Loading...
HomeMy WebLinkAboutSW8060842_CURRENT PERMIT_20211014STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SW8 000$L{2 DOC TYPE ® CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2021 lot4 YYYYMMDD ROY COOPER Ga rnor ELIZABETH S B►SER NORTH CAROLINA EnvWnmmla[ Quality October 14, 2021 Edge Holdings, LLC Arm Adnanna Edge Sidelmger Managing Member 1 Snead Court Shallotte NC 28470 Subject Permit Renewal State Stormwater Management Permit No SW8 060842 Plantation Storage Brunswick County Dear Ms Sidelinger The Wilmington Regional Office received a complete 8-year Stormwater Management Permit Renewal Application for the subject project on October 13, 2021 The Division is hereby notifying you that permit SW8 060842 has been renewed on October 14, 2021, and shall be effective until October 6, 2028 For your records please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application Please keep this permit on file at all tunes Please note that the renewed, updated, and re -issued permit does not impose new or different terms, it merely restates some of the previous terms to provide you with a better understanding of your obligations under the permit The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit The plans originally approved on October 6, 2006 and most recently modified on July 25, 2018, will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H 1000 This permit is subject to the conditions and limitations as specified therein Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable you have the tight to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH) The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714 or via telephone at 919-431-3000 or visit their website at www NCOAH corn Unless such demands are made this permit shall be final and binding If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym smith@ncdenr gov Sincerely, -f�- �.Qo� ckrl " Brian Wrenn Director Division of Energy, Mineral and Land Resources Enclosures Attachment C — Perimttuig History Renewal Application Documents DES/ams \\\Stonnwater\Permits & ProUects\2006\060842 HD\2021 10 permit 060842 cc Sabrma B Babson East Coast Engineering P C P O Box 2469 Shallotte NC 28459 Adrianna Edge Sidelmger Edge Holdings LLC P O Box 1499 Shallotte NC 28459 NCDEQ-DEMLR Wilmington Regional Office �tt North Carolina Department of Emmonmental Quality I Dmmm of Energy Mneral and Land Resources _ d wilmmgton Regional Office 1127 Cardmd Dme Extension I Wilnmngton North Carolina 28405 ern smr=mn.e� /�/ 910.7%7215 State Stormwater Management Systems Permit No SW8 060842 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143 General Statutes of North Carolina as amended and other applicable Laws Rules and Regulations PERMISSION IS HEREBY GRANTED TO Edge Holdings, LLC Plantation Storage Ocean Highway West, Brunswick County FOR THE construction operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the 'stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy Mineral and Land Resources (the Division or DEMLR ) and considered an enforceable part of this permit This permit shall be effective from the date of issuance until October 6 2028 and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 16 of this permit The stormwater control has been designed to handle the runoff from 309 134 square feet of impervious area 3 The tract will be limited to the amount of built -upon area indicated on page 2 of this permit and per approved plans The built -upon area for the future development is limited to 3 693 square feet and is included in the 309,134 square feet of impervious area draining to the wet detention pond 4 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements in accordance with the approved plans 5 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system Page 1 of 5 State Stormwater Management Systems Permit No SW8 060842 6 The following design criteria have been provided in the wet detention pond and must be maintained at design conditions a Drainage Area acres 887 Onsite ftZ 386 418 Offsite ftz None b Total Impervious Surfaces ft2 309 134 OS Bldgs ft' 62,498 OS Prkg/driveways ftZ 242 943 OS Future Development ftz 3 693 c Design Storm inches 1 0 d Pond Depth, feet 65 e TSS removal efficiency 90% f Permanent Pool Elevation FMSL 31 0 g Permanent Pool Surface Area ftZ 18 584 h Permitted Storage Volume ft' 28 035 1 Temporary Storage Elevation FMSL 324 f Controlling Orifice 2 0 0 pipe k Permitted Forebay Volume ft' 14 787 1 Receiving Stream/River Basin Shingletree Swamp / Lumber m Stream Index Number 15-23-2 n Classification of Water Body "C, Sw" II SCHEDULE OF COMPLIANCE 1 The protect and SCM(s) shall be constructed operated and maintained in accordance with the conditions of this permit and the approved plans and specifications 2 The stormwater management system shall be constructed in its entirety vegetated and operational for its intended use prior to the construction of any built -upon surface 3 During construction erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately If the stormwater system was used as an Erosion Control device it must be restored to design condition prior to operation as a stormwater treatment device and prior to occupancy of the facility 4 Decorative spray fountains are allowed in the pond subject to the following criteria a The minimum permanent pool volume is 30 000 cubic feet b The fountain must draw its water from less than 2 below the permanent pool surface c Separated units where the nozzle pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond d The fountain may not be placed into the forebay e The falling water from the fountain must be centered in the main pond away from the shoreline f The maximum horsepower for a fountain in this pond is 1/4 horsepower The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including but not limited to Semiannual scheduled inspections (every 6 months) Sediment removal Mowing and revegetation of slopes and the vegetated filter Immediate repair of eroded areas Maintenance of all slopes in accordance with approved plans and specifications Debris removal and unclogging of outlet structure orifice device flow spreader catch basins and piping Access to the outlet structure must be available at all times Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division The records will indicate the date activity name of person performing the work and what actions were taken Page 2 of 5 State Stormwater Management Systems Permit No SW8 060842 7 Upon completion of construction prior to issuance of a Certificate of Occupancy and prior to operation of this permitted facility a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit the approved plans and specifications and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 8 Access to the stormwater facilities shall be maintained via appropriate easements at all times 9 No person or entity including the permittee shall alter any component shown in the approved plans and specifications Prior to the construction of any modification to the approved plans the permittee shall submit to the Director and shall have received approval for modified plans specifications and calculations including but not limited to those listed below For changes to the project or SCM that impact the certifications a new or updated certification(s) as applicable will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification a Any modification to the approved plans and specifications, regardless of size including the SCM(s) BUA details etc b Redesign or addition to the approved amount of BUA or to the drainage area c Further development subdivision acquisition lease or sale of any all or part of the project and/or property area as reported in the approved plans and specifications d Altering modifying removing relocating redirecting regrading or resizing of any component of the approved SCM(s) the stormwater collection system and/or vegetative conveyance shown on the approved plan e The construction of any allocated future BUA f The construction of any permeable pavement #57 stone area public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications g Other modifications as determined by the Director 10 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made 11 Prior to transfer of the permit a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions Any items not in compliance must be repaired replaced restored or resolved prior to the transfer Records of maintenance activities performed to date may be requested III GENERAL CONDITIONS Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21 The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place as required by any statutes rules, regulations or ordinances which may be imposed by any other Local State or Federal government agency having jurisdiction Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215 1 and subject to enforcement procedures pursuant to NCGS 143-215 6 If the facilities fail to perform satisfactorily the permittee shall take immediate corrective actions This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems These additional or replacement measures shall receive a permit from the Division prior to construction Page 3 of 5 State Stormwater Management Systems Permit No SW8 060842 4 Permit Transfer This permit is not transferable to any person or entity except after notice to and approval by the Director The permittee shall submit a completed and signed Permit Transfer Application Form (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form to the Division at least 60 days prior to any one or more of the following events a The sale or conveyance of the protect area in whole or in part except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants b Dissolution of the partnership corporate or LLC entity subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08 c Bankruptcy d Foreclosure subject to the requirements of Session Law 2013-121 5 Current Permittee Name or Address Changes