HomeMy WebLinkAboutSW8060842_CURRENT PERMIT_20211014STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO
SW8 000$L{2
DOC TYPE
® CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2021 lot4
YYYYMMDD
ROY COOPER
Ga rnor
ELIZABETH S B►SER
NORTH CAROLINA
EnvWnmmla[ Quality
October 14, 2021
Edge Holdings, LLC
Arm Adnanna Edge Sidelmger Managing Member
1 Snead Court
Shallotte NC 28470
Subject Permit Renewal
State Stormwater Management Permit No SW8 060842
Plantation Storage
Brunswick County
Dear Ms Sidelinger
The Wilmington Regional Office received a complete 8-year Stormwater Management Permit Renewal Application for
the subject project on October 13, 2021 The Division is hereby notifying you that permit SW8 060842 has been
renewed on October 14, 2021, and shall be effective until October 6, 2028 For your records please find enclosed a
renewed, updated, and re -issued permit and a copy of the renewal application Please keep this permit on file at all
tunes Please note that the renewed, updated, and re -issued permit does not impose new or different terms, it merely
restates some of the previous terms to provide you with a better understanding of your obligations under the permit
The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the
terms and conditions of this state stormwater permit The plans originally approved on October 6, 2006 and most
recently modified on July 25, 2018, will remain in full force and effect in accordance with the regulations set forth in
Title 15A NCAC 2H 1000
This permit is subject to the conditions and limitations as specified therein Please pay special attention to the
conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed
restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit Failure to establish
an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions,
to transfer the permit, or to renew the permit, will result in future compliance problems
If any parts, requirements, or limitations contained in this permit are unacceptable you have the tight to request an
adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH) The written
petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within
thirty (30) days of receipt of this permit You should contact the OAH with all questions regarding the filing fee (if a
filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714 or
via telephone at 919-431-3000 or visit their website at www NCOAH corn Unless such demands are made this permit
shall be final and binding
If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the
Wilmington Regional Office, at (910) 796-7215 or ashleym smith@ncdenr gov
Sincerely,
-f�- �.Qo�
ckrl "
Brian Wrenn Director
Division of Energy, Mineral and Land Resources
Enclosures Attachment C — Perimttuig History
Renewal Application Documents
DES/ams \\\Stonnwater\Permits & ProUects\2006\060842 HD\2021 10 permit 060842
cc Sabrma B Babson East Coast Engineering P C P O Box 2469 Shallotte NC 28459
Adrianna Edge Sidelmger Edge Holdings LLC P O Box 1499 Shallotte NC 28459
NCDEQ-DEMLR Wilmington Regional Office
�tt North Carolina Department of Emmonmental Quality I Dmmm of Energy Mneral and Land Resources
_ d wilmmgton Regional Office 1127 Cardmd Dme Extension I Wilnmngton North Carolina 28405
ern smr=mn.e� /�/ 910.7%7215
State Stormwater Management Systems
Permit No SW8 060842
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143 General Statutes of North Carolina as
amended and other applicable Laws Rules and Regulations
PERMISSION IS HEREBY GRANTED TO
Edge Holdings, LLC
Plantation Storage
Ocean Highway West, Brunswick County
FOR THE
construction operation and maintenance of a wet detention pond in compliance with the provisions of
15A NCAC 2H 1000 (hereafter referred to as the 'stormwater rules') and the approved stormwater
management plans and specifications and other supporting data as attached and on file with and
approved by the Division of Energy Mineral and Land Resources (the Division or DEMLR ) and
considered an enforceable part of this permit
This permit shall be effective from the date of issuance until October 6 2028 and shall be subject to
the following specified conditions and limitations
I DESIGN STANDARDS
1 This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data
2 This stormwater system has been approved for the management of stormwater runoff as
described in Section 16 of this permit The stormwater control has been designed to handle
the runoff from 309 134 square feet of impervious area
3 The tract will be limited to the amount of built -upon area indicated on page 2 of this permit and
per approved plans The built -upon area for the future development is limited to 3 693 square
feet and is included in the 309,134 square feet of impervious area draining to the wet detention
pond
