=3 66" Prepared by Appian Consulting Engineers, PA Page 16 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Stage -Area -Storage for Pond 3P Sand Filter 2 Elevation Surface Storage (feet) (s(17ft) (cubic -feet) 2370 2,670 0 2375 3,081 144 2380 3,492 308 2385 3,903 493 2390 4,314 698 2395 4,725 924 2400 5,136 1 171 2405 5,186 1,429 2410 5,236 1,689 2415 5,286 1,953 2420 5,336 2,218 2425 5,386 2,486 2430 5,435 2,757 2435 5,485 3,030 2440 5,535 3,305 2445 5,585 3,583 2450 5,635 3,864 2455 5,685 4,147 2460 5,735 4,432 2465 5,785 4,720 2470 5,835 5,011 2475 5,885 5,304 2480 5,934 5,599 2485 5,984 5,897 2490 6,034 6,197 2495 6,084 6,500 2500 6 134 6,806 2505 6,187 7,114 2510 6 239 7,425 2515 6,292 7,738 2520 6,345 8,054 2525 6,398 8,372 2530 6,451 8 694 2535 6,503 9,017 2540 6,556 9,344 2545 6,609 9,673 2550 6 662 10,005 2555 6,714 10,339 2560 6,767 10,676 2565 6,820 11,016 2570 6,872 11,358 2575 6,925 11,703 2580 6,978 12,051 2585 7,031 12,401 2590 7,083 12,754 2595 7,136 13,109 2600 7,189 13,467 2605 7,225 13 828 2610 7,262 14,190 2615 7,298 14,554 2620 7,335 14,920 2625 7,371 - 15,287 2630 7,408 15,657 2635 7,444 16,028 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 2640 7,480 16,401 2645 7,517 16,776 2650 7,553 17,153 2655 7,590 17,532 2660 7,626 17,912 nE C E I V ED �p^S� JUIN 2 3 2008 DWC PROJ # - • Areas 2-Revised-Post Type 1124-hr 15 Inch Rainfall=l 75" Prepared by Appian Consufhng Engineers, PA Page 17 HydroCADO 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Time span=0 00-60 00 hrs, dt=0 01 hrs, 6001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S Post Development Runoff Area=1 400 ac Runoff Depth=0 95" Tc=5 0 min CN=91 Runoff--2 45 cfs 0 111 of Pond 2P Flow Sputter Peak Elev=-24 76 Inflow--2 45 cfs 0 111 of Pnmary=2 45 cfs 0 111 of Secondary--0 00 cfs 0 000 of Outflow--2 45 cfs 0 111 of Pond 3P Sand Fiher 2 Peak Elev--24 15' Storage=1,950 cf Inflow=2 45 cfs 0 111 of Outflow-0 21 cfs 0 111 of Total Runoff Area = 1 400 ac Runoff Volume = 0 111 of Average Runoff Depth = 0 95" 35 00% Pervious Area = 0 490 ac 65 00% Impervious Area = 0 910 ac - �IE_C E 1 V ED IunSU JUNI 2 3 2008 DWO PROJri Areas 2-Revised-Post Type // 24-hr 15 Inch Rainfall=l 75" •Prepared by Appian Consulting Engineers, PA Page 18 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 • • Subcatchment 1S Post Development Runoff = 2 45 cfs @ 11 96 hrs, Volume= 0 111 af, Depth= 0 95 Runoff by SCS TR-20 method, UH=SCS, Time Span= 0 00-60 00 hrs, dt= 0 01 hrs Type II 24-hr 1 5 Inch Rainfall=1 75 Area (ac) CN Descnr)bon 0 910 98 Paved parking & roofs 0 490 79 50-75% Grass cover, Fair, HSG B 1 400 91 Weighted Average 0 490 Pervious Area 0 910 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 50 Direct Entry, Direct Entry Subcatchment 1S Post Development Hydrograph 2 Type II 24-hr 1.5 Inch Rainfall=1.75" Runoff Area=1.400 ac Runoff Volume=0.111 of Runoff Depth=0.95" Tc=5.0 min CN=91 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) nE C E I V ED JUN 2 3-2008 DW a PROJ # Areas 2-Revised-Post Type II 24-hr 15 Inch Rainfall=l 75" •Prepared by Appian Consulting Engineers, PA Page 19 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 • • Hydrograph for Subcatchment 1 S Post Development Time Preap Excess Runoff (hours) (inches) (inches) (cis) 000 000 000 000 1 00 002 000 000 200 004 000 000 300 006 000 000 400 008 000 000 500 Oil 000 000 600 014 000 000 700 017 000 000 800 021 000 000 900 026 000 001 1000 032 001 002 1100 041 004 005 1200 1 16 047 210 1300 1 35 062 013 1400 1 43 069 008 1500 1 49 073 006 1600 1 54 077 005 1700 1 58 080 004 1800 1 61 083 004 1900 164 086 003 2000 1 67 088 003 2100 169 090 003 2200 171 091 003 2300 1 73 093 002 2400 175 095 002 2500 1 75 095 000 2600 1 75 095 000 2700 1 75 095 000 2800 1 75 095 000 2900 1 75 095 000 3000 1 75 095 000 31 00 1 75 095 000 3200 1 75 095 000 3300 1 75 095 000 3400 1 75 095 000 3500 1 75 095 000 3600 175 095 000 3700 1 75 095 000 3800 1 75 095 000 3900 1 75 095 000 4000 1 75 095 000 4100 1 75 095 000 4200 1 75 095 000 4300 1 75 095 000 4400 1 75 095 000 4500 1 75 095 000 4600 1 75 095 000 4700 1 75 095 000 4800 1 75 095 000 4900 1 75 095 000 5000 1 75 095 000 5100 1 75 095 000 5200 1 75 095 000 5300 1 75 095 000 Time Preap Excess Runoff (lours) (mches) finches) (cfs) 5400 1 75 095 000 5500 1 75 095 000 5600 1 75 095 000 5700 1 75 095 000 5800 1 75 095 000 5900 1 75 095 000 6000 1 75 095 000 Areas 2-Revised-Post Type 1124-hr 15 Inch Rainfall=1 75" •Prepared by Appian Consulting Engineers, PA Page 20 HydroCAM 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Pond 2P Flow Spli ter Inflow Area = 1 400 ac, Inflow Depth = 0 95" for 15 Inch event Inflow = 2 45 cfs @ 1196 hrs, Volume= 0 111 of Outflow = 2 45 cfs @ 1196 hrs, Volume= 0 111 A Atten= 0%, Lag= 0 0 min Primary = 2 45 cfs @ 1196 hrs, Volume= 0 111 of Secondary = 0 00 cfs @ 0 00 hrs, Volume= 0 000 of Routing by Stor-Ind method, Time Span= 0 00-60 00 hrs, dt= 0 01 hrs Peak Bev= 24 76' @ 1196 hrs Device Routing Invert Outlet Devices #1 Secondary 23 52' 24 0" x 120 O' tong Culvert CPP, square edge headwall, Ke= 0 500 Outlet Invert-- 21 25' S= 0 01897 Cc-- 0 900 n= 0 010 PVC, smooth interior #2 Device 1 25 25' 14 0' long x 0 5' breadth Broad -Crested Rectangular Weir Head (feet) 0 20 0 40 0 60 0 80 1 00 Coef (English) 2 80 2 92 3 08 3 30 3 32 #3 Primary 23 85' 12 0" Vert Onfice C= 0 600 Primary OutFlow Max--2 44 cfs @ 1196 hrs HW=24 76' (Free Discharge) L3=Onfice (Onfice Controls 2 44 cfs @ 3 25 fps) • Secondary OutFlow Max=O 00 cfs @ 0 00 hrs HW=23 52' (Free Discharge) t1=Culvert ( Controls 0 00 cfs) t2=Broad-Crested Rectangular Weir ( Controls 0 00 cfs) Pond 2P Flow Splitter Hydrograph 12 45 cfs 245cis Inflow Area=1.400 ac Peak Elev=24.76' • 0 00 as 1-1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 So Time (hours) El Inflow r- outflow Q Primary © Secondary nE C E I V ED 10n�� JUN 2 3 2008 DWG PROJ # Areas 2-Revised-Post Type 1124-hr 15 Inch Rainfal1=1 75" .Prepared by Appian Consulting Engineers, PA Page 21 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Hydrograph for Pond 2P Flow Splitter Time Inflow Elevation Outflow Primary Secondary (hours) (cfs) (feet) (cis) (cis) (Cfs) 000 000 2352 000 000 coo 200 000 2352 000 000 000 400 000 2352 000 000 000 600 000 2352 000 000 000 800 000 2386 000 000 000 1000 002 2391 002 002 000 1200 210 2466 210 210 000 1400 008 2398 008 008 000 1600 005 2395 005 005 000 1800 004 2394 004 004 000 2000 003 2393 003 003 000 2200 003 2392 003 003 000 2400 002 2392 002 002 000 2600 000 2385 000 000 000 2800 000 2385 000 000 000 3000 000 2385 000 000 000 3200 000 2385 000 000 000 3400 000 2385 000 000 000 3600 000 2385 000 000 000 3800 000 2385 000 000 000 4000 000 2385 000 000 000 4200 000 2385 000 000 000 • 4400 000 2385 000 000 000 4600 000 2385 000 000 000 4800 000 2385 000 000 000 5000 000 2385 000 000 000 5200 000 2385 000 000 000 5400 000 2385 000 000 000 5600 000 2385 000 000 000 5800 000 2385 000 000 000 6000 000 2385 000 000 000 nE C E I V ED �unl{I JUN 2 3 2008 DWO PROD # n U 11 Areas 2-Revised-Post Type 1124-hr 15 Inch Rainfal1=1 75" Prepared by Appian Consulting Engineers, PA Page 22 HvdroCAD® 8 00 s/n 003967 ® 2006 HvdroCAD Software Solutions LLC 6/20/9008 Stage -Discharge for Pond 2P Flow Spldter Elevation Discharge Primary Secondary (feet) (cts) (cfs) (cfs) 2352 000 000 000 2354 000 000 000 2356 000 000 000 2358 000 000 000 2360 000 000 000 2362 000 000 000 2364 000 000 000 2366 000 000 000 2368 000 000 000 2370 000 000 000 2372 000 000 000 2374 000 000 000 2376 000 000 000 2378 000 000 000 2380 000 000 000 2382 000 000 000 2384 000 000 000 2386 000 000 000 2388 000 000 000 2390 001 001 000 2392 002 002 000 2394 004 004 000 2396 005 005 000 2398 007 007 000 2400 010 010 000 2402 012 012 000 2404 015 015 000 2406 019 019 000 2408 022 022 000 2410 026 026 000 2412 030 030 000 2414 035 035 000 2416 039 039 000 2418 044 