The permittee shall submit a completed Permit Information Update Application Form' (available on the Division website) to the Division within 30 days to making any one or more of the following changes a A name change of the current permittee b A name change of the protect c A mailing address change of the permittee 6 The permittee is responsible for compliance with all terms and conditions of this permit until the Division approves the transfer request Neither the sale of the protect in whole or in part nor the conveyance of common area to a third party constitutes an approved transfer of the permit 7 The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted protect 8 The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification transfer renewal or rescission however these actions do not stay any permit conditions 9 Approved plans application documents supplements calculations operation and maintenance agreement and specifications for this protect are incorporated by reference and are enforceable parts of the permit A copy of this permit application supplements operation and maintenance agreement and approved plans and specifications shall be maintained on file by the permittee 10 Unless specified elsewhere permanent seeding requirements for the on -site stormwater system must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 11 The issuance of this permit does not prohibit the Director from reopening and modifying the permit revoking and reissuing the permit or terminating the permit for cause as allowed by the laws rules and regulations contained in Title 15A NCAC 2H 1000 and NCGS 143-215 1 et al 12 A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit The renewal request must include the appropriate application documentation and the processing fee as outlined in Title 15A NCAC 02H 1045(3) Page 4 of 5 State Stormwater Management Systems Permit No SW8 060842 Permit renewed updated and reissued this the 14th day of October 2021 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION t� Brian— reran Director Division of Energy Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Attachment 1 Permitting History Plantation Storage Permit No SW8060842 Built -Upon Am (BUA) sf Approval Daze Permit Acuw io VerVersionlots peon of the Changes Buildings/ Parking Othef Future Total 10/62006 Original Approval 10 subject to 1995 rules 1 pond 48 000 43 512 101 864 115 658 309 134 2/62008 Plan Revision 1 1 addition of catch basins and a piped collections stem 48 000 43 612 101 864 115 658 309 134 7/25/2018 Minor Modification 12 unlizing future BUA for additional improvements to the site 62 498 242 943 0 3 693 309 134 10/14/2021 Renewal 20 Page 1 of 1 + DEMLR USE ONLY_ _ - - - -� Date Received Fee Paid Permit Number 11 la 13 2021 tvmkocici %506— *SW100 2 NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H 10450. the current permit holder shall renew their high density permit 180 days poor to its expiration Renewed permits are valid for a penod of 8 years per Session Law 2011 398 (SB 781) Section 60 (c) This application form is for permit renewals only A PROJECT INFORMATION 1 2 3 4 State Stonmwater Permit Number SW8 060842 Protect name Plantation Storage Protect street address 9019 Ocean Hwy West City Calabash County What if any changes have been made to the protect as permitted) Brunswick ZIP 28467 None If the project has changed from the ongmal approved plans, please complete SWU-101 for a Ma/or Modification or Minor Modification Application form available at hags.//deg nc govlabouttdivisions/enerav- mmeral-land-resources/enemy-mineral-land-ruleststormwater-omommloostconstruction B PERMITTEE INFORMATION If changes to the permittee or project name have been made please complete either the Permit Update form or the Permit Transfer form available at httpsl/deg nc.aov/aboutfdmsions/energy-mineral-land resources/energy-mineral-land-rules/stomlwater-orogramfoostconstruction State Stormwater Permits do not automatically transfer with the sale of the property 1 Current Permit Holder's Company Name/Organization Edge Holdings LLC 2 Signing Officials Name Adrianna Edge Sidelinger 3 Signing Official s Title Managing Member 4 Mailing Address 1 Snead Court City Shallotte State NC ZIP 281 X 28470 5 Street Address 9019 Ocean Hwy West City Calabash State NC ZIP 98413j 6 Phone ( 919 ) 949-4111 Email edge gary@gmail com �IIVE OCT 13 2010 1 EY_ Stormwater Permit Renewal Form Page 1 of 3 May 11 2018 C SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2 USMP Non -Coastal HQW/ORW) Only applications packages that Include all required items listed below will be accepted and reviewed Initial each item below to indicate that the required information is provided in the application package 1 A permit application processing fee of $505 00 payable to NCDEQ 2 One original signed hard copy and one electronic copy of this completed form The signing official named on this application to represent the current permittee must meet one of the following a