Loading...
HomeMy WebLinkAboutSW8060338_HISTORICAL FILE_20090330STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SW8 MD033g DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2_00c5 03')O YYYYMMDD 4 NCDENRt North Carolina Department of Environment and Natural Resources �\ Beverly Eaves Perdue Governor March 30, 2009 Mr Sheldon Tucker, Manager Ocean Isle Palms, LLC 131 Ocean Blvd West Holden Beach, NC 28462 Division of Water Quality Colleen H Sullins Director Subject Stormwater Permit No SW8 060338 MOD Ocean Isle Palms Phase 1 High Density Subdivision Project Brunswick County Dear Mr Tucker ro Dee Freeman Secretary The Wilmington Regional Office received a modified Stormwater Management Permit application for Ocean Isle Palms Phase 1 on March 30, 2009 Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H 1000 We are forwarding Permit No SW8 060338 MOD, dated March 30, 2009, for the construction of the project, Ocean Isle Palms Phase 1 This permit shall be effective from the date of issuance until November 29, 2017, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adludicatory hearing upon written request within thirty (30) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P O Drawer 27447, Raleigh, NC 27611-7447 Unless such demands are made this permit shall be final and binding Please replace sheets SW-3 and C-13 from the plan set approved on November 29, 2007, with new ones, attached If you have any questions, or need additional information concerning this matter, please contact Linda Lewis or me at (910) 796-7215 Sincerely, eorgett Scott Stormwater Supervisor Division of Water Quality GDS/arl S \WQS\STORMWATER\PERMIT\060338MOD mar09 cc Perry Davis, P E , Cape Fear Engineering Ocean Isle Beach Building Inspections Jeff Phillips, Brunswick County Engineering Wilmington Regional Office Linda Lewis Central Files Wilmington Regional Office 127 Cardinal Drive Extension Wilmington North Carolina 28405 One Phone 910 796 7215 1 FAX 910 350 2004 \ Customer Service 1-877-623-6748 NorthCarolma Internet w ncwaterqualltyorg atura!!ff An Equal Opportunity 1 Aftinnative Action Employer State Stormwater Management Systems Permit No SW8 060338MOD STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Sheldon Tucker & Ocean Isle Palms, LLC Ocean Isle Palms Phase 1 1338 Ocean Isle Beach Road, Ocean Isle Beach, Brunswick County FOR THE construction, operation and maintenance of three (3) wet detention pond(s) in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until November 29, 2017 and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater 2 \F3 runoff as described in Section 16 on page 3 of this permit The subdivision is permitted for 230 lots, each allowed a maximum of 6,000 square feet of built - upon area The Amenity Center and Canoe and Kayak Club are limited to a maximum of 93,654 square feet and 2,614 square feet, respectively, of built -upon area 3 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 4 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system Each of the ponds is designed for 90% TSS removal, therefore, no vegetated filter is required Page 2 of 9 State Stormwater Management Systems " Permit No SW8 060338MOD 6 The following design elements have been permitted for the wet detention ponds 12, 14 and 21, and must be provided in the system at all times Design Criteria Pond #12 Pond #14 Pond #21 a Drainage Area acres Onsite ftZ Offsite, ftZ 2482 1 081 159 0 51 27 2,233 321 0 21 16 921 730 0 b Total Impervious Surfaces, ft (#)Lots at 6,000 ftZ per lot Roads/Parking ftZ Sidewalks ftZ Alleyways, ftZ Canoe & Kayak Club Amenity Center ftZ 545,930 (74)444 000 95,396 871 3 049 2,614 0 1 127,188 (121)726 000 279,220 0 121 968 0 0 483,992 (35)210 000 158,558 0 21 780 0 93 654 c Pond Depth, ft Average Pond Depth, ft 60 50 13 0 70 14 0 (max) 55 d TSS removal efficient % 90 90 90 e Design Storm, inches 1 1 1 f Permanent Pool Elev FMSL 3600 800 600 Perm Pool Surface Area, ft 95,110 1 50,491 50,795 h Permitted Storage Volume ft 204 215 108,618 63 553 i Temporary Storage Elev, , FMSL 3800 990 7 10 Controlling Onfice, D i e 3 4 3 k Permanent Pool Volume ft 484 740 359 604 280,903 1 Permitted Forebay Volume ft 45 512 59 124 62,416 m Maximum Fountain Horsepower 2 1 1 n Receiving Stream/River Basin UT to Jenny's Branch / Lumber o Stream Index Number 15-25-2-16-1-(1) Classification of Water Body C Sw II SCHEDULE OF COMPLIANCE No person or other legal entity shall alter the approved stormwater management system or fill in, alter or pipe any drainage feature, including swales, shown on the approved plans as part of the stormwater management system, unless and until the permittee submits a modification to the permit and receives approval from the Division 2 The permittee is responsible for verifying that the proposed built -upon area on each individual lot, and for the entire project, does not exceed the maximum allowed by this permit The maximum built -upon area assigned to each lot via this permit and the recorded deed restrictions may not be increased or decreased by or with the knowledge of, either the lot owner or the permittee, unless and until the permittee notifies the Division and obtains written approval from the Division At a minimum, this will require an amendment to the recorded deed restrictions, and may also require a permit modification 4 If the permittee establishes an Architectural Review Board or Committee to review plans for compliance with the Covenants and Restrictions, including the lot BUA limit, the plans reviewed must include all proposed built -upon area on that lot Any approval given by the Board on behalf of the permittee does not relieve the permittee of the responsibility to maintain compliance with the overall permitted built -upon area for the project, nor does it relieve the individual lot owner of the responsibility to maintain compliance with the BUA limit assigned to that lot via the recorded deed restrictions Page 3 of 9 State Stormwater Management Systems Permit No SW8 060338MOD 5 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made 6 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below Any revision to the approved plans, regardless of size Project name change Transfer of ownership Redesign or addition to the approved amount of built -upon area Further subdivision, acquisition, or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 8 The Director may determine that other revisions to the project should require a modification to the permit 9 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 10 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 11 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification 12 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 13 Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual Page 4 of 9 State Stormwater Management Systems Permit No SW8 060338MOD 14 The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and re -vegetation of side slopes d Immediate repair of eroded areas e Maintenance of side slopes in accordance with approved plans and specifications f Debris removal and unclogging of structures, orifice, catch basins and piping g Access to all components of the system must be available at all times 15 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 16 This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 17 Prior to the sale of any lot, the following deed restrictions must be recorded a The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 060338MOD, as issued by the Division of Water Quality under NCAC 2H 1000 b The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit c These covenants are to run with the land and be binding on all persons and parties claiming under them d The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality e Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality f The maximum built -upon area per lot is 6,000 square feet This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools g All runoff on the lot must drain into the permitted system This may be accomplished through providing roof dram gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street Lots that will naturally drain into the system are not required to provide these measures h Built -upon area in excess of the permitted amount will require a permit modification 18 A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds Page 5 of 9 State Stormwater Management Systems Permit No SW8 060338MOD 19 Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel The facility must be in compliance with all permit conditions Any items not in compliance must be repaired or replaced to design condition prior to the transfer Records of maintenance activities performed to date will be required 20 Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria a The fountain must draw its water from less than 2' below the permanent pool surface b Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond c The falling water from the fountain must be centered in the pond, away from the shoreline d The maximum horsepower for the fountain's pump is based on the permanent pool volume The maximum pump power for a fountain in Pond #12, 14, and 21 is 2 HP, 1 HP, and 1 HP, respectively III GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a completed "Name/Ownership Change Form" must be submitted to the Division of Water Quality, signed by the parties involved, along with the applicable documents as listed on page 2 of the form The project must be in good standing with DWQ The approval of this request will be considered on its merits and may or may not be approved 2 The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request 3 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 4 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction 5 In the event that the facilities fad to perform satisfactorily, including but not limited to, the creation of nuisance conditions and failing to draw down within 2-5 days, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition 7 Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours 8 The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes Page 6 of 9 State Stormwater Management Systems Permit No SW8 060338MOD 9 The permittee shall submit a permit renewal application to the Division at least 180 days prior to the expiration date of this permit The renewal application will include the processing fee and other documentation as required 10 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction Permit modified and reissued this the 30th day of March 2009 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION By Authority of the Environmental Management Commission Permit Number SW8 060338MOD Page 7 of 9 State Stormwater Management Systems Permit No SW8 060338MOD Ocean Isle Palms Phase 1 Page 1 of 2 Stormwater Permit No SW8 060338MOD Brunswick Countv Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Protect) for (Protect Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the protect construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is a part of this Certification Noted deviations from approved plans and specifications Signature Registration Number Date SEAL Page 8 of 9 State Stormwater Management Systems Permit No SW8 060338MOD Certification Requirements Page 2 of 2 1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the project is graded such that the runoff drains to the system 4 All roof drains are located such that the runoff is directed into the system 5 The outlet/bypass structure elevations are per the approved plan 6 The outlet structure is located per the approved plans 7 Trash rack is provided on the outlet/bypass structure 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 10 The inlets are located per the approved plans and do not cause short- circuiting of the system 11 The permitted amounts of surface area and/or volume have been provided 12 Required drawdown devices are correctly sized per the approved plans 13 All required design depths are provided 14 All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter 15 The required dimensions of the system are provided, per the approved plan cc NCDENR-DWQ Regional Office Brunswick County Budding Inspections Page 9 of 9 State Stormwater Management Systems Permit No SW8 060338MOD STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Sheldon Tucker & Ocean Isle Palms, LLC Ocean Isle Palms Phase 1 1338 Ocean Isle Beach Road, Ocean Isle Beach, Brunswick County FOR THE construction, operation and maintenance of three (3) wet detention pond(s) in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until November 29, 2017 and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data This stormwater system has been approved for the management of stormwater runoff as described in Section 16 on page 3 of this permit The subdivision is �011 permitted for 230 lots, each allowed a maximum of 6,000 square feet of built- 4 upon area The Amenity Center and Canoe and Kayak Club are limited to a a maximum of 93,654 square feet and 2,614 square feet, respectively, of built-uponoo� area Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 4 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system 5 Each of the ponds is designed for 90% TSS removal, therefore, no vegetated filter is required Page 2 of 9 State Stormwater Management Systems Permit No SW8 060338MOD 6 The following design elements have been permitted for the wet detention ponds 12, 14 and 21, and must be provided in the system at all times 6 Design Criteria Pond #12 Pond #14 Pond #21 a Drainage Area, acres 2482 51 27 21 16 Onsite, ft2 1,081159 2-233,321 ft2 0 0� 0921,730�—,��Offsde, b Total Impervious Surfaces ft2 (-545 930 i1,127,188 _' 83,992� (#)Lots at 6,000 ft2 per lot (74)444,000 (121)726,000 (35)210,000 Roads/Parking ft2 95 396 279,220 158 558 Sidewalks, ft2 871 0 0 Alleyways, ft2 3,049 121 968 21,780 Canoe & Kayak Club 2,614 0 Amenity Center, ft2 0 q CUAeo 93,654 c Pond Depth ft 60 130 14 0 (max) Average Pond Depth, ft 50 70 55 d TSS removal efficiency, % 90 90 90 e Design Storm, inches 1 1 1 f Permanent Pool Elev FMSL 3600 800 600 - Perm Pool Surface Area, ft 95 110 50 491 50,795 h Permitted Storage Volume ft 204 215 108,618 63 553 i Temporary Storage Elev , FMSL 3800 990 710 Controlling Orifice, "Op'e 3 4 3 k Permanent Pool Volume, ft 484,740 359,604 1280 903 1 Permitted Forebay Volume, ftJ 45,512 59,124 1 62,416 m Maximum Fountain Horsepower 2 1 1 1 n Receiving Stream/River Basin UT to Jinny's Branch / Lumber o Stream Index Number 15-25-2-16-1-(1) Classification of Water Body C Sw II SCHEDULE OF COMPLIANCE No person or other legal entity shall alter the approved stormwater management system or fill in, alter or pipe any drainage feature, Including swales, shown on the approved plans as part of the stormwater management system, unless and until the permittee submits a modification to the permit and receives approval from the Division 2 The permittee is responsible for verifying that the proposed built -upon area on each Individual lot, and for the entire project, does not exceed the maximum allowed by this permit 3 The maximum built -upon area assigned to each lot via this permit and the recorded deed restrictions may not be Increased or decreased by or with the knowledge of, either the lot owner or the permittee, unless and until the permittee notifies the Division and obtains written approval from the Division At a minimum, this will require an amendment to the recorded deed restrictions, and may also require a permit modification 4 If the permittee establishes an Architectural Review Board or Committee to review plans for compliance with the Covenants and Restrictions, including the lot BUA limit, the plans reviewed must include all proposed built -upon area on that lot Any approval given by the Board on behalf of the permittee does not relieve the permittee of the responsibility to maintain compliance with the overall permitted built -upon area for