HomeMy WebLinkAboutSW8080110_CURRENT PERMIT_20211210STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO
SW8 08 6 1 \ o
DOC TYPE
T$ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
0 21 i 2l U
YYYYMMDD
ROY COOPER
Governor
ELIZMETH S BISER
secretory
BRIAN WRENN
DVrctor
December 10, 2021
Morehead Enterprises, LLC
Arm Virgmia Eimer, Manager
5208-C Hwy 70
Morehead City, NC 28557
NORTH CAROLMA
EnvirwtmenW QuaUty
Subject Permit Renewal
Post -Construction Stormwater Management Permit No SW8 080110
Morehead Enterprises LLC Ehghway 70 Morehead City
Carteret County
Dear Ms Eimer
Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the
Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR") All
previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified
Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit
On August 5, 2009, the Governor signed Session Law 2009-406 This law impacted any development approval
issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which
was current and valid at any point between January 1, 2008, and December 31, 2010 The law extended the
effective period of any permit that was set to expire during this time frame to three (3) years from its current
expiration date On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for
a total of four (4) years extension
The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on December 3, 2021 The Division is hereby notifying you that permit SW8080110 has been
renewed, updated, and re -issued on December 10, 2021, as attached Please be aware that the renewal and re -
issuance of this stormwater permit does not imply that the site is currently in compliance
Tlus permit shall be effective until December 31, 2029, which includes all available extensions, and does not
supersede any other agency permit that may be required The project shall be subject to the conditions and
limitations as specified therein This permit does not impose new or increased stormwater control requirements, it
clarifies the rules and requirements of this program to provide you with a better understanding of your obligations
under this permit Failure to comply with these requirements will result in future compliance problems Please
note that this permit is not transferable except after notice to and approval by the Division
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request
an adjudicatory hearingby filing a written petition with the Office of Administrative Hearings (OAH) The
written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the
OAH within thirty (30) days of receipt of this permit You should contact the OAH with all questions regarding
the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Marl Service Center,
Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www NCOAH com Unless
such demands are made this permit shall be final and binding
If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional
Office, at (910) 796-7215 or ashleym smith@ncdenr gov
Sincerely,
5;�; Brian Wre Direc
Division of Energy, Mineral and Land Resources
E& Q North Carohna Department of Environmental Quality I Division of Energy Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington North Carolina 28405
410.7%7215
State Stormwater Permit No SW8 080110
Page 2 of 2
Enclosures Attachment C—Permitting History
Renewal Application Documents
Copy of the current operation and maintenance agreement
DES/ams %Stormwater\Permits & Projects\2008\080110 HD\2021 12 permit 080110
cc Wilmington Regional Office Stormwater File
D � North Carolina Department of Environmental Quality I Di sion of Energy bfirreral and Land Resources
sra+��r Wflmington Regional Offlce 1 127 Cardinal Dnve Extension I Wilmington, North Carolina 28405
�t\ / 9107967215
Post -Construction Stormwater Management
Permit No SW8 080110
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Morehead Enterprises, LLC
Morehead Enterprises
5208 Highway 70, Carteret County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with the provisions of
15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and as outlined in the
application, approved stormwater management plans, supplement, calculations, operation and
maintenance agreement, recorded documents, specifications, and other supporting data (the
"approved plans and specifications") as attached and/or on file with and approved by the Division of
Energy. Mineral and Land Resources (the "Division" or "DEMLR") The project shall be constructed,
operated and maintained in accordance with these approved plans and specifications The approved
plans and specifications are incorporated by reference and are enforceable part of this permit
This permit shall be effective from the date of issuance until December 31, 2029 and shall be subject
to the following specified conditions and limitations The permit issued shall continue in force and
effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or
rescission, however, these actions do not stay any condition The issuance of this permit does not
prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or
terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A
NCAC 2H 1000 and NCGS 143-215 1 et al
I DESIGN STANDARDS
1 This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data
2 This stormwater system has been approved for the management of stormwater runoff as
described in Section 16 on page 2 of this permit The stormwater control has been designed to
handle the runoff from 32,391 square feet of impervious area
3 The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and