044 000 2420 049 049 000 2422 055 055 000 2424 060 060 000 2426 066 066 000 2428 072 072 000 2430 078 078 000 2432 085 085 000 2434 091 091 000 2436 098 098 000 2438 1 05 105 000 2440 1 12 1 12 000 2442 1 19 1 19 000 2444 1 26 126 000 2446 133 1 33 000 2448 141 141 000 2450 148 148 000 2452 1 56 1 56 000 2454 1 63 163 000 2456 1 71 1 71 000 2458 1 79 - 1 79 000 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 2460 186 1 86 000 2462 1 94 1 94 000 2464 201 201 000 2466 209 209 000 2468 216 216 000 2470 223 223 000 2472 230 230 000 2474 237 237 000 2476 244 244 000 2478 250 250 000 2480 256 256 000 2482 261 261 000 2484 266 266 000 2486 270 270 000 2488 275 275 000 2490 280 280 000 2492 286 286 000 2494 290 290 000 2496 295 295 000 2498 300 300 000 2500 305 305 000 2502 310 310 000 2504 314 314 000 2506 319 319 000 2508 323 323 000 2510 328 328 000 2512 332 332 000 2514 336 336 000 2516 340 340 000 2518 345 345 000 2520 349 349 000 2522 353 353 000 2524 357 357 000 2526 365 361 004 2528 385 365 020 2530 412 369 044 2532 445 372 073 2534 482 376 106 2536 523 380 143 2538 568 384 184 2540 615 388 228 2542 666 391 275 2544 719 395 325 2546 776 398 378 2548 837 402 435 2550 901 406 495 2552 967 409 658 nE C E I V ED �ppp;Sppp JUN 2 3 2008 DWG PROJ # • r1 Areas 2-Revised-Post Type ll 24-hr 15 Inch Rainfall=l 75" Prepared by Appian Consulting Engineers, PA Page 23 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Elevation Storage (feet) (cubio-feet) 2352 0 2353 0 2354 0 2355 0 2356 0 2357 0 2358 0 2359 0 2360 0 2361 0 2362 0 2363 0 2364 0 2365 0 2366 0 2367 0 2368 0 2369 0 2370 0 2371 0 2372 0 2373 0 2374 0 2375 0 2376 0 2377 0 2378 0 2379 0 2380 0 2381 0 2382 0 2383 0 2384 0 2385 0 2386 0 2387 0 2388 0 2389 0 2390 0 2391 0 2392 0 2393 0 2394 0 2395 0 2396 0 2397 0 2398 0 2399 0 2400 0 2401 0 2402 0 2403 0 2404 0 2405 0 Stage -Area -Storage for Pond 2P Flow Splitter Elevation Storage (feet) (cubic -feet) 2406 0 2407 0 2408 0 2409 0 2410 0 2411 0 2412 0 2413 0 2414 0 2415 0 2416 0 2417 0 2418 0 2419 0 2420 0 2421 0 2422 0 2423 0 2424 0 2425 0 2426 0 2427 0 2428 0 2429 0 2430 0 2431 0 2432 0 2433 0 2434 0 2435 0 2436 0 2437 0 2438 0 2439 0 2440 0 2441 0 2442 0 2443 0 2444 0 2445 0 2446 0 2447 0 2448 0 2449 0 2450 0 2451 0 2452 0 2453 0 2454 0 2455 0 2456 0 2457 0 2458 0 2459 0 Elevation Storage (feet) (cubk—feet) 2460 0 2461 0 2462 0 2463 0 2464 0 2465 0 2466 0 2467 0 2468 0 2469 0 2470 0 2471 0 2472 0 2473 0 2474 0 2475 0 2476 0 2477 0 2478 0 2479 0 2480 0 2481 0 2482 0 2483 0 2484 0 2485 0 2486 0 2487 0 2488 0 2489 0 2490 0 2491 0 2492 0 2493 0 2494 0 2495 0 2496 0 2497 0 2498 0 2499 0 2500 0 2501 0 2502 0 2503 0 2504 0 2505 0 2506 0 2507 0 2508 0 2509 0 2510 0 2511 0 2512 0 2513 0 Elevation Storage (feet) (cubic -feet) 2514 0 2515 0 2516 0 2517 0 2518 0 2519 0 2520 0 2521 0 2522 0 2523 0 2524 0 2525 0 2526 0 2527 0 2528 0 2529 0 2530 0 2531 0 2532 0 2533 0 2534 0 2535 0 2536 0 2537 0 2538 0 2539 0 2540 0 2541 0 2542 0 2543 0 2544 0 2545 0 2546 0 2547 0 2548 0 2549 0 2550 0 2551 0 2552 0 RE C E 9 V JUN 2 3 2008 ul PROJ N IDYIXit Areas 2-Revised-Post Type 1124-hr 15 Inch Rainfall=1 75" •Prepared by Appian Consulting Engineers, PA Page 24 HydroCADO 8 00 sin 003967 ® 2006 HydroCAD Software Solubons LLC 6/20/2008 Pond 3P Sand Filter 2 Inflow Area = 1 400 ac, Inflow Depth = 0 95" for 15 Inch event Inflow = 2 45 cfs @ 11 96 hrs, Volume= 0 111 of Outflow = 0 21 cfs @ 12 46 hrs, Volume= 0 111 af, Atten= 91%, Lag= 30 2 min Discarded = 0 21 cfs @ 12 46 hrs, Volume= 0 111 of Routing by Stor-Ind method, Time Span= 0 00-60 00 hrs, dt= 0 01 hrs Peak Elev= 24 15' @ 12 46 hrs Surf Area= 5,285 sf Storage= 1,950 cf Plug -Flow detention time= 76 9 min calculated for 0 111 of (100% of inflow) Center -of -Mass det time= 76 9 min ( 900 1 - 823 1 ) Volume Invert Avail Storage Storage Description #1 23 70' 17,912 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf Area Inc Store Cum Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 2370 2,670 0 0 2400 5,136 1,171 1,171 2500 6,134 5,635 6,806 2600 7,189 6,662 13,467 • 2660 7,626 4,445 17,912 Device Routing Invert Outlet Devices #1 Discarded 0 00' 1 750 m/hr Exfittration over Surface area Discarded OutFlow Max=O 21 cfs @ 12 46 hrs HW=24 15' (Free Discharge) t-1=Exfiltration (ExfiltraUon Controls 0 21 cfs) 11 CI 0 Areas 2-Revised-Post Prepared by Appian Consulting Engineers, PA HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Pond 3P Sand Filter 2 Hydrograph Type 1124-hr 15 Inch Rainfall=1 75" Page 25 + Inflow 0 Discarded 2 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) nE C E I V ED �ppp�,8uus JUN 2 3 2008 DWO PROJ n Areas 2-Revised-Post Type 1124-hr 15 Inch Rainfall=1 75" Prepared by Appian Consulting Engineers, PA Page 26 HydroCAD® 8 00 sin 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 • Hydrograph for Pond 3P Sand Filter 2 Time Inflow Storage Elevation Discarded (hours) (c%) (cubic -feet) (feet) (cfs) 000 000 0 2370 000 200 000 0 2370 000 400 000 0 2370 000 600 000 0 2370 000 800 000 0 2370 000 1000 002 11 2370 002 1200 210 1,480 2406 021 1400 008 1,429 2405 021 1600 005 501 2385 016 1800 004 27 2371 004 2000 003 19 2371 003 2200 003 17 2371 003 2400 002 16 2371 002 2600 000 0 2370 000 2800 000 0 2370 000 3000 000 0 2370 000 3200 000 0 2370 000 3400 000 0 2370 000 3600 000 0 2370 000 3800 000 0 2370 000 4000 000 0 2370 000 4200 000 0 2370 000 4400 000 0 2370 000 • 4600 4800 000 000 0 0 2370 2370 000 000 5000 000 0 2370 000 5200 000 0 2370 000 5400 000 0 2370 000 5600 000 0 2370 000 5800 000 0 2370 000 6000 000 0 2370 000 0 • C Areas 2-Revised-Post Type If 24-hr 1 51nch Rainfall=1 75" Prepared by Appian Consulting Engineers, PA Page 27 HydroCAD® 8 00 sin 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Elevation Discarded (feet) (cfs) 2370 000 2372 Oil 2374 012 2376 013 2378 013 2380 014 2382 015 2384 015 2386 016 2388 017 2390 017 2392 018 2394 019 2396 019 2398 020 2400 021 2402 021 2404 021 2406 021 2408 021 2410 021 2412 021 2414 021 2416 021 2418 022 2420 022 2422 022 2424 022 2426 022 2428 022 2430 022 2432 022 2434 022 2436 022 2438 022 2440 022 2442 023 2444 023 2446 023 2448 023 2450 023 2452 023 2454 023 2456 023 2458 023 2460 023 2462 023 2464 023 2466 023 2468 024 2470 024 2472 024 2474 024 2476 024 Stage -Discharge for Pond 3P Sand Filter 2 Elevation Discarded (feet) (cfs) 2478 024 2480 024 2482 024 2484 024 2486 024 2488 024 2490 024 2492 025 2494 025 2496 025 2498 025 2500 025 2502 025 2504 025 2506 025 2508 025 2510 025 2512 025 2514 025 2516 026 2518 026 2520 026 2522 026 2524 026 2526 026 2528 026 2530 026 2532 026 2534 026 2536 026 2538 026 2540 027 2542 027 2544 027 2546 027 2548 027 2550 027 2552 027 2554 027 2556 027 2558 027 2560 027 2562 027 2564 028 2566 028 2568 028 2570 028 2572 028 2574 028 2576 028 2578 028 2580 028 2582 028 2584 028 Elevation Discarded (feet) (cfs) 2586 029 2588 029 2590 029 2592 029 2594 029 2596 029 2598 029 2600 029 2602 029 2604 029 2606 029 2608 029 2610 029 2612 029 2614 030 2616 030 2618 030 2620 030 2622 030 2624 030 2626 030 2628 030 2630 030 2632 030 2634 030 2636 030 2638 030 2640 030 2642 030 2644 030 2646 030 2648 031 2650 031 2652 031 2654 031 2656 031 2658 031 2660 031 11 • Areas 2-Revised-Post Type /I 24-hr 15 Inch Rainfall=l 75" ulting Engineers, PA Page 28 ® 2006 HvdroCAD Software Solubons LLC 6/20/2008 Stage -Area -Storage for Pond 3P Sand Filter 2 Elevabon Surface Storage (feet) (sq-ft) (cubic -feet) 2370 2,670 0 2375 3,081 144 2380 3,492 308 2385 3,903 493 2390 4,314 698 2395 4,725 924 2400 5136 1,171 2405 5 186 1,429 2410 5 236 1,689 2415 5286 1,953 2420 5,336 2,218 2425 5,386 2,486 2430 5,435 2,757 2435 5,485 3,030 2440 5,535 3,305 2445 5,585 3,583 2450 5,635 3,864 2455 5,685 4,147 2460 5,735 4,432 2465 5,785 4,720 2470 5,835 5,011 2475 5,885 5,304 2480 5,934 5,599 2485 5,984 5,897 2490 6,034 6,197 2495 6,084 6,500 2500 6,134 6,806 2505 6,187 