the project, nor does it relieve the individual lot owner of the responsibility to maintain compliance with the BUA limit assigned to that lot via the recorded deed restrictions Page 3 of 9 State Stormwater Management Systems Permit No SW8 060338MOD 5 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made 6 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 7 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to the approved plans, regardless of size b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area e Further subdivision, acquisition, or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 8 The Director may determine that other revisions to the project should require a modification to the permit 9 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 10 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 11 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification 12 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 13 Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual Page 4 of 9 State Stormwater Management Systems Permit No SW8 060338MOD 14 The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and re -vegetation of side slopes d Immediate repair of eroded areas e Maintenance of side slopes in accordance with approved plans and specifications f Debris removal and unclogging of structures, orifice, catch basins and piping g Access to all components of the system must be available at all times 15 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 16 This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 17 Prior to the sale of any lot, the following deed restrictions must be recorded a The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 060338MOD, as issued by the Division of Water Quality under NCAC 2H 1000 b The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit c These covenants are to run with the land and be binding on all persons and parties claiming under them d The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality e Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality f The maximum built -upon area per lot is 6,000 square feet This allotted �w a amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line Act, and the edge of the pavement Built upon area includes, but is not limited (No° to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools g All runoff on the lot must dram into the permitted system This may be accomplished through providing roof drain gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street Lots that will naturally drain into the system are not required to provide these measures h Built -upon area in excess of the permitted amount will require a permit modification 18 A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds Page 5 of 9 State Stormwater Management Systems Permit No SW8 060338MOD 19 Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel The facility must be in compliance with all permit conditions Any items not in compliance must be repaired or replaced to design condition prior to the transfer Records of maintenance activities performed to date will be required 20 Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria a The fountain must draw its water from less than 2' below the permanent pool surface b Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond c The falling water from the fountain must be centered in the pond, away from the shoreline d The maximum horsepower for the fountain's pump is based on the permanent pool volume The maximum pump power for a fountain in Pond #12, 14, and 21 is 2 HP, 1 HP, and 1 HP, respectively III GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a completed "Name/Ownership Change Form" must be submitted to the Division of Water Quality, signed by the parties involved, along with the applicable documents as listed on page 2 of the form The project must be in good standing with DWQ The approval of this request will be considered on its merits and may or may not be approved 2 The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 4 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction In the event that the facilities fad to perform satisfactorily, including but not limited to, the creation of nuisance conditions and failing to draw down within 2-5 days, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition 7 Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours 8 The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes Page 6 of 9 State Stormwater Management Systems Permit No SW8 060338MOD The permittee shall submit a permit renewal application to the Division at least 180 days prior to the expiration date of this permit The renewal application will include the processing fee and other documentation as required 10 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction Permit modified and reissued this the 30th day of March 2009 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 060338MOD Page 7 of 9 I Is �pE WATg Michael F Easley Governor `p G WdhamG Ross Jr Sammy Co r Nosh Carolina Department of Environment and Natural Resources ,I p Colan H Sulhro Director Division of Water Quality WATER QUALITY SECTION COASTAL STORMWATER PERMIT NAME/OWNERSHIP CHANGE FORM I CURRENT PERMIT INFORMATION 1 Stormwater Management Permit Number Sw8 060338 2 Permit Holder's Name Ocean Isle Palms, Inc 3 Signing official's Name Sheldon Tucker Title Secretary (person legally responsible for penna) 4 Mailing Address 131 ocean Blvd west City Holden Beach State NC Zip 28462 Phone (910) 612-4899 Fax ( 1 II NEW OWNER / PROJECT / ADDRESS INFORMATION t This request is for (please check all that apply) x a Change in ownership of the property/company (Please complete Items #2, #3, and #4 below) b Name change of project (Please complete Item #5 below) c Mailing address change (Please complete Item #4 below) d Other (please explain) 2 New owner's name to be put on permit ocean Isle Palms, LLC 3 New owners signing official's name and title Sheldon Tucker Title Manager 4 New Mailing Address 131 ocean Blvd west City Holden Beach State NC Zip 28462 Phone (910) 612-4899 Fax ( ) __ 5 New Project Name to be placed on permit _ Ownership/Name Change 060608 Page 1 Of 3 PERMIT NAME/OWNERSHIP CHANGE FORM THIS APPLICATION PACKAGE WILL NOT BE ACCEPTED BY THE DIVISION OF WATER QUALITY UNLESS ALL OF THE APPLICABLE ITEMS LISTED BELOW ARE INCLUDED WITH THE SUBMITTAL REQUIRED ITEMS This completed form Legal documentation of the transfer of ownership A copy of the recorded deed restrictions, if required by the permit The designer's certification, if required by the permit A signed Operation and Maintenance plan, if a system that requires maintenance will change ownership Maintenance records CERTIFICATION MUST BE COMPLETED AND SIGNED BY BOTH THE CURRENT PERMIT HOLDER AND TNEISEW APPLICANT IN THE CASE OF A CWME OF OWNERSHIP FOR NAME CHANGES, COMPLETE AND SIGN ONLY THE CURRENT PERMITTEE'S CERTIFICATION Current Permittee's Certification 1, Sheldon Tucker attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete�/ Signaturev ,% L /yam Date New Applicant's Certification (Must be completed for all transfers of ownership) I, Sheldon Tucker attest that this application for an ownership change has been reviewed and is accurate and complete to the best of my knowledge I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incom e / d Signature /% Date �� Dv Mall the entire package to NCDENR Division of Water Quality Surface Water Protection Section — Stormwater at the Appropriate Contact Address (see the following page) PwnershipfName Change-060608 Page 2 of 3 3/3!/67 Gecr92��e ; � I YGG�c�inG� 6wor5 �13 4. Pc d 2 7 7¢ lo¢s x & q-¢¢ coo , hkf 04 /y 4¢3/ r%7 was r���. kb. l i 2cier, 72� axe, IaW � '72lo l 4S col 2c. �No4 Ok-)r-7yd;�LPrn� ►� 4-4 - P 01 t TRANSACTION REPORT MAR-31-2009 TUE 02-39 PM t X � FOR; NCDENR 910 350 2004 SEND DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP w t MAR-31 02,37 PM 93831045 1'32" 10 FAX TX OK 343 t TOTAL ' 1M 32S PAGES 10 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date - 31—� No Pages (excl cover) Qj Express Permitting To _ Z From Sandra Exum Co Phone (910) 796-7265 Fax �,�C3,� 1ra�� J Fax (910) 350-2004 Re Hard copy to follow 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunely AffirmaAve Aotton Employer CAPE FEAR Engineering, Inc. March 5, 2009 Linda Lewis Environmental Engineer 111 North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 RE Ocean Isle Palms — Phase IA & IB Brunswick County DWQ Stormwater Permit Number SW8 060338 Plan Revision / Request for Additional Information Ms Lewis, MAR 0 9 2009 By We are submitting a Plan Revision to the above stormwater permit The intention of this plan revision is to remove the clay liners from the approved pond details This plan revision was originally submitted to you on April 30, 2008 and subsequently you issued a Request for Additional Information for this plan revision on July 31, 2008 A copy of your July 31, 2008 request has been included with this submittal We are aware that the deadline for responding to this request has elapsed, however, we felt it was pertinent to include this information in order to provide some background on the proposed plan revision Since the initial submittal of this plan revision, Cape Fear Engineering has successfully been able to remove a number of clay liners from ponds in other projects by demonstration that the influence of the SHWT is negligible and does not compromise the ponds functioning The same engineering procedure has been applied to this project and it too shows that removal of the clay liners does not compromise the functioning of the ponds The complete Engineer's Report that describes and details this procedure has been included with this submittal Additionally, revised plan sheets Phase IA C-13 and Phase 113 SW-3 have been included in this submittal Please replace the previously approved plan sheets upon approval of this plan revision I trust that this information is sufficient to issue this plan revision for the subject stormwater permit, however, if you have any questions or need any additional information please do not hesitate to contact me Respectfully, Matthew Haley, E I 151 Poole Road 5uite 100 • 6elvi11e,NC243451 • ?EL (910)363-1044 • FAX (910)363 1045 wwwcapefearengineering cam CAPE FEAR Engineering, Inc. 151 Poole Road SuAe 1 W BeMlle NC 28C5/ TEL (8/0)388-10 FAX (810) 383�IN5 www capefearenglneermg com To NC DWQ Surface Water Protection State Stormwater Section 127 Cardinal Drive Ext Wilmington, NC 28405 Attn Linda Lewis ZOO MAR D 9 2009 Transmittal Date March 9, 2009 File 809-02 "36" Subject Ocean Isle Palms Phase 1A & 1B (SW8 060338) Plan Revision — Removal of Clay Liners ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Mail ❑ Sent via Courier Quantity Drawing No Description 1 Original Cover Letter 1 Copy Request for Additional Information Letter 1 Copy Engineer's Report (Including Figures and FEMA FIRM Panels) 3 Copy Revised Plan Sheets Phase 1A C-13 and Phase I SW-3 InJWV7ft5 MAR 09 2009 BY REMARKS Please find the requested information regarding the plan revision to remove the previously permitted clay liners If you have any questions or need any additional information please contact me directly Thanks CC File 809-02 "36" Cape Fear Engineering, In Signed WLS Matthew Haley EV Received By Date P \809\809 02\Wdinin\ST0RM WTR\Trans Linda Lewis 3 9 09 doe RECVVE MAY 0 B Z669 Stormwater Desi arrative & Calcu For Ocean Isle Palms Phase 1 Modification May 2009 OCEAN ISLE PALMS Brunswick County, North Carolina CAPE FEAR Engineering, Inc. 151 Pole Rwd Surte 100 BeMW NC 28451 TEL (910) W8 10 W (910) 8 10 www capefeareng/neering com MAY 0 8 g00g DESIGN NARRATIVE General: The Ocean Isle Palms project is located off Ocean Isle Beach Road (SR 1184), approximately'/< mile south of the intersection of Ocean Isle Beach Road and Georgetown Road (SR 1163) within Brunswick County, North Carolina Ocean Isle Palms Phase IA and 1B is a high density development and consists of approximately 114 45 acres A stormwater permit was issued for Ocean Isle Palms Phase 1 as SW8 060338MOD on 11/29/07 A plan revision to remove the clay liners from Ponds 14 and 21 was issued on 4/2/09 As requested, the total impervious area allocation for each pond has been reviewed and revised to reflect the current plan Revised applications and calculations have been provided The current proposal consists of increasing the size of the drainage area associated with Pond 21 The pond configuration has been modified to remove the previously permitted onfice, which has been replaced with an outlet structure — Proposed improvements within this phase of development include streets, parking, sidewalks, drainage improvements, residential lots, and amenities Pond 21 is currently designed to treat stormwater runoff from 43 5 single family home sites and an amenity center The modified Pond 21 is designed for 90% TSS removal and has been sized to attenuate the peak discharge for the 1-year and 10-year 24-hour storm events Existing Site: The project site is the location a former golf course and is primarily wooded with some open space Soils onsite are comprised primarily HSG C and D soils according to the Brunswick County Soil Survey Site topography in the area is relatively flat with slopes typically less than four percent, but exceeding four percent in small areas adjacent to the wetlands and Jinnys Branch (C Sw, HQW, 15-25-2-16-1-(1 5)) The general gradient is from north to south toward Jinnys Branch Vegetation consists primarily of thick underbrush and grasses with mature pines and hardwoods in the wooded areas Wetlands have been delineated and this delineation is reflected on the site plans The USACE field verified the delineation and a map has been submitted for signature Proposed Improvements: Proposed improvements include drainage devices, streets, and utilities Drainage for the most part will sheet flow from the homesrtes into the streets The typical road section will employee curb and gutter to direct drainage to low points in the roads Drainage from the low points will flow into pipe network system, which will discharge into Amenity Pond 22 The outflow from Amenity Pond 22 will flow into the pipe network system that eventually discharges to Pond 21 Drainage Considerations: xUlfC MAY 0 8 P009 BY All impervious drainage from the project site will be captured in an engineered system of curbed and guttered streets with piped systems or curb outlets that will convey stormwater to the wet detention pond Erosion Control Considerations: Silt fence, wire and gravel inlet protection and inlet sumps will be employed to retain all sediment on -site Maintenance Considerations: During construction, the Contractor shall be required to inspect and repair as needed all erosion control devices after any significant ram event Any measure found not performing its intended function, shall be repaired immediately Upon completion of construction the establishment of permanent ground cover will be a priority DRAINAGE AREA (Ad) _ IMPERVIOUS AREA (A0 WET DETENTION BASIN DATA SHEET OCEAN ISLE PALMS PHASE I A POND #12 24 82 ACRES ✓�� (09.5 REC i ,�-- MAY 0 S 2009 BY = BUILDINGS 10 19 ACRES = >'LOTS @ 0000 SF/LOT ROADS 2 19 ACRES (+ FUToKe SIDEWALKS 0 02 ACRES ToTnt y 3) 87-7 SF C*K CLUB 0 OG ACRES Q CONTINGENCY 0 07 ACRES ALLEY WAYS 51�I� TOTAL 12 53 ACRES,/ PERCENT IMPERVIOUS (1) I = Ad/Ai = 50 47% POND # 12 SHALL BE 0' DEEP WITH AN AVG DEPTH Of 5' AND DESIGNED TO REMOVE 30% T55 5A/DA= 3 54% 1 REQUIRED SURFACE AREA AT PERMANENT POOL SAREQ = 0 8778834 AC = 3524 I 5P SURFACE AREA PROVIDED AT PERMANENT POOL (EL 3G)= 951 1 Ov/SP . .. . .. .. .. . . .. ... .. . . . . . 