per approved plans
4 All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements The final plats for the project will be recorded showing all such
required easements, in accordance with the approved plans
5 The runoff from all built -upon area within the permitted drainage area of this project must be
directed into the permitted stormwater control system
Page 1 of 5
Post -Construction Stormwater Management
Permit No SW8 080110
The following design criteria have been provided in the wet detention pond and must be
maintained at design condition
a
Drainage Area, acres
1 28
Onsite, ft2
55,944
Offsite, ft2
None
b
Total Impervious Surfaces, ft2
32,391
c
Design Storm, inches
1
d
Pond Depth, feet
55
e
TSS removal efficiency
90
f
Permanent Pool Elevation, FMSL
1040
g
Permanent Pool Surface Area, ft2
3,800
h
Permitted Storage Volume, ft'
2,667
1
Temporary Storage Elevation, FMSL
1081
t
Controlling Orifice
VO pipe
k
Permitted Forebay Volume, ft'
3,022
1
Fountain Horsepower, HP
1/8
m
Receiving Stream/River Basin
UT to Newport River / White Oak
n
Stream Index Number
21-(1)
o
Classification of Water Body
"C"
II SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface
During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately
The permittee shall at all time provide the operation and maintenance necessary to assure the
permitted stormwater system functions at the design condition The approved Operation and
Maintenance Plan must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to
a Semiannual scheduled inspections (every 6 months)
b Sediment removal
c Mowing and re -vegetation of slopes and the vegetated filter
d Immediate repair of eroded areas
e Maintenance of all slopes in accordance with approved plans and specifications
f Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch
basins and piping
g Access to the outlet structure must be available at all times
4 Records of maintenance activities must be kept and made available upon request to
authorized personnel of DEMLR The records will indicate the date, activity, name of person
performing the work and what actions were taken
5 Decorative spray fountains are allowed in the pond, subject to the following criteria
a The minimum permanent pool volume is 30,000 cubic feet
b The fountain must draw its water from less than 2' below the permanent pool surface
c Separated units, where the nozzle, pump and intake are connected by tubing, may be
used only if they draw water from the surface in the deepest part of the pond
d The fountain may not be placed into the forebay
e The falling water from the fountain must be centered in the main pond, away from the
shoreline
f The maximum horsepower for a fountain in this pond is 1/8 horsepower
Page 2 of 5
Post -Construction Stormwater Management
Permit No SW8 080110
6 The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division
7 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting
documentation Any deviations from the approved plans and specifications must be noted on
the Certification A modification may be required for those deviations
8 If the stormwater system was used as an Erosion Control device, it must be restored to design
condition prior to operation as a stormwater treatment device, and prior to occupancy of the
facility
9 Access to the stormwater facilities shall be maintained via appropriate easements at all times
10 The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit Within the time frame specified in the notice the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made
11 No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification
Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc
Redesign or addition to the approved amount of BUA or to the drainage area
Further development, subdivision, acquisition, lease or sale of any, all or part of the
protect and/or property area as reported in the approved plans and specifications
Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan
The construction of any allocated future BUA
The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications
Other modifications as determined by the Director
III GENERAL CONDITIONS
1 CORRECTIVE ACTIONS REQUIRED If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions This includes actions required by this
Division and the stormwater rules such as the construction of additional or replacement on -site
stormwater systems These additional or replacement measures shall receive a permit from
the Division prior to construction
2 PERMIT RENEWAL A permit renewal request must be submitted at least 180 days prior to
the expiration date of this permit The renewal request must include the appropriate
application, documentation and the processing fee as outlined in Title 15A NCAC
02H 1045(3)
3 CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION
The permittee shall submit a completed Permit Information Update Application Form to the
Division within 30 days to making any one of these changes
Page 3 of 5
Post -Construction Stormwater Management
Permit No SW8 080110
4 TRANSFER This permit is not transferable to any person or entity except after notice to and
approval by the Director Neither the sale of the project and/or property, in whole or in part, nor
the conveyance of common area to a third party constitutes an approved transfer of the permit
TRANSFER REQUEST The transfer request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H 1045(2) This
request must be submitted within 90 days of the permit holder meeting one or more of