7,114 2510 6,239 7,425 2515 6,292 7 738 2520 6,345 8 054 2525 6,398 8,372 2530 6 451 8,694 2535 6,503 9,017 2540 6,556 9,344 2545 6,609 9,673 2550 6,662 10,005 2555 6,714 10,339 2560 6,767 10,676 2565 6,820 11,016 2570 6,872 11,358 2575 6,925 11,703 2580 6,978 12,051 2585 7,031 12,401 2590 7,083 12,754 2595 7,136 13,109 2600 7,189 13,467 2605 7,225 13 828 2610 7,262 14,190 2615 7 298 14,554 2620 7,335 14,920 2625 7,371 15,287 2630 7,408 15,657 2635 7,444 16,028 Elevabon Surface Storage (feet) (sq-ft) (cubic -feet) 2640 7,480 16,401 2645 7,517 16,776 2650 7,553 17,153 2655 7,590 17,532 2660 7,626 17,912 nE C E I V ED JUN 2 3 2008 DW O PROJ # Areas 2-Revised-Post Type 1124-hr 10-yr 24 hr Rainfall=6 87" •Prepared by Appian Consulting Engineers, PA Page 29 HydroCADO 8 00 sin 003967 ® 2006 HydroCAD Software Solutions LLC 6/2012008 Time span=0 00-60 00 hrs, dt=0 01 hrs, 6001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment lS Post Development Runoff Area=1 400 ac Runoff Depth=5 81 ' Tc=S 0 min CN=91 Runoff=13 51 cfs 0 678 of Pond 2P Flow Splatter Peak Elev-25 62 Inflow-13 51 cfs 0 678 of Pnmary=4 27 cfs 0 547 of Secondary--9 24 cfs 0 131 of Outflow=13 51 cfs 0 678 of Pond 3P Sand Filter 2 Peak Elev-25 81' Storage=12,154 cf Inflow--4 27 cfs 0 547 of Outflow-0 28 cfs 0 547 of Total Runoff Area = 1 400 ac Runoff Volume = 0 678 of Average Runoff Depth = 5 81" 35 00% Pervious Area = 0 490 ac 65 00% impervious Area = 0 910 ac • 0 • n 0 Areas 2-Revised-Post Type 1124-hr 10-yr 24 hr Ra)nha/l=6 87" Prepared by Appian Consulting Engineers, PA Page 30 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Subcatchment 1S Post Development Runoff = 13 51 cfs @ 1196 hrs, Volume= 0 678 af, Depth= 5 81" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0 00-60 00 hrs, dt= 0 01 hrs Type II 24-hr 10-yr 24 hr Rainfall=6 87" Area (ac) CN Descriotion 0 910 98 Paved parking & roofs 0 490 79 50-75% Grass cover, Fair, HSG B 1 400 91 Weighted Average 0 490 Pervious Area 0 910 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (fVft) (ft/sec) (cfs) 50 Direct Entry, Direct Entry 15 14 13 12 11 10 9 8 7 LL 6 5 4 3 2 1 13 51 cis Subcatchment 1S Post Development Hydrograph Type II 24-hr 10-yr 24 hr Rainfall=6.87" Runoff Area=1.400 ac Runoff Volume=0.678 of Runoff Depth=5.81" Tc=5.0 min CN=91 0' 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ❑ Ru-ff • • Areas 2-Revised-Post Type 1124-hr 10-yr 24 hr Rainfall=6 67" Prepared by Appian Consulting Engineers, PA Page 31 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solubons LLC 6/20/2008 Hydrograph for Subcatchment IS Post Development Time Precip Excess Runoff (hours) (inches) (inches) (cis) 000 000 000 000 1 00 007 000 000 200 015 000 000 300 024 000 001 400 033 002 003 500 043 005 005 600 055 009 008 700 068 016 010 800 082 024 013 900 101 037 021 1000 124 054 029 11 00 161 083 055 1200 455 355 1122 1300 530 428 061 1400 563 460 036 1500 586 482 029 1600 605 500 022 1700 620 515 020 1800 633 528 017 1900 644 539 015 2000 654 549 013 2100 663 557 012 2200 671 566 Oil 2300 679 573 Oil 2400 687 581 Oil 2500 687 581 000 2600 687 581 000 2700 687 581 000 2800 687 581 000 2900 687 581 000 3000 687 581 000 31 00 687 581 000 3200 687 581 000 3300 687 581 000 3400 687 581 000 3500 687 581 000 3600 687 581 0 00 3700 687 581 000 3800 687 581 000 3900 687 581 000 4000 687 581 000 41 00 687 581 000 4200 687 581 000 4300 687 581 000 4400 687 581 000 4500 687 581 000 4600 687 581 000 4700 687 581 000 4800 687 581 000 4900 687 581 000 5000 687 581 000 5100 687 581 000 5200 687 581 000 5300 687 581 000 Time Precxp Excess Runoff (hours) Cinches) (inches) (cis) 5400 687 581 000 5500 687 581 000 5600 687 581 000 5700 687 581 000 5800 687 581 000 5900 687 581 000 6000 687 581 000 Areas 2-Revised-Post Type 11 24-hr 10-yr 24 hr Rainfall=6 87" Prepared by Appian Consulting Engineers, PA Page 32 HydroCADO 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Pond 2P Flow Splitter Inflow Area = 1 400 ac, Inflow Depth = 5 81" for 10-yr 24 hr event Inflow = 13 51 cfs @ 11 96 hrs, Volume= 0 678 of Outflow = 13 51 cfs @ 1196 hrs, Volume= 0 678 af, Atten= 0%, Lag= 0 0 min Primary = 4 27 cfs @ 1196 hrs, Volume= 0 547 of Secondary = 9 24 cfs @ 1196 hrs, Volume= 0 131 of Routing by Stor-Ind method, Time Span= 0 00-60 00 hrs, dt= 0 01 hrs Peak Elev= 25 62' @ 11 96 hrs Device Routing Invert Outlet Devices #1 Secondary 23 52' 24 0" x 120 0' long Culvert CPP, square edge headwall, Ke= 0 500 Outlet Invert-- 21 25' S= 0 0189 7 Cc= 0 900 n= 0 010 PVC, smooth interior #2 Device 1 25 25' 14 0' long x 0 5' breadth Broad -Crested Rectangular Weir Head (feet) 0 20 0 40 0 60 0 80 1 00 Coef (English) 2 80 2 92 3 08 3 30 3 32 #3 Primary 23 85' 12 0" Vert Orifice C= 0 600 Primary OutFlow Max=4 26 cfs @ 1196 hrs HW=25 62' (Free Discharge) L3=0nfice (Orifice Controls 4 26 cfs @ 5 43 fps) • Secondary OutFlow Max--9 21 cfs @ 11 96 hrs HW=25 62' (Free Discharge) t1=Culvert (Passes 9 21 cfs of 15 88 cfs potential flow) L2=Broad-Crested Rectangular Weir (Weir Controls 9 21 cfs @ 177 fps) 15 14 13 12 11 10 m 9 8 0 7 LL 6 5 4 3 2 i 0 0 Pond 2P Flow Sputter Hydrograph 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 M Time (hours) Inflow G outflow Pnmary © Secondary C E I V ED JUN 2 3 2008 DWO PROJ # • r�L Areas 2-Revised-Post Type 1124-hr 10-yr 24 fir Rainfall=6 87 Prepared by Appian Consulting Engineers, PA Page 33 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Hydrograph for Pond 2P Flow Splitter Time Inflow Elevation Outflow Primary Secondary (hours) (cis) (feet) (cfs) (cis) (cfs) 000 000 2352 000 000 000 200 000 2352 000 000 000 400 003 2393 003 003 000 600 008 2398 008 008 000 800 013 2402 013 013 000 1000 029 2411 029 029 000 1200 1122 2556 1122 417 705 1400 036 2415 036 036 000 1600 022 2408 022 022 000 1800 017 2405 017 017 000 2000 013 2402 013 013 000 2200 Oil 2401 Oil Oil 000 2400 Oil 2401 Oil Oil 000 2600 000 2385 000 000 000 2800 000 2385 000 000 000 3000 000 2385 000 000 000 3200 000 2385 000 000 000 3400 000 2385 000 000 000 3600 000 2385 000 000 000 3800 000 2385 000 000 000 4000 000 2385 000 000 000 4200 000 2385 000 000 000 4400 000 2385 000 000 000 4600 000 2385 000 000 000 4800 000 2385 000 000 000 5000 000 2385 000 000 000 5200 000 2385 000 000 000 5400 000 2385 000 000 000 5600 000 2385 000 000 000 5800 000 2385 000 000 000 6000 000 2385 000 000 000 • r1 U i1 L Areas 2-Revised-Post Type l/ 24-hr 10-yr 24 hr Rainfall=6 87" Prepared by Appian Consulting Engineers, PA Page 34 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Stage -Discharge for Pond 2P Flow Splitter Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 2352 000 000 000 2354 000 000 000 2356 000 000 000 2358 000 000 000 2360 000 000 0 00 2362 000 000 000 2364 000 000 000 2366 000 000 000 2368 000 000 000 2370 000 000 000 2372 000 000 000 2374 000 000 000 2376 000 000 000 2378 000 000 000 2380 000 000 000 2382 000 000 000 2384 000 000 000 2386 000 000 000 2388 000 000 000 2390 001 001 000 2392 002 002 000 2394 004 004 000 2396 005 005 000 2398 007 007 000 2400 010 010 000 2402 012 012 000 2404 015 015 000 2406 019 019 000 2408 022 022 000 2410 026 026 000 2412 030 030 000 2414 035 035 000 2416 039 039 000 2418 044 044 000 2420 049 049 000 2422 055 055 000 2424 060 060 000 2426 066 066 000 2428 072 072 000 2430 078 078 0 00 2432 085 085 000 2434 091 091 000 2436 098 098 000 2438 105 1 05 000 2440 1 12 1 12 000 2442 1 19 1 19 000 2444 126 126 000 2446 1 33 1 33 000 2448 141 141 000 2450 148 148 000 2452 156 1 56 000 2454 163 163 000 2456 1 71 1 71 000 2458 1 79 1 79 000 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 2460 1 86 1 86 000 2462 1 94 1 94 000 2464 201 201 000 2466 209 209 000 2468 216 216 000 2470 223 223 000 2472 230 230 000 2474 237 237 000 2476 244 244 000 2478 250 250 000 2480 256 256 000 2482 261 261 000 2484 266 266 000 2486 270 270 000 2488 275 275 000 2490 280 280 000 2492 