5A PROV'D= 951 10 > 35241 =5A REQ'D OK MINIMUM REQUIRED VOLUME (SIMPLE METHOD BYTOM SCHUELER) Rv=O 05+0 009T) Rv= 050423 VOLUME= I "'Rv`Ad = Rv= (0 05+0 009-50 47) 1 04292 AC -FT 45420 FT ^ 3 VOLUME PROVIDED AT TEMPORARY POOL INCREM TOTAL El SA F) VOL (CF) VOL. (CF) 3G`/ ✓95110 0 0 37 103170 991 39 9 99 139 9 38 10G075 105075 204215 39 110845 106912 313127 40 1147GG 41 123174 112605 425932 118970 544502 5ET TEMP POOL ELEVATION REQ'D EL = 3G 4G F SAY 38 00' VOL PROV'D = 204215 CF L0 S 2009YBY- . . . . . . . INCREM TOTAL fi SA (5F) VOL, (CF) VOL, (CF) 30 70323 0 0 31 73G09 719GG 719GG 32 7G951 75260 14724G 33 80349 78G50 22589G 34 83803 8207G 307971 35 87312 85558 393529 3G 95110 91211 454740 f-5A *-DEPTH REQ MET F AVE DEPTH = VOL / 5A = 5 09GG5 REQ'D VOLUME = 20% OF VOL TOTAL AT MIN REQ'D 5A AND DEPTH = 94 4% REQ'D VOLUME EAST FOREBAY= 42G49 I CF 5 G% REQ'D VOLUME WEST FOREBAY= 2530 CF CHECK FOREBAY VOLUME EASTERN FOREBAY INCREM TOTAL EL, 5A (5P) VOL, (CF) VOL, (CF) 30 5798 0 0 31 G823 G310 G310 32 7915 73G9 13G79 33 9073 8494 22172 34 10298 9G85 31658 35 1590 10944 42802 42802 CF 5 O' DEEP FOREBAY 45170 42802 - = 42G49 VOL PROV'D= - 42802 42G49 =VOL REQ'D OK .... .......... CHECK FOREBAY VOLUME WESTERN FOREBAY INCREM TOTAL RECEI ri E. SA (SF) VOL. (CF) VOL- (CF) Mqy n 8 20pg 30 34 0 0 I 31 144 89 89 gy 32 332 238 327 33 537 4G4 791 34 340 7G9 15G0 35 13G0 1150 2710 2710 CF 5 O' DEEP FOREBAY . . . .. .. 2710 . —= . . 2530 . . .. ....... . . . .. VOL PROV'D= 2710 2530 =VOL REQ'D OK PROV'D VOLUME _ Q2= 0 2G2901 7 CF5 (FOR 2 DAY DRAWDOWN) Q5= 0 105 1 G07 CF5 (FOR 5 DAY DPAWDOWN) J SELECT A 3" CIRCULAR ORIFICE, EL 3G 0' (PERM POOL EL ) ORIFICE 51ZING REQ'D DPAWDOWN TIME = 2-5 DAYS WHERE Cd= 0 G A= 0 0451 SF g= 32 2 FPS/5 Q PROV'D= 0 23G42 h= AVE HEAD = (TOP OF OUTLET 5TR -PERM POOL EL )/2 Q PROV'D= Cd'A'(2gh) ^ 112 = 1 DPAWDOWN TIME Q2> 0 23G42 >Q5 OK TIME = VOLUM = 2 224 DAYS Q PROVE) WET DETENTION BA51N DATA 5HE OCEAN I5LE PALM5 PHASE I POND # 14 DRAINAGE AREA (Ad) = 2 233 321 5F IMPERVIOUS AREA (Ai) BUILDINGS 750 000 SF ROAD5 279 220 5F GUARDHOUSE 435 5F 51DEWALK5 0 5F ALLEYWAYS 121 9G8 5F TOTAL 1 151 G23 SE ET RECEI E 7MAY ZOOS BY�---- (1 25 LOT5@ G 0005F/LOT) PERCENT IMPERVIOUS (1) I = AJAcl = 51 5707. CALCULATE AVERAGE DEPTH (Davg) 5EE AVERAGE DEPTH CALCULATION SPREADSHEET POP POND # 14 CALCULATE REQUIRED SURFACE AREA AT PERMANENT POOL POND# 14 SHALL BE 13' DEEP HAVE AN AVERAGE DEPTH Of 7 00' AND BE DESIGNED TO REMOVE 90% T55 INTERPOLATION Of TABLE 10 4 IN NCDENR 5TORMWATER BMP MANUAL % IMP AVERAGE DEPTH (FT) G5 700 1 75 50 2 30 190 1 50 52 242 200 1 58 GO 200 240 1 90 SA/DA= 2 00% 5A,, = 44 GGG 5F = 1 03 AC SURFACE AREA PROVIDED AT PERMANENT POOL (ELEV G 0) = 50 49 1 5F SA PROV D= 50 49 1 > 44 GGG =5A REQ'D OK P \509\809 02\Calc5\POND545PREAD5HEET5\POND#14 A5 POND 14 DATA 5HEET PAGE I OF 4 WET DETENTION BA51N DATA SHEET OCEAN I5LE PALMS -PHASE I POND #2 1 DRAINAGE AREA (Ad) = 1 ,093,G85 51' IMPERVIOUS AREA (A) BUILDINGS 2G 1,000 SF ROAD5 134,557 5F AMENITY CENTER 93,G54 5F OFF -SITE 0 5F FUTURE DEVELOPMMENT 0 SF SIDEWALKS 22 548 5F ALLEY WAY5 20,413 5F RESERVE 29,500 5F TOTAL 5GI,G72 51' PERCENT IMPERVIOUS (1) I = At/Acl = 51 3G% CALCULATE AVERAGE DEPTH (Davg) MAY 8 11` C (43 5 LOT5@ G 0005F/LOT) SEE AVERAGE DEPTH CALCULATION SPREADSHEET FOR POND #2 1 (,,(, 4) CALCULATE REQUIRED SURFACE AREA AT PERMANENT POOL POND#21 SHALL BE 1 I' DEEP, HAVE AN AVERAGE DEPTH OF G 50' AND BE DESIGNED TO REMOVE 90%T55 INTERPOLATION OF TABLE 10-4 IN NCDENR 5TORMWATER BMP MANUAL % IMP AVERAGE DEPTH (FT) GO G50 70 50 2 70 230 1 90 52 254 242 200 GO 340 2 90 240 5A/DA= 2 42% 5AREG = 2G 4G7 5F = 0 G I AC SURFACE AREA PROVIDED AT PERMANENT POOL (ELEV G 0) = G2 543 5F 5A PROV'D= G2,543 > 2G 4G7 =5A REQ'D OK P\809\809-02\Calc5\PONDS\5PREAD5tiEET5TOND#2 1 xl5 POND #21 DATA SHEET PAGE I OF 4 MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM 5CHUELER) Rv=O 05+0 009 (1) Rv= 0 5 12203 VOLUME= " Rv'Ad = 1 07 AC -FT = 4G G82 FT-3 VOLUME PROVIDED AT TEMPORARY POOL INCREM TOTAL EL. 5A (5F) VOL, (CF) VOL, (CF) G G2 543 0 0 G 5 47,287 27 458 27,458 7 7I ,74 I 29,757 57,215 8 77 373 74,557 131 772 9 83 072 80 223 21 1 994 10 88913 85 993 297 987 5ET TEMP POOL ELEVATION REQ'D EL = G 82 PROV'D EL= 800 VOL PROV'D = 13 1,772 CF VOL PROV'D= 131,772 > 4G G82 =VOL REQ'D L FOREBAY SIZING PERMANENT POOL VOLUME INCREM TOTAL EL_ 5A (5F) VOL (CF) VOL (CF) -5 9,550 0 0 -4 12 G37 1 1,094 1 1 094 -3 1 G 047 14,342 25,43G -2 1 9,80G 17927 43 3G2 - 1 24 G75 22 241 G5 G03 0 29,1GO 2G,918 92,520 1 33,782 31 471 123 991 2 38 53G 3G 159 1 GO, 1 50 3 43,781 41,159 201,309 4 48,43G 4G 109 247 41 7 5 53 584 51 010 295,427 5 5 5G,233 27,454 325,581 G G2,543 29 G94 355 575 P =9M9-02\CaIc5TOND5\5PREAD5hEET5\POND#21 Ar DECEIVE MAY 0 8 2009 BY OK 5URFACEAREA < REQ MET POND #21 DATA SHEET PAGE 2 OF 4 REQ'D FOREBAY VOLUME = 20% TOTAL = CHECK FOREBAY VOLUME 18,504 CF MAY Zfl09 BY INCREM TOTAL f.L 5A (5F) VOL (CF) VOL, (CF) -5 1,501 0 0 -4 2,201 1 851 I ,85 1 -3 3 151 2 G7G 4,527 -2 4 380 3,7GG 8 293 - I G G4G 5,513 13 8OG 0 8,457 7 552 21,357 1 10333 9 395 30,752 2 12 2G9 1 1,301 42,053 3 14 2G5 13,2G7 55 320 5 18,435 32,700 88 020 5 5 19,535 9,493 97,513 G 20,G31 10 042 107,554 PROV'D VOLUME = 107 554 CF (I I' DEEP FOREBAY) VOL PROV'D= 107,554 > 18,504 =VOL REQ'D ORIFICE 51ZING REQ'D DRAWDOWN TIME = 2-5 DAY5 NOTE ORIFICE 51ZED TO DRAWDOWN THE TEMPORARY POOL IN 2-5 DAY5 02= 0 27015 CF5 (FOR 2 DAY DRAWDOWN) Q5= 0 108OG CF5 (FOR 5 DAY DRAWDOWN) ORIFICE EL = GOO (PERM POOL EL) TEMP POOL EL = 8 00 (OUTLET EL) ORIFICE DIAMETER = 300 IN OK FOREBAY AND MAIN POOL ARE SAME DEPTH Q PROV'D= Cd A*(2gh) ^ 112 WHERE Cd= 0 G A= 0 040 5F g= 32 2 FP5/5 h= (TEMP POOL -NORMAL POOL)/3 0 GG7 Q PROV'D= 0 19295 Q2> 0 19295 >Q5 OK DRAWDOWN TIME TIME = VOLUME = 280 DAYS Q PROV'D P\809M9-02\CaIc5\PONDS\5PPfAD5HEET5\POND#21 A5 POND #21 DATA SHEET PAGE 3 OF 4 AVERAGE DEPTH CALCULATION DESIGN CALCULATIONS POP OCEAN I5LE PALMS - PHASE I - POND 21 DEPTH TT) SURFACE AREA AT DEPTH (5F) INC VOL AT DEPTH (CF) TOTAL VOL AT DEPTH (CF) Option #I (PT 00 62 543 0 0 000 0 5 56 233 29 694 29 694 047 1 0 53 584 27 454 57 148 091 2 0 48 436 51 010 108 158 1 73 30 43 751 46 109 154 267 247 40 38 536 41 159 195425 3 12 50 33 782 36 159 231 584 370 6 0 29 1 60 31 471 263 055 4 21 70 24 675 26 915 289 973 4 64 80 19806 22241 3)2213 499 9 0 16047 17927 330 140 5 28 1 0 0 12 637 14342 344 482 5 5 1 1 1 0 9 550 1 1 094 355 575 5 69 120 130 20 160 P \809\809 02\CaIC5\POND5\5PREAD5HEET5\POND#21 A5 DATE 5/7/09 PROJECT NO 809-02 DESIGNED 13Y T PURVIS Option #2 A,,t ,h,p = 56 233 5P A,,,,,, ,,,o, = 62 543 SF Ate, ,,,,,d = 9 550 5F Depth = 105 FT D,,, =1 6 62 FT LEE 6 5 FT POND #21 AVERAGE DEPTH PAGE I OF I MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER) Rv=O 05+0 005 (U Rv= 0 5 14083 VOLUME= I" Kv Ad = 2 20 AC -FT 95 G77 FT-3 VOLUME PROVIDED AT TEMPORARY POOL INCREM TOTAL EL SA (5F) VOL (CF) VOL (CF) 8 50431 0 O 9 55351 54 42 1 54 42 1 10 G2 08G GO 2 1 9 1) 4 G40 I I G5 500 G3 088 178 G28 12 G9 7G2 G7 82G 24G 454 5ET TEMP POOL ELEVATION REQD EL = 9 G9 PROV'D EL= 9 90 VOL PROV O = 108 G 18 CF VOL PROV'D= 108 G 18 > FOREBAY 51ZING PERMANENT POOL VOLUME 95 G77 =VOL REQ'D OK INCREM TOTAL EL 5A (5F) VOL (CF) VOL, (CF) -5 9 97G 0 0 -4 1 2 201 1 1 059 1 1 085 -3 14 528 13 3G5 24 453 -2 1 G 990 15759 40212 -1 19 G3G 15313 58 525 0 22 394 21 015 79 540 1 25 253 23 544 03 384 2 28 345 2G 815 130 203 3 3 1 4G8 29 907 1 GO 109 4 34 GG3 33 OGG 193 175 5 37 927 3G 295 229 470 G 41 2G 1 39 594 2G9 OG4 7 44 GG4 42 9G3 3 1 2 02G 8 50 491 47 575 359 G04 P \809\809 02\Calc5\POND545PREAD5HEET5\POND# 14 x15 SURFACE AREA < 4 DEPTH REQ MET RECEIVED MAY 0 S 2009 BY POND 14 DATA 5HEET PAGE 2 OF 4 REQ'D POPE DAY VOLUME = 20% TOTAL = G2 405 CF CHECK FOREBAY VOLUME INCREM TOTAL FL. SA (5F) VOL (CF) VOL (CF) 5 239 O 0 -4 527 383 383 -3 927 727 I110 -2 1547 1 237 2 347 - 2 235 1 521 4 2G8 0 3 IGI 2 728 G 99G 4 23G 3 G99 10 G95 2 5 392 4514 15509 3 GG25 G011 21 519 4 7 94G 7 255 28 507 5 9 342 8 G44 37 45 I G 10 518 10 080 47 531 7 12373 1 1 59G 59 1 2G PROV'D VOLUME = 59 1 2G CF (I I' DEEP FOREBAY) VOL PROV'D= 59 1 2G — G2 405 =VOL REQ'D ORIFICE 51ZING REQ'D DRAWDOWN TIME = 2-5 DAYS OK NOTE ORIFICE SIZED TO DRAWDOWN THE TEMPORARY POOL IN 2-5 DAYS Q2= 0 553G9 CPS (FOR 2 DAY DRAWDOWN) Q5= 0 22148 CPS (FOR 5 DAY DRAWDOWN) ORIFICE EL = 800 (PERM POOL EL) TEMP POOL EL = 990 (OUTLET EL) ORIFICE DIAMETER = 400 IN Q PROVD= CXA (2gh)^ 1/2 WHERE Cd= 0 G A= O 087 SF g= 32 2 FP5/S h= (TEMP POOL -NORMAL POOL)/3 = O G33 Q PROV'D= 0 33439 02> 033439 >05 OK DRAWDOWN TIME TIME = VOUIMF = 331 DAYS Q PROV'D 7CEIVED M AY 0 S 2009 BY �-- POND 14 DATA 5HEET P\509Z09-02\Ca1c5\POND515PREAD5HEET5SPONDk 14 A5 PAGE 3 OF 4 AVERAGE DEPTH CALCULATION DE51GN CALCULATIONS FOR OCEAN 15LE PALMS - PHASE I - POND 14 DEPTH (FT) SURFACE AREA AT DEPTH (5F) INC VOL AT DEPTH (CF) TOTAL VOL AT DEPTH (CF) Option#I (FT) 00 50 491 O O 0 DO 1 0 44 GG4 47 575 47 578 0 94 2 0 41 291 42 9G3 90 540 1 79 3 0 37 927 39 594 130 134 2 58 40 34 GG3 3G 295 1 GG 429 3 30 5 0 31 4G8 33 OGG 199 495 395 G 0 28 345 29 907 229 40) 4 54 70 25 293 29819 25C 220 507 8 0 22 394 23 844 280 OG4 5 55 9 0 19 G3G 2) 015 301 079 5 9G 100 1 G 990 18 313 319 392 G 33 11 0 14 528 15 759 335 151 G G4 1 2 0 12 201 13 3G5 345 51 5 G 90 130 9 97G 11 059 359 G04 7 12 140 150 IGO 170 P\509\809-02\Ca1c5\PONDS\5PREADSHEET5POND#14 xl5 AVG DEPTH = 7 0 REC MAY 0 8 2009 BY DATE 5/7/09 PROJECT NO 505-02 DESIGNED BY T PURV15 POND 14 AVERAGE DEPTH PAGE 4 OF 4 ��� CAPE FEAR Engineering, Inc. 151 Poole RoeC Score IW Be1v111e NC 25 51 TEL (810) WB 10 FAX (910) 383-1 5 www capefearengmeenng com To NCDWQ Surface Water Protection Wilmington Regional Office Attn Mary Jean Naugle ❑ As Requested ® For Your Files ❑ Sent via Mad ❑ Sent via Courier Nip WAlh, Transmittal Date May 5, 2009 File 809-02 "36" Subject Ocean Isle Palms SW8 060338 Deed Restrictions ❑ For Distribution ❑ For your Review / Action / Approval Quantity Drawing No Description 1 copy Stormwater Management Permit SW8 060338 1 copy Recorded Protective Covenants for Ocean Isle Palms (may be amended to reflect BUA of 6000 square feet per lot) tw k- c v mt�i� i�mc�il REMARKS 0 CC File File 809-02"36" Cape Fear Engineering, Inc Signed /�l�c �f'� ZtzL Received By Date -1O G` Engineer's Report For Analysis of Pond #12 & #21 under SHWT Conditions Request for Additional Information Stormwater Permit No. SW8 060338 Ocean Isle Palms Phase I Brunswick County Subject: Ocean Isle Palms Phase 1 Brunswick County, North Carolina Prepared for Ocean Isle Palms, LLC 131 Ocean Blvd West Holden Beach, NC 28462 (910)754-2224 Date March 2009 Prepared by Cape Fear Engineering, Inc. 151 Poole Road, Suite 100 Belville, NC 28451 (910)383-1044 Rmcm)EVRI) MAR 0 9 2009 BY: P \809\809-02\Ca1cs\Storm\SHWT ISSUE\Engmeer's Report REV 3-4-09 doc I EnEmeer's Report: Phase 1 — Pond #12 & #21 NCDENR REQUEST The Wilmington Regional Office received an incomplete Plan Revision regarding the State Stormwater Management Permit for Ocean Isle Palms on April 30, 2008 The cover letter indicated that the proposed plan revision is to remove the previously permitted clay liners for the ponds On May 8, 2008, the Division sent an email to your consultant indicating that the pond's temporary storage volume be verified due to the permanent pool elevation being located so far below the seasonal high water table On June 5, 2008, a single plan sheet was submitted for Pond #12, with a revised SHWT As of this date, the plan revision to remove the clay liners is still not complete and cannot be accepted for review until the following information is submitted A Please advise as to the status of construction on these ponds Have the ponds already been constructed? Were they constructed with or without the approved clay liners? If they have been constructed without the permitted clay liner, you will most likely be required to monitor the ponds in lieu of enforcement action B Please demonstrate that sufficient storage has been provided for the required design storm Locating the permanent pool elevation so far into the water table will most likely result in a higher pool elevation, meaning that necessary storage space for the design storm is being taken up by the permanent pool Groundwater modeling to quantify the expected volume of incoming groundwater based on soil type and transmissibility is an option C Please demonstrate that the outlet ditched that the pond discharges into are free flowing under expected high water table conditions With the permanent pool elevation so far down in the water table, it is imperative that the outlets function effectively under high water conditions in order for the pond to drawdown to the design permanent pool elevation within the required 2-5 days and to have the required storage volume available for the next storm P \809\809 02\Ca1cs\Storm\SH WT ISSUE\Engmeer s Report REV 3-4-09 doc RESPONSE PREFACE This evaluation of the subject water quality ponds (Pond #12 & #21) is predicated upon NCDENR's review of the subject development's stormwater submittal from June 8, 2008 The fundamental premise for this request for additional information surrounds NCDENR's position that the post -development seasonal high water table (SHWT) will equal that of pre - development conditions and will affect the subject water quality pond's function with respect to the design storm With NCDENR's concern focusing on groundwater migration from SHWT influence as described, this report treats all groundwater flow within the hydraulic radius of the pond as entering the pond This treatment is necessary to quantify the effects of SHWT influences on the pond and the downstream conveyance As such, the demonstration of downstream capacity treats the downstream conveyance as initially dry However, whether groundwater under SHWT influence daylights within the downstream conveyance or within the pond, the flowrate herein quantified for groundwater is the same Therefore, our calculations demonstrate that neither the design storm storage nor discharge is compromised by groundwater, regardless The following response to NCDENR's letter is provided RESPONSE A Status of Construction Pond #12 1 Pond # 12 is an existing pond that has been in place for approximately 2 years or more Pond #12 was later modified and designed for stormwater treatment The developer is in the process of converting this existing pond into a stormwater pond A clay liner has not been installed to date and this submittal will demonstrate that one is not needed Pond #21 2 Pond #21 has not been constructed B Quantify Groundwater Flow For purposes of quantifying GW flow, Darcy's law was used Q = kA dh where, dl k = hydraulic conductivity A = cross sectional area perpendicular to flow P \809\809 02\Calcs\Storm\SHWT ISSUE\Engmeer s Report REV 34-09 doe dh/dl = hydraulic gradient Determine Soil Types and Hydraulic Conductivity (k) In order to quantify the amount of groundwater flowing into the pond under SHWT conditions, the hydraulic conductivity of the soils that contribute flow to the pond must be determined Since there are various soil types in the vicinity of the pond, and the hydraulic conductivity for each soil changes as a function of depth below the ground surface, the following steps were taken to calculate a weighted average hydraulic conductivity (See Figures 1&2 for an illustration of the soil types located in the vicinity of the proposed ponds ) i The types of soils present in the vicinity of the pond were determined from Brunswick County GIS ii Physical soil data for each of the soils located in the vicinity of the pond was obtained from the "Soil Survey of Brunswick County" It was assumed that the permeability of the soil would closely resemble the hydraulic conductivity of the soil (see "Appendix B") ni For each soil in the vicinity of the ponds, the weighted hydraulic conductivity of the soil was determined (see Table-1 in "Appendix C") IV A weighted average hydraulic conductivity was determined for the ponds based on the approximate linear footage of the normal pool that was in each soil type (see Table-2 in "Appendix C") *** Please see "Appendix B" for excerpted soil narratives for subject soils Estimate Hydraulic Radius (ill) In