the following
i A natural person who is deceased,
u A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved,
ni A person or entity who has been lawfully and finally divested of title to the
property on which the permitted activity is occurring or will occur through
foreclosure, bankruptcy, or other legal proceeding
IV A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur
b TRANSFER INSPECTION Prior to transfer of the permit, a file review and site
inspection will be conducted by Division personnel to ensure the permit conditions
have been met and that the protect and the on -site stormwater system complies with
the permit conditions Records of maintenance activities performed to date may be
requested Protects not in compliance with the permit will not be transferred until all
permit and/or general statute conditions are met
5 COMPLIANCE The permittee is responsible for compliance with the terms and conditions of
this permit until the Division approves the transfer request
a APPROVED PLANS AND SPECIFICATIONS A copy of this permit, approved plans,
application, supplement, operation and maintenance agreement, all applicable
recorded documents, and specifications shall be maintained on file by the permittee at
all times
b DIVISION ACCESS The permittee grants Division Staff permission to enter the
property during normal business hours to inspect all components of the permitted
protect
c ENFORCEMENT Any individual or entity found to be in noncompliance with the
provisions of a stormwater management permit or the requirements of the stormwater
rules is subject to enforcement procedures as set forth in NCGS 143 Article 21
d ANNUAL CERTIFICATION The permittee shall electronically submit to the Division an
annual certification completed by either the permittee or their designee confirming the
protects conformance with permit conditions
e OBTAINING COMPLIANCE The Director may notify the permittee when the permitted
site does not meet one or more of the minimum requirements of the permit Within the
time frame specified in the notice, the permittee shall submit a written time schedule to
the Director for modifying the site to meet minimum requirements The permittee shall
provide copies of modified plans and certification in writing to the Director that the
changes have been made
f OTHER PERMITS The issuance of this permit does not preclude the permittee from
complying with and obtaining any other permits or approvals that are required for this
development to take place, as required by any statutes, rules, regulations, or
ordinances, which may be imposed by any other Local, State or Federal government
agency having jurisdiction Any activities undertaken at this site that cause a water
quality violation or undertaken prior to receipt of the necessary permits or approvals to
do so are considered violations of NCGS 143-215 1, and subject to enforcement
procedures pursuant to NCGS 143-215 6
Page 4 of 5
Post -Construction Stormwater Management
Permit No SW8 080110
Permit renewed, updated and reissued this the 10th day of December 2021
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
c
e -
,X, Brian Wrenn. Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 5 of 5
Attachment C - Permitting History
Morehead Enterprises LLC Hwy70 Morehead City
Permit No SW8 080110
Approval
Date
, Permit
_ Action
BIMS
Version
`
Description of the Changes
1/11/2008
Original
Approval
10
12/10/2021
Renewal
20
Expires December 31, 2029
w
Permit Number
to be p ovided by D IvQ)
Di ainage Area Number _I
Wet Detention Basin Inspection and Maintenance Agreement
I will keep a maintenance record on this BMP This maintenance record will be kept in a
log in a known set location Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP
The wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided
This system (check one)
does ® does not incorporate a vegetated filter at the outlet
This system (check one)
❑ does ® does not incorporate pretreatment other than a forebay
Important maintenance procedures
— Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks)
— No portion of the wet detention pond should be fertilized after the first uutial
fertihzation that is required to establish the plants on the vegetated shelf
— Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin
— If the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency dram should be mmmuzed to the
maximum extent practical
— Once a year, a dam safety expert should inspect the embankment
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storm event greater than 10 inches (or 15 inches if in a
Coastal County) Records of inspection and maintenance should be kept in a known set
location and must be available upon request
Inspection activities shall be performed as follows Any problems that are found shall
be repaired immediately
BMP element
Potential problem
How I will remediate the problem
The entire BMP
Trash/debris is present
Remove the trash/debris
The perimeter of the wet
detention basin
Areas of bare soil and/or
erosive gullies have formed
Regrade the soil if necessary to
remove the gully, and then plant a
ground cover and water until it is
established Provide lime and a
one-hme ferhh7er application
Vegetation is too short or too
Maintain vegetation at a height of
long
approximately six inches
Form SW401 Wet Detention Basin I&M-Rev 2
01
Permit Number /- (L j�%) OA
(to be pros ided by D IT)
Drainage Area Number _I
BMP element
Potential problem
How I will remednate the problem
The inlet device pipe or