286 286 000 2494 290 290 000 2496 295 295 000 2498 300 300 000 2500 305 305 000 2502 310 310 000 2504 314 314 000 2506 319 319 000 2508 323 323 000 2510 328 328 000 2512 332 332 000 2514 336 336 000 2516 340 340 000 2518 345 345 000 2520 349 349 000 2522 353 353 000 2524 357 357 000 2526 365 361 004 2528 385 365 020 2530 412 369 044 2532 445 372 073 2534 482 376 1 06 2536 523 380 143 2538 568 384 1 84 2540 615 388 228 2542 666 391 275 2544 719 395 325 2546 776 398 378 2548 837 402 435 2550 901 406 495 2552 967 409 558 2554 1037 413 624 2556 11 09 416 693 2558 11 83 419 764 2560 1261 423 838 2562 1341 426 914 2564 1423 430 994 (FIE C E I V_ED IIII L 2 3 2008 Jvw DWG PROJ a r1 L_J r 1 L_J • Areas 2-Revised-Post Type 1124-hr 10-yr 24 hr Rainfall=6 87" Prepared by Appian Consulting Engineers, PA Page 35 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Elevation Storage (feet) (cubic -feet) 2352 0 2353 0 2354 0 2355 0 2356 0 2357 0 2358 0 2359 0 2360 0 2361 0 2362 0 2363 0 2364 0 2365 0 2366 0 2367 0 2368 0 2369 0 2370 0 2371 0 2372 0 2373 0 2374 0 2375 0 2376 0 2377 0 2378 0 2379 0 2380 0 2381 0 2382 0 2383 0 2384 0 2385 0 2386 0 2387 0 2388 0 2389 0 2390 0 2391 0 2392 0 2393 0 2394 0 2395 0 2396 0 2397 0 2398 0 2399 0 2400 0 2401 0 2402 0 2403 0 2404 0 2405 - 0 Stage -Area -Storage for Pond 2P Flow Splitter Elevation Storage (feet) (cut»Gfeet) 2406 0 2407 0 2408 0 2409 0 2410 0 2411 0 2412 0 2413 0 2414 0 2415 0 2416 0 2417 0 2418 0 2419 0 2420 0 2421 0 2422 0 2423 0 2424 0 2425 0 2426 0 24-27 0 2428 0 2429 0 2430 0 2431 0 2432 0 2433 0 2434 0 2435 0 2436 0 2437 0 2438 0 2439 0 2440 0 2441 0 2442 0 2443 0 2444 0 2445 0 2446 0 2447 0 2448 0 2449 0 2450 0 2451 0 2452 0 2453 0 2454 0 2455 0 2456 0 2457 0 2458 0 2459 0 Elevation Storage (feet) (cubic -feet) 2460 0 2461 0 2462 0 2463 0 2464 0 2465 0 2466 0 2467 0 2468 0 2469 0 2470 0 2471 0 2472 0 2473 0 2474 0 2475 0 2476 0 2477 0 2478 0 2479 0 2480 0 2481 0 2482 0 2483 0 2484 0 2485 0 2486 0 2487 0 2488 0 2489 0 2490 0 2491 0 2492 0 2493 0 2494 0 2495 0 2496 0 2497 0 2498 0 2499 0 2500 0 2501 0 2502 0 2503 0 2504 0 2505 0 2506 0 2507 0 2508 0 2509 0 2510 0 2511 0 2512 0 2513 - 0 Elevation Storage (feet) (cubic -feet) 2514 0 2515 0 2516 0 2517 0 2518 0 2519 0 2520 0 2521 0 2522 0 2523 0 2524 0 2525 0 2526 0 2527 0 2528 0 2529 0 2530 0 2531 0 2532 0 2533 0 2534 0 2535 0 2536 0 2537 0 2538 0 2539 0 2540 0 2541 0 2542 0 2543 0 2544 0 2545 0 2546 0 2547 0 2548 0 2549 0 2550 0 2551 0 2552 0 2553 0 2554 0 2555 0 2556 0 2557 0 2558 0 2559 0 2560 0 2561 0 2562 0 2563 0 C 0= I 1P E D �u�Su JUPJ 2 3 2008 PROJ k DWO Areas 2-Revised-Post Type 1l 24-hr 10-yr 24 hr Rainfall=6 87" •Prepared by Appian Consulting Engineers, PA Page 36 HydroCADO 8 00 s1n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 • 0 Pond 3P Sand Filter 2 Inflow Area = 1 400 ac, Inflow Depth = 4 69" for 10-yr 24 hr event Inflow = 4 27 cfs @ 11 96 hrs, Volume= 0 547 of Outflow = 0 28 cfs @ 15 10 hrs, Volume= 0 547 af, Atten= 93%, Lag= 188 3 min Discarded = 0 28 cfs @ 15 10 hrs, Volume= 0 547 of Routing by Stor-Ind method, Time Span= 0 00-60 00 hrs, dt= 0 Ot hrs Peak Elev= 25 81' @ 15 10 hrs Surf Area= 6,994 sf Storage= 12,154 cf Plug -Flow detention time= 441 2 min calculated for 0 547 of (100% of inflow) Center -of -Mass del time= 441 2 min ( 1,227 5 - 786 2 ) Volume Invert Avail Storage Storage Description #1 23 70' 17,912 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf Area Inc Store Cum Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 2370 2,670 0 0 2400 5,136 1,171 1,171 2500 6,134 5,635 6,806 2600 7,189 6,662 13,467 2660 7,626 4,445 17,912 Device Routing Invert Outlet Devices #1 Discarded 009 1 750 m/hr Exi iltration over Surface area Discarded OutFlow Max=O 28 cis @ 15 10 hrs HW=25 81' (Free Discharge) L7=Exfiltration (Exfiltration Controls 0 28 cfs) Areas 2-Revised-Post Type 1124-hr 10-yr 24 hr Rainfall=6 87" •Prepared by Appian Consulting Engineers, PA Page 37 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 • Pond 3P Sand Filter 2 4ydrograph D- Inflow [a Discarded 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) j�E C E I V ED JUG! 2 3 2008 DWQ PROJ # • r� U 0 Areas 2-Revised-Post Prepared by Appian Consulting Engineers, PA HvdroCAD® 8 00 sin 003967 m 2006 HvdroCAD Sofb Type 1124-hr 10-yr 24 hr Rainfall=6 87" Page 38 Hydrograph for Pond 3P Sand Fier 2 Time Inflow Storage Elevation Dscarded (hours) (Cfs) (cubic -feet) (feet) (cfs) 000 000 0 2370 000 200 000 0 2370 000 400 003 17 2371 002 600 008 50 2372 007 800 013 91 2373 012 1000 029 557 2387 016 1200 417 7,460 2511 025 1400 036 12,009 2579 028 1600 022 12,058 2580 028 1800 017 11,451 2571 028 2000 013 10,537 2558 027 2200 Oil 9,455 2542 027 2400 Oil 8,355 2525 026 2600 000 6,563 2496 025 2800 000 4,828 2467 024 3000 000 3,177 2438 022 3200 000 1,612 2409 021 3400 000 286 2379 014 3600 000 0 2370 000 3800 000 0 2370 000 4000 000 0 2370 000 4200 000 0 2370 000 4400 000 0 2370 000 4600 000 0 2370 000 4800 000 0 2370 000 5000 000 0 2370 000 5200 000 0 2370 000 5400 000 0 2370 000 5600 000 0 2370 000 5800 000 0 2370 000 6000 000 0 2370 000 Areas 2-Revised-Post Type // 24-hr 10-yr 24 hr Ratnfaff=6 87" •Prepared by Appian Consulting Engineers, PA Page 39 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 11 40 Elevation Discarded (feet) (cfs) 2370 000 2372 Oil 2374 012 2376 013 2378 013 2380 014 2382 015 2384 015 2386 016 2388 017 2390 017 2392 018 2394 019 2396 019 2398 020 2400 021 2402 021 2404 021 2406 021 2408 021 2410 021 2412 021 2414 021 2416 021 2418 022 2420 022 2422 022 2424 022 2426 022 2428 022 2430 022 2432 022 2434 022 2436 022 2438 022 2440 022 2442 023 2444 023 2446 023 2448 023 2450 023 2452 023 2454 023 2456 023 2458 023 2460 023 2462 023 2464 023 2466 023 2468 024 2470 024 2472 024 2474 024 2476 024 Stage -Discharge for Pond 3P Sand Filter 2 Elevation Discarded (feet) (cfs) 2478 024 2480 024 2482 024 2484 024 2486 024 2488 024 2490 024 2492 025 2494 025 2496 025 2498 025 2500 025 2502 025 2504 025 2506 025 2508 025 2510 025 2512 025 2514 025 2516 026 2518 026 2520 026 2522 026 2524 026 2526 026 2528 026 2530 026 2532 026 2534 026 2536 026 2538 026 2540 027 2542 027 2544 027 2546 027 2548 027 2550 027 2552 027 2554 027 2556 027 2558 027 2560 027 2562 027 2564 028 2566 028 2568 028 2570 028 2572 028 2574 028 2576 028 2578 028 2580 028 2582 028 2584 028 Elevation Discarded (feet) (cfs) 2586 029 2588 029 2590 029 2592 029 2594 029 2596 029 2598 029 2600 029 2602 029 2604 029 2606 029 2608 029 2610 029 2612 029 2614 030 2616 030 2618 030 2620 030 2622 030 2624 030 2626 030 2628 030 2630 030 2632 030 2634 030 2636 030 2638 030 2640 030 2642 030 2644 030 2646 030 2648 031 2650 031 2652 031 26 54 031 2656 031 2658 031 2660 031 • 11 0 Areas 2-Revised-Post Type 1124-hr 10-yr 24 hr Rainfall=6 87" Prepared by Appian Consulting Engineers, PA Page 40 HydroCAD® 8 00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 6/20/2008 Stage -Area -Storage for Pond 3P Sand Filter 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 2370 2,670 0 2375 3,081 144 2380 3,492 308 2385 3,903 493 2390 4,314 698 2395 4,725 924 2400 5 136 1 171 2405 5,186 1,429 2410 5,236 1,689 2415 5,286 1,953 2420 5,336 2 218 2425 5,386 2 486 2430 5,435 2,757 2435 5,485 3,030 2440 5,535 3,305 2445 5,585 3,583 2450 5,635 3,864 2455 5,685 4,147 2460 5,735 4,432 2465 5,785 4,720 2470 5,835 5,011 2475 5,885 5,304 2480 5,934 5,599 2485 5,984 5,897 2490 6,034 6,197 2495 6,084 6,500 2500 6 134 6,806 2505 6 187 7,114 2510 6,239 7,425 2515 6,292 7,738 2520 6,345 8,054 2525 6,398 8,372 2530 6 451 8,694 2535 6,503 9,017 2540 6,556 9,344 2545 6,609 9,673 2550 6,662 10,005 2555 6,714 10,339 2560 6,767 10,676 2565 6,820 11,016 2570 6,872 11,358 2575 6,925 11,703 2580 6,978 12,051 2585 7,031 12,401 2590 7,083 12,754 2595 7 136 13,109 2600 7 189 13,467 2605 7,225 13,828 2610 7,262 14,190 2615 7,298 14,554 2620 7,335 14,920 2625 7,371 _ 15,287 2630 7,408 15,657 2635 7,444 _16,028 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 2640 7,480 16,401 2645 7,517 16,776 2650 7,553 17,153 2655 7,590 17,532 2660 7,626 17,912 FROM APPIAN CONSULTING ENGINEERS FAX NO 2529727638 Jun 12 2008 10 15AM P1 F" rMNSM/SS/ON TOt Ms Janett Russell DATE.