order to quantify the amount of groundwater flowing into the pond under SHWT conditions, the hydraulic radius must be estimated The hydraulic radius defines the zone of groundwater influence and can be described as the distance away from the pond where groundwater flow will be in the direction of the pond (See Sheet F-I & F-2 for an illustration of the hydraulic length) Large hydraulic radii indicate shallow hydraulic gradients and little driving head, small hydraulic radii indicate steep hydraulic gradients and greater dnving head For these particular ponds, the following criteria were used to estimate the employed hydraulic radius The criteria and their relevance to this pond are described in detail below Existing Topography and the assertion that subsurface hydrology will closely resemble surface hydrologyfor this riverine system Pond #12 There is a ridge located to the north of the proposed Pond #12 location This ndge creates a natural drainage area divide Areas south of this ndge will contribute southward flows to the proposed pond and ultimately the pond's reach Areas north of this ridge will contribute northward flow to the Ex Stump Pond north of proposed St Lucia Dr and ultimately to a separate reach (See Sheet F-1) P \80%809 0Ma1cs\Storm\SHWT ISSMEngmeer's Report REV 3-4 09 doc Pond #21 The west drainage divide occurs at Curacao Drive, while the east divide is at Adelaide Avenue, the northern divide follows Adelaide Avenue north till it reaches Martinique Street and terminates at the intersection Also, there is an offshoot that follows North Bimini Road from the intersection with Adelaide Avenue west where it reaches the roundabout and terminates Areas west of this drainage area will contribute flow into Pond 914, areas east of Adelaide Ave are considered "future development" and will be treated as the subdivision design progresses (See Sheet P-2) For these reasons, the hydraulic radius was chosen as 350 feet for Pond #12 (shown on Sheet F-1 and reflected in the calculations), and 35 feet for Pond #21 (shown on Sheet F-2 and reflected in the calculations) By keeping these radii smaller than the confining site characteristics described in 1 above, the hydraulic gradient is made steeper, resulting in a more conservative determination in the following flowrate quantification Determine Groundwater Flowrate (Q) As Darcy's Law was used to quantify the amount of groundwater flowing into the ponds during SHWT conditions, groundwater flow into each pond was calculated at incremental intervals from the estimated SHWT elevation to the bottom of the pond Pond #12 The groundwater flow into Pond #12 was calculated at incremental intervals from the SHWT elevation of 38 42' to the bottom of the pond at elevation 30 ft The total groundwater flow into the pond was quantified as the sum of incremental flowrates from each said interval This determination produced a groundwater flow into Pond 412 as 0 213 cfs (please refer to "Appendix D" for calculations) Pond #21 The groundwater flow into Pond #21 was calculated at incremental intervals from the SHWT elevation of 9 08' to the bottom of the pond at elevation -7 ft The total groundwater flow into the pond was quantified as the sum of incremental flowrates from each said interval This determination produced a groundwater flow into Pond #21 as 0 17 cfs (please refer to "Appendix D" for calculations) The following assumptions were employed in determining the groundwater flowrate into the ponds Assumptions and References P \809\809 02\Calcs\Srorrn\SHWT ISSUE\Fngmeer s Report REV 34-09 doe • As dictated by NCDENR's request for additional information, it was assumed that post -development SHWT elevations will approximate pre -development SHWT elevations • The Groundwater flowrate was calculated based on a steady state analysis for the most extreme condition (Groundwater Elevation = estimated SHWT elevation) • Hydraulic Conductivity from Brunswick County Soils Series as discussed above • Hydraulic Length was assumed based on the factors discussed above • Soils mapped immediately at the proposed normal pool location govern the hydraulic conductivity • For groundwater flow calculations the contributing area was assumed to be the two-dimensional planar area between contour surface areas (Also see Table-3 and Sample Calculations-1 in "Appendix D") C Free Flowing Discharge for Outlets Pond #12 Downstream Conveyance Analysis Please refer to the downstream conveyance detail on sheet F-1 This detail shows Pond # 12 discharging into the Ex Stump Pond, and the Ex Stump Pond discharging offsite to another Ex Pond Data and discharge quantification terminates at the outlet from the Ex Stump Pond where it enters the offsite Ex Pond Also, please refer to "Appendix E" for the routing data for these two ponds From Sheet F-1, please note that the discharge elevation of Pond #12 is approximately 1-foot above the receiving Ex Stump Pond (an unnamed tributary to the Class C, SW waterbody Jinny's Branch) Additionally, FEMA FIRM panel 2066 dated June 2, 2006 shows that the limit of the 100-year flood zone along this creek terminates approximately 1,480-feet downstream of the point where Pond 412's downstream conveyance reaches surface water (See attached FIRM Panel) With the 100-year flood elevation approximating 37 35 It msl, the point of reach approximating 29 0 ft msl, and the pond outlet being at 36 0 ft msl, it is immediately evident that the receiving conveyances should graciously accommodate the drawdown of the NCDENR design storm Additionally, as shown in the routing calculations for Ex Stump Pond, the maximum water surface elevation resulting from the 1-year 24-hour storm is 35 48 This leaves approximately 0 52 feet available for discharge from Pond #12 for the 1-year 24-hour storm Since the volume from the 1-year 24-hour storm exceeds the NCDENR design storm, there is no reasonable concern that Pond #12 will back up under SHWT conditions 2 Pond #21 Downstream Conveyance Analysis From Sheet F-2, please note that the discharge elevation of Pond 421 is approximately 1- foot above the receiving Jinny's Branch (Class C, SW waterbody) P \809\809-02\CaIcs\Stonn\SHw r ISSUE\Engmeer s Report RFV 34 09 doe 6 Please refer to the downstream conveyance detail on sheet F-2 This detail shows Pond #21 discharging into Ex Jinny's Branch Data and discharge quantification terminates at the outlet from Pond #21 where it enters the Jinny's Branch Also, please refer to "Appendix E" for the routing data for Pond #21 and an analysis of Jinny's Branch at the reception point of Pond #21 (study point shown on Sheet F-2) Routing calculations (in "Appendix E") show a 1-year 24-hour discharge rate of 4 20 cfs Based on an analysis of the data (below), groundwater will not effect the operation or compromise Pond #21's ability to function as a stormwater pond Pond #21 - Define Jinny's Branch Characteristics at the Pond Outlet Pond #21 discharges directly into Jiriny's Branch The point of interest (study point) for this pond is where Pond #21's outfall meets Jinny's Branch (please see Sheet F-2 for location) At the study point, the top of bank for Jinny's Branch is at an elevation of 8' msl The bottom of the ditch is at elevation 2' msl To be conservative in our calculations, it was assumed that the water surface elevation in Jenny's Branch was equal to the SHWT in Jinny's Branch at the study point (please see the cross-section detail on Sheet F-2) a) Longitudinal Slope The SHWT elevation for Jinny's Branch at the outlet from Pond #21 is 5 0' msl Surveyed information terminates roughly 1,340' downstream of the outlet for Pond 421 at elevation 4 14' msl According to surveyed information, the approximate longitudinal slope of Jinny's Branch is 0 064% b) Width The width of Jinny's Branch at the study point is 66' at the top of bank and 52' at the SHWT level c) Side Slope Based on surveyed information the average side slope ratio was calculated as approximately 2 1 Calculate Depth of Flow in Jinny's Branch Due to 1-year 24-hour Storm Referencing the attached Hydraflow data in "Appendix E" for the upstream catchments, the combined discharge for the 1-year 24-hour rainfall event is equal to 4 20 cfs Jenny's Branch was modeled and a channel report was created to show that when flowing at 4 20 cfs the water surface elevation will be 0 20 ft above the SHWT, resulting in a water surface elevation of 5 20 feet with approximately 2 80 feet of freeboard *See "Appendix F" (Calculations were performed using Hydraflow Express Extensions) Calculate the Flowrate in Jinny's Branch when Flowing Full According to Hydraflow Extensions modeling software, Jenny's Branch, when flowing at full capacity, can carry a flowrate of approximately 405 42 cfs (see "Appendix F" for results) Furthermore, the discharge for the 100 year rainfall event from Pond #21 is 106 82 cfs (see "Appendix E") This modeling shows the P \809\809 02\Ca1cs\Stortn\SHWT ISSUF\Engtneer's Report REV 3-4-09 doe ditch capacity exceeds the current project requirements to handle the discharge even when under SHWT conditions *See "Appendix F" (Calculations were performed using Hydraflow Express Extensions) For additional discussion, please consider the following As the prescribed wet -detention design for the NCDENR water quality ponds (Pond #12 & #21) dictates that the 1-inch storm draws down in 2-5 days, the design drawdown with respect to the receiving body can be hydraulically described in the following manner The New Hanover County Stormwater Design Manual indicates that the 1-mch rainfall event can occur from storms with the following frequencies and durations 2 year /15 minute, 5 year/10 minute, or 10 year/ 10 minute (See Appendix A) As no possible 1- inch storm approximates the 100-year event, there should be no realistic compromise to the downstream conveyance under NCDENR's design storm with or without groundwater influence Therefore, surface water should not compromise the functioning of the Pond #12 and Pond 421 orifice D Evaluate Orifice Pond 412 The orifice was evaluated to determine if its size can effectively deal with incoming groundwater as quantified while maintaining the design permanent pool and NCDENR design storm drawdown requirements This calculation is detailed on pages 4 and 5 of the Pond#12 calculation spreadsheet (See Pond #12 Calculations in Appendix E) The orifice draws down in 14 48 days while operating under SHWT conditions Changing the orifice size to 4 0" reduces the drawdown to 3 97 days Since the SHWT considers the extreme case for water quality we are proposing not to change the orifice size Pond #21 The orifice was evaluated to determine if its size can effectively deal with incoming groundwater as quantified while maintaining the design permanent pool and NCDENR design storm drawdown requirements This calculation is detailed on pages 4 and 5 of the Pond#21 calculation spreadsheet (See Pond #21 Calculations in Appendix E) The orifice draws down in 8 41 days while operating under SHWT conditions Changing the orifice size to 3 5" reduces the drawdown time to 3 28 days (see calcs in Appendix E) Since the SHWT considers the extreme case for water quality we are proposing not to change the orifice size P \809\809-02\Calcs\Stonn\SHWT ISSUE\Engmeers Report REV 34-09 doe Appendix A New Hanover County Design Storm Information P \809\809-02\Calcs\Storm\SHWT ISSUE\Engmeer's Report REV 34 09 doc 9 NEW HANOVER COUNTY STORM WATER DEMGNMANUAL SmYON40 - RUNOFFDETERmwATTONPROCEDURES TABLE 40-3 NEW HANOVER COUNTY DEPTH — DURATION — FREQUENCY TABLE TABLE 40-3A Duration Return Period 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr (fie) (m) (m) (m) (m) (m) (m) 5 min 049 055 060 068 074 080 10 min 088 0 99 1 07 120 131 141 15 min 1 15 129 140 157 170 184 30 min 162 192 214 247 273 299 60 min 210 258 292 341 380 418 2 hr 250 330 360 420 470 520 3 hr 280 3 50 405 4 70 520 580 6hr 330 420 482 571 640 700 12 hr 390 500 580 690 770 ---8 60 24 hr 450 580 700 805 900 10001 TABLE 40-3B Duration Return Period 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr (tune) (m/hr) (m/hr) (m/hr) (m/hr) (m/hr) (mft) 5 min 588 663 723 815 887 960 10 min 528 591 643 722 785 848 15 nun 460 5 15 559 627 682 736 30 nun 323 384 428 494 546 597 60 nun 210 258 292 341 380 418 2 hr 125 165 180 210 235 260 3 hr 093 117 135 157 173 193 6 hr 055 070 080 095 107 117 12hr 033 042 048 058 064 072 24hr 019 024 029 034 038 042 Source Latest Versions of NWS TR-40 and NWS Hydro-35 ADOPTED SEPTEMEER 5, 2000 PAGE 40-5 Appendix B Excerpted Sod Narratives Physical and Chemical Properties of the Soils P \809\809 02\Calcs\Storm\SH WT ISSUETngmeer s Report REV 3-4 09 doe 10 Page 1 of I F:quie d http:/1gis.brunsco.nctloutput/BrttnsNiicl Noc_arc-itns-ser%er4I3612885947 jpg 1 12. ,2008 E11-4 to 9 inches, pale brown (10YR 6/3) fine sandy loam, weak medium granular structure, very friable, common fine roots, very strongly acid, clear wavy boundary E2-9 to 13 inches, brownish yellow (10YR 6/6) fine sandy loam, weak fine subangular blocky structure, very friable, very strongly acid, clear wavy boundary Btl-13 to 16 inches yellowish brown (10YR 5/4) sandy clay loam, weak fine subangular blocky structure, friable, very strongly acid gradual wavy boundary Bt2-16 to 30 inches light yellowish brown (10YR 6/4) sandy clay loam few medium distinct brownish yellow (10YR 6/8) mottles and common medium distinct light brownish gray (10YR 612) mottles, weak fine subangular blocky structure friable very strongly acid, gradual wavy boundary BCg-30 to 38 inches, light brownish gray (10YR 6/2) sandy clay loam that has pockets of sandy loam few medium distinct strong brown (7 SYR 5/8) mottles, weak fine subangular blocky structure, friable, very strongly acid, clear wavy boundary 2Cgl-38 to 46 inches, mottled gray (10YR 6/1), light yellowish brown (10YR 6/4), and brownish yellow (10YR 6/8) loamy sand that has strata of sand single grained, loose, very strongly acid gradual l wavy boundary 2Cg2-46 to 70 inches, light gray (I OYR 7/2) sand, few medium distinct light yellowish brown (10YR 6/4) mottles, single grained, loose, very strongly acid The sandy A and E horizons and loamy St horizons have a combined thickness of less than 40 inches over sandy sediment The sods are very strongly acid or strongly acid throughout, unless the surface layer has been limed The Ap or A horizon has hue of 10YR, value of 3 or 4 and chroma of 1 or 2 The E horizon has hue of 1 OYR or 2 SY, value of 5 or 7, and chroma of 3 to 6 Texture is loamy sand sandy loam, or fine sandy loam The Bt horizon has hue of 1 OYR or 2 5Y, value of 5 to 7 and chroma of 4 to 8 In some pedons the Bt horizon has few to common mottles in chroma of 2 or less Texture is sandy clay loam or sandy loam The BCg horizon has hue of 10YR value of 5 to 7, and chroma of 1 or 2 Texture is sandy clay loam or sandy loam Some pedons of the BCg horizon have thin strata of these textures The 2Cg horizon has hue of 10YR, value of 5 to 8, and chroma of 1 or 2 Texture is sand or loamy sand �Kureb_Senes The Kureb series consists of excessively drained sods I uplands The sods formed in coarse textured ,ediment Slopes range from 1 to 8 percent Typical pedon of Kureb fine sand 1 to 8 percent slopes, 1 7 miles east of Gause Landing, 1 3 miles east Soil Survey of the intersection of N C Highway 904 and State Road 1172 150 feet south of the intersection of N C Highway 904 and State Road 1183 A-0 to 4 inches, gray (1OYR 5/1) fine sand, single grained, loose, common uncoated sand grains, many fine and few coarse roots, slightly acid clear wavy boundary E-4 to 20 inches, light gray (10YR 7/1) fine sand, single grained, loose, common fine and few coarse roots, neutral, clear wavy boundary C/Bh1-20 to 40 inches, brownish yellow (10YR 6/6) fine sand single grained, loose, 10 percent dark brown (7 SYR 4/4) and reddish brown (5YR 5/3) Bh bodies, few medium and coarse roots, neutral, gradual wavy boundary C/Bh2-40 to 53 