The pipe is clogged
Unclog the pipe Dispose of the
swale
sediment off -site
The pipe is cracked or
Rcplace the pipe
otherwise damaged
Erosion is occurring in the
Regrade the svi ale if necessary to
swale
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems v, ith erosion
The forebay
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design depth for
possible Remove the sediment and
sediment storage
dispose of it in a location v here it
will not cause impacts to streams or
the BMP
Erosion has occurred
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems
Weeds are present
Remove the "eeds, preferably by
hand If pesticide is used, wipe it on
the plants rather than spraying
The vegetated shelf
Best professional practices
Prune according to best professional
show that pruning is needed
practices
to maintain optimal plant
health
Plants are dead, diseased or
Determine the source of the
dying
problem sods, hydrology, disease,
etc Remedy the problem and
replace plants Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary
Weeds are present
Remove the weeds, preferably by
hand If pesticide is used, wipe it on
the plants rather than spraying
The main treatment area
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design sediment
possible Remove the sediment and
storage depth
dispose of it in a location where it
will not cause impacts to streams or
the BMP
Algal growth covers over
Consult a professional to remove
50% of the area
and control the algal STowth
Cattails phragmites or other
Remove the plants by wiping them
invasive plants cover 50% of
with pesticide (do not spray)
the basin surface
Form SW401-Wet Detention Basin I&M-Rev 2
Penmt Number ✓(ti)(� �[ �� C
(to be provided by DWQ)
Drainage Area Number _1
BMP element
Potential problem
How I will remediate the problem
The embankment
Shrubs have started to groiN
Remove shrubs immediately
on the embankment
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present
consult a professional to remove
beavers
A tree has started to grow on
Consult a dam safety specialist to
the embankment
remove the tree
An annual inspection by an
Make all needed repairs
appropriate professional
shows that the embankment
needs repair
The outlet device
Clogging has occurred
Clean out the outlet device Dispose
of the sediment off -site
The outlet device is damaged
I Repair or replace the outlet device
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
outlet
the 401 Oversight Unit at 919-733-
1786
The measuring device used to deterirune the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments
When the permanent pool depth reads 3 S feet in the main pond, the
sediment shall be removed
When the permanent pool depth reads S feet in the forebay, the sediment
shall be removed
Sediment Removal
Bottom
90 a 5j 1
(�90 1
FOREBAY
BASIN DIAGRAM
(fill in the blanks)
Permanent Pool Elevation I 0
enanen Pool ob
Volume Sedimnt Rm eeoval Elevation _ / S
ft Min
Sediment Bottom Elevation S d
Storage
MAIN POND
Nil
Storage
Form SW401 Wet Detention Basin 1&M-Rev 2
Pemnt Number
(to be provided by DI1IQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party
Pro7eu name Morehead Enterprises, LLC, Property
BMP drainage area number 1
Print name Virginia Ettner
Title Member Manager
Address PO Box 3320, New Bern NC 28564
Phone 252-67lrl771 1
Signature
Date
Note The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president
I, "77Iie7,J L Mon-han� E , a Notary Public for the State of
IJ,, IIC42oc", County of C2AI/er1 , do hereby certify that
V IV C_ In, n C, "ient personally appeared before me this 8rN
day of ::2-, o. zoo Y , and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements Witness my hand and official
seal
���•�`C�N.SW L M
. eIOT
�2?
••• COU
SEAL
My commission expires 2� 7,5,-��
Fonn SW401-Wet Detention Basin I&M Rev 2
I IFMI H 111E "NI Y
Date eived
Fee Paid
Permit Number
o'
u1 y o((
STATE STORMWATER
PERMIT INFORMATION UPDATE APPLICATION FORM
There is NO FEE for updating project name or permittee information
This form is to only to be used by the current permittee to notify the Division of
1) changes to the Point of Contact (signing official) for the current permittee (LLC Corporation HOA or POA)
2) changes to the mailing address phone number or email address of the current permittee
3) changes to the name of the project and
4) changes to the legal corporate name as documented by a Name Change or Merger filed with the NCSOS
A NEW PERMIT INFORMATION
State Stormwater Permit Number SW8080110
Are you updating
(check all that apply)
If so, please provide the updated information
❑ Project name
❑ Corporation Name'
® Permit Contact Name2 3
Virginia Edner
® Permit Contact Title
Manager
® Mailing Address3
5208-C Hwy 70 West Morehead City NC 28557
® Phone number
252-222-5601
® Email address
virginia eitner(rDgmail com
Provide documentation such as a Name Change /Merger filed with the NCSOS
2 Provide supporting documentation such as NCSOS filing The permit contacts position must b in accordance
with 15A NCAC 02H 1040(1)
q���
3 If more than one point of contact or mailing address is being changed please attach a separa heetr"4 V .._
B CERTIFICATION OF PERMITTEE gy 03 202i
I Virginia Eitner the current permittee hereby notify DEMLR that I am making the chang\-hsted in
Section A above I further attest that this application for an update to the permit information currently on file is accurate
and complete to the best of my knowledge
Signature
T
I V—V i SV7n tct_ e e a Notary Public for the State of I V o/Y�w C�(�n uYI A.