4 All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements The final plats for the project will be recorded showing all such
required easements in accordance with the approved plans
5 The runoff from all built -upon area within the permitted drainage area of this project must be
directed into the permitted stormwater control system
Page 1 of 5
State Stormwater Management Systems
Permit No SW8 060842
6 The following design criteria have been provided in the wet detention pond and must be
maintained at design conditions
a
Drainage Area acres
887
Onsite ftZ
386 418
Offsite ftz
None
b
Total Impervious Surfaces ft2
309 134
OS Bldgs ft'
62,498
OS Prkg/driveways ftZ
242 943
OS Future Development ftz
3 693
c
Design Storm inches
1 0
d
Pond Depth, feet
65
e
TSS removal efficiency
90%
f
Permanent Pool Elevation FMSL
31 0
g
Permanent Pool Surface Area ftZ
18 584
h
Permitted Storage Volume ft'
28 035
1
Temporary Storage Elevation FMSL
324
f
Controlling Orifice
2 0 0 pipe
k
Permitted Forebay Volume ft'
14 787
1
Receiving Stream/River Basin
Shingletree Swamp / Lumber
m
Stream Index Number
15-23-2
n
Classification of Water Body
"C, Sw"
II SCHEDULE OF COMPLIANCE
1 The protect and SCM(s) shall be constructed operated and maintained in accordance with the
conditions of this permit and the approved plans and specifications
2 The stormwater management system shall be constructed in its entirety vegetated and
operational for its intended use prior to the construction of any built -upon surface
3 During construction erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately If the stormwater system was used as an Erosion Control device
it must be restored to design condition prior to operation as a stormwater treatment device
and prior to occupancy of the facility
4 Decorative spray fountains are allowed in the pond subject to the following criteria
a The minimum permanent pool volume is 30 000 cubic feet
b The fountain must draw its water from less than 2 below the permanent pool surface
c Separated units where the nozzle pump and intake are connected by tubing, may be
used only if they draw water from the surface in the deepest part of the pond
d The fountain may not be placed into the forebay
e The falling water from the fountain must be centered in the main pond away from the
shoreline
f The maximum horsepower for a fountain in this pond is 1/4 horsepower
The permittee shall at all times provide the operation and maintenance necessary to assure
the permitted stormwater system functions at the design condition The approved Operation
and Maintenance Plan must be followed in its entirety and maintenance must occur at the
scheduled intervals including but not limited to
Semiannual scheduled inspections (every 6 months)
Sediment removal
Mowing and revegetation of slopes and the vegetated filter
Immediate repair of eroded areas
Maintenance of all slopes in accordance with approved plans and specifications
Debris removal and unclogging of outlet structure orifice device flow spreader catch
basins and piping
Access to the outlet structure must be available at all times
Records of maintenance activities must be kept and made available upon request to
authorized personnel of the Division The records will indicate the date activity name of
person performing the work and what actions were taken
Page 2 of 5
State Stormwater Management Systems
Permit No SW8 060842
7 Upon completion of construction prior to issuance of a Certificate of Occupancy and prior to
operation of this permitted facility a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit the approved plans and specifications and other supporting
documentation Any deviations from the approved plans and specifications must be noted on
the Certification A modification may be required for those deviations
8 Access to the stormwater facilities shall be maintained via appropriate easements at all times
9 No person or entity including the permittee shall alter any component shown in the approved
plans and specifications Prior to the construction of any modification to the approved plans
the permittee shall submit to the Director and shall have received approval for modified plans
specifications and calculations including but not limited to those listed below For changes to
the project or SCM that impact the certifications a new or updated certification(s) as
applicable will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification
a Any modification to the approved plans and specifications, regardless of size including
the SCM(s) BUA details etc
b Redesign or addition to the approved amount of BUA or to the drainage area
c Further development subdivision acquisition lease or sale of any all or part of the
project and/or property area as reported in the approved plans and specifications