• 6111/08 N7TNa NCDENR FAX NO.: (910) 350-2004 FROM: Peter W Sokalsk► inns RnR;(E CONSUETAG ENGINEERS, PA CYVR MUNWIPALA.SMUCTURALENOINELAS COMPREHENaNE FNVIROWWAL BERVILES NkanbW of pagss to fofbw ! d/ thh► page: 7 RED 1=1rst Baptist Church of Swansboro Express Permit Review CONNEWTS Ms Russell, Attached Is the permit request with ►nformat►on as needed Thank you and I hope to hear from you soon► URGENT ❑ PLEASE REPLYtnj AS REQUESTED ACE 0-20 841 South Wesimn 8oubvara P O Box 79M Rocky AAount, NG 27W4 (252) 972-77W (252) 972-7WS (Fax) Weballm mA, qpy a 1 iy 1, n i,l t t' nn wt n I Emao IdIPI1�N1?DPI1�al1�Il(JI1MI5l GItl e�� NCDENR North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension, Wilmington NC 28405 (910) 796-7215 FAX (910)350-2004 Request for Express Permit Review RLL-IN all information below FAX to Express Coordinator along with a comp a detailed narrative and vicinity map of the project location Reviewer Submit Time Confirm APPLICANT Name Pastor Mike Wilkerson Title Pastor Company Name First Baptist Church of Swansboro Address 614 West Corbett Ave City Swansboro Zip 28584 Phone (9101326 5768 Fax f9101326 0138 Email ---pastor swansborofirstbapbst com PROJECT Nance First Baptist Church of Swansboro County Onslow ENGINEER/CONSULTANT INFORMATION Name Peter Sokalski Company Appian Consulting Engineers, PA Address P 0 Box 7966 CityRocky Mount State NC Zip 27804 Phone 252 972-7703 Fax (2521972-7638 Email osokalski(alappianenaineers com ❑ SCOPING MEETING ONLY DWQ DLR DCM Other ❑STREAM ORIGIN DETERMINATION # of Stream calls Stream Name ® STORMWA TER ❑ Low Density ❑ High Density -Detention Pond ® High Density - Other (check all that apply) El Low Dens -Curb & Gutter High Density -Infiltration Off-sile Wetlands MUST be addressed below ® NPDES Phase II B Plan Revision ❑ COASTAL MGT. ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ® Upland Dev ❑ LAND QUALITY ® Erosion and Sedimentation Control Plan with 25 acres to be disturbed WETLANDS (401) Wetlands on Property 7 ❑ Yes ® No Isolated Wetlands on Property? ❑ Yes ® No (Check all that apply) Wetlands will be impacted? ❑ Yes ❑ No Wetland impacts acre(s) Wetlands delineation has been completed? ❑ Yes ❑ No ❑ Buffers impacted Acre(s) USACOE Approval of Delineation completed? ❑ Yes ❑ No 404 Application in Process w/USACOE? ❑ Yes ❑ No / Permit recv d from USACOE❑Yes ❑ No 401 Application Required? ❑ Yes ® No if Yes, ❑ Regular ❑ Express Additional fees, not to exceed 50%of the ongmal Express Review pennit application fee may be charged for subsequent reviews due to the insufficiency of the permit application Total Fee $ Stormwater $ Date Received CAMA $ LIDS $ 401 $ Revised 10/9/2007 Project Name, Stormwater Express Questionnaire (10/92007) What is the applicant's full legal name? First Baptist Church of Swansboro Is the applicant associated with Sole proprietor Corporation ❑ LLC Partnership e Municipality If it's an LLC, is it ❑ Manager -managed or ❑ Member -managed? []What is the applicant's title within the Corp, LLC or Partnership? Will an agent (someone other than the applicant) be signing the applications N Yes Ll No If Yes, what is the agent's name and title? Peter Sokalski, Engineer DP/ease note the application signature requirements are listed in NCAC 2H 1003 (e) In summary, only the sole proprietor of a sole proprietorship, the designated manager, member - manager, president or vice president of a corporation or LLC, the general partner of a partnership, or a ranking official of a municipality may sign permit applications and supplements The signature of the engineer or other agent can be accepted only if accompanied by a signed letter of authorization from one of the aforementioned individuals Corporations, LLC's and Partnerships must be registered with the NC Secretary of State's Office, and be active Please note that spelling, capitalization, and punctuation are extremely important Please provide the entity name exactly as on file with the NC Secretary of State 2 Project Location County Onslow Nearest Town/City. Swansboro (Attach a detailed vicinity map with both 5E571 street names and SR, C, US or Interstate highway numbers, plus other relevant information such as town or city names, directions to, etc Show the nearest intersection of two major roads on the vicinity map A major road is any 1, 2 or 3 digit NC, US or interstate highway) If the project is located in Brunswick, Onslow, or New Hanover Counties, or a small portion of northern Pender County, NPDES Phase 11 Post -Construction rules will apply, unless a vested development nght, as described in the Session Law, can be demonstrated, which is dated prior to July 1, 2007 3 Receiving stream name White Oak River River Basin White Oak What is the classification of the receiving stream? SA, HQW For SA or SR waters, a separate scaled topographic map will be required The project must be accurately located on the map and the X mile radius from the property comer closest to the SA or SR receiving stream must be drawn on the map If you claim that the project is not within mile of SA or SR waters, you must conduct a series of chlorides tests to demonstrate that the chlorides level at a point in the receiving stream that is at least % mile from the project is less than 500 ppm Samples must be sent to a State certified lab for testing 4 If the project is high density, what type of stormwater management BMP's are being proposed? (check all that apply) Wet Detention Infiltration Trench Infiltration Basin ® Sand Filter Bio-retention Wetlands Alternative Cffsite Dry Detention NPDES Phase II Other How many separate BMP's are being proposed? 1 Q 3 4 5 6 7 8 9 10 11 12 Other 5 Is there offsite runoff from the adjacent properties or public right-of-waythat will drain into any of the proposed BMP's on the project and is not being diverted? [ Yes ® No ❑ N/A 6 Is a road across other property required to access the project? ❑ Yes ® No ❑ N/A 7 Is there any existing development or pre-1988 existing BUA located on the property? (Please document, delineate and identify on the plans) ® Yes u No ❑ N/A 8 Will the high density project collect all of the proposed BLIA? ® Yes ❑ No ❑ N/A (If not, attach a separate explanation sheet) Page 1 of 2 Revised 10/9/2007 Project Name 9 Will the project involve the subdivision and sale of property? ❑ Yes ® No ❑ N/A Is the subdivision ❑ residential or ❑ commercial? How many lots are proposed? (Deed restrictions are required for all residential, commercial, low density or high density sub- divisions Specific language for the various types of subdivisions is available from DENR ) 10 Will the plans show all delineated wetlands ❑ Yes ❑ No ®N/A (All projects require either signed wetlands delineation map or wetlands report to be submitted with the application Only a trained professional may provide information regarding the presence or absence of wetlands ) 11 Are wet detention ponds or other engineered controls proposed to be located adjacent wetlands? [-IYes No ® N/A (if, yes, a physical means to prevent the dewatenng of the wetland must be provided, or the SHWT must be prowled to demonstrate that the permanent pool of the BMP is above the SHWT and will not dewater the wetlands over time Where possible, all BMP's and swales should outlet into back the wetland (with level spreaders) 12 For infiltration projects, a site visit must be completed with the DENR sods scientist to verify the sod type, water table and infiltration rate provided in the sods report What is/was the scheduled site visit date? 1221/07 (Include a copy of the consultant's