County of %u'4 do hereby certify that U I1-V-Q I'h 0 r) I IF.f
til
personally appeared before me this the 30 day of I ' 0 /'� 20 V and acknowledge the due
execution of the forgoing instrument Witness my hand and official seal
(Notary Seal)
Notary Signature
My commission e
KRISTA H DE ANDRADE
Notary Public North Carolina
Craven County
My Commis�n Expires
ZZ
Stonmwater Permit Information Update Form Page 1 of 1 May 11 2017
UtMLH Ubt ONLY
Date Rec ived
Fee Paid
Permit Number
1
00
S
S 0& 08o ! O
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H 1045(3), the current permit holder shall renew their high density permit 180 days
poor to its expiration Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60 (c) This application form is for permit renewals only
A PROJECT INFORMATION
1 State Stormwater Permit Number SW8080110
2 Project name Morchead Fnterpnses, LLC Flilgiway 70 MorLhend City
3 Project street address 5208 VIM 70 Wcst
City Morehead City County Carteret
ZIP 28557
4 What if any changes have been made to the project as permitted?
If the project has changed from the original approved plans please complete SWU-101 for a Ma/or
Modification or Minor Modification Application form available at https //deg nc goVabout/divisions/energy-
mi neral-land-resources/energy-minera I-land-rules/stormwater-prop ram/post-construction
B PERMITTEE INFORMATION
If changes to the permittee or project name have been made please complete either the Permit Update form
or the Permit Transfer form available at https //deg nc gov/about/divisions/energv-mineral-land-
resources/energv-mineral-land-rules/stormwater-program/post-construction State Stormwater Permits do not
automatically transfer with the sale of the property
1 Current Permit Holders Company Name/Organization Morehead Enterprise,,, LI C
2 Signing Official's Name Viraimd Eitner
3 Signing Officials Title Manager
4 Mailing Address 5208-C Flwv 70 West
City Morehead City State NC ZIP
28557
5 Street Address 5208-C t Iwy 70 West
City Morehead City State NC ZIP
28557
6 Phone (252) 222-5601 Email
virginia ertner(oigmail com
DEC 0 3 20211
BY
Stormwater Permit Renewal Form Page 1 of 3 May 11 2018
C SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2 USMP Non -Coastal HQW/ORW) Only applications packages that
include all required items listed below will be accepted and reviewed
Initial each item below to indicate that the required information is provided in the application package
V G 1 A permit application processing fee of $505 00 payable to NCDEQ
U� 2 One original signed hard copy and one electronic copy of this completed form The signing official
named on this application to represent the current permittee must meet one of the following
a Corporation - a principle executive officer of at least the level of vice-president
b Limited Liability Company (LLC) - a manager or company official as those terms are defined
in G S 57D North Carolina Limited Liability Company Act
c Public Entity - a principal executive officer ranking official or other duly authorized employee
d Partnership or limited partnership - the general partner
e Sole proprietor, or
f Letter of authorization signed by one of the signatories noted in a - e above authorizing the
signature of another entity
3 One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR including deed restrictions protective covenants
condominium/planned community declaration and easements If the project has been built include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded If
the project has not been built include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date
4 O&M Agreements, Please select one
® I have a copy of the current recorded O&M Agreement for all SCMs and I will continue to
keep this on file with the permit or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me I agree to keep this on file with the permit
V G 5 Designer Certifications Please select one
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed, or
I'- ❑ The project has not yet been built
r►� 6 [IF APPLICABLE] If the project has been built one original hard copy and one electronic copy of a
I signed sealed, and dated letter from a licensed professional stating that the SCMs have been
I' inspected and that they have been built and maintained in accordance with the permit
7 [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC)