d Altering modifying removing relocating redirecting regrading or resizing of any
component of the approved SCM(s) the stormwater collection system and/or
vegetative conveyance shown on the approved plan
e The construction of any allocated future BUA
f The construction of any permeable pavement #57 stone area public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications
g Other modifications as determined by the Director
10 The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit Within the time frame specified in the notice the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made
11 Prior to transfer of the permit a file review and site inspection will be conducted by Division
personnel to ensure the permit conditions have been met and that the project and the on -site
stormwater system complies with the permit conditions Any items not in compliance must be
repaired replaced restored or resolved prior to the transfer Records of maintenance activities
performed to date may be requested
III GENERAL CONDITIONS
Any individual or entity found to be in noncompliance with the provisions of a stormwater
management permit or the requirements of the stormwater rules is subject to enforcement
procedures as set forth in NCGS 143 Article 21
The issuance of this permit does not preclude the permittee from complying with and obtaining
any other permits or approvals that are required for this development to take place as
required by any statutes rules, regulations or ordinances which may be imposed by any
other Local State or Federal government agency having jurisdiction Any activities undertaken
at this site that cause a water quality violation or undertaken prior to receipt of the necessary
permits or approvals to do so are considered violations of NCGS 143-215 1 and subject to
enforcement procedures pursuant to NCGS 143-215 6
If the facilities fail to perform satisfactorily the permittee shall take immediate corrective
actions This includes actions required by this Division and the stormwater rules such as the
construction of additional or replacement on -site stormwater systems These additional or
replacement measures shall receive a permit from the Division prior to construction
Page 3 of 5
State Stormwater Management Systems
Permit No SW8 060842
4 Permit Transfer This permit is not transferable to any person or entity except after notice to
and approval by the Director The permittee shall submit a completed and signed Permit
Transfer Application Form (available on the Division website) accompanied by the required
fee and supporting documentation as listed on the form to the Division at least 60 days prior
to any one or more of the following events
a The sale or conveyance of the protect area in whole or in part except in the case of an
individual lot sale that is made subject to the recorded deed restrictions and protective
covenants
b Dissolution of the partnership corporate or LLC entity subject to NCGS 55-14-05 or
NCGS 57D-6-07 and 08
c Bankruptcy
d Foreclosure subject to the requirements of Session Law 2013-121
5 Current Permittee Name or Address Changes The permittee shall submit a completed
Permit Information Update Application Form' (available on the Division website) to the
Division within 30 days to making any one or more of the following changes
a A name change of the current permittee
b A name change of the protect
c A mailing address change of the permittee
6 The permittee is responsible for compliance with all terms and conditions of this permit until
the Division approves the transfer request Neither the sale of the protect in whole or in part
nor the conveyance of common area to a third party constitutes an approved transfer of the
permit
7 The permittee grants Division Staff permission to enter the property during normal business
hours to inspect all components of the permitted protect
8 The permit issued shall continue in force and effect until the permittee files a request with the
Division for a permit modification transfer renewal or rescission however these actions do
not stay any permit conditions
9 Approved plans application documents supplements calculations operation and
maintenance agreement and specifications for this protect are incorporated by reference and
are enforceable parts of the permit A copy of this permit application supplements operation
and maintenance agreement and approved plans and specifications shall be maintained on
file by the permittee
10 Unless specified elsewhere permanent seeding requirements for the on -site stormwater
system must follow the guidelines established in the North Carolina Erosion and Sediment
Control Planning and Design Manual
11 The issuance of this permit does not prohibit the Director from reopening and modifying the