sod report with the application ) 13 Level Spreaders are required at the outlet of all engineered controls and swales prior to entering surface waters or wetlands Will the plans reflect level spreaders? ❑ Yes ® No ❑ N/A (The purpose of the level spreader is to reduce the energy of the incoming runoff and to promote diffuse sheet flow to prevent erosion and scour into the receiving waters or wetlands ) 14 Is this project A modification to an existing permit A lot that will be treated in an existing, previously permitted BMP? What is the name of the existing permitted facility? What is the permit number of the existing permitted facility? SW8 Is the permitted facility in compliance with its permit? Yes No N/A Have the deed restrictions been recorded? Yes No N/A Have the deed restrictions been submitted? Yes No N/A Has the Designer's Certification been submitted? Yes No NIA 15 Do the plans reflect all information in 15A NCAC 2H 1003 (g)? ® Yes ❑ No ❑ N/A 16 Will all of the design requirements for each proposed BMP be met? ® Yes ❑ No ❑ N/A (if not, attach a separate explanation sheet Please note that the Express program is not set up to handle any type of deviation from the standard design) 17 For each BMP in all high density projects, and low density curb outlet swale projects, the individual drainage area for each proposed BMP must be clearly delineated 18 Any revisions made to the application as a result of this review may cause changes to the other documentation Plans, calculations, application, and supplements should be reviewed for any necessary changes For example, changing the onfice size will require a modification to the calculations, the pond details on the plans, and page 1 of the supplement 19 IS THE PROJECT DESIGNED AND THE APPLICATION READY TO SUBMIT? ❑ Yes ® No Complete applications may be accepted earlier d there is a cancellation in our submittal schedule Page 2 of 2 Revised 10/9/2007 0 • • MISCELLANEOUS SITE INFORMATION 0 AAM j- 4 vvk -8 Town of il Swansbor Z' 0 370179 Ilk - Town of Swansborok. Extraterritorial Jurisdiction 370179, A "A ....... ... 1� #/k FIRST BAPTIST �K CHURCH OF il,ONE X .4, SWAINSBORO 0 ILL -A1474 S At 11sAP'1S'*T' I�AlOb ZONE AE,----' EA1477LICKO ZONE AE (Fi. ZONE AE ,ZONE AE c� jEL 101 Z& GRID NORTH SCALE 1" s 500' (1 6,000) 500 1000 . ..... ... FEET PANEL 53"K FIRM FLOOD INSURANCE RATE MAP �111 NORT11 CAROLINA PANEL 5364 1- '1 IN,, nr il )F T s", MAP REVISED MAP NUMBER NOVEMBER 3, 2005 3720536400K Swir .fN.,ih Ciip,lipa Fcd,-iil Aganc, This is an officA copy isapoinicri ofthaabcin1ofofcrc1cJffzi ir was Wcaltcd ".1c, p MIT On 1,111, 'N a, 0. ..o'co w '.Y "lave bee" ".a' ubnnq ntc tn' dm.11 the W1. back I ur the Waistpoi nov".1i iii 1�aoo ".praii-c p-orail, il..cI i ... — mock fpe I-F cTA `I.cp M.. Sore ',I w ,—, 111, a, 0 0 USGS MAP FOR FIRST BAPTIST CHURCH OF SWANSBORO Is J6. t oLights SWANSBORO QUADRANGLE LAT: 34.69069 LONG: -77,12438 Swans boro • Soil Map—Onslow, North Carolina • (First Baptist Chu f Swansboro) 24 11 N Mete 0 20 40 80 ?20 Feet 0 56 100 Z�0 3U[l Natural Resources Web Soil Survey 2.0 *"T Conservation Service National Cooperative Soil Survey 2 14/2008 Page 1 of 3 Soil Map—Onsiow County, North Carolina (First Baptist Church of Swansboro) MAP LEGEND MAP INFORMATION Area of Interest (AOI) r Very Stony Spot Original soil survey map sheets were prepared at publication scale. Area of interest (A00 Viewing scale and printing scale, however, may vary from the a Wet Spot original. Please rely on the bar scale on each map sheet for proper sells Other map measurements. Sou Map Units Special Une Features Source of Map'. Natural Resources Conservation Service Special Point Features Gully Web Soil Survey URL http.Itwebsoilsurvey.nres.usda gov Blowout Coordinate System: UTM Zone 18N Short Steep Slope ® Bonow Ph This product is generated from the USDA-NRCS certified data as of ,... Other the version date(s) listed below. X clay spot Political Features Soil Survey Area. Onsiow County, North Carolina • Closed Depression Munlclpalales Survey Area Data. Version 9, Aug 23, 2007 • - Greve) Pit CBiea Dates) aerial Images were photographed, 1998 .. G—IN Spot Urban Areas The orthophoto or other base map on which the soil lines were Landfill Water Features compiled and digitized probably differs from the background Oceans imagery displayed on these maps. As a result. some minor shifting Lava Flow of map unit boundaries may be evident. Marsh Streams and Canals Mina or Ouarry Transportation +r-r Rails ® Miscellaneous Water Roads Perennial Waist Interstate Highways Rock Outcrop US Routes t Saline spot Slale Highways Sandy Spot Local Roads --ffi- Severely Eroded Spot Olher Reeds Sinkhole Side or Slip Soule Spot Spoil Area Seny Spot Natural Resources Web Soil Survey 2.0 2,'l 4/2008 "-""' Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map-Onslow County North Carolina First Baptist Church of Swansboro • Map Unit Legend C1 is Onslow County, North Carolina (NC133) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BmB Baymeade-Urban land 52 100 0% complex 0 to 6 percent slopes Totals for Area of Interest (AOI) 521 1000% I'SDA Natural Resources Web Soil Survey 2 0 21W2008 Conservation Service National Cooperative Soil Survey Page 3 of 3 Name or Stream Desrnrlion Curr �IrSS Date Pasm Stream i ,dex Y Hutfmans Branch From source to C NSW 08/01/91 White Oa4 19-5-1 • Bachelors Delight Swamp Hewitts Branch From source to C NSW 08/01/91 White Oak 19-5-2 Bachelors Delight Swamp Half Moon Creek From source to New C NSW O8/01/91 White Oak 19-6 River Blue Creek From source to New SC NSW 08/01/91 White Oak 19-8 River Little Creek From source to New SC NSW O8/01/91 White Oak 19-B 5 River Mill Creek From source to New SC NSW O8/01/91 White Oak 19-9 River Deep Gully Creek From source to Mill SC NSW 08/01/91 White Oak 19-9-1 (Elizabeth Lake) Creek Socoe Creek From source to Mill SC NSW 08/01/91 White Oak 19-9-2 Creek WHITE OAK RIVER From source to Spring C 06/01/56 White Oak 20-(1) Branch WHITE OAK RIVER From Spring Branch to C HQW 08/01/90 White Oak 20-(14 5) Hunters Creek WHITE OAK RIVER From Hunters Creek to SA HQW 06/01/56 White Oak 20-(18) Atlantic Ocean, including the Intracoastal Waterway, with exception of restricted shellfish area adjacent to Swansboro Starkeys Creek From source to White C 06/01/56 White Oak 20-10 Oak River Mulberry Creek From source to White C 06/01/56 White Oak 20-13 Oak River Spring Branch From source to White C 06/01/56 White Oak 20-14 Oak River Grants Creek From source to Spring C 06/01/56 White Oak 20-14-1 Branch Halls Branch From source to Grants C 06/01/56 White Oak 20-14-1-1 (Cummins Creek) Creek Calebs Creek From source to White C 06/01/56 White Oak 20-15 Oak River Freemans Creek From source to White C 06/01/56 White Oak 20-16 Oak River Webb Creek From source to White C 06/01/56 White Oak 20-19 Oak River Pitts Creek From source to White SA HQW 06/01/56 White Oak 20-21 (Hargetts Creek) Oak River Hargetts Creek From source to White C 06/01/56 White Oak 20-25 Oak River Holland Mill From source to White SA HQW 06/01/56 White Oak 20-26 • Creek Oak River Cartwheel Branch From source to Holland SA HQW - 06/01/56 White Oak 20-26-1 Mill Creek Page 9 of t ) Precipitation Frequency Data Server Page 1 of 3 /ram POINT PRECIPITATIONr ` FREQUENCY ESTIMATES 1 FROM NOAA ATLAS 14 • North Carolma 34 672 N 77 1" W 26 feet Goan "Prrcrp.i Fmqua y Ail. of the lhu Wd SbLes' NOAA Atlas 14 Vertu h 2, Vimim 3 GM Bmmrq D Marna, B Lrn, T Parzybok, UYekta, and D Ptiley NOAA, Nabonal Weather Seance, Sdver Spurg, Maryland 2004 Extracted Fn Apr 18 2008 Confidence Llmlts �� Seasonality j Location Maps 1 Other Info GIS data 1 Maps 'FHel Map Precipitation Intensity Estimates (in/hr) x JEPI", nnn 1li3060 m man man man I_0 3 hr 6 hr 1_ hr 4 hr 48 hr 4 d 11 7 d at 10 d t� U d 1� 30 ddv 45 d3v 60 1 d1 nun F —2] 6 39 5 10 4 28 2 95 1 85 114 0 82 ® 29 17 10 ®0 04 