inches, brownish yellow (10YR 6/8) fine sand, common medium distinct dark reddish brown (5YR 3/2) vertical bands and mottles and thin streaks of yellowish brown (10YR 5/6), single grained loose, few coarse roots, few coarse weakly cemented reddish brown (5YR 4/4) concretions, few small pockets of uncoated sand grams, neutral, gradual wavy boundary C1-53 to 70 inches, light yellowish brown (1 OYR 6/4) fine sand, common medium faint brown (10YR 5/3) mottles and common medium distinct light gray (10YR 7/1) mottles, single grained, loose, neutral gradual wavy boundary C2-70 to 80 inches, light yellowish brown (I OYR 6/4) fine sand, single grained loose, neutral The sandy horizons extend to 80 inches or more The sod ranges from strongly acid to neutral throughout, unless the surface layer has been limed The A horizon has hue of 10YR, value of 3 to 6 and chroma of 1 or 2 The E horizon has hue of 1 OYR, value of 7 or 8 and chroma of 1 or 2 Texture is sand or fine sand The C part of the C/Bh horizon has hue of 10YR value of 5 to 8 and chroma of 4 to 8 The Bh part of the C/Bh horizon has hue of SYR to 1 OYR, value of 3 to 6 and chroma of 2 to 6 The C/Sh horizon is sand or fine sand The C horizon has hue of IOYR value of 6 to 8, and chroma of 1 to 8 Mottles are in shades of these colors Texture is sand, fine sand or loamy sand Witte Series The Lafitte series consists of very poorly drained soils on low flood plains adjoining salt water They are below 5 feet in elevation and are flooded daily with saline water The soils formed from herbaceous plant residue and small amounts of mineral soil sediment Slopes are less than 1 percent Brunswick County North Carolina Typical pedon of Lafitte muck, 4 0 miles west of Southport, 0 8 mile southwest of Long Beach Bridge and 250 feet south of the Intracoastal Waterway in marsh Oat-0 to 12 inches, dark brown (7 5YR 3/2) muck pressed and rubbed about 35 percent fiber, about 15 percent rubbed massive, many fine and medium live roots, few coarse stems, about 50 percent mineral content, moderately alkaline, clear smooth boundary Oa2-12 to 30 inches, black (10YR 2/1) muck rubbed and pressed, about 30 percent fiber, about 5 percent rubbed, massive, few fine and medium roots, about 60 percent mineral content moderately alkaline, gradual wavy boundary Oa3-30 to 40 inches, very dark brown (10YR 2/2) muck pressed and rubbed, about 35 percent fiber about 10 percent rubbed, massive common medium roots few coarse stems, about 50 percent mineral content, moderately alkaline, gradual wavy boundary Oa4-40 to 55 inches very dark gray (10YR 3/1) muck and thin dark gray (5Y 4/1) mineral strata, about 5 percent fiber, about 1 percent rubbed fiber massive, about 70 percent mineral moderately alkaline, gradual wavy boundary 2Cg-55 to 72 inches gray (5Y 5/1) silty clay massive flows easily through fingers when squeezed, moderately alkaline The decomposed organic layers range from 51 inches to more than 80 inches thick The soil ranges from neutral to moderately alkaline The surface and subsurface organic layers have hue of 7 5YR or 10YR, value of 2 or 3, and chroma of 1 or 2 The underlying mineral soil has hue of 5Y or SGY, or it is neutral, and has value of 3 to 5 and chroma of 0 to 2 It is silty clay or clay iLeOn Series ` The Leon series consists of poorly drained soils on uplands The soils formed in coarse textured sediment Slopes are less than 1 percent Typical pedon of Leon fine sand is 2 2 miles south of Grissettown, 1 6 miles west of the intersection of N C Highway 904 and State Road 1163, 50 feet south of State Road 1163 A-0 to 6 inches, dark gray (10YR 4/1) fine sand, single grained, loose, about 1 /3 sand grains are uncoated, common medium and fine roots, extremely acid, clear wavy boundary E-6 to 14 inches, light gray (10YR 7/1) fine sand, single grained, loose, very strongly acid, clear wavy boundary 61 Bh1-14 to 17 inches, black (5YR 211) fine sand, massive friable weakly cemented, very strongly acid gradual wavy boundary Bh2-17 to 23 inches, dark reddish brown (5YR 3/3) fine sand, few medium faint black (5YR 2/1) mottles, massive, friable weakly cemented, very strongly acid clear irregular boundary E'-23 to 30 inches, light gray (10YR 7/1) fine sand, single grained, loose very strongly acid, gradual wavy boundary B'h-30 to 35 inches black (5YR 2/1) fine sand, massive, weakly cemented, very strongly acid, gradual wavy boundary E"-35 to 42 inches brown (10YR 4/3) fine sand single grained loose, very strongly acid, gradual wavy boundary B"h1-42 to 72 inches, black (5YR 2/1) fine sand, massive weakly cemented very strongly acid, gradual wavy boundary B h2-72 to 80 inches, dark gray (5YR 4/1) fine sand massive weakly cemented, very strongly acid The sandy horizons are 80 inches thick or more The soil is extremely acid or very strongly acid throughout, unless the surface layer has been limed The A or Ap horizon has hue of 10YR value of 2 to 4 and chroma of 1 The E horizon has hue of 10YR value of 5 to 8 and chroma of 1 or 2 Texture is sand or fine sand The Bin horizon has hue of 5YR or 10YR value of 2 or 3, and chroma of 1 to 3 Texture is fine sand or sand The lower E', B'h E , and B"h horizons have hue of 5YR to 1 OYR, value of 2 to 7, and chroma of 1 or 2 Texture is sand or fine sand Lumbee Series The Lumbee series consists of poorly drained soils on stream terraces The soils formed in moderately fine textured sediment Slopes are 0 to 2 percent Typical pedon of Lumbee fine sandy loam, 1 mile northwest of Regan, 1 4 miles northeast of the intersection of N C Highway 904 and forest road 30 feet north of forest road A-0 to 6 inches, very dark gray (10YR 3/1) fine sandy loam, weak medium granular structure very friable, common fine roots, very strongly acid clear wavy boundary E-6 to 18 inches light brownish gray (10YR 6/2) fine sandy loam weak medium granular structure, very friable common fine roots, very strongly acid, clear wavy boundary Btg1-18 to 28 inches gray (10YR 6/1) sandy clay loam, few medium prominent red (2 5YR 5/8) mottles and common medium distinct brownish yellow (10YR 6/8) mottles, weak fine subangular �l o4 Muckalee Series The Muckalee series consists of poorly drained soils on low flood plains The sods formed in moderately coarse textured recent alluvium Slopes are 0 to 2 percent Typical pedon of Muckalee loam, 1 3 miles southwest of Waccamaw 08 mile northeast of the intersection of State Road 1321 and State Road 1322 250 feet west of State Road 1321 A-0 to 6 inches very dark grayish brown (10YR 3/2) loam, weak fine granular structure friable, many fine roots, strongly acid gradual wavy boundary Cg1-6 to 22 inches, grayish brown (10YR 5/2) loamy sand, common medium faint light brownish gray (10YR 6/2) mottles, single grained, very friable, common fine roots, medium acid, gradual wavy boundary Cg2-22 to 36 inches, gray (10YR 6/1) sandy loam that has lenses of sandy clay loam, few medium distinct yellowish brown (10YR 5/6) and strong brown (7 SYR 5/8) mottles, massive, friable, few fine and medium roots, medium acid, gradual wavy boundary ,g3-36 to 65 inches, gray (10YR 6/1) loamy sand that has strata of sandy loam, common medium distinct strong brown (7 SYR 5/6) and light olive brown (2 5Y 5/6) mottles and few medium distinct greenish gray (5G 5/1) mottles, massive friable, slightly acid The loamy or sandy horizons are 40 inches thick or more The sod ranges from strongly acid to slightly acid in the A horizons and medium acid to neutral in the underlying matenals The A horizon has hue of 10YR, value of 3 to 5 and chroma of 1 or 2 The Cg horizon has hue of 10YR or 5Y, value of 3 to 7, and chroma of 1 or 2 The Cg horizon is generally sandy loam that has fragments of marl in the lower part Texture includes sand, loamy sand, loam, fine sandy loam and thin layers of sandy clay loam Murvdle Series The Murvdle series consists of very poorly drained soils in depressions on uplands The soils formed in coarse textured sediment with an abundance of organic matter Slopes are 0 to 2 percent Typical pedon of Murville mucky fine sand, 1 2 miles southeast of Boiling Spring Lake, 0 2 mile northwest of the intersection of N C Highway 133 and N C Highway 87 35 feet east of N C Highway 133 A-0 to 5 inches, black (5YR 2/1) mucky fine sand, weak medium granular structure, very friable common medium and fine roots extremely acid, gradual wavy boundary Sod Survey Bh1-5 to 35 inches black (5YR 2/1) fine sand, massive very friable, few large roots, sand grams are coated with organic matter and feel loamy, extremely acid gradual wavy boundary Bh2-35 to 55 inches, dark reddish brown (5YR 3/2) fine sand, massive, very friable, sand grains are coated and bridged with organic matter and feel loamy, extremely acid, gradual wavy boundary Bh3-55 to 60 inches, dark reddish brown (5YR 2/2) fine sand, massive, very friable, extremely acid gradual wavy boundary Bh4-60 to 80 inches, dark reddish brown (5YR 3/2) fine sand massive, very friable, extremely acid The sandy horizons are 80 inches thick or more The sod ranges from extremely acid to strongly acid throughout, unless the surface layer has been limed The A horizon has hue of SYR to 10YR value of 2 or 3, and chroma of 1 or 2 The Bh horizon has hue of SYR to 10YR, value of 2 or 3, and chroma of 1 or 2 Sand grains are coated with organic matter and have a soft, loamy feel Texture is fine sand or sand The Cg horizon, where present, has hue of 10YR, value of 5 to 7, and chroma of 1 to 4 Mottles are in shades of these colors Texture ranges from sand to sandy clay loam Newhan Series The Newhan senes consists of excessively drained sods on the Outer Banks The sods formed in coarse textured eolian and marine sediments Slopes are 2 to 30 percent. Typical pedon of Newhan fine sand 2 to 30 percent slopes, on Ocean Isle Beach, 0 7 mile west of the intersection of N C Highway 904 and State Road 1144 50 feet north of State Road 1144 A-0 to 1 inch, grayish brown (10YR 5/2) fine sand single grained, loose, mildly alkaline, clear wavy boundary C-1 inch to 80 inches, light gray (10YR 7/2) fine sand few fine faint pale brown (10YR 6/31 mottles single grained, loose, common dark minerals, few shell fragments, mildly alkaline The sandy horizons are 80 inches thick or more The soil is neutral or mildly alkaline throughout The silt plus clay content is less than 5 percent Calcareous shell fragments range from 0 to 25 percent of the sod volume, and the soil has few to common grains of dark minerals The A horizon, where present, has hue of 10YR value of 5 or 6, and chroma of 1 or 2 The C honzon has hue of 11 OYR, value of 7 or 8, and chroma of 1 or 2 Texture is fine sand or sand Brunswick County North Carolina TABLE 17 --PHYSICAL AND CHEMICAL PROPERTIES OF THE SOILS --Continued Map symbol and IDepth'Clay 1 Moist I Permea- 1Awailable1 Soil 1Salinity'Shrink-swe so 11 name bulk bll lty water �reactioni I potential Jo ---------------I 0-131 5-1511 45-1 651 2.0-6 0 10 10-0 15'4. 5-5 5 Johns I13-38118-3511.40-1 601 0 6-2.0 10 12-0 L514 5-5 5 138-70' 2-1011 60-1 751 6 0-20 10 03-0 D614 5-5 5 KcB- =- -- --�1 0-861 0-3 11 60-1 801 6.4-20 -1 <0 OS 14 5-7 3 `Kureb LA --------------- 1 0-551 --- 10 05-0.501 2 0-6 0 10 20-0 5013.6-8.4 Lafitte 155-72130-8510 50-1 OOi <0 06 10 15-0 2016.1-8.4 - 0- Lo----------- -1 0-B0I 1-6 11 40-1.651 6 -20 10 02-0 OS 3.6-5.5 -fin �-_JI---�----�--'- I-- - -�- - �-- -- Lu--------------- 1 0-181 4-1811 55-1. 701 2 0-6 0 10 08-0 1214 5-5.5 Lumbee 118-38I18-3511 30-1.451 0 6-2 0 10 12-0 1614 5-5.5 I38-801 1-1011 60-1.751 6 0-20 10 03-0.06i4 5-5.5 Ly--------------- 1 0-161 5-2011 30-1 601 2 0-6 0 10 09-0 1313.6-5.5 Lynchburg 116-80118-3511.30-1 501 0 6-2 0 10 12-0 1613 6-5.5 Ma --------------- 1 0-181 <3 11 35-1 651 6 0-20 10.03-0 0713 6-6.0 Mandarin 118-351 2-9 IL 45-1 601 0 6-20 10.30-0 1513.6-6 0 135-621 <3 11 35-1. 451 0 6-26 10.03-0 0714 5-7 3 162-801 2-9 11 45-1 601 0 6-20 l0.10-0 1514.5-7 3 rHk------------------ 1 0-6 110-251 --- -1 0 6-2 0 10.09-0. 15Z 15 1-3 ',Muckalee 1 6-651 5-201 --- i 0 6-2 0 10 08-01215 6-8.4 Mv-------- ----1 0-5 1 2-8 11 20-1 401 6 0-20 10 15-0. 2013.6-5 5 Murvllle 1 5-801 2-8 11.60-1 751 2 0-6 0 10 05-0 0913 6-5 5 NeE, NbE--------- 1 0-801 --- 11 60-1 75i >20 1 <0.05 13 6-7 8 Newhan NoB -------------- 1 0-161 2-8 11 55-1 751 6 0-20 10 06-0. 1114 5-6 C Norfolk 116-63118-3511 35-1 451 0 6-2.0 10 10-0 1514.55-5 5 63-90 - On --------------- 1 0-171 5-1511 45-1 651 2 0-6 0 10 11-0.1513 6-5.5 Onslow 117-65115-3511 3D-1 501 0 6_2.0 10 12 0 17 i3.6 5 5 65-80 PaA-------------- 1 0-551 2-1211 60-1 751 6 0-20 10 05-0 1014.5-6.0 Pactolus i55-801 2-1211 60-1 75i 6 0-20 10 03-0 0714 5-5.'. Pn--- ------------1 0-111 5-1511 2D-1 401 2 0.6.0 10 20-0. 3013 6-5 5 Pantego 111-15118-3511 30-1 401 0 6-2'0 10 12-02013.6-5.`. 15-80!18-401,1 25-1 4011 0 6-2.0 !0 15-0 2013 6-5.5 Pt 1 Pits 1 I Ra---------------I 0-15 Rains 15-72 72-80 TM_______________i 0-12 Tomahawk ,12-23 5-201 30-1 60' 2 0-6.0 10 30-0 14'4 5-6.5 18-3511 30-1 501 0 6-2*0 10 11-0 1514 5-5.5 18-4011 30-1 501 0 6-2 0 10 10-0 1514 5-5.5 2-8 1160-1 751 6 0-20 10.04-0 1014 5-5 5 5-1511:45-1 651 2.0-6 0 10. 10-0 1414 5-5 5 2-8 11 60-1.751 6 0-20 !0.04-0 0814 5-6 5 K os cm 1 <2 12 ILow--------- 10. 20 ILow--------- 10 24 <2 ILow--------10.10 <2 `Low --------- 10 10 4-8 8-16 I I lyow-________I____ lHigh-------- I0.32 <2 'Low --------- 10.10 <2 <2 ILow--------- 10. 24 'Low ------ --10 32 <2 'Low ----- ----i0.10 <2 <2 ILow--------- 1D. 20 1Low--------- 10.20 --- -_- ILow--------- 10. 10 1Low-------- 10 15 --- ILOw__------- 10 10 ILow--------- 10 IS <2 <2 ILow--------- 10. 