permit revoking and reissuing the permit or terminating the permit for cause as allowed by the
laws rules and regulations contained in Title 15A NCAC 2H 1000 and NCGS 143-215 1 et al
12 A permit renewal request must be submitted at least 180 days prior to the expiration date of
this permit The renewal request must include the appropriate application documentation and
the processing fee as outlined in Title 15A NCAC 02H 1045(3)
Page 4 of 5
State Stormwater Management Systems
Permit No SW8 060842
Permit renewed updated and reissued this the 14th day of October 2021
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
t� Brian— reran Director
Division of Energy Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 5 of 5
Attachment 1 Permitting History
Plantation Storage
Permit No SW8060842
Built -Upon Am (BUA) sf
Approval
Daze
Permit Acuw
io
VerVersionlots
peon of the Changes
Buildings/
Parking
Othef
Future
Total
10/62006
Original Approval
10
subject to 1995 rules 1 pond
48 000
43 512
101 864
115 658
309 134
2/62008
Plan Revision
1 1
addition of catch basins and a piped collections stem
48 000
43 612
101 864
115 658
309 134
7/25/2018
Minor Modification
12
unlizing future BUA for additional improvements to the
site
62 498
242 943
0
3 693
309 134
10/14/2021
Renewal
20
Page 1 of 1
+
DEMLR USE ONLY_ _
- - - -�
Date Received
Fee Paid
Permit Number
11 la 13 2021
tvmkocici %506—
*SW100 2
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H 10450. the current permit holder shall renew their high density permit 180 days
poor to its expiration Renewed permits are valid for a penod of 8 years per Session Law 2011 398 (SB 781)
Section 60 (c) This application form is for permit renewals only
A PROJECT INFORMATION
1
2
3
4
State Stonmwater Permit Number SW8 060842
Protect name Plantation Storage
Protect street address 9019 Ocean Hwy West
City Calabash County
What if any changes have been made to the protect as permitted)
Brunswick ZIP 28467
None
If the project has changed from the ongmal approved plans, please complete SWU-101 for a Ma/or
Modification or Minor Modification Application form available at hags.//deg nc govlabouttdivisions/enerav-
mmeral-land-resources/enemy-mineral-land-ruleststormwater-omommloostconstruction
B PERMITTEE INFORMATION
If changes to the permittee or project name have been made please complete either the Permit Update form
or the Permit Transfer form available at httpsl/deg nc.aov/aboutfdmsions/energy-mineral-land
resources/energy-mineral-land-rules/stomlwater-orogramfoostconstruction State Stormwater Permits do not
automatically transfer with the sale of the property
1 Current Permit Holder's Company Name/Organization Edge Holdings LLC
2 Signing Officials Name Adrianna Edge Sidelinger
3 Signing Official s Title Managing Member
4 Mailing Address 1 Snead Court
City Shallotte State NC ZIP 281 X 28470
5 Street Address 9019 Ocean Hwy West
City Calabash State NC ZIP 98413j
6 Phone ( 919 ) 949-4111 Email edge gary@gmail com
�IIVE
OCT 13 2010
1
EY_
Stormwater Permit Renewal Form Page 1 of 3 May 11 2018
C SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2 USMP Non -Coastal HQW/ORW) Only applications packages that
Include all required items listed below will be accepted and reviewed
Initial each item below to indicate that the required information is provided in the application package
1 A permit application processing fee of $505 00 payable to NCDEQ
2 One original signed hard copy and one electronic copy of this completed form The signing official
named on this application to represent the current permittee must meet one of the following
a Corporation — a principle executive officer of at least the level of vice-president
b Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G S 57D North Carolina Limited Liability Company Act
c Public Entity — a principal executive officer ranking official or other duly authorized employee
d Partnership or limited partnership — the general partner
e Sole proprietor or
f Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity
3 One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR including deed restrictions protective covenants
condominium/planned community declaration and easements If the project has been built include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded If
the project has not been built include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date
,o�� 4 O�fv1 Agreements Please select one
;Vj I have a copy of the current recorded O&M Agreement for all SCMs and I will continue to
keep this on file with the permit or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent tome I agree to keep this on file with the permit
C� 5 Designer Certifications Please select one
�( A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed or