03OF02 0 02 0 01 Fil F5 7 82 6 26 5 28 3 75 2 40 1 52 110 67 40 0 23 13 07 OS ®0 02 0 02 0 02 001 10 8 91 7 13 6 01 4 35 2 83 1 83 1 33 81 48 28 16 ®® 04 03 02 O 02 0 02 F2 5-1 10 12 8 07 6 82 5 05 3 36 2 23 164 1 Ol 0 60 0 35 0 20 0 11 07 0 OS 0 03 0 03 0 02 0 02 50 1106 880 743 560 379 257 191 118 071 041 024 013 008 ®004 003 002 002 100 11 96 9 50 8 01 6 13 4 22 2 93 2 2-01 1 36 0 83 0 48 0 28 14 0 09 07 ® 0 03 0 03 0 02 200 12 87 l0 21 8 59 6 68 4 69 3 31 2 53 1 57 ®® 32 17 10 08 O5 ® 03 002 500 14 04 11 10 9 31 7 41 5 32 3 86 2 99 1 87 1 I S 0 67 39 0 20 12 ®0 05 FIF— 0 03 1000 I5 06 11 86 9 92 8 03 5 86 4 35 3 42 14 1 33 0 77 0 44 0 22 14 0 10 0 06 0 04 0 04 0 03 Text version of table These Reo m fregnetrq estimates ale based man annual maoma senea AEP is the Annual Exceedanw Probabdty Reese rda fiche ogumararo� larrarenftnnaam NOTE ramatng iaas estrnales near zero to appear as zero • * Upper bound of the 90% confidence interval Precipitation Intensity Estimates (tn/hr) Aar. (1-m n10 man 15 rom 30 manmanan 60 120n mman Ed O2 691 552 463 320 201 124 ®056 33 019 11 ®004 03 002 02 001 001 8 46 6 77 5 71 4 06 2 60 1 65 1 20 0 74 0 44 26 0 15 0 O8 OS 0 04 03 0 02 0 02 002 10 9 64 7 70 6 50 4 71 3 07 1 99 1 46 0 90 0 54 0 3 l 0 l8 0 I0 0 06 0 OS 03 0 02 0 02 0 02 25 1092 87l 735 545 363 242 179 1 11 067 039 022 012 008 006 004 003 002 002 50 I 1 94 9 51 8 02 6 04 09 2 79 2 09 1 30 0 79 0 46 26 14 ® 0 07 0 04 0 03 0 03 0 02 100 12 94 10 28 8 66 6 63 Kfl 3 18 2 41 1 50 0 92 KIIEKIFI-61F10 0 07 05 0 04 0 03 0 02 200 13 95 11 OS 9 29 7 23 5 07 3 60 2 76 1 73 1 06 61 36 IS I 1 08 OS ® 0 03 0 03 500 15 24 l2 05 ] 0 12 8 OS 5 77 21 3 28 2 06 1 27 74 0 43 0 22 13 0 10 0 06 0 04 0 04 0 03 1000 16 40 l2 91 10 80 8 75 6 38 76 3 75 2 37 1 47 0 86 0 50 0 25 I5 11 0 06 0 OS 0 04 0 03 The upper bound d the mn8dence idevd at 90%cadidm i;e lewd a the value which 5%d the smdated quantile values for a given tequency as grsatarthan "These preaprtalim hequenoy estimates are based on an annual comma soles AEP is to Annual Exmodance ftbanddy Please refs to the do,inen+a ion far male iduma4on NOTE Famafl ng pevanls a;Matas near zero to appear as zero ' Lower bound of the 90% confidence interval Precipitation Intensity Estimates (in/hr) A 30 60 15 mm man gman min hr hr hr hr h8 day day day day day a y E6O [ 5 90 4 72 3 96 2 73 1 71 1 OS 0 75 0 46 0 27 16 0 09 0 05 0 03 0 03 02 0 Ol 0 Ol 0 Ol 721 578 488 346 222 139 000 061 036 021 012 007 004 003 002 002 002 001 10 821 6 56 5 54 4 01 2 61 1 67 1 21 0 74 0 43 0 26 0 15 0 O8 OS 0 04 03 0 02 002 002 25 9 27 7 39 6 24 4 62 3 OS 2 149 0 903 1 0 54 32 0 18 10 ® 0 05 03 0 02 OF021 0 02 innnnnnnnnnnnnnnnnnn http //dipper nws noaa gov/cgt-btn/hdsc/buildout perl7type=idf&units=us&senes=am&statename=NORT 4/18/2008 Precipitation Frequency Data Server 50 JLOA18 04 JL6 78 5 11 3 46 2 32 1 72 1 OS 0 63 0 37 21 0 11 0 07 0 05 0 03 0 03 02 0 02 100 10 86 8 64 7 27 5 57 3 84 2 63 1 97 1 21 72 43 24 0 13 0 O8 0 06 0 04 0 03 0 02 0 02 200 I l 62 9 21 7 74 6 03 4 23 2 96 2 24 1 3A 83 49 2A I5 ® 07 0 04 0 03 - 0 0 02 1 12 54 9 92 8 32 6 62 4 75 3 42 2 62 1 62 9A 57 0 33 0 17 0 1 I 0 OA 0 OS 0 04 0 03 0 03 � L. 1U00 J 13 34 LO 50 L79J ELL SLID EELE96 J LE 1L1J OL65 OL3J—IS The lower bound of the mnfidxce Inleval ai 90%confitlencs level is the value whch 9% of the si ndatd quaidile value These preoptlahm frequency eslmates are based on an annual naxlma series AEP Is the Annual Eleeedance Robab Pleaserefstothecbcumentasonfmr ffdamahm NOTE Femmtbngprevailscsbnatesrteezeotoapp�aszeo Annual Maxima based Point I➢F curves - Version 3 34 672 M 77 199 W 26 ft c 07 0 05 03 _ 02 0 01 U Q. 01 W C C f C £ E E £ I 1 1 I n m n m Fri Apr 18 11,34 04 2003 Maps - I I 1 _ 1 _r 1 i { i£ L L L L L L L L L J J J J T T J T J T 1 L S S L t L L S 1 ♦ I� • � • q q q ry ry e e m 1 1 r l 1 1 1 1 1 a a a a a a s a a s m m m n o n an n m ri m m ri m Duration o Annual Exceedance Probability Cl-an-Y) 2-uear 10B-year — `-Ll�-- 14'-year I-- 25-uear -N- 1000-IJeal a 1 "Location J rT f �.� � y � p 9i I 170'1d 110'b 100"tl 110"'M RO"N 70"tl Page 2 of 3 http //dipper nws noaa gov/cgI-bin/hdsc/bulldout pert?type=ldf&umts--ls&senes=am&statename=NORT 4/18/2008 Precipitation Frequency Data Server Page 3 of 3 These maps xae proh¢ed mmg a cirect map request from the b S Cer_us Su3au More and Car'ograe`ic Reeource; Tiger Ma0aner Please read nrm/u1r eL for more aiformahon. LEGEND — State — Connector — County z Stream Indian Resv `!- MiI Mary Area Lake/Pond/Ocean National Park — Street xa Other Park — Expressway F�I C I ty — ItIgtway .o .2— eRurity.6 .a 11 Scale 1 226583 *average —true scale aecends on j on1tor8 esolution Other Maps/Photographs - VILII USCS dren it orthophoto qu rd rangk (ROQ) covering this location from TerreServer USGS Aenal Photograph may also be available from this site A DOQ is a computer -generated image of an aenal photograph in which image displacement caused by ten -am relief and camera tilts has been removed It combines the image characteristics of a photograph with the geometric qualities of a map Visit the USGS for more information Watershed/Stream Flow Information - Find tht Water,hcd for this location using the U S Environmental Protection Agency's site Aate Data Sources - Precipitation frequency results are based on data from a variety of sources but largely NCDC The following links provide general information about observing sites in the area, regardless of if their data was used in this study Fordetatled information about the stations used in this study please refer to our documentation Using the Nition it Chm_iti_c_D tt1 CLn ter c j NCDC) station search engine locate other climate stations within +1-30 lmnutes OR_ , +/-1 degree } of this location (34 6721-77 199) Digital ASCII data can be obtained directly from N C DC llydrometrorobggal Desgn Studies Center DOCYNOAA/Nilninat Weather Service 1325 I?ast West Hgbw y Silver Spring MD20910 (301) 713-1669 Q hmss HDSGQvLshorpd�naagL� IhsLi1mxr http //dipper nws noaa gov/cgi-bin/hdse(buildout perl'ltype—ldf&umts�us&senes=am&statename=NORT 4/18/2008 cclpitation Frequency Data Server POINT PRECIPITATION fir„ ` FREQUENCY ESTIMATES FROM NOAA ATLAS 14 9,01 • North Carolma 34 672 N 771" W 26 feet treat F enptaboo-Froqucecy Atlas ofthe United Safei NOAA AtW 14 Volume 2, Vernon 3 GM 13oronn, D Marbn, B Ire, T ParzyboF UYekla, and D Riley NOAA, Naborai Weather Ser ace, Silver Spmrg, Maryland, 2004 Exb.UW Wed Feb 13 2009 Page 1 of 4 ( Confidence Llrruts I( Seasonality j Location Maps Other Info 11 GIS data 11 Maps 1 Help 11 Docs 11 U S Map Precipitation Frequency Estimates (inches) ARI* (years) i rem 10 rem 15 rem 3(1 nnn 60 rem_ 120 3hr Crhr l2hr — 24h1 --- 48hr a d31 7 dery LII dery ����� �0 day 30!