" I Provide one hard copy and one electronic copy of documentation from the NC Secretary of State
or other official documentation which supports the titles and positions held by the persons listed in
Section C 2 per 15A NCAC 2H 1043(3)(b)
Ac( 0 4c,
3 2021 9`l
Stormwater Permit Renewal Application Form Page 2 of 3 May 11 2018
IF
D PERMITTEE'S CERTIFICATION
I drain is 2�gy the person legally responsible for the permit certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and It will be kept on site), that I am
responsible for the performance of the maintenance procedures and the site has been and will be maintained
according to the O&M Agreement and approved plans I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project SCMs, or ownership All information provided on this permit renewal application is, to the best of my
knowledge, correct and compl to
Signature LU\ Date I3D 12,1
NOTARIZATION
I &IS61
County of
thatylraArlA niw
this the day of
execution of the forgoing instrument Witness my hand and official seal
(Notary Seal)
Notary Signature vk
My commission expires JK20221
a Notary Public for the State of
do hereby certify
personally appeared before me
20 21 and acknowledge the due
IRIS DE ANDRAD
Public arolina
r o
mm Iss ion Ex s
---------------
KRISTA H DE ANDRADE
Notary Public North Carolina
Craven County
My Commission Expires
DEC 0 3
?021
By
Stor nwater Permit Renewal Application Form Page 3 of 3 May 11 2018
R Permit No -�) 4,(f ) /?oll c
(to be Provided by DWD)
W A r,,g0
NCDENR
O\T
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out printed and submitted
The Required Items Checklist (Part III) must be panted filled out and submitted along with all of the required information
I PROJECT INFORMATION
s_
Protect name MOREHEAD ENTERPRISES LLC HIGHWAY 70 MOREHEAD CITY
Contact person VIRGINIA EITNER
Phone number 252 637 5576
Date JANUARY 7 2008
Drainage area number 1
II- DESIGN INFORMATION 5, y
Site Characteristics
Drainage area 55944 fe
Impervious area 32 391 fe
%impervious 578989704 %
Design rainfall depth 10 In
Storage Volume Non SR Waters
Minimum volume required
2 667
ft'
Volume provided
2667
ry'
Storage Volume SR Waters
1 yr 24 hr runoff depth
NA
In
Pre development 1 yr 24 hr runoff
NA
ft'
Post development 1 yr 24 hr runoff
NA
ft'
Minimum volume required
#VALUE'
ft'
Volume provided
NA
ft'
Peak Flow Calculations
Is pre/post control of the 1 yr 24 hr peak flow required?
N
(Y or N)
1 yr 24 hr rainfall depth
NA
in
Rational C pre development
NA
(umtless)
Rational C post development
NA
limitless)
Rainfall intensity 1 yr 24 hr storm
NA
in/hr
Pre development 1 yr 24 hr peak flow
NA
ft'/sec
Post development 1 yr 24 hr peak flow
NA
h'/sec
Pre/Post 1 yr 24 hr peak flow control
#VALUE'
ft'/sec
Basin Elevations
Basin bottom elevation
490
ff
Sediment cleanout elevation
390
It Increase to provide at least tit of sediment storage
Bottom of shelf elevation
9 90
ft
Permanent pool elevation
1040
it
Top of shelf elevation
1090
ft
Temporary pool elevation
1081
If
Volume and Surface Area Calculations
SAIDA ratio
670
(unitless)
Surface area al the bottom of shelf
2550 00
fe
Volume at the bottom of shelf
1275000
It'
Permanent pool surface area required
3 748
f?
Permanent pool surface area provided
3 800
fe OK
Permanent pool volume
14 338
ft'
Average depth for SAIDA tables
3773157895
ft OK
Surface area at the top of shelf
5250
ft
Volume at the top of shelf
1 6601
ft'
Form SW401 Wet Detention Satin Rev 3
Parts I & 11 Design Summary Page 1 of 2
y
Permit No 12406x000
(10'be provided by DWQ)
II DESIGN INFORMATION-,��
Forebay volume
3 022
It,
Forebay % of permanent pool volume
21
%
OK
Temporary pool surface area provided
4 974
fe
Drawdown Calculations
Treatment volume drawdown time
3 18
days
OK
Treatment volume discharge rate
001
fees
Pre development 1 yr 24 hr discharge
NA
ft'/s
OK
Post development 1 yr 24 hr discharge
NA
ff'/s
OK
Additional Information
Diameter of orifice
1 00
in
Design TSS removal
90
%
Basin side slopes
3
1
OK
Vegetated shelf slope
10
1
OK
Vegetated shelf width
10
It
OK
Length of flowpath to width ratio
3
1
OK
Length to width ratio
3
1
OK
Trash rack for overflow & orifice?
Y
(Y or N)
OK
Freeboard provided
1
It
OK
Vegetated filter provided?
N
(Y or N)
Design must be based on 90% TSS removal
Recorded drainage easement provided?
Y
(Y or N)
OK
Capures all runoff at ultimate build out?