Corporation — a principle executive officer of at least the level of vice-president b Limited Liability Company (LLC) — a manager or company official as those terms are defined in G S 57D North Carolina Limited Liability Company Act c Public Entity — a principal executive officer ranking official or other duly authorized employee d Partnership or limited partnership — the general partner e Sole proprietor or f Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity 3 One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR including deed restrictions protective covenants condominium/planned community declaration and easements If the project has been built include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded If the project has not been built include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date ,o�� 4 O�fv1 Agreements Please select one ;Vj I have a copy of the current recorded O&M Agreement for all SCMs and I will continue to keep this on file with the permit or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent tome I agree to keep this on file with the permit C� 5 Designer Certifications Please select one �( A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed or ❑ The project has not yet been built ,QJ/A 6 [IF APPLICABLE] If the project has been built one original hard copy and one electronic copy of a signed sealed and dated letter from a licensed professional stating that the SCMs have been inspected and that they have been built and maintained in accordance with the permit 4 � 7 [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC) Provide one hard copy and one electronic copy of documentation from the NC Secretary of State or other official documentation which supports the titles and positions held by the persons listed in Section C 2 per 15A NCAC 2H 1043(3)(b) httos //www sosnc gov/online services/search/by title/ Business Registration =;L0=g V SEP 2 0 202, BY_ Stormwater Permit Renewal Application Form Page 2 of 3 May 11 2018 D PERMITTEE'S CERTIFICATION Adrianna Edge Sidelinger the person legally responsible for the permit certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site) that I am responsible for the performance of the maintenance procedures and the site has been and will be maintained according to the O&M Agreement and approved plans I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project SCMs or ownership All information provided on this permit renewal application is to the best of my knowledge correct and complete Signature 4 dt/a -,' S[ ( 4r ram- Date NOTARIZATION I Sabrina B Babson North Carolina that Adnanna Edge Sidelinger County of Brunswick a Notary Public for the State of do hereby certify personally appeared before me this the 1fith day of September 20 21 and acknowledge the due execution of the forgoing instrument Witness my hand and official seal er Sf P 20 ?0?, Stormwater Permit Renewal Application Form Page 3 of 3 May 11 2018 I �J/ %�Dfo �t /1 Peel n0 1 3 Permit No SW 8 0&0 r5 `t E / r (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT Thry form may be photocopied for use as an original DWQ Stormwater Management Plan Review A complete Stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details I PROJECT INFORMATION Project Name Plantation Sto Contact Person Elizabeth Nelson Phone Number (910) 754-8029 For projects with multiple basins, specify which basin this worksheet applies to elevations Basin Bottom Elevation 2450 ft (floor of the basin) Permanent Pool Elevation 31 00 ft (elevation of the orifice) Temporary Pool Elevation 32 40 ft (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 18,584 sq ft (water surface area at the orifice elevation) Drainage Area 8-97 ac (on -site and off -site drainage to the basin) Impervious Area 7 10 ac (on -site and off -vile drainage to the basin) volumes Permanent Pool Volume 69,989 cu ft (combined volume of main basin and forebay) Temporary Pool Volume 28,035 cu ft (volume detained above the permanent pool) Forebay Volume 14,787 cu ft (approximately 20% of total volume) Other parametery SA/DAi 400 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 20 in (2 to 5 day temporary pool draw -down required) Design Rainfall 1 0 in Design TSS Removal 2 90 % (minimum 85% required) Form SWU 102 Rev 3 99 Page I o1`4 9h�06 lee`aP re.r � 2 J_W L6 L160842 Footnotes When using the Division SA/DA tables the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth Linear interpolation should be employed to determine the correct value for non standard table entries In the 20 coastal counties the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal The NCDENR BMP manual provides design tables for both 85%TSS removal and 90% TSS removal II REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below If a requirement has not been met, attach justification Applicants Initials a The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet) b The forebay volume is approximately equal to 20% of the basin volume ES c The