❑ The project has not yet been built
,QJ/A 6 [IF APPLICABLE] If the project has been built one original hard copy and one electronic copy of a
signed sealed and dated letter from a licensed professional stating that the SCMs have been
inspected and that they have been built and maintained in accordance with the permit
4 � 7 [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC)
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State
or other official documentation which supports the titles and positions held by the persons listed in
Section C 2 per 15A NCAC 2H 1043(3)(b)
httos //www sosnc gov/online services/search/by title/ Business Registration
=;L0=g V
SEP 2 0 202,
BY_
Stormwater Permit Renewal Application Form Page 2 of 3 May 11 2018
D PERMITTEE'S CERTIFICATION
Adrianna Edge Sidelinger the person legally responsible for the permit certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site) that I am
responsible for the performance of the maintenance procedures and the site has been and will be maintained
according to the O&M Agreement and approved plans I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project SCMs or ownership All information provided on this permit renewal application is to the best of my
knowledge correct and complete
Signature 4 dt/a -,' S[ ( 4r ram- Date
NOTARIZATION
I Sabrina B Babson
North Carolina
that Adnanna Edge Sidelinger
County of
Brunswick
a Notary Public for the State of
do hereby certify
personally appeared before me
this the 1fith day of September 20 21 and acknowledge the due
execution of the forgoing instrument Witness my hand and official seal
er Sf P 20 ?0?,
Stormwater Permit Renewal Application Form Page 3 of 3 May 11 2018
I
�J/ %�Dfo �t /1 Peel n0 1 3 Permit No SW 8 0&0 r5 `t E
/ r (to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
Thry form may be photocopied for use as an original
DWQ Stormwater Management Plan Review
A complete Stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details
I PROJECT INFORMATION
Project Name Plantation Sto
Contact Person Elizabeth Nelson Phone Number (910) 754-8029
For projects with multiple basins, specify which basin this worksheet applies to
elevations
Basin Bottom Elevation
2450
ft
(floor of the basin)
Permanent Pool Elevation
31 00
ft
(elevation of the orifice)
Temporary Pool Elevation
32 40
ft
(elevation of the discharge structure overflow)
areas
Permanent Pool Surface Area
18,584
sq ft
(water surface area at the orifice elevation)
Drainage Area
8-97
ac
(on -site and off -site drainage to the basin)
Impervious Area
7 10
ac
(on -site and off -vile drainage to the basin)
volumes
Permanent Pool Volume
69,989
cu ft
(combined volume of main basin and forebay)
Temporary Pool Volume
28,035
cu ft
(volume detained above the permanent pool)
Forebay Volume
14,787
cu ft
(approximately 20% of total volume)
Other parametery
SA/DAi 400 (surface area to drainage area ratio from DWQ table)
Diameter of Orifice 20 in (2 to 5 day temporary pool draw -down required)
Design Rainfall 1 0 in
Design TSS Removal 2 90 % (minimum 85% required)
Form SWU 102 Rev 3 99 Page I o1`4
9h�06 lee`aP re.r � 2
J_W L6 L160842
Footnotes
When using the Division SA/DA tables the correct SA/DA ratio for permanent pool sizing should be computed based upon the
actual impervious % and permanent pool depth Linear interpolation should be employed to determine the correct value for non
standard table entries
In the 20 coastal counties the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide
90% TSS removal The NCDENR BMP manual provides design tables for both 85%TSS removal and 90% TSS removal
II REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section 15 A NCAC 2H 1008
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below If a requirement has not been met, attach justification
Applicants Initials
a The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet)
b The forebay volume is approximately equal to 20% of the basin volume
ES c The temporary pool controls runoff from the design storm event
FSl-i d The temporary pool draws down in 2 to 5 days
B5� e if required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
calculations)
85 f The basin length to width ratio is greater than 3
g The basin side slopes above the permanent pool are no steeper than') 1
85 It A submerged and vegetated perimeter shelf with a slope of 6 1 or less (show detail)
gs(4 i Vegetative cover above the permanent pool elevation is specified
BSN j A trash rack or similar device is provided for both the overflow and orifice
BStf k A recorded drainage easement is provided for each basin including access to nearest right-of-
way
l If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified prior to use as a wet detention basin
—SH— in A mechanism is specified which will dram the basin for maintenance or an emergency
III WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided
This system (check one) 0 does 0 does not incorporate a vegetated filter at the outlet
This system (check one) 0 does 0 does not incorporate pretreatment other than a forebay
Form SWU 102 Rev 3 99 Page 2 of
S wg O6ad/�2
Maintenance activities shall be performed as follows
1 After every significant runoff producing rainfall event and at least monthly
a Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition
Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within
2 to 5 days as designed
2 Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed
Inspect and repair the collection system (i e catch basins, piping, swales, riprap, etc ) quarterly to maintain
proper functioning
4 Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below) Removed sediment shall be disposed of
in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i e
stockpiling near a wet detention basin or stream, etc )
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments
When the permanent pool depth reads 4 875 feet in the main pond, the sediment shall be removed
When the permanent pool depth reads 450 feet in the forebay, the sediment shall be removed
BASIN DIAGRAM
till in the blanks)
Permanent Pool Elevation 31 00
Sediment Re oval El 26 50 750%
� Sediment Removal Elevation 26 12� � 7S%
Bottom Ele atlon 25 00 12500
Bottom Elevation 24 50 25°//
•
FOREBAY MAIN POND
5 Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface These
plants shall be encouraged to grow along the vegetated shelf and forebay berm
6 If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency dram shall be minimized to the maximum extent practical
Form SWU 102 Rev 3 99 Page 3 of
7 All components of the wet detention basin system shall be maintained in good working order
I acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party
Print Name Jennings D
Title Managing Member - Edge Holdings, LLC
Address 8991 Ocean Highway West, Calabash, NC 28467
Phone (910)287-6414
Signature
Date
X
Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a
resident of the subdivision has been named the president , r /a
I, can «n_. �Sc1 , a Notary Public for the State of , OC O—Q(LS L L r o_
County of r-��rt.,r do hereby certify that, r\Q5 f -
personally appeared before me this day of a66and acknowledge the due
execution of the forgoing wet detention basin maintenance requirements Witness my hand and official seal,
AO uai-\C4
U
SEAL
My commission expires /() _ ':�7 —aeYA ?S
Form SWU-102 Rev 3 99 Page 4 of
Plantation Storage
Stormwater Permit No SW8 060842
Brunswick County
Designer s Certification
State Stormwatei Management Systems
Permit No SW8 060842
Page 1 of 2
I J Christian Russell as a duly registered Professional Engineer in the
Stale of North Carolina having been authorized to observe eno ica weekly/ full lime) the
construction of the protect,
Plantation Storage
(Project)
for Edge Holdings LLC (Project Owner) hereby stale that, to the best of
my abilities due care and diligence was used in the observation of the project construction such
that the construction was observed to be built within substantial compliance and intent of the
approved plans and specifications
The checklist of items on page 2 of this form is included in the Certification
Noted deviations from approved plans and specification
Registration Number 035054
Date 6-29 2020
Sri CAR
oe' Fs sr y
L
35054
g 29 202p
oy eNciNEE�
SEP 10 2021
BYE
Page 1 of 2
SmtP Stormwater Management Systems
Permit No SW8 060842
Page 2 of 2
Certification Requirements
J 1 The drainage area to the system contains approximately the permitted acreage
2 The drainage area to the system contains no more than the permitted amount of
built upon area
�L3 All the built upon area associated with the project is graded such that the runoff
drains to the system
4 All roof drains are located such that the runoff is directed into the system
�5 The outlet/bypass structure elevations are per the approved plan
J 6 The outlet structure is located per the approved plans
_,V_7 Trash rack is provided on the outlet/bypass structure
8 All slopes are grassed with permanent vegetation
9 Vegetated slopes are no steeper than 3 1
10 The inlets are located per the approved plans and do not cause short circuiting of
the system
11 The permitted amounts of surface area and/or volume have been provided
._12 Required drawdown devices are correctly sized per the approved plans
13 All required design depths are provided
14 All required parts of the system are provided such as a vegetated shelf and a
forebay
�L15 The required system dimensions are provided per the approved plans
cc NCDEQ DEMLR Regional Office
Brunswick County Engineering
eY SFID 4? ?0�,��
Page 2 of 2