Y
(Y or N)
OK
Drain mechanism for maintenance or emergencies
PUMP
PROVIDE FOR MAINTENANCE WHEN NEEDED
1VALUEI
Form SW401 Wet Detention Basin Rev 3 Parts I & 11 Design Summary Page 2 of 2
lZ,
Permit No ?!U SCrx �
(to be provided by DWO)
III"tREQUIRED ITEMS CHECKLIST'
Please Indicate the page or plan sheet numbers where the supporting documentation can be found An incomplete submittal package will
result in a request for additional information This will delay final review and approval of the protect Initial in the space provided to
Indicate the following design requirements have been met If the applicant has designated an agent the agent may Initial below If a
requirement has not been met, attach justification
Pagel Plan
Initials
Sheet No
P-,CC_
S }} 1 3' 2-
1 Plans (1 50 or larger) of the entire site showing
Design at ultimate build out
Off site drainage (if applicable)
Delineated drainage basins (include Rational C coefficient per basin)
Basin dimensions
Pretreatment system
High flow bypass system
Maintenance access
Recorded drainage easement and public right of way (ROW)
Overflow device and
S ♦♦ 3 S
Boundaries of drainage easement
p
V�
S�
2 Partial plan (1 = 30' or larger) and details for the wet detention basin showing
Outlet structure with trash rack or similar
Maintenance access
Permanent pool dimensions
Forebay and main pond with hardened emergency spillway
Basin cross section
Vegetation specification for planting shelf and
✓1
Filter strip
N ry
3 Section view of the dry detention basin (1" = 20 or larger) showing
Side slopes 31 or lower
Pretreatment and treatment areas and
Inlet and outlet structures
4 If the basin is used for sediment and erosion control during construction clean out of the basin is specified
on the plans prior to use as a wet detention basin
IZDKf A`215 A table of elevations areas incremental volumes & accumulated volumes for overall pond and for forebay
to verify volume provided
S 6 An assurance that the installed system will meet design specifications upon initial operation once the
pp y protect is complete and the entire drainage area is stabilized
V�!J— 5143 7 A construction sequence that shows how the wet detention basin will be protected from sediment until the
n entire drainage area is stabilized
ti flT7Mk08 The supporting calculations
N A 9 A copy of the signed and notarized inspection and maintenance (I&M) agreement
N 10 A copy of the deed restriction
Form SW401 Wet Detention Basin Rev 1 Part III Required Items Checklist Page 1 of 1
,r,,N14-2008 MON 09 22 AM NCDENR FAX NO 9103502004 P 07
State Stormwater Management systems
Permit No SW8 080110
Morehead Enterprises
Stormwater Permit No SW8 080110
Carteret County
Designer's Certification
I Ronald D Cullipher , as a duly registered Engineer
in the State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
[�y I
for Virginia Eitner (Member Manager) (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications
The checklist of items on page 2 of this form is included in the Certification
Noted deviations from approved plans and specification NOW E I no
�.•`' CAR
�N ......... �.
SSI
-n ic•4 53L i¢
(.
Stgnat a �o��oNE�:�'•Q'Z�,:
Registration Number i� 3 TJ '�q�v D CSts Ito •,•
Date
m
MAY 2 1 2009
Page 6 of 7
3I'J-14-2008 MON 09 22 AM NCDENR FAX NO 9103502004 P OB
State Stormwater Management Systems
Permit No SW8 080110
Certification Requirements
1
The drainage area to the system contains approximately the permitted
V-9�2
acreage
The drainage area to the system contains no more than the permitted
pp�
amount of built -upon area
such that the
11 _3
All the built -upon area associated with the project is graded
runoff drains to the system
v�
4
All roof drains are located such that the runoff is directed into the system
The outletlbypass structure elevations are per the approved plan
629,(-6
The outlet structure is located per the approved plans
�-7
Trash rack is provided on the outlet/bypass structure
All slopes are grassed with permanent vegetation
Vegetated slopes are no steeper than 3 1
10 The inlets are located per the approved plans and do not cause short-
circuiting of the system
11 The permitted amounts of surface area and/or volume have been
provided
PIT, 12 Required drawdown devices are correctly sized per the approved plans
kfr 3 All required design depths are provided
14 All required parts of the system are provided, such as a vegetated shelf,
and y
r The required system dimensions are provided per the approved plans
cc NCDENR-DWQ Regional Office
Carteret County Building Inspections
Page 7 of 7