temporary pool controls runoff from the design storm event FSl-i d The temporary pool draws down in 2 to 5 days B5� e if required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) 85 f The basin length to width ratio is greater than 3 g The basin side slopes above the permanent pool are no steeper than') 1 85 It A submerged and vegetated perimeter shelf with a slope of 6 1 or less (show detail) gs(4 i Vegetative cover above the permanent pool elevation is specified BSN j A trash rack or similar device is provided for both the overflow and orifice BStf k A recorded drainage easement is provided for each basin including access to nearest right-of- way l If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin —SH— in A mechanism is specified which will dram the basin for maintenance or an emergency III WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided This system (check one) 0 does 0 does not incorporate a vegetated filter at the outlet This system (check one) 0 does 0 does not incorporate pretreatment other than a forebay Form SWU 102 Rev 3 99 Page 2 of S wg O6ad/�2 Maintenance activities shall be performed as follows 1 After every significant runoff producing rainfall event and at least monthly a Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed 2 Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed Inspect and repair the collection system (i e catch basins, piping, swales, riprap, etc ) quarterly to maintain proper functioning 4 Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below) Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i e stockpiling near a wet detention basin or stream, etc ) The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the permanent pool depth reads 4 875 feet in the main pond, the sediment shall be removed When the permanent pool depth reads 450 feet in the forebay, the sediment shall be removed BASIN DIAGRAM till in the blanks) Permanent Pool Elevation 31 00 Sediment Re oval El 26 50 750% � Sediment Removal Elevation 26 12� � 7S% Bottom Ele atlon 25 00 12500 Bottom Elevation 24 50 25°// • FOREBAY MAIN POND 5 Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface These plants shall be encouraged to grow along the vegetated shelf and forebay berm 6 If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency dram shall be minimized to the maximum extent practical Form SWU 102 Rev 3 99 Page 3 of 7 All components of the wet detention basin system shall be maintained in good working order I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Print Name Jennings D Title Managing Member - Edge Holdings, LLC Address 8991 Ocean Highway West, Calabash, NC 28467 Phone (910)287-6414 Signature Date X Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president , r /a I, can «n_. �Sc1 , a Notary Public for the State of , OC O—Q(LS L L r o_ County of r-��rt.,r do hereby certify that, r\Q5 f - personally appeared before me this day of a66and acknowledge the due execution of the forgoing wet detention basin maintenance requirements Witness my hand and official seal, AO uai-\C4 U SEAL My commission expires /() _ ':�7 —aeYA ?S Form SWU-102 Rev 3 99 Page 4 of Plantation Storage Stormwater Permit No SW8 060842 Brunswick County Designer s Certification State Stormwatei Management Systems Permit No SW8 060842 Page 1 of 2 I J Christian Russell as a duly registered Professional Engineer in the Stale of North Carolina having been authorized to observe eno ica weekly/ full lime) the construction of the protect, Plantation Storage (Project) for Edge Holdings LLC (Project Owner) hereby stale that, to the best of my abilities due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included in the Certification Noted deviations from approved plans and specification Registration Number 035054 Date 6-29 2020 Sri CAR oe' Fs sr y L 35054 g 29 202p oy eNciNEE� SEP 10 2021 BYE Page 1 of 2 SmtP Stormwater Management Systems Permit No SW8 060842 Page 2 of 2 Certification Requirements J 1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built upon area �L3 All the built upon area associated with the project is graded such that the runoff drains to the system 4 All roof drains are located such that the runoff is directed into the system �5 The outlet/bypass structure elevations are per the approved plan J 6 The outlet structure is located per the approved plans _,V_7 Trash rack is provided on the outlet/bypass structure 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 10 The inlets are located per the approved plans and do not cause short circuiting of the system 11 The permitted amounts of surface area and/or volume have been provided ._12 Required drawdown devices are correctly sized per the approved plans 13 All required design depths are provided 14 All required parts of the system are provided such as a vegetated shelf and a forebay �L15 The required system dimensions are provided per the approved plans cc NCDEQ DEMLR Regional Office Brunswick County Engineering eY SFID 4? ?0�,�� Page 2 of 2