20 ILow--------- 10 20 <2 <2 ILow--------- 10 10 ±Low---------10.10 <2 ILow--------- 10 10 <2 <2 'Low --------- 10.20 Low --------- !0 24 <2 ILow_________ 10 20 <2 114w---------.0.24 <2 ILow--------- 10 10 <2 ! Low_________ 10 10 1 <2 ILow--------- 10 10 1 <2 ILow---------- 10 28 1 <2 !Low --------- 10 28 0.20 0 24 0 28 0 10 0 15 0 10 5 5 5 5 5 -5- 5 5 5 5 4 5 5 5 5 115 matter .5-2 <2 30-70 5-4 2-4 5-5 -3- I 9-20 i 5-2 I I .5-2 I I .5-2 I 10-15 Appendix C Table-1 (Ponds #12 & #21) Table-2 (Ponds #12 & #21) P \809\809-02\Calcs\Stonn\SHW'I ISSUE\Engineer's Repon REV 34-09 doc I 1 e Pond #12 Table-1 Weighted Average Hydraulic Conductivity for various Sod Types Soil Type = Lo, Leon Depth D p ( ) Hydraulic Avg Conductivity D x Kav Conductivity (K) in Depth Range(Kavg)g m) in/hr in/hr in^2/hr 0 - 80 6 - 20 13 0 1040 0 Weighted Kavg= Soil Type = 1300 m/hr KrB, Kureb L= 1U4UU Weighted Kavg = F(Di x Kavg) Dtot Depth (D) Hydraulic Avg Conductivity x Kavg Conductive (K) in Depth Range (Kavg)D m in/hr (m/hr)in^2/hr 0 - 80 6 - 20 13 0 1040 0 Weighted Kavg= L= 1U4UU 13 00 in/hr Weighted Kavg = F(Di x Kavg) Dtot Table-2 Weighted Average Hydraulic Conductivity for Pond#12 Soil Type Weighted Kavg Linear Feet of Normal Pool Avg x LF n/hr ft in/hr x ft Lo Leon 1300 1089 1415700 KrB, Kureb 1300 131 170300 1220 1586000 Weighted Average = 13 m/hr F(Kavg x LF) Weighted Average = 7(LF) Pond #21 Table-1 Weighted Average Hydraulic Conductivity for various Sod Types Soil Type = Mk, Muckalee Depth (D) Hydraulic Conductive (K) Avg Conductivity in Depth Range(Kavg)D x Kavg in m/hr in/hr W2/hr 0 - 6 06 - 2 13 78 6 - 65 06 - 2 1 3 767 E= 78 Weighted Kavg= 1 30 in/hr Weighted Kavg = E(Di x Kavg) Dtot Table-2 Weighted Average Hydraulic Conductivity for Pond#21 Soil Type Weighted Kavg Linear Feet of Avg x LF Normal Pool in/hr ft in/hr x ft Mk, Muckalee 1 30 1515 196950 1515 196950 Weighted Average = 13 m/hr Weighted Average = F(Kavg x LF) E(LF) Appendix D Table-3 (Ponds #12 & #21) Sample Calculations-1 P \809\809 02\Calcs\Storrn\SIIWT ISSUE\Engmeers Report REV 3-4 09 doc 12 Pond #12 Table-3 Groundwater Flow into Pond#12 During SHWT Conditions (from Darcy's Eqn ) SHWT = 3842 ft msl Normal Pool = 36 ft msl K = 1300 in/hr (1) Elevation (2) Contour Area (3) X-Sectional Area (4) dh L (5)hOO ft W2 (ft-2)ft ft 3842 108603 -- -- --38 106979 1624 042 350 37 103170 3809 1 42 350 36 95110 8060 242 350 35 87312 7798 242 350 0 016 34 83803 3509 242 350 0 007 33 80349 3454 242 350 0 007 32 76951 3398 242 350 0 007 31 73609 3342 242 350 0 007 30 70323 70323 242 350 0 146 Total Groundwater Flow into Pond (Qgw) = 0 213 cfs Pond #21 Table-3 Groundwater Flow into Pond#21 During SHWT Conditions (from Darcy's Eqn ) SHWT = 908 ft mSl Normal Pool = 6 ft mSl K = 1 30 inlhr (1) Elevation (2) Contour Area (3) X-Sectional Area (4) dh L (5)h0027 ft ft-2 (ft-2)ft ft 908 71286 -- -- --9 70873 413 008 35 8 65846 5027 1 08 35 7 60952 4894 208 35 6 50795 10157 308 35 5 41255 9540 308 35 0 025 4 37059 4196 308 35 0 011 3 32996 4063 308 35 0 011 2 29071 3925 308 35 0 010 1 25288 3783 308 35 0 010 0 21656 3632 308 35 0 010 -1 18164 3492 308 35 0 009 -2 14513 3651 308 35 0 010 -3 11968 2545 308 35 0 007 -4 9653 2315 308 35 0 006 -5 7551 2102 308 35 0 006 -6 5658 1893 308 35 0 005 -7 3970 3970 308 35 0 011 Total Groundwater Flow into Pond (Qgw) = 0 170 cfs Sample Calculations-1 The following sample calculations correspond to Table-3 (1) Elevation (E) — this elevation corresponds to the incremental contour elevation in the pond (2) Contour Area (SA) — Contour Surface Area at E(,) (3) Contributing Area (A) — Cross Sectional Area between elevation E(,) and E), 1) A(,) = SA(, 1) - SA(j) (4) Head Differential (dh) For E(,) > Normal Pool Elevation dh = E(, O) - E(,) (E(, o) = SHWT elevation) For E(,) <Normal Pool Elevation dh — E(, O) — Normal Pool Elevation (5) Length (L) — Hydraulic Length Length over which the head differential acts (6) Incremental Flowrate (Q) — inflow of ground water through the cross sectional area between elevation E(,) and E(, 1) Q = KA (dh/L) Where, K = weighted average hydraulic conductivity (See Table-2) A = See Column 3 dh = See Column 4 L — See Column 5 Appendix E Pond #12 & #21 Design Calculations Pond Routing Data P \80%809-02\Calcs\Storm\SI-IWT ISSUE\Engmeers Report REV 34-09 doe 13 WET DETENTION BASIN DATA SHEET OCEAN ISLE PALMS PHASE I A POND # 12 DRAINAGE AREA (Ad) _ IMPERVIOUS AREA (Ai) BUILDINGS ROADS SIDEWALKS CK CLUB CONTINGENCY 24 82 ACRES 10 19 ACRES 2 19 ACRES 0 02 ACRES 0 OG ACRES 0 07 ACRES TOTAL 12 53 ACRES PERCENT IMPERVIOUS (1) I = Ad/Ai = 50 47% POND # 12 SHALL BE G' DEEP WITH AN AVG DEPTH OF 5' AND DESIGNED TO REMOVE 90% T55 SA/DA= 3 54% REQUIRED SURFACE AREA AT PERMANENT POOL 74 LOTS @ GOOO SF/LOT ALLEY WAYS SA�ZEQ = 0 8778634 AC = 3824 1 SF SURFACE AREA PROVIDED AT PERMANENT POOL (EL 3G)= 951 10 SF SA PROV'D= 951 10 > 3824 1 =5A REQ'D OK MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER) Rv=O 05+0 009'(1) Rv= (0 05+0 009.50 47) Rv= 050423 VOLUME= I '*Rv*AcI = 1 04292 AC -FT 45429 FT^3 VOLUME PROVIDED AT TEMPORARY POOL INCREM TOTAL EL SA (5F) VOL, (CF) VOL, (CF) 3G 55110 0 0 37 103170 99139 9 99139 9 38 IOG979 105075 204215 39 110845 106912 313127 40 1147GG 112805 425932 41 123174 118970 544902 108G03 SET TEMP POOL ELEVATION REQ'D EL = 3G 4G f-5AY 38 00' VOL PROV'D = 204215 CF VOL PROV'D= 204215 > 45429 =VOL REQ'D OK FOREBAY SIZING THIS POND WILL HAVE TWO FOREBAY5 ONE WILL FILTER 94% AND THE OTHER FOREBAY, G% OF THE ENTIRE DRAINAGE BA51N PERMANENT POOL VOLUME INCREM TOTAL EL,_ 5A (5F) VOL (CF) VOL. (CF) 30 70323 0 0 31 73GO9 719GG 719GG 32 7G951 75280 14724G 33 80349 78G50 22569G 34 53803 6207G 307971 35 67312 85556 393529 3G 95110 91211 484740 F5A � DEPTH REQ MET 4- AVE DEPTH = VOL / 5A = 5 09GG5 REQ'D VOLUME = 20% OF VOL TOTAL AT MIN REQ'D 5A AND DEPTH = 94 4% REQ'D VOLUME EAST FOREBAY= 42G49 I CF 5 G% REQ'D VOLUME WEST FOREBAY= 2530 CF CHECK FOREBAY VOLUME EASTERN FOREBAY INCREM TOTAL EL. 5A (5F) VOL, (CF) VOL, (CF) 30 5758 0 0 31 G823 G310 G310 32 7915 73G9 13G79 33 9073 5494 22172 34 10298 9G85 31858 35 11590 10944 42802 42802 CP 5 O' DEEP FOREBAY 45179 42802 42G49 VOL PROV'D= 42802 42G49 =VOL REQ'D OK CHECK FOREBAY VOLUME WESTERN FOREBAY INCREM TOTAL FL. SA (5F) VOL. (CF) VOL. (CF) 30 34 0 0 31 144 89 89 32 332 238 327 33 597 4G4 791 34 940 7G9 15G0 35 13G0 1150 2710 2710 CF 5 0' DEEP FOREBAY 2710 = 2530 VOL PROV'D= 2710 2530 =VOL REQ'D OK ORIFICE 51ZING REQ'D DRAWDOWN TIME = 2-5 DAYS STEP # I DETERMINE THE ALLOWABLE RANGE OF FLOWRATES (SHWT CONDITIONS NOT PRESENT) Qz = 0 2G290 CF5 (FOR 2 DAY DRAWDOWN) Q5 = 0 105 1 G CF5 (FOR 5 DAY DRAWDOWN) NOTE THE NORMAL POOL 15 MORE THAN G-INCHES BELOW THE ESTIMATED SHWT THE ORIFICE MUST BE EVALUATED TO EFFECTIVELY DEAL WITH THE INFLOW OF GROUNDWATER AND DRAWDOWN THE DE51GN STORM VOLUME IN 2-5 DAYS TFP #2 QUANTIFY THE AMOUNT OF GROUND WATER EXPECTED TO ENTER THE POND UNDER SHWT CONDITIONS (SEE ATTACHED CALCULATIONS) Qgw = 0 2 13 CF5 STEP #3 SELECT ORIFICE SIZE ORIFICE DIA = 30 IN STEP #4 DETERMINE ELEVATION IN POND DUE TO INCOMING GROUNDWATER FLOW (STEADY STATE HEAD TO PA55 GROUNDWATER) Q9w = Cd'A'(2'g'hyw) � 112 h9w= 081214 ELEV9w = 3G 90 WHERE Cd= 0 G A= 0 04909 51' g= 322 FP5/5 h= head read for Q9w STEP #5 DETERMINE REQUIRED ELEVATION ABOVE ELEVATION DUE TO GROUNDWATER MIN REQ'D VOLUME = 78,G50 CF INCREM TOTAL fl . 5A (51) VOL (CP) VOL, (CF) 3G 2 9G,722 0 0 37 103,170 79,957 79,957 38 1 OG,979 105,075 185,032 MIN REQ'D ELEVATION = 3G 99 TEMP POOL ELEV (ELEVTP) = 38 00 (OUTLET STRUCTURE ELEVATION) STEP #G DETERMINE THE ALLOWABLE RANGE OF FLOWRATES (SHWT CONDITIONS PRESENT) Qz + Q9w = 0 47590 CF5 Q5 + Q9w = 0 3 181 G CF5 STEP #7 DEMONSTRATE ORIFICE ACCOMMODATES STEADY STATE GROUNDWATER * Q2-Q5 QTOT= Ca'A'(2'g'hAVG) ^ 1 /2 QTOT= 0 27G WHERE Cd= 0 G A= 0 04909 51' g= 32 2 FP5/5 h AVG= ELEVTP - ELEV9w + h9w 2 = 13G214 FT Q2 + Qgw < 0 27G < Q5 + Qgw NG STEP #8 DETERMINE DRAWDOWN TIME Qd = Discharge of Design Volume Qdv = QTOT - Qgw = O OO CFS DRAWDOWN TIME TIME = VOLUME = 14 48 DAYS Qdv WET DETENTION BASIN DATA SHEET OCEAN ISLE PALMS -PHASE I POND #21 DRAINAGE AREA (Ad) = 21 I G ACRES IMPERVIOUS AREA (Ai) BUILDINGS 482 ACRES (35 LOTS@ G OOOSF/LOT) ROADS 3 G4 ACRES AMENITY CENTER 2 15 ACRES OFF -SITE 0 00 ACRES CONTINGENCY 0 50 ACRES ALLEY WAY TOTAL II II ACRES PERCENT IMPERVIOUS (1) I = Ai/Ad = 52 5 1 % POND#2 1 SHALL BE 13 0' DEEP WITH AN AVG DEPTH OF 5 5'* DESIGNED TO REMOVE 90% T55 SA/DA= 3 30% REQUIRED SURFACE AREA AT PERMANENT POOL SAKEQ= 0 G9825 AC = 30417 SF SURFACE AREA PROVIDED AT PERMANENT POOL (EL G 0')= 50795 SF 5A PROV'D= 50795 > 304 17 =SA REQ'D OK MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER) Rv=O 05+0 000*(1) Rv= 052259 VOLUME= I " Kv Ad = 0 92 15 AC -FT 40141 FT^3 VOLUME PROVIDED AT TEMPORARY POOL INCREM TOTAL fl 5A (5F) VOL (CF) VOL (GE) G 50795 0 0 G 5 55874 2GGG7 20007 7 G0952 2920G 55874 8 G584G G3399 119273 9 70873 G53G0 187G32 10 7G030 73452 2GIO54 SET TEMP POOL ELEVATION REQ'D EL = G 9G 4--- SAY 7 1' VOL PROV'D = 622 1 3 CF VOL PROV'D= 62213 > 40141 =VOL REQ'D OK FOREBAY SIZING PERMANENT POOL VOLUME INCREM TOTAL EL 5A (5F) VOL, (CF) VOL (CF) -7 3970 0 0 -6 5658 4814 4514 -5 7551 6605 11419 -4 9653 8602 20021 -3 11968 1081I 30831 -2 14513 13241 44072 -I I8I64 16339 G0410 0 21656 19910 80320 I 25288 23472 103792 2 29071 27180 130972 3 32996 31034 IG2005 4 37059 35028 197033 5 41255 35157 236190 5 5 43402 21164 257354 6 50795 23549 280903 REQ'D VOLUME = 20% TOTAL = 561 81 CF CHECKFOREBAY VOLUME < SURFACE AREA a DEPTH REQ MET AVE DEPTH = VOL / 5A < = 5 53 NCREM TOTAL EL SA (5F) VOL (CF) VOL (CF) - 1 5939 0 0 0 7428 6684 6684 1 8980 8204 14888 2 10597 9789 24676 3 12278 11438 3GI14 5 14024 26302 62416 PROV'D VOLUME = G24 16 CF 7DEEP FOREBAY) VOL PROV'D= 62416 = 56181 =VOL REQ'D ORIFICE SIZING REQ'D DRAWDOWN TIME = 2-5 DAYS STEP # I DETERMINE THE ALLOWABLE RANGE OF FLOWRATES (SHWT CONDITIONS NOT PRESENT) OK QZ = 0 23229 CFS (FOR 2 DAY DRAWDOWN) Q5 = 0 09292 CPS (FOR 5 DAY DRAWDOWN) NOTE THE NORMAL POOL 15 MORE THAN 6-INCHE5 BELOW THE ESTIMATED SHWT THE ORIFICE MUST BE EVALUATED TO EFFECTIVELY DEAL WITH THE INFLOW OF GROUNDWATER AND DRAWDOWN THE DESIGN STORM VOLUME IN 2-5 DAYS STEP #2 QUANTIFY THE AMOUNT OF GROUND WATER EXPECTED TO ENTER THE POND UNDER SHWT CONDITIONS (SEE ATTACHED CALCULATIONS) Qgw = 0 17 CF5 STEP #3 SELECT ORIFICE SIZE ORIFICE DIA = 30 IN STEP #4 DETERMINE ELEVATION IN POND DUE TO INCOMING GROUNDWATER FLOW (STEADY STATE HEAD TO PASS GROUNDWATER) Qyw = Cd'A (2 6j'h9j) 1/2 hyw = 0 5 1 733 ELEVgw = G GO WHERE Cd= 0 G A= 0 04909 SF g= 32 2 FP5/5 h= head recq'd for Qyw STEP #5 DETERMINE REQUIRED ELEVATION ABOVE ELEVATION DUE TO GROUNDWATER MIN REQ'D VOLUME = 2G 921 CF INCREM TOTAL EL. SA (SF) VOL, (CF) VOL (CF) G G 5G 889 0 0 7 GO,952 23,5G8 23 5G8 8 G5,84G G3 399 8G 9G7 MIN REQ'D ELEVATION = 7 05 TEMP POOL ELEV (ELEVTP) = 7 10 (OUTLET STRUCTURE ELEVATION) STEP #G DETERMINE THE ALLOWABLE RANGE OF FLOWRATES (SHWT CONDITIONS PRESENT) Q2 + Qyw = 0 40229 CF5 Q5 + Qyw = 0 2G292 CF5 STEP #7 DEMONSTRATE ORIFICE ACCOMMODATES STEADY STATE GROUNDWATER E Q2-05 QTOT= Cd A*(2'6j'hAVG)^ 1/2 QTOT= 0207 WHERE Cd= O G A= 0 04900 5F g= 32 2 FPS/5 h AVG= ELEVTP - ELEVgw + hgw 2 = 0 7G7 FT Q2 + Qgw < 0 207 < Q5 + Qgw NG STEP #8 DETERMINE DRAWDOWN TIME Qa = Discharge Of Design VOlume Qd = OTOT - QJw = 004 CF5 DRAWDOWN TIME TIME = VOLUME = 8 4 1 DAYS Qdv 1 ED 2 4 5 7 o $ Legend Hvd Origin Description 1 SCS Runoff POST DEVELOPMENT POND 12 - 2 Reservoir SCS POND 12 R 4 SCS Runoff EX STUMP POND 5 Reservoir STUMP POND ROUTING 7 SCS Runoff POST DEVELOPMENT POND 21 8 Reservoir SCS POND 21 R - Hydraflow Hydrographs Model Project SHWT ISSUE 1-12-09 gpw Monday Jan 12 2009, 4 18 PM Table of Contents SHWT ISSUE 1-12-09 gpw Hydraflow Hydrographs by Intelisolve 1 -Year Summary Report Hydrograph Reports Hydrograph No 1, SCS Runoff, POST DEVELOPMENT POND 12 Hydrograph No 2, Reservoir, SCS POND 12 R Pond Report Hydrograph No 4, SCS Runoff, EX STUMP POND Hydrograph No 5, Reservoir, STUMP POND ROUTING Pond Report Hydrograph No 7, SCS Runoff, POST DEVELOPMENT POND 21 Hydrograph No 8, Reservoir, SCS POND 21 R Pond Report Monday Jan 12 2009 4 17 PM 2 2 3 4 Hydrograph Summary Report Hyd No Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation W Maximum storage (cuft) Hydrograph description 1 SCS Runoff 4300 2 734 189 998 — POST DEVELOPMENT POND 12 2 Reservoir 030 2 1454 81 293 1 3775 177 487 SCS POND 12 R 4 SCS Runoff 7805 2 762 629 375 — - - - - EX STUMP POND 5 Reservoir 6305 2 780 629 372 4 3548 287 154 STUMP POND ROUTING 7 SCS Runoff 2969 1 759 217 714 — — — — — POST DEVELOPMENT POND 21 8 Reservoir 420 1 898 161 161 7 813 129 249 SCS POND 21 R SHWT ISSUE 1-12-09 9PW Return Period 1 Year Monday, Jan 12 2009, 4 17 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot 2 Hydraflow Hydrographs by Intelisolve Monday Jan 12 2009 4 17 PM r Hyd No 1 POST DEVELOPMENT POND 12 Hydrograph type = SCS Runoff Peak discharge = 43 00 cfs Storm frequency = 1 yrs Time Interval = 2 min Drainage area = 24 820 ac Curve number = 84 Basin Slope = 1 5 % Hydraulic length = 850 ft Tc method = LAG Time of conc (Tc) = 20 00 min Total precip = 3 70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5000 U1211111 3000 2000 1000 000 POST DEVELOPMENT POND 12 Hyd No 1 -- 1 Yr Hydrograph Volume = 189 998 cult Q (cfs) 5000 4000 3000 2000 1000 000 0 2 5 7 9 12 14 16 19 21 23 26 Hyd No 1 Time (hrs) -- 3 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Jan 12 2009 4 17 PM Hyd No 2 SCS POND 12 R Hydrograph type = Reservoir Peak discharge = 0 30 cfs Storm frequency = 1 yrs Time Interval = 2 min Inflow hyd No = 1 Max Elevation = 37 75 ft Reservoir name = Pond #12 Max Storage = 177,487 cuft Storage Indication method used Q (cfs) 5000 4000 3000 2000 IDIOM SCS POND 12 R Hyd No 2 -- 1 Yr Hydrograph Volume = 81 293 cult Q (cfs) 5000 4000 3000 2000 1000 000 000 0 10 19 29 39 48 58 68 77 87 97 Time (hrs) — Hyd No 2 —Hyd No 1 Pond Report Hydraflow Hydrographs by Intellsolve Monday Jan 12 2009 4 17 PM Pond No 1 - Pond #12 Pond Data Pond storage is based on known contour areas Average end area method used Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr Storage (cuft) Total storage (cuft) 000 3600 95 110 0 0 100 3700 103 170 99 140 99 140 200 3800 106 979 105 075 204 215 300 3900 110 845 108 912 313 127 400 4000 114 776 112 811 425 937 500 41 00 118 744 116 760 542 697 600 4200 122 767 120 756 663 453 Culvert I Orifice Structures Weir Structures [A] [B] [C] [D] [A] IB] [C] [D] Rise (in) = 1800 300 000 000 Crest Len (ft) = 12 00 1200 000 000 Span (in) = 1800 300 Goo 000 Crest El (ft) = 38 00 3850 000 000 No Barrels = 1 1 0 0 Weir Coeff = 333 333 000 000 Invert El (ft) = 3558 3600 000 000 Weir Type = Riser Rect -- - Length (ft) = 63797 000 000 000 Multi Stage = Yes No No No Slope (%) = 0 10 000 000 000 N Value = 013 013 013 000 Orif Coeff = 060 060 060 000 Multi Stage = n/a No No No Exfiltration = 0 000 in/hr (Contour) Tatlwater Elev = 0 00 ft Note CulveNOnfice cuHlow have been analyzed under inlet and outlet control Stage (ft) Stage / Discharge stage (ft) 600 500 400 300 200 1 00 000 600 500 400 300 200 1 00 000 000 3000 6000 9000 12000 15000 18000 21000 24000 27000 30000 — Total 0 Discharge (cfs) 5 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Jan 12 2009 4 17 PM Hyd No 4 EX STUMP POND Hydrograph type = SCS Runoff Peak discharge = 78 05 cfs Storm frequency = 1 yrs Time Interval = 2 min Drainage area = 214 420 ac Curve number = 64 Basin Slope = 0 3 % Hydraulic length = 4788 ft Tc method = KIRPICH Time of conc (Tc) = 47 99 min Total precip = 3 70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 8000 7000 6000 5000 4000 3000 2000 1000 000 EX STUMP POND Hyd No 4 -- 1 Yr Hydrograph Volume = 629 375 cult Q (cfs) 8000 7000 6000 1611I1U: [[111I1: [K11111111, 2000 1000 000 0 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) — Hyd No 4 6 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Jan 12 2009 4 17 PM Hyd No 5 STUMP POND ROUTING Hydrograph type = Reservoir Peak discharge = 63 05 cfs Storm frequency = 1 yrs Time Interval = 2 min Inflow hyd No = 4 Max Elevation = 35 48 ft Reservoir name = EX STUMP POND Max Storage = 287,154 cuft Storage Indication method used Wet pond routing start elevation = 35 00 ft Hydrograph Volume = 629 372 cult STUMP POND ROUTING Q (cfs) Hyd No 5 -- 1 Yr Q (cfs) 8000 7000 6000 5000 4000 3000 2000 1000 0 00 8000 7000 6000 5000 4000 3000 2000 1000 000 0 3 5 8 11 13 16 19 21 24 27 — Hyd No 5 — Hyd No 4 Time (hrs) Pond Report Hydraflow Hydrographs by Intellsolve Monday Jan 12 2009 4 17 PM Pond No 5 - EX STUMP POND Pond Data Pond storage Is based on known contour areas Average end area method used Stage / Storage Table Stage (ft) Elevation (ft) Contour area (scift) Incr Storage (cult) Total storage (cuft) 000 3400 187 690 0 0 1 00 3500 195 169 191 430 191 430 200 3600 203 268 199 219 390 648 300 3700 212 677 207 973 598 621 400 3800 224 600 218 639 817 259 500 3900 253 176 238 888 1 056 147 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 6000 000 000 000 Crest Len (ft) = 56 70 3000 000 000 Span (in) = 6000 000 000 000 Crest El (ft) = 35 00 3700 000 000 No Barrels = 3 0 0 0 Weir Coll = 333 333 000 000 Invert El (ft) = 2996 000 000 000 Weir Type = Riser Clplti -- -- Length (ft) = 13500 000 000 000 Multi -Stage = Yes No No No Slope (%) = 074 000 000 000 N Value = 013 000 000 000 Orif Coeff = 060 000 000 000 Multi Stage = n/a No No No Exftltration = 0 0001n/hr (Contour) Tailwater Elev = 0 00 It Stage (11) 500 400 300 200 1 00 000 Stage / Discharge Note CulverYOnfice outflows have been analysed under inlet and outlet control Stage (ft) 500 400 300 200 1 00 000 000 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 — Total Q Discharge (cfs) Hydrograph Plot HydraFlow Hydrographs by Intehsolve Hyd No 7 POST DEVELOPMENT POND 21 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 30 660 ac Basin Slope = 1 0 % Tc method = USER Total precip = 3 70 in Storm duration = 24 hrs Q (cfs) 3000 2500 2000 1500 1000 500 Monday Jan 12 2009 4 17 PM Peak discharge = 29 69 cfs Time Interval = 1 min Curve number = 82 Hydraulic length = 2275 ft Time of conc (Tc) = 57 60 min Distribution = Type III Shape factor = 484 POST DEVELOPMENT POND 21 Hyd No 7 -- 1 Yr Hydrograph Volume = 217 714 cult Q (cfs) 3000 2500 2000 1500 1000 6Y11); mww 0 3 5 8 10 13 15 18 20 23 25 — Hyd No 7 Time (hrs) 8 men n Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday Jan 12 2009 4 17 PM Hyd No 8 SCS POND 21 R Hydrograph type = Reservoir Peak discharge = 4 20 cfs Storm frequency = 1 yrs Time interval = 1 min Inflow hyd No = 7 Max Elevation = 8 13 ft Reservoir name = POND #21 Max Storage = 129,249 cuft Storage Indication method used Hydrograph Volume = 161 161 cult SCS POND 21 R Q (cfs) Hyd No 8 -- 1 Yr Q (cfs) 3000 3000 2500 - - - - - ----- - -- - -- -- - - 2500 2000 2000 1500 1500 1000 1000 000 000 0 5 10 15 19 24 29 34 39 44 48 — Hyd No 8 — Hyd No 7 Time (hrs) Pond Report 10 Hydraflow Hydrographs by Intellsolve Monday Jan 12 2009 4 17 PM Pond No 4 - POND #21 Pond Data Pond storage Is based on known contour areas Average end area method used Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr Storage (cult) Total storage (cuft) 000 600 50 795 0 0 050 650 58 553 27 337 27 337 1 00 700 60 952 29 876 57 213 200 800 65 846 63 399 120 612 300 900 70 873 68 360 188 972 400 1000 76 030 73 452 262 423 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 800 300 000 000 Crest Len (ft) = 3000 000 000 0 00 Span (in) = 800 300 000 000 Crest El (ft) = 890 000 000 000 No Barrels = 3 1 0 0 Weir Coeff = 333 000 333 000 Invert El (ft) = 710 600 000 000 Weir Type = CIPIb — — — Length (ft) = 2500 000 000 000 Multi -Stage = No No No No Slope (%) = 1 00 100 000 000 N Value = 013 013 000 000 Orif Coeff = 060 060 000 000 Multi -Stage = n/a No No No Exfiltration = 0 000 In/hr (Contour) Tallwater Elev = 0 00 ft Stage (ft) 400 300 200 1 00 Wil Note CulverVOnfice outflows have been analyzed under inlet and outlet control Stage / Discharge Stage (it) 400 300 200 1 00 11IM11111111111 000 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 — Total C1 Discharge (cfs) Table of Contents SHWT ISSUE 1-12 09 gpw Hydraflow Hydrographs by Intelisolve 100 - Year Summary Report Hydrograph Reports Hydrograph No 7, SCS Runoff, POST DEVELOPMENT POND 21 Hydrograph No 8, Reservoir, SCS POND 21 R Pond Report Monday Jan 12 2009 4 18 PM 1 2 2 3 4 Hydrograph Summary Report Hyd No Hydrograph type (origin) Peak flow (CIS) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SOS Runoff 15759 2 732 723 397 — --- - - - POST DEVELOPMENT POND 12 2 Reservoir 5406 2 756 589 768 1 39 61 381 833 SOS POND 12 R 4 SOS Runoff 62300 2 754 4 228 051 - - — - — EX STUMP POND 5 Reservoir 54945 2 768 4 228 049 4 3735 675 894 STUMP POND ROUTING 7 SOS Runoff 11596 1 757 868 588 — -- -- POST DEVELOPMENT POND 21 8 Reservoir 10682 1 769 808 558 7 989 254 477 SOS POND 21 R i SHWT ISSUE 1-12-09 gpw Return Period 100 Year Monday, Jan 12 2009, 4 18 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot 2 Hydraflow Hydrographs by Intelisolve Hyd No 7 POST DEVELOPMENT POND 21 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 30 660 ac Basin Slope = 1 0 % Tc method = USER Total precip = 10 00 in Storm duration = 24 hrs Q (cfs) 12000 10000 OXIDE 4000 Pz1I1I111111 A Monday Jan 12 2009 4 18 PM c d 0 Peak discharge = 115 96 cfs Time interval = 1 min Curve number = 82 Hydraulic length = 2275 ft Time of conc (Tc) = 57 60 min Distribution = Type III Shape factor = 484 POST DEVELOPMENT POND 21 Hyd No 7 -- 100 Yr Hydrograph Volume = 868 588 cult Q (cfs) 12000 10000 [:I8I1I11 4000 2000 WMT0 0 3 5 8 10 13 15 18 20 23 25 — Hyd No 7 ` Time (hrs) Hydrograph Plot HydraHow Hydrographs by Intelisolve Monday Jan 12 2009 4 18 PM Hyd No 8 SCS POND 21 R Hydrograph type = Reservoir Peak discharge = 106 82 cfs Storm frequency = 100 yrs Time Interval = 1 min Inflow hyd No = 7 Max Elevation = 9 89 ft Reservoir name = POND #21 Max Storage = 254,477 cuft Storage Indication method used Q (cfs) 12000 10000 Of 11 4000 2000 W"A SCS POND 21 R Hyd No 8 -- 100 Yr Hydrograph Volume = 808 558 cult Q (cfs) 12000 10000 [:11III111 4000 2000 MIMI 0 3 6 9 12 15 18 21 24 27 30 33 — Hyd No 8 — Hyd No 7 Time (hrs) 3 Pond Report C! Hydraflow Hydrographs by Intellsolve Monday Jan 12 2009 4 18 PM Pond No 4 - POND #21 Pond Data Pond storage is based on known contour areas Average end area method used Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr Storage (cuft) Total storage (cult) 000 600 50 795 0 0 050 650 58 553 27 337 27 337 1 00 700 60 952 29 876 57 213 200 800 65 846 63 399 120 612 300 900 70 873 68 360 188 972 400 1000 76 030 73 452 262 423 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 800 300 000 000 Crest Len (ft) = 30 00 000 000 000 Span (in) = 800 300 000 000 Crest El (ft) = 890 000 000 000 No Barrels = 3 1 0 0 Weir Coeff = 333 000 333 000 Invert El (ft) = 710 600 000 000 Weir Type = Clplti — — — Length (ft) = 2500 000 000 000 Multi Stage = No No No No Slope (%) = 1 00 100 000 000 N-Value = 013 013 000 000 C rif Coeff = 060 060 000 000 Multi -Stage = n/a No No No Exfiltration = 0 000 inthr (Contour) Tailwater Elev = 000111 Stage (ft) 400 300 200 100 000 I Note Culven/Onfce out lours have been anal zed under inlet and outlet control Stage / Discharge Stage (ft) 400 300 200 1 00 [�DU7• 000 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 — Total 0 Discharge (cfs) Appendix F Jenny's Branch Channel Report Using Hydraflow Express Extensions P \809\809 02\Calcs\Storm\SHWT ISSUE\Engmcer s Report REV 34 09 doe 14 Channel Report Hydraflow Express Extension for AutoCAD® Civil 31D® 2008 by Autodesk Inc Pond #21's Outfall into Ex Jinny's Branch Trapezoidal Bottom Width (ft) = 5200 Side Slopes (z 1) = 200,200 Total Depth (ft) = 300 Invert Elev (ft) = 500 Slope (%) = 006 N-Value = 0 030 Calculations Compute by Known Q Known Q (cfs) = 420 Elev (ft) i:1<1i111 700 ME 500 400 Section Monday Jan 12 2009 Highlighted Depth (ft) �0 20 Q (cfs) = 4200 Area (sqft) = 1048 Velocity (ft/s) = 040 Wetted Perim (ft) = 5289 Crit Depth, Yc (ft) = 006 Top Width (ft) = 5280 EGL (ft) = 020 Depth (ft) 4 00 300 200 1 00 11 I -1 00 Reach (ft) 0 Channel Report 11 Hydraflow Express Extension for AutoCAD® Civil 3D® 2008 by Autodesk Inc, Pond #21's Outfall into Ex Jenny's Branch Trapezoidal Bottom Width (ft) = 5200 Side Slopes (z 1) = 200,200 Total Depth (ft) = 300 Invert Elev (ft) = 500 Slope (%) = 006 N-Value = 0 030 Calculations Compute by Q vs Depth No Increments = 5 Elev (ft) 900 700 500 400 Section Monday Jan 12 2009 I t f Highlighted Depth (ft) = 300 Qr(cfs) = 4054 Area (sqft) = 17400 Velocity (fUs) = 233 Wetted Perim (ft) = 6542 Cnt Depth, Yc (ft) = 095 Top Width (ft) = 6400 EGL (ft) o = 308 Depth (ft) 4 00 300 200 1 00 M -1 00 Reach (ft) Y July 31, 2008 Mark Saunders, President Ocean Isle Palms, Inc 1321 Ocean Blvd West Holden Beach, NC 28462 Subject Request for Additional Information Stormwater Project No SW8 060338 Mod Ocean Isle Palms Phase 1 Brunswick County Dear Mr Saunders Michael F Easley Governor William G Ross Jr Secretary North Carolina Department of Environment and Natural Resources Coleen H Sullins Director Division of Water Quality The Wilmington Regional Office received an incomplete Plan Revision regarding the State Stormwater Management Permit for Ocean Isle Palms on April 30, 2008 The cover letter indicated that the proposed plan revision is to remove the previously permitted clay liners for the ponds On May 8, 2008, the Division sent an email to your consultant indicating that the Plan Revision was incomplete and could not be accepted for review The email requested that the pond's temporary storage volume be verified due to the permanent pool elevation being located so far below the seasonal high water table On June 5, 2008, a single plan sheet was submitted for Pond #12, with a revised SHWT As of this date, the plan revision to remove the clay liners is still not complete and cannot be accepted for review until the following information is submitted Please advise as to the status of construction on these ponds Have the ponds already been constructed? Were they constructed with or without the approved and permitted clay liners? If they have been constructed without the permitted clay liner, you will most likely be required to monitor the ponds in lieu of enforcement action Please demonstrate that sufficient storage has been provided for the required design storm Locating the permanent pool elevation so far into the water table will most likely result in a higher pool elevation, meaning that necessary storage space for the design storm is being taken up by the permanent pool Groundwater modeling to quantify the expected volume of incoming groundwater based on soil type and transmissibility is an option 3 Please demonstrate that the outlet ditches that the pond discharges into are free flowing under expected high water conditions With the permanent pool elevation so far down into the water table, it is imperative that the outlets function effectively under high water conditions in order for the pond to drawdown to the design permanent pool elevation within the required 2-5 days and to have the required storage volume available for the next storm Please note that this request for additional information is in response to a preliminary review of the incomplete plan revision request The requested information should be received in this Office prior to August 31, 2008 N�am�`nCazohna �vaturally North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington NC 28405 Phone (910) 796 7215 Customer Service Wilmington Regional Office Internet w iv ncivaterauality ore Fax (910) 350 2004 1 877 623-6748 An Equal Opportunity/Affirmative Acton Employer— 50%Recycledll0%Post Consumer Paper Mr Saunders July 31, 2008 Stormwater Application No SW8 060338 If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter The request must indicate the date by which you expect to submit the required information The Division is allowed 90 days from the receipt of a completed application to issue the permit The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215 1 and is subject to enforcement action pursuant to NCGS 143-215 6A Please reference the State assigned protect number on all correspondence Any original documents that need to be revised have been sent to the engineer or agent All original documents must be returned or new originals must be provided Copies are not acceptable If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at Imda lewis@ncmad net Sincerely, Linda Lewis Environmental Engineer III ENB/arl S\WQS\STORMWATER\ADDINFO\2008\060338 ju108 CC John Sims, Cape Fear Engineering Robert Patterson, DWQ Linda Lewis Page 2 of 2 CAPE FEAR Engineering, Inc. 151 P0018 floetl Sm1e 100 BeNdle NC 28451 TEL (910) 38& 1044 FAX (910) 383 1M www capefearenglneering com To NCDENR DWQ State Stormwater Section 127 Cardinal Drive Ext Wilmington, NC 28405 -TRT7 Linda Lewis Transmittal Date June 5, 2008 File 809-02 "36" Subject Ocean Isle Palms Phase 1 SW8 060338 ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Mail ❑ Sent via Courier Quantity I Drawing No 1 Revised Plan Sheet (C-13) REMARKS Revised SHWT Elevation for Pond #12 CC File Copy Description Cape Fear Engineering, Inc ��✓�/ p Signed 61?00 � John W Sims IV Received By /Date Transmittal -State SW -clay liner doc Ocean Isle Palms SW8 060338 Mod Subject Ocean Isle Palms SW8 060338 Mod From Linda Lewis <Iinda lewis@ncmail net> Date Fn, 09 May 2008 13 30 55 -0400 To John Sims <John suns@capefearengmeering com> John The Division received an incomplete modified stormwater permit application on April 30, 2008 The application cannot be accepted for review until the following information is provided 1 To avoid dewatering a site and to guarantee that sufficient volume is available in the pond, the Permanent pool elevation for a wet pond should be set within 6" of the SHWT If it is not, then the temporary pool elevation should be calculated using the approximate SHWT as the baseline for measuring the depth of the temporary pool volume Linda 1 of 1 5/9/2008 1 31 PM CAPE FEAR Engineering, Inc. 151 Poole Hoed Suite 100 BeNdle NC23451 TEL (810) 38S 1044 FAX (910) 383 1045 www cape(earengmeenng com To NCDENR DWQ State Stormwater Section 127 Cardinal Drive Ext Wilmington, NC 28405 Attn Linda Lewis Transmittal File 809-02 "36" Subject Ocean Isle Palms Phase 1 SW8 060338 ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Mail ❑ Sent via Courier Quantity I Drawing No Description 1 Cover Letter 1 Copy of Ocean Ridge Justification 1 Revised Plan Sheets (1A C-13, 1 B SW-3) 113R I/_T 5 CC File Copy Lndtal-State SW —clay finer doc Cape Fear Engineering, IInccmay Signed u 4""6 , 0j John W Sims, IV Received By Date 4FCAPE FEAR Engineering, Inc. April 30, 2006 Linda LeWis Environmental Engineer NCDENR-DWQ Wilmington, NC 28405 KE Ocean Isle Palms — Phase I A f, I B 5W8 000335 — v✓ It 1 7,9 G, le - Plan Revision — Wet Ponds Linda RECEIVED APR 3 0 2008 BY. , Please find attached for your review and approval a plan revision for the above described plan Please accept this cover letter as the required narrative to describe the proposed revision The intention of this plan revision is to delete all required clay hners from the approved pond details for this project Included with this submittal are updated detail sheets with revised pond sections Engineering Justification for removing the hners was submitted with the plan revisions for Ocean Ridge Phase 6, 5ection I � 3 Although the Justification specifically addressed Ocean Ridge Phase 6 the most conservative assumptions were used and apply to the majority if not all Brunswick County Sites In this case the permanent pool of pond # 12 15 set 4 1 7' below 5HWr and the permanent pool of pond #2 I is set 3 08 below 51iWT Ponds # 12 and #2 1 both are not adjacent to any wetlands I trust this information to be sufficient for your review and approval Should you have any questions comments, or require additional information regarding this matter, please contact this office 5incerely, John W 51m5, IV Cc file (820-02 36 ) L\ 151 Poole Road, 5mte 100 • Oelvdle NC2B451 • TEL (910)383-1044 • FAX (910)383-1045 l wwwcapefearengmeermg com ,� ''j CAPE FEAR Engineering, Inc. 151 Poole Road Suite 100 eeNAle NC 28451 TEL (910) 383-1044 FAX (910f 3BX1045 www capefearengmeenng tom To NCDENR Division of Water Quality Surface Water Protection Section -SW 127 Cardinal Drive Extension Wilmington, NC 28405 Attn IZC'F E][V�� 1 4 2008 Transmittal 14, 2008 File 809-02 "36" Subject Ocean Isle Palms Phase 1 Stormwater Name Change Brunswick County ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Mail ® Sent via Courier Quantity Drawing No Description 1 Cover Letter 1 Original Permit Name/Ownership Change Form 1 Copy of State Stormwater Permit 1 Copy Certification of Conversion 1 Copy Limited Liability Company Annual Report 1 Copy Articles of Organization Including Articles of Conversion REMARKS If you have questions or comment please contact me at 910 383 1044 CC File File Cape Fear Engineering, Inc r/ i Signed Mendith B Butler Received By Date Transmittal -Poole Rd d�FCAPE FEAR Engineering, Inc. August 11, 2008 NCDENR Division of Water Quality Surface Water Protection Section- Stormwater 127 Cardinal Drive Extension Wilmington, NC 28405 Subject Ocean Isle Palms Phase 1 Name Change To Whom It May Concern We are submitting Ocean Isle Palms Phase 1 name change on behalf of Ocean Isle Palms, LLC The company has not changed ownership Ocean Isle Palms, Inc have Just changed the name to Ocean Isle Palms, LLC fhis phase is still under construction and upon completion the stormwater treatment system certification will be sent to your office Sincerely, Meridith B Butler, Permit Coordinator 151 Poole Road Suite 100 • 6elville NL28451 • TEL (910)363-1044 • FAX (910)363-1045 wwwcapefearengineering com p¢vsary� � r LIMITED LIABILITY COMPANY ANNUAL REPORT NAML OF LIMI I LD LIABILI I Y COMPANY Ocean Isle Palms ll C SI CRF rARY OF STATF 1 I C ID NUMBFR 0817314 NATURI OF RININFSS Real Estate REGISFEREDAGEN'F Saunders Mark I REGIS FIRED OFFICE MAILING ADDRESS 131 Ocean Blvd West Holden Beach NC 28462 F Filed Annual Report -1 0 8704679 For leer 2008 Do not data entu manually S IAIEOF INCORPORAIION N( REGIS I ERED OFFICE