� d 1� d`iv 60 day nun �1 0 49 0 78 0 98 1 34 1 68 2 04 2 21 2 69 3 17 3 66 4 26 4 77 5 53 6 19 8 24 10 17 12 69 15 48 �058 092 116 160 201 248 267 325 384 445 516 577 666 742 980 1209 1500 1828 0 67 1 07 1 35 1 92 2 46 3 ]0 3 37 4 11 4 88 5 75 62 7 33 8 38 9 19 I 1 93 14 53 17 88 21 54 10 0 75 120 1 52 2 20 2 86 3 69 4 03 92 5 88 6 87 7 89 8 64 9 80 10 65 13 68 16 50 0 25 24 14 25 0 85 135 ] 71 2 53 3 37 47 4 94 6 06 7 28 8 54 9 80 10 55 11 85 12 77 16 16 19 21 355 2768 ® 9} 1 47 1 86 2 81 3 8l 5 15 5 76 7 OS 8 57 10 00 1 147 12 18 13 57 14 53 18 20 21 38 26 22 30 45 100 1 00 1 59 2 01 3 OS 4 24 5 87 ® 8 20 9 98 I 1 62 13 34 13 97 I5 43 16 41 20 34 23 60 28 99 33 26 200 1 OS 171 2 t 5 3 35 4 71 65 7 61 9 43 11 56 13 43 15 44 15 93 17 43 18 44 22 61 25 89 31 87 36 11 ®1 I S 1 86 2 34 3 72 5 34 7 76 9 03 I 1 24 13 90 16 17 I8 63 18 97 0 34 21 36 5 82 29 03 35 85 39 94 1000 1 26 1 98 2 49 4 03 5 89 8 74 10 31 12 88 16 OS I8 SS 1 40 21 60 22 80 3 77 28 41 3 ] 50 39 02 2 90 -Text version of table rnaea❑e°p"a°°"beq'ta"q,innla ierased°r NOTE F rL"ngf � esh A. motDatpm mare - Reese rderto the W,_�men'a,ipn lame infamatioO NOTE Formatting ler�s eshmates rwa zeroto appea as zero • Upper bound of the 90% confidence interval Precipitation Frequency Estimates inches) 121n (icRara) rem yy 10 erremmm mddy dy da day hrhh 53 0 85 1 OG 14G t 82 2 23 2 43 2 98 3 55 4 OS 72 5 2S 04 75 8 89 ]0 91 13 62 16 53 62 1 00 1 26 1 74 2 18 2 70 94 3 61 430 4 92 5 72 35 7 29 8 09 10 59 12 97 16 12 E 9 51 08] S6 130 428 208 266 3I0 387566 41 2 4 55 6 7 4 7I 910 U00II1161I1476[1769^_I75j12573 1002 2 S SA 1922I 27�0 1I 25 91 1 46 1 85 73 3 G4 4 8( 5 41 70 8 11 9 40 10 82 11 59 12 92 13 91 17 43 20 59 25 33 29 52 }�r50 l DO 1 59 2001 3 03 4 1 1 5 60 6 3U 7 83 9 52 l0 99 I2 G8 13 38 14 81 IS 85 19 65 22 94 28 21 32 51 loll 200 I U8 1 17 i 72 1 85 2 17 2 33 3 33 3 63 59 5 09 , 38 23 7 26 32 9 04 l O 39 1107 12 81 12 77 14 78 14 76 17 13 I5 37 17 56 16 87 19 09 17 92 20 19 22 02 24 55 25 39 27 93 31 25 34 4Z(�3 35 57 3 I 500 1 27 2 OZ 54 4 04 5 80 8 45 9 89 12 39 I5 42 l7 87 0 78 S U3 22 44 23 S 18 ,U� 3 L u91�3 M1( 3 0811 1009 1 37 2 16 2 71 4 39 4l 55 Ell 32 14 24 17 83 20 60 24 02 24 i4 25 30 2b 34 31 21 34 34 42 60 46 52 The under bound d the confidence interval et 90%con6dence lore) m the value 1Mch 5% d Ore srridaEed niarmle values frz a muen frrnraav am mmlw t,e ^ These precipitation frequency esbmates are eased m a petal dvatmn senes ARI is the Average Rmtnenc , Interval Please referto the doc.mcr _ ^ i fa more information NOTE Fonnatang prevents mbtnatm n zero to appear es zero * Lower bound of the 90% confidence interval Precipitation Frequency Estimates (inches) 1 24 48 4 7 I0 20 30 45 60 mni'rtmi rem rem mom fir hr hr der day day day day day day Alit** SO IS 30 60 120 3P24q�j a 411lG ,,,~ _^4) R81 2 Oil 3 35 3 88 4 37 S09 5 70 7 66 9 52 11 871 07 i 4R 1 r 2 28 2 46 2 97 4 07 4 70 5 2R I3 6 R3 9 12 1 14 04 5�061®125177227285308373 44U 526 601 670 5 [8471filI1�r1'591ir 10]069 110 140 203 0 0 78 1 24 1 57 2 32 264 338 3 09 07 368 446 528 625 712 787 21 87 25 81 48 5 46 G 49 7 70 8 78 9 S4 10 78 1 665 14 88 17 84 http //dipper nws noaa gov/cgi-hin/lldsc/buddout perhtype=pf&units=us&senes=pd&statename=NORTH 2/13/2008 recipitation Frequency Data Server Page 2 of 4 50 110 84 1 34 1 70 2 56 3 48 4 67 L5,91 6 33 7 58 8 93 l 0 19 1 o 94 12 26 13 18 16 661L2A 24 25 28 30 100 0 91 1 45 1 83 2 80 3 85 529 5 94 7 27 8 -- 10 28 11 72 12 43 13 82 14 78 I8 49 21 69 26 64 30 75 *1000 0 971111 54 1 94 3 03 4 24 5 95 6 75 8 28 10 01 l l 73 13 38 l4 02 I5 46 16 44 20 37 23 63 29 06 33 19 1 OS 166 2 09 3 33 4 77 6 87 7 91 9 73 11 86 13 85 I5 83 16 41 17 75 18 77 22 92 26 23 32 29 36 36 1 121 76 2 21 3 57 5 21 7 67 8 93 1102 13 49 15 65 17 88 I8 41 19 64 20 63 24 94 28 22 34 78 38 76 me rowerooum aim mmance away awxax revs is meravewnrn a amsmaa a grmrme vanes mra gm insweny are mss um These preopdaaar heTan y esanates are based on a partial daabon mmcma sees AM is ft Away e Raarence lntwM Pleaserelablhe dommenl31ronim miew4amaton. NOTE Fan%Mngprereftes4malrnea toappeamzao Partial duration based Point Precipitation Frequency Estimates - Version 3 34 672 H 77 199 H 26 ft 44 42 -' - 38 36 34 — _ __ r_- 30 28 s 26 24 20 �. is a 16 (1 14 r __-_ems__ J--Kf r 1 2 u��---a----e-'�1 0 1 2 3 4 5 6 78910 20 30 40 50 80100 140 200 300 500 700 1000 Average Recurrence Interval (years) Ned Feb 13 09 00 02 2008 ➢uration 5-min --hr- 30-day --- 10-m rn -� 3-hr -+- s-:aa -�- 15 mir, -�- ^_ _ _ 7-Jay -+- o0-day �- 4U-rni r1 --�- 12-hr-- 60-m1n- 24-hr a- • hap //dipper nws noaa gov/cgi-bm/hdsc/buildout perl7type=pf&units=us&senes=pd&statename=NORTH 2/13/2008 Precipitation Frequency Data Server Partial duration based Point Precipitation Frequency Estimates - Version 3 34 672 M 77 199 N 26 it Page 3 of 4 44 42 36 34 32 _ _ k _ 30 a 26 i_ 24 ti22 __ __ __ _____ i — — —I_ _ _ r 4_ 20 is 16 14 o 'A - - - 0 L L C L L L E i i L i L L i L L T J T 3 T T T T T T 1 L 2 L L L L L L G 1 9 M N q 9 4 q q q -' m V! O• Duration ^ ^ N CI V �p Wed Feb 13 09 00 02 2008 r1 L Average Recurrence Interval (years) 1 -3- 2 100 — 2Ud a 9 -s- 500 �-- 25 1000 -a- _Location E l7r a 110 m 100"k qo^w aoiW 70-W These maps were produced us rig a Bred map request from the U S Census P. eau tA�c rmrs an. Ca osaenlc Pecource. Tiger Map Server P1 Pk.a readr4rc( v �, for more njormatron http //dipper nws noaa gov/cgi-bin/hdsc/buildout perhtype=pf&units=is&senes=pd&statename=NORTH 2/13/2008 Precipitation Frequency Data Server Page 4 of 4 LEGEND - — State — Connector --- County 4;T, Stream Indian Resv Military Area ice.."., LakelPond/Ocean National Park — Street Other Park Expressway City — Highway .0 .2 C.gtlnty.6 .8 mi Scale 1 228583 Tavera2e--true scale tleperds tin wonitor8 esolution Other Maps/Photographs - Vmji USGS darnit it orthophoteoquadr ingit- (DOQJ covering this location from TermServer, USGS Aerial Photograph may also be available from this site A DOQ is a computer -generated Image of an aerial photograph in which image displacement caused by terrain relief and camera tilts has been removed It combines the image characteristics of a photograph With the geometric qualities of a map Visit the USGS for more information Watershed/Stream Flow Information - Find tht P'alei,htd for this location using the U S Environmental Protection Agency's site Coate Data Sources - Precipitation frequency results are based on data from a variety ofsources but largely NCDC The following links prowde general information about observing slier in the area, regardless of if their data was used in this study For detailed information about the stations used in this study please refer to our documentation Using the \ rtional ChmAne_D it i Centar's (%C1C station search engine locate other clunate stations within +1-30 minutes I OR 1 +1-1 degree ' of this location (34 672/-77 199) Digital ASCII data can be obtained directly from 1 CDC Hydromeleorologa:al Design Studies Center DOC/NOAAMational Weather Service 1325 East Wed Highway Silver Spring MD20910 (301) 713 1669 Quatioans fID�Clue,tlorc Fnna��m Dn�himm CJ http //dipper nws noaa gov/cgi-bin/hdsc/buildout perl7type=pf&units=us&senes=pd&statename=NORTH 2/13/2008 C� • V� SCALE 1' = 50 I FAM Baptist Church - SWansboro, WC Sift asaaonm No aaaler TO* - <1r First Bq" Church - Owensboro, NC SSs9 Fe 0-11 1 23Y aH - SL Wk or - 24 1.F14 Fa 14-W Sy 2.5H 2-5V 616 aL Wk WK OW L4 r021r 24 1.4-14 Fa 26-40 N2.50 esY wl SL Wk WK �' 2-6 1-+u A Fi 40-54 5Y52 10114r1 FSL aLS MA Clay L� r0so- 26 1A-14 Fl b/-aa 10YR 50 - SC SLS w - 0.64 0.t4-1.4 Fa 66-72 Na0 10YR 60 - FS SLS NA - 620 >14 Fa 72-W 10Y711 - FS I ffiS MA - 620 >u Seam" High Wiser Table - <121 th• - Pt° _ First Baptist Church - Sssrsbaro, IC 01* 2 saaaolrh Nlah •MW Table - <1r First Baptist Church - swsrsbo% "C 81104 A 0-10 1 2.6Y 42 - FLS Wa or - a20 m E 10-15 2.5Y 72 - Fw 0rk or - aao >14 at 15-28 10YRN - SCL ale WK 0.62 a14.1.1 apt 26-46 5Y an 10YR 54 c eLS am - 0L60-2 0.01414 aq2 N-da 10Y 771 7.6YR 6a C alS w pa em a060.2 0.014.14 M'4.1 50-:S 5GY 6'1 2.5Y 7M 5YR SIB SCL SZ MA m". c0 . pea, Nw 1 0.1f2 0.1<-4 C9 70-84- SY 72 2" 7A I FS I SLS I w Fa. Fb, D"I& 620 >14 First OWW Church - SWanrbom NC Sib 5 A 0-2 2.SY 4M - SL Wk Gr - 24 1.444 E 2-14 2.6Y 6N - SL Wk Gr at 14-30 10YR 505 2.5V 5n c Wk eehc CONnet a060.2 nol-0.14 Big50-40 10Y wl ? � c SLS w Carman• Modkmn. Pr-mrnt 0.0602 a01414 C L. c 40-66 2SY 7M 10YR �, FSL SLS w ! 5r-w -W 24 1.4-u 5T40' C0 55-aN 5YY72 SGVwl FSL SLS w F�f ' " t4.0 Soomm" High aralar Table -14' saaaohl ' Nhah 1001w Table - 2a' First BaplbtChurch -BNlarhebOrb NC 11111196 saaor lash OFaler Table - <1r 0■ LEGEND . Location of soy borhhp. Sour I I location n uwAmr. GRAPHIC SCALE 1a c w' SHEET DATE: SCALE: OCT 25, 2007 1- = 50' OF PROJECT NO. DRAWN L3 r. 1 10904.S1 SM DEEP SOIL BORING MAP FIRST BAPTIST CHURCH 614 WEST CORBETT AVE - ONSLOW COUNTY, NORTH CAROLINA OCT 2007 I I Soil & Environmental Consultants, PA 11010 Raven Ridge Road • Rakigh, North Carolina 27614 • Phone: (919) 946-5900 > Fax: (919) 546.9467 wwwSandFC.com