STREET ADDRESS 131 Ocean Blvd Nest /lolden Beach N( 28462 Braun wick Countv PRINCIPAL OFFICI TELLPIIONE NUMBER (910) 842-4939 PRINCIPAL OFFICE MAILING ADDRESS 13/ Ocean Blvd (Vest Holden Beach NC 28462 PRINCIPAI OFFICF SI REET ADDRESS 131 Ocean Blvd West Holden Beach tbC 28462 MANAGER S/MEM13LIZ S/ORGAN1LLRS Ncone Mark Saunders line Member Addre s s 131 Ocean Blvd W Holden Beach bC 28462 Nannc Donald Honarth Title Manager 4ddress 131 Ocean Blvd W Holden Beach NC 28462 Name Carroll M Lrpscombe line Manager 4ddress 131 Ocean Blvd W Holden Beach 1vC 28462 Name Sheldon Tucker l the Manager Address 131 Ocean Blvd W Holden Beach NC 28462 CFRI Il ICATION OF ANNUAL RLPORT MUSI BE COMPLETED BY Al I LIMITED I IABILITY COMPANIES Muk Saundin I ORM MUST BE SIGNED BY A MANAGERIMEMBER Mark Saunders 04/15/2008 DA rE Member TYPE OR PRINT NAME TYPE OR PRINT TITLE ANNIJAI RF POR I FFF S200 MAII 10 ti.n ry of Male Corporation, Division Post Office Box 29525 Raleigh NC 27626 0325 March 10, 2008 Linda Lewis Environmental Engineer NCDENR-D WQ Wilmington, NC 28405 RE Ocean Ridge Phase 6 Section 1 and Section 3 SW8 070917 Plan Revision — Wet Ponds Linda Please find attached for your review and approval a plan revision for the above described plan Please accept this cover letter as the required narrative to describe the proposed revision The intention of this plan revision is to delete all required clay liners from the approved pond details for this project Included with this submittal is the engineering justification for deleting the clay liners and updated detail sheets with revised pond sections Pond #5 of this project has been constructed to substantial completion Due to unforeseen conditions in the field, the orifice and therefore the permanent pool elevation of the pond were revised by 0 2 feet (from 40 0 to 40 2) to maintain positive drainage This field change has a negligible impact to the permanent pool area, temporary pool volume, and temporary pool drawdown The revised detail for Pond #5 is included with this submittal, and shows the revised permanent pool elevation Finally, the designers certification for the construction of Pond #5, certified to be in accordance with the revised plan, is included with this submittal I trust this information to be sufficient for your review and approval Should you have any questions, comments, or require additional information regarding this matter, please contact this office Sincerely, K Davis Fennell, PE cc file (810-0611 36") 4 Stormwater Design Narrative and Calculations ' for Ocean Ridge Plantation -Phase 6- Wet Detention Basins in Seasonal High Water Table Prepared for Coastal Communities at Ocean Ridge Plantation 351 Ocean Ridge Parkway SW Ocean Isle Beach, North Carolina 28469 (910) 287-1903 Brunswick County, North Carolina Date February, 2008 Prepared by Cape Fear Engineering, Inc. 151 Poole Road, Suite 100 Belville, NC 28451 (910)383-1044 BACKGROUND Wet detention basins have been widely utilized in eastern North Carolina as a means of providing treatment for storm water runoff from impervious surfaces The wet detention basin is described by the 2007 NCDENR Stormwater BMP Manual as a device that will work well in areas with a shallow water table and poorly drained soils Also from the 2007 NCDENR Stormwater BMP Manual, "In wet detention basins, a permanent pool of standing water is maintained by the riser — the elevated outlet of the wet detention basin " (NCDENR Stormwater BMP Manual, revised 09-28-07, page 10-3) It is generally accepted that siting a wet detention basin in close proximity to wetland areas requires careful study and planning to prevent any adverse hydrologic impacts (dewatenng) of the wetland by the pond It is clear that absent any naturally occurring geology, wet detention basins designed with outlets lower than the wetland elevation may alter wetland hydrology The Ellipse equation is commonly used to evaluate the impact of a drainage feature, such as a pond, ditch, or pipe dram, on the hydrology of adjacent wetlands The Ellipse equation makes the basic assumption that dewatenng will occur due to the drainage feature, and uses that assumption to approximate how long the dewatenng will take and the horizontal distance over which the water table is lowered An excerpt from the USDA/NRCS Part 650 Engineering Field Handbook (Hydrology Tools for Wetland Determination) is attached for reference to the Ellipse equation and its application to drainage features It has been suggested that the Ellipse equation be used to prove that wet detention basins will in fact lower the water table, and to prove that the seasonal high water table will not compromise the storage volume of the temporary pool Because the first assumption of the Ellipse equation is that groundwater will be lowered, this creates a circular argument that cannot be solved Accepting the assumption that ground water will be lowered, the Ellipse equation can be used to approximate the horizontal impact to the water table over a fixed period of time The ellipse equation is written as S = 4K * (m2 +2am) 9 where S = dram spacing or horizontal impact distance (ft) K = hydraulic conductivity (in/hr) m= vertical distance, after drawdown, of water table above dram (ft) a= depth of barrier layer below drains (ft) q = drainage rate (in/hr) The drainage rate (q) is written as v 9=- where q= drainage rate (in/hr) v = drainage porosity (F,ft/fr)) * drawdown depth (c, FT) t = drawdown time Some of the parameters in the ellipse equation require site specific field study to be properly determined For example, to measure the depth of the barrier layer, the hydraulic conductivity, and drainage porosity of the soils at a specific location would require the installation of wells, pump testing and monitonng for analysis For the purposes of this report, conservative estimates of these factors are used to generate the closest possible drain spacing By analyzing the Ellipse equation and performing trials, it is apparent that calculated dram spacing is impacted by parameter as follows When K decreases, drain spacing decreases When in decreases, drain spacing decreases When v increases, q increases, and therefore dram spacing decreases Based on this analysis, assumed values for hydraulic conductivity (K) should be estimated low, the depth to the barrier layer (m) estimated low, and the drainage porosity of the sods (v) should be estimated high to predict the closest possible dram spacing For the purpose of this report, the drawdown time will be held constant at 60 days The first assumption in this analysis is that the seasonal high water table elevation is the design elevation for the existing saturated surface This assumption is extremely conservative in that the seasonal high water table occurs for less than 2 months of the calendar year , and during the rest of a calendar year the water table is significantly lower The soils at Ocean Ridge Phase 6 are a mix of Leon, Murville, and Torhunta among others The hydraulic conductivity of these soils ranges from 2-20 inches per hour as reported in the USDA Soil Survey A hydraulic conductivity of 2 inches per hour (48 inches per day) is assumed for step 2 of the Ellipse equation below The drainage porosity (F, also known as available water capacity) for these soils range from 0 05 to 0 30 in/in (or f /ft) A drainage porosity of 0 30 fr/ft is assumed for this report step 3 of the Ellipse equation below The depth to the confining layer in the surficial aquifers of Brunswick County ranges from 0 to 50 feet The depth to the confining layer is assumed to be 5 feet for step 5 of the Ellipse equation below At Ocean Ridge Phase 6, the greatest proposed change to the water table occurs at Pond # 4, where the pond bank is at elevation 42, seasonal high water table is at elevation 40 90, and the proposed normal pool of the pond is at elevation 35 0, so for step 1 of the Ellipse equation d = 42-35 = 7 feet c=42-409= I I feet Applying the Ellipse equation per the example 19-4 of the attached report, along with the assumption of parameters described above, yields the following STEP m=d—c=7-11=59feet STEP 2 K = 2 in/hr = 48 in/day = 4 ft/day STEP 3 v = F * c, where F = 0 30 ft/ft and c = 1 1 feet v = 0 30*1 1= 0 33 ft STEP 4 q = v/t where v is calculated, t assumed to be 60 days q = 0 33 ft/60 days = 0 0055 ft/day STEP 5 S = 4K* (mz +tam) 4 where K=4 ft/d m=59ft a = 5 ft (assumed) q = 0 0055 ft/d S = 522 feet Given the assumed parameters, the distance between multiple drains is calculated to be 522 feet As this report addresses a wet detention basin as a boundary condition (only 1 dram), the horizontal impact to the water table is one half the value, or 261 feet In other words, over a period of 60 days, the limits of the lowered water table would extend at least 261 feet from the dram CONCLUSIONS For proper application of the Ellipse equation, the assumption that the water table will equalize to the outlet elevation of the riser must be accepted The riser has the ability to discharge water 24 hours a day, 7 days a week, 365 days a year There is no source of water recharge to a pond with the ability to overcome this discharge — the flow out of a properly operating riser structure will always be greater than the flow into the pond, therefore the outlet elevation of the riser will control the water table and will establish the post -construction modified seasonal high water table elevation The design decision to base the normal pool elevation of a wet detention basin on seasonal high water table elevations is extremely conservative, and perhaps misapplied If the permanent pool elevation of the basin is set to equal the seasonal high water table elevation, then the basin will only perform as intended for less than 60 days of the year During the balance of the year, when the water table is below seasonal high, it is possible that the normal pool elevation could be controlled by the water table If this occurs, the permanent pool will be held at an elevation lower than the design depth, the average depth of the pond will be compromised, and functionality of the shelf vegetated with wetland species will be impaired A better solution to this design issue is to design the permanent pool of the pond at an average water table elevation Finally, a clay liner does not prevent the equalization of the basin permanent pool in the water table, it simply extends the process Even with a clay liner, the permanent pool of the basin and the water table will equalize, it will simply take more time Given that the elevations will equalize, it would be better to encourage rather than inhibit the process illllli111i111illllllllll111llllll111 B2?33 P1014I�So4- 19004 Brunswick County, NC Register of Deeds page 1 of 1 Presenter Ret -7 Taal �_ Rev int Ck S i( (�_ Ck # Cash $ Cash $ _ Rnanca G ita nn. 9f docdment are illegible due to conditoo clori, ial P current contains seals vended by anginal ^enMatcannot to reproduced or copied North Carolina Department of The Secretary of State CERTIFICATION OF CONVERSION I, ELAINE F MARSHALL, Secretary of State of the State ofNorth Carolina, do hereby certify that on the 12th day of December, 2007, Articles of Organization Including Articles of Conversion was filed in this office CONVERTING OCEAN ISLE PALMS, INC NC INTO OCEAN ISLE PALMS, LLC NC a limited lability company duly formed under the laws of the State of North Carolina with its period of duration being Perpetual The name of the resulting entity was changed by virtue of said conversion to N/A The effective date of said conversion, if different from the date of filing was N/A The resulting entity has not filed articles of dissolution and continues to be in existence in this State as of the date of this certificate 1 FURTHER certify that this certificate is in compliance with North Carolina General Statutes §47- 18 1 and §5513-26 and may be recorded in the office of the Register of Deeds in the same manner as deeds, the name of the resulting entity appearing in the "Grantee" index Certification# 87544635-1 Reference# 6990401-es Page 1 of I Verify this certificate online at w secretary state ne us/venfication IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal at the City of Raleigh, this 22nd day of January, 2008 Secretary of State Y C200734500170 State of North Carolina Department of the Secretary of State ARTICLES OF ORGANIZATION INCLUDING ARTICLES OF CONVERSION SOSID 0817314 Date Filed 12/12/2007 10 10 00 AM Elaine F Marshall North Carolina Secretar) of State C200734500170 Pursuant to §§ 57C-2-21, 57C-9A-01 and 57C-9A-03 of the General Statutes of North Carolina, the undersigned converting business entity does hereby submit these Articles of Organization including Articles of Conversion for the purpose of forming a limited Lability company The name of the limited Lability company is Ocean Isle Palms, LLC The limited liability company is being fonned pursuant to a conversion of another business entity The name of the converting business entity is Ocean Isle Palms, Inc and the organization and internal affairs of the converting business entity are governed by the laws of the state or country of North Carolina A plan of conversion has been approved by the converting business entity as required by law The converting business entity is a (check one) ® domestic corporation, ❑foreign corporation, ❑ foreign limited liability company, ❑ domestic limited partnership, ❑ foreign limited partnership, ❑ domestic registered limited liability partnership, ❑ foreign limited liability partnership, or ❑ other partnership as defined in G S 59-36, whether or not formed under the laws of North Carolina If the limited liability company is to dissolve by a specific date, the latest date on which the limited liability company is to dissolve (If no date for dissolution is specified, there shall be no limit on the duration of the limited liability company ) The name and address of each person executing these articles of organization is as follows (State whether each person is executing these articles of organization in the capacity of a member organizer or both) Paul M Hattenhauer, Organizer 4401 Barclay Downs Drive, Suite 200 Charlotte, NC 28209 The street address and county of the initial registered office of the limited liability company is Number and Street 131 Ocean Boulevard West City, State, Zip Code Holden Beach, NC 28462 County Brunswick CORPORATIONS DIVISION P O BOX 29622 RALEIGH, NC 27626-0622 (Revised January 2002) (Form L-01A) C200734500170 The mailing address, if different from the street address, of the initial registered office is The name of the initial registered agent is Mark A Saunders Principal office information (Select either a orb) ® The limited liability company has a principal office The street address and county of the principal office of the limited liability company is Number and Street 131 Ocean Boulevard West City, State, Zip Code Holden Beach, NC 28462 County Brunswick • The mailing address, if different from the street address, of the principal office of the limited liability company is b ❑ The limited liability company does not have a principal office 10 Check one of the following ❑ (i) Member -managed LLC all members by virtue of their status as members shall be managers of this limited liability company ® (11) Manager -managed LLC except as provided by N C G S Section 57C-3-20(a), the members of this limited liability company shall not be managers by virtue of their status as members 11 Any other provisions which the limited liability company elects to include are attached 12 These articles will be effective upon filing, unless a date and/or time is specified This is the 6th day of December, 2007 Paul M Hattenhauer, Organizer Type or Print Name and Title 30103-4 297775 NOTES 1 Fling fee is S125 This document must be filed wtIh the Secretary of State CORPORATIONS DIVISION P O BOX 29622 RALEIGH, NC 27626-0622 (Revised January 2002) (Form L-0IA)